SLEMAN 2016
Bahan - 1
NO. URAIAN TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 2
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN
ANALISA KONSTRUKSI
PEKERJAAN PERSIAPAN
1 1.00 m1 Pek. Pengukuran & Pemasangan Bowplank 90,939.00
2 1.00 m2 Pekerjaan Pengukuran Gedung 12,595.00
3 1.00 m2 Membersihkan Lapangan dan Perataan 12,100.00
4 1.00 m2 Pembuatan jalan sementara, tebal 25 cm 91,410.00
5 1.00 m2 Pembuatan Jalan Sementara 76,230.00
6 1.00 m2 Pek. Kantor Direksi Keet , dengan lantai plesteran 7,554,965.00
7 1.00 m1 Pagar Sementara dari Seng Gelombang tinggi 2 m 418,165.00
8 1.00 m1 Pagar Sementara dari Kawat Duri tinggi 1.8 m 58,421.00
9 1.00 m1 Pagar Sementara dari Kayu tinggi 2 m 346,995.00
10 1.00 m1 Pasang pagar kawat jaring galvanis, tinggi 1,00 m 15,171.00
11 1.00 m2 Pembuatan Gudang Semen dan Alat - alat 1,248,599.00
12 1.00 m2 Pembuatan Rumah Jaga / Konstruksi Kayu 1,475,815.00
13 1.00 m2 Pembuatan Bedeng Buruh 1,225,499.00
14 1.00 m2 Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm 171,116.00
15 1.00 m2 Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm 44,159.00
16 1.00 m1 Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm 243,837.00
17 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan seng) 804,137.00
18 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan flexi) 441,137.00
PEKERJAAN BONGKARAN
1 1.00 m3 Membongkar pasangan batu kali 334,400.00
2 1.00 m3 Membongkar pasangan batu merah dan membersihkan 160,600.00
3 1.00 m3 Membongkar beton bertulang dan membersihkan 554,400.00
4 1.00 m2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 14,300.00
5 1.00 m2 Mengupas plesteran lama 9,625.00
6 1.00 m2 Membongkar genteng / sirap untuk dipergunakan lagi 14,300.00
7 1.00 m2 Membongkar atap seng 10,450.00
8 1.00 m2 Membongkar usuk / reng dipakai lagi 19,811.00
9 1.00 m2 Membongkar usuk / reng tidak dipakai lagi 14,300.00
10 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi 837,100.00
11 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi 88,000.00
13 1.00 m3 Mengerjakan kembali bangunan kayu yang telah dibongkar 1,388,200.00
PEKERJAAN TANAH
1 1.00 m3 Menggali tanah biasa sedalam 1 meter 52,250.00
2 1.00 m3 Menggali tanah biasa sedalam 2 meter 64,350.00
3 1.00 m3 Menggali tanah biasa sedalam 3 meter 76,670.00
4 1.00 m3 Menggali tanah keras sedalam 1 meter 69,520.00
5 1.00 m3 Menggali tanah cadas sedalam 1 meter 105,600.00
6 1.00 m3 Menggali tanah lumpur sedalam 1 meter 84,150.00
7 1.00 m2 Mengerjakan stripping tebing setinggi 1 meter 3,850.00
8 1.00 m3 Urug kembali bekas galian 14,762.00
9 1.00 m3 Membuang tanah sejauh 30 meter 22,880.00
10 1.00 m3 Membuang tanah sejauh 150 meter 39,556.00
11 1.00 m3 Memadatkan tanah (per 20 cm) 38,500.00
12 1.00 m2 Meratakan tanah ditumbuk halus 17,600.00
13 1.00 m3 Mengurug pasir urug 218,900.00
14 1.00 m3 Memasang Lapisan pudel campuran 1 KP : 3 PP : 7 TL 477,757.00
15 1.00 m3 Memasang Lapisan pudel campuran 1 KP : 5 TL 457,380.00
16 1.00 m3 Memasang lapisan ijuk tebal 10 cm 44,550.00
17 1.00 m3 Pemasangan lapisan ijuk 110,550.00
18 1.00 m3 Mengurug sirtu padat untuk peninggian lantai bangunan 105,050.00
19 1.00 m3 Urug tanah (mendatangkan) 126,500.00
20 1.00 m3 Membuang tanah dengan menghampar 17,600.00
21 1.00 m1 Membuat sumur 309,595.00
22 1.00 m2 Gebalan rumput 37,950.00
PEKERJAAN PONDASI
1 1.00 m3 Pasangan pondasi 1 Pc : 1 Ps 335,566.00
2 1.00 m3 Pasangan pondasi 1 Pc : 2 Ps 341,891.00
3 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 3 PP 344,971.00
4 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 4 PP 346,874.00
5 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 5 PP 348,128.00
6 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 6 PP 349,041.00
7 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 8 PP 350,218.00
8 1.00 m3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 333,543.00
9 1.00 m3 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 PP 274,263.00
10 1.00 m3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 295,543.00
Rekapitulasi - 3
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
PEKERJAAN DINDING
1 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP 29,350,673.00
2 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP 29,351,609.00
3 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP 29,350,891.00
4 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP 29,352,505.00
5 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP 29,357,273.00
6 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP 29,329,618.00
7 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP 14,674,232.00
8 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP 14,673,875.00
9 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP 14,674,132.00
10 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP 14,674,321.00
11 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP 14,675,152.00
12 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran spesi 1 PC : 8 PP 14,675,067.00
13 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 KP : 10 PP 14,674,671.00
14 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 1 PP 14,665,950.00
15 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 2 PP 14,668,484.00
16 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 3 PP 1,761,273.00
17 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 4 PP 1,772,173.00
18 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 3 PP 2,806,048.00
19 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 4 PP 2,813,949.00
20 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 3 PP 2,750,251.00
21 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 4 PP 2,756,251.00
22 1.00 m2 Memasang dinding terawang (roster) ukuran 25 x 25 cm, campuran spesi 1 PC : 3 PP 1,801,602.00
23 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP 6,641,602.00
24 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP 6,641,833.00
25 1.00 m2 Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP 19,295,892.00
26 1.00 m2 Pasangan dinding batako 1,037,171.00
27 1.00 m1 Memasang rollag bata , campuran spesi 1 PC : 3 PP 3,566,755.00
PEKERJAAN BETON
1 1.00 m3 Membuat beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87 #VALUE!
2 1.00 m3 Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78 #VALUE!
3 1.00 m3 Membuat beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72 #VALUE!
4 1.00 m3 Membuat lantai kerja beton mutu fc = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 #VALUE!
5 1.00 m3 Membuat beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66 #VALUE!
6 1.00 m3 Membuat beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61 #VALUE!
7 1.00 m3 Membuat beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58 #VALUE!
8 1.00 m3 Membuat beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56 #VALUE!
9 1.00 m3 Membuat beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53 #VALUE!
10 1.00 m3 Membuat beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52 #VALUE!
11 1.00 m3 Membuat beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49 #VALUE!
12 1.00 m3 Membuat beton mutu fc = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48 #VALUE!
13 1.00 m3 Membuat beton kedap air dengan strorox 100 408,980.00
14 10.00 kg Pembesian dengan besi ulir 194,216.00
15 10.00 kg Pembesian dengan besi polos 194,216.00
16 10.00 kg Memasang kabel presstressed polos/strands 187,770.00
17 1.00 kg Memasang jaring kawat baja/wire mesh 9,185.00
0 0.00 - JASA 10 % 182,490.00
19 1.00 m2 Cetakan beton / begisting memakai multiplek 185,306.00
20 1.00 m3 Membongkar cetakan 264,000.00
21 Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken ) 2,061,675.00
22 Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding ) 1,219,075.00
23 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) tanpa dolken, 100 kg besi #VALUE!
24 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) tanpa dolken, 125 kg besi #VALUE!
25 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) tanpa dolken, 150 kg besi #VALUE!
26 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) tanpa dolken, 175 kg besi #VALUE!
27 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) tanpa dolken, 200 kg besi #VALUE!
28 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai dolken, 100 kg besi #VALUE!
29 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai dolken, 125 kg besi #VALUE!
30 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai dolken, 150 kg besi #VALUE!
31 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai dolken, 175 kg besi #VALUE!
32 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai scaffolding, 100 kg besi #VALUE!
33 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai scaffolding, 100 kg besi #VALUE!
34 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai scaffolding, 125 kg besi #VALUE!
35 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai scaffolding, 150 kg besi #VALUE!
36 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai scaffolding, 175 kg besi #VALUE!
37 1.00 m3 Pekerjaan beton bertulang fc' = 19.3 MPa ( K-225) memakai scaffolding, 200 kg besi #VALUE!
Rekapitulasi - 4
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
38 1.00 m1 Pembuatan tiang pancang (40 x 40) cm, beton bertulang 1,266,881.00
39 1.00 m1 Pembuatan tiang pancang (35 x 35) cm, beton bertulang 1,000,263.00
40 1.00 m1 Memasang 1 m PVC Waterstop lebar 150 mm 6,864.00
41 1.00 m1 Memasang PVC Waterstop lebar 200 mm 8,107.00
42 1.00 m1 Membuat PVC Waterstop lebar 230 mm 320 mm 9,152.00
43 1.00 m1 Cor beton kerb ( 15 x 30 ) cm 29,843.00
44 1.00 m1 Cor beton Devider ( 30 x 30 ) cm 49,725.00
PEKERJAAN PLESTERAN
1 1.00 m2 Memasang plesteran 1 PC : 1 PP, tebal 15 mm 41,789.00
2 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm 41,844.00
3 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 15 mm 42,184.00
4 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 15 mm 42,155.00
5 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 15 mm 42,496.00
6 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 15 mm 42,619.00
7 1.00 m2 Memasang plesteran 1 PC : 7 PP, tebal 15 mm 42,799.00
8 1.00 m2 Memasang plesteran 1 PC : 8 PP, tebal 15 mm 42,979.00
9 1.00 m2 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm 40,751.00
10 1.00 m2 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm 42,130.00
11 1.00 m2 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm 38,996.00
12 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm 40,538.00
13 1.00 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm 40,250.00
14 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 20 mm 56,104.00
15 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 20 mm 46,327.00
16 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 20 mm 56,427.00
17 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 20 mm 56,973.00
18 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 20 mm 57,045.00
19 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm 55,771.00
20 1.00 m2 Memasang Berapen 1 PC : 5 PP, tebal 15 mm 25,435.00
21 1.00 m1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 10,901.00
22 1.00 m1 Sponengan (untuk saluran dan sejenisnya) 18,689.00
23 1.00 m2 Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm 317,559.00
24 1.00 m2 Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm 53,559.00
25 1.00 m2 Memasang Plesteran Ciprat 1 PC : 2 PP 31,875.00
26 1.00 m2 Memasang finishing siar pasangan dinding bata merah (=20 m) 17,874.00
27 1.00 m2 Memasang finishing siar pasangan dinding conblock ekspose (=8 m) 8,423.00
28 1.00 m2 Plesteran siar adukan 1 Pc : 2 Ps 22,041.00
29 1.00 m2 Memasang acian 23,523.00
30 1.00 m2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm 42,924.00
31 1.00 m2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm 50,509.00
32 1.00 m2 Plesteran batu kali 1pc:3ps 52,710.00
33 1.00 m2 Plesteran batu kali 1pc:4ps 52,796.00
34 1.00 m2 Plesteran K- 50, tebal 20 mm 51,635.00
Rekapitulasi - 5
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
PEKERJAAN CONBLOCK
1 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400tebal pasir 5 cm 164,120.00
2 1.00 m2 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300 tebal pasir 5 cm 164,120.00
3 1.00 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 tebal pasir 5 cm 145,200.00
4 1.00 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 tebal pasir 5 cm 149,820.00
5 1.00 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 tebal pasir 5 cm 128,975.00
6 1.00 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 tebal pasir 5 cm 161,700.00
7 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400 tebal pasir 5 cm 164,120.00
8 1.00 m2 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 tebal pasir 5 cm 164,120.00
9 1.00 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200 tebal pasir 5 cm 145,475.00
10 1.00 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200 tebal pasir 5 cm 161,700.00
11 1.00 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200 tebal pasir 5 cm 145,475.00
12 1.00 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200 tebal pasir 5 cm 161,700.00
13 1.00 m2 Pasang grassblock bulat tebal 10 cm tebal pasir 5 cm 170,610.00
14 1.00 m2 Pasang grassblock tebal 10 cm tebal pasir 5 cm 155,870.00
Rekapitulasi - 6
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
21 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas plitur) 2,818,787.00
22 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal) 1,298,147.00
23 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kamper 1,051,747.00
24 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai 1,086,947.00
25 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kruing 981,347.00
26 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu jati lokal (lebar sampai 90 cm) 690,765.00
27 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamper (lebar sampai 90 cm) 594,515.00
28 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu bengkirai (lebar sampai 90 cm) 608,265.00
29 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kruing (lebar sampai 90 cm) 567,015.00
30a 1.00 m2 Memasang jalusi kusen, kayu kelas I atau II 2,581,579.00
31 1.00 m2 Memasang jalusi kusen, kayu jati (lokal) 1,155,979.00
32 1.00 m2 Memasang jalusi kusen, kayu kamper 924,979.00
33 1.00 m2 Memasang jalusi kusen, kayu bengkirai 957,979.00
34 1.00 m2 Memasang jalusi kusen, kayu kruing 858,979.00
35 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu jati (lokal) 593,960.00
36 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kamper 518,500.00
37 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu bengkirai 529,280.00
38 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kruing 496,940.00
39 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kamper 682,796.00
40 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu bengkirai 696,546.00
41 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kruing 655,296.00
42 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas plitur) bentang 6 meter 39,823,520.00
43 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) bentang 6 meter 2,404,270.00
44 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kamper bentang 6 meter 13,203,520.00
45 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu bengkirai bentang 6 meter 14,413,520.00
46 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kruing bentang 6 meter 11,993,520.00
47 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu glugu bentang 6 meter 2,348,307.00
48 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati (klas plitur) 44,170,555.00
49 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati lokal 3,349,555.00
50 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kamper 15,130,555.00
51 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kruing 13,810,555.00
52 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu bengkirai 16,450,555.00
53 1.00 m3 Memasang konstruksi gordeng, kayu jati (klas plitur) 39,191,020.00
54 1.00 m3 Memasang konstruksi gordeng, kayu jati lokal 1,771,770.00
55 1.00 m3 Memasang konstruksi gordeng, kayu kamper 12,571,020.00
56 1.00 m3 Memasang konstruksi gordeng, kayu bengkirai 13,781,020.00
57 1.00 m3 Memasang konstruksi gordeng, kayu kruing 11,361,020.00
58 1.00 m3 Memasang konstruksi gordeng, kayu glugu 1,715,807.00
59 1.00 m2 Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3 30,910.00
60 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 2/3 30,910.00
61 1.00 m2 Memasang usuk kamper 5/7, reng kamper 2/3 30,910.00
62 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 2/3 30,910.00
63 1.00 m2 Memasang usuk bengkirai 5/7, reng bengkirai 2/3 30,910.00
64 1.00 m2 Memasang usuk kruing 5/7, reng jati (lokal) 2/3 30,910.00
65 1.00 m2 Memasang usuk kruing 5/7, reng kruing 2/3 30,910.00
66 1.00 m2 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1) 31,665.00
67 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 3/4 31,480.00
68 1.00 m2 Memasang usuk kamper 5/7, reng kamper 3/4 31,321.00
69 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 3/4 31,609.00
70 1.00 m2 Memasang usuk bengkirai 5/7, reng bengkirai 3/4 31,451.00
71 1.00 m2 Memasang usuk kruing 5/7, reng jati (lokal) 3/4 31,532.00
72 1.00 m2 Memasang usuk kruing 5/7, reng kruing 3/4 31,374.00
73 1.00 m2 Memasang rangka atap sirap, kayu jati (lokal) 50,732.00
74 1.00 m2 Memasang rangka atap sirap, kayu kamper 1,670,619.00
75 1.00 m2 Memasang rangka atap sirap, kayu bengkirai 1,852,119.00
76 1.00 m2 Memasang rangka atap sirap, kayu kruing 1,489,119.00
77 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu jati (lokal) 58,635.00
78 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kamper 209,825.00
79 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu bengkirai 226,765.00
80 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kruing 192,885.00
81 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu jati (lokal) 57,774.00
82 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kamper 217,800.00
83 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu bengkirai 235,730.00
84 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kruing 199,870.00
85 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu jati (lokal) 45,023.00
86 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kamper 172,650.00
87 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu bengkirai 186,950.00
88 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kruing 158,350.00
89 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu jati (lokal) 40,507.00
90 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu kamper 158,317.00
91 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai 171,517.00
92 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu kruing 145,117.00
93 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas plitur) 307,616.00
94 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (lokal) 136,544.00
95 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kamper 108,824.00
96 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu bengkirai 112,784.00
97 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kruing 100,904.00
Rekapitulasi - 7
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
98 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur) 453,866.00
99 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu ati (lokal) 192,506.00
100 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kamper 150,156.00
101 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai 156,206.00
102 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kruing 138,056.00
103 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur) 597,896.00
104 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal) 253,376.00
105 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper 197,551.00
106 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkirai 205,526.00
107 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kruing 181,601.00
108 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas plitur) 352,745.00
109 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lokal) 148,409.00
110 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper 115,299.00
111 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai 120,029.00
112 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing 105,839.00
113 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas plitur) 252,359.00
114 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal 109,799.00
115 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kamper 86,699.00
116 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu bengkirai 89,999.00
117 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kruing 80,099.00
118 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur) 206,027.00
119 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal) 91,979.00
120 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kamper 73,499.00
121 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu bengkirai 76,139.00
122 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kruing 68,219.00
123 1.00 m2 Membuat listplank asbes plat ram kayu jati (lokal) 251,693.00
124 1.00 m2 Membuat listplank asbes plat ram kayu kamper 497,131.00
125 1.00 m2 Membuat listplank asbes plat ram kayu bengkirai 564,231.00
126 1.00 m2 Membuat listplank asbes plat ram kayu kruing 469,631.00
127 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal) 65,333.00
128 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kamper 340,223.00
129 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai 371,023.00
130 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kruing 309,423.00
131 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu jati (lokal) 123,041.00
132 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kamper 397,931.00
133 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai 428,731.00
134 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kruing 367,131.00
135 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kamper 399,146.00
136 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai 429,946.00
137 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kruing 368,346.00
138 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (klas plitur) 485,925.00
139 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (lokal) 319,605.00
140 1.00 m2 Memasang dinding lambriziring dari papan kayu kamper 292,655.00
141 1.00 m2 Memasang dinding lambriziring dari papan kayu bengkirai 296,505.00
142 1.00 m2 Memasang dinding lambriziring dari papan kayu kruing 284,955.00
143 1.00 m2 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm 48,549.00
144 1.00 m2 Memasang dinding bilik, rangka kayu kruing 293,698.00
145 1 m1 Mengerjakan papan ruiter kayu jati 2/20 (lokal) 70,204.00
146 1.00 m1 Mengerjakan papan ruiter kayu kamper 2/20 54,804.00
147 1.00 m1 Mengerjakan papan ruiter kayu bengkirai 2/20 57,004.00
148 1.00 m1 Mengerjakan papan ruiter kayu kruing 2/20 50,404.00
149 1.00 m2 Pasang plywood tebal 4 mm, untuk dinding 32,166.00
150 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu jati (lokal) tanpa plepet 68,279.00
151 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kamper tanpa plepet 186,089.00
152 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu bengkirai tanpa plepet 199,289.00
153 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kruing tanpa plepet 172,889.00
154 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu jati (lokal) memakai plepet 74,911.00
155 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kamper memakai plepet 192,721.00
156 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu bengkirai memakai plepet 205,921.00
157 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kruing memakai plepet 179,521.00
158 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati (lokal) 90,075.00
159 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper 217,703.00
160 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai 232,003.00
161 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing 203,403.00
162 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka hollow 351,232.00
163 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati (lokal) 108,885.00
164 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper 236,513.00
165 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai 250,813.00
166 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing 222,213.00
167 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 370,042.00
168 1.00 m2 Memasang langit-langit asbes semen, tebal 4 mm 30,717.00
169 1.00 m2 Memasang langit-langit asbes semen, tebal 5 mm 37,614.00
170 1.00 m2 Memasang langit-langit asbes semen, tebal 6 mm 42,152.00
171 1.00 m2 Memasang langit-langit akustik ukuran (30 x 30) cm 21,252.00
172 1.00 m2 Memasang langit-langit akustik ukuran (30 x 60) cm 400,785.00
173 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm 265,485.00
Rekapitulasi - 8
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
174 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm 17,325.00
175 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm 37,950.00
176 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm 42,075.00
177 1.00 m2 Memasang langit-langit lambriziring kayu, tebal 9 mm 296,010.00
178 1.00 m2 Memasang langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 17,603.00
179 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium 435,765.00
180 1.00 m1 Memasang ist langit-langit kayu profil 12,846.00
181 1.00 m1 Pasang list profil cornees gypsum lebar sampai 5 cm 62,580.00
182 1.00 m1 Pasang list profil cornees gypsum lebar 5 - 10 cm 129,931.00
183 1.00 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm 89,827.00
184 1 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak berlubang 1,492,128.00
185 1.00 m3 Memasang usuk peniung, kayu jati (klas plitur) 48,799,870.00
Rekapitulasi - 9
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
PEKERJAAN PENGECATAN
1 1.00 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama 11,000.00
2 1.00 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 10,868.00
3 1.00 m2 Mendempul dan Menggosok Kayu 10,010.00
4 1.00 m2 Pengecatan Bidang Kayu Lama 35,442.00
5 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup 41,195.00
6 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 53,658.00
7 1.00 m2 Pelaburan Bidang Kayu dengan Teak Oil 31,526.00
8 1.00 m2 Pelaburan Bidang Kayu dengan Pelitur 45,584.00
9 1.00 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 8,222.00
10 1.00 m2 Pelaburan Bidang Kayu dengan Vernis 35,882.00
11 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 56,676.00
12 1.00 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 36,581.00
13 1.00 m2 Melabur tembok dengan kalkarium 9,026.00
14 1.00 m2 Melabur Tembok dengan Kapur Sirih 26,128.00
15 1.00 m2 Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) 26,389.00
16 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi 23,309.00
17 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah 42,779.00
18 1.00 m2 Pemasangan Wall Paper 52,151.00
19 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 12,578.00
um
20 1.00 m2 17,457.00
Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um
21 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 159,307.00
um
22 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat 130,625.00
Mutakhir, tebal 200 um
23 1.00 m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat 10,868.00
24 1.00 m2 Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 931,700.00
2.
25 1.00 m2 Menyabun Permukaan Tembok Lama 10,868.00
26 1.00 m2 Pengecatan tembok tidak terlindung dari panas dan hujan 107,254.00
27 1.00 m2 Pengecatan bidang besi ( 3 x ) 30,565.00
28 1.00 m2 Pengetiran kayu ( 2 x ) 17,737.00
29 1.00 m2 Pekerjaan cat duco 3 x 67,109.00
30 1.00 m2 Mengecat genteng 36,700.00
31 10.00 m2 Mengecat kerb 3 kali 62,331.00
32 1.00 m2 Memasang Prodo Mas 24 karat 4,545,640.00
33 1.00 m2 Mengerjakan Cat Sungging 357,166.00
PEKERJAAN SANITASI
1 1.00 bh Memasang Kloset Duduk / Monoblok 2,593,888.00
2 1.00 bh Memasang 1Kloset Jongkok Porselen 709,038.00
3 1.00 bh Memasang Kloset Jongkok Teraso 1,777,138.00
4 1.00 bh Memasang Urinoir 4,099,238.00
5 1.00 bh Memasang Wastafel 1,081,388.00
6 1.00 bh Memasang Bak Mandi Fiberglass, volume 0.30 m 801,680.00
7 1.00 bh Memasang Badkip Porselen 429,275.00
8 1.00 bh Memasang Bak Fiberglass volume 1 m air 1,948,540.00
9 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah 15 cm 58,533.00
10 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah 20 cm 84,894.00
11 1.00 m1 Memasang Pipa Beton 5 cm - 20 cm 3,422,502.00
12 1.00 m1 Memasang Pipa Beton 30 cm - 100 cm 69,095,096.00
13 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35 cm 18,559,739.00
14 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50 cm 31,614,913.00
15 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65 cm 46,807,310.00
16 1.00 m1 Memasang Pipa Galvanis " 38,126.00
17 1.00 m1 Memasang Pipa Galvanis " 35,568.00
18 1.00 m1 Memasang Pipa Galvanis 1" 48,356.00
19 1.00 m1 Memasang Pipa Galvanis 1" 80,283.00
20 1.00 m1 Memasang Pipa Galvanis 3" 49,934.00
21 1.00 m1 Memasang Pipa Galvanis 4" 91,195.00
22 1.00 m1 Memasang Pipa PVC tipe AW " 54,609.00
23 1.00 m1 Memasang Pipa PVC tipe AW " 61,003.00
24 1.00 m1 Memasang Pipa PVC tipe AW 1" 82,315.00
25 1.00 m1 Memasang Pipa PVC tipe AW 1" 84,447.00
26 1.00 m1 Memasang Pipa PVC tipe AW 2" 88,334.00
27 1.00 m1 Memasang Pipa PVC tipe AW 2" 71,659.00
28 1.00 m1 Memasang Pipa PVC tipe AW 3" 123,942.00
29 1.00 m1 Memasang Pipa PVC tipe AW 4" 68,530.00
30 1.00 bh Memasang Bak Cuci Piring Stainles Steel 445,885.00
31 1.00 bh Memasang Bak Cuci Piring Teraso 486,585.00
32 1.00 bh Memasang Kran " atau " 449,872.00
33 1.00 bh Memasang Floor Drain 92,290.00
Rekapitulasi - 10
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
Rekapitulasi - 11
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
Rekapitulasi - 12
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
Rekapitulasi - 13
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
Rekapitulasi - 14
NO. SATUAN JENIS PEKERJAAN HARGA SATUAN
Rekapitulasi - 15
HALAMAN
Analisa Konstruksi - 1
Analisa Konstruksi - 1
Analisa Konstruksi - 1
Analisa Konstruksi - 1
Analisa Konstruksi - 1
Analisa Konstruksi - 2
Analisa Konstruksi - 2
Analisa Konstruksi - 2
Analisa Konstruksi - 3
Analisa Konstruksi - 3
Analisa Konstruksi - 3
Analisa Konstruksi - 3
Analisa Konstruksi - 4
Analisa Konstruksi - 4
Analisa Konstruksi - 4
Analisa Konstruksi - 5
Analisa Konstruksi - 5
Analisa Konstruksi - 5
Analisa Konstruksi - 6
Analisa Konstruksi - 6
Analisa Konstruksi - 6
Analisa Konstruksi - 6
Analisa Konstruksi - 6
Analisa Konstruksi - 6
Analisa Konstruksi - 6
Analisa Konstruksi - 7
Analisa Konstruksi - 7
Analisa Konstruksi - 7
Analisa Konstruksi - 7
Analisa Konstruksi - 7
Analisa Konstruksi - 8
Analisa Konstruksi - 8
Analisa Konstruksi - 8
Analisa Konstruksi - 8
Analisa Konstruksi - 8
Analisa Konstruksi - 8
Analisa Konstruksi - 8
Analisa Konstruksi - 8
Analisa Konstruksi - 9
Analisa Konstruksi - 9
Analisa Konstruksi - 9
Analisa Konstruksi - 9
Analisa Konstruksi - 9
Analisa Konstruksi - 9
Analisa Konstruksi - 9
Analisa Konstruksi - 10
Analisa Konstruksi - 10
Analisa Konstruksi - 10
Analisa Konstruksi - 10
Analisa Konstruksi - 10
Analisa Konstruksi - 10
Analisa Konstruksi - 10
Analisa Konstruksi - 11
Analisa Konstruksi - 11
Analisa Konstruksi - 11
Analisa Konstruksi - 11
Analisa Konstruksi - 11
Analisa Konstruksi - 12
Analisa Konstruksi - 12
Analisa Konstruksi - 12
Analisa Konstruksi - 12
Analisa Konstruksi - 13
Rekapitulasi - 16
HALAMAN
Analisa Konstruksi - 13
Analisa Konstruksi - 13
Analisa Konstruksi - 13
Analisa Konstruksi - 14
Analisa Konstruksi - 14
Analisa Konstruksi - 14
Analisa Konstruksi - 15
Analisa Konstruksi - 15
Analisa Konstruksi - 15
Analisa Konstruksi - 15
Analisa Konstruksi - 15
Analisa Konstruksi - 16
Analisa Konstruksi - 16
Analisa Konstruksi - 16
Analisa Konstruksi - 16
Analisa Konstruksi - 16
Analisa Konstruksi - 17
Analisa Konstruksi - 17
Analisa Konstruksi - 17
Analisa Konstruksi - 17
Analisa Konstruksi - 18
Analisa Konstruksi - 18
Analisa Konstruksi - 18
Analisa Konstruksi - 18
Analisa Konstruksi - 19
Analisa Konstruksi - 19
Analisa Konstruksi - 19
Analisa Konstruksi - 19
Analisa Konstruksi - 19
Analisa Konstruksi - 20
Analisa Konstruksi - 20
Analisa Konstruksi - 20
Analisa Konstruksi - 20
Analisa Konstruksi - 21
Analisa Konstruksi - 21
Analisa Konstruksi - 21
