PROFIT
HARGA 2019
Kode Nama Tenaga / Barang Satuan
14%
datar
1 2 3 4 5
TENAGA
1 Tukang batu Org 83,000.00
2 Tukang kayu Org 94,000.00
3 Tukang besi Org 88,000.00
4 Tukang pipa Org 83,000.00
5 Tukang cat Org 83,000.00
6 Pekerja Org 72,000.00
7 Kepala Tukang Org 98,000.00
8 Mandor Org 99,000.00
2. 2. BAHAN MATERIAL
2. 2. BAHAN BANGUNAN
2. 2. 1. BAHAN ALAM: PASIR, BATU, KERIKIL, BATA, ASPAL, SEMEN
2. 2. 1. 4 Batu amyang Kg 4,300.00
2. 2. 1. 5 Batu andesit M2 163,700.00
2. 2. 1. 6 Batu andesit bakar M2 190,600.00
2. 2. 1. 7 Batu Andesit alur M2 268,600.00
2. 2. 1. 8 Batu Andesit Alur hitam M2 274,600.00
2. 2. 1. 9 Batu andesit hitam bakar M2 264,100.00
2. 2. 1. 10 Batu andesit hitam M2 213,000.00
2. 2. 1. 14 Batu Bata / Merah Bj 700.00
2. 2. 1. 15 Batu Bobos M2 146,100.00
2. 2. 1. 16 Batu candi M2 141,400.00
2. 2. 1. 17 Batu candi hitam M2 141,400.00
2. 2. 1. 18 Batu granit black gold M2 2,310,000.00
2. 2. 1. 19 Batu granit motif M2 220,100.00
2. 2. 1. 20 Batu guary/batu besar ( uk. Crussher) M3 215,500.00
2. 2. 1. 21 Batu koral putih M2 183,400.00
2. 2. 1. 22 Batu koral sikat M2 179,100.00
2. 2. 1. 23 Batu koral warna M2 190,900.00
2. 2. 1. 24 Batu lempeng M2 111,000.00
2. 2. 1. 25 Batu lempeng hijau M2 109,800.00
2. 2. 1. 26 Batu lempeng coklat M2 75,100.00
2. 2. 1. 27 Batu marmo biasa M2 93,400.00
2. 2. 1. 28 Batu paras putih M2 127,100.00
2. 2. 1. 29 Batu paras grobongan M2 110,100.00
2. 2. 1. 30 Batu pecah 0,5-1 cm M3 256,700.00
2. 2. 1. 31 Batu pecah 1-2 cm M3 283,000.00
2. 2. 1. 32 Batu pecah 2-3 cm M3 257,000.00
2. 2. 1. 33 Batu pecah 3-5 cm M3 256,000.00
2. 2. 1. 34 Batu pecah 5-7 cm M3 250,000.00
2. 2. 1. 35 Batu pecah 8-10 cm M3 250,000.00
2. 2. 1. 36 Batu pecah 10-15 cm (15-20) M3 283,000.00
2. 2. 1. 37 Batu plontos 5/7 cm M3 192,500.00
2. 2. 1. 38 Batu putih / gunung M3 207,500.00
2. 2. 1. 39 Batu putih pecah , 5 - 7 cm M3 185,000.00
2. 2. 1. 40 Batu susun sirih M2 451,000.00
3
2. 2. 1. 41 Batu Volcano 10-15 cm M3 467,500.00
2. 2. 1. 42 Batu warna ( hias ) Zak 93,100.00
2. 2. 1. 45 Kapur Batu ( sirih ) Kg 1,800.00
2. 2. 1. 46 Kapur Batu Kg 1,270,500.00
2. 2. 1. 50 Pasir pasang / beton M3 207,500.00
2. 2. 1. 51 Pasir Urug M3 180,000.00
2. 2. 1. 52 PC / Portland cement Kg 1,230.00
2. 2. 1. 53 Semen Merah M3 150,200.00
2. 2. 1. 54 Semen Putih / warna Kg 3,000.00
2. 2. 1. 55 Sirtu royalti M3 187,000.00
2. 2. 1. 56 Sirtu Urug M3 187,000.00
2. 2. 1. 62 Tanah urug M3 72,500.00
2. 2. 1. 63 Urugan Taman M3 104,500.00
2. 2. 1. 65 Pasir putih halus rit 1,045,000.00
4
2. 2. 2. BAHAN KAYU DAN BAMBU :
2. 2. 2. 2 Bambu (Dia 6 - 8 cm x 600cm) Btg 12,100.00
2. 2. 2. 8 Dolken bambu panjang 3 m Btg 46,200.00
2. 2. 2. 9 Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m Btg 173,300.00
2. 2. 2. 10 HPL Btg 253,000.00
2. 2. 2. 11 Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting Btg 20,800.00
2. 2. 2. 12 Kayu bakar M3 187,000.00
2. 2. 2. 13 Kayu Balau Balok M3 10,725,000.00
2. 2. 2. 14 Kayu Balau Papan M3 11,825,000.00
2. 2. 2. 15 Kayu bekisting M3 2,291,700.00
2. 2. 2. 16 Kayu Jati Balok eks. Bojonegoro M3 30,800,000.00
2. 2. 2. 17 Kayu Jati Balok lokal M3 20,900,000.00
2. 2. 2. 18 Kayu Jati Papan eks. Bojonegoro M3 36,850,000.00
2. 2. 2. 19 Kayu jati papan lokal M3 22,550,000.00
2. 2. 2. 20 Kayu Kamper Balok M3 10,450,000.00
2. 2. 2. 21 Kayu Kamper papan M3 11,550,000.00
2. 2. 2. 28 Kayu Kempas Balok M3 7,425,000.00
2. 2. 2. 29 Kayu Kempas Papan M3 8,525,000.00
2. 2. 2. 30 Kayu Kruing Balok M3 6,875,000.00
2. 2. 2. 31 Kayu Kruing Papan M3 8,772,500.00
2. 2. 2. 32 Kayu Meranti Balok M3 6,050,000.00
2. 2. 2. 33 Kayu Meranti Papan M3 6,050,000.00
2. 2. 2. 34 Kayu Tahun Balok ( Mauni/ Akasia ) M3 4,950,000.00
2. 2. 2. 35 Kayu Tahun papan ( Mauni/akasia) M3 5,225,000.00
2. 2. 2. 36 Kornis kayu jati lebar 10 cm + Finishing m' 110,000.00
5
2. 2. 3. 96 List Profil besar ( gypsum ) M' 23,100
2. 2. 3. 97 List Profil kecil ( gypsum ) M' 17,400
2. 2. 3. 98 Multiplek 6 mm, uk 1,20 x 2,40 m Lbr 94,600
2. 2. 3. 99 Multiplek 9 mm, uk. 1,20 x 2,40 m Lbr 140,800
2. 2. 3. 113 Rangka plafond metal furing M' 13,200
2. 2. 3. 125 Seng Plat BJLS 30 lebar 0,60 m M' 31,400
2. 2. 3. 126 Seng Plat BJLS 30 lebar 0,90 m M' 42,400
2. 2. 3. 138 Tripleks 122 x 244 tbl = 2 mm Lbr 37,400
2. 2. 3. 139 Tripleks 122 x 244 tbl = 3 mm Lbr 51,200
2. 2. 3. 140 Tripleks 122 x 244 tbl = 4 mm Lbr 79,800
2. 2. 3. 141 Tripleks 122 x 244 tbl = 6 mm Lbr 83,100
2. 2. 3. 142 Tripleks 122 x 244 tbl = 9 mm Lbr 133,100
Rangka atap galvalum M2 210,000 239,400
6
2. 2. 4. 56 Pintu Pagar besi holo (20.20.2)mm, Rangka besi holo (50.50.2)mm dicat motif unit 523,300.00
2. 2. 4. 57 Pintu Pagar Besi Tuang Ø14" (komplit) Bh 365,500.00
2. 2. 4. 58 Pintu Pagar Besi Tuang Ø16" (komplit) M2/Psg 487,400.00
Pintu Pagar pipa besi holo (20.20.1)mm, Rangka besi holo (50.50.2)mm dicat
2. 2. 4. 59 motif M2/Psg 460,900.00 525,426
2. 2. 4. 60 Pintu Plat Harmonika M2 1,297,100.00
2. 2. 4. 61 Pintu PVC Lipat (70x210)cm Unit 499,000.00
2. 2. 4. 62 Pintu PVC Polos (70x210)cm Unit 219,500.00
2. 2. 4. 63 Pintu Roling Door aluminium M2 378,800.00
2. 2. 4. 64 Pintu Roling Door besi M2 548,700.00
2. 2. 4. 93 Profil aluminium T (Metal Furring) M' 37,700.00
2. 2. 4. 94 Profil daun pintu almunium coklat / hitam Bh 89,300.00
2. 2. 4. 95 Profil kusen almunium coklat / hitam 4" M' 101,900.00
2. 2. 4. 96 Profil kusen aluminium 4" M' 90,300.00
2. 2. 4. 97 Profil kusen aluminium 4"ykk M2 176,300.00
2. 2. 4. 98 Ralling tangga / grill stainlees Dia 2" M2 / Psg 924,000.00
2. 2. 4. 99 Ralling tangga / pagar besi M2 / Psg 548,700.00
2. 2. 4. 104 Tangga Pipa GI Ǿ 1" Unit 571,800.00
2. 2. 4. 105 Teralis Besi M2 283,600.00
2. 2. 4. 106 Teralis stainlees btg 473,600.00
7
2. 2. 5. 49 Laminate Florring Ex. Germany + Foam sheet M2 630,100
2. 2. 5. 50 Laminate Florring Lokal + Foam sheet M2 236,200
2. 2. 5. 51 List Keramik (10x20)cm Bh 17,400
2. 2. 5. 52 Marmer bakar M2 109,100
2. 2. 5. 53 Marmer Hitam M2 112,600
2. 2. 5. 54 Marmer Putih M2 189,400.00
2. 2. 5. 58 Paving Stone (12x12) 5 warna tebal 6 cm M2 77,000
2. 2. 5. 59 Paving Stone abu - abu t= 8 cm, K225 M2 80,300.00
2. 2. 5. 60 Paving Stone abu - abu t= 6 cm, K225 M2 67,100.00
2. 2. 5. 77 Rooster Beton Uk. 10 x 30 cm Bh 22,000
2. 2. 5. 78 Rooster Beton Uk. 20 x 20 cm M2 22,000
2. 2. 5. 83 Wallpaper ( standart ) Bh 7,500
Keramik tekstur Uk. 25 cm x 25 cm M2 6,200
Keramik dinding 25 x 40 cm M2 66,600
Keramik tekstur Uk. 40 cm x 40 cm M2 60,000
8
2. 2. 6. 26 Meni besi Kg 34,700
2. 2. 6. 27 Minyak bekisting Ltr 5,800
2. 2. 6. 28 Minyak Cat / Thiner A Ltr 30,000
2. 2. 6. 29 Minyak Cat / Thiner B Ltr 16,200
2. 2. 6. 30 Minyak Pelumas Ltr 37,500
2. 2. 6. 31 Minyak Tanah Ltr 12,700
2. 2. 6. 32 Oli Gardan Ltr 40,500
2. 2. 6. 33 Oli rem Ltr 75,100
2. 2. 6. 34 Oli Hidrolis Ltr 30,000
2. 2. 6. 35 Oli Presneleng Ltr 40,500
2. 2. 6. 36 Paint Stone Zak 427,400
2. 2. 6. 37 Plamur kayu Kg 27,200
2. 2. 6. 38 Plamur Tembok Kg 15,600
2. 2. 6. 39 Politur jadi Ltr 55,400
2. 2. 6. 40 Residu ( Ter ) Ltr 5,800
2. 2. 6. 41 Rol kuas Bh 17,400
2. 2. 6. 42 Sabun Kg 11,600
2. 2. 6. 43 Sending impra ( melamine) Kg 67,000
2. 2. 6. 44 Soda api Kg 17,400
2. 2. 6. 45 Spiritus Ltr 16,200
2. 2. 6. 46 Stempet / Gemuk Kg 34,700
2. 2. 6. 47 Teak oil Ltr 8,100
2. 2. 6. 48 Vernis Ltr 40,500
2. 2. 6. 49 Vet Pkt 57,800
2. 2. 6. 50 Water prooffing Kg 75,100
2. 2. 6. 51 Wood filler impra ( dempul jati ) Kg 37,000
2. 2. 6. 52 Wood stain impra ( Pewarna melamine) Kg 69,300
9
2. 2. 7. 51 Kunci Tanam Pintu Antik ex. Miler Bh 236,800
2. 2. 7. 52 Kunci tanam Slot ex.Kuda (2x Putaran) Bh 70,500
2. 2. 7. 56 Selot ( kunci pintu ) merk SES Bh 283,000
2. 2. 7. 58 Slot ( Kunci-kunci pintu ) lokal Bh 95,900
2. 2. 7. 59 Slot Tanam Kamar Mandi Bh 138,600
2. 2. 8. BAHAN SANITAIR :
2. 2. 8. 1 Avor plastik / floor drain Bh 11,200
2. 2. 8. 2 Avor staninlees steel Bh 47,400
2. 2. 8. 3 Bak cuci traso M2 205,000
2. 2. 8. 4 Bak Cuci Stainlesstel (Royal) Bh 253,000
2. 2. 8. 10 Double Kran Dupon Bh 206,800
2. 2. 8. 11 Kloset Duduk Keramik Bh 601,800
10
2. 2. 8. 12 Kloset Duduk Keramik Komplit ex.AMSTAD Bh 2,086,500
2. 2. 8. 13 Kloset Duduk Keramik Komplit ex.INA Bh 1,376,800
2. 2. 8. 14 Kloset Duduk Keramik Komplit ex.TOTO Bh 2,673,200
2. 2. 8. 15 Kloset Jongkok Keramik ex.AMSTAD Bh 237,900
2. 2. 8. 16 Kloset Jongkok Keramik ex.INA Bh 142,700
2. 2. 8. 17 Kloset Jongkok teraso Bh 140,900
2. 2. 8. 18 Kloset Monoblok Lokal Bh 974,300
2. 2. 8. 29 Kran cucian dia 3/4" Bh 75,700.00
2. 2. 8. 30 Kran Dia 1/2 " Bh 27,700.00
2. 2. 8. 31 Kran Dia 3/4 " Bh 32,900.00
2. 2. 8. 32 Kran Dupon Bh 159,900
2. 2. 8. 33 Kran Toto 1/2" Bh 306,700
2. 2. 8. 34 Pipa kurasan plastik Bh 8,700
2. 2. 8. 57 PVC AW Dia 0.5 " ( abu - abu ) M' / bhn 2,900
2. 2. 8. 58 PVC AW Dia 0.75 " ( abu - abu ) M' / bhn 8,700
2. 2. 8. 59 PVC AW Dia 1 " ( abu - abu ) M' / bhn 11,000
2. 2. 8. 60 PVC AW Dia 1,25 " ( abu - abu ) M' / bhn 14,400
2. 2. 8. 61 PVC AW Dia 1,5 " ( abu - abu ) M' / bhn 17,400
2. 2. 8. 62 PVC AW Dia 2 " ( abu - abu ) M' / bhn 20,200
2. 2. 8. 63 PVC AW Dia 2 ,5" ( abu - abu ) M' / bhn 28,900
2. 2. 8. 64 PVC AW Dia 3 " ( abu - abu ) M' / bhn 34,700
2. 2. 8. 65 PVC AW Dia 4 " ( abu - abu ) M' / bhn 52,000
2. 2. 8. 66 PVC AW Dia 5 " ( abu - abu ) M' / bhn 84,400
2. 2. 8. 67 PVC AW Dia 6 " ( abu - abu ) M' / bhn 114,400
2. 2. 8. 113 Shower Dupon Set 209,000 238,260.00
2. 2. 8. 114 Shower toilet Bh 105,000
2. 2. 8. 115 Seal Tape Bh 23,100
2. 2. 8. 116 Stop Kran Dia 1 " Bh 23,700
2. 2. 8. 117 Stop Kran Dia 1/2 " Bh 31,200
2. 2. 8. 118 Stop Kran Dia 3/4 " Bh 20,200
2. 2. 8. 119 Stop kran dia 1" kuningan Bh 80,900
2. 2. 8. 120 Stop kran dia 1" plastik Bh 20,800
2. 2. 8. 121 Stop kran dia 1/2" kuningan Bh 76,800
2. 2. 8. 122 Stop kran dia 3/4" kuningan Bh 59,500
2. 2. 8. 123 Stop Kran Ǿ 1/2" Bh 26,000
2. 2. 8. 124 Tandon Air fiberglass ex.Grand Kap.1.100 Ltr (Profil Tank) Bh 1,430,000 1,630,200.00
2. 2. 8. 125 Tandon Air Fiberglass ex.Grand Kap.800 Ltr (Profil Tank) Bh 1,155,000 1,316,700.00
2. 2. 8. 126 Tandon air stainlees steel kap. 1.000 ltr Bh 3,135,000 3,573,900.00
2. 2. 8. 127 Tandon air stainlees steel kap. 550 ltr Bh 1,815,000.00 2,069,100.00
2. 2. 8. 137 Urinoir Bh 1,148,100
2. 2. 8. 138 Wastafel Besar Warna Muda ex.INA Bh 269,500
2. 2. 8. 139 Wastafel Besar Warna Tua ex.INA Kg 298,700
2. 2. 8. 140 Wiremesh M7 Uk. (2,1x5.4) m Bh 12,800
11
2. 2. 10. BAHAN BETON CETAKAN :
2. 2. 10. 11 Buis Beton 1/2 ø 20 Cm M' 40,500
2. 2. 10. 12 Buis Beton 1/2 ø 30 Cm M' 60,100
2. 2. 10. 13 Buis Beton 1/2 ø 40 Cm M' 63,600
2. 2. 10. 14 Buis Beton ø 100 Cm M' 404,300
2. 2. 10. 15 Buis Beton ø 20 Cm M' 63,600
2. 2. 10. 16 Buis Beton ø 30 Cm M' 86,700
2. 2. 10. 17 Buis Beton ø 40 Cm M' 115,500.00
12
2. 2. 12. BAHAN JENIS PAKU :
2. 2. 12. 1 Paku biasa Kg 16,200.00
2. 2. 12. 2 Paku Eternit / Triplek Kg 20,000.00
2. 2. 12. 3 Paku Gypsum Kg 24,300.00
2. 2. 12. 4 Paku Kalsiboard Kg 27,700.00
