Harga Upah
Kode Nama Kegiatan Vol Daerah Daerah
Datar Pegunungan
1 2 3 4 8
5
HARGA SATUAN BAHAN DAN UPAH
HARGA 2017
No. Nama Tenaga / Barang Satuan
datar
1 2 3 4
TENAGA
1 Tukang kayu/batu/besi/cat Org 75,000.00
2 Tukang kayu Org 85,000.00
3 Pekerja Org 65,000.00
4 Kepala Tukang Org 90,000.00
5 Mandor Org 95,000.00
BAHAN MATERIAL
BAHAN BANGUNAN
BAHAN ALAM: PASIR, BATU, KERIKIL, BATA, ASPAL, SEMEN
II.1.14 Batu Bata / Merah Bj 650.00
II.1.15 Batu belah, uk. 8/10 cm M3 200,000.00
II.1.16 Batu belah,Uk.10-15 Cm & 15 - 20 cm M3 200,000.00
II.1.22 Batu guary/batu besar ( uk. Crussher) M3 175,000.00
II.1.26 Batu lempeng M2 86,600.00
II.1.34 Batu pecah 2-3 cm M3 285,000.00
II.1.49 Ijuk Kg 5,000.00
II.1.50 Kapur Batu ( sirih ) Kg 1,100.00
II.1.51 Kapur Batu m3 1,100,000.00
II.1.55 Pasir pasang / beton M3 240,000.00
II.1.56 Pasir Urug M3 150,000.00
II.1.57 PC / Portland cement Kg 1,600.00
-
II.15 BAHAN JENIS PAKU :
II.15.1 Paku biasa Kg 14,700.00
Tulungagung, 2017
CV. WILIS
75,000.00
85,000.00
65,000.00
90,000.00
95,000.00
750.00
215,000.00
215,000.00
200,000.00
95,300.00
315,000.00
5,500.00
1,200.00
1,200,000.00
250,000.00
180,000.00
1,500.00
215,000.00
20,000.00
10,500,000.00
11,500,000.00
3,200,000.00
20,000,000.00
21,500,000.00
10,000,000.00
11,000,000.00
10,000,000.00
11,000,000.00
6,800,000.00
7,500,000.00
5,250,000.00
5,850,000.00
4,675,000.00
5,125,000.00
13,500.00
5,500.00
2,500.00
6,000.00
5,800.00
3,100.00
22,000.00
17,000.00
9,200.00
17,000.00
61,500.00
47,500.00
50,500.00
54,500.00
45,000.00
52,000.00
48,500.00
65,000.00
56,500.00
50,000.00
77,000.00
29,500.00
58,500.00
61,500.00
77,000.00
28,500.00
25,500.00
28,000.00
112,500.00
52,500.00
55,000.00
60,000.00
67,500.00
31,000.00
11,500.00
1,700.00
3,500.00
15,000.00
19,000.00
14,000.00
9,000.00
33,000.00
5,000.00
29,000.00
16,000.00
26,000.00
15,000.00
53,500.00
5,000.00
15,000.00
10,000.00
62,500.00
17,000.00
15,000.00
30,000.00
7,000.00
38,500.00
50,000.00
70,000.00
35,000.00
65,000.00
15,500.00
20,000.00
13,500.00
9,500.00
45,000.00
11,500.00
6,500.00
6,500.00
22,500.00
39,000.00
16,500.00
32,000.00
80,000.00
102,000.00
207,000.00
67,000.00
67,000.00
265,000.00
91,500.00
15,000.00
2017
RI SAPUTRO, SH
ANALISA HARGA SATUAN PEKERJAAN
A.4.1.1.5 Membuat 1m3 beton mutu f'c = 14.5 Mpa (K175) slump (12 ± 2)cm w/c = 0.66
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.650 65,000.00
Tukang Batu L.02 OH 0.275 75,000.00
Kepala Tukang L.03 OH 0.028 90,000.00
Mandor L.04 OH 0.083 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC / Portland cement kg 326.000 1,600.00
Pasir pasang / beton kg 0.5429 240,000.00
Batu pecah 2-3 cm kg 0.7622 285,000.00
Air bersih Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.1.1.7 Membuat 1m3 beton mutu f'c = 19.3 Mpa (K225) slump (12 ± 2)cm w/c = 0.58