Analisa Konstruksi - 21
Analisa Konstruksi - 22
Analisa Konstruksi - 22
Analisa Konstruksi - 22
Analisa Konstruksi - 22
Analisa Konstruksi - 23
Analisa Konstruksi - 23
Analisa Konstruksi - 23
Analisa Konstruksi - 23
Analisa Konstruksi - 24
Analisa Konstruksi - 24
Analisa Konstruksi - 24
Analisa Konstruksi - 24
Analisa Konstruksi - 24
Analisa Konstruksi - 25
Analisa Konstruksi - 25
Analisa Konstruksi - 25
Analisa Konstruksi - 25
Analisa Konstruksi - 25
Analisa Konstruksi - 25
Analisa Konstruksi - 25
Analisa Konstruksi - 26
Analisa Konstruksi - 26
Analisa Konstruksi - 26
Analisa Konstruksi - 26
Analisa Konstruksi - 27
Analisa Konstruksi - 27
Analisa Konstruksi - 27
Analisa Konstruksi - 27
Analisa Konstruksi - 27
Analisa Konstruksi - 27
Analisa Konstruksi - 28
Analisa Konstruksi - 28
Analisa Konstruksi - 28
Rekapitulasi - 17
HALAMAN
Analisa Konstruksi - 28
Analisa Konstruksi - 29
Analisa Konstruksi - 29
Analisa Konstruksi - 29
Analisa Konstruksi - 30
Analisa Konstruksi - 30
Analisa Konstruksi - 30
Analisa Konstruksi - 31
Analisa Konstruksi - 31
Analisa Konstruksi - 31
Analisa Konstruksi - 31
Analisa Konstruksi - 31
Analisa Konstruksi - 32
Analisa Konstruksi - 32
Analisa Konstruksi - 32
Analisa Konstruksi - 32
Analisa Konstruksi - 32
Analisa Konstruksi - 33
Analisa Konstruksi - 33
Analisa Konstruksi - 33
Analisa Konstruksi - 33
Analisa Konstruksi - 33
Analisa Konstruksi - 34
Analisa Konstruksi - 34
Analisa Konstruksi - 34
Analisa Konstruksi - 34
Analisa Konstruksi - 34
Analisa Konstruksi - 35
Analisa Konstruksi - 35
Analisa Konstruksi - 35
Analisa Konstruksi - 35
Analisa Konstruksi - 35
Analisa Konstruksi - 36
Analisa Konstruksi - 36
Analisa Konstruksi - 36
Analisa Konstruksi - 36
Analisa Konstruksi - 36
Analisa Konstruksi - 37
Analisa Konstruksi - 37
Analisa Konstruksi - 37
Analisa Konstruksi - 37
Analisa Konstruksi - 38
Analisa Konstruksi - 38
Analisa Konstruksi - 38
Analisa Konstruksi - 38
Analisa Konstruksi - 39
Analisa Konstruksi - 39
Analisa Konstruksi - 39
Analisa Konstruksi - 39
Analisa Konstruksi - 40
Analisa Konstruksi - 40
Analisa Konstruksi - 40
Analisa Konstruksi - 40
Analisa Konstruksi - 41
Analisa Konstruksi - 41
Analisa Konstruksi - 41
Analisa Konstruksi - 41
Analisa Konstruksi - 41
Analisa Konstruksi - 42
Analisa Konstruksi - 42
Analisa Konstruksi - 42
Analisa Konstruksi - 42
Analisa Konstruksi - 42
Analisa Konstruksi - 43
Analisa Konstruksi - 43
Analisa Konstruksi - 43
Analisa Konstruksi - 43
Analisa Konstruksi - 44
Analisa Konstruksi - 44
Analisa Konstruksi - 44
Analisa Konstruksi - 44
Analisa Konstruksi - 45
Rekapitulasi - 18
HALAMAN
Analisa Konstruksi - 45
Analisa Konstruksi - 45
Analisa Konstruksi - 45
Analisa Konstruksi - 45
Analisa Konstruksi - 46
Analisa Konstruksi - 46
Analisa Konstruksi - 46
Analisa Konstruksi - 46
Analisa Konstruksi - 47
Analisa Konstruksi - 47
Analisa Konstruksi - 47
Analisa Konstruksi - 47
Analisa Konstruksi - 48
Analisa Konstruksi - 48
Analisa Konstruksi - 48
Analisa Konstruksi - 48
Analisa Konstruksi - 48
Analisa Konstruksi - 49
Analisa Konstruksi - 49
Analisa Konstruksi - 49
Analisa Konstruksi - 49
Analisa Konstruksi - 49
Analisa Konstruksi - 50
Analisa Konstruksi - 50
Analisa Konstruksi - 50
Analisa Konstruksi - 50
Analisa Konstruksi - 51
Analisa Konstruksi - 51
Analisa Konstruksi - 51
Analisa Konstruksi - 51
Analisa Konstruksi - 51
Analisa Konstruksi - 52
Analisa Konstruksi - 52
Analisa Konstruksi - 52
Analisa Konstruksi - 52
Analisa Konstruksi - 53
Analisa Konstruksi - 53
Analisa Konstruksi - 53
Analisa Konstruksi - 53
Analisa Konstruksi - 53
Analisa Konstruksi - 54
Analisa Konstruksi - 54
Analisa Konstruksi - 54
Analisa Konstruksi - 54
Analisa Konstruksi - 54
Analisa Konstruksi - 55
Analisa Konstruksi - 55
Analisa Konstruksi - 55
Analisa Konstruksi - 55
Analisa Konstruksi - 56
Analisa Konstruksi - 56
Analisa Konstruksi - 56
Analisa Konstruksi - 56
Analisa Konstruksi - 56
Analisa Konstruksi - 57
Analisa Konstruksi - 57
Analisa Konstruksi - 57
Analisa Konstruksi - 57
Analisa Konstruksi - 57
Analisa Konstruksi - 58
Analisa Konstruksi - 58
Analisa Konstruksi - 58
Analisa Konstruksi - 58
Analisa Konstruksi - 58
Analisa Konstruksi - 59
Analisa Konstruksi - 59
Analisa Konstruksi - 59
Analisa Konstruksi - 59
Analisa Konstruksi - 59
Rekapitulasi - 19
HALAMAN
Analisa Konstruksi - 60
Analisa Konstruksi - 60
Analisa Konstruksi - 60
Analisa Konstruksi - 60
Analisa Konstruksi - 60
Analisa Konstruksi - 61
Analisa Konstruksi - 61
Analisa Konstruksi - 61
Analisa Konstruksi - 61
Analisa Konstruksi - 61
Analisa Konstruksi - 62
Analisa Konstruksi - 62
Analisa Konstruksi - 62
Analisa Konstruksi - 62
Analisa Konstruksi - 62
Analisa Konstruksi - 63
Analisa Konstruksi - 63
Analisa Konstruksi - 63
Analisa Konstruksi - 63
Analisa Konstruksi - 64
Analisa Konstruksi - 64
Analisa Konstruksi - 64
Analisa Konstruksi - 64
Analisa Konstruksi - 64
Analisa Konstruksi - 65
Analisa Konstruksi - 65
Analisa Konstruksi - 65
Analisa Konstruksi - 65
Analisa Konstruksi - 65
Analisa Konstruksi - 66
Analisa Konstruksi - 66
Analisa Konstruksi - 66
Analisa Konstruksi - 66
Analisa Konstruksi - 66
Analisa Konstruksi - 67
Analisa Konstruksi - 67
Analisa Konstruksi - 67
Analisa Konstruksi - 67
Analisa Konstruksi - 67
Analisa Konstruksi - 68
Analisa Konstruksi - 68
Analisa Konstruksi - 68
Analisa Konstruksi - 68
Analisa Konstruksi - 69
Analisa Konstruksi - 69
Analisa Konstruksi - 69
Analisa Konstruksi - 69
Analisa Konstruksi - 70
Analisa Konstruksi - 70
Analisa Konstruksi - 70
Analisa Konstruksi - 70
Analisa Konstruksi - 71
Analisa Konstruksi - 71
Analisa Konstruksi - 71
Analisa Konstruksi - 71
Analisa Konstruksi - 71
Analisa Konstruksi - 72
Analisa Konstruksi - 72
Analisa Konstruksi - 72
Analisa Konstruksi - 72
Analisa Konstruksi - 72
Analisa Konstruksi - 73
Analisa Konstruksi - 73
Analisa Konstruksi - 73
Analisa Konstruksi - 73
Analisa Konstruksi - 73
Analisa Konstruksi - 74
Analisa Konstruksi - 74
Analisa Konstruksi - 74
Analisa Konstruksi - 74
Analisa Konstruksi - 74
Analisa Konstruksi - 75
Analisa Konstruksi - 75
Analisa Konstruksi - 75
Analisa Konstruksi - 75
Analisa Konstruksi - 75
Analisa Konstruksi - 76
Rekapitulasi - 20
HALAMAN
Analisa Konstruksi - 76
Analisa Konstruksi - 76
Analisa Konstruksi - 76
Analisa Konstruksi - 76
Analisa Konstruksi - 77
Analisa Konstruksi - 77
Analisa Konstruksi - 77
Analisa Konstruksi - 77
Analisa Konstruksi - 77
Analisa Konstruksi - 78
Analisa Konstruksi - 78
Analisa Konstruksi - 78
Analisa Konstruksi - 78
Analisa Konstruksi - 78
Analisa Konstruksi - 79
Analisa Konstruksi - 79
Analisa Konstruksi - 79
Analisa Konstruksi - 79
Analisa Konstruksi - 79
Analisa Konstruksi - 80
Analisa Konstruksi - 80
Analisa Konstruksi - 80
Analisa Konstruksi - 80
Analisa Konstruksi - 80
Analisa Konstruksi - 81
Analisa Konstruksi - 81
Analisa Konstruksi - 81
Analisa Konstruksi - 81
Analisa Konstruksi - 81
Analisa Konstruksi - 82
Analisa Konstruksi - 82
Analisa Konstruksi - 82
Analisa Konstruksi - 82
Analisa Konstruksi - 82
Analisa Konstruksi - 83
Analisa Konstruksi - 83
Analisa Konstruksi - 83
Analisa Konstruksi - 83
Analisa Konstruksi - 84
Analisa Konstruksi - 84
Analisa Konstruksi - 84
Analisa Konstruksi - 84
Analisa Konstruksi - 84
Analisa Konstruksi - 85
Analisa Konstruksi - 85
Analisa Konstruksi - 85
Analisa Konstruksi - 85
Analisa Konstruksi - 85
Analisa Konstruksi - 86
Analisa Konstruksi - 86
Analisa Konstruksi - 86
Analisa Konstruksi - 86
Analisa Konstruksi - 86
Analisa Konstruksi - 87
Analisa Konstruksi - 87
Analisa Konstruksi - 87
Analisa Konstruksi - 87
Analisa Konstruksi - 88
Analisa Konstruksi - 88
Analisa Konstruksi - 88
Analisa Konstruksi - 88
Analisa Konstruksi - 89
Analisa Konstruksi - 89
Analisa Konstruksi - 89
Analisa Konstruksi - 89
Analisa Konstruksi - 90
Analisa Konstruksi - 90
Analisa Konstruksi - 90
Analisa Konstruksi - 90
Analisa Konstruksi - 91
Analisa Konstruksi - 91
Analisa Konstruksi - 91
Analisa Konstruksi - 91
Analisa Konstruksi - 91
Analisa Konstruksi - 92
Analisa Konstruksi - 92
Rekapitulasi - 21
HALAMAN
Analisa Konstruksi - 92
Analisa Konstruksi - 92
Analisa Konstruksi - 92
Analisa Konstruksi - 92
Analisa Konstruksi - 92
Analisa Konstruksi - 93
Analisa Konstruksi - 93
Analisa Konstruksi - 93
Analisa Konstruksi - 93
Analisa Konstruksi - 93
Analisa Konstruksi - 94
Analisa Konstruksi - 94
Analisa Konstruksi - 95
Analisa Konstruksi - 95
Analisa Konstruksi - 95
Analisa Konstruksi - 95
Analisa Konstruksi - 95
Analisa Konstruksi - 96
Analisa Konstruksi - 96
Analisa Konstruksi - 96
Analisa Konstruksi - 96
Analisa Konstruksi - 96
Analisa Konstruksi - 97
Analisa Konstruksi - 97
Analisa Konstruksi - 97
Analisa Konstruksi - 97
Analisa Konstruksi - 97
Analisa Konstruksi - 98
Analisa Konstruksi - 98
Analisa Konstruksi - 98
Analisa Konstruksi - 98
Analisa Konstruksi - 98
Analisa Konstruksi - 99
Analisa Konstruksi - 99
Analisa Konstruksi - 99
Analisa Konstruksi - 99
Analisa Konstruksi - 99
Analisa Konstruksi - 100
Analisa Konstruksi - 100
Analisa Konstruksi - 100
Analisa Konstruksi - 100
Analisa Konstruksi - 100
Analisa Konstruksi - 101
Analisa Konstruksi - 101
Analisa Konstruksi - 101
Analisa Konstruksi - 101
Analisa Konstruksi - 101
Analisa Konstruksi - 102
Analisa Konstruksi - 102
Analisa Konstruksi - 102
Analisa Konstruksi - 102
Analisa Konstruksi - 102
Analisa Konstruksi - 103
Analisa Konstruksi - 103
Analisa Konstruksi - 103
Analisa Konstruksi - 103
Analisa Konstruksi - 103
Analisa Konstruksi - 104
Analisa Konstruksi - 104
Analisa Konstruksi - 104
Analisa Konstruksi - 104
Analisa Konstruksi - 104
Analisa Konstruksi - 104
Analisa Konstruksi - 105
Analisa Konstruksi - 105
Analisa Konstruksi - 105
Analisa Konstruksi - 105
Rekapitulasi - 22
HALAMAN
Rekapitulasi - 23
HALAMAN
Rekapitulasi - 24
HALAMAN
Rekapitulasi - 25
HALAMAN
Rekapitulasi - 26
HALAMAN
Rekapitulasi - 27
HALAMAN
Analisa Pelumpuran - 1
Analisa Pelumpuran - 1
Analisa Pelumpuran - 1
Analisa Pelumpuran - 1
Analisa Pelumpuran - 1
Analisa Pelumpuran - 1
Analisa Pelumpuran - 2
Analisa Pelumpuran - 2
Analisa Pelumpuran - 2
Analisa Pelumpuran - 2
Analisa Pelumpuran - 2
Analisa Pelumpuran - 2
Analisa Pelumpuran - 3
Analisa Pelumpuran - 4
Analisa Pelumpuran - 4
Analisa Pelumpuran - 4
Analisa Pelumpuran - 4
Analisa Pelumpuran - 4
Analisa Pelumpuran - 4
Analisa Pelumpuran - 4
Analisa Pelumpuran - 5
Analisa Pelumpuran - 5
Analisa Pelumpuran - 5
Analisa Pelumpuran - 5
Analisa Pelumpuran - 5
Rekapitulasi - 28
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
PEKERJAAN PERSIAPAN
Analisa Konstruksi - 29
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 30
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 31
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 32
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 33
No. Macam Pekerjaan Upah
(1) (2) (3)
PEKERJAAN BONGKARAN
Analisa Konstruksi - 34
No. Macam Pekerjaan Upah
(1) (2) (3)
10 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
AK 6.0000 oh Tukang kayu @ Rp. 75,000.00 450,000.00
0.6000 oh Kep. Tk. Kayu @ Rp. 85,000.00 51,000.00
4.0000 oh Pekerja @ Rp. 60,000.00 240,000.00
0.2000 oh Mandor @ Rp. 100,000.00 20,000.00
JUMLAH ( BELUM PPN ) 761,000.00
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
AK 1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
0.2000 oh Mandor @ Rp. 100,000.00 20,000.00
JUMLAH ( BELUM PPN ) 80,000.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 35
No. Macam Pekerjaan Upah
(1) (2) (3)
PEKERJAAN TANAH
Analisa Konstruksi - 36
No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 2835:2008 - 6.9 1.00 m3 Mengurug kembali
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
(Digunakan analisa galian terendah dalam pekerjaan tersebut)
Analisa Konstruksi - 37
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 38
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 39
No. Macam Pekerjaan Upah
(1) (2) (3)
PEKERJAAN PONDASI
Analisa Konstruksi - 40
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN
Analisa Konstruksi - 41
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 42
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 43
No. Macam Pekerjaan Upah
(1) (2) (3)
14 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan 40% batu belah
SNI 2836:2008 - 6.10 0.4800 m3 Batu belah 15 cm/20 cm @ Rp. -
194.0000 kg Portland Cement @ Rp. 180.00
0.3120 m3 Pasir beton @ Rp. 250,000.00
0.4680 m3 Koral Beton @ Rp. 20,000.00
126.0000 kg Besi beton @ Rp. 15,000.00
1.8000 kg Kawat beton @ Rp. 60,000.00
3.4000 oh Pekerja @ Rp. 60,000.00 204,000.00
0.8500 oh Tukang batu @ Rp. 70,000.00 59,500.00
0.0850 oh Kepala tukang @ Rp. 80,000.00 6,800.00
0.1700 oh Mandor @ Rp. 100,000.00 17,000.00
JUMLAH ( BELUM PPN ) 287,300.00
JASA 10 %
JUMLAH
DIBULATKAN
15 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan 40% batu belah tanpa besi
AK 0.4800 m3 Batu belah 15 cm/20 cm @ Rp. -
194.0000 kg Portland Cement @ Rp. 180.00
0.3120 m3 Pasir beton @ Rp. 250,000.00
0.4680 m3 Koral Beton @ Rp. 20,000.00
3.4000 oh Pekerja @ Rp. 60,000.00 204,000.00
0.8500 oh Tukang batu @ Rp. 70,000.00 59,500.00
0.0850 oh Kepala tukang @ Rp. 80,000.00 6,800.00
0.1700 oh Mandor @ Rp. 100,000.00 17,000.00
JUMLAH ( BELUM PPN ) 287,300.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 44
No. Macam Pekerjaan Upah
(1) (2) (3)
PEKERJAAN DINDING
1 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
SNI 6897:2008 - 6.1 140.0000 bh Bata merah @ Rp. 190,000.00
43.5000 kg Portland Cement @ Rp. 180.00
0.0800 m3 Pasir Pasang @ Rp. 250,000.00
0.6000 oh Pekerja @ Rp. 60,000.00 36,000.00
0.2000 oh Tukang batu @ Rp. 70,000.00 14,000.00
0.0200 oh Kepala tukang @ Rp. 80,000.00 1,600.00
0.0300 oh Mandor @ Rp. 100,000.00 3,000.00
JUMLAH ( BELUM PPN ) 54,600.00
JASA 10 %
JUMLAH
DIBULATKAN
2 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
SNI 6897:2008 - 6.2 140.0000 bh Bata merah @ Rp. 190,000.00
32.9500 kg Portland Cement @ Rp. 180.00
0.0910 m3 Pasir Pasang @ Rp. 250,000.00
0.6000 oh Pekerja @ Rp. 60,000.00 36,000.00
0.2000 oh Tukang batu @ Rp. 70,000.00 14,000.00
0.0200 oh Kepala tukang @ Rp. 80,000.00 1,600.00
0.0300 oh Mandor @ Rp. 100,000.00 3,000.00
JUMLAH ( BELUM PPN ) 54,600.00
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
SNI 6897:2008 - 6.3 140.0000 bh Bata merah @ Rp. 190,000.00
26.5500 kg Portland Cement @ Rp. 180.00
0.0930 m3 Pasir Pasang @ Rp. 250,000.00
0.6000 oh Pekerja @ Rp. 60,000.00 36,000.00
0.2000 oh Tukang batu @ Rp. 70,000.00 14,000.00
0.0200 oh Kepala tukang @ Rp. 80,000.00 1,600.00
0.0300 oh Mandor @ Rp. 100,000.00 3,000.00
JUMLAH ( BELUM PPN ) 54,600.00
JASA 10 %
JUMLAH
DIBULATKAN
4 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
SNI 6897:2008 - 6.4 140.0000 bh Bata merah @ Rp. 190,000.00
22.2000 kg Portland Cement @ Rp. 180.00
0.1020 m3 Pasir Pasang @ Rp. 250,000.00
0.6000 oh Pekerja @ Rp. 60,000.00 36,000.00
0.2000 oh Tukang batu @ Rp. 70,000.00 14,000.00
0.0200 oh Kepala tukang @ Rp. 80,000.00 1,600.00
0.0300 oh Mandor @ Rp. 100,000.00 3,000.00
JUMLAH ( BELUM PPN ) 54,600.00
JASA 10 %
JUMLAH
DIBULATKAN
5 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
SNI 6897:2008 - 6.5 140.0000 bh Bata merah @ Rp. 190,000.00
18.5000 kg Portland Cement @ Rp. 180.00
0.1220 m3 Pasir Pasang @ Rp. 250,000.00
0.6000 oh Pekerja @ Rp. 60,000.00 36,000.00
0.2000 oh Tukang batu @ Rp. 70,000.00 14,000.00
0.0200 oh Kepala tukang @ Rp. 80,000.00 1,600.00
0.0300 oh Mandor @ Rp. 100,000.00 3,000.00
JUMLAH ( BELUM PPN ) 54,600.00
JASA 10 %
JUMLAH
Analisa Konstruksi - 45
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN
Analisa Konstruksi - 46
No. Macam Pekerjaan Upah
(1) (2) (3)
6 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP
SNI 6897:2008 - 6.6 140.0000 bh Bata merah @ Rp. 190,000.00
10.0800 kg Portland Cement @ Rp. 180.00
0.0925 m3 Pasir Pasang @ Rp. -
0.0275 m3 Kapur padam @ Rp. 250,000.00
0.6000 oh Pekerja @ Rp. 60,000.00 36,000.00
0.2000 oh Tukang batu @ Rp. 70,000.00 14,000.00
0.0200 oh Kepala tukang @ Rp. 80,000.00 1,600.00
0.0300 oh Mandor @ Rp. 100,000.00 3,000.00
JUMLAH ( BELUM PPN ) 54,600.00
JASA 10 %
JUMLAH
DIBULATKAN
7 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP
SNI 6897:2008 - 6.7 70.0000 bh Bata merah @ Rp. 190,000.00
18.9500 kg Portland Cement @ Rp. 180.00
0.0380 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
8 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP
SNI 6897:2008 - 6.8 70.0000 bh Bata merah @ Rp. 190,000.00
14.3700 kg Portland Cement @ Rp. 180.00
0.0400 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
9 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP
SNI 6897:2008 - 6.9 70.0000 bh Bata merah @ Rp. 190,000.00
11.5000 kg Portland Cement @ Rp. 180.00
0.0430 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
10 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP
SNI 6897:2008 - 6.10 70.0000 bh Bata merah @ Rp. 190,000.00
9.6800 kg Portland Cement @ Rp. 180.00
0.0450 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 47
No. Macam Pekerjaan Upah
(1) (2) (3)
11 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP
SNI 6897:2008 - 6.11 70.0000 bh Bata merah @ Rp. 190,000.00
8.3200 kg Portland Cement @ Rp. 180.00
0.0490 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
12 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran spesi 1 PC : 8 PP
SNI 6897:2008 - 6.12 70.0000 bh Bata merah @ Rp. 190,000.00
6.5000 kg Portland Cement @ Rp. 180.00
0.0500 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
13 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 KP : 10 P
SNI 6897:2008 - 6.13 70.0000 bh Bata merah @ Rp. 190,000.00
4.5000 kg Portland Cement @ Rp. 180.00
0.0500 m3 Pasir Pasang @ Rp. 250,000.00
0.0150 m3 Kapur padam @ Rp. -
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
14 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 1 P
SNI 6897:2008 - 6.14 70.0000 bh Bata merah @ Rp. 190,000.00
0.0180 m3 Semen Merah @ Rp. 49,000.00
0.0180 m3 Pasir Pasang @ Rp. 250,000.00
0.0180 m3 Kapur padam @ Rp. -
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 48
No. Macam Pekerjaan Upah
(1) (2) (3)
15 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 2 P
SNI 6897:2008 - 6.15 70.0000 bh Bata merah @ Rp. 190,000.00
0.0140 m3 Semen Merah @ Rp. 49,000.00
0.0280 m3 Pasir Pasang @ Rp. 250,000.00
0.0140 m3 Kapur padam @ Rp. -
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 49
No. Macam Pekerjaan Upah
(1) (2) (3)
22a 1.00 m2 Memasang dinding terawang (roster) ukuran 20 x 20 cm, campuran spesi 1 PC : 3 PP
AK 16.0000 bh Roster 25/25 cm @ Rp. 100,000.00
14.0000 kg Portland Cement @ Rp. 180.00
0.0320 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
Analisa Konstruksi - 50
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN
23 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
SNI 6897:2008 - 6.22 30.0000 Buah Terawang (roster) @ Rp. 200,000.00
14.0000 kg Portland Cement @ Rp. 180.00
0.0320 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 51
No. Macam Pekerjaan Upah
(1) (2) (3)
24 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
SNI 6897:2008 - 6.23 30.0000 Buah Terawang (roster) @ Rp. 200,000.00
11.0000 kg Portland Cement @ Rp. 180.00
0.0350 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
25 1.00 m2 Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
SNI 6897:2008 - 6.24 70.0000 Buah Bata berongga ekspose @ Rp. 250,000.00
14.0000 kg Portland Cement @ Rp. 180.00
0.0320 m3 Pasir Pasang @ Rp. 250,000.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1500 oh Tukang batu @ Rp. 70,000.00 10,500.00
0.0150 oh Kepala tukang @ Rp. 80,000.00 1,200.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 31,200.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 52
No. Macam Pekerjaan Upah
(1) (2) (3)
PEKERJAAN BETON
1 1.00 m3 Membuat beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
SNI 7394:2008 - 6.1 247.0000 kg Portland Cement @ Rp. 180.00
0.6207 m3 Pasir beton @ Rp. 250,000.00
0.7400 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
1.6500 oh Pekerja @ Rp. 60,000.00 99,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
0.0280 oh Kepala tukang @ Rp. 80,000.00 2,240.00
0.0830 oh Mandor @ Rp. 100,000.00 8,300.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
1.00 m3 Membuat 1 m beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
3
2
SNI 7394:2008 - 6.2 276.0000 kg Portland Cement @ Rp. 180.00
0.5914 m3 Pasir beton @ Rp. 250,000.00
0.7496 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
1.6500 oh Pekerja @ Rp. 60,000.00 99,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
0.0280 oh Kepala tukang @ Rp. 80,000.00 2,240.00
0.0830 oh Mandor @ Rp. 100,000.00 8,300.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m3 Membuat beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
SNI 7394:2008 - 6.3 299.0000 kg Portland Cement @ Rp. 180.00
0.5707 m3 Pasir beton @ Rp. 250,000.00
0.7533 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
1.6500 oh Pekerja @ Rp. 60,000.00 99,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
0.0280 oh Kepala tukang @ Rp. 80,000.00 2,240.00
0.0830 oh Mandor @ Rp. 100,000.00 8,300.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
4 1.00 m3 Membuat lantai kerja beton mutu fc = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
SNI 7394:2008 - 6.4 230.0000 kg Portland Cement @ Rp. 180.00
0.6379 m3 Pasir beton @ Rp. 250,000.00
0.7607 m3 Koral beton @ Rp. 20,000.00
200.0000 Liter Air @ Rp. ~ #VALUE!
1.2000 oh Pekerja @ Rp. 60,000.00 72,000.00
0.2000 oh Tukang batu @ Rp. 70,000.00 14,000.00
0.0200 oh Kepala tukang @ Rp. 80,000.00 1,600.00
0.0600 oh Mandor @ Rp. 100,000.00 6,000.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 53
No. Macam Pekerjaan Upah
(1) (2) (3)
5 1.00 m3 Membuat beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
SNI 7394:2008 - 6.5 326.0000 kg Portland Cement @ Rp. 180.00
0.5429 m3 Pasir beton @ Rp. 250,000.00
0.7622 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
1.6500 oh Pekerja @ Rp. 60,000.00 99,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
0.0280 oh Kepala tukang @ Rp. 80,000.00 2,240.00
0.0830 oh Mandor @ Rp. 100,000.00 8,300.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
6 1.00 m3 Membuat beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
SNI 7394:2008 - 6.6 352.0000 kg Portland Cement @ Rp. 180.00
0.5221 m3 Pasir beton @ Rp. 250,000.00
0.7637 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
1.6500 oh Pekerja @ Rp. 60,000.00 99,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
0.0280 oh Kepala tukang @ Rp. 80,000.00 2,240.00
0.0830 oh Mandor @ Rp. 100,000.00 8,300.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
7 1.00 m3 Membuat beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
SNI 7394:2008 - 6.7 371.0000 kg Portland Cement @ Rp. 180.00
0.4986 m3 Pasir beton @ Rp. 250,000.00
0.7756 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
1.6500 oh Pekerja @ Rp. 60,000.00 99,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
0.0280 oh Kepala tukang @ Rp. 80,000.00 2,240.00
0.0830 oh Mandor @ Rp. 100,000.00 8,300.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
8 1.00 m3 Membuat beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
SNI 7394:2008 - 6.8 384.0000 kg Portland Cement @ Rp. 180.00
0.4943 m3 Pasir beton @ Rp. 250,000.00
0.7696 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
1.6500 oh Pekerja @ Rp. 60,000.00 99,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
0.0280 oh Kepala tukang @ Rp. 80,000.00 2,240.00
0.0830 oh Mandor @ Rp. 100,000.00 8,300.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 54
No. Macam Pekerjaan Upah
(1) (2) (3)
9 1.00 m3 Membuat beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
SNI 7394:2008 - 6.9 406.0000 kg Portland Cement @ Rp. 180.00
0.4886 m3 Pasir beton @ Rp. 250,000.00
0.7600 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
1.6500 oh Pekerja @ Rp. 60,000.00 99,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
0.0280 oh Kepala tukang @ Rp. 80,000.00 2,240.00
0.0830 oh Mandor @ Rp. 100,000.00 8,300.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
10 1.00 m3 Membuat beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
SNI 7394:2008 - 6.10 413.0000 kg Portland Cement @ Rp. 180.00
0.4864 m3 Pasir beton @ Rp. 250,000.00
0.7563 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
1.6500 oh Pekerja @ Rp. 60,000.00 99,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
0.0280 oh Kepala tukang @ Rp. 80,000.00 2,240.00
0.0830 oh Mandor @ Rp. 100,000.00 8,300.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m3 Membuat beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
SNI 7394:2008 - 6.11 439.0000 kg Portland Cement @ Rp. 180.00
0.4786 m3 Pasir beton @ Rp. 250,000.00
0.7452 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
2.1000 oh Pekerja @ Rp. 60,000.00 126,000.00
0.3500 oh Tukang batu @ Rp. 70,000.00 24,500.00
0.0350 oh Kepala tukang @ Rp. 80,000.00 2,800.00
0.1050 oh Mandor @ Rp. 100,000.00 10,500.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
12 1.00 m3 Membuat beton mutu fc = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48
SNI 7394:2008 - 6.12 448.0000 kg Portland Cement @ Rp. 180.00
0.4764 m3 Pasir beton @ Rp. 250,000.00
0.7407 m3 Koral beton @ Rp. 20,000.00
215.0000 Liter Air @ Rp. ~ #VALUE!
2.1000 oh Pekerja @ Rp. 60,000.00 126,000.00
0.3500 oh Tukang batu @ Rp. 70,000.00 24,500.00
0.0350 oh Kepala tukang @ Rp. 80,000.00 2,800.00
0.1050 oh Mandor @ Rp. 100,000.00 10,500.00
JUMLAH ( BELUM PPN ) #VALUE!
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 55
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 56
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 10,060.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 57
No. Macam Pekerjaan Upah
(1) (2) (3)
0.1341 oh Pekerja @ Rp. 60,000.00 8,046.00
0.1341 oh Tukang Besi @ Rp. 70,000.00 9,387.00
0.0107 oh Kepala Tukang Besi @ Rp. 80,000.00 856.00
0.0475 oh Mandor @ Rp. 100,000.00 4,748.00
JUMLAH ( BELUM PPN ) 23,037.00
JASA 10 %
JUMLAH
DIBULATKAN
17.i 1.00 unit Stutwerk untuk 1m beton, tinggi 3-4 m (memakai scafolding) sistem bondex
AK 10.0000 unit Scafolding @ Rp.
0.0420 m3 Kayu Glugu 5/7 @ Rp. 11,000.00
0.0240 m3 Papan Glugu 1/20 @ Rp.
2.2000 oh Pekerja @ Rp. 60,000.00 132,000.00
3.5000 oh Tukang kayu @ Rp. 70,000.00 245,000.00
0.3500 oh Kepala Tukang kayu @ Rp. 80,000.00 28,000.00
0.1200 oh Mandor @ Rp. 100,000.00 12,000.00
JUMLAH ( BELUM PPN ) 417,000.00
JASA 10 %
JUMLAH
Analisa Konstruksi - 58
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN
17.j 1.00 m3 Pekerjaan Beton K225, Plat Lantai tbl. 12 cm, besi 6 1x lapis (Sistem Bondex)
AK
Beton mutu fc = 19,3 MPa (K 225),
1.0000 m3 slump (12 2) cm, w/c=0,58 @ Rp.
8.8544 m2 Plat Bondex @ Rp.
27.1300 kg Tulangan wire mesh 6-15 @ Rp. -
1.0000 unit Stutwerk untuk 1m beton @ Rp. -
1.0000 unit Membongkar @ Rp. -
JUMLAH ( BELUM PPN ) -
JUMLAH
DIBULATKAN
Analisa Konstruksi - 59
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 68,640.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 60
No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 7394:2008 - 6.28 0.2000 m3 Kayu kelas III @ Rp.
1.5000 m3 Paku 5 cm - 12 cm @ Rp.
0.4000 ltr Minyak bekisting @ Rp.
157.5000 kg Besi beton polos @ Rp.
2.2500 kg Kawat beton @ Rp.
336.0000 kg Portland Cement @ Rp. #REF!
0.5400 m3 Pasir beton @ Rp. 250,000.00
0.8100 m3 Kerikil beton @ Rp. 190,000.00
5.3000 oh Pekerja @ Rp. 60,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00
1.3000 oh Tukang kayu @ Rp. 70,000.00
1.0500 oh Tukang besi @ Rp. 70,000.00 73,500.00
0.2620 oh Kepala tukang @ Rp. 80,000.00 20,960.00
0.2650 oh Mandor @ Rp. 100,000.00 26,500.00
JUMLAH ( BELUM PPN ) 120,960.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 61
No. Macam Pekerjaan Upah
(1) (2) (3)
336.0000 kg Portland Cement @ Rp.
0.5400 m3 Pasir beton @ Rp.
0.8100 m3 Kerikil beton @ Rp.
0.1400 m3 Kayu kelas II balok @ Rp.
2.8000 lbr Plywood tebal 9 mm @ Rp.
16.0000 btg Dolken kayu galam, (8-10) cm, panjang@
4mRp.
6.3500 oh Pekerja @ Rp. 60,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00
1.6500 oh Tukang kayu @ Rp. 70,000.00
1.4000 oh Tukang besi @ Rp. 70,000.00 98,000.00
0.3330 oh Kepala tukang @ Rp. 80,000.00 26,640.00
0.3180 oh Mandor @ Rp. 100,000.00 31,800.00
JUMLAH ( BELUM PPN ) 156,440.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 62
No. Macam Pekerjaan Upah
(1) (2) (3)
3.0000 kg Kawat beton @ Rp.
336.0000 kg Portland Cement @ Rp.
0.5400 m3 Pasir beton @ Rp.
0.8100 m3 Kerikil beton @ Rp. 190,000.00
0.1050 m3 Kayu kelas II balok @ Rp.
2.5000 lbr Plywood tebal 9 mm @ Rp.
14.0000 btg Dolken kayu galam, (8-10) cm, panjang@
4mRp.
5.6500 oh Pekerja @ Rp. 60,000.00 339,000.00
0.2750 oh Tukang batu @ Rp. 70,000.00 19,250.00
1.5600 oh Tukang kayu @ Rp. 70,000.00 109,200.00
1.4000 oh Tukang besi @ Rp. 70,000.00 98,000.00
0.3230 oh Kepala tukang @ Rp. 80,000.00 25,840.00
0.2830 oh Mandor @ Rp. 100,000.00 28,300.00
JUMLAH ( BELUM PPN ) 619,590.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 63
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 64
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 65
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 66
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 67
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 68
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 69
No. Macam Pekerjaan Upah
(1) (2) (3)
PEKERJAAN PLESTERAN
Analisa Konstruksi - 70
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 71
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 72
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 73
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 74
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 75
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 76
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH
DIBULATKAN
Analisa Konstruksi - 77
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 78
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 79
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 80
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 81
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 82
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 83
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN
Analisa Konstruksi - 84
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 85
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 86
No. Macam Pekerjaan Upah
(1) (2) (3)
34 1.00 m2 Memasang lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm
SNI 7395:2008 - 6.33 1.0600 m2 Ubin keramik artistik @ Rp. -
8.1900 kg Portland Cement @ Rp. 180.00
0.0450 m3 Pasir Pasang @ Rp. 250,000.00
3.2000 kg Semen warna @ Rp. 11,340.00
0.7000 oh Pekerja @ Rp. 60,000.00 42,000.00
0.3500 oh Tukang batu @ Rp. 70,000.00 24,500.00
0.0350 oh Kepala tukang @ Rp. 80,000.00 2,800.00
0.0350 oh Mandor @ Rp. 100,000.00 3,500.00
JUMLAH ( BELUM TERMASUK PPN ) 72,800.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 87
No. Macam Pekerjaan Upah
(1) (2) (3)
35 1.00 m2 Memasang lantai keramik ukuran (33 x 33) cm
SNI 7395:2008 - 6.34 1.0890 m2 Ubin keramik @ Rp. 117,500.00
8.1900 kg Portland Cement @ Rp. 180.00
0.0450 m3 Pasir Pasang @ Rp. 250,000.00
1.6200 kg Semen warna @ Rp. 11,340.00
0.7000 oh Pekerja @ Rp. 60,000.00 42,000.00
0.3500 oh Tukang batu @ Rp. 70,000.00 24,500.00
0.0350 oh Kepala tukang @ Rp. 80,000.00 2,800.00
0.0350 oh Mandor @ Rp. 100,000.00 3,500.00
JUMLAH ( BELUM TERMASUK PPN ) 72,800.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 88
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 89
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN
39 1.00 m2 Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP
SNI 7395:2008 - 6.38 1.0683 m2 Mosaik @ Rp. 47,500.00
14.1500 kg Portland Cement @ Rp. 180.00
0.0390 m3 Pasir Pasang @ Rp. 250,000.00
2.0000 kg Semen warna @ Rp. 11,340.00
0.7000 oh Pekerja @ Rp. 60,000.00 42,000.00
0.3500 oh Tukang batu @ Rp. 70,000.00 24,500.00
0.0350 oh Kepala tukang @ Rp. 80,000.00 2,800.00
0.0350 oh Mandor @ Rp. 100,000.00 3,500.00
JUMLAH ( BELUM TERMASUK PPN ) 72,800.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 90
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 91
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 92
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 93
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 94
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH
DIBULATKAN
Analisa Konstruksi - 95
No. Macam Pekerjaan Upah
(1) (2) (3)
61.a 1.00 m1 Memasang plint vinyl karet ukuran (15 x 30) cm dengan perekat
SNI 7395:2008 - 6.62 1.7600 m1 Vinyl karet @ Rp.
0.0800 kg Lem vinyl @ Rp.