2. 2. 12. 5 Paku Kayu Uk.2,5"-5" Kg 15,100.00
2. 2. 12. 6 Paku Reng Kayu 2" Kg 15,600.00
2. 2. 12. 7 Paku Usuk 3" Kg 15,600.00
2. 2. 12. 8 Paku Asbes Kg 27,200.00
2. 2. 12. 9 Paku beton 5cm Bh 600.00
2. 2. 12. 10 Paku Kait ( pancing ) Bh 1,200.00
2. 2. 12. 11 Paku Ramset / dinabolt Bh 2,900.00
2. 2. 12. 12 Paku Sekrup Bh 600.00
2. 2. 12. 13 Paku Seng ( Paku payung ) Kg 26,000.00
2. 2. 12. 14 Paku Sumbat Bh 1,800.00
2. 2. 12. 15 Skrup Fixer Bh 800.00
Tulungagung, 2019
Dibuat oleh :
KONSULTAN PERENCANA
CV. SENTOSA KARYA TEKNIK
13
EDI SANTOSO, ST
Direktur
14
BAHAN ALAM: PASIR, BATU, KERIKIL, BATA, ASPAL, SEMEN
Batu amyang Kg 4,300.00
Batu andesit M2 163,700.00
Batu andesit bakar M2 190,600.00
Batu Andesit alur M2 268,600.00
Batu Andesit Alur hitam M2 274,600.00
Batu andesit hitam bakar M2 264,100.00
Batu andesit hitam M2 213,000.00
Batu Bata / Merah Bj 700.00
Batu Bobos M2 146,100.00
Batu candi M2 141,400.00
Batu candi hitam M2 141,400.00
Batu granit black gold M2 2,310,000.00
Batu granit motif M2 220,100.00
Batu guary/batu besar ( uk. CruM3 215,500.00
Batu koral putih M2 183,400.00
Batu koral sikat M2 179,100.00
Batu koral warna M2 190,900.00
Batu lempeng M2 111,000.00
Batu lempeng hijau M2 109,800.00
Batu lempeng coklat M2 75,100.00
Batu marmo biasa M2 93,400.00
Batu paras putih M2 127,100.00
Batu paras grobongan M2 110,100.00
Batu pecah 0,5-1 cm M3 256,700.00
Batu pecah 1-2 cm M3 283,000.00
Batu pecah 2-3 cm M3 257,000.00
Batu pecah 3-5 cm M3 256,000.00
Batu pecah 5-7 cm M3 250,000.00
Batu pecah 8-10 cm M3 250,000.00
Batu pecah 10-15 cm (15-20) M3 283,000.00
Batu plontos 5/7 cm M3 192,500.00
Batu putih / gunung M3 207,500.00
Batu putih pecah , 5 - 7 cm M3 185,000.00
Batu susun sirih M2 451,000.00
15
Batu Volcano 10-15 cm M3 467,500.00
Batu warna ( hias ) Zak 93,100.00
Kapur Batu ( sirih ) Kg 1,800.00
Kapur Batu Kg 1,270,500.00
Pasir pasang / beton M3 207,500.00
Pasir Urug M3 180,000.00
PC / Portland cement Kg 1,230.00
Semen Merah M3 150,200.00
Semen Putih / warna Kg 3,000.00
Sirtu royalti M3 187,000.00
Sirtu Urug M3 181,300.00
Tanah urug M3 72,500.00
Urugan Taman M3 104,500.00
Pasir putih halus rit 1,045,000.00
16
BAHAN KAYU DAN BAMBU :
Bambu (Dia 6 - 8 cm x 600cm) Btg 12,100.00
Dolken bambu panjang 3 m Btg 46,200.00
Dolken Kayu jati lokal dia 10cm Btg 173,300.00
HPL Btg 253,000.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kaBtg 20,800.00
Kayu bakar M3 187,000.00
Kayu Balau Balok M3 10,725,000.00
Kayu Balau Papan M3 11,825,000.00
Kayu bekisting M3 2,291,700.00
Kayu Jati Balok eks. BojonegoroM3 30,800,000.00
Kayu Jati Balok lokal M3 20,900,000.00
Kayu Jati Papan eks. Bojonegor M3 36,850,000.00
Kayu jati papan lokal M3 22,550,000.00
Kayu Kamper Balok M3 10,450,000.00
Kayu Kamper papan M3 11,550,000.00
Kayu Kempas Balok M3 7,425,000.00
Kayu Kempas Papan M3 8,525,000.00
Kayu Kruing Balok M3 6,875,000.00
Kayu Kruing Papan M3 8,772,500.00
Kayu Meranti Balok M3 6,050,000.00
Kayu Meranti Papan M3 6,050,000.00
Kayu Tahun Balok ( Mauni/ AkasM3 4,950,000.00
Kayu Tahun papan ( Mauni/akasM3 5,225,000.00
Kornis kayu jati lebar 10 cm + Fim' 110,000.00
17
List Profil besar ( gypsum ) M' 23,100
List Profil kecil ( gypsum ) M' 17,400
Multiplek 6 mm, uk 1,20 x 2,40Lbr 94,600
Multiplek 9 mm, uk. 1,20 x 2,40Lbr 140,800
Rangka plafond metal furing M' 13,200
Seng Plat BJLS 30 lebar 0,60 mM' 31,400
Seng Plat BJLS 30 lebar 0,90 m M' 42,400
Tripleks 122 x 244 tbl = 2 mm Lbr 37,400
Tripleks 122 x 244 tbl = 3 mm Lbr 51,200
Tripleks 122 x 244 tbl = 4 mm Lbr 79,800
Tripleks 122 x 244 tbl = 6 mm Lbr 83,100
Tripleks 122 x 244 tbl = 9 mm Lbr 133,100
Rangka atap galvalum M2 200,000
18
Pintu Pagar besi holo (20.20.2) unit 523,300.00
Pintu Pagar Besi Tuang Ø14" (koBh 365,500.00
Pintu Pagar Besi Tuang Ø16" (koM2/Psg 487,400.00
19
Laminate Florring Ex. Germany + M2 630,100
Laminate Florring Lokal + Foam sh M2 236,200
List Keramik (10x20)cm Bh 17,400
Marmer bakar M2 109,100
Marmer Hitam M2 112,600
Marmer Putih M2 189,400.00
Paving Stone (12x12) 5 warna teba M2 77,000
Paving Stone abu - abu t= 8 cm, M2 80,300.00
Paving Stone abu - abu t= 6 cm, M2 67,100.00
Rooster Beton Uk. 10 x 30 cm Bh 22,000
Rooster Beton Uk. 20 x 20 cm M2 22,000
Wallpaper ( standart ) Bh 7,500
Keramik tekstur Uk. 25 cm x 25 cm M2 6,200
Keramik dinding 25 x 40 cm M2 66,600
Keramik tekstur Uk. 40 cm x 40 cm M2 60,000
20
Meni besi Kg 34,700
Minyak bekisting Ltr 5,800
Minyak Cat / Thiner A Ltr 30,000
Minyak Cat / Thiner B Ltr 16,200
Minyak Pelumas Ltr 37,500
Minyak Tanah Ltr 12,700
Oli Gardan Ltr 40,500
Oli rem Ltr 75,100
Oli Hidrolis Ltr 30,000
Oli Presneleng Ltr 40,500
Paint Stone Zak 427,400
Plamur kayu Kg 27,200
Plamur Tembok Kg 15,600
Politur jadi Ltr 55,400
Residu ( Ter ) Ltr 5,800
Rol kuas Bh 17,400
Sabun Kg 11,600
Sending impra ( melamine) Kg 67,000
Soda api Kg 17,400
Spiritus Ltr 16,200
Stempet / Gemuk Kg 34,700
Teak oil Ltr 8,100
Vernis Ltr 40,500
Vet Pkt 57,800
Water prooffing Kg 75,100
Wood filler impra ( dempul jati Kg 37,000
Wood stain impra ( Pewarna meKg 69,300
21
Kunci Tanam Pintu Antik ex. MilBh 236,800
Kunci tanam Slot ex.Kuda (2x PuBh 70,500
Selot ( kunci pintu ) merk SES Bh 283,000
Slot ( Kunci-kunci pintu ) lokal Bh 95,900
Slot Tanam Kamar Mandi Bh 138,600
BAHAN SANITAIR :
Avor plastik / floor drain Bh 11,200
Avor staninlees steel Bh 47,400
Bak cuci traso M2 205,000
Bak Cuci Stainlesstel (Royal) Bh 253,000
Double Kran Dupon Bh 206,800
Kloset Duduk Keramik Bh 601,800
22
Kloset Duduk Keramik Komplit Bh 2,086,500
Kloset Duduk Keramik Komplit eBh 1,376,800
Kloset Duduk Keramik Komplit Bh 2,673,200
Kloset Jongkok Keramik ex.AM Bh 237,900
Kloset Jongkok Keramik ex.INA Bh 142,700
Kloset Jongkok teraso Bh 140,900
Kloset Monoblok Lokal Bh 974,300
Kran cucian dia 3/4" Bh 75,700.00
Kran Dia 1/2 " Bh 27,700.00
Kran Dia 3/4 " Bh 32,900.00
Kran Dupon Bh 159,900
Kran Toto 1/2" Bh 306,700
Pipa kurasan plastik Bh 8,700
PVC AW Dia 0.5 " ( abu - abu ) M' / bhn 2,900
PVC AW Dia 0.75 " ( abu - abu )M' / bhn 8,700
PVC AW Dia 1 " ( abu - abu ) M' / bhn 11,000
PVC AW Dia 1,25 " ( abu - abu )M' / bhn 14,400
PVC AW Dia 1,5 " ( abu - abu ) M' / bhn 17,400
PVC AW Dia 2 " ( abu - abu ) M' / bhn 20,200
PVC AW Dia 2 ,5" ( abu - abu ) M' / bhn 28,900
PVC AW Dia 3 " ( abu - abu ) M' / bhn 34,700
PVC AW Dia 4 " ( abu - abu ) M' / bhn 52,000
PVC AW Dia 5 " ( abu - abu ) M' / bhn 84,400
PVC AW Dia 6 " ( abu - abu ) M' / bhn 114,400
Shower Dupon Set 209,000
Shower toilet Bh 105,000
Slang Spiral Saluran PembuangaBh 25,400
Seal Tape Bh 23,100
Stop Kran Dia 1 " Bh 23,700
Stop Kran Dia 1/2 " Bh 31,200
Stop Kran Dia 3/4 " Bh 20,200
Stop kran dia 1" kuningan Bh 80,900
Stop kran dia 1" plastik Bh 20,800
Stop kran dia 1/2" kuningan Bh 76,800
Stop kran dia 3/4" kuningan Bh 59,500
Stop Kran Ǿ 1/2" Bh 26,000
Tandon Air fiberglass ex.Grand KBh 1,430,000
Tandon Air Fiberglass ex.Grand BKh 1,155,000
Tandon air stainlees steel kap. 1Bh 3,135,000
Tempat Sabun Keramik ex.INA Bh 31,200
Urinoir Bh 1,148,100
Wastafel Besar Warna Muda ex.Bh 269,500
Wastafel Besar Warna Tua ex.INKg 298,700
Wiremesh M7 Uk. (2,1x5.4) m Bh 12,800
Glass bird Kg 49,700.00
Kaca air 5 Cm M2 94,700.00
Kaca bluegreen t=8mm M2 752,000.00
Kaca patry M2 2,505,800.00
Kaca Bening t= 7 mm M2 150,700.00
Kaca Bening t= 10 mm M2 231,000.00
Kaca Buram t=3mm M2 112,600.00
Kaca Es t=3mm M2 115,500.00
Kaca profil (Bevel / moulding) M' 7,500.00
Kaca Ray-band t= 5 mm M2 113,200.00
Kaca Ray-band t= 7 mm M2 176,100.00
23
Tiang pancang 25.25 (k.500) m' 165,000
Buis Beton 1/2 ø 20 Cm M' 36,800
Buis Beton 1/2 ø 30 Cm M' 54,600
Buis Beton 1/2 ø 40 Cm M' 57,800
Buis Beton ø 100 Cm M' 404,300
Buis Beton ø 20 Cm M' 63,600
Buis Beton ø 30 Cm M' 86,700
Waterstop (Lebar 250mm) m 90,600
24
BAHAN JENIS PAKU :
Paku biasa Kg 16,200.00 16,200.00
Paku Eternit / Triplek Kg 20,000.00 20,000.00
Paku Gypsum Kg 24,300.00 24,300.00
Paku Kalsiboard Kg 27,700.00 27,700.00
Paku Kayu Uk.2,5"-5" Kg 15,100.00 15,100.00
Paku Reng Kayu 2" Kg 15,600.00 15,600.00
Paku Usuk 3" Kg 15,600.00 15,600.00
Paku Asbes Kg 27,200.00 27,200.00
Paku beton 5cm Bh 600.00 600.00
Paku Kait ( pancing ) Bh 1,200.00 1,200.00
Paku Ramset / dinabolt Bh 2,900.00 2,900.00
Paku Sekrup Bh 600.00 600.00
Paku Seng ( Paku payung ) Kg 26,000.00 26,000.00
Paku Sumbat Bh 1,800.00 1,800.00
Skrup Fixer Bh 800.00 800.00
Elektroda Kg 156,200.00
Exhaust dinding 20 x 20 cm Unit 334,500
Exhaust dinding 30 x 30 cm Unit 450,000
Exhaust dinding 40 x 40 cm Unit 550,000
Exhaust langit-langit 20/20 cm M' 239,000
Venetion Blinds And Vertical BlinUnit 99,500
Pengukuran ( uitzet ) jalan > 50 per - km 1,100,000.00
25
ANALISA HARGA SATUAN PEKERJAAN
27
A.3.2.1.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.3 Pemasangan 1m3 Pondasi Batu pecah 10-15 cm (15-20) camp. 1SP : 5 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.500 72,000.00 108,000.00
Tukang Batu L.02 OH 0.750 83,000.00 62,250.00
Kepala Tukang L.03 OH 0.075 98,000.00 7,350.00
Mandor L.04 OH 0.075 99,000.00 7,425.00
JUMLAH TENAGA KERJA 185,025.00
B BAHAN
Batu pecah 10-15 cm (15-20) m3 1.200 283,000.00 339,600.00
PC / Portland cement kg 136.000 1,230.00 167,280.00
Pasir pasang / beton m3 0.544 207,500.00 112,880.00
JUMLAH HARGA BAHAN 619,760.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 804,785.00
E Overhead & Profit ( maks 14 % ) 12 % x D 96,574.20
F Harga Satuan Pekerja (D + E ) 901,359.20
28
A.4.1.1.5 Membuat 1m3 beton mutu f'c = 14.5 Mpa (K175) slump (12 ± 2)cm w/c = 0.66
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.650 72,000.00 118,800.00
Tukang Batu L.02 OH 0.275 83,000.00 22,825.00
Kepala Tukang L.03 OH 0.028 98,000.00 2,744.00
Mandor L.04 OH 0.083 99,000.00 8,217.00
JUMLAH TENAGA KERJA 152,586.00
B BAHAN
PC / Portland cement kg 326.000 1,230.00 400,980.00
Pasir pasang / beton kg 0.5429 207,500.00 112,651.75
Batu pecah 2-3 cm kg 0.7622 257,000.00 195,885.40
Air bersih Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 731,017.15
29
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 883,603.15
E Overhead & Profit ( maks 14 % ) 12 % x D 106,032.38
F Harga Satuan Pekerja (D + E ) 989,635.53
A.4.1.1.7 Membuat 1m3 beton mutu f'c = 19.3 Mpa (K225) slump (12 ± 2)cm w/c = 0.58
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.650 72,000.00 118,800.00
Tukang Batu L.02 OH 0.275 83,000.00 22,825.00
Kepala Tukang L.03 OH 0.028 98,000.00 2,744.00
Mandor L.04 OH 0.083 99,000.00 8,217.00
JUMLAH TENAGA KERJA 152,586.00
B BAHAN
PC / Portland cement kg 371.000 1,230.00 456,330.00
Pasir pasang / beton m3 0.4986 207,500.00 103,459.50
Batu pecah 2-3 cm m3 0.7756 257,000.00 199,329.20
Air bersih Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 780,618.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 933,204.70
E Overhead & Profit ( maks 14 % ) 12 % x D 111,984.56
F Harga Satuan Pekerja (D + E ) 1,045,189.26