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.650 65,000.00
Tukang Batu L.02 OH 0.275 75,000.00
Kepala Tukang L.03 OH 0.028 90,000.00
Mandor L.04 OH 0.083 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC / Portland cement kg 371.000 1,600.00
Pasir pasang / beton m3 0.4986 240,000.00
Batu pecah 2-3 cm m3 0.7756 285,000.00
Air bersih Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.1.1.8 Membuat 1m3 beton mutu f'c = 21.7 Mpa (K250) slump (12 ± 2)cm w/c = 0.56
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.650 65,000.00
Tukang Kayu L.02 OH 0.275 85,000.00
Kepala Tukang L.03 OH 0.028 90,000.00
Mandor L.04 OH 0.083 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC / Portland cement kg 384.000 1,600.00
Pasir pasang / beton m3 0.4943 240,000.00
Batu pecah 2-3 cm m3 0.7696 285,000.00
Air bersih Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14 % ) 14 % x D
F Harga Satuan Pekerja (D + E )
A.4.1.1.9 Membuat 1m3 beton mutu f'c = 24 Mpa (K275) slump (12 ± 2)cm w/c = 0.53
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.650 65,000.00
Tukang Batu L.02 OH 0.275 75,000.00
Kepala Tukang L.03 OH 0.028 90,000.00
Mandor L.04 OH 0.083 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC / Portland cement kg 406.000 1,600.00
Pasir pasang / beton m3 0.4886 240,000.00
Batu pecah 2-3 cm m3 0.7600 285,000.00
Air bersih Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
B BAHAN
Kayu bekisting m3 0.045 3,000,000.00
Paku biasa kg 0.300 14,700.00
Minyak bekisting liter 0.100 5,300.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.4.1.11 Pemasangan 1m2 dinding Batu Bata / Merah (5x11x22) tebal 1/2 bata camp 1SP : 6PP
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.300 65,000.00
Tukang Batu L.02 OH 0.100 75,000.00
Kepala Tukang L.03 OH 0.010 90,000.00
Mandor L.04 OH 0.015 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Bata / Merah bh 70.000 650.00
PC / Portland cement kg 8.320 1,600.00
Pasir pasang / beton m3 0.049 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
B BAHAN
PC / Portland cement kg 7.776 1,600.00
Pasir pasang / beton m3 0.023 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.4.2.6 Pemasangan 1m2 Plesteran 1SP : 6PP tebal 15 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.300 65,000.00
Tukang Batu L.02 OH 0.150 75,000.00
Kepala Tukang L.03 OH 0.015 90,000.00
Mandor L.04 OH 0.015 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC / Portland cement kg 4.416 1,600.00
Pasir pasang / beton m3 0.027 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.5.2 HARGA SATUAN PEKERJAAN ATAP
A.4.5.2.1a Pemasangan 1m2 atap genteng MKP lokal
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.150 65,000.00