0.0800 oh Pekerja @ Rp. 60,000.00 4,800.00
0.0800 oh Tukang @ Rp. 75,000.00 6,000.00
0.0080 oh Kepala tukang @ Rp. 85,000.00 680.00
Analisa Konstruksi - 96
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0040 oh Mandor @ Rp. 100,000.00 400.00
JUMLAH ( BELUM PPN ) 11,880.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 97
No. Macam Pekerjaan Upah
(1) (2) (3)
Analisa Konstruksi - 98
No. Macam Pekerjaan Upah
(1) (2) (3)
PEKERJAAN CONBLOCK
1 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. 89,700.00
0.0500 m 3
Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
2 1.00 m2 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. 89,700.00
0.0500 m 3
Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. 72,500.00
0.0500 m 3
Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
4 1.00 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. 76,700.00
0.0500 m 3
Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
5 1.00 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 tebal pasir 5 cm
AK 1.0000 m 2
Conblock @ Rp. 57,750.00
0.0500 m3 Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 99
No. Macam Pekerjaan Upah
(1) (2) (3)
6 1.00 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. 87,500.00
0.0500 m 3
Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
7 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. 89,700.00
0.0500 m3 Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
8 1.00 m2 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 tebal pasir 5 cm
AK 1.0000 m 2
Conblock @ Rp. 89,700.00
0.0500 m3 Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
9 1.00 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200 tebal pasir 5 cm
AK 1.0000 m 2
Conblock @ Rp. 72,750.00
0.0500 m3 Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
10 1.00 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200 tebal pasir 5 cm
AK 1.0000 m 2
Conblock @ Rp. 87,500.00
0.0500 m3 Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. 72,750.00
0.0500 m 3
Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
12 1.00 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. 87,500.00
0.0500 m3 Pasir urug @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.2500 oh Tukang batu @ Rp. 70,000.00 17,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 80,000.00 2,000.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 52,000.00
JASA 10 %
JUMLAH
DIBULATKAN
1.a 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas I
SNI 3434:2008 - 6.1 1.1000 m3 Balok kayu @ Rp. 31,000,000.00
1.2500 kg Paku 10 cm @ Rp. 27,000.00
1.0000 kg Lem kayu @ Rp. 1,269.00
7.0000 oh Pekerja @ Rp. 60,000.00 420,000.00
21.0000 oh Tukang kayu @ Rp. 75,000.00 1,575,000.00
2.1000 oh Kepala tukang @ Rp. 85,000.00 178,500.00
0.3500 oh Mandor @ Rp. 100,000.00 35,000.00
JUMLAH ( BELUM PPN ) 2,208,500.00
JASA 10 %
JUMLAH
DIBULATKAN
1 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati (klas plitur)
SNI 3434:2008 - 6.1 1.1000 m3 Balok kayu jati (klas plitur) @ Rp. 31,000,000.00
1.2500 kg Paku 10 cm @ Rp. 27,000.00
1.0000 kg Lem kayu @ Rp. 1,269.00
7.0000 oh Pekerja @ Rp. 60,000.00 420,000.00
21.0000 oh Tukang kayu @ Rp. 75,000.00 1,575,000.00
2.1000 oh Kepala tukang @ Rp. 85,000.00 178,500.00
0.3500 oh Mandor @ Rp. 100,000.00 35,000.00
JUMLAH ( BELUM PPN ) 2,208,500.00
JASA 10 %
JUMLAH
DIBULATKAN
2 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati lokal
SNI 3434:2008 - 6.1 1.1000 m3 Balok kayu jati (lokal) @ Rp. 75,000.00
1.2500 kg Paku 10 cm @ Rp. 27,000.00
1.0000 kg Lem kayu @ Rp. 1,269.00
7.0000 oh Pekerja @ Rp. 60,000.00 420,000.00
21.0000 oh Tukang kayu @ Rp. 75,000.00 1,575,000.00
2.1000 oh Kepala tukang @ Rp. 85,000.00 178,500.00
0.3500 oh Mandor @ Rp. 100,000.00 35,000.00
JUMLAH ( BELUM PPN ) 2,208,500.00
JASA 10 %
JUMLAH
DIBULATKAN
2.a 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas II atau III
SNI 3434:2008 - 6.2 1.2000 m3 Balok kayu @ Rp. 75,000.00
1.2500 kg Paku 10 cm @ Rp. 27,000.00
1.0000 kg Lem kayu @ Rp. 1,269.00
7.0000 oh Pekerja @ Rp. 60,000.00 420,000.00
18.0000 oh Tukang kayu @ Rp. 75,000.00 1,350,000.00
1.8000 oh Kepala tukang @ Rp. 85,000.00 153,000.00
0.3000 oh Mandor @ Rp. 100,000.00 30,000.00
JUMLAH ( BELUM PPN ) 1,953,000.00
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kamper
SNI 3434:2008 - 6.2 1.2000 m3 Balok kayu kamper @ Rp. 9,000,000.00
1.2500 kg Paku 10 cm @ Rp. 27,000.00
1.0000 kg Lem kayu @ Rp. 1,269.00
6.0000 oh Pekerja @ Rp. 60,000.00 360,000.00
18.0000 oh Tukang kayu @ Rp. 75,000.00 1,350,000.00
1.8000 oh Kepala tukang @ Rp. 85,000.00 153,000.00
0.3000 oh Mandor @ Rp. 100,000.00 30,000.00
JUMLAH ( BELUM PPN ) 1,893,000.00
JASA 10 %
JUMLAH
DIBULATKAN
4 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu bengkirai
SNI 3434:2008 - 6.2 1.2000 m3 Balok kayu bengkirai @ Rp. 10,000,000.00
1.2500 kg Paku 10 cm @ Rp. 27,000.00
1.0000 kg Lem kayu @ Rp. 1,269.00
6.0000 oh Pekerja @ Rp. 60,000.00 360,000.00
18.0000 oh Tukang kayu @ Rp. 75,000.00 1,350,000.00
1.8000 oh Kepala tukang @ Rp. 85,000.00 153,000.00
0.3000 oh Mandor @ Rp. 100,000.00 30,000.00
JUMLAH ( BELUM PPN ) 1,893,000.00
JASA 10 %
JUMLAH
DIBULATKAN
5 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kruing
SNI 3434:2008 - 6.2 1.2000 m3 Balok kayu kruing @ Rp. 8,000,000.00
1.2500 kg Paku 10 cm @ Rp. 27,000.00
1.0000 kg Lem kayu @ Rp. 1,269.00
6.0000 oh Pekerja @ Rp. 60,000.00 360,000.00
18.0000 oh Tukang kayu @ Rp. 75,000.00 1,350,000.00
1.8000 oh Kepala tukang @ Rp. 85,000.00 153,000.00
0.3000 oh Mandor @ Rp. 100,000.00 30,000.00
JUMLAH ( BELUM PPN ) 1,893,000.00
JASA 10 %
JUMLAH
DIBULATKAN
6 1.00 m2 Membuat dan memasang pintu klamp, kayu jati (klas plitur)
SNI 3434:2008 - 6.3 0.0400 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
dalbang 9 0.0500 kg Paku 5 cm - 7 cm @ Rp. 53,000.00
0.3500 oh Pekerja @ Rp. 60,000.00 21,000.00
1.0500 oh Tukang kayu @ Rp. 75,000.00 78,750.00
0.1050 oh Kepala tukang @ Rp. 85,000.00 8,925.00
0.0180 oh Mandor @ Rp. 100,000.00 1,800.00
JUMLAH ( BELUM PPN ) 110,475.00
JASA 10 %
JUMLAH
DIBULATKAN
10a 1.00 m2 Membuat dan memasang pintu klamp sederhana, kayu kelas III untuk gudang sementara
SNI 3434:2008 - 6.4 0.0400 m3 Papan kayu @ Rp. 9,000,000.00
0.0500 kg Paku 5 cm - 7 cm @ Rp. 53,000.00
0.3500 oh Pekerja @ Rp. 60,000.00 21,000.00
1.0500 oh Tukang kayu @ Rp. 75,000.00 78,750.00
0.1050 oh Kepala tukang @ Rp. 85,000.00 8,925.00
0.0180 oh Mandor @ Rp. 100,000.00 1,800.00
10b 1.00 m2 Membuat dan memasang daun pintu panel, kayu kelas I atau II
SNI 3434:2008 - 6.5 0.0400 m3 Papan kayu @ Rp. 9,000,000.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
3.0000 oh Tukang kayu @ Rp. 75,000.00 225,000.00
0.3000 oh Kepala tukang @ Rp. 85,000.00 25,500.00
0.0500 oh Mandor @ Rp. 100,000.00 5,000.00
JUMLAH ( BELUM PPN ) 315,500.00
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (klas plitur)
SNI 3434:2008 - 6.5 0.0400 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
3.0000 oh Tukang kayu @ Rp. 75,000.00 225,000.00
0.3000 oh Kepala tukang @ Rp. 85,000.00 25,500.00
0.0500 oh Mandor @ Rp. 100,000.00 5,000.00
JUMLAH ( BELUM PPN ) 315,500.00
JASA 10 %
JUMLAH
DIBULATKAN
12 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (lokal)
SNI 3434:2008 - 6.5 0.0400 m3 Papan kayu jati (lokal) @ Rp. 13,500,000.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
3.0000 oh Tukang kayu @ Rp. 75,000.00 225,000.00
0.3000 oh Kepala tukang @ Rp. 85,000.00 25,500.00
0.0500 oh Mandor @ Rp. 100,000.00 5,000.00
JUMLAH ( BELUM PPN ) 315,500.00
JASA 10 %
JUMLAH
DIBULATKAN
16a 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kelas I atau II
SNI 3434:2008 - 6.6 0.0240 m3 Papan kayu @ Rp. 35,100,000.00
0.3000 kg Lem kayu @ Rp. 1,269.00
0.8000 oh Pekerja @ Rp. 60,000.00 48,000.00
2.4000 oh Tukang kayu @ Rp. 75,000.00 180,000.00
0.2400 oh Kepala tukang @ Rp. 85,000.00 20,400.00
0.0400 oh Mandor @ Rp. 100,000.00 4,000.00
16 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (klas plitur)
SNI 3434:2008 - 6.6 0.0240 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.3000 kg Lem kayu @ Rp. 1,269.00
0.8000 oh Pekerja @ Rp. 60,000.00 48,000.00
2.4000 oh Tukang kayu @ Rp. 75,000.00 180,000.00
0.2400 oh Kepala tukang @ Rp. 85,000.00 20,400.00
0.0400 oh Mandor @ Rp. 100,000.00 4,000.00
JUMLAH ( BELUM PPN ) 252,400.00
JASA 10 %
JUMLAH
DIBULATKAN
17 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (lokal)
SNI 3434:2008 - 6.6 0.0240 m3 Papan kayu jati (lokal) @ Rp. 13,500,000.00
0.3000 kg Lem kayu @ Rp. 1,269.00
0.8000 oh Pekerja @ Rp. 60,000.00 48,000.00
2.4000 oh Tukang kayu @ Rp. 75,000.00 180,000.00
0.2400 oh Kepala tukang @ Rp. 85,000.00 20,400.00
0.0400 oh Mandor @ Rp. 100,000.00 4,000.00
JUMLAH ( BELUM PPN ) 252,400.00
JASA 10 %
JUMLAH
DIBULATKAN
18 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kamper
SNI 3434:2008 - 6.6 0.0240 m3 Papan kayu kamper @ Rp. 10,000,000.00
0.3000 kg Lem kayu @ Rp. 1,269.00
0.8000 oh Pekerja @ Rp. 60,000.00 48,000.00
2.4000 oh Tukang kayu @ Rp. 75,000.00 180,000.00
0.2400 oh Kepala tukang @ Rp. 85,000.00 20,400.00
0.0400 oh Mandor @ Rp. 100,000.00 4,000.00
JUMLAH ( BELUM PPN ) 252,400.00
JASA 10 %
JUMLAH
DIBULATKAN
19 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu bengkirai
SNI 3434:2008 - 6.6 0.0240 m3 Papan kayu bengkirai @ Rp. 10,500,000.00
0.3000 kg Lem kayu @ Rp. 1,269.00
0.8000 oh Pekerja @ Rp. 60,000.00 48,000.00
2.4000 oh Tukang kayu @ Rp. 75,000.00 180,000.00
0.2400 oh Kepala tukang @ Rp. 85,000.00 20,400.00
0.0400 oh Mandor @ Rp. 100,000.00 4,000.00
JUMLAH ( BELUM PPN ) 252,400.00
JASA 10 %
JUMLAH
DIBULATKAN
20 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kruing
SNI 3434:2008 - 6.6 0.0240 m3 Papan kayu kruing @ Rp. 9,000,000.00
0.3000 kg Lem kayu @ Rp. 1,269.00
0.8000 oh Pekerja @ Rp. 60,000.00 48,000.00
2.4000 oh Tukang kayu @ Rp. 75,000.00 180,000.00
0.2400 oh Kepala tukang @ Rp. 85,000.00 20,400.00
0.0400 oh Mandor @ Rp. 100,000.00 4,000.00
JUMLAH ( BELUM PPN ) 252,400.00
JASA 10 %
JUMLAH
DIBULATKAN
21a 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kelas I atau II
SNI 3434:2008 - 6.7 0.0640 m3 Papan kayu @ Rp. 35,100,000.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
3.0000 oh Tukang kayu @ Rp. 75,000.00 225,000.00
0.3000 oh Kepala tukang @ Rp. 85,000.00 25,500.00
0.0500 oh Mandor @ Rp. 100,000.00 5,000.00
21 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas plitur)
SNI 3434:2008 - 6.7 0.0640 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
3.0000 oh Tukang kayu @ Rp. 75,000.00 225,000.00
0.3000 oh Kepala tukang @ Rp. 85,000.00 25,500.00
0.0500 oh Mandor @ Rp. 100,000.00 5,000.00
JUMLAH ( BELUM PPN ) 315,500.00
JASA 10 %
JUMLAH
DIBULATKAN
22 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal)
SNI 3434:2008 - 6.7 0.0640 m3 Papan kayu jati (lokal) @ Rp. 13,500,000.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
3.0000 oh Tukang kayu @ Rp. 75,000.00 225,000.00
0.3000 oh Kepala tukang @ Rp. 85,000.00 25,500.00
0.0500 oh Mandor @ Rp. 100,000.00 5,000.00
JUMLAH ( BELUM PPN ) 315,500.00
JASA 10 %
JUMLAH
DIBULATKAN
23 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kamper
SNI 3434:2008 - 6.7 0.0640 m3 Papan kayu kamper @ Rp. 10,000,000.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
3.0000 oh Tukang kayu @ Rp. 75,000.00 225,000.00
0.3000 oh Kepala tukang @ Rp. 85,000.00 25,500.00
0.0500 oh Mandor @ Rp. 100,000.00 5,000.00
JUMLAH ( BELUM PPN ) 315,500.00
JASA 10 %
JUMLAH
DIBULATKAN
24 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai
SNI 3434:2008 - 6.7 0.0640 m3 Papan kayu bengkirai @ Rp. 10,500,000.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
3.0000 oh Tukang kayu @ Rp. 75,000.00 225,000.00
0.3000 oh Kepala tukang @ Rp. 85,000.00 25,500.00
0.0500 oh Mandor @ Rp. 100,000.00 5,000.00
JUMLAH ( BELUM PPN ) 315,500.00
JASA 10 %
JUMLAH
DIBULATKAN
25 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kruing
SNI 3434:2008 - 6.7 0.0640 m3 Papan kayu kruing @ Rp. 9,000,000.00
dalbang 32 0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 oh Pekerja @ Rp. 60,000.00 60,000.00
3.0000 oh Tukang kayu @ Rp. 75,000.00 225,000.00
0.3000 oh Kepala tukang @ Rp. 85,000.00 25,500.00
0.0500 oh Mandor @ Rp. 100,000.00 5,000.00
JUMLAH ( BELUM PPN ) 315,500.00
JASA 10 %
JUMLAH
DIBULATKAN
26a 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)
SNI 3434:2008 - 6.8 0.0250 m3 Papan kayu @ Rp. 13,500,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 22 @ Rp. 67,000.00
0.7000 oh Pekerja @ Rp. 60,000.00 42,000.00
2.1000 oh Tukang kayu @ Rp. 75,000.00 157,500.00
26 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu jati lokal (lebar sampai 90 cm
SNI 3434:2008 - 6.8 0.0250 m3 Papan kayu jati (lokal) @ Rp. 13,500,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 22 @ Rp. 67,000.00
0.7000 oh Pekerja @ Rp. 60,000.00 42,000.00
2.1000 oh Tukang kayu @ Rp. 75,000.00 157,500.00
0.2100 oh Kepala tukang @ Rp. 85,000.00 17,850.00
0.0350 oh Mandor @ Rp. 100,000.00 3,500.00
JUMLAH ( BELUM PPN ) 220,850.00
JASA 10 %
JUMLAH
DIBULATKAN
27 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamper (lebar sampai 90 cm
SNI 3434:2008 - 6.8 0.0250 m3 Papan kayu kamper @ Rp. 10,000,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 22 @ Rp. 67,000.00
0.7000 oh Pekerja @ Rp. 60,000.00 42,000.00
2.1000 oh Tukang kayu @ Rp. 75,000.00 157,500.00
0.2100 oh Kepala tukang @ Rp. 85,000.00 17,850.00
0.0350 oh Mandor @ Rp. 100,000.00 3,500.00
JUMLAH ( BELUM PPN ) 220,850.00
JASA 10 %
JUMLAH
DIBULATKAN
28 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu bengkirai (lebar sampai 90 c
SNI 3434:2008 - 6.8 0.0250 m3 Papan kayu bengkirai @ Rp. 10,500,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 22 @ Rp. 67,000.00
0.7000 oh Pekerja @ Rp. 60,000.00 42,000.00
2.1000 oh Tukang kayu @ Rp. 75,000.00 157,500.00
0.2100 oh Kepala tukang @ Rp. 85,000.00 17,850.00
0.0350 oh Mandor @ Rp. 100,000.00 3,500.00
JUMLAH ( BELUM PPN ) 220,850.00
JASA 10 %
JUMLAH
DIBULATKAN
29 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kruing (lebar sampai 90 cm)
SNI 3434:2008 - 6.8 0.0250 m3 Papan kayu kruing @ Rp. 9,000,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 22 @ Rp. 67,000.00
0.7000 oh Pekerja @ Rp. 60,000.00 42,000.00
2.1000 oh Tukang kayu @ Rp. 75,000.00 157,500.00
0.2100 oh Kepala tukang @ Rp. 85,000.00 17,850.00
0.0350 oh Mandor @ Rp. 100,000.00 3,500.00
JUMLAH ( BELUM PPN ) 220,850.00
JASA 10 %
JUMLAH
DIBULATKAN
29a 1.00 m2 Membuat pintu plywood rangkap, rangka expose kayu kelas I atau II
SNI 3434:2008 - 6.9 0.0256 m3 Papan kayu @ Rp. 9,000,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.5000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 22 @ Rp. 67,000.00
0.8000 oh Pekerja @ Rp. 60,000.00 48,000.00
2.4000 oh Tukang kayu @ Rp. 75,000.00 180,000.00
0.2400 oh Kepala tukang @ Rp. 85,000.00 20,400.00
0.0400 oh Mandor @ Rp. 100,000.00 4,000.00
JUMLAH ( BELUM PPN ) 252,400.00
JASA 10 %
35a 1.00 m2 Pasang pintu teakwood rangkap, rangka expose kayu kelas I
SNI 3434:2008 - 6.11 0.0196 m3 Papan kayu @ Rp. 13,500,000.00
0.0300 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.3000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Teakwood tebal 4 mm ukuran (90 x 2 @ Rp. 67,000.00
0.8000 oh Pekerja @ Rp. 60,000.00 48,000.00
2.4000 oh Tukang kayu @ Rp. 75,000.00 180,000.00
0.2400 oh Kepala tukang kayu @ Rp. 85,000.00 20,400.00
0.0400 oh Mandor @ Rp. 100,000.00 4,000.00
JUMLAH ( BELUM PPN ) 252,400.00
JASA 10 %
JUMLAH
DIBULATKAN
39a 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kelas II
SNI 3434:2008 - 6.12 0.0250 m3 Papan kayu @ Rp. 10,000,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.8000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Teakwood tebal 4 mm ukuran (90 x 22 @ Rp. 67,000.00
0.5000 lbr Formika @ Rp. 65,000.00
0.8500 oh Pekerja @ Rp. 60,000.00 51,000.00
2.5500 oh Tukang kayu @ Rp. 75,000.00 191,250.00
0.2550 oh Kepala tukang @ Rp. 85,000.00 21,675.00
0.0430 oh Mandor @ Rp. 100,000.00 4,300.00
JUMLAH ( BELUM PPN ) 268,225.00
JASA 10 %
JUMLAH
DIBULATKAN
39 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kamper
SNI 3434:2008 - 6.12 0.0250 m3 Papan kayu kamper @ Rp. 10,000,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.8000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Teakwood tebal 4 mm ukuran (90 x 22 @ Rp. 67,000.00
0.5000 lbr Formika @ Rp. 65,000.00
0.8500 oh Pekerja @ Rp. 60,000.00 51,000.00
2.5500 oh Tukang kayu @ Rp. 75,000.00 191,250.00
0.2550 oh Kepala tukang @ Rp. 85,000.00 21,675.00
0.0430 oh Mandor @ Rp. 100,000.00 4,300.00
40 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu bengkirai
SNI 3434:2008 - 6.12 0.0250 m3 Papan kayu bengkirai @ Rp. 10,500,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.8000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Teakwood tebal 4 mm ukuran (90 x 22 @ Rp. 67,000.00
0.5000 lbr Formika @ Rp. 65,000.00
0.8500 oh Pekerja @ Rp. 60,000.00 51,000.00
2.5500 oh Tukang kayu @ Rp. 75,000.00 191,250.00
0.2550 oh Kepala tukang @ Rp. 85,000.00 21,675.00
0.0430 oh Mandor @ Rp. 100,000.00 4,300.00
JUMLAH ( BELUM PPN ) 268,225.00
JASA 10 %
JUMLAH
DIBULATKAN
41 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kruing
SNI 3434:2008 - 6.12 0.0250 m3 Papan kayu kruing @ Rp. 9,000,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.8000 kg Lem kayu @ Rp. 1,269.00
1.0000 lbr Teakwood tebal 4 mm ukuran (90 x 22 @ Rp. 67,000.00
0.5000 lbr Formika @ Rp. 65,000.00
0.8500 oh Pekerja @ Rp. 60,000.00 51,000.00
2.5500 oh Tukang kayu @ Rp. 75,000.00 191,250.00
0.2550 oh Kepala tukang @ Rp. 85,000.00 21,675.00
0.0430 oh Mandor @ Rp. 100,000.00 4,300.00
JUMLAH ( BELUM PPN ) 268,225.00
JASA 10 %
JUMLAH
DIBULATKAN
42a 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kelas I, II, III
SNI 3434:2008 - 6.13 1.1000 m3 Balok kayu @ Rp. 31,000,000.00
15.0000 kg Besi strip tebal 5 mm @ Rp. 46,000
5.6000 kg Paku 12 cm @ Rp. 27,000.00
4.0000 oh Pekerja @ Rp. 60,000.00 240,000.00
12.0000 oh Tukang kayu @ Rp. 75,000.00 900,000.00
1.2000 oh Kepala tukang @ Rp. 85,000.00 102,000.00
0.2000 oh Mandor @ Rp. 100,000.00 20,000.00
JUMLAH ( BELUM PPN ) 1,262,000.00
JASA 10 %
JUMLAH
DIBULATKAN
42 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas plitur) bentang 6 meter
SNI 3434:2008 - 6.13 1.1000 m3 Kayu jati (klas plitur) balok @ Rp. 31,000,000.00
dalbang 55 15.0000 kg Besi strip @ Rp. 46,000
5.6000 kg Paku 12 cm @ Rp. 27,000.00
4.0000 oh Pekerja @ Rp. 60,000.00 240,000.00
12.0000 oh Tukang kayu @ Rp. 75,000.00 900,000.00
1.2000 oh Kepala tukang @ Rp. 85,000.00 102,000.00
0.2000 oh Mandor @ Rp. 100,000.00 20,000.00
JUMLAH ( BELUM PPN ) 1,262,000.00
JASA 10 %
JUMLAH
DIBULATKAN
43 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) bentang 6 meter
SNI 3434:2008 - 6.13 1.1000 m3 Kayu jati (lokal) balok @ Rp. 75,000.00
15.0000 kg Besi strip @ Rp. 46,000
5.6000 kg Paku 12 cm @ Rp. 27,000.00
4.0000 oh Pekerja @ Rp. 60,000.00 240,000.00
12.0000 oh Tukang kayu @ Rp. 75,000.00 900,000.00
1.2000 oh Kepala tukang @ Rp. 85,000.00 102,000.00
0.2000 oh Mandor @ Rp. 100,000.00 20,000.00
JUMLAH ( BELUM PPN ) 1,262,000.00
JASA 10 %
JUMLAH
59 1.00 m2 Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3
SNI 3434:2008 - 6.16 0.0140 m3 Kaso-kaso (5 x 7) cm jati (lokal) @ Rp.
66 1.00 m2 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1)
SNI 3434:2008 - 6.17 0.0140 m3 Kaso-kaso (5 x 7) cm jati (klas 1) @ Rp. 30,000.00
0.0072 m3 Reng (3 x 4) cm jati (klas 1) @ Rp. 37,000.00
0.2500 kg Paku 5 cm dan 10 cm @ Rp. 53,000.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.1000 oh Tukang kayu @ Rp. 75,000.00 7,500.00
0.0100 oh Kep. Tk. Kayu @ Rp. 85,000.00 850.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 14,850.00
JASA 10 %
JUMLAH
DIBULATKAN
76.a 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kelas II atau III
SNI 3434:2008 - 6.19 0.0154 m3 Kaso-kaso (5 x 7) cm @ Rp. 8,000,000.00
0.2000 kg Paku 7 cm 10 cm @ Rp. 66,125.00
0.1500 oh Pekerja @ Rp. 75,000.00
0.3000 oh Tukang kayu @ Rp. 85,000.00
0.0300 oh Kepala tukang @ Rp. 60,000.00 1,800.00
0.0750 oh Mandor @ Rp. 100,000.00 7,500.00
JUMLAH ( BELUM PPN ) 9,300.00
JASA 10 %
JUMLAH
DIBULATKAN
77 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu jati (lokal)
SNI 3434:2008 - 6.19 0.0154 m3 Kaso-kaso (5 x 7) cm jati lokal @ Rp. 75,000.00
0.2000 kg Paku 7 cm 10 cm @ Rp. 53,000.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.3000 oh Tukang kayu @ Rp. 75,000.00 22,500.00
0.0300 oh Kepala tukang @ Rp. 85,000.00 2,550.00
0.0750 oh Mandor @ Rp. 100,000.00 7,500.00
JUMLAH ( BELUM PPN ) 41,550.00
JASA 10 %
JUMLAH
DIBULATKAN
80.a 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kelas II atau III
SNI 3434:2008 - 6.20 0.0163 m3 Kaso-kaso (5 x 7) cm @ Rp. 8,000,000.00
0.2500 kg Paku 7 cm 10 cm @ Rp. 53,000.00
0.2000 oh Pekerja @ Rp. 60,000.00 12,000.00
0.3000 oh Tukang kayu @ Rp. 75,000.00 22,500.00
0.0300 oh Kepala tukang @ Rp. 85,000.00 2,550.00
0.0100 oh Mandor @ Rp. 100,000.00 1,000.00
JUMLAH ( BELUM PPN ) 38,050.00
JASA 10 %
JUMLAH
DIBULATKAN
81 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu jati (lokal)
SNI 3434:2008 - 6.20 0.0163 m3 Kaso-kaso (5 x 7) cm jati lokal @ Rp. 75,000.00
0.2500 kg Paku 7 cm 10 cm @ Rp. 53,000.00
0.2000 oh Pekerja @ Rp. 60,000.00 12,000.00
0.3000 oh Tukang kayu @ Rp. 75,000.00 22,500.00
0.0300 oh Kepala tukang @ Rp. 85,000.00 2,550.00
0.0100 oh Mandor @ Rp. 100,000.00 1,000.00
85 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu jati (lokal)
AK 0.0130 m3 Kayu jati (lokal) balok @ Rp. 75,000.00
0.1200 kg Paku @ Rp. 53,000.00
0.1700 oh Pekerja @ Rp. 60,000.00 10,200.00
0.2700 oh Tukang kayu @ Rp. 75,000.00 20,250.00
0.0270 oh Kepala tukang kayu @ Rp. 85,000.00 2,295.00
0.0085 oh Mandor @ Rp. 100,000.00 850.00
JUMLAH ( BELUM PPN ) 33,595.00
JASA 10 %
JUMLAH
DIBULATKAN
92.a 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kelas I atau II
SNI 3434:2008 - 6.21 0.0108 m3 Papan kayu @ Rp.
0.1000 kg Paku 5 cm dan 7 cm @ Rp. 53,000.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.2000 oh Tukang kayu @ Rp. 75,000.00 15,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 23,625.00
JASA 10 %
JUMLAH
DIBULATKAN
93 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas plitur)
AK 0.0072 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0500 kg Paku biasa 2" - 5" @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.2000 oh Tukang kayu @ Rp. 75,000.00 15,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 23,625.00
JASA 10 %
JUMLAH
DIBULATKAN
97.a 1.00 m2 Memasang lisplank ukuran (3 x 30) cm, kayu kelas I atau II
SNI 3434:2008 - 6.22 0.0110 m3
Papan kayu @ Rp.
0.0500 kg Paku 5 cm dan 7 cm @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.2000 oh Tukang kayu @ Rp. 75,000.00 15,000.00
0.0200 oh Kepala tukang kayu @ Rp. 85,000.00 1,700.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 23,200.00
JASA 10 %
JUMLAH
DIBULATKAN
98 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur)
SNI 3434:2008 - 6.22 0.0110 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0500 kg Paku 5 cm dan 7 cm @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.2000 oh Tukang kayu @ Rp. 75,000.00 15,000.00
0.0200 oh Kepala tukang @ Rp. 85,000.00 1,700.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 23,200.00
JASA 10 %
JUMLAH
DIBULATKAN
101 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai
SNI 3434:2008 - 6.22 0.0110 m3 Papan kayu bengkirai @ Rp. 10,500,000.00
0.0500 kg Paku 5 cm dan 7 cm @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.2000 oh Tukang kayu @ Rp. 75,000.00 15,000.00
0.0200 oh Kepala tukang @ Rp. 85,000.00 1,700.00
103 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur)
AK 0.0145 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 66,125.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.2500 oh Tukang kayu @ Rp. 75,000.00 18,750.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0075 oh Mandor @ Rp. 100,000.00 750.00
JUMLAH ( BELUM PPN ) 30,625.00
JASA 10 %
JUMLAH
DIBULATKAN
104 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal)
AK 0.0145 m3 Papan kayu jati (lokal) @ Rp. 13,500,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 66,125.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.2500 oh Tukang kayu @ Rp. 75,000.00 18,750.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0075 oh Mandor @ Rp. 100,000.00 750.00
JUMLAH ( BELUM PPN ) 30,625.00
JASA 10 %
JUMLAH
DIBULATKAN
108 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas plitur)
AK 0.0086 m3
Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.1000 oh Tukang kayu @ Rp. 75,000.00 7,500.00
0.0100 oh Kepala tukang kayu @ Rp. 85,000.00 850.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 14,850.00
JASA 10 %
JUMLAH
DIBULATKAN
109 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lokal)
AK 0.0086 m3
Papan kayu jati (lokal) @ Rp. 13,500,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.1000 oh Tukang kayu @ Rp. 75,000.00 7,500.00
0.0100 oh Kepala tukang kayu @ Rp. 85,000.00 850.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 14,850.00
JASA 10 %
JUMLAH
DIBULATKAN
113 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas plitur)
AK 0.0060 m3
Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.1000 oh Tukang kayu @ Rp. 75,000.00 7,500.00
0.0100 oh Kepala tukang kayu @ Rp. 85,000.00 850.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 14,850.00
JASA 10 %
JUMLAH
DIBULATKAN
114 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal
AK 0.0060 m3
Papan kayu jati (lokal) @ Rp. 13,500,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.1000 oh Tukang kayu @ Rp. 75,000.00 7,500.00
0.0100 oh Kepala tukang kayu @ Rp. 85,000.00 850.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 14,850.00
JASA 10 %
JUMLAH
DIBULATKAN
118 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur)
AK 0.0048 m3
Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.1000 oh Tukang kayu @ Rp. 75,000.00 7,500.00
0.0100 oh Kepala tukang kayu @ Rp. 85,000.00 850.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 14,850.00
JASA 10 %
JUMLAH
DIBULATKAN
119 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal)
AK 0.0048 m3
Papan kayu jati (lokal) @ Rp. 13,500,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 66,125.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.1000 oh Tukang kayu @ Rp. 75,000.00 7,500.00
0.0100 oh Kepala tukang kayu @ Rp. 85,000.00 850.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 14,850.00
JASA 10 %
JUMLAH
DIBULATKAN
123 1.00 m2 Membuat listplank asbes plat ram kayu jati (lokal)
AK 0.0250 m 3
Ram kayu jati (lokal) @ Rp. 75,000.00
1.0000 m2 Asbes plat @ Rp. 17,800.00
0.3000 kg Paku reng @ Rp. 66,125.00
0.6000 oh Pekerja @ Rp. 60,000.00 36,000.00
1.8000 oh Tukang kayu @ Rp. 75,000.00 135,000.00
0.1800 oh Kep. Tk. Kayu @ Rp. 85,000.00 15,300.00
0.0300 oh Mandor @ Rp. 100,000.00 3,000.00
JUMLAH ( BELUM PPN ) 189,300.00
JASA 10 %
JUMLAH
DIBULATKAN
127 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal)
SNI 3434:2008 - 6.23 0.0280 m 3
Balok kayu jati (lokal) @ Rp. 75,000.00
0.1500 kg Paku 5 cm dan 7 cm @ Rp. 66,125.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang kayu @ Rp. 75,000.00 33,750.00
0.0450 oh Kepala tukang @ Rp. 85,000.00 3,825.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 47,375.00
JASA 10 %
JUMLAH
DIBULATKAN
128 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kamper
SNI 3434:2008 - 6.23 0.0280 m 3
Balok kayu kamper @ Rp. 9,000,000.00
0.1500 kg Paku 5 cm dan 7 cm @ Rp. 66,125.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang kayu @ Rp. 75,000.00 33,750.00
0.0450 oh Kepala tukang @ Rp. 85,000.00 3,825.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 47,375.00
JASA 10 %
JUMLAH
DIBULATKAN
129 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai
SNI 3434:2008 - 6.23 0.0280 m 3
Balok kayu bengkirai @ Rp. 10,000,000.00
0.1500 kg Paku 5 cm dan 7 cm @ Rp. 66,125.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang kayu @ Rp. 75,000.00 33,750.00
0.0450 oh Kepala tukang @ Rp. 85,000.00 3,825.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 47,375.00
JASA 10 %
JUMLAH
DIBULATKAN
130 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kruing
SNI 3434:2008 - 6.23 0.0280 m 3
Balok kayu kruing @ Rp. 8,000,000.00
0.1500 kg Paku 5 cm dan 7 cm @ Rp. 66,125.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang kayu @ Rp. 75,000.00 33,750.00
0.0450 oh Kepala tukang @ Rp. 85,000.00 3,825.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 47,375.00
JASA 10 %
JUMLAH
DIBULATKAN
130.a 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kelas II
SNI 3434:2008 - 6.24 0.0280 m 3
Balok kayu @ Rp.