A.4.1.1.9 Membuat 1m3 beton mutu f'c = 24 Mpa (K275) slump (12 ± 2)cm w/c = 0.53
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.650 72,000.00 118,800.00
Tukang Batu L.02 OH 0.275 83,000.00 22,825.00
Kepala Tukang L.03 OH 0.028 98,000.00 2,744.00
Mandor L.04 OH 0.083 99,000.00 8,217.00
JUMLAH TENAGA KERJA 152,586.00
B BAHAN
PC / Portland cement kg 406.000 1,230.00 499,380.00
Pasir pasang / beton m3 0.4886 207,500.00 101,384.50
Batu pecah 2-3 cm m3 0.7600 257,000.00 195,320.00
Air bersih Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 817,584.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 970,170.50
E Overhead & Profit ( maks 14 % ) 12 % x D 116,420.46
F Harga Satuan Pekerja (D + E ) 1,086,590.96
A.4.1.1.17 Pembesian 10 Kg dengan Besi polos atau ulir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.070 72,000.00 5,040.00
Tukang Besi L.02 OH 0.070 88,000.00 6,160.00
Kepala Tukang L.03 OH 0.007 98,000.00 686.00
Mandor L.04 OH 0.004 99,000.00 396.00
JUMLAH TENAGA KERJA 12,282.00
B BAHAN
Besi Beton / tulangan beton kg 10.500 9,600.00 100,800.00
Kawat Beton / bendraat kg 0.150 19,500.00 2,925.00
JUMLAH HARGA BAHAN 103,725.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 116,007.00
E Overhead & Profit ( maks 14 % ) 12 % x D 13,920.84
30
F Harga Satuan Pekerja (D + E ) 129,927.84
33
Pekerja / Buruh tak terlatih L.01 OH 0.200 72,000.00 14,400.00
Tukang Kayu L.02 OH 0.200 94,000.00 18,800.00
Kepala Tukang L.03 OH 0.020 98,000.00 1,960.00
Mandor L.04 OH 0.001 99,000.00 99.00
JUMLAH TENAGA KERJA 35,259.00
B BAHAN
Seng Plat BJLS 30 lebar 0,90 m m' 1.050 42,400.00 44,520.00
Paku biasa Kg 0.015 16,200.00 243.00
Kayu Tahun papan ( Mauni/akasia) m3 0.019 5,225,000.00 99,275.00
JUMLAH HARGA BAHAN 144,038.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 179,297.00
E Overhead & Profit ( maks 14 % ) 12 % x D 21,515.64
F Harga Satuan Pekerja (D + E ) 200,812.64
D Jumlah( A + B + C ) 28,667.50
E Overhead & Profit ( maks 14 % ) 12 % x D 3,440.10
F Harga Satuan Pekerja (D + E ) 32,107.60
A.4.4.2.27a 1m' Benangan
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.015 72,000.00 1,080.00
Tukang Batu L.02 OH 0.050 83,000.00 4,150.00
JUMLAH TENAGA KERJA 5,230.00
B BAHAN
PC / Portland cement kg 3.750 1,230.00 4,612.50
Pasir pasang / beton m3 0.030 207,500.00 6,225.00
JUMLAH HARGA BAHAN 10,837.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 16,067.50
E Overhead & Profit ( maks 14 % ) 12 % x D 1,928.10
F Harga Satuan Pekerja (D + E ) 17,995.60
B BAHAN
Keramik dinding Uk. 20cm x 33 cm m2 1.050 54,300.00 57,015.00
PC / Portland cement kg 9.300 1,230.00 11,439.00
Pasir pasang / beton m3 0.018 207,500.00 3,735.00
Semen Putih / warna kg 1.940 3,000.00 5,820.00
JUMLAH HARGA BAHAN 78,009.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 189,024.00
E Overhead & Profit ( maks 14 % ) 14 % x D 22,682.88
F Harga Satuan Pekerja (D + E ) 211,706.88
38
A.4.4.3.54B Pemasangan 1m2 Dinding keramik ukuran 25 cm x 40 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.900 72,000.00 64,800.00
Tukang Batu L.02 OH 0.450 83,000.00 37,350.00
Kepala Tukang L.03 OH 0.045 98,000.00 4,410.00
Mandor L.04 OH 0.045 99,000.00 4,455.00
JUMLAH TENAGA KERJA 111,015.00
B BAHAN
Keramik dinding 25 x 40 cm m2 1.060 66,600.00 70,596.00
PC / Portland cement kg 9.300 1,230.00 11,439.00
Pasir pasang / beton m3 0.018 207,500.00 3,735.00
Semen Putih / warna kg 1.940 3,000.00 5,820.00
JUMLAH HARGA BAHAN 91,590.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 202,605.00
E Overhead & Profit ( maks 14 % ) 12 % x D 24,312.60
F Harga Satuan Pekerja (D + E ) 226,917.60
A.4.4.3.58 Pemasangan 1m2 Dinding batu andesit bakar
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.900 72,000.00 64,800.00
Tukang Batu L.02 OH 0.450 83,000.00 37,350.00
Kepala Tukang L.03 OH 0.045 98,000.00 4,410.00
Mandor L.04 OH 0.045 99,000.00 4,455.00
JUMLAH TENAGA KERJA 111,015.00
B BAHAN
Batu andesit bakar m2 1.060 190,600.00 202,036.00
PC / Portland cement kg 9.300 1,230.00 11,439.00
Pasir pasang / beton m3 0.018 207,500.00 3,735.00
Semen Putih / warna kg 1.940 3,000.00 5,820.00
JUMLAH HARGA BAHAN 223,030.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 334,045.00
E Overhead & Profit ( maks 14 % ) 12 % x D 40,085.40
F Harga Satuan Pekerja (D + E ) 374,130.40
39
A.4.5.1.7 Pemasangan 1m2 langit langit gypsum board (120x240x9)mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.100 72,000.00 7,200.00
Tukang Kayu L.02 OH 0.050 94,000.00 4,700.00
Kepala Tukang L.03 OH 0.005 98,000.00 490.00
Mandor L.04 OH 0.005 99,000.00 495.00
JUMLAH TENAGA KERJA 12,885.00
B BAHAN
Gypsum board tebal 9mm ( 1,2 x 2,4 m ) lbr 0.364 76,500.00 27,846.00
Paku Asbes kg 0.110 27,200.00 2,992.00
JUMLAH HARGA BAHAN 30,838.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 43,723.00
E Overhead & Profit ( maks 14 % ) 12 % x D 5,246.76
F Harga Satuan Pekerja (D + E ) 48,969.76
A.4.5.1.7A Pemasangan 1m2 langit langit Calsy board ( uk. 122 x 244 x 0.3 cm )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.100 72,000.00 7,200.00
Tukang Kayu L.02 OH 0.050 94,000.00 4,700.00
Kepala Tukang L.03 OH 0.005 98,000.00 490.00
Mandor L.04 OH 0.005 99,000.00 495.00
JUMLAH TENAGA KERJA 12,885.00
B BAHAN
Calsy bord ( uk. 122 x 244 x 0.3 cm ) lbr 0.364 62,400.00 22,713.60
Paku kalsiboard kg 0.110 27,700.00 3,047.00
JUMLAH HARGA BAHAN 25,760.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 38,645.60
E Overhead & Profit ( maks 14 % ) 12 % x D 4,637.47
F Harga Satuan Pekerja (D + E ) 43,283.07
A.4.5.1.9A Pemasangan 1m' list gypsum Kecil
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.021 72,000.00 1,512.00
Tukang Kayu L.02 OH 0.021 94,000.00 1,974.00
Kepala Tukang L.03 OH 0.002 98,000.00 196.00
Mandor L.04 OH 0.001 99,000.00 99.00
JUMLAH TENAGA KERJA 3,781.00
B BAHAN
List Profil kecil ( gypsum ) m' 1.050 17,400.00 18,270.00
Plamur tembok kg 0.200 15,600.00 3,120.00
JUMLAH HARGA BAHAN 21,390.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 25,171.00
E Overhead & Profit ( maks 14 % ) 12 % x D 3,020.52
F Harga Satuan Pekerja (D + E ) 28,191.52
41
A.4.5.2.4 Pemasangan 1m' bubung
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.400 72,000.00 28,800.00
Tukang Batu L.02 OH 0.200 83,000.00 16,600.00
Kepala Tukang L.03 OH 0.0200 98,000.00 1,960.00
Mandor L.04 OH 0.002 99,000.00 198.00
JUMLAH TENAGA KERJA 47,558.00
B BAHAN
Genteng bubung Mantili ex. Trenggalek / Tulungagung bh 5.000 6,400.00 32,000.00
PC / Portland cement kg 8.000 1,230.00 9,840.00
Pasir pasang / beton m3 0.032 207,500.00 6,640.00
JUMLAH HARGA BAHAN 48,480.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 96,038.00
E Overhead & Profit ( maks 14 % ) 12 % x D 11,524.56
F Harga Satuan Pekerja (D + E ) 107,562.56
A.4.6.1.5b Pembuatan dan Pemasangan 1m2 daun pintu panil kayu balau
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.000 72,000.00 72,000.00
Tukang Kayu L.02 OH 3.000 94,000.00 282,000.00
Kepala Tukang L.03 OH 0.300 98,000.00 29,400.00
Mandor L.04 OH 0.050 99,000.00 4,950.00
JUMLAH TENAGA KERJA 388,350.00
B BAHAN
Kayu Balau Papan m3 0.040 11,825,000.00 473,000.00
Lem ( Kayu + Tembok ) kg 0.050 13,900.00 695.00
JUMLAH HARGA BAHAN 473,695.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 862,045.00
E Overhead & Profit ( maks 14 % ) 12 % x D 103,445.40
F Harga Satuan Pekerja (D + E ) 965,490.40
A.4.6.1.6 Pembuatan dan Pemasangan 1m2 daun pintu dan jendela Kaca kayu jati
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.800 72,000.00 57,600.00
Tukang Kayu L.02 OH 2.400 94,000.00 225,600.00
Kepala Tukang L.03 OH 0.240 98,000.00 23,520.00
Mandor L.04 OH 0.040 99,000.00 3,960.00
JUMLAH TENAGA KERJA 310,680.00
B BAHAN
Kayu jati papan lokal m3 0.024 22,550,000.00 541,200.00
Lem ( Kayu + Tembok ) kg 0.300 13,900.00 4,170.00
JUMLAH HARGA BAHAN 545,370.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 856,050.00
E Overhead & Profit ( maks 14 % ) 12 % x D 102,726.00
F Harga Satuan Pekerja (D + E ) 958,776.00
A.4.6.1.6b Pembuatan dan Pemasangan 1m2 daun pintu dan jendela Kaca kayu balau
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.800 72,000.00 57,600.00
Tukang Kayu L.02 OH 2.400 94,000.00 225,600.00
Kepala Tukang L.03 OH 0.240 98,000.00 23,520.00
Mandor L.04 OH 0.040 99,000.00 3,960.00
43
JUMLAH TENAGA KERJA 310,680.00
B BAHAN
Kayu Balau Papan m3 0.024 11,825,000.00 283,800.00
Lem ( Kayu + Tembok ) kg 0.300 13,900.00 4,170.00
JUMLAH HARGA BAHAN 287,970.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 598,650.00
E Overhead & Profit ( maks 14 % ) 12 % x D 71,838.00
F Harga Satuan Pekerja (D + E ) 670,488.00
44
A.4.6.1.15 Pemasangan 1m3 konstruksi gording kayu kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 6.700 72,000.00 482,400.00
Tukang Kayu L.02 OH 20.100 94,000.00 1,889,400.00
Kepala Tukang L.03 OH 2.010 98,000.00 196,980.00
Mandor L.04 OH 0.335 99,000.00 33,165.00
JUMLAH TENAGA KERJA 2,601,945.00
B BAHAN
Kayu Kruing Balok m3 1.100 6,875,000.00 7,562,500.00
Besi Beugel/Baut kg 15.000 18,700.00 280,500.00
Paku biasa kg 3.000 16,200.00 48,600.00
JUMLAH HARGA BAHAN 7,891,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 10,493,545.00
E Overhead & Profit ( maks 14 % ) 12 % x D 1,259,225.40
F Harga Satuan Pekerja (D + E ) 11,752,770.40
A.4.6.1.16 Pemasangan 1m2 usuk + reng Kayu Kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.100 72,000.00 7,200.00
Tukang Kayu L.02 OH 0.100 94,000.00 9,400.00
Kepala Tukang L.03 OH 0.010 98,000.00 980.00
Mandor L.04 OH 0.005 99,000.00 495.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Kayu Kruing Balok m3 0.014 6,875,000.00 96,250.00
Kayu Kruing Balok m3 0.0036 6,875,000.00 24,750.00
Paku biasa kg 0.250 16,200.00 4,050.00
JUMLAH HARGA BAHAN 125,050.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 143,125.00
E Overhead & Profit ( maks 14 % ) 12 % x D 17,175.00
F Harga Satuan Pekerja (D + E ) 160,300.00
A.4.6.1.19 Pemasangan 1m2 rangka langit langit (50 x 100) cm Kayu Tahun Balok ( Mauni/ Akasia )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
45
Pekerja / Buruh tak terlatih L.01 OH 0.150 72,000.00 10,800.00
Tukang Kayu L.02 OH 0.300 94,000.00 28,200.00
Kepala Tukang L.03 OH 0.030 98,000.00 2,940.00
Mandor L.04 OH 0.075 99,000.00 7,425.00
JUMLAH TENAGA KERJA 49,365.00
B BAHAN
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.015 4,950,000.00 76,230.00
Paku biasa kg 0.200 16,200.00 3,240.00
JUMLAH HARGA BAHAN 79,470.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 128,835.00
E Overhead & Profit ( maks 14 % ) 12 % x D 15,460.20
F Harga Satuan Pekerja (D + E ) 144,295.20
46
A.4.6.1.20 Pemasangan 1m2 rangka langit langit (60 x 60) cm Kayu Tahun Balok ( Mauni/ Akasia )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.200 72,000.00 14,400.00
Tukang Kayu L.02 OH 0.300 94,000.00 28,200.00
Kepala Tukang L.03 OH 0.030 98,000.00 2,940.00