Tukang Kayu L.02 OH 0.075 85,000.00
Kepala Tukang L.03 OH 0.0075 90,000.00
Mandor L.04 OH 0.008 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng mkp bh 25.000 2,300.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.6.1.7c Pembuatan dan Pemasangan 1m2 daun pintu dan jendela Kaca kayu kruing
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.800 65,000.00
Tukang Kayu L.02 OH 2.400 85,000.00
Kepala Tukang L.03 OH 0.240 90,000.00
Mandor L.04 OH 0.040 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kruing Papan m3 0.024 6,850,000.00
Lem ( Kayu + Tembok ) kg 0.300 12,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.6.1.19 Pemasangan 1m2 rangka langit langit (50 x 100) cm Kayu Tahun Balok ( Mauni/ Akasia )
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.150 65,000.00
Tukang Kayu L.02 OH 0.300 85,000.00
Kepala Tukang L.03 OH 0.030 90,000.00
Mandor L.04 OH 0.075 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.015 4,500,000.00
Paku biasa kg 0.200 14,700.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
B BAHAN
Soda api kg 0.050 15,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14 % ) 14 % x D
F Harga Satuan Pekerja (D + E )
A.4.7.1.4 1m2 pengecatan bidang kayu baru (1lapis plamur, 1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.070 65,000.00
Tukang cat L.02 OH 0.009 75,000.00
Kepala Tukang L.03 OH 0.006 90,000.00
Mandor L.04 OH 0.0030 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat Meny kayu kg 0.200 24,700.00
Plamur kayu kg 0.150 24,700.00
Cat Dasar Kayu kg 0.170 27,800.00
Cat Kayu kg 0.260 58,300.00
Kuas 3 " bh 0.010 13,700.00
Minyak Cat / Thiner B kg 0.030 14,700.00
Kertas gosok ( rempelas ) lbr 0.200 3,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.7.1.10 1m2 pengecatan tembok baru (1lapis plamur, 1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 65,000.00
Tukang cat L.02 OH 0.063 75,000.00
Kepala Tukang L.03 OH 0.0063 90,000.00
Mandor L.04 OH 0.0030 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamur Tembok kg 0.100 14,200.00
Cat Tembok kg 0.100 24,500.00
Cat Tembok kg 0.260 24,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.7.1.10b 1m2 pengecatan tembok baru (1lapis plamur, 1lapis cat dasar , 2 lapis cat penutup)wathersield
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 65,000.00
Tukang cat L.02 OH 0.063 75,000.00
Kepala Tukang L.03 OH 0.0063 90,000.00
Mandor L.04 OH 0.0030 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamur Tembok kg 0.100 14,200.00
Cat Tembok exterior wheathershield kg 0.100 105,000.00
Cat Tembok exterior wheathershield kg 0.260 105,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.7.1.11 1m2 pengecatan tembok lama (1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.028 65,000.00