0.1500 kg Paku 5 cm dan 7 cm @ Rp. 66,125.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang kayu @ Rp. 75,000.00 33,750.00
0.0450 oh Kepala tukang @ Rp. 85,000.00 3,825.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 47,375.00
JASA 10 %
JUMLAH
DIBULATKAN
131 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu jati (lokal)
SNI 3434:2008 - 6.24 0.0280 m3 Balok kayu jati (lokal) @ Rp. 75,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.8600 lbr Teakwood tebal 4 mm, Ukuran 120 cm @ Rp. 67,000.00
0.5600 kg Lem kayu @ Rp. 1,269.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
132 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kamper
SNI 3434:2008 - 6.24 0.0280 m3 Balok kayu kamper @ Rp. 9,000,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.8600 lbr Teakwood tebal 4 mm, Ukuran 120 cm @ Rp. 67,000.00
0.5600 kg Lem kayu @ Rp. 1,269.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang kayu @ Rp. 75,000.00 33,750.00
0.0450 oh Kepala tukang @ Rp. 85,000.00 3,825.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 47,375.00
JASA 10 %
JUMLAH
DIBULATKAN
133 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai
SNI 3434:2008 - 6.24 0.0280 m3 Balok kayu bengkirai @ Rp. 10,000,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.8600 lbr Teakwood tebal 4 mm, Ukuran 120 cm @ Rp. 67,000.00
0.5600 kg Lem kayu @ Rp. 1,269.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang kayu @ Rp. 75,000.00 33,750.00
0.0450 oh Kepala tukang @ Rp. 85,000.00 3,825.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 47,375.00
JASA 10 %
JUMLAH
DIBULATKAN
134 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kruing
SNI 3434:2008 - 6.24 0.0280 m3 Balok kayu kruing @ Rp. 8,000,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.8600 lbr Teakwood tebal 4 mm, Ukuran 120 cm @ Rp. 67,000.00
0.5600 kg Lem kayu @ Rp. 1,269.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang kayu @ Rp. 75,000.00 33,750.00
0.0450 oh Kepala tukang @ Rp. 85,000.00 3,825.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 47,375.00
JASA 10 %
JUMLAH
DIBULATKAN
134.a 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kelas II
SNI 3434:2008 - 6.25 0.0280 m3 Balok kayu @ Rp. 8,000,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.8600 lbr Teakwood tebal 4 mm, Ukuran 120 cm @ Rp. 67,000.00
0.5600 kg Lem kayu @ Rp. 1,269.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang kayu @ Rp. 75,000.00 33,750.00
0.0450 oh Kepala tukang @ Rp. 85,000.00 3,825.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 47,375.00
JASA 10 %
JUMLAH
DIBULATKAN
135 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kamper
SNI 3434:2008 - 6.25 0.0280 m3 Balok kayu kamper @ Rp. 9,000,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.8600 lbr Plywood tebal 4 mm, ukuran 120 cm @ Rp. 50,000.00
0.5600 kg Lem kayu @ Rp. 1,269.00
0.2000 oh Pekerja @ Rp. 60,000.00
0.6000 oh Tukang kayu @ Rp. 75,000.00 45,000.00
0.0600 oh Kepala tukang @ Rp. 85,000.00 5,100.00
0.0100 oh Mandor @ Rp. 100,000.00 1,000.00
JUMLAH ( BELUM PPN ) 51,100.00
JASA 10 %
136 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai
SNI 3434:2008 - 6.25 0.0280 m3 Balok kayu bengkirai @ Rp. 10,000,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.8600 lbr Plywood tebal 4 mm, ukuran 120 cm @ Rp. 50,000.00
0.5600 kg Lem kayu @ Rp. 1,269.00
0.2000 oh Pekerja @ Rp. 60,000.00
0.6000 oh Tukang kayu @ Rp. 75,000.00 45,000.00
0.0600 oh Kepala tukang @ Rp. 85,000.00 5,100.00
0.0100 oh Mandor @ Rp. 100,000.00 1,000.00
JUMLAH ( BELUM PPN ) 51,100.00
JASA 10 %
JUMLAH
DIBULATKAN
137 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kruing
SNI 3434:2008 - 6.25 0.0280 m3 Balok kayu kruing @ Rp. 8,000,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.8600 lbr Plywood tebal 4 mm, ukuran 120 cm @ Rp. 50,000.00
0.5600 kg Lem kayu @ Rp. 1,269.00
0.2000 oh Pekerja @ Rp. 60,000.00
0.6000 oh Tukang kayu @ Rp. 75,000.00 45,000.00
0.0600 oh Kepala tukang @ Rp. 85,000.00 5,100.00
0.0100 oh Mandor @ Rp. 100,000.00 1,000.00
JUMLAH ( BELUM PPN ) 51,100.00
JASA 10 %
JUMLAH
DIBULATKAN
138 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (klas plitur)
SNI 3434:2008 - 6.26 0.0070 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.1000 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.1500 kg Paku skrup 10 cm @ Rp. 27,000.00
0.6000 oh Pekerja @ Rp. 60,000.00
1.8000 oh Tukang kayu @ Rp. 75,000.00 135,000.00
0.1800 oh Kepala tukang @ Rp. 85,000.00 15,300.00
0.0300 oh Mandor @ Rp. 100,000.00 3,000.00
JUMLAH ( BELUM PPN ) 153,300.00
JASA 10 %
JUMLAH
DIBULATKAN
139 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (lokal)
SNI 3434:2008 - 6.26 0.0070 m3 Papan kayu jati (lokal) @ Rp. 13,500,000.00
0.1000 kg Paku 5 cm dan 10 cm @ Rp. 27,000.00
0.1500 kg Paku skrup 10 cm @ Rp. 27,000.00
0.6000 oh Pekerja @ Rp. 60,000.00
1.8000 oh Tukang kayu @ Rp. 75,000.00 135,000.00
0.1800 oh Kepala tukang @ Rp. 85,000.00 15,300.00
0.0300 oh Mandor @ Rp. 100,000.00 3,000.00
JUMLAH ( BELUM PPN ) 153,300.00
JASA 10 %
JUMLAH
DIBULATKAN
143 1.00 m2 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm
SNI 3434:2008 - 6.27 0.4000 lbr Plywood tebal 4 mm @ Rp. 80,000.00
0.0500 kg Paku 1 cm dan 2,5 cm @ Rp. 66,125.00
0.0250 oh Pekerja @ Rp. 75,000.00
0.0750 oh Tukang kayu @ Rp. 85,000.00
0.0080 oh Kepala tukang @ Rp. 60,000.00 480.00
0.0010 oh Mandor @ Rp. 100,000.00 100.00
JUMLAH ( BELUM PPN ) 580.00
JASA 10 %
JUMLAH
DIBULATKAN
143.a 1.00 m2 Memasang dinding bilik, rangka kayu kelas III atau IV
SNI 3434:2008 - 6.28 1.5000 m2 Bilik bambu @ Rp. 80,000.00
0.0140 m3 Kaso-kaso (5 x 7) cm @ Rp. 8,000,000.00
0.0030 m3 List kayu 2/4 kruing @ Rp. 8,000,000.00
0.0120 kg Paku @ Rp. 27,000.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.0500 oh Tukang kayu @ Rp. 75,000.00 3,750.00
0.0050 oh Kepala tukang @ Rp. 85,000.00 425.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 10,675.00
JASA 10 %
JUMLAH
DIBULATKAN
150 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu jati (lokal) tanpa plepet
AK 0.0120 m3 Kayu jati (lokal) balok @ Rp. 75,000.00
0.0600 kg Paku biasa @ Rp. 52,875.00
1.1000 lbr Asbes plat ( 100 x 100 x 0,3 ) @ Rp. 17,800.00
0.1800 oh Pekerja @ Rp. 60,000.00 10,800.00
0.3200 oh Tukang kayu @ Rp. 75,000.00 24,000.00
0.0320 oh Kepala tukang kayu @ Rp. 85,000.00 2,720.00
0.0090 oh Mandor @ Rp. 100,000.00 900.00
JUMLAH ( BELUM PPN ) 38,420.00
JASA 10 %
JUMLAH
DIBULATKAN
151 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kamper tanpa plepet
AK 0.0120 m 3
Kayu kamper balok @ Rp. 9,000,000.00
0.0600 kg Paku biasa @ Rp. 52,875.00
1.1000 lbr Asbes plat ( 100 x 100 x 0,3 ) @ Rp. 17,800.00
0.1800 oh Pekerja @ Rp. 60,000.00 10,800.00
0.3200 oh Tukang kayu @ Rp. 75,000.00 24,000.00
0.0320 oh Kepala tukang kayu @ Rp. 85,000.00 2,720.00
0.0090 oh Mandor @ Rp. 100,000.00 900.00
JUMLAH ( BELUM PPN ) 38,420.00
JASA 10 %
JUMLAH
DIBULATKAN
152 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu bengkirai tanpa plepet
AK 0.0120 m 3
Kayu bengkirai balok @ Rp. 10,000,000.00
0.0600 kg Paku biasa @ Rp. 52,875.00
1.1000 lbr Asbes plat ( 100 x 100 x 0,3 ) @ Rp. 17,800.00
0.1800 oh Pekerja @ Rp. 60,000.00 10,800.00
0.3200 oh Tukang kayu @ Rp. 75,000.00 24,000.00
0.0320 oh Kepala tukang kayu @ Rp. 85,000.00 2,720.00
0.0090 oh Mandor @ Rp. 100,000.00 900.00
JUMLAH ( BELUM PPN ) 38,420.00
JASA 10 %
JUMLAH
DIBULATKAN
153 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kruing tanpa plepet
AK 0.0120 m 3
Kayu kruing balok @ Rp. 8,000,000.00
0.0600 kg Paku biasa @ Rp. 52,875.00
1.1000 lbr Asbes plat ( 100 x 100 x 0,3 ) @ Rp. 17,800.00
0.1800 oh Pekerja @ Rp. 60,000.00 10,800.00
0.3200 oh Tukang kayu @ Rp. 75,000.00 24,000.00
0.0320 oh Kepala tukang kayu @ Rp. 85,000.00 2,720.00
0.0090 oh Mandor @ Rp. 100,000.00 900.00
JUMLAH ( BELUM PPN ) 38,420.00
JASA 10 %
JUMLAH
DIBULATKAN
154 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu jati (lokal) memakai plepet
AK 0.0120 m3 Kayu jati (lokal) balok @ Rp. 75,000.00
0.0600 kg Paku biasa @ Rp. 52,875.00
1.1000 lbr Asbes plat ( 100 x 100 x 0,3 ) @ Rp. 17,800.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 30,000.00
0.0100 kg Paku plepet @ Rp. 52,875.00
0.1800 oh Pekerja @ Rp. 60,000.00 10,800.00
0.3200 oh Tukang kayu @ Rp. 75,000.00 24,000.00
0.0320 oh Kepala tukang kayu @ Rp. 85,000.00 2,720.00
0.0090 oh Mandor @ Rp. 100,000.00 900.00
JUMLAH ( BELUM PPN ) 38,420.00
JASA 10 %
JUMLAH
DIBULATKAN
155 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kamper memakai plepet
AK 0.0120 m3 Kayu kamper balok @ Rp. 9,000,000.00
0.0600 kg Paku biasa @ Rp. 52,875.00
1.1000 lbr Asbes plat ( 100 x 100 x 0,3 ) @ Rp. 17,800.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 30,000.00
0.0100 kg Paku plepet @ Rp. 52,875.00
0.1800 oh Pekerja @ Rp. 60,000.00 10,800.00
0.3200 oh Tukang kayu @ Rp. 75,000.00 24,000.00
0.0320 oh Kepala tukang kayu @ Rp. 85,000.00 2,720.00
0.0090 oh Mandor @ Rp. 100,000.00 900.00
JUMLAH ( BELUM PPN ) 38,420.00
JASA 10 %
JUMLAH
DIBULATKAN
156 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu bengkirai memakai plepet
AK 0.0120 m3 Kayu bengkirai balok @ Rp. 10,000,000.00
0.0600 kg Paku biasa @ Rp. 52,875.00
1.1000 lbr Asbes plat ( 100 x 100 x 0,3 ) @ Rp. 17,800.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 30,000.00
0.0100 kg Paku plepet @ Rp. 52,875.00
0.1800 oh Pekerja @ Rp. 60,000.00 10,800.00
0.3200 oh Tukang kayu @ Rp. 75,000.00 24,000.00
0.0320 oh Kepala tukang kayu @ Rp. 85,000.00 2,720.00
0.0090 oh Mandor @ Rp. 100,000.00 900.00
JUMLAH ( BELUM PPN ) 38,420.00
JASA 10 %
JUMLAH
DIBULATKAN
157 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kruing memakai plepet
AK 0.0120 m3 Kayu kruing balok @ Rp. 8,000,000.00
0.0600 kg Paku biasa @ Rp. 52,875.00
1.1000 lbr Asbes plat ( 100 x 100 x 0,3 ) @ Rp. 17,800.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 30,000.00
0.0100 kg Paku plepet @ Rp. 52,875.00
0.1800 oh Pekerja @ Rp. 60,000.00 10,800.00
0.3200 oh Tukang kayu @ Rp. 75,000.00 24,000.00
0.0320 oh Kepala tukang kayu @ Rp. 85,000.00 2,720.00
0.0090 oh Mandor @ Rp. 100,000.00 900.00
JUMLAH ( BELUM PPN ) 38,420.00
JASA 10 %
JUMLAH
DIBULATKAN
158 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati (lokal)
AK 0.0130 m3 Kayu jati (lokal) balok @ Rp. 75,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 9,500.00
0.0500 roll Kasa gypsum @ Rp. 81,500.00
0.4500 kg Tepung gypsum @ Rp. 45,000.00
0.0030 kg Alkasit @ Rp. 4,000.00
0.0500 kg Paku gypsum @ Rp. 6,000.00
0.1200 kg Paku usuk @ Rp. 53,000.00
0.2400 oh Pekerja @ Rp. 60,000.00 14,400.00
0.3700 oh Tukang kayu @ Rp. 75,000.00 27,750.00
0.0370 oh Kepala tukang kayu @ Rp. 85,000.00 3,145.00
0.0120 oh Mandor @ Rp. 100,000.00 1,200.00
JUMLAH ( BELUM PPN ) 46,495.00
JASA 10 %
JUMLAH
DIBULATKAN
159 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper
AK 0.0130 m3 Kayu kamper balok @ Rp. 9,000,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 9,500.00
0.0500 roll Kasa gypsum @ Rp. 81,500.00
0.4500 kg Tepung gypsum @ Rp. 45,000.00
0.0030 kg Alkasit @ Rp. 4,000.00
0.0500 kg Paku gypsum @ Rp. 6,000.00
0.1200 kg Paku usuk @ Rp. 53,000.00
0.2400 oh Pekerja @ Rp. 60,000.00 14,400.00
0.3700 oh Tukang kayu @ Rp. 75,000.00 27,750.00
0.0370 oh Kepala tukang kayu @ Rp. 85,000.00 3,145.00
0.0120 oh Mandor @ Rp. 100,000.00 1,200.00
JUMLAH ( BELUM PPN ) 46,495.00
JASA 10 %
JUMLAH
DIBULATKAN
160 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai
AK 0.0130 m3 Kayu bengkirai balok @ Rp. 10,000,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 9,500.00
0.0500 roll Kasa gypsum @ Rp. 81,500.00
0.4500 kg Tepung gypsum @ Rp. 45,000.00
0.0030 kg Alkasit @ Rp. 4,000.00
0.0500 kg Paku gypsum @ Rp. 6,000.00
0.1200 kg Paku usuk @ Rp. 53,000.00
0.2400 oh Pekerja @ Rp. 60,000.00 14,400.00
0.3700 oh Tukang kayu @ Rp. 75,000.00 27,750.00
0.0370 oh Kepala tukang kayu @ Rp. 85,000.00 3,145.00
0.0120 oh Mandor @ Rp. 100,000.00 1,200.00
JUMLAH ( BELUM PPN ) 46,495.00
JASA 10 %
JUMLAH
DIBULATKAN
161 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing
AK 0.0130 m3 Kayu kruing balok @ Rp. 8,000,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 9,500.00
0.0500 roll Kasa gypsum @ Rp. 81,500.00
0.4500 kg Tepung gypsum @ Rp. 45,000.00
0.0030 kg Alkasit @ Rp. 4,000.00
0.0500 kg Paku gypsum @ Rp. 6,000.00
0.1200 kg Paku usuk @ Rp. 53,000.00
0.2400 oh Pekerja @ Rp. 60,000.00 14,400.00
0.3700 oh Tukang kayu @ Rp. 75,000.00 27,750.00
0.0370 oh Kepala tukang kayu @ Rp. 85,000.00 3,145.00
0.0120 oh Mandor @ Rp. 100,000.00 1,200.00
JUMLAH ( BELUM PPN ) 46,495.00
JASA 10 %
JUMLAH
DIBULATKAN
163 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati (lokal)
AK 0.0130 m3 Kayu jati (lokal) balok @ Rp. 75,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 57,000.00
0.0500 roll Kasa gypsum @ Rp. 81,500.00
0.4500 kg Tepung gypsum @ Rp. 45,000.00
0.0030 kg Alkasit @ Rp. 4,000.00
0.0500 kg Paku gypsum @ Rp. 6,000.00
0.1200 kg Paku usuk @ Rp. 53,000.00
0.2400 oh Pekerja @ Rp. 60,000.00 14,400.00
0.3700 oh Tukang kayu @ Rp. 75,000.00 27,750.00
0.0370 oh Kepala tukang kayu @ Rp. 85,000.00 3,145.00
0.0120 oh Mandor @ Rp. 100,000.00 1,200.00
JUMLAH ( BELUM PPN ) 46,495.00
JASA 10 %
JUMLAH
DIBULATKAN
164 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper
AK 0.0130 m3 Kayu kamper balok @ Rp. 9,000,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 57,000.00
0.0500 roll Kasa gypsum @ Rp. 81,500.00
0.4500 kg Tepung gypsum @ Rp. 45,000.00
0.0030 kg Alkasit @ Rp. 4,000.00
0.0500 kg Paku gypsum @ Rp. 6,000.00
0.1200 kg Paku usuk @ Rp. 53,000.00
0.2400 oh Pekerja @ Rp. 60,000.00 14,400.00
0.3700 oh Tukang kayu @ Rp. 75,000.00 27,750.00
0.0370 oh Kepala tukang kayu @ Rp. 85,000.00 3,145.00
0.0120 oh Mandor @ Rp. 100,000.00 1,200.00
JUMLAH ( BELUM PPN ) 46,495.00
JASA 10 %
JUMLAH
DIBULATKAN
165 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai
AK 0.0130 m3 Kayu bengkirai balok @ Rp. 10,000,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 57,000.00
0.0500 roll Kasa gypsum @ Rp. 81,500.00
0.4500 kg Tepung gypsum @ Rp. 45,000.00
0.0030 kg Alkasit @ Rp. 4,000.00
0.0500 kg Paku gypsum @ Rp. 6,000.00
0.1200 kg Paku usuk @ Rp. 53,000.00
0.2400 oh Pekerja @ Rp. 60,000.00 14,400.00
0.3700 oh Tukang kayu @ Rp. 75,000.00 27,750.00
0.0370 oh Kepala tukang kayu @ Rp. 85,000.00 3,145.00
0.0120 oh Mandor @ Rp. 100,000.00 1,200.00
JUMLAH ( BELUM PPN ) 46,495.00
JASA 10 %
JUMLAH
DIBULATKAN
166 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing
AK 0.0130 m3 Kayu kruing balok @ Rp. 8,000,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 57,000.00
0.0500 roll Kasa gypsum @ Rp. 81,500.00
0.4500 kg Tepung gypsum @ Rp. 45,000.00
0.0030 kg Alkasit @ Rp. 4,000.00
0.0500 kg Paku gypsum @ Rp. 6,000.00
0.1200 kg Paku usuk @ Rp. 53,000.00
0.2400 oh Pekerja @ Rp. 60,000.00 14,400.00
0.3700 oh Tukang kayu @ Rp. 75,000.00 27,750.00
0.0370 oh Kepala tukang kayu @ Rp. 85,000.00 3,145.00
0.0120 oh Mandor @ Rp. 100,000.00 1,200.00
JUMLAH ( BELUM PPN ) 46,495.00
JASA 10 %
JUMLAH
DIBULATKAN
178 1.00 m2 Memasang langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
SNI 2839:2008 - 6.7 0.3640 lbr Gypsum board @ Rp. 9,500.00
0.1100 kg Paku skrup @ Rp. 17,000.00
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.0500 oh Tukang kayu @ Rp. 75,000.00 3,750.00
0.0050 oh Kepala tukang @ Rp. 85,000.00 425.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 10,675.00
JASA 10 %
JUMLAH
DIBULATKAN
179 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium
SNI 2839:2008 - 6.9 3.6000 m Profil Alluminium "T" @ Rp. 20,000.00
0.1500 kg Kawat diameter 4 mm @ Rp. 12,000.00
1.0500 bh Ramset @ Rp. 22,000.00
1.5000 lbr Akustik Uk. 60 cm x 120 cm @ Rp. 150,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.5000 oh Tukang kayu @ Rp. 75,000.00 37,500.00
0.0500 oh Kepala tukang @ Rp. 85,000.00 4,250.00
0.0250 oh Mandor @ Rp. 100,000.00 2,500.00
JUMLAH ( BELUM PPN ) 74,250.00
JASA 10 %
JUMLAH
DIBULATKAN
183 1.00 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm
AK 1.1000 m 1
List profil cornees gypsum @ Rp. 21,500.00
1.0500 kg Tepung gypsum @ Rp. 45,000.00
0.0053 kg Alkasit @ Rp. 4,000.00
0.1125 oh Pekerja @ Rp. 60,000.00 6,750.00
0.0400 oh Tukang kayu @ Rp. 75,000.00 3,000.00
0.0040 oh Kepala tukang kayu @ Rp. 85,000.00 340.00
0.0065 oh Mandor @ Rp. 100,000.00 650.00
JUMLAH ( BELUM PPN ) 10,740.00
JASA 10 %
JUMLAH
DIBULATKAN
184 1.00 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak berlubang
AK Membuat pola ukir dan memindahkan pola
1.0000 lb Kertas 100 x 100 cm @ Rp. 2,000.00
15.0000 lbr Kerta karbon @ Rp. 3,800.00
2.0000 org Tukang gambar @ Rp. 70,000.00 140,000.00
JUMLAH ( A ) 140,000.00
Mengukir
16.0000 org Tukang Ukir @ Rp. 50,000.00 800,000.00
1.0000 org Kepala Tk, Ukir @ Rp. 60,000.00 60,000.00
JUMLAH ( B ) 860,000.00
46 1.00 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat
AK 9.0000 bh Genteng beton natural @ Rp. 4,500.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kep. Tk. Batu @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
48 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat
AK 9.0000 bh Genteng beton Warna @ Rp. 5,250.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kep. Tk. Batu @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
50 1.00 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat
AK 14.5000 bh Genteng beton natural @ Rp. 9,300.00
0.3000 oh Pekerja @ Rp. 60,000.00 18,000.00
0.1000 oh Tukang batu @ Rp. 70,000.00 7,000.00
0.0100 oh Kep. Tk. Batu @ Rp. 80,000.00 800.00
0.0150 oh Mandor @ Rp. 100,000.00 1,500.00
JUMLAH ( BELUM PPN ) 27,300.00
JASA 10 %
JUMLAH
DIBULATKAN
PEKERJAAN PENGECATAN
2 1.00 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual
AK 0.0500 kg Sabun @ Rp. 12,600.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.0025 oh Mandor @ Rp. 100,000.00 250.00
JUMLAH ( BELUM TERMASUK PPN ) 9,250.00
JASA 10 %
JUMLAH
DIBULATKAN
5 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
AK 0.2000 kg Cat meni @ Rp. 26,000.00
0.1500 kg Plamir @ Rp. 26,000.00
0.1700 kg Cat dasar @ Rp. 53,000.00
0.2600 kg Cat penutup @ Rp. 53,000.00
0.0700 oh Pekerja @ Rp. 60,000.00 4,200.00
0.0090 oh Tukang Cat @ Rp. 70,000.00 630.00
0.0060 oh Kepala tukang @ Rp. 80,000.00 480.00
0.0025 oh Mandor @ Rp. 100,000.00 250.00
JUMLAH ( BELUM TERMASUK PPN ) 5,560.00
JASA 10 %
JUMLAH
DIBULATKAN
6 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
AK 0.2000 kg Cat meni @ Rp. 26,000.00
0.1500 kg Plamir @ Rp. 26,000.00
0.1700 kg Cat dasar @ Rp. 53,000.00
0.3500 kg Cat penutup @ Rp. 53,000.00
0.0700 oh Pekerja @ Rp. 60,000.00 4,200.00
0.1050 oh Tukang Cat @ Rp. 70,000.00 7,350.00
0.0040 oh Kepala tukang @ Rp. 80,000.00 320.00
0.0025 oh Mandor @ Rp. 100,000.00 250.00
JUMLAH ( BELUM TERMASUK PPN ) 12,120.00
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
AK 0.1000 Kg Plamir tembok @ Rp. 115,000.00
0.1000 Kg Cat dasar @ Rp. 93,500.00
0.2600 Kg Cat penutup 2 x @ Rp. 93,500.00
0.0200 oh Pekerja @ Rp. 60,000.00 1,200.00
0.0630 oh Tukang Cat @ Rp. 70,000.00 4,410.00
0.0063 oh Kepala tukang @ Rp. 80,000.00 504.00
0.0025 oh Mandor @ Rp. 100,000.00 250.00
JUMLAH ( BELUM TERMASUK PPN ) 6,364.00
JASA 10 %
JUMLAH
DIBULATKAN
12 1.00 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
AK 0.1200 kg Cat dasar @ Rp. 93,500.00
0.1800 lbr Cat penutup 2 x @ Rp. 93,500.00
0.0280 oh Pekerja @ Rp. 60,000.00 1,680.00
0.0420 oh Tukang Cat @ Rp. 70,000.00 2,940.00
0.0042 oh Kepala tukang @ Rp. 80,000.00 336.00
0.0025 oh Mandor @ Rp. 100,000.00 250.00
JUMLAH ( BELUM TERMASUK PPN ) 5,206.00
JASA 10 %
JUMLAH
DIBULATKAN
19 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, te
AK
0.1000 Kg Meni ( Read Lead ) A @ Rp. 25,000.00
0.1000 Kg Meni ( Read Lead ) B @ Rp. 32,500.00
0.0400 Kg Alluminium C @ Rp. -
0.0400 Kg Alluminium B @ Rp. -
0.0100 Ltr Pengencer @ Rp. 15,500.00
0.0020 m3 Perancah Kayu @ Rp. 1,100,000.00
0.0060 oh Pekerja @ Rp. 60,000.00 360.00
0.0060 oh Tukang Cat @ Rp. 70,000.00 420.00
0.0225 oh Kepala tukang @ Rp. 80,000.00 1,800.00
0.0075 oh Mandor @ Rp. 100,000.00 750.00
JUMLAH ( BELUM TERMASUK PPN ) 3,330.00
JASA 10 %
JUMLAH
DIBULATKAN
20 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 2
AK
0.3000 Kg Meni Besi @ Rp. 32,500.00
0.0060 oh Pekerja @ Rp. 60,000.00 360.00
0.0600 oh Tukang Cat @ Rp. 70,000.00 4,200.00
0.0120 oh Kepala tukang @ Rp. 80,000.00 960.00
0.0060 oh Mandor @ Rp. 100,000.00 600.00
JUMLAH ( BELUM TERMASUK PPN ) 6,120.00
JASA 10 %
JUMLAH
DIBULATKAN
21 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, te
AK
0.1100 Kg Cat Dasar @ Rp. 32,500.00
0.1700 Kg Cat Antara @ Rp. 45,000.00
0.0800 Kg Cat Penutup @ Rp. 45,000.00
0.5000 oh Pekerja @ Rp. 60,000.00 30,000.00
0.8000 oh Tukang Cat @ Rp. 70,000.00 56,000.00
0.3000 oh Kepala tukang @ Rp. 80,000.00 24,000.00
0.2000 oh Mandor @ Rp. 100,000.00 20,000.00
JUMLAH ( BELUM TERMASUK PPN ) 130,000.00
JASA 10 %
JUMLAH
DIBULATKAN
22 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis
AK Mutakhir, tebal 200 um
0.3000 Kg Cat Dasar @ Rp. 32,500.00
0.4000 oh Pekerja @ Rp. 60,000.00 24,000.00
0.7000 oh Tukang Cat @ Rp. 70,000.00 49,000.00
0.2000 oh Kepala tukang @ Rp. 80,000.00 16,000.00
0.2000 oh Mandor @ Rp. 100,000.00 20,000.00
JUMLAH ( BELUM TERMASUK PPN ) 109,000.00
JASA 10 %
JUMLAH
DIBULATKAN
24 1.00 m2 Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersi
AK
40.0000 Kg Pasir Silika @ Rp. 750.00
10.0000 Ltr BBM @ Rp. 49,500.00
Peralatan @ Rp.
Kompresor, Blasting Pot , Selang Dan Nozzle
1.6000 oh Pekerja @ Rp. 60,000.00 96,000.00
1.6000 oh Tukang Cat @ Rp. 70,000.00 112,000.00
0.8000 oh Kepala tukang @ Rp. 80,000.00 64,000.00
0.5000 oh Mandor @ Rp. 100,000.00 50,000.00
JUMLAH ( BELUM TERMASUK PPN ) 322,000.00
JASA 10 %
JUMLAH
DIBULATKAN
PEKERJAAN SANITASI
13 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35 cm
AK 87.0000 bh Batu bata @ Rp. 190,000.00
44.0000 kg PC @ Rp. 180.00
0.0700 m3 Pasir pasang @ Rp. 250,000.00
0.0700 m3 Batu kerikil @ Rp. 190,000.00
1.6000 kg Besi beton @ Rp. 15,000.00
0.0600 m3 Pasir beton @ Rp. 250,000.00
3.2000 oh Pekerja @ Rp. 60,000.00 192,000.00
1.0150 oh Tukang batu @ Rp. 70,000.00 71,050.00
0.0015 oh Kepala tukang batu @ Rp. 80,000.00 120.00
0.0160 oh Mandor @ Rp. 100,000.00 1,600.00
JUMLAH ( BELUM TERMASUK PPN ) 264,770.00
JASA 10 %
JUMLAH
DIBULATKAN
14 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50 cm
AK 150.0000 bh Batu bata @ Rp. 190,000.00
77.0000 kg PC @ Rp. 180.00
0.1300 m3 Pasir pasang @ Rp. 250,000.00
0.0200 m3 Batu kerikil @ Rp. 190,000.00
2.6000 kg Besi beton @ Rp. 15,000.00
0.0900 m3 Pasir beton @ Rp. 250,000.00
1.4200 oh Pekerja @ Rp. 60,000.00 85,200.00
0.4730 oh Tukang batu @ Rp. 70,000.00 33,110.00
0.0470 oh Kepala tukang batu @ Rp. 80,000.00 3,760.00
0.0710 oh Mandor @ Rp. 100,000.00 7,100.00
JUMLAH ( BELUM TERMASUK PPN ) 129,170.00
JASA 10 %
JUMLAH
DIBULATKAN
15 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65 cm
AK 222.0000 bh Batu bata @ Rp. 190,000.00
114.0000 kg PC @ Rp. 180.00
0.1840 m3 Pasir pasang @ Rp. 250,000.00
0.0330 m3 Batu kerikil @ Rp. 190,000.00
4.8500 kg Besi beton @ Rp. 15,000.00
0.1200 m3 Pasir beton @ Rp. 250,000.00
2.1600 oh Pekerja @ Rp. 60,000.00 129,600.00
0.7200 oh Tukang batu @ Rp. 70,000.00 50,400.00
0.0720 oh Kepala tukang batu @ Rp. 80,000.00 5,760.00
0.1080 oh Mandor @ Rp. 100,000.00 10,800.00
0.1000 oh Tukang Gali @ Rp. 60,000.00 6,000.00
JUMLAH ( BELUM TERMASUK PPN ) 196,560.00
JASA 10 %
JUMLAH
DIBULATKAN
32.C 1.00 bh Pekerjaan Sumur Peresapan Air Kotor dalam 3 meter, tanpa tutup
AK 3.0000 m1 Memasang buis beton 80 dengan iju @ Rp.
0.0900 m3 Urugan batu koral tebal 15 cm @ Rp.
0.1200 m3 Urugan pasir tebal 20 cm @ Rp.
0.0630 oh Pekerja @ Rp. 60,000.00 3,780.00
32.D 1.00 bh Pekerjaan Sumur Peresapan Air Kotor dalam 5 meter, tanpa tutup
AK 5.0000 m1 Memasang buis beton 80 dengan iju @ Rp.
0.0900 m3 Urugan batu koral tebal 15 cm @ Rp.
0.1200 m3 Urugan pasir tebal 20 cm @ Rp.
0.0630 oh Pekerja @ Rp. 60,000.00 3,780.00
0.0021 oh Mandor @ Rp. 100,000.00 210.00
JUMLAH ( BELUM TERMASUK PPN ) 3,990.00
JASA 10 %
JUMLAH
DIBULATKAN
36.G 1.000 unit Memasang beton precast jenis U-Ditch /Box Culvert
AK 1.000 unit Beton Precast U-DITCH, 60x70 @ Rp.
1.000 set Cover U-600 Light Duty Type 1 @ Rp.
0.250 hari Sewa Pick Up @ Rp.
0.0625 hari Sewa Tripod dan Tackel @ Rp.
0.0625 ls Alat dan bahan pendukung @ Rp.
1.5000 oh Pekerja @ Rp. 60,000.00 90,000.00
0.750 oh Tukang Batu @ Rp. 70,000.00 52,500.00
0.075 oh Kepala Tukang Batu @ Rp. 80,000.00 6,000.00
0.001 oh Mandor @ Rp. 100,000.00 75.00
JUMLAH ( BELUM TERMASUK PPN ) 148,575.00
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m2 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
SNI 2839:2008 - 6.4 15.0000 kg Besi siku L 30.30.3 @ Rp. 16,000
32.8000 kg Besi plat baja @ Rp. 15,000.00
0.0500 kg kawat las @ Rp. 96,000.00
1.0500 oh Pekerja @ Rp. 60,000.00 63,000.00
1.0500 oh Tukang las @ Rp. 80,000.00 84,000.00
0.1050 oh Kepala tukang @ Rp. 80,000.00 8,400.00
0.0520 oh Mandor @ Rp. 100,000.00 5,200.00
JUMLAH ( BELUM PPN ) 160,600.00
JASA 10 %
JUMLAH
DIBULATKAN
14.B 1.00 m2 Pekerjaan Partisi Panel Komposit (tanpa pintu dan kaca)
AK 2.1415 m1 Frame Casement Lokal Type Brown @ Rp.
0.1000 x Harga partisi panel Komposit (perleng @ Rp.
0.6591 lbr Panel Komposit @ Rp.
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4500 oh Tukang besi konstruksi @ Rp. 70,000.00 31,500.00
0.0450 oh Kepala tukang @ Rp. 80,000.00 3,600.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 44,900.00
JASA 10 %
JUMLAH
DIBULATKAN
14.C 1.00 m2 Pekerjaan Rangka hollow 2,8 x 2,8 cm, untuk pemasangan aluminium komposit.
AK 5.8667 m1 Rangka Hollow 2,8 x 2,8cm, tbl 1,8m @ Rp.
64.0000 cm Pengelasan @ Rp.
0.7040 m2 Pengecatan rangka 3x lapis, ex emco @ Rp.
1.6700 oh Pekerja @ Rp. 60,000.00 100,200.00
1.6700 oh Tukang Besi @ Rp. 70,000.00 116,900.00
0.1670 oh Kepala tukang Besi @ Rp. 80,000.00 13,360.00
0.0835 oh Mandor @ Rp. 100,000.00 8,350.00
JUMLAH ( BELUM PPN ) 238,810.00
JASA 10 %
JUMLAH
DIBULATKAN
14.E 1.00 m2 Pasang Alumunium Komposit 6mm + Rangka Hollow 2,8 cm x 2,8 cm
AK 1.0000 ls Rangka Hollow 2,8cmx2,8cm,t=2mm @ Rp.
1.0000 ls Alumunium Komposit 5mmx1220x24 @ Rp.
JUMLAH ( BELUM PPN ) -
JASA 10 %
JUMLAH
DIBULATKAN
14.F 1.00 m2 Rangka Atap Baja Ringan Atap Genteng, sampai dengan bentang 7m
AK 6.6200 m Profile 'C' Taso 75-80 @ Rp.
3.7100 m Reng Taso Galvalum/zincalume t=0,6 @ Rp.
0.1000 x Harga rangka baja ringan (perlengkapa @ Rp.
