Rab Infrastruktur
Rab Infrastruktur
A PEKERJAAN TANAH
1 Pekerjaan penebangan pohon Pohon 251,290.00 25,000.00 6,282,250,000.00
2 Pekerjaan land Clearing humus M2 14,376,379.00 2,500.00 35,940,947,500.00
3 Pekerjaan Galian Tanah M3 7,271,386.00 25,000.00 181,784,650,000.00
4 Pekerjaan Urugan Tanah M3 6,952,885.00 35,000.00 243,350,975,000.00
L PERTAMANAN
1 Perataan Tanah M2 1,933,000.00 5,000.00 9,665,000,000.00
2 Tanaman M2 1,933,000.00 50,000.00 96,650,000,000.00
M LAPANGAN GOLF
1 Pembentukan tanah M2 1,100,000.00 25,000.00 27,500,000,000.00
2 Urugan lapisan tanah humus tebal 10 cm M2 1,100,000.00 15,000.00 16,500,000,000.00
3 Tanaman rumput dan pohon M2 1,100,000.00 75,000.00 82,500,000,000.00
4 Pembuatan danau air ( luas = 2000 M2 dalam 3 M) M3 6,000.00 80,000.00 480,000,000.00
5 Konstruksi area lapangan golf Ls 1.00 10,000,000,000.00 10,000,000,000.00
6 Lapangan Driving Range Ls 1.00 1,000,000,000.00 1,000,000,000.00
7 Bangunan Club House M2 1,000.00 8,000,000.00 8,000,000,000.00
N PAGAR KAWASAN
1 Pagar beton Precast tinggi 220 CM M' 26,000.00 650,000.00 16,900,000,000.00
2 Pagar BRC tinggi 180 CM Pondasi batu gunung M' 15,000.00 1,950,000.00 29,250,000,000.00