Tukang cat L.02 OH 0.042 75,000.00
Kepala Tukang L.03 OH 0.0042 90,000.00
Mandor L.04 OH 0.0030 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat Tembok kg 0.120 24,500.00
Cat Tembok kg 0.180 24,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
A.4.7.1.21c 1m2 Pengecatan Genteng (1lapis cat dasar, 2lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.0280 65,000.00
Tukang cat L.02 OH 0.0420 75,000.00
Kepala Tukang L.03 OH 0.0042 90,000.00
Mandor L.04 OH 0.0025 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat genteng kg 0.350 45,000.00
Cat genteng ltr 0.160 45,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C )
E Overhead & Profit ( maks 14% ) D x14%
F Harga Satuan Pekerja (D + E )
Tulungagung, 2017
CV. WILIS
78,000.00
15,000.00
1,800.00
5,700.00
100,500.00
368,000.00
153,096.00
216,799.50
15,000.00
752,895.50
853,395.50
119,475.37
972,870.87
Jumlah Harga
( Rp)
107,250.00
20,625.00
2,520.00
7,885.00
138,280.00
521,600.00
130,296.00
217,227.00
16,125.00
885,248.00
1,023,528.00
143,293.92
1,166,821.92
Jumlah Harga
( Rp)
107,250.00
20,625.00
2,520.00
7,885.00
138,280.00
593,600.00
119,664.00
221,046.00
16,125.00
950,435.00
1,088,715.00
152,420.10
1,241,135.10
Jumlah Harga
( Rp)
107,250.00
23,375.00
2,520.00
7,885.00
141,030.00
614,400.00
118,632.00
219,336.00
16,125.00
968,493.00
1,109,523.00
155,333.22
1,264,856.22
Jumlah Harga
( Rp)
107,250.00
20,625.00
2,520.00
7,885.00
138,280.00
649,600.00
117,264.00
216,600.00
16,125.00
999,589.00
1,137,869.00
159,301.66
1,297,170.66
Jumlah Harga
( Rp)
4,550.00
5,250.00
630.00
380.00
10,810.00
94,500.00
2,325.00
96,825.00
107,635.00
15,068.90
122,703.90
12,270.39
Jumlah Harga
( Rp)
33,800.00
22,100.00
2,340.00
2,470.00
60,710.00
135,000.00
4,410.00
530.00
139,940.00
200,650.00
28,091.00
228,741.00
Jumlah Harga
( Rp)
33,800.00
22,100.00
2,340.00
2,470.00
60,710.00
4,410.00
530.00
4,940.00
65,650.00
9,191.00
74,841.00
Jumlah Harga
( Rp)
260,000.00
260,000.00
260,000.00
36,400.00
296,400.00
Jumlah Harga
( Rp)
19,500.00
7,500.00
900.00
1,425.00
29,325.00
45,500.00
22,992.00
9,600.00
78,092.00
107,417.00
15,038.38
122,455.38
Jumlah Harga
( Rp)
19,500.00
7,500.00
900.00
1,425.00
29,325.00
45,500.00
13,312.00
11,760.00
70,572.00
99,897.00
13,985.58
113,882.58
Jumlah Harga
( Rp)
19,500.00
11,250.00
1,350.00
1,425.00
33,525.00
12,441.60
5,520.00
17,961.60
51,486.60
7,208.12
58,694.72
Jumlah Harga
( Rp)
19,500.00
11,250.00
1,350.00
1,425.00
33,525.00
7,065.60
6,480.00
13,545.60
47,070.60
6,589.88
53,660.48
Jumlah Harga
( Rp)
45,500.00
26,250.00
3,150.00
3,325.00
78,225.00
43,788.00
16,000.00
10,800.00
3,750.00
74,338.00
152,563.00
21,358.82
173,921.82
Jumlah Harga
( Rp)
45,500.00
26,250.00
3,150.00