0.1000 oh Pekerja @ Rp. 60,000.00 6,000.00
0.1000 oh Tukang besi konstruksi @ Rp. 70,000.00 7,000.00
0.0100 oh Kepala tukang @ Rp. 80,000.00 800.00
0.0050 oh Mandor @ Rp. 100,000.00 500.00
JUMLAH ( BELUM PPN ) 14,300.00
JASA 10 %
JUMLAH
DIBULATKAN
18 1.00 m1 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
SNI 2839:2008 - 6.19 1.0500 m Seng plat @ Rp. 100,000.00
0.0100 kg Paku 1 cm - 2,5 cm @ Rp. 66,125.00
0.5000 kg Besi strip @ Rp. 46,000
0.1500 oh Pekerja @ Rp. 60,000.00
0.3000 oh Tukang besi @ Rp. 70,000.00 21,000.00
0.0300 oh Kepala tukang @ Rp. 80,000.00 2,400.00
0.0080 oh Mandor @ Rp. 100,000.00 800.00
JUMLAH ( BELUM PPN ) 24,200.00
JASA 10 %
JUMLAH
DIBULATKAN
19 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0096 m3 Kayu jati papan @ Rp. 35,100,000.00
0.2500 kg Flincoat @ Rp. 6,550.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 41,250.00
JASA 10 %
JUMLAH
DIBULATKAN
Analisa Konstruksi - 204
No. Macam Pekerjaan Upah
(1) (2) (3)
20 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati (lokal)
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0096 m3 Kayu jati (lokal) papan @ Rp. 13,500,000.00
0.2500 kg Flincoat @ Rp. 6,550.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 41,250.00
JASA 10 %
JUMLAH
DIBULATKAN
21 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0096 m3 Kayu kamper papan @ Rp. 10,000,000.00
0.2500 kg Flincoat @ Rp. 6,550.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 41,250.00
JASA 10 %
JUMLAH
DIBULATKAN
22 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0096 m3 Kayu kruing papan @ Rp. 9,000,000.00
0.2500 kg Flincoat @ Rp. 6,550.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 41,250.00
JASA 10 %
JUMLAH
DIBULATKAN
23 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0096 m3 Kayu bengkirai papan @ Rp. 10,500,000.00
0.2500 kg Flincoat @ Rp. 6,550.00
0.1500 oh Pekerja @ Rp. 60,000.00 9,000.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 41,250.00
JASA 10 %
JUMLAH
DIBULATKAN
24 1.00 m1 Pasang talang miring, seng BJLS 28 papan kayu jati (klas 1)
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0190 m3 Kayu jati papan (klas 1) @ Rp. 35,100,000.00
0.3000 kg Flincoat @ Rp. 6,550.00
0.0400 oh Pekerja @ Rp. 60,000.00 2,400.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 34,650.00
JASA 10 %
JUMLAH
DIBULATKAN
25 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu jati (lokal)
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0190 m3 Kayu jati (lokal) papan @ Rp. 13,500,000.00
0.2500 kg Flincoat @ Rp. 6,550.00
0.0400 oh Pekerja @ Rp. 60,000.00 2,400.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 34,650.00
JASA 10 %
JUMLAH
DIBULATKAN
26 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0190 m3 Kayu kamper papan @ Rp. 10,000,000.00
0.2500 kg Flincoat @ Rp. 6,550.00
0.0400 oh Pekerja @ Rp. 60,000.00 2,400.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 34,650.00
JASA 10 %
JUMLAH
DIBULATKAN
27 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0190 m3 Kayu kruing papan @ Rp. 9,000,000.00
0.2500 kg Flincoat @ Rp. 6,550.00
0.0400 oh Pekerja @ Rp. 60,000.00 2,400.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 34,650.00
JASA 10 %
JUMLAH
DIBULATKAN
28 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. -
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 66,125.00
0.0190 m3 Kayu bengkirai papan @ Rp. 10,500,000.00
0.2500 kg Flincoat @ Rp. 6,550.00
0.0400 oh Pekerja @ Rp. 60,000.00 2,400.00
0.4000 oh Tukang kayu @ Rp. 75,000.00 30,000.00
0.0250 oh Kepala tukang kayu @ Rp. 85,000.00 2,125.00
0.0013 oh Mandor @ Rp. 100,000.00 125.00
JUMLAH ( BELUM PPN ) 34,650.00
JASA 10 %
JUMLAH
DIBULATKAN
42,000.00
24,500.00
1,322.50
67,822.50 82,672.50
8,267.25
90,939.75
90,939.00
- 11,450.00
1,145.00
12,595.00
12,595.00
- 11,000.00
1,100.00
12,100.00
12,100.00
-
600.00
12,500.00
13,100.00 83,100.00
8,310.00
91,410.00
91,410.00
-
1,800.00
2,500.00
4,300.00 69,300.00
6,930.00
76,230.00
76,230.00
16,250.00
630,000.00
22,950.00
17,600.00
6,300.00
37,500.00
25,000.00
3,000.00
5,700,000.00
9,250.00
24,000.00
2,800.00
-
3,000.00
6,497,650.00 6,868,150.00
686,815.00
7,554,965.00
7,554,965.00
16,250.00
450.00
54,000.00
1,250.00
180.00
252,000.00
1,620.00
11,700.00
337,450.00 380,150.00
38,015.00
418,165.00
418,165.00
13,000.00
360.00
-
1,250.00
180.00
1,620.00
16,410.00 53,110.00
5,311.00
58,421.00
58,421.00
16,250.00
450.00
1,250.00
180.00
252,000.00
1,620.00
271,750.00 315,450.00
31,545.00
346,995.00
346,995.00
7,812.00
7,812.00 13,792.00
1,379.20
15,171.20
15,171.00
22,100.00
735,000.00
8,100.00
1,890.00
7,500.00
1,000.00
127,500.00
903,090.00 1,135,090.00
113,509.00
1,248,599.00
1,248,599.00
39,000.00
966,000.00
18,900.00
127,500.00
1,151,400.00 1,341,650.00
134,165.00
1,475,815.00
1,475,815.00
16,250.00
651,000.00
8,100.00
3,240.00
7,500.00
1,000.00
127,500.00
67,500.00
882,090.00 1,114,090.00
111,409.00
1,225,499.00
1,225,499.00
126,000.00
2,160.00
25,000.00
153,160.00 155,560.00
15,556.00
171,116.00
171,116.00
15,000.00
1,250.00
16,250.00 40,145.00
4,014.50
44,159.50
44,159.00
108,460.00
52,500.00
18,500.00
-
8,100.00
187,560.00 221,670.00
22,167.00
243,837.00
243,837.00
122,500.00
126,000.00
31,725.00
67,500.00
3,024.00
6,750.00
810.00
358,309.00 731,034.00
73,103.40
804,137.40
804,137.00
122,500.00
90,000.00
31,725.00
3,024.00
6,750.00
810.00
254,809.00 401,034.00
40,103.40
441,137.40
441,137.00
- 304,000.00
30,400.00
334,400.00
334,400.00
- 146,000.00
14,600.00
160,600.00
160,600.00
- 504,000.00
50,400.00
554,400.00
554,400.00
- 13,000.00
1,300.00
14,300.00
14,300.00
- 8,750.00
875.00
9,625.00
9,625.00
- 13,000.00
1,300.00
14,300.00
14,300.00
- 9,500.00
950.00
10,450.00
10,450.00
- 18,010.00
1,801.00
19,811.00
19,811.00
- 13,000.00
1,300.00
14,300.00
14,300.00
- 761,000.00
76,100.00
837,100.00
837,100.00
- 80,000.00
8,000.00
88,000.00
88,000.00
- 9,750.00
975.00
10,725.00
10,725.00
- 1,262,000.00
126,200.00
1,388,200.00
1,388,200.00
- 47,500.00
4,750.00
52,250.00
52,250.00
- 58,500.00
5,850.00
64,350.00
64,350.00
- 69,700.00
6,970.00
76,670.00
76,670.00
- 63,200.00
6,320.00
69,520.00
69,520.00
- 96,000.00
9,600.00
105,600.00
105,600.00
- 76,500.00
7,650.00
84,150.00
84,150.00
- 3,500.00
350.00
3,850.00
3,850.00
13,420.00
1,342.00
14,762.00
14,762.00
20,800.00
2,080.00
22,880.00
22,880.00
20,800.00
2,080.00
22,880.00
22,880.00
- 35,960.00
3,596.00
39,556.00
39,556.00
35,000.00
3,500.00
38,500.00
38,500.00
16,000.00
1,600.00
17,600.00
17,600.00
180,000.00
180,000.00 199,000.00
19,900.00
218,900.00
218,900.00
10,125.00
100,000.00
237,000.00
347,125.00 434,325.00
43,432.50
477,757.50
477,757.00
18,600.00
310,000.00
328,600.00 415,800.00
41,580.00
457,380.00
457,380.00
30,000.00
30,000.00 40,500.00
4,050.00
44,550.00
44,550.00
90,000.00
90,000.00 100,500.00
10,050.00
110,550.00
110,550.00
78,000.00
78,000.00 95,500.00
9,550.00
105,050.00
105,050.00
96,000.00
96,000.00 115,000.00
11,500.00
126,500.00
126,500.00
16,000.00
1,600.00
17,600.00
17,600.00
170,000.00
170,000.00 281,450.00
28,145.00
309,595.00
309,595.00
2,000.00
-
2,000.00 34,500.00
3,450.00
37,950.00
37,950.00
-
70,560.00
78,500.00
149,060.00 305,060.00
30,506.00
335,566.00
335,566.00
-
48,060.00
106,750.00
154,810.00 310,810.00
31,081.00
341,891.00
341,891.00
-
36,360.00
121,250.00
157,610.00 313,610.00
31,361.00
344,971.00
344,971.00
-
29,340.00
130,000.00
159,340.00 315,340.00
31,534.00
346,874.00
346,874.00
-
24,480.00
136,000.00
160,480.00 316,480.00
31,648.00
348,128.00
-
21,060.00
140,250.00
161,310.00 317,310.00
31,731.00
349,041.00
349,041.00
-
16,380.00
146,000.00
162,380.00 318,380.00
31,838.00
350,218.00
350,218.00
-
-
11,221.00
136,000.00
147,221.00 303,221.00
30,322.10
333,543.10
333,543.00
-
-
8,330.00
85,000.00
93,330.00 249,330.00
24,933.00
274,263.00
274,263.00
-
17,175.60
-
95,500.00
112,675.60 268,675.60
26,867.56
295,543.16
295,543.00
-
10,980.00
-
123,000.00
133,980.00 289,980.00
28,998.00
318,978.00
318,978.00
-
7,380.00
-
130,750.00
138,130.00 294,130.00
29,413.00
323,543.00
323,543.00
-
64,800.00
64,800.00 145,920.00
14,592.00
160,512.00
160,512.00
2,120,280.00 2,407,580.00
240,758.00
2,648,338.00
2,648,338.00
122,280.00 409,580.00
40,958.00
450,538.00
450,538.00
-
34,920.00
78,000.00
9,360.00
122,280.00 340,580.00
34,058.00
374,638.00
374,638.00
26,627,830.00 26,682,430.00
2,668,243.00
29,350,673.00
29,350,673.00
26,628,681.00 26,683,281.00
2,668,328.10
29,351,609.10
29,351,609.00
26,628,029.00 26,682,629.00
2,668,262.90
29,350,891.90
29,350,891.00
26,629,496.00 26,684,096.00
2,668,409.60
29,352,505.60
29,352,505.00
26,633,830.00 26,688,430.00
2,668,843.00
29,357,273.00
26,608,689.40 26,663,289.40
2,666,328.94
29,329,618.34
29,329,618.00
13,312,911.00 13,340,211.00
1,334,021.10
14,674,232.10
14,674,232.00
13,312,586.60 13,339,886.60
1,333,988.66
14,673,875.26
14,673,875.00
13,312,820.00 13,340,120.00
1,334,012.00
14,674,132.00
14,674,132.00
13,312,992.40 13,340,292.40
1,334,029.24
14,674,321.64
14,674,321.00
13,313,747.60 13,341,047.60
1,334,104.76
14,675,152.36
14,675,152.00
, campuran spesi 1 PC : 8 PP
13,300,000.00
1,170.00
12,500.00
13,313,670.00 13,340,970.00
1,334,097.00
14,675,067.00
14,675,067.00
13,313,310.00 13,340,610.00
1,334,061.00
14,674,671.00
14,674,671.00
13,305,382.00 13,332,682.00
1,333,268.20
14,665,950.20
14,665,950.00
13,307,686.00 13,334,986.00
1,333,498.60
14,668,484.60
14,668,484.00
1,375,000.00
5,457.60
182,000.00
4,200.00
1,566,657.60 1,601,157.60
160,115.76
1,761,273.36
1,761,273.00
1,375,000.00
4,366.80
193,000.00
4,200.00
1,576,566.80 1,611,066.80
161,106.68
1,772,173.48
1,772,173.00
2,375,000.00
4,093.20
137,500.00
4,200.00
2,520,793.20 2,550,953.20
255,095.32
2,806,048.52
2,806,048.00
2,375,000.00
3,276.00
145,500.00
4,200.00
2,527,976.00 2,558,136.00
255,813.60
2,813,949.60
2,813,949.00
2,375,000.00
2,728.80
91,000.00
4,200.00
2,472,928.80 2,500,228.80
250,022.88
2,750,251.68
2,750,251.00
2,375,000.00
2,183.40
97,000.00
4,200.00
2,478,383.40 2,505,683.40
250,568.34
2,756,251.74
2,756,251.00
an spesi 1 PC : 3 PP
1,600,000.00
2,520.00
8,000.00
1,610,520.00 1,637,820.00
163,782.00
1,801,602.00
1,801,602.00
an spesi 1 PC : 3 PP
1,600,000.00
2,520.00
8,000.00
1,610,520.00 1,637,820.00
163,782.00
1,801,602.00
mpuran spesi 1 PC : 3 PP
6,000,000.00
2,520.00
8,000.00
6,010,520.00 6,037,820.00
603,782.00
6,641,602.00
6,641,602.00
mpuran spesi 1 PC : 4 PP
6,000,000.00
1,980.00
8,750.00
6,010,730.00 6,038,030.00
603,803.00
6,641,833.00
6,641,833.00
, campuran spesi 1 PC : 3 PP
17,500,000.00
2,520.00
8,000.00
17,510,520.00 17,541,720.00
1,754,172.00
19,295,892.00
19,295,892.00
812,500.00
2,183.40
97,000.00
911,683.40 942,883.40
94,288.34
1,037,171.74
1,037,171.00
3,230,000.00
889.65
3,425.00
3,234,314.65 3,242,504.65
324,250.47
3,566,755.12
3,566,755.00
44,460.00
155,175.00
14,800.00
214,435.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
49,680.00
147,850.00
14,992.00
212,522.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
53,820.00
142,675.00
15,066.00
211,561.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
216,089.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
58,680.00
135,725.00
15,244.00
209,649.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
63,360.00
130,525.00
15,274.00
209,159.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
66,780.00
124,650.00
15,512.00
206,942.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
69,120.00
123,575.00
15,392.00
208,087.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
73,080.00
122,150.00
15,200.00
210,430.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
74,340.00
121,600.00
15,126.00
211,066.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
79,020.00
119,650.00
14,904.00
213,574.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
80,640.00
119,100.00
14,814.00
214,554.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
72,000.00
120,000.00
16,000.00
208,000.00 371,800.00
37,180.00
408,980.00
408,980.00
- 6,240.00
624.00
6,864.00
6,864.00
- 7,370.00
737.00
8,107.00
8,107.00
- 8,320.00
832.00
9,152.00
9,152.00
157,500.00
9,000.00
166,500.00 176,560.00
17,656.00
194,216.00
194,216.00
157,500.00
9,000.00
157,500.00
6,000.00
163,500.00 170,700.00
17,070.00
187,770.00
187,770.00
-
3,000.00
3,000.00 8,350.00
835.00
9,185.00
9,185.00
-
-
- 17,600.00
1,760.00
19,360.00
19,360.00
-
3,000.00
3,000.00 6,510.00
651.00
7,161.00
7,161.00
-
9,198.00
9,198.00 19,954.00
1,995.40
21,949.40
21,949.00
-
16,092.00
16,092.00 39,129.00
3,912.90
43,041.90
43,041.00
-
16,350.00
16,350.00 35,491.00
3,549.10
39,040.10
39,040.00
-
28,608.00
28,608.00 62,078.00
6,207.80
68,285.80
68,285.00
-
25,542.00
25,542.00 55,429.00
5,542.90
60,971.90
60,971.00
-
44,670.00
44,670.00 96,943.00
9,694.30
106,637.30
106,637.00
- 417,000.00
41,700.00
458,700.00
- -
#REF!
#REF!
- 54,080.00
5,408.00
59,488.00
59,488.00
-
11,700.00
750.00
12,450.00 66,530.00
6,653.00
73,183.00
73,183.00
-
-
- 68,640.00
6,864.00
75,504.00
75,504.00
-
-
-
-
- 68,640.00
6,864.00
75,504.00
75,504.00
- 68,640.00
6,864.00
75,504.00
75,504.00
-
-
- 68,640.00
6,864.00
75,504.00
75,504.00
- 13,700.00
1,370.00
15,070.00
15,070.00
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
- 152,140.00
15,214.00
167,354.00
167,354.00
- 214,540.00
21,454.00
235,994.00
235,994.00
- 156,440.00
15,644.00
172,084.00
172,084.00
- 549,450.00
54,945.00
604,395.00
604,395.00
- 549,210.00
54,921.00
604,131.00
604,131.00
- 619,590.00
61,959.00
681,549.00
681,549.00
-
-
-
-
-
-
-
- 2,780.00
278.00
3,058.00
3,058.00
- 4,610.00
461.00
5,071.00
5,071.00
59,500.00
25,200.00
26,450.00
111,150.00 165,900.00
16,590.00
182,490.00
182,490.00
59,500.00
27,760.00
26,450.00
113,710.00 168,460.00
16,846.00
185,306.00
185,306.00
- 240,000.00
24,000.00
264,000.00
264,000.00
770,000.00
770,000.00 1,874,250.00
187,425.00
2,061,675.00
2,061,675.00
672,000.00
672,000.00 1,108,250.00
110,825.00
1,219,075.00
1,219,075.00
#VALUE!
1,942,160.00
1,824,900.00
264,000.00
#VALUE! #VALUE!
#VALUE!
#VALUE!
2,427,700.00
1,824,900.00
264,000.00
#VALUE! #VALUE!
#VALUE!
#VALUE!
2,913,240.00
1,824,900.00
264,000.00
#VALUE! #VALUE!
#VALUE!
#VALUE!
3,398,780.00
1,824,900.00
264,000.00
#VALUE! #VALUE!
#VALUE!
#VALUE!
3,884,320.00
1,824,900.00
264,000.00
#VALUE! #VALUE!
#VALUE!
2,850.00
23,500.00
-
10,890.00
675,000.00
54,000.00
256,000.00
7,935.00
675.00
3,600.00
1,034,450.00 1,151,710.00
115,171.00
1,266,881.00
1,266,881.00
2,400.00
20,000.00
-
8,820.00
517,500.00
42,000.00
216,000.00
7,935.00
675.00
3,000.00
818,330.00 909,330.00
90,933.00
1,000,263.00
1,000,263.00
- 6,240.00
624.00
6,864.00
6,864.00
- 7,370.00
737.00
8,107.00
8,107.00
- 8,320.00
832.00
9,152.00
9,152.00
2,754.00
6,075.00
738.00
2,835.00
1,798.60
14,200.60 27,130.60
2,713.06
29,843.66
29,843.00
5,508.00
12,150.00
1,476.00
2,835.00
1,798.60
23,767.60 45,204.60
4,520.46
49,725.06
49,725.00
2,790.72
4,000.00
6,790.72 37,990.72
3,799.07
41,789.79
41,789.00
1,840.32
5,000.00
6,840.32 38,040.32
3,804.03
41,844.35
41,844.00
1,399.68
5,750.00
7,149.68 38,349.68
3,834.97
42,184.65
42,184.00
1,123.20
6,000.00
7,123.20 38,323.20
3,832.32
42,155.52
42,155.00
933.12
6,500.00
7,433.12 38,633.12
3,863.31
42,496.43
42,496.00
794.88
6,750.00
7,544.88 38,744.88
3,874.49
42,619.37
42,619.00
708.48
7,000.00
7,708.48 38,908.48
3,890.85
42,799.33
42,799.00
622.08
7,250.00
7,872.08 39,072.08
3,907.21
42,979.29
42,979.00
1,036.80
-
3,250.00
4,286.80 37,046.80
3,704.68
40,751.48
40,751.00
540.00
-
5,000.00
5,540.00 38,300.00
3,830.00
42,130.00
42,130.00
-
441.00
2,250.00
2,691.00 35,451.00
3,545.10
38,996.10
38,996.00
-
343.00
3,750.00
4,093.00 36,853.00
3,685.30
40,538.30
40,538.00
331.20
-
3,500.00
3,831.20 36,591.20
3,659.12
40,250.32
40,250.00
2,453.76
6,750.00
9,203.76 51,003.76
5,100.38
56,104.14
56,104.00
1,866.24
7,750.00
9,616.24 42,116.24
4,211.62
46,327.86
46,327.00
1,497.60
8,000.00
9,497.60 51,297.60
5,129.76
56,427.36
56,427.00
1,244.16
8,750.00
9,994.16 51,794.16
5,179.42
56,973.58
56,973.00
1,059.84
9,000.00
10,059.84 51,859.84
5,185.98
57,045.82
57,045.00
-
441.00
4,500.00
4,941.00 50,701.00
5,070.10
55,771.10
55,771.00
933.12
6,500.00
7,433.12 23,123.12
2,312.31
25,435.43
25,435.00
90.00
500.00
590.00 9,910.00
991.00
10,901.00
10,901.00
90.00
3,250.00
3,340.00 39,740.00
3,974.00
43,714.00
43,714.00
90.00
3,250.00
3,340.00 16,990.00
1,699.00
18,689.00
18,689.00
1,800.00
240,000.00
241,800.00 288,690.00
28,869.00
317,559.00
317,559.00
1,800.00
-
1,800.00 48,690.00
4,869.00
53,559.00
53,559.00
777.60
900.00
1,677.60 28,977.60
2,897.76
31,875.36
31,875.00
559.44
559.44 16,249.44
1,624.94
17,874.38
17,874.00
288.00
288.00 7,658.00
765.80
8,423.80
8,423.00
1,141.20
3,000.00
4,141.20 35,341.20
3,534.12
38,875.32
38,875.00
777.60
4,000.00
4,777.60 20,037.60
2,003.76
22,041.36
22,041.00
585.00
585.00 21,385.00
2,138.50
23,523.50
23,523.00
1,272.60
5,250.00
6,522.60 39,022.60
3,902.26
918.00
-
3,400.00
4,318.00 45,918.00
4,591.80
50,509.80
50,509.00
1,468.80
4,850.00
6,318.80 47,918.80
4,791.88
52,710.68
52,710.00
1,171.98
5,225.00
6,396.98 47,996.98
4,799.70
52,796.68
52,796.00
2,001.60
7,500.00
9,501.60 46,941.60
4,694.16
51,635.76
51,635.00
39,249.60
1,764.00
11,250.00
52,263.60 78,353.60
7,835.36
86,188.96
86,188.00
39,527.10
1,800.00
11,250.00
52,577.10 79,617.10
7,961.71
87,578.81
87,578.00
42,400.00
1,872.00
11,250.00
55,522.00 83,692.00
8,369.20
92,061.20
92,061.00
46,675.20
1,764.00
11,250.00
14,742.00
74,431.20 100,521.20
10,052.12
110,573.32
110,573.00
47,005.20
1,800.00
11,250.00
17,010.00
77,065.20 104,105.20
10,410.52
114,515.72
114,515.00
37,100.00
-
11,250.00
18,370.80
66,720.80 94,890.80
9,489.08
104,379.88
104,379.00
42,432.00
1,764.00
11,250.00
14,742.00
70,188.00 96,278.00
9,627.80
105,905.80
105,905.00
42,732.00
1,800.00
11,250.00
17,010.00
72,792.00 99,832.00
9,983.20
109,815.20
109,815.00
302,328.00
1,764.00
11,250.00
14,742.00
330,084.00 356,174.00
35,617.40
391,791.40
391,791.00
267,075.00
1,800.00
11,250.00
17,010.00
297,135.00 324,175.00
32,417.50
356,592.50
356,592.00
-
1,764.00
11,250.00
14,742.00
27,756.00 53,846.00
5,384.60
59,230.60
59,230.00
-
1,800.00
11,250.00
17,010.00
30,060.00 57,100.00
5,710.00
62,810.00
62,810.00
-
1,728.00
11,250.00
17,010.00
29,988.00 54,948.00
5,494.80
60,442.80
60,442.00
-
1,764.00
11,250.00
14,742.00
27,756.00 53,846.00
5,384.60
59,230.60
59,230.00
-
1,800.00
11,250.00
17,010.00
30,060.00 57,100.00
5,710.00
62,810.00
62,810.00
17,490.00
297.00
1,000.00
18,787.00 31,707.00
3,170.70
34,877.70
34,877.00
5,295.00
223.20
750.00
6,268.20 19,188.20
1,918.82
21,107.02
21,107.00
8,745.00
223.20
750.00
9,718.20 22,638.20
2,263.82
24,902.02
24,902.00
3,975.00
280.80
750.00
5,005.80 17,925.80
1,792.58
19,718.38
19,718.00
17,490.00
205.20
750.00
1,134.00
19,579.20 32,499.20
3,249.92
35,749.12
35,749.00
30,005.00
205.20
750.00
1,134.00
32,094.20 45,014.20
4,501.42
49,515.62
49,515.00
8,745.00
205.20
750.00
1,134.00
10,834.20 23,754.20
2,375.42
26,129.62
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
-
21,600.00
12,600.00
1,440.00
35,640.00 73,080.00
7,308.00
80,388.00
80,388.00
-
1,474.20
11,250.00
31,185.00
43,909.20 116,709.20
11,670.92
128,380.12
128,380.00
-
1,474.20
11,250.00
36,288.00
49,012.20 121,812.20
12,181.22
133,993.42
133,993.00
127,957.50
1,474.20
11,250.00
18,370.80
159,052.50 231,852.50
23,185.25
255,037.75
255,037.00
127,957.50
1,474.20
11,250.00
18,370.80
159,052.50 231,852.50
23,185.25
255,037.75
255,037.00
50,196.00
1,800.00
11,250.00
17,010.00
80,256.00 153,056.00
15,305.60
168,361.60
168,361.00
44,520.00
1,872.00
11,250.00
18,370.80
76,012.80 148,812.80
14,881.28
163,694.08
163,694.00
-
1,800.00
11,250.00
13,050.00 85,850.00
8,585.00
94,435.00
94,435.00
-
1,872.00
11,250.00
13,122.00 85,922.00
8,592.20
94,514.20
94,514.00
149,737.50
1,764.00
11,250.00
49,555.80
212,307.30 321,597.30
32,159.73
353,757.03
50,744.25
2,547.00
9,750.00
22,680.00
85,721.25 158,521.25
15,852.13
174,373.38
174,373.00
-
205.20
750.00
283.50
1,238.70 14,158.70
1,415.87
15,574.57
15,574.00
-
205.20
750.00
567.00
1,522.20 14,442.20
1,444.22
15,886.42
15,886.00
-
102.60
375.00
147.42
625.02 13,545.02
1,354.50
14,899.52
14,899.00
53,000.00
216.00
750.00
1,134.00
55,100.00 68,020.00
6,802.00
74,822.00
74,822.00
10,590.00
297.00
800.00
1,134.00
12,821.00 25,741.00
2,574.10
28,315.10
28,315.00
-
205.20
750.00
1,134.00
2,089.20 15,009.20
1,500.92
16,510.12
16,510.00
25,440.00
1,474.20
11,250.00
7,371.00
45,535.20 118,335.20
11,833.52
130,168.72
130,168.00
38,745.00
3,500.00
42,245.00 67,540.00
6,754.00
74,294.00
74,294.00
39,375.00
3,500.00
42,875.00 60,695.00
6,069.50
66,764.50
66,764.00
147,000.00
6,000.00
153,000.00 227,725.00
22,772.50
250,497.50
250,497.00
304,500.00
6,000.00
310,500.00 385,225.00
38,522.50
423,747.50
423,747.00
43,932.00
1,674.00
4,500.00
17,010.00
67,116.00 171,116.00
17,111.60
188,227.60
188,227.00
-
1,674.00
4,500.00
31,185.00
37,359.00 130,959.00
13,095.90
144,054.90
144,054.00
-
1,674.00
4,500.00
21,999.60
28,173.60 121,773.60
12,177.36
133,950.96
133,950.00
64,872.00
1,674.00
4,500.00
31,185.00
102,231.00 195,831.00
19,583.10
215,414.10
215,414.00
64,872.00
1,674.00
4,500.00
32,886.00
103,932.00 197,532.00
19,753.20
217,285.20
217,285.00
44,520.00
1,674.00
4,500.00
31,185.00
81,879.00 175,479.00
17,547.90
193,026.90
193,026.00
44,520.00
1,674.00
4,500.00
21,999.60
72,693.60 166,293.60
16,629.36
182,922.96
182,922.00
49,290.00
1,674.00
4,500.00
21,999.60
77,463.60 171,063.60
17,106.36
25,440.00
-
2,239.20
6,250.00
7,371.00
41,300.20 176,500.20
17,650.02
194,150.22
194,150.00
34,650.00
2,239.20
6,250.00
31,185.00
74,324.20 178,324.20
17,832.42
196,156.62
196,156.00
77,000.00
2,115.00
8,750.00
87,865.00 160,665.00
16,066.50
176,731.50
176,731.00
44,000.00
2,115.00
8,750.00
54,865.00 127,665.00
12,766.50
140,431.50
140,431.00
-
1,872.00
11,250.00
13,122.00 106,722.00
10,672.20
117,394.20
117,394.00
1,543,100.00
3,150.00
1,546,250.00 1,568,575.00
156,857.50
1,725,432.50
1,725,432.00
72,600.00
2,250.00
74,850.00 110,620.00
11,062.00
121,682.00
121,682.00
80,000.00
7,200.00
87,200.00 97,820.00
9,782.00
107,602.00
107,602.00
-
-
- 11,880.00
1,188.00
13,068.00
13,068.00
30,000.00
850.00
30,850.00 48,670.00
4,867.00
53,537.00
53,537.00
43,200.00
73.44
225.00
571.73
44,070.17 55,120.17
5,512.02
60,632.18
60,632.00
50,000.00
73.44
225.00
571.73
50,870.17 61,920.17
6,192.02
68,112.18
68,112.00
135,150.00
205.20
750.00
283.50
136,388.70 149,308.70
14,930.87
164,239.57
164,239.00
97,075.00
205.20
750.00
283.50
98,313.70 111,233.70
11,123.37
122,357.07
122,357.00
-400tebal pasir 5 cm
89,700.00
7,500.00
97,200.00 149,200.00
14,920.00
164,120.00
164,120.00
89,700.00
7,500.00
97,200.00 149,200.00
14,920.00
164,120.00
164,120.00
72,500.00
7,500.00
80,000.00 132,000.00
13,200.00
145,200.00
145,200.00
76,700.00
7,500.00
84,200.00 136,200.00
13,620.00
149,820.00
149,820.00
57,750.00
7,500.00
65,250.00 117,250.00
11,725.00
128,975.00
128,975.00
87,500.00
7,500.00
95,000.00 147,000.00
14,700.00
161,700.00
161,700.00
00 tebal pasir 5 cm
89,700.00
7,500.00
97,200.00 149,200.00
14,920.00
164,120.00
164,120.00
89,700.00
7,500.00
97,200.00 149,200.00
14,920.00
164,120.00
164,120.00
72,750.00
7,500.00
80,250.00 132,250.00
13,225.00
145,475.00
145,475.00
87,500.00
7,500.00
95,000.00 147,000.00
14,700.00
161,700.00
161,700.00
72,750.00
7,500.00
80,250.00 132,250.00
13,225.00
145,475.00
145,475.00
87,500.00
7,500.00
95,000.00 147,000.00
14,700.00
161,700.00
161,700.00
95,600.00
7,500.00
103,100.00 155,100.00
15,510.00
170,610.00
170,610.00
82,200.00
7,500.00
89,700.00 141,700.00
14,170.00
155,870.00
155,870.00
34,100,000.00
33,750.00
1,269.00
34,135,019.00 36,343,519.00
3,634,351.90
39,977,870.90
39,977,870.00
34,100,000.00
33,750.00
1,269.00
34,135,019.00 36,343,519.00
3,634,351.90
39,977,870.90
39,977,870.00
82,500.00
33,750.00
1,269.00
117,519.00 2,326,019.00
232,601.90
2,558,620.90
2,558,620.00
90,000.00
33,750.00
1,269.00
125,019.00 2,078,019.00
207,801.90
2,285,820.90
2,285,820.00
10,800,000.00
33,750.00
1,269.00
10,835,019.00 12,728,019.00
1,272,801.90
14,000,820.90
14,000,820.00
12,000,000.00
33,750.00
1,269.00
12,035,019.00 13,928,019.00
1,392,801.90
15,320,820.90
15,320,820.00
9,600,000.00
33,750.00
1,269.00
9,635,019.00 11,528,019.00
1,152,801.90
12,680,820.90
12,680,820.00
320,000.00
1,350.00
321,350.00 431,825.00
43,182.50
475,007.50
475,007.00
1,404,000.00
2,650.00
1,406,650.00 1,517,125.00
151,712.50
1,668,837.50
1,668,837.00
540,000.00
2,650.00
542,650.00 653,125.00
65,312.50
718,437.50
718,437.00
400,000.00
2,650.00
402,650.00 513,125.00
51,312.50
564,437.50
564,437.00
420,000.00
2,650.00
422,650.00 533,125.00
53,312.50
586,437.50
586,437.00
360,000.00
2,650.00
362,650.00 473,125.00
47,312.50
520,437.50
520,437.00
360,000.00
634.50
360,634.50 676,134.50
67,613.45
743,747.95
743,747.00
1,404,000.00
634.50
1,404,634.50 1,720,134.50
172,013.45
1,892,147.95
1,892,147.00
540,000.00
634.50
540,634.50 856,134.50
85,613.45
941,747.95
941,747.00
400,000.00
634.50
400,634.50 716,134.50
71,613.45
787,747.95
787,747.00
420,000.00
634.50
420,634.50 736,134.50
73,613.45
809,747.95
809,747.00
360,000.00
634.50
360,634.50 676,134.50
67,613.45
743,747.95
743,747.00
842,400.00
380.70
842,400.00
380.70
842,780.70 1,095,180.70
109,518.07
1,204,698.77
1,204,698.00
324,000.00
380.70
324,380.70 576,780.70
57,678.07
634,458.77
634,458.00
240,000.00
380.70
240,380.70 492,780.70
49,278.07
542,058.77
542,058.00
252,000.00
380.70
252,380.70 504,780.70
50,478.07
555,258.77
555,258.00
216,000.00
380.70
216,380.70 468,780.70
46,878.07
515,658.77
515,658.00
2,246,400.00
634.50
2,246,400.00
634.50
2,247,034.50 2,562,534.50
256,253.45
2,818,787.95
2,818,787.00
864,000.00
634.50
864,634.50 1,180,134.50
118,013.45
1,298,147.95
1,298,147.00
640,000.00
634.50
640,634.50 956,134.50
95,613.45
1,051,747.95
1,051,747.00
672,000.00
634.50
672,634.50 988,134.50
98,813.45
1,086,947.95
1,086,947.00
576,000.00
634.50