Mandor L.04 OH 0.010 99,000.00 990.00
JUMLAH TENAGA KERJA 46,530.00
B BAHAN
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0163 4,950,000.00 80,685.00
Paku biasa kg 0.250 16,200.00 4,050.00
JUMLAH HARGA BAHAN 84,735.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 131,265.00
E Overhead & Profit ( maks 14 % ) 12 % x D 15,751.80
F Harga Satuan Pekerja (D + E ) 147,016.80
48
A.4.6.2.5 Pemasangan 1 bh engsel pintu
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.015 72,000.00 1,080.00
Tukang Kayu L.02 OH 0.150 94,000.00 14,100.00
Kepala Tukang L.03 OH 0.015 98,000.00 1,470.00
Mandor L.04 OH 0.0008 99,000.00 79.20
JUMLAH TENAGA KERJA 16,729.20
B BAHAN
Engsel Pintu (Arch ) nylon bh 1.000 9,800.00 9,800.00
JUMLAH HARGA BAHAN 9,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 26,529.20
E Overhead & Profit ( maks 14 % ) 12 % x D 3,183.50
F Harga Satuan Pekerja (D + E ) 29,712.70
A.4.6.2.6 Pemasangan 1 bh engsel jendela
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.010 72,000.00 720.00
Tukang Kayu L.02 OH 0.100 94,000.00 9,400.00
Kepala Tukang L.03 OH 0.010 98,000.00 980.00
Mandor L.04 OH 0.0005 99,000.00 49.50
JUMLAH TENAGA KERJA 11,149.50
B BAHAN
Engsel Jendela (Arch ) bh 1.000 17,400.00 17,400.00
JUMLAH HARGA BAHAN 17,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 28,549.50
E Overhead & Profit ( maks 14 % ) 12 % x D 3,425.94
F Harga Satuan Pekerja (D + E ) 31,975.44
A.4.6.2.7 Pemasangan 1 set hak angin
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.100 72,000.00 7,200.00
Tukang Kayu L.02 OH 0.200 94,000.00 18,800.00
Kepala Tukang L.03 OH 0.020 98,000.00 1,960.00
Mandor L.04 OH 0.0005 99,000.00 49.50
JUMLAH TENAGA KERJA 28,009.50
B BAHAN
Hak Angin bh 1.000 17,400.00 17,400.00
JUMLAH HARGA BAHAN 17,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 45,409.50
E Overhead & Profit ( maks 14 % ) 12 % x D 5,449.14
F Harga Satuan Pekerja (D + E ) 50,858.64
A.4.6.2.8 Pemasangan 1 bh Grendel jendela
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.010 72,000.00 720.00
Tukang Kayu L.02 OH 0.100 94,000.00 9,400.00
Kepala Tukang L.03 OH 0.010 98,000.00 980.00
Mandor L.04 OH 0.0005 99,000.00 49.50
JUMLAH TENAGA KERJA 11,149.50
B BAHAN
Grendel jendela merk SES bh 1.000 23,700.00 23,700.00
49
JUMLAH HARGA BAHAN 23,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 34,849.50
E Overhead & Profit ( maks 14 % ) 12 % x D 4,181.94
F Harga Satuan Pekerja (D + E ) 39,031.44
A.4.7.1.5 1m2 pengecatan bidang kayu baru (1lapis plamur, 1lapis cat dasar , 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.070 72,000.00 5,040.00
Tukang cat L.02 OH 0.105 83,000.00 8,715.00
Kepala Tukang L.03 OH 0.004 98,000.00 392.00
Mandor L.04 OH 0.0030 99,000.00 297.00
JUMLAH TENAGA KERJA 14,444.00
B BAHAN
Cat Meny kayu kg 0.200 27,200.00 5,440.00
Plamur kayu kg 0.150 27,200.00 4,080.00
Cat Dasar Kayu kg 0.170 30,600.00 5,202.00
Cat Kayu kg 0.350 64,100.00 22,435.00
Kuas 3 " bh 0.010 15,100.00 151.00
Minyak Cat / Thiner B kg 0.030 16,200.00 486.00
Kertas gosok ( rempelas ) lbr 0.200 3,500.00 700.00
JUMLAH HARGA BAHAN 38,494.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 52,938.00
E Overhead & Profit ( maks 14 % ) 12 % x D 6,352.56
F Harga Satuan Pekerja (D + E ) 59,290.56
A.4.7.1.10 1m2 pengecatan tembok baru (1lapis plamur, 1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 72,000.00 1,440.00
Tukang cat L.02 OH 0.063 83,000.00 5,229.00
Kepala Tukang L.03 OH 0.0063 98,000.00 617.40
Mandor L.04 OH 0.0030 99,000.00 297.00
JUMLAH TENAGA KERJA 7,583.40
B BAHAN
Plamur Tembok kg 0.100 15,600.00 1,560.00
Cat Tembok kg 0.100 24,300.00 2,430.00
Cat Tembok kg 0.260 24,300.00 6,318.00
JUMLAH HARGA BAHAN 10,308.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 17,891.40
E Overhead & Profit ( maks 14 % ) 12 % x D 2,146.97
F Harga Satuan Pekerja (D + E ) 20,038.37
A.4.7.1.10b 1m2 pengecatan tembok baru (1lapis plamur, 1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
52
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 72,000.00 1,440.00
Tukang cat L.02 OH 0.063 83,000.00 5,229.00
Kepala Tukang L.03 OH 0.0063 98,000.00 617.40
Mandor L.04 OH 0.0030 99,000.00 297.00
JUMLAH TENAGA KERJA 7,583.40
B BAHAN
Plamur Tembok kg 0.100 15,600.00 1,560.00
Cat Tembok interior premium kg 0.100 54,900.00 5,490.00
Cat Tembok interior premium kg 0.260 54,900.00 14,274.00
JUMLAH HARGA BAHAN 21,324.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 28,907.40
E Overhead & Profit ( maks 14 % ) 12 % x D 3,468.89
F Harga Satuan Pekerja (D + E ) 32,376.29
A.4.7.1.10c 1m2 pengecatan tembok baru (1lapis plamur, 1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 72,000.00 1,440.00
Tukang cat L.02 OH 0.063 83,000.00 5,229.00
Kepala Tukang L.03 OH 0.0063 98,000.00 617.40
Mandor L.04 OH 0.0030 99,000.00 297.00
JUMLAH TENAGA KERJA 7,583.40
B BAHAN
Plamur Tembok kg 0.100 15,600.00 1,560.00
Cat Tembok exterior wheathershield kg 0.100 121,300.00 12,130.00
Cat Tembok exterior wheathershield kg 0.260 121,300.00 31,538.00
JUMLAH HARGA BAHAN 45,228.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 52,811.40
E Overhead & Profit ( maks 14 % ) 12 % x D 6,337.37
F Harga Satuan Pekerja (D + E ) 59,148.77
A.4.7.1.11 1m2 pengecatan tembok lama (1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.028 72,000.00 2,016.00
Tukang cat L.02 OH 0.042 83,000.00 3,486.00
Kepala Tukang L.03 OH 0.0042 98,000.00 411.60
Mandor L.04 OH 0.0030 99,000.00 297.00
JUMLAH TENAGA KERJA 6,210.60
B BAHAN
Cat Tembok kg 0.120 24,300.00 2,916.00
Cat Tembok kg 0.180 24,300.00 4,374.00
JUMLAH HARGA BAHAN 7,290.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 13,500.60
E Overhead & Profit ( maks 14 % ) 12 % x D 1,620.07
F Harga Satuan Pekerja (D + E ) 15,120.67
53
Cat Tembok kg 0.100 24,300.00 2,430.00
Cat Tembok kg 0.260 24,300.00 6,318.00
JUMLAH HARGA BAHAN 8,748.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 16,331.40
E Overhead & Profit ( maks 14 % ) 12 % x D 1,959.77
F Harga Satuan Pekerja (D + E ) 18,291.17
55
JUMLAH HARGA BAHAN 365,195.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 592,585.00
E Overhead & Profit ( maks 14 % ) 12 % x D 71,110.20
F Harga Satuan Pekerja (D + E ) 663,695.20
A.5.1.1.12 Pemasangan 1 bh bak cuci piring stainlesssteel
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.030 72,000.00 2,160.00
Tukang Batu L.02 OH 0.300 83,000.00 24,900.00
Kepala Tukang L.03 OH 0.0300 98,000.00 2,940.00
Mandor L.04 OH 0.0150 99,000.00 1,485.00
JUMLAH TENAGA KERJA 31,485.00
B BAHAN
Bak Cuci Stainlesstel (Royal) unit 1.000 253,000.00 253,000.00
kran cucian bh 1.000 68,800.00 68,800.00
JUMLAH HARGA BAHAN 321,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 353,285.00
E Overhead & Profit ( maks 14 % ) 12 % x D 42,394.20
F Harga Satuan Pekerja (D + E ) 395,679.20
A.5.1.1.14 Pemasangan 1 bh floor drain
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.010 72,000.00 720.00
Tukang Batu L.02 OH 0.100 83,000.00 8,300.00
Kepala Tukang L.03 OH 0.0100 98,000.00 980.00
Mandor L.04 OH 0.0050 99,000.00 495.00
JUMLAH TENAGA KERJA 10,495.00
B BAHAN
Avor staninlees steel unit 1.000 47,400.00 47,400.00
JUMLAH HARGA BAHAN 47,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 57,895.00
E Overhead & Profit ( maks 14 % ) 12 % x D 6,947.40
F Harga Satuan Pekerja (D + E ) 64,842.40
59
60
61
62
63
Pemasangan 1m' plint keramik ukuran 10 cm x 40 cm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh taL.01 OH 0.090 68,500.00 6,165.00
Tukang Batu L.02 OH 0.090 79,000.00 7,110.00
Kepala Tukang L.03 OH 0.035 93,500.00 3,272.50
Mandor L.04 OH 0.005 94,500.00 472.50
JUMLAH TENAGA KERJA 17,020.00
B BAHAN
List Keramik (10x40)cm m' 4.00 5,200.00 20,800.00
PC / Portland cement kg 1.240 1,400.00 1,736.00
Pasir pasang / beton m3 0.003 264,000.00 792.00
JUMLAH HARGA BAHAN 23,328.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 40,348.00
64
E Overhead & Profit ( maks 14 % ) 14 % x D 5,648.72
F Harga Satuan Pekerja (D + E ) 45,996.72
Pemasangan 1m2 Dinding keramik ukuran 20 cm x 25 cm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh taL.01 OH 0.900 68,500.00 61,650.00
Tukang Batu L.02 OH 0.450 79,000.00 35,550.00
Kepala Tukang L.03 OH 0.045 93,500.00 4,207.50
Mandor L.04 OH 0.045 94,500.00 4,252.50
JUMLAH TENAGA KERJA 105,660.00
B BAHAN
Keramik dinding motif Uk. 2 m2 1.060 64,700.00 68,582.00
PC / Portland cement kg 9.300 1,400.00 13,020.00
Pasir pasang / beton m3 0.018 264,000.00 4,752.00
Semen Putih / warna kg 1.940 3,000.00 5,820.00
JUMLAH HARGA BAHAN 92,174.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 197,834.00
65
66
Pekerja / Buruh tak 1.2.7.10 oh 7.0000 65,000.00 455,000.00
Tukang kayu 1.2.7.19 oh 21.0000 85,000.00 1,785,000.00
Kepala Tukang 1.2.7.3 oh 2.1000 85,000.00 178,500.00
Mandor 1.2.7.5 oh 0.3500 90,000.00 31,500.00
67
Pekerja / Buruh tak 1.2.7.10 oh 1.0000 65,000.00 65,000.00
Tukang kayu 1.2.7.19 oh 3.0000 85,000.00 255,000.00
Kepala Tukang 1.2.7.3 oh 0.3000 85,000.00 25,500.00
Mandor 1.2.7.5 oh 0.0500 90,000.00 4,500.00
68
Pekerja / Buruh tak 1.2.7.10 oh 0.0600 65,000.00 3,900.00
Tukang kayu 1.2.7.19 oh 0.6000 85,000.00 51,000.00
Kepala Tukang 1.2.7.3 oh 0.0600 85,000.00 5,100.00
Mandor 1.2.7.5 oh 0.0030 90,000.00 270.00
69
Pemasangan grendel jendela merk SES
70
Grendel jendela m 2.2.7.25 bh 1.0000 21,500.00 21,500.00
10,045.00 21,500.00 - 31,545.00
0.1400 1,406.30 3,010.00 - 4,416.30
11,451.30 24,510.00 - 35,961.30
71
Pekerja / Buruh tak 1.2.7.10 Oh 0.0200 65,000.00 1,300.00
Tukang cat 1.2.7.18 Oh 0.0630 75,000.00 4,725.00
Kepala Tukang 1.2.7.3 Oh 0.0063 85,000.00 535.50
Mandor 1.2.7.5 Oh 0.0030 90,000.00 270.00
72
6,830.50 5,746.00 - 12,576.50
0.1400 956.27 804.44 - 1,760.71
7,786.77 6,550.44 - 14,337.21
73
Pekerja / Buruh tak 1.2.7.10 oh 1.0000 65,000.00 65,000.00
Tukang batu 1.2.7.16 oh 1.5000 75,000.00 112,500.00
Kepala Tukang 1.2.7.3 oh 0.1500 85,000.00 12,750.00
Mandor 1.2.7.5 oh 0.1600 90,000.00 14,400.00
74
0.1400 28,686.00 46,662.00 - 75,348.00
233,586.00 379,962.00 - 613,548.00
75
BACK UP PERHITUNGAN VOLUME PEKERJAAN
II PEKERJAAN TANAH
1 Galian tanah 1.20 x 1.20 x 1.70 x 29 = 70.99
1.00 x 1.00 x 1.70 x 19 = 32.30
0.70 x 0.75 x 70.00 = 36.75 +
140.04 = 140.04 m3
2 Pas. Pondasi batu kali 1 : 5 0.6 + 0.25 x 0.6 x 70.00 = 17.85 = 17.85 m3
2
3 Pas. Bata merah 1/2 bata cam 1:3 0.3 x 158.00 - 13.52 = 43.34 = 43.34 m2
77
8 Benangan kolom 3.50 x 4 x 30 = 420.00
p1 6.24 x 2 x 5 = 62.40
p2 5.54 x 2 x 8 = 88.64
p3 5.54 x 2 x 7 = 77.56
j1 4.68 x 2 x 40 = 374.40
j2 3.16 x 2 x 6 = 37.92
bv1 2.88 x 2 x 5 = 28.80
lubang angin 0.50 x 2 x 69 = 69.00
overstek 49.70 x 2 = 99.40 +
1,258.12 = 1,258.12 m'
2 sloof
Membuat Beton 0.15 x 0.30 x 169.00 - 0.16 = 7.45 +
7.45 = 7.45 m3
Pembesian
Ø6 selimut beton 2 cm 0.86 x 1128 x 0.222 = 215.36
Ø 12 169.20 x 6 x 0.888 = 901.50 +
1,116.86 = 1,116.86 kg
Membuat Bekisting 2x = 50.70 m2