3,325.00
78,225.00
46,640.00
16,640.00
10,800.00
4,050.00
78,130.00
156,355.00
21,889.70
178,244.70
Jumlah Harga
( Rp)
58,500.00
33,750.00
4,050.00
4,275.00
100,575.00
59,360.00
14,880.00
4,320.00
4,850.00
83,410.00
183,985.00
25,757.90
209,742.90
Jumlah Harga
( Rp)
1,950.00
5,950.00
630.00
380.00
8,910.00
14,300.00
179.00
14,479.00
23,389.00
3,274.46
26,663.46
Jumlah Harga
( Rp)
1,365.00
1,785.00
180.00
95.00
3,425.00
15,750.00
2,840.00
18,590.00
22,015.00
3,082.10
25,097.10
Jumlah Harga
( Rp)
9,750.00
6,375.00
675.00
760.00
17,560.00
57,500.00
57,500.00
75,060.00
10,508.40
85,568.40
Jumlah Harga
( Rp)
26,000.00
17,000.00
1,800.00
190.00
44,990.00
20,000.00
12,800.00
7,680.00
40,480.00
85,470.00
11,965.80
97,435.80
Jumlah Harga
( Rp)
455,000.00
1,785,000.00
189,000.00
33,250.00
2,462,250.00
7,150,000.00
18,375.00
12,600.00
7,180,975.00
9,643,225.00
1,350,051.50
10,993,276.50
Jumlah Harga
( Rp)
65,000.00
255,000.00
27,000.00
4,750.00
351,750.00
274,000.00
630.00
274,630.00
626,380.00
87,693.20
714,073.20
Jumlah Harga
( Rp)
52,000.00
204,000.00
21,600.00
3,800.00
281,400.00
164,400.00
3,780.00
168,180.00
449,580.00
62,941.20
512,521.20
Jumlah Harga
( Rp)
9,750.00
25,500.00
2,700.00
7,125.00
45,075.00
69,300.00
2,940.00
72,240.00
117,315.00
16,424.10
133,739.10
Jumlah Harga
( Rp)
650.00
42,500.00
4,500.00
475.00
48,125.00
188,000.00
188,000.00
236,125.00
33,057.50
269,182.50
Jumlah Harga
( Rp)
650.00
8,500.00
900.00
47.50
10,097.50
35,500.00
35,500.00
45,597.50
6,383.65
51,981.15
Jumlah Harga
( Rp)
975.00
12,750.00
1,350.00
76.00
15,151.00
8,500.00
8,500.00
23,651.00
3,311.14
26,962.14
Jumlah Harga
( Rp)
650.00
8,500.00
900.00
47.50
10,097.50
15,000.00
15,000.00
25,097.50
3,513.65
28,611.15
Jumlah Harga
( Rp)
650.00
8,500.00
900.00
47.50
10,097.50
20,500.00
20,500.00
30,597.50
4,283.65
34,881.15
Jumlah Harga
( Rp)
6,500.00
17,000.00
1,800.00
47.50
25,347.50
15,000.00
15,000.00
40,347.50
5,648.65
45,996.15
Jumlah Harga
( Rp)
975.00
12,750.00
1,350.00
760.00
15,835.00
29,000.00
29,000.00
44,835.00
6,276.90
51,111.90
Jumlah Harga
( Rp)
1,300.00
17,000.00
1,800.00
95.00
20,195.00
83,000.00
83,000.00
103,195.00
14,447.30
117,642.30
Jumlah Harga
( Rp)
975.00
12,750.00
1,350.00
76.00
15,151.00
101,200.00
825.00
102,025.00
117,176.00
16,404.64
133,580.64
Jumlah Harga
( Rp)
9,750.00
285.00
10,035.00
790.00
790.00
10,825.00
1,515.50
12,340.50
Jumlah Harga
( Rp)
4,550.00
675.00
540.00
285.00
6,050.00
4,940.00
3,705.00
4,726.00
15,158.00
137.00
441.00
640.00
29,747.00
35,797.00
5,011.58
40,808.58
Jumlah Harga
( Rp)
1,300.00
4,725.00
567.00
285.00
6,877.00
1,420.00
2,450.00
6,370.00
10,240.00
17,117.00
2,396.38
19,513.38
Jumlah Harga
( Rp)
1,300.00
4,725.00
567.00
285.00
6,877.00
1,420.00