576,634.50 892,134.50
89,213.45
981,347.95
981,347.00
407,118.25 627,968.25
62,796.83
690,765.08
690,765.00
407,118.25 627,968.25
62,796.83
690,765.08
690,765.00
319,618.25 540,468.25
54,046.83
594,515.08
594,515.00
332,118.25 552,968.25
55,296.83
608,265.08
608,265.00
294,618.25 515,468.25
51,546.83
567,015.08
567,015.00
230,400.00
1,983.75
634.50
67,000.00
300,018.25 552,418.25
55,241.83
2,106,000.00
190.35
2,106,190.35 2,346,890.35
234,689.04
2,581,579.39
2,581,579.00
2,106,000.00
190.35
2,106,190.35 2,346,890.35
234,689.04
2,581,579.39
2,581,579.00
810,000.00
190.35
810,190.35 1,050,890.35
105,089.04
1,155,979.39
1,155,979.00
600,000.00
190.35
600,190.35 840,890.35
84,089.04
924,979.39
924,979.00
630,000.00
190.35
630,190.35 870,890.35
87,089.04
957,979.39
957,979.00
540,000.00
190.35
540,190.35 780,890.35
78,089.04
858,979.39
858,979.00
264,600.00
1,983.75
380.70
67,000.00
333,964.45 586,364.45
58,636.45
645,000.90
645,000.00
264,600.00
1,983.75
380.70
67,000.00
333,964.45 539,964.45
53,996.45
593,960.90
593,960.00
196,000.00
1,983.75
380.70
67,000.00
265,364.45 471,364.45
47,136.45
518,500.90
518,500.00
205,800.00
1,983.75
380.70
67,000.00
275,164.45 481,164.45
48,116.45
529,280.90
529,280.00
176,400.00
1,983.75
380.70
67,000.00
245,764.45 451,764.45
45,176.45
496,940.90
496,940.00
250,000.00
1,983.75
1,015.20
67,000.00
32,500.00
352,498.95 620,723.95
62,072.40
682,796.35
682,796.00
250,000.00
1,983.75
1,015.20
67,000.00
32,500.00
262,500.00
1,983.75
1,015.20
67,000.00
32,500.00
364,998.95 633,223.95
63,322.40
696,546.35
696,546.00
225,000.00
1,983.75
1,015.20
67,000.00
32,500.00
327,498.95 595,723.95
59,572.40
655,296.35
655,296.00
34,100,000.00
690,000.00
151,200.00
34,941,200.00 36,203,200.00
3,620,320.00
39,823,520.00
39,823,520.00
34,941,200.00 36,203,200.00
3,620,320.00
39,823,520.00
39,823,520.00
bentang 6 meter
82,500.00
690,000.00
151,200.00
923,700.00 2,185,700.00
218,570.00
2,404,270.00
9,900,000.00
690,000.00
151,200.00
10,741,200.00 12,003,200.00
1,200,320.00
13,203,520.00
13,203,520.00
entang 6 meter
11,000,000.00
690,000.00
151,200.00
11,841,200.00 13,103,200.00
1,310,320.00
14,413,520.00
14,413,520.00
8,800,000.00
690,000.00
151,200.00
9,641,200.00 10,903,200.00
1,090,320.00
11,993,520.00
11,993,520.00
31,625.00
690,000.00
151,200.00
872,825.00 2,134,825.00
213,482.50
2,348,307.50
2,348,307.00
37,200,000.00
690,000.00
151,200.00
38,041,200.00 40,155,050.00
4,015,505.00
44,170,555.00
44,170,555.00
37,200,000.00
690,000.00
151,200.00
38,041,200.00 40,155,050.00
4,015,505.00
44,170,555.00
44,170,555.00
90,000.00
931,200.00 3,045,050.00
304,505.00
3,349,555.00
3,349,555.00
10,800,000.00
690,000.00
151,200.00
11,641,200.00 13,755,050.00
1,375,505.00
15,130,555.00
15,130,555.00
9,600,000.00
690,000.00
151,200.00
10,441,200.00 12,555,050.00
1,255,505.00
13,810,555.00
13,810,555.00
12,000,000.00
690,000.00
151,200.00
12,841,200.00 14,955,050.00
1,495,505.00
16,450,555.00
16,450,555.00
34,100,000.00
690,000.00
81,000.00
34,871,000.00 35,628,200.00
3,562,820.00
39,191,020.00
39,191,020.00
34,100,000.00
690,000.00
81,000.00
34,871,000.00 35,628,200.00
3,562,820.00
39,191,020.00
39,191,020.00
82,500.00
853,500.00 1,610,700.00
161,070.00
1,771,770.00
1,771,770.00
9,900,000.00
690,000.00
81,000.00
10,671,000.00 11,428,200.00
1,142,820.00
12,571,020.00
12,571,020.00
11,000,000.00
690,000.00
81,000.00
11,771,000.00 12,528,200.00
1,252,820.00
13,781,020.00
13,781,020.00
8,800,000.00
690,000.00
81,000.00
9,571,000.00 10,328,200.00
1,032,820.00
11,361,020.00
11,361,020.00
31,625.00
690,000.00
81,000.00
802,625.00 1,559,825.00
155,982.50
1,715,807.50
1,715,807.00
-
18,000.00
6,750.00
24,750.00 39,600.00
3,960.00
43,560.00
43,560.00
13,250.00 28,100.00
2,810.00
30,910.00
30,910.00
-
-
13,250.00
13,250.00 28,100.00
2,810.00
30,910.00
30,910.00
-
-
13,250.00
13,250.00 28,100.00
2,810.00
30,910.00
30,910.00
-
-
13,250.00
13,250.00 28,100.00
2,810.00
30,910.00
30,910.00
-
-
13,250.00
13,250.00 28,100.00
2,810.00
30,910.00
30,910.00
-
-
13,250.00
13,250.00 28,100.00
2,810.00
30,910.00
30,910.00
-
-
13,250.00
13,250.00 28,100.00
2,810.00
30,910.00
30,910.00
-
-
13,250.00
13,250.00 28,100.00
2,810.00
30,910.00
30,910.00
420.00
266.40
13,250.00
13,936.40 28,786.40
2,878.64
31,665.04
31,665.00
302.40
216.00
13,250.00
13,768.40 28,618.40
2,861.84
31,480.24
31,480.00
302.40
72.00
13,250.00
13,624.40 28,474.40
2,847.44
31,321.84
31,321.00
420.00
216.00
13,250.00
13,886.00 28,736.00
2,873.60
31,609.60
31,609.00
420.00
72.00
13,250.00
13,742.00 28,592.00
2,859.20
31,451.20
31,451.00
350.00
216.00
13,250.00
13,816.00 28,666.00
2,866.60
31,532.60
31,532.00
350.00
72.00
13,250.00
13,672.00 28,522.00
2,852.20
31,374.20
31,374.00
1,650.00
10,600.00
12,250.00 30,070.00
3,007.00
33,077.00
33,077.00
12,375.00
13,225.00
9,000.00
10,200.00
44,800.00 46,120.00
4,612.00
50,732.00
50,732.00
1,485,000.00
13,225.00
9,000.00
10,200.00
1,517,425.00 1,518,745.00
151,874.50
1,670,619.50
1,670,619.00
1,650,000.00
13,225.00
9,000.00
10,200.00
1,682,425.00 1,683,745.00
168,374.50
1,852,119.50
1,852,119.00
1,320,000.00
13,225.00
9,000.00
10,200.00
1,352,425.00 1,353,745.00
135,374.50
1,489,119.50
1,489,119.00
123,200.00
13,225.00
11,250.00
25,500.00
173,175.00 182,475.00
18,247.50
200,722.50
200,722.00
1,155.00
10,600.00
11,755.00 53,305.00
5,330.50
58,635.50
58,635.00
138,600.00
10,600.00
149,200.00 190,750.00
19,075.00
209,825.00
209,825.00
154,000.00
10,600.00
164,600.00 206,150.00
20,615.00
226,765.00
226,765.00
123,200.00
10,600.00
133,800.00 175,350.00
17,535.00
192,885.00
192,885.00
130,400.00
13,250.00
143,650.00 181,700.00
18,170.00
199,870.00
199,870.00
1,222.50
13,250.00
146,700.00
13,250.00
159,950.00 198,000.00
19,800.00
217,800.00
217,800.00
163,000.00
13,250.00
176,250.00 214,300.00
21,430.00
235,730.00
235,730.00
130,400.00
13,250.00
143,650.00 181,700.00
18,170.00
199,870.00
199,870.00
975.00
6,360.00
7,335.00 40,930.00
4,093.00
45,023.00
45,023.00
117,000.00
6,360.00
123,360.00 156,955.00
15,695.50
172,650.50
172,650.00
130,000.00
6,360.00
136,360.00 169,955.00
16,995.50
186,950.50
186,950.00
104,000.00
6,360.00
110,360.00 143,955.00
14,395.50
158,350.50
158,350.00
900.00
5,300.00
6,200.00 36,825.00
3,682.50
40,507.50
40,507.00
108,000.00
5,300.00
113,300.00 143,925.00
14,392.50
158,317.50
158,317.00
120,000.00
5,300.00
125,300.00 155,925.00
15,592.50
171,517.50
171,517.00
96,000.00
5,300.00
101,300.00 131,925.00
13,192.50
145,117.50
145,117.00
-
5,300.00
5,300.00 28,925.00
2,892.50
31,817.50
31,817.00
252,720.00
3,306.25
256,026.25 279,651.25
27,965.13
307,616.38
307,616.00
97,200.00
3,306.25
100,506.25 124,131.25
12,413.13
136,544.38
136,544.00
72,000.00
3,306.25
75,306.25 98,931.25
9,893.13
108,824.38
108,824.00
75,600.00
3,306.25
78,906.25 102,531.25
10,253.13
112,784.38
112,784.00
64,800.00
3,306.25
68,106.25 91,731.25
9,173.13
100,904.38
100,904.00
-
3,306.25
3,306.25 26,506.25
2,650.63
29,156.88
29,156.00
386,100.00
3,306.25
389,406.25 412,606.25
41,260.63
453,866.88
453,866.00
148,500.00
3,306.25
151,806.25 175,006.25
17,500.63
192,506.88
192,506.00
110,000.00
3,306.25
113,306.25 136,506.25
13,650.63
150,156.88
150,156.00
115,500.00
3,306.25
118,806.25 142,006.25
14,200.63
156,206.88
156,206.00
99,000.00
3,306.25
102,306.25 125,506.25
12,550.63
138,056.88
138,056.00
508,950.00
3,967.50
512,917.50 543,542.50
54,354.25
597,896.75
597,896.00
195,750.00
3,967.50
199,717.50 230,342.50
23,034.25
253,376.75
253,376.00
145,000.00
3,967.50
148,967.50 179,592.50
17,959.25
197,551.75
197,551.00
152,250.00
3,967.50
156,217.50 186,842.50
18,684.25
205,526.75
205,526.00
130,500.00
3,967.50
134,467.50 165,092.50
16,509.25
181,601.75
181,601.00
301,860.00
3,967.50
305,827.50 320,677.50
32,067.75
352,745.25
352,745.00
116,100.00
3,967.50
120,067.50 134,917.50
13,491.75
148,409.25
148,409.00
86,000.00
3,967.50
89,967.50 104,817.50
10,481.75
115,299.25
115,299.00
90,300.00
3,967.50
94,267.50 109,117.50
10,911.75
120,029.25
120,029.00
77,400.00
3,967.50
81,367.50 96,217.50
9,621.75
105,839.25
105,839.00
210,600.00
3,967.50
214,567.50 229,417.50
22,941.75
252,359.25
252,359.00
81,000.00
3,967.50
84,967.50 99,817.50
9,981.75
109,799.25
109,799.00
60,000.00
3,967.50
63,967.50 78,817.50
7,881.75
86,699.25
86,699.00
63,000.00
3,967.50
66,967.50 81,817.50
8,181.75
89,999.25
89,999.00
54,000.00
3,967.50
57,967.50 72,817.50
7,281.75
80,099.25
80,099.00
168,480.00
3,967.50
172,447.50 187,297.50
18,729.75
206,027.25
206,027.00
64,800.00
3,967.50
68,767.50 83,617.50
8,361.75
91,979.25
91,979.00
48,000.00
3,967.50
51,967.50 66,817.50
6,681.75
73,499.25
73,499.00
50,400.00
3,967.50
54,367.50 69,217.50
6,921.75
76,139.25
76,139.00
43,200.00
3,967.50
47,167.50 62,017.50
6,201.75
68,219.25
68,219.00
1,875.00
17,800.00
19,837.50
39,512.50 228,812.50
22,881.25
251,693.75
251,693.00
225,000.00
17,800.00
19,837.50
262,637.50 451,937.50
45,193.75
497,131.25
497,131.00
250,000.00
17,800.00
19,837.50
287,637.50 512,937.50
51,293.75
564,231.25
564,231.00
200,000.00
17,800.00
19,837.50
237,637.50 426,937.50
42,693.75
469,631.25
469,631.00
0
9,918.75
9,918.75 57,293.75
5,729.38
63,023.13
63,023.00
2,100.00
9,918.75
12,018.75 59,393.75
5,939.38
65,333.13
65,333.00
252,000.00
9,918.75
261,918.75 309,293.75
30,929.38
340,223.13
340,223.00
280,000.00
9,918.75
289,918.75 337,293.75
33,729.38
371,023.13
371,023.00
224,000.00
9,918.75
233,918.75 281,293.75
28,129.38
309,423.13
309,423.00
-
9,918.75
9,918.75 57,293.75
5,729.38
63,023.13
63,023.00
2,100.00
4,050.00
57,620.00
710.64
64,480.64 111,855.64
11,185.56
123,041.20
123,041.00
252,000.00
4,050.00
57,620.00
710.64
314,380.64 361,755.64
36,175.56
397,931.20
397,931.00
280,000.00
4,050.00
57,620.00
710.64
342,380.64 389,755.64
38,975.56
428,731.20
428,731.00
224,000.00
4,050.00
57,620.00
710.64
286,380.64 333,755.64
33,375.56
367,131.20
367,131.00
224,000.00
4,050.00
57,620.00
710.64
286,380.64 333,755.64
33,375.56
367,131.20
367,131.00
252,000.00
4,050.00
43,000.00
710.64
12,000.00
311,760.64 362,860.64
36,286.06
280,000.00
4,050.00
43,000.00
710.64
12,000.00
339,760.64 390,860.64
39,086.06
429,946.70
429,946.00
224,000.00
4,050.00
43,000.00
710.64
12,000.00
283,760.64 334,860.64
33,486.06
368,346.70
368,346.00
224,000.00
4,050.00
43,000.00
710.64
12,000.00
283,760.64 334,860.64
33,486.06
368,346.70
368,346.00
245,700.00
2,700.00
4,050.00
36,000.00
288,450.00 441,750.00
44,175.00
485,925.00
485,925.00
94,500.00
2,700.00
4,050.00
36,000.00
137,250.00 290,550.00
29,055.00
319,605.00
319,605.00
70,000.00
2,700.00
4,050.00
36,000.00
112,750.00 266,050.00
26,605.00
292,655.00
292,655.00
73,500.00
2,700.00
4,050.00
36,000.00
116,250.00 269,550.00
26,955.00
296,505.00
296,505.00
63,000.00
2,700.00
4,050.00
36,000.00
105,750.00 259,050.00
25,905.00
284,955.00
284,955.00
32,000.00
3,306.25
1,875.00
6,375.00
43,556.25 44,136.25
4,413.63
48,549.88
48,549.00
120,000.00
112,000.00
24,000.00
324.00
256,324.00 266,999.00
26,699.90
293,698.90
293,698.00
120,000.00
112,000.00
24,000.00
324.00
256,324.00 266,999.00
26,699.90
293,698.90
293,698.00
54,000.00
1,322.50
55,322.50 63,822.50
6,382.25
70,204.75
70,204.00
40,000.00
1,322.50
41,322.50 49,822.50
4,982.25
54,804.75
54,804.00
42,000.00
1,322.50
43,322.50 51,822.50
5,182.25
57,004.75
57,004.00
36,000.00
1,322.50
37,322.50 45,822.50
4,582.25
50,404.75
50,404.00
20,000.00
1,350.00
21,350.00 29,242.50
2,924.25
32,166.75
32,166.00
23,652.50 62,072.50
6,207.25
68,279.75
68,279.00
130,752.50 169,172.50
16,917.25
186,089.75
186,089.00
142,752.50 181,172.50
18,117.25
199,289.75
199,289.00
118,752.50 157,172.50
15,717.25
172,889.75
172,889.00
29,681.25 68,101.25
6,810.13
74,911.38
74,911.00
136,781.25 175,201.25
17,520.13
192,721.38
192,721.00
148,781.25 187,201.25
18,720.13
205,921.38
205,921.00
124,781.25 163,201.25
16,320.13
179,521.38
179,521.00
975.00
3,420.00
4,075.00
20,250.00
12.00
300.00
6,360.00
35,392.00 81,887.00
8,188.70
90,075.70
90,075.00
117,000.00
3,420.00
4,075.00
20,250.00
12.00
300.00
6,360.00
151,417.00 197,912.00
19,791.20
217,703.20
217,703.00
130,000.00
3,420.00
4,075.00
20,250.00
12.00
300.00
6,360.00
164,417.00 210,912.00
21,091.20
232,003.20
232,003.00
104,000.00
3,420.00
4,075.00
20,250.00
12.00
300.00
6,360.00
138,417.00 184,912.00
18,491.20
203,403.20
203,403.00
112,500.00
3,420.00
4,075.00
20,250.00
12.00
2,550.00
130,000.00
272,807.00 319,302.00
31,930.20
351,232.20
975.00
20,520.00
4,075.00
20,250.00
12.00
300.00
6,360.00
52,492.00 98,987.00
9,898.70
108,885.70
108,885.00
117,000.00
20,520.00
4,075.00
20,250.00
12.00
300.00
6,360.00
168,517.00 215,012.00
21,501.20
236,513.20
236,513.00
130,000.00
20,520.00
4,075.00
20,250.00
12.00
300.00
6,360.00
181,517.00 228,012.00
22,801.20
250,813.20
250,813.00
104,000.00
20,520.00
4,075.00
20,250.00
12.00
300.00
6,360.00
155,517.00 202,012.00
20,201.20
222,213.20
222,213.00
112,500.00
20,520.00
4,075.00
20,250.00
12.00
2,550.00
130,000.00
289,907.00 336,402.00
33,640.20
370,042.20
370,042.00
-
-
-
-
- 12,515.00
1,251.50
13,766.50
13,766.00
-
-
-
-
- 9,284.00
928.40
10,212.40
10,212.00
-
-
-
-
- 9,284.00
928.40
10,212.40
10,212.00
-
-
-
-
- 8,359.00
835.90
9,194.90
9,194.00
-
-
-
2,304.00
2,304.00 5,567.00
556.70
6,123.70
6,123.00
19,580.00
300.00
19,880.00 27,925.00
2,792.50
30,717.50
30,717.00
25,850.00
300.00
26,150.00 34,195.00
3,419.50
37,614.50
37,614.00
29,975.00
300.00
30,275.00 38,320.00
3,832.00
42,152.00
42,152.00
-
1,500.00
1,500.00 19,320.00
348,000.00
1,500.00
349,500.00 364,350.00
36,435.00
400,785.00
400,785.00
225,000.00
1,500.00
226,500.00 241,350.00
24,135.00
265,485.00
265,485.00
-
900.00
900.00 15,750.00
1,575.00
17,325.00
17,325.00
18,750.00
900.00
19,650.00 34,500.00
3,450.00
37,950.00
37,950.00
22,500.00
900.00
23,400.00 38,250.00
3,825.00
42,075.00
42,075.00
150,000.00
300.00
150,300.00 269,100.00
26,910.00
296,010.00
296,010.00
3,458.00
1,870.00
5,328.00 16,003.00
1,600.30
17,603.30
17,603.00
72,000.00
1,800.00
23,100.00
225,000.00
321,900.00 396,150.00
39,615.00
435,765.00
435,765.00
3,675.00
528.75
4,203.75 11,678.75
1,167.88
12,846.63
12,846.00
-
-
- 8,910.00
891.00
9,801.00
9,801.00
14,850.00
31,500.00
14.00
46,364.00 56,891.00
5,689.10
62,580.10
62,580.00
68,200.00
39,375.00
17.60
107,592.60 118,119.60
11,811.96
129,931.56
129,931.00
23,650.00
47,250.00
21.20
70,921.20 81,661.20
8,166.12
89,827.32
89,827.00
idak berlubang
2,000.00
57,000.00
59,000.00 199,000.00
- 860,000.00
70,000.00
2,480.00
72,480.00 297,480.00
131,480.00 1,356,480.00
135,648.00
1,492,128.00
1,492,128.00
42,120,000.00
33,750.00
1,269.00
42,155,019.00 44,363,519.00
4,436,351.90
48,799,870.90
48,799,870.00
45,000.00
45,000.00 61,105.00
6,110.50
67,215.50
67,215.00
45,000.00
45,000.00 65,800.00
6,580.00
72,380.00
72,380.00
40,500.00
40,500.00 61,300.00
6,130.00
67,430.00
67,430.00
17,500.00
1,440.00
8,000.00
24,000.00
50,940.00 67,840.00
6,784.00
74,624.00
74,624.00
18,375.00
2,650.00
1,944.00
5.76
1,949.76 55,989.76
5,598.98
61,588.74
61,588.00
17,500.00
-
3,800.00
274.32
21,574.32 63,174.32
6,317.43
69,491.75
69,491.00
38,000.00
1,320.00
39,320.00 54,825.00
5,482.50
60,307.50
60,307.00
41,400.00
1,320.00
42,720.00 58,225.00
5,822.50
64,047.50
64,047.00
36,600.00
1,320.00
37,920.00 52,865.00
5,286.50
58,151.50
58,151.00
42,000.00
1,320.00
43,320.00 58,265.00
5,826.50
64,091.50
64,091.00
30,800.00
1,320.00
32,120.00 47,065.00
4,706.50
51,771.50
51,771.00
33,600.00
1,320.00
34,920.00 49,865.00
4,986.50
54,851.50
54,851.00
30,448.00
1,320.00
31,768.00 46,488.00
4,648.80
51,136.80
51,136.00
31,620.00
1,320.00
32,940.00 47,660.00
4,766.00
52,426.00
52,426.00
36,000.00
1,320.00
37,320.00 52,040.00
5,204.00
57,244.00
57,244.00
46,250.00
1,320.00
47,570.00 62,290.00
6,229.00
68,519.00
68,519.00
38,000.00
1,320.00
39,320.00 54,040.00
5,404.00
59,444.00
59,444.00
42,780.00
1,320.00
44,100.00 58,820.00
5,882.00
64,702.00
64,702.00
41,650.00
1,320.00
42,970.00 57,690.00
5,769.00
63,459.00
63,459.00
43,320.00
1,320.00
44,640.00 59,360.00
5,936.00
65,296.00
65,296.00
126,000.00
96,000.00
222,000.00 237,920.00
23,792.00
261,712.00
261,712.00
55,125.00
96,000.00
151,125.00 167,045.00
16,704.50
183,749.50
183,749.00
-
96,000.00
96,000.00 111,920.00
11,192.00
123,112.00
123,112.00
63,000.00
96,000.00
159,000.00 174,920.00
17,492.00
192,412.00
192,412.00
-
96,000.00
96,000.00 111,920.00
11,192.00
123,112.00
123,112.00
-
96,000.00
96,000.00 112,015.00
11,201.50
123,216.50
123,216.00
28,875.00
96,000.00
124,875.00 143,630.00
14,363.00
157,993.00
157,993.00
-
96,000.00
96,000.00 111,920.00
11,192.00
123,112.00
123,112.00
-
2,645.00
2,645.00 10,075.00
1,007.50
11,082.50
11,082.00
51,450.00
370.00
51,820.00 59,625.00
5,962.50
65,587.50
65,587.00
22,800.00
740.00
23,540.00 106,390.00
10,639.00
117,029.00
117,029.00
64,050.00
64,050.00 78,025.00
7,802.50
85,827.50
85,827.00
1,000,500.00
17,500.00
1,983.75
-
1,019,983.75 1,055,738.75
105,573.88
1,161,312.63
1,161,312.00
109,140.00
10,600.00
119,740.00 140,190.00
14,019.00
154,209.00
154,209.00
112,500.00
112,500.00 128,605.00
12,860.50
141,465.50
141,465.00
54,000.00
54,000.00 68,810.00
6,881.00
75,691.00
75,691.00
-
10,600.00
9,960.00
18,750.00
39,310.00 42,235.00
4,223.50
46,458.50
46,458.00
26,250.00
1,440.00
8,000.00
24,000.00
59,690.00 76,590.00
7,659.00
84,249.00
84,249.00
21,000.00
1,440.00
8,000.00
24,000.00
54,440.00 71,340.00
7,134.00
78,474.00
78,474.00
4,980.00
2,650.00
7,630.00 22,350.00
2,235.00
24,585.00
24,585.00
290,000.00
2,650.00
35,000.00
327,650.00 356,625.00
35,662.50
392,287.50
392,287.00
-
2,650.00
2,650.00 31,475.00
3,147.50
34,622.50
34,622.00
-
3,967.50
3,306.25
40,000.00
47,273.75 76,248.75
7,624.88
83,873.63
83,873.00
-
1,322.50
7,200.00
4,500.00
13,022.50 14,132.50
1,413.25
15,545.75
15,545.00
45,000.00
45,000.00 72,300.00
7,230.00
79,530.00
79,530.00
40,500.00
40,500.00 67,800.00
6,780.00
74,580.00
74,580.00
47,250.00
47,250.00 68,050.00
6,805.00
74,855.00
74,855.00
47,250.00
47,250.00 74,550.00
7,455.00
82,005.00
82,005.00
134,850.00
134,850.00 155,650.00
15,565.00
171,215.00
171,215.00
134,850.00
134,850.00 162,150.00
16,215.00
178,365.00
178,365.00
30,000.00
-
3,800.00
274.32
34,074.32 75,674.32
7,567.43
83,241.75
37,200.00
-
3,800.00
274.32
41,274.32 82,874.32
8,287.43
91,161.75
91,161.00
28,050.00
700,000.00
728,050.00 748,500.00
74,850.00
823,350.00
823,350.00
27,500.00
8,750.00
36,250.00 65,075.00
6,507.50
71,582.50
71,582.00
262,500.00
112,000.00
11,250.00
385,750.00 455,000.00
45,500.00
500,500.00
500,500.00
750.00
750.00 10,000.00
1,000.00
11,000.00
11,000.00
630.00
630.00 9,880.00
988.00
10,868.00
10,868.00
2,480.00
400.00
450.00
3,330.00 9,100.00
910.00
10,010.00
10,010.00
3,900.00
9,010.00
9,010.00
21,920.00 32,220.00
3,222.00
35,442.00
35,442.00
31,890.00 37,450.00
3,745.00
41,195.00
41,195.00
36,660.00 48,780.00
4,878.00
53,658.00
53,658.00
16,560.00
16,560.00 28,660.00
2,866.00
31,526.00
31,526.00
8,250.00
20,460.00
7,000.00
35,710.00 41,440.00
4,144.00
45,584.00
45,584.00
875.00
875.00 7,475.00
747.50
8,222.50
8,222.00
8,250.00
1,550.00
350.00
140.00
10,290.00 32,620.00
3,262.00
35,882.00
35,882.00
11,500.00
9,350.00
24,310.00
45,160.00 51,524.00
5,152.40
56,676.40
56,676.00
11,220.00
16,830.00
28,050.00 33,256.00
3,325.60
36,581.60
36,581.00
3,000.00
3,000.00 8,206.00
820.60
9,026.60
9,026.00
350.00
2,500.00
2,200.00
9,375.00
14,425.00 23,753.00
2,375.30
26,128.30
26,128.00
2,200.00
18,750.00
20,950.00 23,990.00
2,399.00
26,389.00
26,389.00
3,250.00
140.00
3,390.00 21,190.00
2,119.00
23,309.00
23,309.00
3,250.00
140.00
2,200.00
5,590.00 38,890.00
3,889.00
42,779.00
42,779.00
30,000.00
1,800.00
31,800.00 47,410.00
4,741.00
52,151.00
52,151.00
2,500.00
3,250.00
-
-
155.00
2,200.00
8,105.00 11,435.00
1,143.50
12,578.50
12,578.00
9,750.00
9,750.00 15,870.00
1,587.00
17,457.00
17,457.00
3,575.00
7,650.00
3,600.00
14,825.00 144,825.00
14,482.50
159,307.50
159,307.00
9,750.00
9,750.00 118,750.00
11,875.00
130,625.00
130,625.00
630.00
630.00 9,880.00
988.00
10,868.00
10,868.00
30,000.00
495,000.00
-
525,000.00 847,000.00
84,700.00
931,700.00
931,700.00
630.00
630.00 9,880.00
988.00
10,868.00
10,868.00
10,500.00
80,640.00
91,140.00 97,504.00
9,750.40
107,254.40
107,254.00
4,342.00
9,000.00
2,325.00
15,667.00 27,787.00
2,778.70
30,565.70
30,565.00
9,625.00
9,625.00 16,125.00
1,612.50
17,737.50
17,737.00
23,375.00
883.50
24,258.50 61,008.50
6,100.85
67,109.35
67,109.00
-
-
-
- 36,400.00
3,640.00
40,040.00
40,040.00
27,000.00
27,000.00 33,364.00
3,336.40
36,700.40
36,700.00
-
-
- 6,364.00
636.40
7,000.40
7,000.00
191,250.00
11,400.00
202,650.00 566,650.00
20,265.00 56,665.00
5,666.50
62,331.50
62,331.00
13,510.00 37,776.67
3,777.67
41,554.33
41,554.00
6,755.00 18,888.33
1,888.83
20,777.17
20,777.00
3,660,000.00
5,400.00
3,665,400.00 4,132,400.00
413,240.00
4,545,640.00
4,545,640.00
3,120.00
3,120.00 10,572.00
19,125.00
2,000.00
21,125.00 314,125.00
24,245.00 324,697.00
32,469.70
357,166.70
357,166.00
1,950,000.00
117,000.00
2,067,000.00 2,358,080.00
235,808.00
2,593,888.00
2,593,888.00
340,000.00
1,080.00
2,500.00
343,580.00 644,580.00
64,458.00
709,038.00
709,038.00
82,000.00
1,330,000.00
1,080.00
2,500.00
1,415,580.00 1,615,580.00
161,558.00
1,777,138.00
1,777,138.00
2,750,000.00
825,000.00
1,080.00
2,500.00
3,578,580.00 3,726,580.00
372,658.00
4,099,238.00
4,099,238.00
700,000.00
84,000.00
1,080.00
2,500.00
787,580.00 983,080.00
98,308.00
320,000.00
57,600.00
377,600.00 728,800.00
72,880.00
801,680.00
801,680.00
250,000.00
50,000.00
300,000.00 390,250.00
39,025.00
429,275.00
429,275.00
995,000.00
119,400.00
1,114,400.00 1,771,400.00
177,140.00
1,948,540.00
1,948,540.00
42,000.00
122.40
3,250.00
1,650.00
47,022.40 53,212.40
5,321.24
58,533.64
58,533.00
62,800.00
156.60
3,500.00
2,100.00
68,556.60 77,176.60
7,717.66
84,894.26
84,894.00
38,500.00
3,040,000.00
705.60
14,000.00
3,600.00
3,096,805.60 3,111,365.60
311,136.56
3,422,502.16
3,422,502.00
46,750.00
62,700,000.00
1,854.00
15,250.00
10,350.00
62,774,204.00 62,813,724.00
6,281,372.40
69,095,096.40
69,095,096.00
16,530,000.00
7,920.00
17,500.00
13,300.00
24,000.00
15,000.00
16,607,720.00 16,872,490.00
1,687,249.00
18,559,739.00
18,559,739.00
28,500,000.00
13,860.00
32,500.00
3,800.00
39,000.00
22,500.00
28,611,660.00 28,740,830.00
2,874,083.00
31,614,913.00
31,614,913.00
42,180,000.00
20,520.00
46,000.00
6,270.00
72,750.00
30,000.00
42,355,540.00 42,552,100.00
4,255,210.00
46,807,310.00
46,807,310.00
16,800.00
4,900.00
21,700.00 34,660.00
3,466.00
38,126.00
38,126.00
15,000.00
4,375.00
19,375.00 32,335.00
3,233.50
35,568.50
35,568.00
24,000.00
7,000.00
31,000.00 43,960.00
4,396.00
48,356.00
48,356.00
40,200.00
11,725.00
51,925.00 72,985.00
7,298.50
80,283.50
80,283.00
18,840.00
5,495.00
24,335.00 45,395.00
4,539.50
49,934.50
49,934.00
43,800.00
12,775.00
56,575.00 82,905.00
8,290.50
91,195.50
91,195.00
33,000.00
9,625.00
42,625.00 49,645.00
4,964.50
54,609.50
54,609.00
37,500.00
10,937.50
48,437.50 55,457.50
5,545.75
61,003.25
61,003.00
52,500.00
15,312.50
67,812.50 74,832.50
7,483.25
82,315.75
82,315.00
54,000.00
15,750.00
69,750.00 76,770.00
7,677.00
84,447.00
84,447.00
54,000.00
15,750.00
69,750.00 80,304.00
8,030.40
88,334.40
88,334.00
45,000.00
13,125.00
58,125.00 65,145.00
6,514.50
71,659.50
71,659.00
75,000.00
21,875.00
96,875.00 112,675.00
11,267.50
123,942.50
123,942.00
36,000.00
10,500.00
46,500.00 62,300.00
6,230.00
68,530.00
68,530.00
315,000.00
65,000.00
380,000.00 405,350.00
40,535.00
445,885.00
445,885.00
319,000.00
65,000.00
3,600.00
12,500.00
400,100.00 442,350.00
44,235.00
486,585.00
486,585.00
400,000.00
75.00
400,075.00 408,975.00
40,897.50
449,872.50
449,872.00
-
-
- 7,350.00
735.00
8,085.00
8,085.00
-
-
- 51,450.00
5,145.00
56,595.00
56,595.00
-
-
- 3,990.00
399.00
4,389.00
4,389.00
-
-
- 3,990.00
399.00
4,389.00
4,389.00
-
-
- 351,200.00
35,120.00
386,320.00
386,320.00
75,000.00
75,000.00 83,900.00
8,390.00
92,290.00
92,290.00
265,000.00
1,080.00
2,500.00
268,580.00 463,680.00
46,368.00
510,048.00
510,048.00
45,600,000.00
21,600.00
75,000.00
182,952.00
68,040.00
45,947,592.00 46,571,592.00
4,657,159.20
51,228,751.20
51,228,751.00
334,620.00
2,700,000.00
168,000.00
210,000.00
44,980.00
3,457,600.00 4,144,600.00
414,460.00
4,559,060.00
4,559,060.00
- 8,120.00
812.00
8,932.00
8,932.00
- 10,832.60
1,083.26
11,915.86
11,915.00
- 16,250.00
1,625.00
17,875.00
17,875.00
- 19,850.00
1,985.00
21,835.00
21,835.00
- 19,850.00
1,985.00
21,835.00
21,835.00
-
-
- 52,500.00
5,250.00
57,750.00
57,750.00
-
-
-
-
-
- 148,575.00
14,857.50
163,432.50
163,432.00
-
-
- 1,820.00
182.00
2,002.00
2,002.00
-
-
- 3,640.00
364.00
4,004.00
4,004.00
- 55,000.00
- 85,000.00
8,500.00
93,500.00
93,500.00
-
-
-
-
- 13,687.50
1,368.75
15,056.25
15,056.00
- 85,000.00
8,500.00
93,500.00
93,500.00
18,400.00
3,600.00
22,000.00 27,640.00
2,764.00
30,404.00
30,404.00
18,400.00
3,600.00
22,000.00 27,640.00
2,764.00
30,404.00
30,404.00
49,500.00
450.00
49,950.00 263,530.00
26,353.00
289,883.00
289,883.00
240,000.00
492,000.00
4,800.00
736,800.00 897,400.00
89,740.00
987,140.00
987,140.00
38,400.00
14,850.00
180.00
53,430.00 77,990.00
7,799.00
85,789.00
85,789.00
913,920.00
1,155,589.00 1,254,989.00
125,498.90
1,380,487.90
1,380,487.00
232,500.00
232,500.00 410,700.00
41,070.00
451,770.00
451,770.00
63,000.00
63,000.00 125,920.00
12,592.00
138,512.00
138,512.00
80,600.00
80,600.00 148,200.00
14,820.00
163,020.00
163,020.00
38,900.00
38,900.00 181,900.00
18,190.00
200,090.00
200,090.00
29,700.00
60,000.00
1,800.00
91,500.00 97,644.00
9,764.40
107,408.40
107,408.00
118,800.00
554,800.00
5,100.00
678,700.00 685,750.00
68,575.00
754,325.00
754,325.00
50,600.00
225,000.00
8,100.00
283,700.00 295,970.00
29,597.00
325,567.00
325,567.00
135,000.00
135,000.00 185,100.00
18,510.00
203,610.00
203,610.00
284,142.00
284,142.00 771,918.61
77,191.86
849,110.47
849,110.00
-
-
-
-
-
- 44,900.00
1,381.54
138.15
1,519.69
1,519.00
-
-
-
- 44,900.00
4,490.00
49,390.00
49,390.00
ium komposit.