0.30 x 2 x 169.00 = 101.40 x 0.50 = 50.70
Membuat Bekisting ( ongkos tenaga ) 0.30 x 2 x 169.00 = 101.40 x 0.50 = 50.70 = 50.70 m2
Membongkar begisting dan menyiram beton = 7.45 m3
3 kolom
Membuat Beton 0.25 x 0.30 x 5.70 x 29 = 12.40
0.20 x 0.30 x 5.70 x 19 = 6.50 +
18.90 = 18.90 m3
Pembesian
Ø8 selimut beton 2 cm 1.06 x 47 x 0.395 x 29 = 570.69
Ø 16 6.20 x 8 x 1.578 x 29 = 2,269.80
Ø6 selimut beton 2 cm 0.96 x 39 x 0.222 x 19 = 157.92
Ø 14 6.20 x 6 x 1.578 x 19 = 1,115.33 +
4,113.74 = 4,113.74 Kg
4 balok
Beton 0.25 x 0.40 x 112.00 - 4.49 = 6.71
0.20 x 0.30 x 71.00 - 2.35 = 1.91
0.15 x 0.25 x 46.00 - 0.83 = 0.90
0.15 x 0.20 x 11.00 - 0.20 = 0.13 +
9.65 = 9.65 m3
Pembesian
Ø8 1.18 x 816 x 0.395 = 380.34
Ø 16 112.10 x 8 x 1.578 = 1,415.15
Ø 10 112.10 x 2 x 0.616 = 138.11
Ø8 0.88 x 517 x 0.395 = 179.71
Ø 14 72.00 x 8 x 1.208 = 695.81
Ø 10 72.00 x 2 x 0.616 = 88.70
Ø6 0.68 x 308 x 0.222 = 46.50
Ø 10 47.00 x 6 x 0.616 = 173.71
79
Ø6 0.58 x 74 x 0.222 = 9.53
Ø 10 11.50 x 4 x 0.616 = 28.34 +
3155.90 = 3,155.90 Kg
Membuat Bekisting 2x
0.28 x 2 x 112.00 - 3.92 = 58.80
0.18 x 2 x 71.00 - 1.47 = 24.09
0.08 x 2 x 46.00 - 0.19 = 7.17
0.08 x 2 x 11.00 - 0.13 = 1.63 +
91.68 = 91.68 m2
91.68 x 1.00 = 91.68
Membuat Bekisting ( ongkos tenaga ) 91.68 x 0.00 = 0.00 = 0.00 m2
Membongkar begisting dan menyiram beton = 9.65 m3
5 dak
Beton 19.20 x 11.25 x 0.12 = 25.92
5.00 x 15.20 x 0.12 = 9.12
3.15 x 3.15 x 0.12 = 1.19 +
36.23 = 36.23 m3
Pembesian
Ø8 19.20 x 57 x 0.395 x 2 = 864.58
Ø8 11.25 x 97 x 0.395 x 2 = 862.09
Ø 8 extra 1.00 x 116 x 0.395 = 45.82
Ø 8 extra 1.00 x 196 x 0.395 = 77.42
Ø8 5.00 x 77 x 0.395 x 2 = 304.15
Ø8 15.20 x 26 x 0.395 x 2 = 312.21
Ø 8 extra 1.00 x 78 x 0.395 = 30.81
Ø 8 extra 1.00 x 27 x 0.395 = 10.67
Ø8 3.15 x 17 x 0.395 x 1 = 21.15
Ø8 3.15 x 17 x 0.395 x 1 = 21.15 +
2550.05 = 2,550.05 Kg
Membuat Bekisting
19.20 x 11.25 - 43.85 = 172.15
5.00 x 15.20 = 76.00
3.15 x 3.15 = 9.92 +
258.07 = 258.07 m2
258.07 x 1.00 = 258.07
Membuat Bekisting ( ongkos tenaga ) 258.07 x 0.00 = 0.00 = 0.00 m2
Membongkar begisting dan menyiram beton = 36.23 m3
6 Balok bordes
Beton 0.15 x 0.25 x 12.00 = 0.45
0.45 = 0.45 m3
Pembesian
Ø8 0.68 x 81 x 0.395 = 21.76
Ø 12 12.20 x 6 x 0.888 = 65.00
86.76 = 86.76 Kg
Membuat Bekisting 2x
0.13 x 2 x 12.00 x 0.50 = 1.56
1.56 = 1.56 m2
Membuat Bekisting ( ongkos tenaga ) = 1.56 m2
Membongkar begisting dan menyiram beton = 0.45 m3
7 Plat tangga
Beton 5.50 x 3.00 x 0.12 = 1.98
0.35 x 0.18 x 1.50 x 20 x 0.50 = 0.95 +
2.93 = 2.93 m3
Pembesian
Ø8 5.50 x 25 x 0.395 x 2 = 108.63
Ø8 3.00 x 45 x 0.395 x 2 = 106.65
Ø8 0.58 x 13 x 0.395 x 20 = 59.57
80
Ø8 1.60 x 5 x 0.395 x 20 = 63.20
338.05 = 338.05 Kg
Membuat Bekisting
5.50 x 3.00 = 16.50
0.18 x 1.50 x 20 = 5.40 +
21.90 = 21.90 m2
Membongkar begisting dan menyiram beton = 2.93 m3
A BETON K175
1 sloof
Membuat Beton 0.15 x 0.20 x 22.00 = 0.66 +
0.66 = 0.66 m3
Pembesian
Ø6 selimut beton 2 cm 0.66 x 148 x 0.222 = 21.68
Ø 10 22.20 x 4 x 0.616 = 54.70 +
76.38 = 76.38 kg
Membuat Bekisting 2x = 4.40 m2
0.20 x 2 x 22.00 = 8.80 x 1.00 = 8.80 +
bekisting 8.80 x 0.5 = 4.40
Membuat Bekisting ( ongkos tenaga ) 8.80 x 0.5 = 4.40 = 4.40 m2
Membongkar begisting dan menyiram beton = 0.66 m3
2 kolom
Membuat Beton
lt1 0.15 x 0.15 x 4.00 x 9 = 0.81
lt2 0.15 x 0.25 x 3.75 x 15 = 2.11
lt2 0.15 x 0.20 x 3.75 x 22 = 2.48
lt2 0.15 x 0.15 x 3.75 x 6 = 0.51
lt2 0.15 x 0.15 x 1.00 x 7 = 0.16 +
6.07 = 6.07 m3
Pembesian
Ø6 selimut beton 2 cm 0.56 x 26 x 0.222 x 9 = 29.09
Ø 10 4.50 x 4 x 0.616 x 9 = 99.79
Ø6 selimut beton 2 cm 0.76 x 26 x 0.222 x 15 = 65.80
Ø 12 3.95 x 6 x 0.888 x 15 = 315.68
Ø6 selimut beton 2 cm 0.66 x 26 x 0.222 x 22 = 83.81
Ø 10 3.95 x 4 x 0.616 x 22 = 214.12
Ø6 selimut beton 2 cm 0.56 x 26 x 0.222 x 6 = 19.39
Ø 10 3.95 x 4 x 0.616 x 6 = 58.40
Ø6 selimut beton 2 cm 0.56 x 8 x 0.222 x 7 = 6.96
Ø 10 1.20 x 4 x 0.616 x 7 = 20.70 +
913.74 = 913.74 Kg
81
Membuat Bekisting 2x
0.30 x 4.00 x 9 = 10.80
0.50 x 3.75 x 15 = 28.13
0.40 x 3.75 x 22 = 33.00
0.30 x 3.75 x 6 = 6.75
0.30 x 1.00 x 7 = 2.10 +
80.78
bekisting 80.78 x 0.50 = 40.39 = 40.39 m2
Membuat Bekisting ( ongkos tenaga ) 80.78 x 0.50 = 40.39 = 40.39 m2
Membongkar begisting dan menyiram beton = 6.07 m3
3 balok
Beton 0.15 x 0.25 x 33.00 = 1.24
1.24 = 1.24 m3
Pembesian
Ø6 0.68 x 221 x 0.222 = 33.36
Ø 10 33.20 x 6 x 0.616 = 122.71 +
156.07 = 156.07 Kg
Membuat Bekisting 2x 0.13 x 2 x 33.00 x 0.50 = 4.29
4.29 x 0.50 = 2.15 = 2.15 m2
Membuat Bekisting ( ongkos tenaga ) 4.29 x 0.50 = 2.15 = 2.15 m2
Membongkar begisting dan menyiram beton = 1.24 m3
4 Dak
Beton 3.00 x 4.00 x 0.10 = 1.20
3.50 x 5.50 x 0.10 = 1.93 +
3.13 = 3.13 m3
Pembesian
Ø8 3.10 x 33 x 0.395 = 40.41
Ø8 4.10 x 25 x 0.395 = 40.49
Ø8 3.60 x 45 x 0.395 = 63.99
Ø8 5.60 x 29 x 0.395 = 64.15 +
209.04 = 209.04 Kg
Membuat Bekisting 2x
3.00 x 4.00 x 1.00 = 12.00
3.50 x 5.50 x 1.00 = 19.25 +
31.25 = 31.25 m2
Membuat Bekisting ( ongkos tenaga ) = 31.25 m2
Membongkar begisting dan menyiram beton = 3.13 m3
7 Ring balok
Beton 0.15 x 0.15 x 155.50 = 3.50
3.50 = 3.50 m3
Pembesian
Ø6 0.48 x 1038 x 0.222 = 110.61
Ø 10 155.60 x 4 x 0.616 = 383.40 +
494.01 = 494.01 Kg
Membuat Bekisting 2x
0.30 x 1 x 155.50 x 1.00 = 46.65
84
IX PEKERJAAN KERAMIK DAN BATU HIAS
1 Pas. Keramik lantai 40 x 40 cm motif
LT1 r.tunggu 4.85 x 14.85 = 72.02
2.35 x 6.00 = 14.10
bawah tangga 2.85 x 5.35 = 15.25
depan km 1.00 x 2.85 = 2.85
bp 2.85 x 5.85 = 16.67
tindakan 3.35 x 5.85 = 19.60
gizi 2.85 x 5.85 = 16.67
laborat 2.85 x 5.85 = 16.67
gigi 4.85 x 3.85 = 18.67
steril 2.85 x 3.85 = 10.97
promkes 2.85 x 3.85 = 10.97
loket/rekam medik 2.85 x 4.85 = 13.82
apotek/ gudang obat 2.85 x 4.85 = 13.82
Kia 3.35 x 4.85 = 16.25
imunisasi 2.35 x 4.85 = 11.40
tangga 0.53 x 1.50 x 20 = 15.90
bordes 1.50 x 2.85 = 4.28
LT2 r.tunggu 2.85 x 6.35 = 18.10
2.85 x 8.35 = 23.80
pantry 2.35 x 2.85 = 6.70
r. dokter 2.85 x 2.85 = 8.12
r. kepala 2.85 x 2.85 = 8.12
balkon 2.85 x 2.50 = 7.13
r.admin 7.85 x 5.85 = 45.92
r.rapat 4.85 x 8.85 = 42.92
r. arsip 3.85 x 6.35 = 24.45
gudang 2.85 x 3.85 = 10.97
depan km 1.35 x 2 = 2.70
bawah pintu 0.15 x 23.8 = 3.57 +
492.41 = 492.41 m2
85
X PEKERJAAN LISTRIK
1 Pas. Instalasi lampu = 63.00 titik
2 Pas. Instalasi stop kontak = 39.00 titik
3 Pas. Stop kontak = 39.00 bh
4 Pas. Saklar ganda = 23.00 bh
5 Pas. Saklar tunggal = 16.00 bh
6 Pas. Saklar hotel (tangga) = 1.00 set
7 Pas. Lampu led 10 w = 45.00 bh
8 Pas. Lampu led 5 w = 7.00 bh
9 Pas. Lampu spot 20 w = 1.00 bh
10 Pas. Downlight = 10.00 bh
11 Pas. Panel group = 2.00 bh
12 Operspanning = 1.00 bh
13 Pas. Groud = 3.00 bh
14 Pas. Kabel penangkal petir = 32.80 m'
86
XI PEKERJAAN SANITASI
1 Pas. Pipa 1/2 '' = 26.50 m'
2 Pas. Pipa 1.5 '' = 48.40 m'
3 Pas. Pipa 2.5 '' = 24.00 m'
4 Pas. Pipa 3 '' air kotor ke jalur ipal = 39.80 m'
5 Pas. Pipa 4 '' = 24.80 m'
6 Pas. Klosed jongkok = 4.00 bh
7 Pas. Klosed duduk monoblok = 1.00 bh
8 Pas. Wastafel lengkap = 2.00 bh
9 Pas. Kran air = 6.00 bh
10 Pas. Shower toilet = 1.00 bh
11 Pas. Avoor stainlesssteel = 5.00 bh
12 Pas. Tandon air kapasitas 1000 liter fiberglass = 1.00 bh
13 Pas. Pompa air = 1.00 bh
14 Buat sumur bor = 1.00 bh
15 Buat septictank = 1.00 bh
II PEKERJAAN PASANGAN
1 Pas. Batu kosong/aanstampeng 0.6 x 0.15 x 71.92 = 6.47 = 6.47 m3
2 Pas. Pondasi batu kali 1 : 5 0.25 + 0.50 x 0.5 x 71.92 = 13.49 = 13.49 m3
2
3 Pas. Bata merah 1/2 bata cam 1:3 0.30 x 65.92 - 9.78 = 16.84 = 16.84 m2
4 Pas. Bata merah 1/2 bata cam 1:5 2.60 x 65.92 = 171.39
pengurangan
penebalan 5 x 3 = 15.00
p1 1.4 x 1.90 x 2 = 5.32
p2 0.92 x 1.90 x 3 = 5.24
pj2 1.02 x 1.90 x 1 = 1.94
1.32 x 0.96 x 1 = 1.27
87
j1 1.38 x 1.35 x 2 = 3.73
j2 0.72 x 1.35 x 1 = 0.97
J4 0.72 x 0.96 x 2 = 1.38
bv 0.72 x 0.52 x 1 = 0.37
p3 0.8 x 2.00 x 4 = 6.40 +
41.62
171.39 - 41.62 = 129.77 = 129.77 m2
5 Pas. Bata merah 1 bata cam 1:5 5 x 3 = 15.00 = 15.00 m2
6 Plesteran cam 1:3 tebal 15 mm 16.84 x 2 = 33.68 = 33.68 m2
7 Plesteran cam 1:5 tebal 15 mm 129.77 x 2 = 259.54
15.00 x 2 = 30.00 +
289.54
kramik 38.80 + 6.72 45.52 -
244.02 = 244.02 m2
88
4 Pas. Kunci tanam ex ses = 5.00 bh
5 Pas. Kunci selot ex ses 5 = 5.00 bh
6 Pas. Grendel tanam 5 = 5.00 bh
7 Pas. Engsel pintu 5 x 3 = 15.00 = 15.00 bh
8 Pas. Engsel floring 5 x 2 = 10.00 = 10.00 bh
9 Pas. Engsel jendela 15 x 2 = 30.00 = 30.00 bh
10 Pas. Windhak ex ses 15 x 1 = 15.00 = 15.00 set
11 Pas. Grendel jendela ex ses 15 x 1 = 15.00 = 15.00 bh
12 Pas. Handle pintu stainless 5.00 x 2 = 10.00 = 10.00 set
13 Pas. Daun pintu kaca tebal 5 mm bingkai alumunium 0.7 x 2.20 x 5 x 2 = 15.40 = 15.40 m2
14 Pas. Daun pintu km alumunium lengkap 0.8 x 2 x 4 = 6.40 = 6.40 m2
15 Pas. Kaca bening tebal 5 mm
pj1 0.46 x 0.68 x 1 x 2 = 0.63
pj2 0.46 x 0.68 x 1 x 2 = 0.63
j1 0.46 x 1.07 x 2 x 2 = 1.97
j2 0.46 x 1.07 x 1 x 1 = 0.49
j3 0.46 x 0.68 x 1 x 2 = 0.63
j4 0.46 x 0.68 x 3 x 1 = 0.94
BV1 0.46 x 0.24 x 1 x 1 = 0.11 +
5.40 = 5.40 m2
IV PEKERJAAN BETON
membuat beton k175
1 sloof
Membuat Beton 0.15 x 0.20 x 71.92 = 2.16 +
2.16 = 2.16 m3
Pembesian
Ø6 selimut beton 2 cm 0.66 x 480 x 0.222 = 70.33
Ø 10 72.12 x 4 x 0.616 = 177.70 +
248.03 = 248.03 kg
89
Membuat Bekisting 3x = 9.49 m2
0.20 x 2 x 71.92 = 28.77 x 1.00 = 28.77 +
bekisting 28.77 x 0.33 = 9.49
Membuat Bekisting ( ongkos tenaga ) 28.77 x 0.67 = 19.28 = 19.28 m2
Membongkar begisting dan menyiram beton = 2.16 m3
2 kolom
Membuat Beton 0.15 x 0.20 x 3.00 x 30 = 2.70
0.15 x 0.15 x 3.00 x 10 = 0.68 +
3.38 = 3.38 m3
Pembesian
Ø6 selimut beton 2 cm 0.66 x 21 x 0.222 x 30 = 92.31
Ø 10 3.50 x 4 x 0.616 x 30 = 258.72
Ø6 selimut beton 2 cm 0.56 x 21 x 0.222 x 10 = 26.11
Ø 10 3.50 x 4 x 0.616 x 10 = 86.24 +
463.38 = 463.38 Kg
3 balok
Beton 0.15 x 0.20 x 165.73 = 4.97
4.97 = 4.97 m3
Pembesian
Ø6 0.58 x 1106 x 0.222 = 142.41
Ø 10 165.93 x 4 x 0.616 = 408.85 +
551.26 = 551.26 Kg
Membuat Bekisting 3x
0.08 x 2 x 165.73 x 0.50 = 13.26
13.26 x 0.33 = 4.38 = 4.38 m2
Membuat Bekisting ( ongkos tenaga ) 13.26 x 0.67 = 8.88 = 8.88 m2
Membongkar begisting dan menyiram beton = 4.97 m3
4 Dak
Beton 8.53 x 2.50 x 0.10 = 2.13
1.50 x 7.50 x 0.10 = 1.13
2.33 x 10.00 x 0.10 = 2.33
10.70 x 8.30 x 0.10 = 8.88 +
14.47 = 14.47 m3
Pembesian
Ø8 8.63 x 21 x 0.395 = 71.59
Ø8 2.60 x 69 x 0.395 = 70.86
Ø8 1.60 x 61 x 0.395 = 38.55
Ø8 7.60 x 13 x 0.395 = 39.03
Ø8 2.43 x 81 x 0.395 = 77.59
Ø8 10.10 x 20 x 0.395 = 79.79
Ø8 10.80 x 67 x 0.395 = 285.82
Ø8 8.40 x 87 x 0.395 = 288.67 +
951.90 = 951.90 Kg
Membuat Bekisting
8.53 x 2.50 x 0.50 = 10.66
1.50 x 7.50 x 0.50 = 5.63
2.33 x 10.00 x 0.50 = 11.63
10.70 x 8.30 x 0.50 = 44.41 +
72.33 = 72.33 m2
Membuat Bekisting ( ongkos tenaga ) = 72.33 m2
90
Membongkar begisting dan menyiram beton = 14.47 m3
5 ring balok
Beton 0.12 x 0.15 x 3.50 = 0.06
0.06 = 0.06 m3
Pembesian
Ø6 0.42 x 24 x 0.222 = 2.24
Ø 10 3.70 x 4 x 0.616 = 9.12 +
11.36 = 11.36 Kg
Membuat Bekisting 3x
0.03 x 2 x 3.50 x 0.50 = 0.11
0.11 x 0.33 = 0.04 = 0.04 m2
Membuat Bekisting ( ongkos tenaga ) 0.11 x 0.67 = 0.07 = 0.07 m2