10,500.00
27,300.00
39,220.00
46,097.00
6,453.58
52,550.58
Jumlah Harga
( Rp)
1,820.00
3,150.00
378.00
285.00
5,633.00
2,940.00
4,410.00
7,350.00
12,983.00
1,817.62
14,800.62
Jumlah Harga
( Rp)
1,300.00
4,725.00
567.00
285.00
6,877.00
2,450.00
6,370.00
8,820.00
15,697.00
2,197.58
17,894.58
Jumlah Harga
( Rp)
13,000.00
22,500.00
7,200.00
1,425.00
44,125.00
14,500.00
8,000.00
3,200.00
3,200.00
9,750.00
15,000.00
13,750.00
67,400.00
350.00
350.00
111,875.00
15,662.50
127,537.50
Jumlah Harga
( Rp)
3,250.00
5,625.00
720.00
285.00
9,880.00
23,905.00
1,760.00
25,665.00
35,545.00
4,976.30
40,521.30
Jumlah Harga
( Rp)
1,820.00
3,150.00
378.00
237.50
5,585.50
15,750.00
7,200.00
22,950.00
28,535.50
3,994.97
32,530.47
Jumlah Harga
( Rp)
4,550.00
675.00
540.00
237.50
6,002.50
137.00
22,050.00
22,187.00
28,189.50
3,946.53
32,136.03
2017
DIRI SAPUTRO, SH
BACK UP PERHITUNGAN VOLUME PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi
2 Pengupasan Cat Lama
3 Pas. Lisiplank 20 cm
Vol 5.00 + 4.00 = 9.00
9.00
2 Pas. Bubungan
14.00 = 14.00
14.00
3 Pas. Talang miring BJLS 30 lebar 90 cm
### 8.00 = 8.00
8.00
IV PEKERJAAN PLAFOND
1 Pas. Rangka plafond baru Kayu tahun
Volume 1 17.10 x 7.60 =
2 Pasang plapond
Sama dengan luas rangka plapond
2 Cat plafond
17.10 x 7.60 = 129.96
129.96
3 Cat kayu baru
kusen
P.1 = 0.24 x 6.32 x 1 = 1.52
= 0.36 x 1.82 x 1 = 0.66
P.2 = 0.24 x 5.92 x 1 = 1.42
= 0.36 x 0.92 x 1 = 0.33
PJ.1 = 0.24 x 7.44 x 3 = 5.36
= 0.36 x 3.39 x 3 = 3.66
PJ.2 = 0.24 x 7.84 x 1 = 1.88
= 0.36 x 4.29 x 1 = 1.54
J.1 = 0.24 x 6.58 x 5 = 7.90
= 0.36 x 3.29 x 5 = 5.92
J.2 = 0.24 x 6.58 x 2 = 3.16
= 0.36 x 3.29 x 2 = 2.37
D.pintu P.1 = 0.61 x 2.01 x 2 x 4 = 9.81
D.pintu P.2 = 0.82 x 2.01 x 2 x 4 = 13.19
D.Jendela = 0.22 x 3.7 x 14 x 1 = 11.40
Lisplank = 0.25 x 58.21 = 14.55 +
84.66
EKERJAAN
TULUNGAGUNG
= 1.00 Ls
= 1.00 Ls
0.10
0.00
0.00
0.10 = 0.10 m3
62.50
49.00
6.61
118.11 x 50% = 59.06 m2
= 9.00 m'
= 118.11 m2
= 14.00 m'
= 8.00 m'
129.96
129.96 x 70% = 90.97 m2
= 129.96 m2
= 81.00 m'
80.02 = 412.18 m2
= 129.96 m2
= 84.66 m2
Tulungagung, 2017
Dibuat Oleh
CV. WILIS
I PEKERJAAN PERSIAPAN
1 Err:509
2 Err:509
3 Pengupasan Cat Lama
IV PEKERJAAN PLAFOND
1 Pas. Rangka plafond baru Kayu tahun
Volume 1 1.50 x 6.00 = 9.00
Volume 2 0.80 x 9.60 x 1.00 = 7.68
11.00 x 10.00 x 1.00 = 110.00
126.68
2 Pasang plapond
Sama dengan luas rangka plapond
2 Cat plafond
Induk = 32.00 x 5.00 = 160.00
Joglo = 1.90 x 4.60 x 2.00 = 17.48
Teras Dpn = 1.50 x 18.00 = 27.00
Teras Blkng = 1.50 x 18.00 = 27.00
Gewel Dpn = 0.80 x 9.70 x 2.00 = 15.52
247.00
3 Cat kayu baru
kusen
P.1 = 0.24 x 5.72 x 8 = 10.98
= 0.36 x 0.92 x 8 = 2.65
= 0.4 x 0.92 x 8 = 2.94
P.2 = 0.24 x 4.94 x 2 = 2.37
PJ.1 = 0.24 x 9.02 x 2 = 4.33
= 0.36 x 5.86 x 2 = 4.22