-
-
-
- 238,810.00
23,881.00
262,691.00
262,691.00
-
-
-
- -
-
-
-
-
-
- -
-
-
-
-
-
-
- 14,300.00
1,430.00
15,730.00
15,730.00
-
-
-
-
- 238,810.00
23,881.00
262,691.00
262,691.00
-
-
-
- 141,700.00
14,170.00
155,870.00
155,870.00
-
-
-
-
-
-
-
-
- 185,900.00
18,590.00
204,490.00
204,490.00
- 8,390.00
839.00
9,229.00
9,229.00
83,600.00
95,311.58
78,936.00
257,847.58 272,147.58
27,214.76
299,362.34
299,362.00
83,600.00
1,057.50
18,000.00
102,657.50 117,057.50
11,705.75
128,763.25
128,763.00
91,300.00
160,000.00
322,000.00
573,300.00 601,000.00
60,100.00
661,100.00
661,100.00
105,000.00
661.25
23,000.00
9,000.00
137,661.25 161,861.25
16,186.13
178,047.38
178,047.00
-
991.88
336,960.00
1,637.50
339,589.38 380,839.38
38,083.94
418,923.31
418,923.00
-
991.88
336,960.00
1,637.50
339,589.38 380,839.38
38,083.94
418,923.31
418,923.00
Analisa Konstruksi - 390
Bahan Jumlah
(4) (5)
-
991.88
129,600.00
1,637.50
132,229.38 173,479.38
17,347.94
190,827.31
190,827.00
-
991.88
96,000.00
1,637.50
98,629.38 139,879.38
13,987.94
153,867.31
153,867.00
-
991.88
86,400.00
1,637.50
89,029.38 130,279.38
13,027.94
143,307.31
143,307.00
-
991.88
100,800.00
1,637.50
103,429.38 144,679.38
14,467.94
159,147.31
159,147.00
-
991.88
666,900.00
1,965.00
669,856.88 704,506.88
70,450.69
774,957.56
774,957.00
-
991.88
256,500.00
1,637.50
259,129.38 293,779.38
29,377.94
323,157.31
323,157.00
-
991.88
190,000.00
1,637.50
192,629.38 227,279.38
22,727.94
250,007.31
250,007.00
-
991.88
171,000.00
1,637.50
173,629.38 208,279.38
20,827.94
229,107.31
229,107.00
-
991.88
199,500.00
1,637.50
202,129.38 236,779.38
23,677.94
260,457.31
260,457.00
1,200,000.00
2,475,000.00
3,675,000.00 4,113,500.00
367,500.00 411,350.00
41,135.00
452,485.00
452,485.00
111,500.00
111,500.00 256,925.00
25,692.50
282,617.50
282,617.00
135,000.00
135,000.00 290,520.00
29,052.00
319,572.00
319,572.00
11,500.00
11,500.00 156,920.00
15,692.00
172,612.00
172,612.00
27,500.00
1,057.50
18,000.00
46,557.50 60,957.50
6,095.75
67,053.25
67,053.00
16,500.00
1,057.50
18,000.00
35,557.50 49,957.50
4,995.75
54,953.25
54,953.00
37,400.00
1,057.50
18,000.00
56,457.50 70,857.50
7,085.75
77,943.25
77,943.00
- 54,000.00
5,400.00
59,400.00
59,400.00
15,000.00
15,000.00 54,450.00
5,445.00
59,895.00
59,895.00
10,000.00
10,000.00 48,475.00
4,847.50
53,322.50
53,322.00
60,000.00
60,000.00 98,250.00
9,825.00
108,075.00
108,075.00
22,000.00
22,000.00 35,500.00
3,550.00
39,050.00
39,050.00
300.00
300.00 9,300.00
930.00
10,230.00
450.00
450.00 19,350.00
1,935.00
21,285.00
21,285.00
2,500.00
2,500.00 16,000.00
1,600.00
17,600.00
17,600.00
750.00
750.00 14,250.00
1,425.00
15,675.00
15,675.00
15,500.00
15,500.00 60,500.00
6,050.00
66,550.00
66,550.00
10,000.00
10,000.00 28,000.00
2,800.00
30,800.00
30,800.00
11,000.00
11,000.00 56,000.00
5,600.00
61,600.00
61,600.00
23,000.00
23,000.00 32,000.00
3,200.00
35,200.00
35,200.00
10,000.00
10,000.00 64,000.00
6,400.00
70,400.00
70,400.00
20,000.00
20,000.00 42,500.00
4,250.00
46,750.00
46,750.00
4,400.00
4,400.00 17,900.00
1,790.00
19,690.00
19,690.00
38,500.00
38,500.00 52,000.00
5,200.00
57,200.00
57,200.00
10,230.00
10,230.00 25,077.50
2,507.75
27,585.25
27,585.00
38,500.00
38,500.00 61,000.00
6,100.00
67,100.00
67,100.00
9,900.00
9,900.00 23,400.00
2,340.00
25,740.00
25,740.00
137,500.00
137,500.00 151,000.00
15,100.00
166,100.00
166,100.00
11,000.00
11,000.00 25,847.50
2,584.75
28,432.25
28,432.00
16,500.00
16,500.00 30,000.00
3,000.00
33,000.00
33,000.00
9,350.00
9,350.00 22,850.00
2,285.00
25,135.00
25,135.00
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
CAT
1 Cat kayu se kualitas Avian kg 52,500
2 Cat kayu se kualitas Emco biasa kg 53,000
3 Cat kayu se kualitas Emco Bintang kg 68,500
4 Cat kayu se kualitas Par kg 12,000
5 Cat besi se kualitas Patna kg 15,000
6 Cat besi se kualitas Emco biasa kg 45,000
7 Cat besi se kualitas Emco Bintang kg 58,000
8 Cat kayu se kualitas Avian kg 45,000
9 Cat tembok/cat semen Maxilite 5 kg 63,500
10 Cat tembok/cat emulsi dasar minyak Express kg 20,000
11 Cat tembok/cat polivynyl asetat Dulux 2,5 ltr 125,000
12 Cat tembok/cat kilap/cat acrilyc Dulux 2,5 Ltr 134,000
13 Cat ICI Catylac 5 kg 105,500
14 Cat Tembok Catylac Biasa 5kg 130,000
15 Cat Tembok Catylac Bintang 5kg 140,000
16 Cat Tembok Vinilex Dalam 2,5kg 135,000
17 Cat Tembok Vinilex Luar 2,5kg 270,000
18 Cat Tembok Dulux Dalam 2,5 kg 134,000
19 Cat Tembok Dulux Luar 2,5 kg 224,000
20 Cat tembok se kualitas Decolith 5kg 93,500
21 Cat Sintex kg 8,500
22 Cat dasar meni besi type A (cepat kering) Jago kg 26,000
23 Cat dasar meni besi type A (cepat kering) Par kg 25,000
24 Cat dasar meni kayu Jago kg 26,000
25 Cat duco kg 55,000
26 Cat genteng air ICI weathershield kg 75,000
27 Cat dasar undercoat / alkali resisiting primer 2,5 ltr 105,000
28 Cat dinding weathershield Dulux 2,5 ltr 224,000
29 Cat dasar kayu, besi dan genteng kg 32,500
30 Cat meni kayu, besi dan genteng kg 32,500
31 Cat Besi kg 45,000
32 Cat Brom kg 47,500
33 Dempul kayu typa A (putih) alfa + kg 31,000
34 Dempul lilin / kayu bj 10,250
35 Dempul Kayu woodfiler lmpra kg 31,500
36 Plamur Fuji 5 kg 115,000
37 Plamur kayu Jago kg 26,000
38 Plamur tembok acrilyc RG London kg 15,000
39 Plamur jenis sirlak kuning ltr 24,500
40 Sirlak putih batangan kg 77,000
41 Sirlak kuning serbuk kg 309,000
42 Oker kuning kg 20,000
43 Oker hitam kg 17,000
44 Oker pewarna politur merah / coklat bks 2,000
45 Kalkarium kg 30,000
46 Politur Propan kg 55,000
47 Teak Oil Propan ltr 46,000
48 Pernis Kayu ltr 55,000
49 Glass Blit Impra Propan ltr 15,600
50 Thermo plastik / cat marka Avian kg 61,000
51 Cat rettar kg 17,500
52 Terpentin ltr 20,000
53 Minyak cat ltr 20,000
54 Thinner ltr 15,500
55 Spiritus ltr 10,000
56 Batu kambang kg 45,000
57 Cat meni besi sinkromat kg 32,500
58 Thermo plastik / cat marka (putih) Avian kg 61,500
59 Thermo plastik / cat marka (kuning) Avian kg 62,000
60 Thermo plastik / cat marka (merah) Avian kg 62,000
Bahan - 401
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
KUAS
1 Kuas roll bh 27,500
2 Kuas ukuran 3" Toho bh 14,000
3 Kuas ukuran 2,5" Toho bh 9,000
4 Kuas 5" Toho bh 29,500
5 Kuas 2" Toho bh 7,000
6 Kuas ukuran kecil 1" Toho bh 4,000
BAHAN LAINNYA
1 Soda api kg 15,000
2 Sabun deterjen kg 12,600
3 Amplas lbr 3,500
4 Prodo Mas m2 3,050,000
5 Kertas 100 x 100 cm lbr 2,000
6 Karbon lbr 3,800
7 Alumunium C kg -
8 Alumunium B kg -
PERALATAN SANITASI
A. BAK MANDI
1 Bak mandi teraso uk. 50x50x50 cm bh 178,000
2 Bak mandi teraso uk. 60x60x60 cm bh 205,000
3 Bak mandi teraso uk. 90x80x80 cm bh 265,000
4 Bak mandi (bathtube) dengan shower lux bh 4,065,000
5 Bak mandi (bathtube) standar hurlay bh 4,100,000
6 Bak mandi fiber glass 0,30 m3 bh 320,000
7 Bak mandi fiber glass 0,50 m3 bh 995,000
B. KLOSET
1 Kloset jongkok porselin type CE7 Toto bh 340,000
2 Kloset jongkok porselin type CE8 standar bh 190,000
3 Kloset jongkok putih INA bh 145,000
4 Kloset jongkok warna INA bh 165,000
5 Kloset duduk standar / porselin ( dengan tangki KIA bh 1,095,000
6 standart) "Lolo"
Kloset duduk porselin lux ( dengan tangki "Toto" ) bh 1,950,000
7 Kloset duduk putih dengan tangki "Toto" set 3,700,000
8 Kloset duduk warna dengan tangki "Toto" set 3,700,000
9 Kloset duduk putih dengan tangki "KIA" set 1,419,000
10 Kloset duduk warna dengan tangki "KIA" set 1,650,000
11 Kloset duduk lengkap INA bh 1,139,000
12 Kloset jongkok bh 95,000
13 Kloset jongkok standar / keramik bh 126,500
14 Kloset jongkok teraso bh 82,000
C. WASTAFEL
1 Wastafel standar INA bh 219,000
2 Wastafel lux INA bh 520,000
3 Wastafel putih (Morgan) set 500,000
4 Wastafel warna (Morgan) set 700,000
5 Badkip bh 250,000
6 Bak cuci stainless steel bh 315,000
7 Water drain + asesories set 65,000
D. URINOIR
1 Urinoir standar TOTO U 57 set 2,750,000
2 Urinoir putih American Standard set 1,970,000
4 Urinoir warna (KIA) set 636,000
5 Meja cuci dapur 125 x 50 cm bh 319,000
6 Tempat sabun tunggal bh 16,000
7 Kran air Wastafel AR 1/2" bh 400,000
8 Seal tape bh 3,000
9 Floordrain bh 75,000
Bahan - 402
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
B. GENTENG
1 Genteng beton besar natural 1m 9 biji bh 4,500
2 Genteng beton besar warna 1m 9 biji bh 5,250
3 Genteng beton kecil natural 1m 11 biji bh 3,700
4 Genteng beton kecil warna 1m 11 biji bh 4,850
5 Genteng beton kecil natural 1m 20 biji bh 2,500
6 Genteng beton kecil warna 1m 20 biji bh 4,500
7 Genteng bubungan beton bh 5,250
8 Genteng Wuwung warna bh 7,500
9 Nok press beton bh 6,000
10 Genteng Beton Besar bh 4,000
11 Genteng Beton Kecil bh 3,500
12 Genteng Aspal ex.Onduline lbr 145,000
Bahan - 403
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Bahan - 404
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
LANTAI
A. KERAMIK BERMOTIF
1 Tegel keramik Roman Bella (20 x 25) dos 67,000
2 Tegel keramik Roman Bella (10 x 25) dos 56,000
3 Tegel keramik Roman Alice (20 x 20) dos 72,000
4 Tegel keramik Roman Latanza (20 x 25) dos 82,000
5 Tegel keramik Roman Latanza (8 x 20) bj 21,250
6 Tegel keramik Roman Tulip (20 x 25) dos 64,000
7 Tegel keramik Roman Tulip (8 x 20) bj 15,250
8 Tegel keramik Roman Milano (20 x 25) dos 67,000
9 Tegel keramik Roman Milano (8 x 20) bj 21,700
10 Sablon/Antik 20/20 m2 128,250
11 Marblon/Kembang ukuran tipe 20/20 m2 45,700
12 Marblon/Kembang ukuran tipe 30/30 m2 52,300
13 Marblon/Kembang plint ukuran tipe 20/20 bh 2,200
14 Marblon/Kembang plint ukuran tipe 15/20 bh 1,700
15 Marblon/Kembang plint ukuran tipe 10/20 bh 1,200
16 Marblon/Kembang plint ukuran tipe 30/30 bh 5,200
17 Marblon/Kembang plint ukuran tipe 15/30 bh 2,840
18 Marblon/Kembang plint ukuran tipe 10/30 bh 2,000
Bahan - 405
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
C. ZENITH
1 Tegel Keramik Essensa m2 350,000
(Celestial White, Luna Grey, Solar Gold)
2 Tegel Keramik Essensa m2 370,000
(Celestial White, Luna Grey, Solar Gold)
3 Tegel Keramik Essensa m2 370,000
(Celestial White, Luna Grey, Solar Gold)
4 Tegel Keramik Essensa m2 400,000
(Aurora Green, Eclipse Black, Horizon Blue, Meteor Brown,
Nova Red)
5 Tegel Keramik Essensa m2 412,000
(Aurora Green, Eclipse Black, Horizon Blue, Meteor Brown,
Nova Red)
6 Tegel Keramik Essensa m2 412,500
(Aurora Green, Eclipse Black, Horizon Blue, Meteor Brown,
Nova Red)
D. TRAVERTINE
1 Tegel Keramik Essensa m2 300,000
(Daisy, Gladiola, Lily, Salvia)
2 Tegel Keramik Essensa m2 340,000
(Daisy, Gladiola, Lily, Salvia)
3 Tegel Keramik Essensa m2 337,350
(Daisy, Gladiola, Lily, Salvia)
4 Tegel Keramik Essensa m2 330,000
(Ebony, Maple, Rosemary)
5 Tegel Keramik Essensa m2 378,000
(Ebony, Maple, Rosemary)
6 Tegel Keramik Essensa m2 377,500
(Ebony, Maple, Rosemary)
E. MARBLE
1 Tegel Keramik Essensa m2 337,000
(Alexandra, Calamus)
2 Tegel Keramik Essensa m2 337,000
(Alexandra, Calamus)
F. LAVAGNA
1 Tegel Keramik Essensa m2 250,000
(Magnetite, Pietra di Luna)
2 Tegel Keramik Essensa m2 250,000
(Adameello, Gran Sasso, Marmolada, Monte Rosa, Pardoi)
G. DOMUS
1 Tegel Keramik Essensa m2 195,500
(Crono, Eros, Zeus)
2 Tegel Keramik Essensa m2 225,000
(Crono, Eros, Zeus)
3 Tegel Keramik Essensa m2 240,500
(Crono, Eros, Zeus)
4 Tegel Keramik Essensa m2 205,000
(Calisto, Ermes, Nitto)
5 Tegel Keramik Essensa m2 240,000
(Calisto, Ermes, Nitto)
6 Tegel Keramik Essensa m2 248,000
(Calisto, Ermes, Nitto)
H. GRANITI IMPERIALI
1 Tegel Keramik Essensa m2 195,900
(Balmoral Red, Beola Grey, Bianco Crystal, Green Forest,
Grigorio Perla, Impala Black, Kashmir White)
2 Tegel Keramik Essensa m2 226,250
(Balmoral Red, Beola Grey, Bianco Crystal, Green Forest,
Grigorio Perla, Impala Black, Kashmir White)
Bahan - 406
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
I. ISOLATOR
1 Isolator keramik bentuk rol bh 11,000
2 Isolator keramik bentuk T - I bh 2,500
3 Isolator keramik bentuk sungkup bh 2,500
J. TEGEL / KERAMIK
1 Tegel/Ubin teraso 30/30 m2 40,000
2 Tegel abu-abu 11/11 m2 47,900
3 Tegel abu-abu 15/15 m2 44,800
4 Tegel abu-abu 20/20 m2 40,000
5 Ubin semen kelabu rata 20/20 m2 22,800
6 Ubin semen kelabu rata 30/30 m2 34,750
7 Ubin semen berwarna satu rata 20/20 m2 26,400
8 Tegel warna 11/11 m2 57,900
9 Tegel warna 15/15 m2 52,000
10 Tegel warna 20/20 m2 35,000
11 Tegel abu-abu 30/30 m2 37,000
12 Plint tegel abu-abu 15/20 bh 1,000
13 Tegel warna 20/20 m2 35,000
14 Tegel warna 30/30 m2 44,000
15 Plint tegel abu-abu 11/11 bh 1,500
16 Plint tegel abu-abu 15/15 bh 2,300
17 Plint tegel abu-abu 20/20 bh 1,700
18 Plint tegel abu-abu 30/30 bh 4,100
19 Plint tegel abu-abu 15/30 bh 2,750
20 Plint tegel abu-abu 10/20 bh 750
21 Plint tegel abu-abu 10/30 bh 1,500
22 Plint tegel warna 10/20 bh 3,300
23 Plint tegel warna 10/30 bh 8,500
24 Plint tegel warna 11/11 bh 1,750
25 Plint tegel warna 15/15 bh 2,400
26 Plint tegel warna 20/20 bh 2,750
27 Plint tegel warna 15/20 bh 2,500
28 Plint tegel warna 30/30 bh 5,100
29 Plint tegel warna 15/30 bh 3,150
30 Tegel porselin 11/11 m2 42,000
31 Tegel keramik 10/20 berglasir m2 42,000
32 Tegel keramik 20/20 berglasir m2 42,000
33 Tegel keramik 30/30 berglasir m2 47,000
34 Tegel keramik 20/25 m2 46,500
35 Tegel keramik 40/40 berglasir m2 52,000
36 Keramik Putih 30/30 m2 37,000
37 Tegel keramik standar ( MULIA) 20/20 dan 30/30 m2 48,000
38 Tegel keramik mosaik m2 61,200
39 Stepnosing granito bh 12,000
40 List keramik dinding motif 5/20 bh 10,000
41 Plint keramik 10 x 30 bh 3,000
42 Keramik dinding 20/25 m2 45,000
43 Tegel/Ubin teraso 40/40 m2 45,000
44 Bahan cor teraso m 3
45 Batu teraso kg
46 Tegel abu-abu 40/40 m2 38,000
47 Tegel warna 40/40 m 2
40,000
48 Plint tegel abu-abu 10/40 bh 2,000
49 Plint tegel warna 10/40 bh 2,000
50 Plint ubin teraso 10/40 bh
51 Plint ubin teraso 10/30 bh
52 Plint ubin granit 10/40 bh
53 Plint ubin granit 10/30 bh
Bahan - 407
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
PIPA
1 Pipa beton 20 x 30 panjang 1 m m 37,500
2 Pipa beton tanpa tulangan dia. 20 cm panjang 1 m m 35,000
3 Pipa beton tanpa tulangan dia. 30 cm panjang 1 m m 42,500
4 Pipa beton tanpa tulangan dia. 60 cm panjang 0,5 m m 52,500
5 Pipa beton tanpa tulangan dia. 80 cm panjang 0,5 m m 55,000
6 Pipa beton tanpa tulangan 1/2 dia. 20 cm m 20,000
Bahan - 408
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Bahan - 409
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
KERB TAMAN
1 Devider Mutiara m 140,000
2 Devider /kans teen tebal 30 Mutiara m 45,000
3 Devider /kans teen tebal 25 Mutiara m 40,000
4 Devider /kans teen tebal 20 Mutiara bh 35,000
5 Devider /kans teen tebal 15 Mutiara bh 25,000
6 Ram ukuran tipe 65 x 20 x 30 bh 53,000
7 Ramp ( terpasang ) bh 56,000
8 Devider terpasang bh 60,000
9 Kerb terpasang bh 55,000
10 Kerb ukuran tipe 60 x 32 x 35 bh 51,000
11 Kerb ukuran tipe 50 x 31 x 35 bh 50,000
12 Kerb ukuran tipe 50 x 35 x 15 bh 25,000
13 Kerb ukuran tipe 50 x 20 x 20 bh 25,000
14 Kerb ukuran tipe 50 x 30 x 15 bh 25,000
15 Kerb ukuran tipe 40 x 20 x 15 bh 10,000
16 Kerb ukuran tipe 40 x 40 x 42 bh 45,000
17 Kerb ukuran tipe 40 x 35 x 15 bh 20,000
18 Kerb ukuran tipe 50 x 30 x (30/18) bh 57,000
19 Ukuran tipe 5 x 30 x 10 bh 25,000
Bahan - 410
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
PERGOLA 1 UNIT ( 6 m)
A Konstruksi Pergola
1 Pipa Besi Galvanis 3" 12 m 1,020,000
2 Pipa Besi Galvanis 2" 24 m 1,080,000
3 Strip Plat 7 mm 3 m 591,000
4 Besi Ulir D 16 161,16 kg 1,450,440
5 Kasa Wiremess 4 mm 12,6 m2 315,000
6 Pipa Besi Galvanis 3/4" 12 unit 540,000
7 Bola-bola Pipa 1 unit 175,000
B Pemotongan dan Las unit 725,000
C Pengecatan unit 250,000
D Pasangan
1 Galian tanah 0,4 m 11,625,000
2 Pondasi ( cor beton ) 0,4 m 256,000
3 Pasang Pergola unit 250,000
E Tanaman Stifora 2 batang 100,000
F Bongkaran 1 m 50,000
C.11 BRONJONG dan KAWAT ANYAM (mesh 8 cm x 10 cm)
C.11.1 BRONJONG
A Galvanis 2,7 mm
Ukuran 2,0 m x 1,0 m x 0,5 m unit 280,000
Ukuran 3,0 m x 1,0 m x 0,5 m unit 808,000
Ukuran 3,0 m x 1,5 m x 0,5 m unit 942,000
Ukuran 4,0 m x 1,0 m x 0,5 m unit 1,033,000
Ukuran 1,5 m x 1,0 m x 1,0 m unit 604,000
Ukuran 2,0 m x 1,0 m x 1,0 m unit 805,000
Ukuran 3,0 m x 1,0 m x 1,0 m unit 1,150,000
Ukuran 4,0 m x 1,0 m x 1,0 m unit 1,552,500
B Galvanis 3,00 mm
Ukuran 2,0 m x 1,0 m x 0,5 m unit 607,000
Ukuran 3,0 m x 1,0 m x 0,5 m unit 898,000
Ukuran 3,0 m x 1,5 m x 0,5 m unit 124,000
Ukuran 4,0 m x 1,0 m x 0,5 m unit 118,000
Ukuran 1,5 m x 1,0 m x 1,0 m unit 688,000
Ukuran 2,0 m x 1,0 m x 1,0 m unit 917,000
Ukuran 3,0 m x 1,0 m x 1,0 m unit 1,333,000
Ukuran 4,0 m x 1,0 m x 1,0 m unit 1,749,000
C Galvanis dan PVC Coating 2,7 mm
Ukuran 2,0 m x 1,0 m x 0,5 m unit 562,000
Ukuran 3,0 m x 1,0 m x 0,5 m unit 842,000
Ukuran 3,0 m x 1,5 m x 0,5 m unit 1,172,700
Ukuran 4,0 m x 1,0 m x 0,5 m unit 1,102,000
Ukuran 1,5 m x 1,0 m x 1,0 m unit 678,000
Ukuran 2,0 m x 1,0 m x 1,0 m unit 865,500
Ukuran 3,0 m x 1,0 m x 1,0 m unit 1,245,000
Ukuran 4,0 m x 1,0 m x 1,0 m unit 1,621,800
C.11.2 KAWAT ANYAM
A Kawat Anyam 2,7 mm
Ukuran 5,0 m x 2 ,0 m unit 3,630,000
B Kawat Anyam dan PVC Coating 2,7 mm
Ukuran 5,0 m x 2 ,0 m unit 6,485,971
A. KAYU JATI
1 Kayu jati balok 8/12 ( klas plitur ) m3 31,000,000
2 Kayu jati papan m3 35,100,000
3 Balok kayu kelas I ukuran 8/12 m1 140,000
4 Balok kayu kelas I ukuran 8/10 m1 110,000
5 Balok kayu kelas I ukuran 6/12 m 1
160,000
6 Balok kayu kelas I ukuran 6/10 m1 150,000
7 Balok kayu kelas I ukuran 6/8 m 1
144,000
8 Bingkai kayu kelas I ukuran 5/7 m1 30,000
9 Bingkai kayu kelas I ukuran 4/6 m 1
21,000
10 Bingkai kayu kelas I ukuran 3/4, 3/5 m1 37,000
11 Bingkai kayu kelas I ukuran 2/3 m1 3,000
12 Papan kayu kelas I ukuran 3/20 m1 250,000
Bahan - 411
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
B. KAYU KAMPER
1 Kayu kamper balok m3 9,000,000
2 Kayu kamper papan m3 10,000,000
3 Balok kayu kelas I ukuran 8/12 m1 85,000
4 Balok kayu kelas I ukuran 8/10 m1 45,000
5 Balok kayu kelas I ukuran 6/12 m 1
62,500
6 Balok kayu kelas I ukuran 6/10 m1 40,000
7 Balok kayu kelas I ukuran 6/8 m 1
35,000
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1 21,600
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m 1
21,250
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1 10,000
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m 1
3,000
12 Papan kayu kelas I ukuran 2/15 m1 35,000
13 Papan kayu kelas I ukuran 2/20 m1 40,000
14 Papan kayu kelas I ukuran 2/25 m1 60,000
15 Papan kayu kelas I ukuran 3/18 m 1
72,000
16 Papan kayu kelas I ukuran 3/20 m1 75,000
17 Papan kayu kelas I ukuran 3/30 m 1
110,000
18 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 3,000
19 Lis Dan jalusi kayu kelas I ukuran 1/5 m 1
5,000
20 Lis Dan jalusi kayu kelas I ukuran 2/4 m1 6,500
Bahan - 412
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
C. KAYU BENGKIRAI
1 Kayu bengkirai balok m3 10,000,000
2 Kayu bengkirai papan m 3
10,500,000
3 Balok kayu kelas I ukuran 8/12 m1 100,000
4 Balok kayu kelas I ukuran 8/10 m 1
45,000
5 Balok kayu kelas I ukuran 6/12 m1 75,000
6 Balok kayu kelas I ukuran 6/10 m 1
40,000
7 Balok kayu kelas I ukuran 6/8 m1 35,000
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m 1
30,000
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1 21,250
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1 10,000
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m 1
3,000
12 Papan kayu kelas I ukuran 2/15 m1 35,000
13 Papan kayu kelas I ukuran 2/20 m1 46,250
14 Papan kayu kelas I ukuran 2/25 m1 60,000
15 Papan kayu kelas I ukuran 3/18 m 1
72,000
16 Papan kayu kelas I ukuran 3/20 m1 75,000
17 Papan kayu kelas I ukuran 3/30 m 1
110,000
18 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 3,000
19 Lis Dan jalusi kayu kelas I ukuran 1/5 m 1
5,000
20 Lis Dan jalusi kayu kelas I ukuran 2/4 m1 10,000
D. KAYU KRUING
1 Kayu kruing balok m3 8,000,000
2 Kayu kruing papan m3 9,000,000
3 Balok kayu kelas I ukuran 8/12 m 1
62,500
4 Balok kayu kelas I ukuran 8/10 m1 45,000
5 Balok kayu kelas I ukuran 6/12 m 1
46,250
6 Balok kayu kelas I ukuran 6/10 m1 40,000
7 Balok kayu kelas I ukuran 6/8 m 1
35,000
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1 25,000
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m 1
20,000
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1 10,000
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m 1
3,000
12 Papan kayu kelas I ukuran 2/15 m1 35,000
13 Papan kayu kelas I ukuran 2/20 m1 28,750
14 Papan kayu kelas I ukuran 2/25 m1 60,000
15 Papan kayu kelas I ukuran 2/30 m 1
40,500
16 Papan kayu kelas I ukuran 3/18 m1 72,000
17 Papan kayu kelas I ukuran 3/20 m 1
50,000
18 Papan kayu kelas I ukuran 3/25 m1 50,000
19 Papan kayu kelas I ukuran 3/30 m1 110,000
20 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 3,000
21 Lis Dan jalusi kayu kelas I ukuran 1/5 m 1
5,000
22 Lis Dan jalusi kayu kelas I ukuran 2/4 m1 5,500
Bahan - 413
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
BAHAN TUMBUHAN
1 Bambu petung btg 50,000
2 Bambu wulung btg 15,000
3 Bambu apus btg 10,000
4 Gedek bambu kulit m2 80,000
5 Gedek bambu daging m2 40,000
6 Ijuk m3 75,000
7 Ijuk kg 5,000
8 Alang-alang ikat 10,000
Bahan - 414
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
B. KAWAT
1 Kawat beton / bindrat kg 12,000
2 Kawat ayakan m2 15,000
3 Kawat bronjong kg 34,000
4 Kawat nyamuk m2 18,000
5 Kawat nyamuk Baja m2 25,000
6 Kawat las kg 26,000
7 Kawat galvanis kg 20,000
8 Kawat anyam galvanis kg 22,000
9 Kawat duri kg 14,000
10 Besi jaring kawat baja kg 12,500
11 Kawat seng polos kg 20,000
12 Kawat kassa m2 33,500
13 Kawat burung m2 15,700
14 Kawat jaring lbr 36,500
15 Kawat harmonika m2 26,500
16 Kawat penggantung rangka hollow m1 1,000
Bahan - 415
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
SENG BJLS
1 Seng BJLS 0,20 gelombang P = 180 cm lbr 37,000
2 Seng BJLS 0,20 gelombang P = 210 cm (merk Fumira) lbr 45,000
3 Seng BJLS 0,20 gelombang P = 240 cm lbr 49,000
4 Seng BJLS 0,20 gelombang P = 300 cm lbr 61,000
5 Seng BJLS 0,28 lembaran 45 cm lebar m1 19,000
6 Seng BJLS 0,28 lembaran 53 cm lebar m 1
23,000
7 Seng BJLS 0,20 lembaran 90 cm lebar m1 24,000
8 Seng BJLS 0,30 lembaran 45 cm lebar m 1
19,000
9 Seng BJLS 0,30 lembaran 53 cm lebar m1 24,000
10 Seng BJLS 0,30 lembaran 60 cm lebar m1 24,000
11 Seng BJLS 0,30 lembaran 90 cm lebar m1 30,500
12 Seng plat 3" x 6" BJLS 28 lbr 47,000
13 Seng plat 3" x 6" BJLS 24 lbr 42,000
14 Seng gelombang 2" - 5" BJLS 24 lbr 27,000
Bahan - 416
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
PAKU
1 Paku gording 125 x 5,1 mm kg 11,000
2 Paku gording 100 x 4,2 mm kg 11,000
3 Paku usuk 80 x 3,8 mm kg 11,000
4 Paku reng 55 x 3,1 mm kg 11,000
5 Paku plepet 40 x 2,1 mm kg 16,000
6 Paku eternit 20 x 1,5 mm kg 17,000
7 Angkur / baut bh 6,000
8 Baut Baja kg 18,500
9 Paku besar, sedang kg 11,000
10 Paku Payung Ulir kg 25,000
11 Paku Payung Biasa 22,000
12 Paku Beton 5 cm bh 300
13 Paku kait bh 9,000
14 Paku pancing bh -
15 Paku pancing kg 10,000
16 Paku asbes bh 500
17 Paku sumbat bh 450
18 Paku sekrup 3.5" bh 750
19 Paku skrup 1" GROSS 11,000
20 Paku gypsum kg 23,000
21 Paku hak panjang 15 cm kg 10,000
PENGGANTUNG / PENGUNCI
1 Engsel pintu bh 15,000
2 Engsel jendela bh 12,000
3 Grendel 2" bh 7,000
4 Grendel 3" bh 8,000
5 Grendel 4" bh 10,000
6 Hak angin bh 10,000
7 Selot pintu Union kecil bh 50,000
8 Selot pintu Union besar bh 60,000
9 Engsel angin bh 20,000
10 Kait angin bh 2,500
11 Door holder bh 15,500
12 Door stop bh 18,000
13 Penggantung + rel pintu dorong bh 180,000
14 Kunci tanam bh 45,000
15 Kunci tanam antik bh 125,000
Bahan - 417
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
B. AGREGAT
1 Agregat hakus/pasir klas A ( Uk. butir 5 mm ) m3 90,000
2 Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 ) m3 150,000
3 Agregat kasar/krikil/pasir klas B ( Uk. 4 - 19 ) m3 150,000
4 Batu pecah 2/3 ( split ) m3 250,000
5 Batu Split 1/2 m 3
250,000
6 Batu Jagung 0,5/1,00 kg 20,000
7 Batu pecah 2/3 m3 190,000
8 Batu pecah 10/15 m 3
190,000
9 Batu pecah 3/4 m3 190,000
10 Batu pecah 4/6 m 3
190,000
11 Batu pecah 5/7 m3 190,000
12 Batu pecah 1/2 m 3
190,000
13 Batu belah 15/20 m3 90,000
14 Batu belah hitam m 3
110,000
15 Batu belah putih m3 80,000
16 Sirtu Klas A lewat ayakan 1" m 3
65,000
17 Sirtu klas B lewat ayakan 2" m3 65,000
18 Pasir urug darat m 3
100,000
19 Pasir pasang ( progo ) m3 190,000
20 Pasir pasang ( krasak ) m 3
180,000
21 Krikil beton biasa m3 200,000
22 Kerikil beton pecah m 3
250,000
23 Kerikil tidak tersaring m3 110,000
24 Split D 30 - 40 mm m 3
190,000
25 Split D 10 - 20 mm m3 190,000
26 Split D 1 - 2 cm m 3
250,000
27 Batu merah ( 5x11x23 ) bj 750
28 Batu merah ( 4x9x19 ) bj 550
29 Krokos 0,2/0,4 m3 110,000
30 Tanah urug m 3
100,000
Bahan - 418
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
31 Sirtu m3 100,000
32 Batako bh 3,000
33 Roster 25/25 bh 3,500
34 Roster 20/20 bh 3,500
35 Roster 10/20 bh 3,500
36 Roster terawang 12 x 11 x 24 bh 4,000
37 Bata berongga expose 5 x 11 x 24 bh 1,500
38 Hollow block 20 bh
39 Hollow block 15 bh
40 Hollow block 10 bh
41 Tanah liat m3 65,000
42 Pasir Silika kg 5,000
43 Bata pelapis dinding 3x7x24 cm bh 11,000
44 Panel beton pracetak lbr 231,000
45 Kolom beton pracetak btg 330,000
ASPAL
1 Aspal curah kg 9,000
2 Aspal drum kg 10,917
3 Aspal modifer / asphalt joint kg 65,000
4 Drum aspal bekas bh 9,529
5 Rubber Filler m1 11,340
6 Mata Kucing bh 248,325
7 Filler kg 1,269
8 Aspal Emulsi Type CRS-2 kg 9,000
9 Aspal Emulsi Type CRS-1 kg 9,000
10 Aspal Emulsi Type CRS-1 Polymer kg 10,000
11 Aspal Panas kg 9,000
Bahan - 419
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
BAHAN KACA
1 Genteng kaca lengkung cekung 3 mm bh 7,500
2 Genteng kaca lengkung cekung 5 mm bh 9,000
3 Genteng kaca lengkung rata 3 mm bh 8,500
4 Genteng kaca lengkung rata 5 mm bh 9,500
5 Genteng kaca 3 mm bh 8,300
6 Genteng kaca 5 mm bh 9,300
7 Kaca buram/kaca es 3 mm m2 35,000
8 Kaca buram/kaca es 5 mm m 2
125,000
9 Genteng Kaca Paris bh 10,000
10 Genteng Kaca Kodok bh 15,000
11 Genteng Kaca Beton bh 25,000
12 Kaca bening 3 mm m2 75,000
13 Kaca bening 5 mm m 2
85,000
14 Kaca riben 3 mm m2 75,000
15 Kaca riben 5 mm m 2
110,000
16 Kaca cermin 3 mm m2 125,000
17 Kaca cermin 5 mm m2 175,000
18 kaca dark blue 5 mm m2 180,000
19 kaca dark green 5 mm lbr 180,000
20 Roof Light Fiberglass lbr 150,000
21 Kaca bening 8 mm m2 250,000
22 kaca polos 6 mm m2 120,000
23 kaca dark blue 6 mm m 2
220,000
24 kaca dark green 6 mm m2 220,000
25 kaca dark blue 8 mm m2 450,000
26 kaca dark green 8 mm m2 450,000
27 kaca polos 10 mm m2 300,000
28 Cermin 3mm 60"x48" (153cm x 122cm) 119,000
29 Cermin 5mm 60"x48" (153cm x 122cm) 182,000
30 Cermin 5mm 72"x48" (183cm x 122cm) 218,500
31 Cermin 5mm 96"x72" (244cm x 183cm) 437,000
Bahan - 420
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
BAHAN PLASTIK
1 Pipa PVC abu-abu dia. 1/2" Wavin btg 17,000
2 Pipa PVC abu-abu dia. 3/4" Wavin btg 24,000
3 Pipa PVC abu-abu dia. 1" Wavin btg 32,000
4 Pipa PVC abu-abu dia. 1 1/2" Wavin btg 55,000