Membongkar begisting dan menyiram beton = 0.06 m3
92
IX PEKERJAAN CAT CATAN
1 Cat dinding 277.70 + 252.00 = 529.70 = 529.70 m2
2 Cat plafond 144.66 + 68.5 = 213.16 = 213.16 m2
3 Cat kayu 3 lapis cat penutup
kusen pj1 0.26 x 7.96 x 1 = 2.07
0.4 x 1.68 x 1 = 0.67
pj2 0.26 x 7.96 x 1 = 2.07
0.4 x 1.68 x 1 = 0.67
p2 0.26 x 5.22 x 3 = 4.07
j1 0.26 x 5.1 x 2 = 2.65
0.4 x 1.23 x 2 = 0.98
j2 0.26 x 3.9 x 1 = 1.01
j3 0.26 x 4.32 x 1 = 1.12
0.4 x 0.84 x 1 = 0.34
j4 0.26 x 3.12 x 3 = 2.43
BV1 0.24 x 2.24 x 1 = 0.54
daun pintu pj1 0.92 x 2.15 x 1 x 2 = 3.96
pj2 0.92 x 2.15 x 1 x 2 = 3.96
p2 0.82 x 2.15 x 3 x 2 = 10.58
daun jendela pj1 0.24 x 2.6 x 1 x 2 = 1.25
pj2 0.24 x 2.6 x 1 x 2 = 1.25
j1 0.24 x 3.38 x 2 x 2 = 3.24
j2 0.24 x 3.38 x 1 x 1 = 0.81
j3 0.24 x 2.6 x 1 x 2 = 1.25
j4 0.24 x 2.6 x 3 x 1 = 1.87
BV1 0.24 x 1.72 x 1 x 1 = 0.41
lisplank 0.26 x 42 = 10.92 +
58.12 = 58.12 m2
93
2.4888 J1
94
0.9
95
0.68
1.20834
1.57824
1.57824
1.20834
96
275
137.5
97
4.1925
221.76
54
275.76
98
42
99
50000
7.77
100
RENCANA ANGGARAN BIAYA
NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PUSKESMAS REJOTANGAN
LOKASI : KECAMATAN REJOTANGAN KABUPATEN TULUNGAGUNG
SUMBERDANA : PAJAK ROKOK TAHUN 2019
KONSULTAN PERENCANA : CV. SENTOSA KARYA TEKNIK
101
2 Pembesian
a plat setempat A.4.1.1.17 1,941.48 kg 12,992.78 1,299.28 27,747,753.31
b Sloof A.4.1.1.17 1,116.86 kg 12,992.78 1,299.28 15,962,232.81
c Kolom A.4.1.1.17 4,113.74 kg 12,992.78 1,299.28 58,793,828.78
d Balok A.4.1.1.17 3,155.90 kg 12,992.78 1,299.28 45,104,319.73
e Plat Lantai A.4.1.1.17 2,550.05 kg 12,992.78 1,299.28 36,445,473.72
f Balok bordes A.4.1.1.17 86.76 kg 12,992.78 1,299.28 1,239,979.33
g Plat tangga A.4.1.1.17 338.05 kg 12,992.78 1,299.28 4,831,431.69
3 Membuat bekisting
a plat setempat A.4.1.1.20 23.48 m2 183,803.20 18,380.32 4,747,269.05
b Sloof A.4.1.1.21 50.70 m2 196,636.72 19,663.67 10,966,429.87
c Kolom A.4.1.1.21 86.79 m2 196,636.72 19,663.67 18,772,711.02
d Balok A.4.1.1.23 91.68 m2 334,969.15 33,496.92 33,780,969.04
e Plat Lantai A.4.1.1.24 258.07 m2 381,477.04 38,147.70 108,292,557.68
f Balok bordes A.4.1.1.21 1.56 m2 196,636.72 19,663.67 337,428.61
g Plat tangga A.4.1.1.21 21.90 m2 196,636.72 19,663.67 4,736,978.58
102
B membuat beton k175
1 Beton
a sloof A.4.1.1.5 0.66 m3 989,635.53 98,963.55 718,475.39
b Kolom A.4.1.1.5 6.07 m3 989,635.53 98,963.55 6,607,796.42
c Balok A.4.1.1.5 1.24 m3 989,635.53 98,963.55 1,349,862.86
d Dak A.4.1.1.5 3.13 m3 989,635.53 98,963.55 3,407,315.12
e Balok latai dan balok overstek A.4.1.1.5 3.96 m3 989,635.53 98,963.55 4,310,852.36
f Plat overstek + meja A.4.1.1.5 3.47 m3 989,635.53 98,963.55 3,777,438.81
g Ring balok A.4.1.1.5 3.50 m3 989,635.53 98,963.55 3,810,096.78
2 pembesian
a sloof A.4.1.1.17 76.38 kg 12,992.78 1,299.28 1,091,627.73
b Kolom A.4.1.1.17 913.74 kg 12,992.78 1,299.28 13,059,229.10
c Balok A.4.1.1.17 156.07 kg 12,992.78 1,299.28 2,230,562.18
d Dak A.4.1.1.17 209.04 kg 12,992.78 1,299.28 2,987,612.72
e Balok latai dan balok overstek A.4.1.1.17 559.47 kg 12,992.78 1,299.28 7,995,980.15
f Plat overstek + meja A.4.1.1.17 384.97 kg 12,992.78 1,299.28 5,502,015.26
g Ring balok A.4.1.1.17 494.01 kg 12,992.78 1,299.28 7,060,421.75
3 Membuat bekisting
a sloof A.4.1.1.21 4.40 m2 196,636.72 19,663.67 951,721.72
b Kolom A.4.1.1.21 40.39 m2 196,636.72 19,663.67 8,736,372.83
c Balok A.4.1.1.21 2.15 m2 196,636.72 19,663.67 465,045.84
d Dak A.4.1.1.21 31.25 m2 196,636.72 19,663.67 6,759,387.25
e Balok latai dan balok overstek A.4.1.1.21 26.40 m2 196,636.72 19,663.67 5,710,330.35
f Plat overstek + meja A.4.1.1.21 16.37 m2 196,636.72 19,663.67 3,540,837.42
g Ring balok A.4.1.1.21 23.33 m2 196,636.72 19,663.67 5,046,288.15
C membuat bekisting ( ongkos tenaga ) A.4.1.1.27 323.68 m2 81,135.04 8,113.50 28,887,968.72
D membongkar bekisting dan menyiram beton A.4.1.1.27b 110.51 m3 322,560.00 32,256.00 39,210,716.16
E Rabat beton A.4.1.1.4 29.03 m3 830,663.85 83,066.38 26,525,588.66
JUMLAH 667,258,631.91
V PEKERJAAN RANGKA ATAP
1 Pas. Rangka atap baja ringan 288.93 m2 239,400.00 23,940.00 76,086,826.20
2 Pas. Talang miring BJlS 30 A.4.2.1.18 6.00 m' 200,812.64 20,081.26 1,325,363.42
3 Pas. Kalsiplank 20 cm 72.40 m' 31,350.00 3,135.00 2,496,714.00
JUMLAH 79,908,903.62
VI PEKERJAAN ATAP
1 Pas. Genteng Mantili A.4.5.2.1 288.93 m2 111,302.24 11,130.22 35,374,411.82
2 Pas. Bubungan A.4.5.2.4 51.00 m' 107,562.56 10,756.26 6,034,259.62
3 Pas. Mainan Bubungan 3.00 bh 150,000.00 15,000.00 495,000.00
JUMLAH 41,903,671.44
VII PEKERJAAN PLAFOND
1 Pas. Rangka plafond metal furing A.4.6.1.19a 516.16 m2 142,477.44 14,247.74 80,895,270.97
2 Pas. Gypsumboard A.4.5.1.7 516.16 m2 48,969.76 4,896.98 27,803,854.45
JUMLAH 108,699,125.42
VIII PEKERJAAN KERAMIK DAN BATU HIAS
1 Pas. Keramik lantai 40 x 40 cm motif A.4.4.3.4 492.41 m2 193,939.49 19,393.95 105,047,519.35
2 Pas. Keramik lantai 40 x 40 cm tekstur A.4.4.3.4b 21.60 m2 197,266.16 19,726.62 4,687,043.96
3 Pas. Plint keramik 10 x 40 cm A.4.4.3.39 343.92 m' 45,721.42 4,572.14 17,296,963.36
4 Pas. Keramik lantai 25 x 25 cm tekstur A.4.4.3.37 12.50 m2 134,295.28 13,429.53 1,846,560.10
5 Pas. Keramik dinding 25 x 40 cm motif A.4.4.3.54B 74.84 m2 226,917.60 22,691.76 18,680,764.50
6 Pas. Batu andesit bakar A.4.4.3.58 7.20 m2 374,130.40 37,413.04 2,963,112.77
JUMLAH 150,521,964.04
IX PEKERJAAN LISTRIK
1 Pas. Instalasi lampu 63.00 titik 171,000.00 17,100.00 11,850,300.00
2 Pas. Instalasi stop kontak 39.00 titik 171,000.00 17,100.00 7,335,900.00
3 Pas. Stop kontak 39.00 bh 12,540.00 1,254.00 537,966.00
4 Pas. Saklar ganda 23.00 bh 25,194.00 2,519.40 637,408.20
5 Pas. Saklar tunggal 16.00 bh 15,618.00 1,561.80 274,876.80
6 Pas. Saklar hotel (tangga) 1.00 set 62,700.00 6,270.00 68,970.00
7 Pas. Lampu led 10 w 45.00 bh 85,500.00 8,550.00 4,232,250.00
8 Pas. Lampu led 5 w 7.00 bh 39,900.00 3,990.00 307,230.00
9 Pas. Lampu spot 20 w 1.00 bh 193,800.00 19,380.00 213,180.00
10 Pas. Downlight 10.00 bh 62,700.00 6,270.00 689,700.00
11 Pas. Panel group 2.00 bh 400,000.00 40,000.00 880,000.00
12 Operspanning 1.00 bh 500,000.00 50,000.00 550,000.00
13 Pas. Groud 3.00 bh 570,000.00 57,000.00 1,881,000.00
14 Pas. Kabel penangkal petir 32.80 m' 111,720.00 11,172.00 4,030,857.60
JUMLAH 33,489,638.60
103
X PEKERJAAN SANITASI
1 Pas. Pipa 1/2 '' A.5.1.1.25 26.50 m' 14,395.36 1,439.54 419,624.74
2 Pas. Pipa 1.5 '' A.5.1.1.28 48.40 m' 44,247.84 4,424.78 2,355,755.00
3 Pas. Pipa 2.5 '' A.5.1.1.30 24.00 m' 71,177.12 7,117.71 1,879,075.97
4 Pas. Pipa 3 '' air kotor ke jalur ipal A.5.1.1.31 39.80 m' 81,245.92 8,124.59 3,556,946.38
5 Pas. Pipa 4 '' A.5.1.1.32 24.80 m' 111,278.72 11,127.87 3,035,683.48
6 Pas. Klosed jongkok A.5.1.1.2 4.00 bh 445,614.40 44,561.44 1,960,703.36
7 Pas. Klosed duduk monoblok A.5.1.1.1 1.00 bh 3,560,829.44 356,082.94 3,916,912.38
8 Pas. Wastafel lengkap A.5.1.1.5 2.00 bh 663,695.20 66,369.52 1,460,129.44
9 Pas. Kran air A.5.1.1.16 6.00 bh 74,023.88 7,402.39 488,557.61
10 Pas. Shower toilet 1.00 bh 125,000.00 12,500.00 137,500.00
11 Pas. Avoor stainlesssteel A.5.1.1.14 5.00 bh 64,842.40 6,484.24 356,633.20
12 Pas. Tandon air kapasitas 1000 liter fiberglass 1.00 bh 1,630,200.00 163,020.00 1,793,220.00
13 Pas. Pompa air 1.00 bh 627,000.00 62,700.00 689,700.00
14 Buat sumur bor 1.00 bh 1,700,000.00 170,000.00 1,870,000.00
15 Buat septictank 1.00 bh 3,400,000.00 340,000.00 3,740,000.00
JUMLAH 27,660,441.56
104
XI PEKERJAAN CAT CATAN
1 Cat dinding A.4.7.1.10 1,840.66 m2 20,038.37 2,003.84 40,572,204.69
2 Cat plafond A.4.7.1.10d 628.36 m2 18,291.17 1,829.12 12,642,782.16
3 Cat kayu 3 lapis cat penutup A.4.7.1.5 275.33 m2 59,290.56 5,929.06 17,956,916.87
4 Coauting batu hias A.4.7.1.12b 7.20 m2 43,822.24 4,382.22 347,072.14
JUMLAH 71,518,975.86
JUMLAH TOTAL B 1,717,459,504.38
105
5 membongkar bekisting dan menyiram beton A.4.1.1.27b 25.04 m3 322,560.00 32,256.00 8,884,592.64
6 Rabat beton A.4.1.1.4 7.34 m3 830,663.85 83,066.38 6,706,779.91
JUMLAH 108,194,507.80
V PEKERJAAN KERAMIK DAN BATU HIAS
1 Pas. Keramik lantai 30 x 30 cm polos A.4.4.3.35b 139.09 m2 182,694.31 18,269.43 27,952,046.80
2 Pas. Keramik lantai 30 x 30 cm tekstur A.4.4.3.4b 14.00 m2 197,266.16 19,726.62 3,037,898.86
3 Pas. Keramik lantai 25 x 25 cm tekstur A.4.4.3.37 7.70 m2 134,295.28 13,429.53 1,137,481.02
4 Pas. Keramik dinding 25 x 40 cm motif A.4.4.3.54B 38.80 m2 226,917.60 22,691.76 9,684,843.17
5 Pas. Batu andesit bakar A.4.4.3.58 6.72 m2 374,130.40 37,413.04 2,765,571.92
JUMLAH 44,577,841.77
106
VI PEKERJAAN LISTRIK
1 Pas. Instalasi lampu + Blower 31.00 titik 171,000.00 17,100.00 5,831,100.00
2 Pas. Instalasi stop kontak 15.00 titik 171,000.00 17,100.00 2,821,500.00
3 Pas. Stop kontak 15.00 bh 12,540.00 1,254.00 206,910.00
4 Pas. Saklar ganda 10.00 bh 25,194.00 2,519.40 277,134.00
5 Pas. Saklar tunggal 8.00 bh 15,618.00 1,561.80 137,438.40
6 Pas. Lampu led 10 w 22.00 bh 85,500.00 8,550.00 2,069,100.00
7 Pas. Lampu led 5 w 5.00 bh 39,900.00 3,990.00 219,450.00
8 Pas. Lampu spot 20 w 1.00 bh 193,800.00 19,380.00 213,180.00
9 Pas. Blower 3.00 bh 419,520.00 41,952.00 1,384,416.00
JUMLAH 13,160,228.40
VII PEKERJAAN SANITASI
1 Pas. Pipa 1/2 '' A.5.1.1.25 16.00 m' 14,395.36 1,439.54 253,358.34
2 Pas. Pipa 1.5 '' A.5.1.1.28 22.00 m' 44,247.84 4,424.78 1,070,797.73
3 Pas. Pipa 2.5 '' A.5.1.1.30 24.00 m' 71,177.12 7,117.71 1,879,075.97
4 Pas. Pipa 3 '' air kotor ke jalur ipal A.5.1.1.31 38.00 m' 81,245.92 8,124.59 3,396,079.46
5 Pas. Pipa 4 '' A.5.1.1.32 32.00 m' 111,278.72 11,127.87 3,917,010.94
6 Pas. Klosed jongkok A.5.1.1.2 1.00 bh 445,614.40 44,561.44 490,175.84
7 Pas. Klosed duduk monoblok A.5.1.1.1 3.00 bh 3,560,829.44 356,082.94 11,750,737.15
8 Pas. Wastafel lengkap A.5.1.1.5 3.00 bh 663,695.20 66,369.52 2,190,194.16
9 Pas. Kran air A.5.1.1.16 5.00 bh 74,023.88 7,402.39 407,131.34
10 Pas. Shower toilet 3.00 bh 125,000.00 12,500.00 412,500.00
11 Pas. Avoor stainlesssteel A.5.1.1.14 4.00 bh 64,842.40 6,484.24 285,306.56
12 Pas. Tandon air kapasitas 1000 liter fiberglass 1.00 bh 1,630,200.00 163,020.00 1,793,220.00
13 Pas. Pompa air 1.00 bh 627,000.00 62,700.00 689,700.00
14 Buat septictank 1.00 bh 3,400,000.00 340,000.00 3,740,000.00
JUMLAH 32,275,287.49
VII PEKERJAAN CAT CATAN
1 Cat dinding A.4.7.1.10 529.70 m2 20,038.37 2,003.84 11,675,755.88
2 Cat plafond A.4.7.1.10d 213.16 m2 18,291.17 1,829.12 4,288,839.91
3 Cat kayu 3 lapis cat penutup A.4.7.1.5 58.12 m2 59,290.56 5,929.06 3,790,564.08
4 Coauting batu hias A.4.7.1.12b 6.72 m2 43,822.24 4,382.22 323,934.00
JUMLAH 20,079,093.87
JUMLAH TOTAL C 357,643,033.11
Terbilang : Dua milyar sembilan puluh enam juta seratus enam puluh enam ribu lima puluh empat rupiah
Tulungagung, 2019
Mengetahui/Menyetujui Mengetahui/Menyetujui
KEPALA DINAS KESEHATAN KUASA PENGGUNA ANGGARAN
KABUPATEN TULUNGAGUNG
107
Pembina Utama Muda NIP. 19640609 199003 1 007
NIP. 19590922 198803 1 006
108
0.00
0.00 133.2
#REF!