= 0.4 x 2.64 x 2 = 2.11
J.1 = 0.24 x 6.38 x 6 = 9.19
= 0.36 x 3.19 x 6 = 6.89
= 0.4 x 1.58 x 6 = 3.79
J.2 = 0.24 x 5.98 x 6 = 8.61
= 0.36 x 2.99 x 6 = 6.46
= 0.4 x 1.38 x 6 = 3.31
BV = 0.24 x 4.44 x 2 = 2.13
= 0.36 x 0.62 x 2 = 0.45
D.pintu P.1 = 0.92 x 2.01 x 2 x 2 = 7.40
D.pintu P.2 = 0.82 x 2.01 x 8 x 2 = 26.37
D.pintu P.2 = 0.72 x 2.01 x 2 x 2 = 5.79
D.jendela = 0.22 x 3.18 x 10 = 7.00
Lisplank = 0.25 x 69.4 = 17.35 +
134.34
Tulungagung,
HENRY FRISMAN
RJAAN
LUNGAGUNG
= 1.00 Ls
= 1.00 Ls
= 1.00 Ls
= 6.59 m2
= 4.00 bh
= 1.00 bh
= 12.00 bh
= 32.00 m'
= 126.68 m2
= 126.68 m2
= 48.40 m'
100.99 = 545.51 m2
= 247.00 m2
= 134.34 m2
Tulungagung, 2017
Dibuat Oleh
CV. WILIS
PEKERJAAN : Err:509
LOKASI : PUSTU DS. WATES, KEC.CAMPURDARAT, KAB.TULUNGAGUNG
SUMBER DANA : APBD TAHUN 2016
I PEKERJAAN PERSIAPAN
1 Err:509
2 Err:509
3 Err:509
IV PEKERJAAN PLAFOND
1 Pas. Rangka plafond baru Kayu tahun
Volume 1 1.50 x 16.80 = 25.20
Volume 2 11.00 x 9.55 = 105.05
Volume 3 0.80 x 10.90 x 1.00 = 8.72
138.97
2 Pasang plapond
Sama dengan luas rangka plapond
2 Cat plafond
Induk = 15.00 x 5.00 = 75.00
KM/WC = 1.25 x 4.60 = 5.75
Teras Dpn = 1.50 x 16.80 = 25.20
Teras Blkng = 1.50 x 16.80 = 25.20
Gewel Dpn = 0.80 x 9.20 x 2.00 = 14.72
145.87
3 Cat kayu baru
kusen
P.1 = 0.24 x 5.72 x 9 = 12.36
= 0.36 x 0.92 x 9 = 2.98
= 0.4 x 0.92 x 9 = 3.31
P.2 = 0.24 x 4.94 x 2 = 2.37
PJ.1 = 0.24 x 8.86 x 1 = 2.13
= 0.36 x 5.86 x 1 = 2.11
= 0.4 x 2.54 x 1 = 1.02
PJ.2 = 0.24 x 7.36 x 1 = 1.77
= 0.36 x 1.48 x 1 = 0.53
= 0.4 x 0.92 x 1 = 0.37
J.1 = 0.24 x 6.48 x 6 = 9.33
= 0.36 x 3.24 x 6 = 7.00
= 0.4 x 1.58 x 6 = 3.79
BV = 0.24 x 4.44 x 3 = 3.20
= 0.36 x 0.62 x 3 = 0.67
D.pintu P.1 = 0.92 x 2.01 x 2 x 11 = 40.68
D.pintu P.2 = 0.82 x 2.01 x 2 x 2 = 6.59
Lisplank = 0.25 x 55.4 = 13.85 +
114.05
KERJAAN
ULUNGAGUNG
= 1.00 Ls
= 1.00 Ls
= 1.00 Ls
= 8.00 Bh
= 49.00 m'
= 138.97 m2
= 138.97 m2
= 61.60 m'
99.20 = 539.30 m2
= 145.87 m2
= 114.05 m2
Tulungagung, 2017
Dibuat Oleh
CV. WILIS
I PEKERJAAN PERSIAPAN
1 Pengukuran / Bouplank
2 Pembersihan Lokasi
3 Bongkaran Beton
4 Bongkaran Dinding
5 Bongkaran Kusen
II PEKERJAAN PASANGAN
1 Pas.Bata merah cam 1 Pc : 6 Psr ( tebal 1/2 bata)
1.20 x 3.20 = 3.84
1.00 x 1.20 = 1.20
3.00 x 3.00 = 9.00
14.04
2 Plesteran cam. 1 Pc : 6 Psr ( tebal 1,5 cm )
14.04 x 2 dari pas. Bata 1 : 6 = 28.08
1.00 x 3.00 = 3.00
31.08
4.69
4 Melamine
25.74 dari luas lapis HPL
Tulungagung,
Dibuat Oleh
CV. WILIS
HENRY FRISMAND
Direktur
N
= 1.00 Ls
= 1.00 Ls
= 1.00 Ls
= 1.00 Ls
= 1.00 Ls
= 14.04 m2
= 31.08 m2
= 0.35 m3
= 47.78 kg
4.30 = 4.30 m2
= 0.06 m3
= 2.73 m2
= 25.74 m2
= 1.00 bh
= 4.00 bh
= 1.93 m2
= 418.08 m2
= 172.00 m2
= 4.69 m2
= 25.74 m2
Tulungagung, 2017
Dibuat Oleh
CV. WILIS
HARGA SATUAN
No URAIAN PEKERJAAN VOLUME SAT.
(Rp)
1 2 3 4
I PEKERJAAN PERSIAPAN
1 Pengukuran / Bouwplank 1.00 Ls 150,000.00
2 Pembersihan lokasi 1.00 Ls 334,018.68
3 Bongkaran Beton 1.00 Ls 950,000.00
4 Bongkaran Dinding 1.00 Ls 500,000.00
5 Bongkaran Kusen 1.00 Ls 350,000.00
II PEKERJAAN PASANGAN
1 Pas.Bata merah cam 1 Pc : 6 Psr ( tebal 1/2 bata) 14.04 m2 113,882.58
2 Plesteran cam. 1 Pc : 6 Psr ( tebal 1,5 cm ) 31.08 m2 53,660.48
VI PEKERJAAN CAT-CATAN
1 Cat dinding baru 418.08 m2 19,513.38
2 Cat plafond 172.00 m2 17,894.58
3 Cat kayu baru 4.69 m2 40,808.58
4 Melamine 25.74 m2 127,537.50
JUMLAH KONSTRUKSI
PPN 10%
JUMLAH SELURUHNYA
Tulungagung, 2017
CV. WILIS
HENRY FRISMANDIRI SAPUTRO, SH
Direktur
JUMLAH
( Rp)
5
150,000.00
334,018.68
950,000.00
500,000.00
350,000.00
2,284,018.68
1,598,911.42
1,667,767.84
3,266,679.26
408,387.67
586,279.23
983,586.30
1,978,253.20
659,596.59
1,949,419.84
10,937,800.00
269,182.50
107,848.56
13,923,847.49
403,755.08
403,755.08
8,158,153.91
3,077,867.76
191,392.24
3,282,305.10
14,709,719.01
1,856,000.00
180,000.00
2,036,000.00
38,602,272.73
3,860,227.27
42,462,500.00
2017
NDIRI SAPUTRO, SH
REKAPITULASI RENCANA ANGGARAN BIAYA
No URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN PASANGAN
VI PEKERJAAN CAT-CATAN
JUMLAH
PPN 10%
JUMLAH SELURUHNYA
Terbilang : Empat Puluh Dua Juta Empat Ratus Enam Puluh Dua Ribu Lima Ratus Rupiah
Tulungagung, 2017
Dibuat Oleh
CV. WILIS
UNG KANTOR
JUMLAH
2,284,018.68
3,266,679.26
1,978,253.20
13,923,847.49
403,755.08
14,709,719.01
2,036,000.00
38,602,272.73
3,860,227.27
42,462,500.00
Lima Ratus Rupiah
2017
Dibuat Oleh
CV. WILIS
MANDIRI SAPUTRO, SH
PEMERINTAH KABUPATEN TULUNGAGUNG
DINAS KESEHATAN
PUSKESMAS SENDANG
KABUPATEN TULUNGAGUNG
Nama Kegiatan :
PEMELIHARAAN RUTIN/BERKALA
KANTOR BPMPD
Nama Pekerjaan :
PEMELIHARAAN RUTIN / BERKALA GEDUNG KANTOR
Lokasi :
PUSKESMAS SENDANG
SUMBER DANA :
APBD TAHUN ANGGARAN 2017