64,381.50 (1,129.50)
46,683.00 (819.00)
271,992.60 (4,771.80)
122,521.50 (2,149.50)
588,072.42 434.94
906,510.90 (5,151.70)
122,367.71 (2,146.80)
116,974.15 (2,052.18)
240,769.14 (4,224.02)
58,529.86 (1,026.84)
55,605.00 (975.53)
18,316.95 (321.35)
506,958.00 -
553,014.00 -
83,676.00 -
16,479,384.00 (183,272.00)
967,341.30 (1,850.90)
670,149.00 339.00
320,678.58 (2,601.94)
347,014.86 (5,079.98)
58,937.43 (529.99)
29,473.79 238.92
32,033.43 (57.99)
50,740.83 117.81
39,215.43 (183.99)
290,183.58 (2,570.94)
801,192.00 -
152,684.99 (1,922.68)
525,426.00 -
7.32 32,705.00
1,105,994.37 (19,403.41)
1,105,994.37 (19,403.41)
1,105,994.37 (19,403.41)
1,105,994.37 (19,403.41)
1,105,994.37 (19,403.41)
1,105,994.37 (19,403.41)
1,105,994.37 (19,403.41)
109
-
13,192.88 (200.09)
13,192.88 (200.09)
13,192.88 (200.09)
13,192.88 (200.09)
13,192.88 (200.09)
13,192.88 (200.09)
13,192.88 (200.09)
-
185,751.60 (1,948.40)
198,814.29 (2,177.57)
198,814.29 (2,177.57)
339,257.84 (4,288.69)
386,596.23 (5,119.19)
198,814.29 (2,177.57)
198,814.29 (2,177.57)
110
1,007,307.59
1,007,307.59
1,007,307.59
1,007,307.59
1,007,307.59
1,007,307.59
1,007,307.59
13,192.88
13,192.88
13,192.88
13,192.88
13,192.88
13,192.88 13,390,999.00
13,192.88 78,706,683.00
198,814.29
198,814.29 92,097,682.00
198,814.29 92,097,682.00
198,814.29
198,814.29
198,814.29
198,814.29
81,250.08
328,320.00
845,497.13
12.20
228,000.00 11,400.00
203,372.58 (2,559.94)
31,350.00 -
112,349.28 (1,047.04)
109,483.32 (1,920.76)
150,000.00 -
143,425.68 (948.24)
49,224.06 (254.30)
197,402.70 (3,463.21)
200,788.77 (3,522.61)
136,693.41 (2,398.13)
230,969.70 (4,052.10)
380,811.30 (6,680.90)
171,000.00
171,000.00
12,540.00
25,194.00
15,618.00
62,700.00
85,500.00
39,900.00
193,800.00
62,700.00
400,000.00
500,000.00
570,000.00
111,720.00
111
14,378.82
44,627.58
71,832.54
82,081.14
112,650.24
453,571.80
3,624,415.68
675,546.90
73,521.74
125,000.00
66,000.30
1,630,200.00
627,000.00
1,500,000.00
3,400,000.00
112
12.20
20,396.20
18,617.80
60,349.32
44,604.78
12.20
113
2,096,166,054.00 0.00
114
239,400.60
115
674,100.60
116
TIM
NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PUSKESMAS REJOTANGAN
LOKASI : KECAMATAN REJOTANGAN KABUPATEN TULUNGAGUNG
SUMBERDANA : PAJAK ROKOK TAHUN 2019
KONSULTAN PERENCANA : CV. SENTOSA KARYA TEKNIK
117
f Balok bordes A.4.1.1.9 0.45 m3 1,086,590.96 108,659.10 537,862.53
g Plat tangga A.4.1.1.9 2.93 m3 1,086,590.96 108,659.10 3,502,082.66
2 Pembesian
a plat setempat A.4.1.1.17 1,941.48 kg 12,992.78 1,299.28 27,747,753.31
b Sloof A.4.1.1.17 1,116.86 kg 12,992.78 1,299.28 15,962,232.81
c Kolom A.4.1.1.17 4,113.74 kg 12,992.78 1,299.28 58,793,828.78
d Balok A.4.1.1.17 3,155.90 kg 12,992.78 1,299.28 45,104,319.73
e Plat Lantai A.4.1.1.17 2,550.05 kg 12,992.78 1,299.28 36,445,473.72
f Balok bordes A.4.1.1.17 86.76 kg 12,992.78 1,299.28 1,239,979.33
g Plat tangga A.4.1.1.17 338.05 kg 12,992.78 1,299.28 4,831,431.69
3 Membuat bekisting
a plat setempat A.4.1.1.20 23.48 m2 183,803.20 18,380.32 4,747,269.05
b Sloof A.4.1.1.21 50.70 m2 196,636.72 19,663.67 10,966,429.87
c Kolom A.4.1.1.21 86.79 m2 196,636.72 19,663.67 18,772,711.02
d Balok A.4.1.1.23 91.68 m2 334,969.15 33,496.92 33,780,969.04
e Plat Lantai A.4.1.1.24 258.07 m2 381,477.04 38,147.70 108,292,557.68
f Balok bordes A.4.1.1.21 1.56 m2 196,636.72 19,663.67 337,428.61
g Plat tangga A.4.1.1.21 21.90 m2 196,636.72 19,663.67 4,736,978.58
B membuat beton k175
1 Beton
a sloof A.4.1.1.5 0.66 m3 989,635.53 98,963.55 718,475.39
b Kolom A.4.1.1.5 6.07 m3 989,635.53 98,963.55 6,607,796.42
c Balok A.4.1.1.5 1.24 m3 989,635.53 98,963.55 1,349,862.86
d Dak A.4.1.1.5 3.13 m3 989,635.53 98,963.55 3,407,315.12
e Balok latai dan balok overstek A.4.1.1.5 3.96 m3 989,635.53 98,963.55 4,310,852.36
f Plat overstek + meja A.4.1.1.5 3.47 m3 989,635.53 98,963.55 3,777,438.81
g Ring balok A.4.1.1.5 3.50 m3 989,635.53 98,963.55 3,810,096.78
2 pembesian
a sloof A.4.1.1.17 76.38 kg 12,992.78 1,299.28 1,091,627.73
b Kolom A.4.1.1.17 913.74 kg 12,992.78 1,299.28 13,059,229.10
c Balok A.4.1.1.17 156.07 kg 12,992.78 1,299.28 2,230,562.18
d Dak A.4.1.1.17 209.04 kg 12,992.78 1,299.28 2,987,612.72
e Balok latai dan balok overstek A.4.1.1.17 559.47 kg 12,992.78 1,299.28 7,995,980.15
f Plat overstek + meja A.4.1.1.17 384.97 kg 12,992.78 1,299.28 5,502,015.26
g Ring balok A.4.1.1.17 494.01 kg 12,992.78 1,299.28 7,060,421.75
3 Membuat bekisting
a sloof A.4.1.1.21 4.40 m2 196,636.72 19,663.67 951,721.72
b Kolom A.4.1.1.21 40.39 m2 196,636.72 19,663.67 8,736,372.83
c Balok A.4.1.1.21 2.15 m2 196,636.72 19,663.67 465,045.84
d Dak A.4.1.1.21 31.25 m2 196,636.72 19,663.67 6,759,387.25
e Balok latai dan balok overstek A.4.1.1.21 26.40 m2 196,636.72 19,663.67 5,710,330.35
f Plat overstek + meja A.4.1.1.21 16.37 m2 196,636.72 19,663.67 3,540,837.42
g Ring balok A.4.1.1.21 23.33 m2 196,636.72 19,663.67 5,046,288.15
C membuat bekisting ( ongkos tenaga ) A.4.1.1.27 323.68 m2 81,135.04 8,113.50 28,887,968.72
D membongkar bekisting dan menyiram beton A.4.1.1.27b 110.51 m3 322,560.00 32,256.00 39,210,716.16
E Rabat beton A.4.1.1.4 29.03 m3 830,663.85 83,066.38 26,525,588.66
JUMLAH 667,258,631.91
V PEKERJAAN RANGKA ATAP
1 Pas. Rangka atap baja ringan 288.93 m2 239,400.00 23,940.00 76,086,826.20
2 Pas. Talang miring BJlS 30 A.4.2.1.18 6.00 m' 200,812.64 20,081.26 1,325,363.42
3 Pas. Kalsiplank 20 cm 72.40 m' 31,350.00 3,135.00 2,496,714.00
JUMLAH 79,908,903.62
VI PEKERJAAN ATAP
1 Pas. Genteng Mantili A.4.5.2.1 288.93 m2 111,302.24 11,130.22 35,374,411.82
2 Pas. Bubungan A.4.5.2.4 51.00 m' 107,562.56 10,756.26 6,034,259.62
3 Pas. Mainan Bubungan 3.00 bh 150,000.00 15,000.00 495,000.00
JUMLAH 41,903,671.44
VII PEKERJAAN PLAFOND
1 Pas. Rangka plafond metal furing A.4.6.1.19a 516.16 m2 142,477.44 14,247.74 80,895,270.97
2 Pas. Gypsumboard A.4.5.1.7 516.16 m2 48,969.76 4,896.98 27,803,854.45
JUMLAH 108,699,125.42
VIII PEKERJAAN KERAMIK DAN BATU HIAS
1 Pas. Keramik lantai 40 x 40 cm motif A.4.4.3.4 492.41 m2 193,939.49 19,393.95 105,047,519.35
2 Pas. Keramik lantai 40 x 40 cm tekstur A.4.4.3.4b 21.60 m2 197,266.16 19,726.62 4,687,043.96
3 Pas. Plint keramik 10 x 40 cm A.4.4.3.39 343.92 m' 45,721.42 4,572.14 17,296,963.36
118
4 Pas. Keramik lantai 25 x 25 cm tekstur A.4.4.3.37 12.50 m2 134,295.28 13,429.53 1,846,560.10
5 Pas. Keramik dinding 25 x 40 cm motif A.4.4.3.54B 74.84 m2 226,917.60 22,691.76 18,680,764.50
6 Pas. Batu andesit bakar A.4.4.3.58 7.20 m2 374,130.40 37,413.04 2,963,112.77
JUMLAH 150,521,964.04
IX PEKERJAAN LISTRIK
1 Pas. Instalasi lampu 63.00 titik 171,000.00 17,100.00 11,850,300.00
2 Pas. Instalasi stop kontak 39.00 titik 171,000.00 17,100.00 7,335,900.00
3 Pas. Stop kontak 39.00 bh 12,540.00 1,254.00 537,966.00
4 Pas. Saklar ganda 23.00 bh 25,194.00 2,519.40 637,408.20
5 Pas. Saklar tunggal 16.00 bh 15,618.00 1,561.80 274,876.80
6 Pas. Saklar hotel (tangga) 1.00 set 62,700.00 6,270.00 68,970.00
7 Pas. Lampu led 10 w 45.00 bh 85,500.00 8,550.00 4,232,250.00
8 Pas. Lampu led 5 w 7.00 bh 39,900.00 3,990.00 307,230.00
9 Pas. Lampu spot 20 w 1.00 bh 193,800.00 19,380.00 213,180.00
10 Pas. Downlight 10.00 bh 62,700.00 6,270.00 689,700.00
11 Pas. Panel group 2.00 bh 400,000.00 40,000.00 880,000.00
12 Operspanning 1.00 bh 500,000.00 50,000.00 550,000.00
13 Pas. Groud 3.00 bh 570,000.00 57,000.00 1,881,000.00
14 Pas. Kabel penangkal petir 32.80 m' 111,720.00 11,172.00 4,030,857.60
JUMLAH 33,489,638.60
X PEKERJAAN SANITASI
1 Pas. Pipa 1/2 '' A.5.1.1.25 26.50 m' 14,395.36 1,439.54 419,624.74
2 Pas. Pipa 1.5 '' A.5.1.1.28 48.40 m' 44,247.84 4,424.78 2,355,755.00
3 Pas. Pipa 2.5 '' A.5.1.1.30 24.00 m' 71,177.12 7,117.71 1,879,075.97
4 Pas. Pipa 3 '' air kotor ke jalur ipal A.5.1.1.31 39.80 m' 81,245.92 8,124.59 3,556,946.38
5 Pas. Pipa 4 '' A.5.1.1.32 24.80 m' 111,278.72 11,127.87 3,035,683.48
6 Pas. Klosed jongkok A.5.1.1.2 4.00 bh 445,614.40 44,561.44 1,960,703.36
7 Pas. Klosed duduk monoblok A.5.1.1.1 1.00 bh 3,560,829.44 356,082.94 3,916,912.38
8 Pas. Wastafel lengkap A.5.1.1.5 2.00 bh 663,695.20 66,369.52 1,460,129.44
9 Pas. Kran air A.5.1.1.16 6.00 bh 74,023.88 7,402.39 488,557.61
10 Pas. Shower toilet 1.00 bh 125,000.00 12,500.00 137,500.00
11 Pas. Avoor stainlesssteel A.5.1.1.14 5.00 bh 64,842.40 6,484.24 356,633.20
12 Pas. Tandon air kapasitas 1000 liter fiberglass 1.00 bh 1,630,200.00 163,020.00 1,793,220.00
13 Pas. Pompa air 1.00 bh 627,000.00 62,700.00 689,700.00
14 Buat sumur bor 1.00 bh 1,700,000.00 170,000.00 1,870,000.00
15 Buat septictank 1.00 bh 3,400,000.00 340,000.00 3,740,000.00
JUMLAH 27,660,441.56
XI PEKERJAAN CAT CATAN
1 Cat dinding A.4.7.1.10 1,840.66 m2 20,038.37 2,003.84 40,572,204.69
2 Cat plafond A.4.7.1.10d 628.36 m2 18,291.17 1,829.12 12,642,782.16
3 Cat kayu 3 lapis cat penutup A.4.7.1.5 275.33 m2 59,290.56 5,929.06 17,956,916.87
4 Coauting batu hias A.4.7.1.12b 7.20 m2 43,822.24 4,382.22 347,072.14
JUMLAH 71,518,975.86
JUMLAH TOTAL B 1,717,459,504.38
119
11 Pas. Galvalum 14.00 m2 501,600.00 50,160.00 7,724,640.00
12 Perbaikan plafond 1.00 ls 1,000,000.00 100,000.00 1,100,000.00
JUMLAH 75,100,371.31
III PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pas. Kusen pintu dan jendela kayu balau A.4.6.1.2 0.63 m3 16,296,112.00 1,629,611.20 11,293,205.62
2 Pas. Daun pintu dan jendela kayu balau A.4.6.1.5b 9.29 m2 965,490.40 96,549.04 9,866,346.40
3 Pas. Daun jendela kaca bingkai kayu balau A.4.6.1.6b 3.73 m2 670,488.00 67,048.80 2,751,012.26
4 Pas. Kunci tanam ex ses A.4.6.2.2 5.00 bh 318,076.64 31,807.66 1,749,421.52
5 Pas. Kunci selot ex ses A.4.6.2.11 5.00 bh 341,934.88 34,193.49 1,880,641.84
6 Pas. Grendel tanam A.4.6.2.2b 5.00 bh 58,407.44 5,840.74 321,240.92
7 Pas. Engsel pintu A.4.6.2.5 15.00 bh 29,712.70 2,971.27 490,259.62
8 Pas. Engsel floring 10.00 bh 500,000.00 50,000.00 5,500,000.00
9 Pas. Engsel jendela A.4.6.2.6 30.00 bh 31,975.44 3,197.54 1,055,189.52
10 Pas. Windhak ex ses A.4.6.2.7 15.00 set 50,858.64 5,085.86 839,167.56
11 Pas. Grendel jendela ex ses A.4.6.2.8 15.00 bh 39,031.44 3,903.14 644,018.76
12 Pas. Handle pintu stainless A.4.6.2.12e 10.00 set 287,612.64 28,761.26 3,163,739.04
13 Pas. Daun pintu kaca tebal 5 mm bingkai alumunium A.4.2.1.13 15.40 m2 655,644.64 65,564.46 11,106,620.20
14 Pas. Daun pintu km alumunium lengkap 6.40 m2 801,192.00 80,119.20 5,640,391.68
15 Pas. Kaca bening tebal 5 mm A.4.6.2.17 5.40 m2 150,762.30 15,076.23 895,528.09
JUMLAH 57,196,783.03
IV PEKERJAAN BETON
1 membuat beton k175
a sloof A.4.1.1.5 2.16 m3 989,635.53 98,963.55 2,351,374.01
b Kolom A.4.1.1.5 3.38 m3 989,635.53 98,963.55 3,679,464.89
c Balok A.4.1.1.5 4.97 m3 989,635.53 98,963.55 5,410,337.43
d Dak A.4.1.1.5 14.47 m3 989,635.53 98,963.55 15,752,028.70
e Ring balok A.4.1.1.5 0.06 m3 989,635.53 98,963.55 65,315.94
2 pembesian
a sloof A.4.1.1.17 248.03 kg 12,992.78 1,299.28 3,544,860.24
b Kolom A.4.1.1.17 463.38 kg 12,992.78 1,299.28 6,622,655.87
c Balok A.4.1.1.17 551.26 kg 12,992.78 1,299.28 7,878,642.32
d Dak A.4.1.1.17 951.90 kg 12,992.78 1,299.28 13,604,614.20
e Ring balok A.4.1.1.17 11.36 kg 12,992.78 1,299.28 162,357.83
3 Membuat bekisting
a sloof A.4.1.1.21 9.49 m2 196,636.72 19,663.67 2,052,690.72
b Kolom A.4.1.1.21 14.85 m2 196,636.72 19,663.67 3,212,060.82
c Balok A.4.1.1.21 4.38 m2 196,636.72 19,663.67 947,395.72
d Dak A.4.1.1.21 72.33 m2 196,636.72 19,663.67 15,645,007.35
e Ring balok A.4.1.1.21 0.04 m2 196,636.72 19,663.67 8,652.02
4 membuat bekisting ( ongkos tenaga ) A.4.1.1.27 130.71 m2 81,135.04 8,113.50 11,665,677.19
5 membongkar bekisting dan menyiram beton A.4.1.1.27b 25.04 m3 322,560.00 32,256.00 8,884,592.64
6 Rabat beton A.4.1.1.4 7.34 m3 830,663.85 83,066.38 6,706,779.91
JUMLAH 108,194,507.80
V PEKERJAAN KERAMIK DAN BATU HIAS
1 Pas. Keramik lantai 30 x 30 cm polos A.4.4.3.35b 139.09 m2 182,694.31 18,269.43 27,952,046.80
2 Pas. Keramik lantai 30 x 30 cm tekstur A.4.4.3.4b 14.00 m2 197,266.16 19,726.62 3,037,898.86
3 Pas. Keramik lantai 25 x 25 cm tekstur A.4.4.3.37 7.70 m2 134,295.28 13,429.53 1,137,481.02
4 Pas. Keramik dinding 25 x 40 cm motif A.4.4.3.54B 38.80 m2 226,917.60 22,691.76 9,684,843.17
5 Pas. Batu andesit bakar A.4.4.3.58 6.72 m2 374,130.40 37,413.04 2,765,571.92
JUMLAH 44,577,841.77
VI PEKERJAAN LISTRIK
1 Pas. Instalasi lampu + Blower 31.00 titik 171,000.00 17,100.00 5,831,100.00
2 Pas. Instalasi stop kontak 15.00 titik 171,000.00 17,100.00 2,821,500.00
3 Pas. Stop kontak 15.00 bh 12,540.00 1,254.00 206,910.00
4 Pas. Saklar ganda 10.00 bh 25,194.00 2,519.40 277,134.00
5 Pas. Saklar tunggal 8.00 bh 15,618.00 1,561.80 137,438.40
6 Pas. Lampu led 10 w 22.00 bh 85,500.00 8,550.00 2,069,100.00
7 Pas. Lampu led 5 w 5.00 bh 39,900.00 3,990.00 219,450.00
8 Pas. Lampu spot 20 w 1.00 bh 193,800.00 19,380.00 213,180.00
9 Pas. Blower 3.00 bh 419,520.00 41,952.00 1,384,416.00
JUMLAH 13,160,228.40
VII PEKERJAAN SANITASI
1 Pas. Pipa 1/2 '' A.5.1.1.25 16.00 m' 14,395.36 1,439.54 253,358.34
2 Pas. Pipa 1.5 '' A.5.1.1.28 22.00 m' 44,247.84 4,424.78 1,070,797.73
3 Pas. Pipa 2.5 '' A.5.1.1.30 24.00 m' 71,177.12 7,117.71 1,879,075.97
120
4 Pas. Pipa 3 '' air kotor ke jalur ipal A.5.1.1.31 38.00 m' 81,245.92 8,124.59 3,396,079.46
5 Pas. Pipa 4 '' A.5.1.1.32 32.00 m' 111,278.72 11,127.87 3,917,010.94
6 Pas. Klosed jongkok A.5.1.1.2 1.00 bh 445,614.40 44,561.44 490,175.84
7 Pas. Klosed duduk monoblok A.5.1.1.1 3.00 bh 3,560,829.44 356,082.94 11,750,737.15
8 Pas. Wastafel lengkap A.5.1.1.5 3.00 bh 663,695.20 66,369.52 2,190,194.16
9 Pas. Kran air A.5.1.1.16 5.00 bh 74,023.88 7,402.39 407,131.34
10 Pas. Shower toilet 3.00 bh 125,000.00 12,500.00 412,500.00
11 Pas. Avoor stainlesssteel A.5.1.1.14 4.00 bh 64,842.40 6,484.24 285,306.56
12 Pas. Tandon air kapasitas 1000 liter fiberglass 1.00 bh 1,630,200.00 163,020.00 1,793,220.00
13 Pas. Pompa air 1.00 bh 627,000.00 62,700.00 689,700.00
14 Buat septictank 1.00 bh 3,400,000.00 340,000.00 3,740,000.00
JUMLAH 32,275,287.49
VII PEKERJAAN CAT CATAN
1 Cat dinding A.4.7.1.10 529.70 m2 20,038.37 2,003.84 11,675,755.88
2 Cat plafond A.4.7.1.10d 213.16 m2 18,291.17 1,829.12 4,288,839.91
3 Cat kayu 3 lapis cat penutup A.4.7.1.5 58.12 m2 59,290.56 5,929.06 3,790,564.08
4 Coauting batu hias A.4.7.1.12b 6.72 m2 43,822.24 4,382.22 323,934.00
JUMLAH 20,079,093.87
JUMLAH TOTAL C 357,643,033.11
Terbilang : Dua milyar sembilan puluh enam juta seratus enam puluh enam ribu lima puluh empat rupiah
Mengetahui/Menyetujui Mengetahui/Menyetujui
KEPALA DINAS KESEHATAN KUASA PENGGUNA ANGGARAN
KABUPATEN TULUNGAGUNG
121
TIME SCHEDULE
100
0.46 0.46
0.17 0.17
0.48 95 0.10 0.38
0.46 0.46
0.23 0.23
0.84 0.84
0.27 0.27
5.23 0.52 0.52 0.52 1.05 1.05 1.57
0.64 0.64
0.26 0.26
5.03 1.51 1.01 1.01 1.51
1.19 0.36 0.24 0.59
0.33
0.16 90
0.08
1.40
0.73 0.73
0.42 0.42
1.08 0.22 0.86
0.55 0.55
2.07 80 2.07
122
0.03 0.03
0.17 0.17
-
1.32 1.32
0.76 0.76
2.80 0.56 0.70 1.54
2.15 2.15
1.74 1.74
0.06 0.06
0.23 0.23
-
0.23 0.23
0.52 75 0.52
0.90 0.18 0.72
1.61 1.61
5.17 5.17
0.02 0.02
0.23 0.23
-
-
0.03 0.03
0.32 0.32
0.06 0.06
0.16 0.16
0.21 0.21
0.18 70 0.18
0.18 0.18
-
0.05 0.05
0.62 0.62
0.11 0.11
0.14 0.14
0.38 0.38
0.26 0.26
0.34 0.34
-
0.05 0.05
0.42 0.42
0.02 65 0.02
0.32 0.32
0.27 0.27
0.17 0.17
0.24 0.24
1.38 0.28 1.10
1.87 1.87
1.27 0.25 1.01
3.63 3.63
0.06 0.06
0.12 0.12
60
1.69 1.69
0.29 0.29
0.02 0.02
3.86 3.86
1.33 1.33
5.01 3.01
0.22 0.22
0.83 55 0.83
123
0.09 0.09
0.89 0.89
0.14 0.14
0.57 0.57
0.35 0.35
0.03 0.03
0.03 0.03
0.01 0.01
0.00 0.00
0.20 0.20
0.01 50 0.01
0.01 0.01
0.03 0.03
0.04 0.04
0.03 0.03
0.09 0.09
0.19 0.19
0.02 0.02
0.11 0.11
0.09 0.09
0.17 0.17
0.14 45 0.14
0.09 0.09
0.19 0.19
0.07 0.07
0.02 0.02
0.01 0.01
0.02 0.02
0.09 0.09
0.03 0.03
0.09 0.09
0.18 0.18
1.94 40
0.60
0.86
0.02
0.11 0.11
0.02 0.02
0.16 0.16
0.05 0.05
35
0.20 0.20
0.64 0.64
0.11 0.11
0.78 0.78
0.19 0.19
0.10
0.70
0.39
0.02 0.02
0.04
124
0.37
0.05 30
0.54 0.54
0.47
0.13
0.08
0.09
0.02
0.02
0.26
0.05
0.04
0.03 25
0.15
0.53
0.27
0.04
0.11
0.18
0.26
0.75
0.00
- 20
0.17
0.32
0.38
0.65
0.01
-
0.10
0.15
0.05
0.75
0.00
0.56
0.42 15
0.32
1.33
0.14
0.05
0.46
0.13
0.28
0.13
0.01 10
0.01
0.01
0.10
0.01
0.01
0.07
0.01
0.05
0.09
125
0.16
0.19
0.02 5
0.56
0.10
0.02
0.02
0.01
0.09
0.03
0.18
0.56
0.20
0.18
0.02 0
100.00 0.91 1.79 2.94 3.38 3.92 3.39 3.19 4.43 6.53 7.80 5.46 8.14 9.16 8.74 8.49
0.91 2.70 5.64 9.02 12.94 16.33 19.52 23.95 30.47 38.28 43.74 51.88 61.04 69.78 78.27
Tulungagung,
126
XVI XVII XVIII XIX XX
26 27 28 29 30
-
0.07 -
0.02 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.33 -
0.16 -
0.08 -
1.40 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
127
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2.00 -
-
-
128
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.97 0.97 -
0.30 0.30 -
0.43 0.43 -
0.01 0.01 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.10 -
0.70 -
0.39 -
-
0.04 -
129
0.37 -
0.05 -
-
-
-
0.47 -
0.13 -
0.08 -
0.09 -
0.02 -
0.02 -
0.26 -
0.05 -
0.04 -
0.03 -
0.15 -
0.53 -
0.27 -
0.04 -
-
-
-
0.11 -
0.18 -
0.26 -
0.75 -
0.00 -
-
0.17 -
0.32 -
0.38 -
0.65 -
0.01 -
-
0.10 -
0.15 -
0.05 -
0.75 -
0.00 -
0.56 -
0.42 -
0.32 -
-
-
1.33 -
0.14 -
0.05 -
0.46 -
0.13 -
-
-
0.28 -
0.13 -
0.01 -
0.01 -
0.01 -
0.10 -
0.01 -
0.01 -
0.07 -
-
-
0.01 -
0.05 -
0.09 -
130
0.16 -
0.19 -
0.02 -
0.56 -
0.10 -
0.02 -
0.02 -
0.01 -
0.09 -
0.03 -
0.18 -
-
-
0.28 0.17 0.11 -
0.20 -
0.18 -
0.02 -
Tulungagung, 2019
Dibuat oleh :
KONSULTAN PERENCANA
CV. SENTOSA KARYA TEKNIK
EDI SANTOSO, ST
Direktur
131
REKAPITULASI RENCANA ANGGARAN BIAYA
NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PUSKESMAS REJOTANGAN
LOKASI : KECAMATAN REJOTANGAN KABUPATEN TULUNGAGUNG
SUMBERDANA : PAJAK ROKOK TAHUN 2019
KONSULTAN PERENCANA : CV. SENTOSA KARYA TEKNIK
Tulungagung, 2019
Mengetahui/Menyetujui Mengetahui/Menyetujui
KEPALA DINAS KESEHATAN KUASA PENGGUNA ANGGARAN
KABUPATEN TULUNGAGUNG
60,000,000.00 60,000,000.00
20,000,000.00 20,000,000.00
23,000,000.00 23,000,000.00
37,000,000.00
140,000,000.00 pagu 103,000,000.00 96,000,000.00
#REF!
#REF! fisik
PUSKESMAS REJOTANGAN
No TENAGA JUMLAH
PERALATAN
1 Dump truck 2
2 Pickup 1
3 Molen 2
4 vibrator 1
5 genset 1
6 Pompa air 1