5 Pipa PVC abu-abu dia. 2" Wavin btg 70,000
6 Pipa PVC abu-abu dia. 2 1/2" Wavin btg 90,000
7 Pipa PVC abu-abu dia. 3" Wavin btg 120,000
8 Pipa PVC abu-abu dia. 4" Wavin btg 200,000
9 Pipa PVC putih dia. 1/2" Wavin/magalone btg 17,000
10 Pipa PVC putih dia. 3/4" Wavin/mgalone btg 24,000
11 Pipa PVC putih dia. 1" Wavin btg 32,000
12 Pipa PVC putih medium dia. 3" Wavin btg 75,000
13 Pipa PVC putih tebal dia. 3" Wavin btg 135,000
14 Pipa PVC putih medium dia. 4" Wavin btg 114,000
15 Pipa PVC putih tebal dia. 4" Wavin btg 220,000
16 Atap plastik gelombang PVC (180 X 80) lbr 180,000
17 Kusen + pintu PVC unit 210,000
PENUTUP ATAP
1 Atap genteng keramik M-Class warna Natural bh 9,500
2 Asesories Atap genteng M-Class warna natural :
3 Hiasan akhir bh 24,500
4 Pemanas air bh 12,500
5 Nok genting beton bh 6,500
6 Nok stel gelombang lbr 55,000
7 nok genteng aspal lbr 84,000
8 nok genteng metal lbr 50,000
9 Penangkal petir bh 33,500
10 Lisplank kiri bh 58,000
11 Lisplank texture kayu bh 47,000
12 Lisplank papan klasiboard bh 52,500
13 genting aspal lbr 137,000
14 Material khusus parkir dg FG 300 gram/m2 m2 176,000
Bahan - 421
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Nusaboard (Imperial)
1 Nusaboar lbr 51,000
2 Nusaboard (Imperial) lbr 38,500
3 Nusaboard (Imperial) lbr 66,000
4 Nusaboard (Imperial) lbr 49,500
5 Nusaboard (Imperial) lbr 88,000
6 Nusaboard (Imperial) lbr 66,000
7 Nusaboard (Imperial) lbr 144,650
8 Nusaboard (Imperial) lbr 109,000
9 Nusaboard (Imperial) lbr 194,000
10 Nusaboard (Imperial) lbr 145,000
NUSAPLANK
1 Nusaplank lbr 28,400
2 Nusaplank lbr 52,600
3 Nusaplank lbr 46,200
4 Nusaplank lbr 45,500
5 Nusaplank lbr 71,000
6 Nusaplank lbr 81,500
7 Nusaplank lbr 88,500
8 Nusaplank lbr 132,500
Bahan - 422
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
GENTENG KERAMIK
TERREAL TERRACOTA
Jenis Romane Canal
1 Roman CaUnglazed bh 20,500
Natural bh 23,700
Tropical bh 25,500
2 Romane Unglazed bh 8,000
Natural bh 10,000
Tropical bh 12,000
3 Nok Unglazed bh 33,600
Natural bh 19,200
Tropical bh 29,200
4 Lisplank Unglazed bh 20,300
Natural bh 22,600
Tropical bh 33,500
5 Lisplank Unglazed bh 22,600
Natural bh 25,000
Tropical bh 33,500
6 Double lengkung lisplank kanan bh 35,100
bh 27,200
bh 44,100
7 Ujung jur Unglazed bh 49,100
Natural bh 55,000
Tropical bh 113,000
8 Ujung no Unglazed bh 76,100
Natural bh 55,000
Tropical bh 113,000
9 Nok 3 ar Unglazed bh 69,000
Natural bh 113,000
Tropical bh 131,000
10 Nok 2 ar Unglazed bh 131,000
Natural bh 115,000
Tropical bh 143,000
11 Nok 4 ar Unglazed bh 335,100
Natural bh 225,600
Tropical bh 367,000
Bahan - 423
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Bahan - 424
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
BAHAN PEMBANTU
1 Pasir putih m3 257,000
2 Pewarna khusus (Jade Green) kg 160,000
3 Pewarna Standart (Red, Yellow, Brawn, Black) kg 61,000
4 WBM Bonding Mix ltr 18,000
5 Waterproof ltr 18,000
6 Coating Heritage / Doff ltr 126,000
7 Coating Gloss / Semi Gloss ltr 66,000
8 Bahan Pembersih Batu/Wax Removal ltr 66,000
Bahan - 425
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Pintu Klasik
1 Single Pintu ukiran tembaga m2 890,000
Pintu ukiran aluminium m2 1,200,000
Pintu ukiran aluminium Teralis m2 3,117,500
2 Double Pintu ukiran Tembaga + Ukiran Aluminium trls m2 7,148,750
Pintu ukiran aluminium+ Ukiran Aluminium trls m2 6,342,500
Bahan - 426
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
LAIN-LAIN
1 Tiang bendera
-Pondasi umpak buah 33,500
-Ompak ornamen buah 70,000
-Tiang galvanis 3" m1 25,500
-Bendera 120 x 180 buah 115,000
2 Rambu lalu lintas (terpasang) buah 500,000
3 Papan nama jalan (terpasang) buah 262,500
4 Sumur peresapan 5 m buah 225,000
5 Air minum, instalasi dalam dengan pipa pralon 1" medium, ace m1 18,200
6 Air minum, instalasi luar dengan pipa pralon 1" medium, aceso m1 17,400
7 Minyak Flux liter 12,600
8 Asbuton kg 2,500
9 Tumpuan konstruksi m 70,000
10 Kerikil sungai - royalty m3 7,000
11 Batu gunung - royalty m3 7,000
12 Uji test besi ( 3 sampel tiap jenis diameter benda uji ) set 157,500
13 Uji test aspal ttk 105,000
14 Sewa alat sondir hr 105,000
15 Sewa Scaffolding unit 21,000
16 Benda uji silinder beton bh 3,200
17 Biaya tes beton per benda uji bh 5,250
18 Biaya analisis tes beton perbenda uji bh 15,750
19 Bambu batangan (apus) batang 12,000
20 Air ltr ~
21 Strorox kg -
22 Waterstop lebar 150 mm m1 -
23 Waterstop lebar 200 mm m1 -
24 Waterstop lebar 230 mm - 320 mm m 1
-
25 Gas oksigen 5 kg tb 18,000
26 Nipel bh 10,500
27 Pipa dia. 3/8" - 15 cm bh 1,575
28 Nitobond EC kg 105,000
29 Conbextra EP kg 210,000
30 Cebex 100 kg 157,500
31 Sewa Compressor untuk pekerjaan grouting hr 262,500
32 Sewa Mesin Grouting hr 157,500
33 Sewa mesin gerinda untuk pekerjaan grouting hr 105,000
34 Sewa mixer untuk pekerjaan grouting hr 6,300
35 Alat bantu pekerjaan grouting ls 5,250
36 Alat bantu pekerjaan pekerjaan expantion joint ls 136,500
37 Pelapisan kedap air lantai dengan coating ( terpasang ) m2 42,000
38 Pelapisan kedap air lantai dengan membran ( terpasang ) m2 63,000
39 Sewa alat perakitan baja Jam 250,000
40 Sewa Alat Ukur hr 200,000
41 Sewa Alat Las Jam 120,000
42 Sewa Mobil Tanki hr 300,000
43 Sewa Pompa Air hr 200,000
Bahan - 427
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
ALAT UKUR
1 Lux Meter Digital bh 3,250,000
2 Meger Analog bh 2,000,000
3 Meteran bulat Esen 5m bh 13,500
4 Multitester Analog sekualitas Sanwa bh 225,000
5 Multitester Digital bh 615,000
6 Tang Ampere Digital bh 801,000
7 OK meter bh 325,000
ARMATURE
1 Armature Kotak Sorot (Kosong) unit 650,000
2 Armature Simbat 40 W unit 93,000
3 Kap Aluminium E.27 bh 41,000
4 Kap Aluminium E.40 bh 56,500
5 Spot + F.MP bh 94,000
6 Armature Broadway MGP268/ 1XHPI-T 250W unit 4,200,000
7 Armature Broadway MGP268/ 1XHPI-T 400W unit 4,410,000
8 Armature Broadway SGP268/ 1XSON-T 150W unit 4,500,000
9 Armature Broadway SGP268/ 1XSON-T 250W unit 4,450,000
10 Armature Broadway SGP268/ 1XSON-T 400W unit 5,200,000
11 Armature CDM TT 150W / 83 unit 700,000
12 Armature con Tempo RVP250 MHN-TD 150W IC 220V-50HZ unit 1,700,000
13 Armature con Tempo RVP250 MHN-TD 70W IC 220V-50HZ unit 1,600,000
14 Armature con Tempo RVP250 SON-T 150W IC 220V-50HZ A unit 1,550,000
15 Armature con Tempo RVP250 SON-T 70W IC 220V-50HZ A unit 1,300,000
16 Armature con Tempo RVP250 SON-TD 150W IC 220V-50HZ unit 1,600,000
17 Armature con Tempo RVP250 SON-TD 70W IC 220V-50HZ S unit 1,300,000
18 Armature con Tempo RVP350 HPI-T 250W IC 220V-50HZ A unit 1,800,000
19 Armature con Tempo RVP350 HPI-T 250W IC 220V-50HZ S unit 1,750,000
20 Armature con Tempo RVP350 HPI-T 400W IC 220V-50HZ A unit 2,100,000
21 Armature con Tempo RVP350 HPI-T 400W IC 220V-50HZ S unit 1,950,000
22 Armature con Tempo RVP350 SON-T 250W IC 220V-50HZ A unit 1,750,000
23 Armature con Tempo RVP350 SON-T 250W IC 220V-50HZ S unit 1,800,000
24 Armature con Tempo RVP350 SON-T 400W IC 220V-50HZ A unit 2,250,000
25 Armature con Tempo RVP350 SON-T 400W IC 220V-50HZ S unit 2,280,000
26 Armature ECOStreet HRX066 1XHPLN 125W unit 1,300,000
27 Armature ECOStreet HRX086 1XHPLN 250W unit 1,900,000
28 Armature ECOStreet SRX066 1XSON 100W unit 2,100,000
Bahan - 428
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Bahan - 429
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Bahan - 430
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
ASESORIS JARINGAN
1 Banded bh 7,000
2 BC 6 mm /m 10,000
3 Cover MCB bh 7,100
4 Ground Road btg 39,000
5 Service Link dan Clamp bh 7,000
6 Stainlees Steel 0,70 x 20 m 15,000
7 Stoping Buckle bh 3,500
8 Terminal Kabel bh 30,000
9 Wadge Type bh 8,500
10 Box MCB set 7,000
11 Rel MCB m1 52,500
12 Terminal Nol Besar buah 45,000
13 Beugel bh -
14 Knee pipa PVC 1.5" bh 500
15 Klem pipa bh 250
16 Pipa spiral 1.5" m1 4,500
17 Angkur bh 12,500
18 Spener set -
19 Kawat 6 mm m1
20 Klem PVC 1/2" bh 500
BALAST / TRAFO
1 Balast Mercury 80W 220V bh 129,100
2 Balast Mercury 125W 220V bh 141,500
3 Balast Mercury 250W 220V bh 225,000
4 Balast Mercury 400W 220V bh 310,000
5 Balast Metal Halide 70W 220V bh 176,500
6 Balast Metal Halide 100W 220V bh 340,000
7 Balast Metal Halide 150W 220V bh 250,000
8 Balast Metal Halide 250W 220V bh 450,000
9 Balast Natrium 250W 220V bh 287,000
10 Balast Natrium 400W 220V bh 210,000
11 Balast SON 70W 220V bh 165,000
12 Balast SON 150W 220V bh 220,000
13 Balast SON 250W 220V bh 356,000
14 Travo TL 10W bh 40,000
15 Travo TL 20W bh 40,000
16 Travo TL 40W bh 40,000
Bahan - 431
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
BOHLAM / LAMPU
1 Lampu Halogin 500W 220V bh 35,500
2 Lampu Halogin 1.000W 220V bh 40,500
3 Lampu HPIT 150W 220V bh 328,900
4 Lampu HPIT 250W 220V bh 368,500
5 Lampu HPIT 400W 220V bh 389,500
6 Lampu HPIT 1.000W 220V bh 1,500,000
7 Lampu Mercury 80W 220V "Philips" bh 61,500
8 Lampu Mercury 125W 220V "Philips" bh 126,000
9 Lampu Mercury 250W 220V "Philips" bh 128,000
10 Lampu Mercury 400W 220V "Philips" bh 156,000
11 Lampu Metal Halide 70W 220V bh 194,700
12 Lampu Metal Halide 100W 220V bh 250,500
13 Lampu Metal Halide 150W 220V bh 198,000
14 Lampu Metal Halide 250W 220V bh 447,000
15 Lampu Natal isi 50 "Philips" set 31,000
16 Lampu Natal isi 100 "Philips" set 137,850
17 Lampu Natrium 250W 220V "Philips" bh 262,000
18 Lampu Natrium 400W 220V "Philips" bh 278,900
19 Lampu PH Esensial 8W "Philips" bh 29,000
20 Lampu PH Esensial 14W "Philips" bh 33,000
21 Lampu PH Esensial 18W "Philips" bh 36,000
22 Lampu PH Esensial 23W "Philips" bh 39,000
23 Lampu PH Esensial 40W "Philips" bh 100,000
24 Lampu Pijar 5W "Philips" bh 5,000
25 Lampu Pijar 10W "Philips" bh 6,000
26 Lampu Pijar 25W "Philips" bh 6,000
27 Lampu Pijar 40W "Philips" bh 7,000
28 Lampu Pijar 100W "Philips" bh 16,000
29 Lampu Pijar 150W "Philips" bh 16,700
30 Lampu Pijar 200W "Philips" bh 18,600
31 Lampu Pijar 60W "Philips" bh 16,400
32 Lampu Pijar 75W "Philips" bh 16,800
33 Lampu SL 8W/9W/10W bh 86,000
34 Lampu SLE 11W "Philips" bh 92,750
35 Lampu SLE 15W bh 95,750
36 Lampu SLE 20W bh 92,500
37 Lampu Softone 100W/220V "Philips" bh 10,000
38 Lampu SON 70W 220V bh 175,500
39 Lampu SON 150W 220V bh 279,000
40 Lampu SON 250W 220V bh 289,000
41 Lampu SON-T 70W 220V bh 130,000
42 Lampu SON-T 150W 220V bh 197,500
43 Lampu SON-T 250W 220V bh 306,000
44 Lampu Sport 80W pk (m) unit 110,500
45 Lampu TL 10 Watt "Philips" bh 9,000
46 Lampu TL 18 Watt bh 14,000
47 Lampu TL 20 Watt bh 14,000
48 Lampu TL 36 Watt bh 16,000
49 Lampu TL 40 Watt bh 16,000
50 Lampu Pilot / Pilot lamp bh 13,000
51 Lampu PL 20/25 wat Tornado bh 52,000
52 lampu Hias TO-2 bh 150,000
53 Lampu MVF 606 M 150 Mc bh 8,532,000
54 Lampu TWG 128/830 HF P.CCE2 bh 265,500
55 Lampu Led Sreng Standar 15 meter cool white set 7,865,000
56 Led Power Driver Out Door bh 1,100,000
57 Lampu sekualitas MBF 504 CDM-T70W WBI unit 11,910,000
58 Glare Shield Lamp unit 2,925,000
59 Lampu Gantung Bulat unit 2,910,000
60 Lampu sekualitas SVF616WB 100 Son TPP 100 wat unit 6,610,000
61 Lampu sekualitas mini deco flood unit 7,350,000
62 Lampu BCS703 12x LED unit 4,710,000
63 Power Supply ps 300 m 9,900,000
64 Lampu sekualitas SVF606N070 Son TPP 70 Wat unit 6,380,000
Bahan - 432
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
BOX PANEL
1 Box Panel 20 x 11 x 9 bh 98,000
2 Box Panel 20 x 15 x 9 bh 62,000
3 Box Panel 20 x 40 x 50 bh 140,000
4 Box Panel 25 x 25 x 12 bh 115,000
5 Box Panel 25 x 25 x 20 bh 156,000
6 Box Panel 30 x 40 x 15 bh 280,000
7 Box Panel 30 x 40 x 20 bh 320,700
8 Box Panel KWH Meter 20 x 40 x 50 bh 400,000
9 Box Panel KWH Meter 20 x 40 x 60 bh 650,000
10 Box Panel KWH Meter 25 x 35 x 20 bh 180,000
11 Tutup Panel 30 x 30 bh 37,200
FITTING
1 Fitting duduk bh 5,000
2 Fitting Gantung Plastik Gantung bh 3,000
3 Fitting Goliath E.27 gantung bh 27,500
4 Fitting Goliath E.40 gantung bh 34,000
5 Fitting kecil lampu 2,5W bh 1,000
6 Fitting Plastik hitam bh 2,500
7 Fitting Sport Par 38 (1) Oog bh 30,000
8 Fitting Spot duduk bh 30,000
9 Fitting Spot taman bh 35,000
10 Fitting WD E.27 duduk bh 12,000
11 Fitting WD E.40 duduk bh 24,000
FLASHER
1 Flasher Lampu Hias Buterfly bh 3,800,000
2 Flasher Lampu Hias Kembang Api besar bh 3,850,000
3 Flasher Lampu Hias Kembang Api kecil bh 3,850,000
4 Flasher Lampu Hias Kipas bh 3,810,000
Bahan - 433
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
KABEL
1 Kabel DX 2 x 10 Sqmm m1 9,500
2 Kabel DX 2 x 16 Sqmm m 1 13,500
3 Kabel DX 2 x 25 Sqmm m1 18,500
4 Kabel NYA 1,5 Sqmm m 1 5,000
5 Kabel NYA 2,5 Sqmm m1 8,000
6 Kabel NYFG by 3 x 4 Sqmm sekualitas Eterna m 1 95,000
7 Kabel NYFG by 3 x 6 Sqmm sekualitas Eterna m1 150,000
8 Kabel NYFG by 3 x 10 Sqmm sekualitas Supreme m1 190,000
9 Kabel NYFG by 4 x 6 Sqmm sekualitasEterna m 1 240,000
10 Kabel NYFG by 4 x 10 Sqmm sekualitas Supreme m 1 270,000
11 Kabel NYM 2 x 1,5 Sqmm sekualitas Supreme m 1 10,900
12 Kabel NYM 2 x 2,5 Sqmm sekualitas Supreme m 1 15,500
13 Kabel NYM 2 x 4 Sqmm sekualitas Supreme m 1 21,000
14 Kabel NYM 3 x 1,5 Sqmm sekualitas Supreme m 1 13,500
15 Kabel NYM 3 x 2,5 Sqmm sekualitas Supreme m 1 19,500
16 Kabel NYM 3 x 4 Sqmm sekualitas Supreme m 1 26,500
17 Kabel NYY 3 x 1,5 Sqmm sekualitas Supreme m 1 19,500
18 Kabel NYY 3 x 2,5 Sqmm sekualitas Supreme m 1 23,500
19 Kabel NYY 3 x 4 Sqmm sekualitas Supreme m 1 32,100
20 Kabel NYY 3 x 6 Sqmm sekualitas Supreme m 1 45,100
21 Kabel NYY 3 x 10 Sqmm sekualitas Supreme m 1 70,500
22 Kabel NYY 4 x 6 Sqmm sekualitas Supreme m 1 56,500
23 Kabel NYY 4 x 10 Sqmm sekualitas Supreme m 1 89,500
24 Kabel Snoor 2 x 0,23 m1 5,500
25 Kabel Twisted NFA2T 2 x16 Sqmm m 1 13,500
26 Kabel NYA 4 sqmm "Supreme" m1 30,000
27 Kabel NYM 4 x 4 sqmm "Supreme" m 1 30,000
28 Kabel NYM 4 x 6 sqmm "Supreme" m1 35,000
29 Kabel NYY 4 x 2,5 sqmm "Supreme" m 1 25,000
30 Kabel LVTC 3x50 netral 25 m1 70,000
KAPASITOR
1 Kapasitor 4 mF "Philips" bh 46,000
2 Kapasitor 8 mF bh 30,000
3 Kapasitor 12,5 mF bh 34,000
4 Kapasitor 20 mF bh 63,000
5 Kapasitor 25 mF bh 65,000
6 Kapasitor Metal Halide 70W 220V bh 89,500
7 Kapasitor Metal Halide 100W 220V bh 85,000
8 Kapasitor Metal Halide 150W 220V bh 89,500
Bahan - 434
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Bahan - 435
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
LAMPU HIAS
1 Lampu Anggur isi 100 pcs 85,000
2 Lampu Anggur isi 140 pcs 98,000
3 Lampu Capsul isi 100 pcs 260,000
4 Lampu Capsul isi 140 pcs 280,000
5 Lampu Rice Light 10 m bh 100,000
6 Lampu Rice Light isi 100 pcs 78,000
7 Lampu Rice Light isi 140 pcs 94,000
8 Lampu Slang 2 Jalur (sekualitas Sinyoku) roll 3,100,000
9 Lampu Slang 3 Jalur (sekualitas Sinyoku) roll 3,500,000
10 Lampu Tirai 2 x 2 m bh 650,000
11 LH - Butterfly Lamp (DC-009) pcs 22,900,000
12 LH - Chrismast Lamp (DC-008) pcs 17,500,000
13 LH - Cottonrose Lamp (DC-004) pcs 20,800,000
14 LH - Double Piled Fountain Lamp (DC-019) pcs 20,900,000
15 LH - Dragon Flying Lamp (DC-016) pcs 17,954,112
16 LH - Dragon Phoenix (DC-013) pcs 19,654,269
17 LH - Fireworks Lamp (DC-001) 6 meter pcs 18,867,250
18 LH - Fireworks Lamp (DC-001) 8 meter pcs 21,256,758
19 LH - Floor Lamp (DC-017) pcs 13,600,456
20 LH - Flower Pot Lamp (DC-020+B47) pcs 21,250,000
21 LH - Fountain Lamp (DC-014) pcs 20,000,000
22 LH - Fountain Lamp Ball (DC-006) pcs 18,000,000
23 LH - Hepla Lamp (DC-011) pcs 21,000,000
24 LH - Logo Kota Besar unit 12,950,000
25 LH - Logo Kota Sedang unit 7,200,000
26 LH - Lucky Lamp (DC-005) pcs 15,950,000
27 LH - No. 1 Lamp (DC-010) pcs 20,500,000
28 LH - Octopus Lamp (DC-018) pcs 20,800,000
29 LH - Ornament Lingkungan 2D unit 7,200,000
30 LH - Ornament Lingkungan 3D unit 12,950,000
31 LH - Redbud Flower Lamp (DC-015) pcs 20,700,000
32 LH - Seplendiel Lamp (DC-002) pcs 22,500,000
33 LH - Star Flower Lamp (DC-007) pcs 20,800,000
34 LH - Windmill Lamp (DC-003) pcs 21,750,000
PERALATAN
1 Betel bh 30,000
2 Betel Mokuba bh 58,000
3 Box Tool Kit bh 350,000
4 Genset Tipe 5000 bh 9,700,000
5 Gergaji besi bh 20,000
6 Isolasi besar bh 8,000
7 Kompresor Multipro BE 075 PMOO unit 1,100,000
8 Kompresor Multipro BE 100 DMTR unit 1,200,000
9 Kunci Inggris bh 75,000
10 Kunci L bh 77,500
11 Kunci T 8, 10, 12 bh 31,000
12 Mata Bur Besi set 118,500
13 Mata Bur Beton 8m bh 27,000
14 Mata Bur Beton 12m bh 41,000
15 Mesin Bor Tangan Bosch 10 GMB RZ bh 587,500
16 Mesin Gerinda bh 885,700
17 Obeng +/- bh 31,000
18 Obeng minus bh 10,000
19 Obeng plus bh 11,000
20 Obeng Tespen biasa bh 25,000
21 Obeng Tespen Sinyal bh 28,500
22 Palu Besi Bulat 1 LB Kecil bh 25,200
23 Palu Besi Bulat 2 11/2 LB Besar bh 32,000
24 Palu Besi New Zealand 11/2 LB Besar bh 25,500
25 Pengupas Kabel (Wire Stiper Sellert) bh 45,000
26 Sabuk Pengaman bh 3,300,000
27 Senter 4 batery bh 89,900
Bahan - 436
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
PHOTO CELL
1 Photo Cell 3 Ampere bh 85,500
2 Photo Cell 6 Ampere bh 119,000
3 Photo Cell 10 Ampere bh 142,000
STANG LAMPU
1 Stang Ornament GIP dia 1,1" L = 3 m btg 202,800
2 Stang Ornament GIP dia 2" L = 1 m btg
3 Stang Ornament GIP dia 2" L = 2 m btg 240,800
4 Stang Ornament GIP dia 2" L = 2.2 m btg
5 Stang Ornament GIP dia 2" L = 3 m btg 265,800
6 Stang Ornament GIP dia 2" L = 4 m btg 278,900
7 Stang Ornament GIP dia 2" L = 6 m btg 400,000
TALI
1 Kabel Ties 10 Cm pcs 9,000
2 Kabel Ties 15 Cm pcs 13,000
3 Kabel Ties 20 Cm pcs 15,500
4 Kabel Ties 25 Cm pcs 18,900
5 Tali Kabel Plister Roll 14,000
TIANG
1 Tiang Galvanist Cb. 1, t = 5 m, type tanam dia 2" btg 900,000
2 Tiang Galvanist Cb. 1, t = 6 m, base plate btg 3,400,000
3 Tiang Galvanist Cb. 1, t = 7 m, base plate btg 3,410,000
4 Tiang Galvanist Cb. 1, t = 9 m, base plate btg 4,600,000
5 Tiang Galvanist Cb. 1, t = 11 m, baseplate bh 5,400,000
6 Tiang Galvanist Cb. 2, t = 6 m, baseplate btg 4,420,000
7 Tiang Galvanist Cb. 2, t = 9 m, baseplate btg 4,300,000
8 Tiang GIP Cb. 1 2",3",4", t = 7 m, tanam btg 2,800,000
9 Tiang GIP Cb. 1 2",3",4",5", t = 9 m, tanam btg 3,100,000
10 Tiang GIP Cb. 1 3",4",5", t = 9 m, tanam btg 2,900,000
11 Tiang Lampu Highmask Cb. 2, t = 20 m, hidrolik btg 17,250,000
12 Tiang Lampu Highmask Cb. 4, t = 20 m, hidrolik btg 16,550,000
Bahan - 437
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Armatur
1 Armatur Downlight 4 in buah 125,000
2 Armatur Downlight 6 in buah 150,000
3 Armatur Downlight 8 in buah 175,000
4 Armatur Downlight 12 in buah 187,000
5 Armatur lampu RM 2 x 20 wat unit 165,000
6 Armatur lampu RM 2 x 40 wat unit 195,000
7 Armatur TKO 2 x 20 wat unit 175,000
8 Armatur TKO 2 x 40 wat unit 197,000
Bahan - 438
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
TRAFFIC LIGHT/MARKA/RAMBU :
1 Modul LED Merah Lokal buah 1,500,000
2 Modul LED Merah Import buah 2,450,000
3 Modul LED Kuning Lokal buah 1,500,000
4 Modul LED Kuning Import buah 2,450,000
5 Modul LED Hijau Lokal buah 1,800,000
6 Modul LED Hijau Import buah 2,650,000
7 Modul LED Merah Lokal buah 2,000,000
8 Modul LED Merah Import buah 2,650,000
9 Modul LED Kuning Lokal buah 2,000,000
10 Modul LED Kuning Import buah 2,750,000
11 Modul LED Hijau Lokal buah 2,500,000
12 Modul LED Hijau Import buah 2,900,000
13 Bolam Lampu Pijar buah 65,000
14 Reflektor & Fiting buah 175,000
15 Reflektor & Fiting buah 200,000
16 Housing Lamp 1 Asp set 400,000
17 Housing Lamp 2 Asp set 800,000
18 Housing Lamp 3 Asp set 1,200,000
19 Housing Lamp 1 Asp set 500,000
20 Housing Lamp 2 Asp set 1,000,000
21 Housing Lamp 3 Asp set 1,500,000
22 Karet buah 75,000
23 Karet buah 95,000
24 Lensa Polycarbonat buah 150,000
25 Lensa Polycarbonat buah 200,000
26 Lensa Kaca buah 250,000
27 Lensa Kaca buah 325,000
28 Box Lamp Pijar 1 Asp set 65,000
29 Box Lamp Pijar 2 Asp set 1,300,000
30 Box Lamp Pijar 3 Asp set 1,820,000
31 Box Lamp Pijar 1 Asp set 910,000
32 Box Lamp Pijar 2 Asp set 1,820,000
33 Box Lamp Pijar 3 Asp set 2,600,000
34 Box Lamp LED 1 Asp set 1,700,000
35 Box Lamp LED 2 Asp set 3,000,000
36 Box Lamp LED 3 Asp set 4,600,000
37 Box Lamp LED 1 Asp set 2,000,000
38 Box Lamp LED 2 Asp set 3,900,000
39 Box Lamp LED 3 Asp set 5,850,000
40 Flsher LED 1 Asp set 1,670,000
41 Flsher LED 2 Asp set 3,250,000
42 Flsher LED 1 Asp set 2,100,000
43 Flsher LED 2 Asp set 3,910,000
44 Controller Microprossesor unit 21,000,000
45 Controller Microprossesor unit 26,000,000
46 Controller Mini Micro unit 14,000,000
47 Controller Mini Eprom unit 10,000,000
48 Controller Flasher unit 5,000,000
49 Couting Down/Hitung Mundur unit 8,100,000
50 Controller 10 Plan Wirelles unit 7,000,000
51 Slave Control unit 5,000,000
52 Solarcell unit 5,210,000
53 Battery MF 12 Volt/42 AH unit 1,750,000
54 Tiang Lengkung batang 3,000,000
55 Tiang Lurus batang 1,700,000
56 Patok Pengaman batang 500,000
57 Traffic Light Simpang Empat 220,000,000
58 Traffic Light Simpang Empat 320,000,000
59 Traffic Light Simpang Empat 150,000,000
60 Traffic Light Simpang Tiga 190,000,000
61 Traffic Light Simpang Tiga 280,000,000
Bahan - 439
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
MARKA
1 Thermoplastik kg 16,000
2 Glassbead kg 16,500
3 Pengecatan Marka Jalan m2 95,000
4 Pengecatan Marka Jalan m2 95,000
5 Pembuatan pita pengaduh m2 100,000
6 Aplikator marka jalan unit 35,100,000
7 Preheater unit 35,125,000
RAMBU
1 Daun Rambu Lalu Lintas lembar 250,000
2 Daun Rambu Lalu Lintas dengan Tiang unit 550,000
3 Daun RPPJ lembar 1,560,000
4 Daun RPPJ lembar 2,540,000
5 Daun RPPJ lembar 3,100,000
6 Daun RPPJ lembar 4,520,000
7 Break Tester Portable 196,000,000
8 Alumunium lembar 110,500
9 Scotchlite meter 110,000
10 Alat timbang portabel 1 tapak 92,000,000
11 Alat timbang portabel 2 tapak 157,000,000
12 Cermin tikungan polycarbonat terpasang 6,000,000
13 Alumunium tebal 1.5 mm m2 -
14 Skotlight Reflektive Sheet m2 -
15 Besi cor ceper (melati) Buah -
16 Besi cor tiang + frame Set -
17 Mur dan baut Buah -
18 Pemotongan, pengeboran Unit -
19 Perakitan dan penyetelan Unit -
20 Tutup besi dia 2.5" Buah -
21 Angkur baut dia. 19 mm Buah -
22 Box panel kontrol APILL 60x90x120 Buah -
23 Box panel kontrol APILL 35x70x90 Buah -
24 Kontroller multi program 6 Signal group Unit -
25 Gembok bh 20,000
26 Tiang GIP 3" h = 3 m Batang -
27 Tiang GIP 3" h = 6 m Batang -
28 Lighting Box 3 Lampu Unit -
29 Box Lamp komplit (LED) 30" Unit -
30 Lampu pijar 25 W/220V Buah 5,000
31 Mata cutter Buah 5,000
32 Klem besi bh 5,000
Bahan - 440
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Bahan - 441
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Bahan - 442
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Peralatan
1 Bottle Sprayer Buah 15,000
2 Tangga lipat Buah 1,000,000
3 Kain pell Buah 10,000
4 Selang plastik Meter 12,000
5 Grenda tangan 4" Bosch Buah 650,000
6 Gunting Besar Buah 20,000
7 Gunting Dahan Buah 66,000
8 Sabit Buah 35,000
9 Sapu lidi Buah 5,000
10 Tali tampar Buah 15,000
11 Safety belt Buah 100,000
12 Glass cloth Lembar 27,500
13 Ember kecil Buah 10,000
14 Cover window washer Set 35,000
15 Stick brush Buah 25,000
16 Hand brush Buah 20,000
17 Extention handle Set 35,000
18 Rack bowl Buah 75,000
19 Window wipper 35cm Set 50,000
20 Stick hand brush Buah 35,000
21 Gelas ukur Buah 15,000
22 Kain lobby duster 60cm Buah 60,000
23 Kain lobby duster 80cm Buah 80,000
24 Double bucket chrome Set 90,000
25 Dustbin Round Set 80,000
26 Floor wipper 50cm Buah 140,000
27 Stick lobby duster 60 cm Set 90,000
28 Stick lobby duster 80 cm Set 120,000
29 Sapu ijuk Buah 15,000
30 Appron/celemek Buah 25,000
31 Kape Buah 10,000
32 Toilet bowl brush Buah 25,000
33 Toilet cop Buah 25,000
34 Ember plastik 3 galon Buah 60,000
35 Trolly Dorong Buah 200,000
36 Wet floor sign Buah 40,000
37 Wep mop holder plastik Set 30,000
38 Window washer Set 35,000
39 Dust pan buka Buah 20,000
40 Gembor plastik Buah 25,000
41 Kentucky mop 400gr Buah 30,000
42 Nylon broom Buah 20,000
43 Cloth/Kain Buah 10,000
44 Vacuum Cleaner Buah 65,000
45 Linggis Buah 50,000
46 Pacul Buah 50,000
47 Tempat Sampah pasar Buah 120,000
48 Cethok Buah 18,000
49 Gerobag alko Buah 500,000
50 Drim Buah 80,000
51 Skrap Buah 10,000
Bahan - 443
HARGA
NO. URAIAN BAHAN SATUAN SATUAN (Rp.)
Bahan - 444
PEKERJAAN BESI DAN ALUMUNIUM
3 1.00 m2 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
SNI 2839:20 15.0000 kg Besi siku L 30.30.3
32.8000 kg Besi plat baja
0.0500 kg kawat las
1.0500 oh Pekerja
1.0500 oh Tukang las
0.1050 oh Kepala tukang
0.0520 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
14.B 1.00 m2 Pekerjaan Partisi Panel Komposit (tanpa pintu dan kaca)
AK 2.1415 m1 Frame Casement Lokal Type Brown YKK
0.1000 x Harga partisi panel Komposit (perlengkapan)
0.6591 lbr Panel Komposit
0.1500 oh Pekerja
0.4500 oh Tukang besi konstruksi
0.0450 oh Kepala tukang
0.0080 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
14.C 1.00 m2 Pekerjaan Rangka hollow 2,8 x 2,8 cm, untuk pemasangan aluminium kom
AK 5.8667 m1 Rangka Hollow 2,8 x 2,8cm, tbl 1,8mm
64.0000 cm Pengelasan
0.7040 m2 Pengecatan rangka 3x lapis, ex emco
1.6700 oh Pekerja
1.6700 oh Tukang Besi
0.1670 oh Kepala tukang Besi
0.0835 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
14.F 1.00 m2 Rangka Atap Baja Ringan Atap Genteng, sampai dengan bentang 7m
AK 6.6200 m Profil C75 tebal 1 mm Taso
3.7100 m reng 32 Taso 0.45 mm
0.1000 x Harga rangka baja ringan (perlengkapan)
0.1000 oh Pekerja
0.1000 oh Tukang besi konstruksi
0.0100 oh Kepala tukang
0.0050 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
18 1.00 m1 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
SNI 2839:20 1.0500 m Seng plat 3' x 6' BJLS 28
0.0100 kg Paku 1 cm - 2,5 cm
0.5000 kg Besi strip
0.1500 oh Pekerja
0.3000 oh Tukang besi
0.0300 oh Kepala tukang
0.0080 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
19 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0096 m3 Kayu jati papan
0.2500 kg Flincoat
0.1500 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
20 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati (lokal)
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0096 m3 Kayu jati (lokal) papan
0.2500 kg Flincoat
0.1500 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
21 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0096 m3 Kayu kamper papan
0.2500 kg Flincoat
0.1500 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
22 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0096 m3 Kayu kruing papan
0.2500 kg Flincoat
0.1500 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
23 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0096 m3 Kayu bengkirai papan
0.2500 kg Flincoat
0.1500 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
24 1.00 m1 Pasang talang miring, seng BJLS 28 papan kayu jati (klas 1)
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0190 m3 Kayu jati papan (klas 1)
0.3000 kg Flincoat
0.0400 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
25 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu jati (lokal)
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0190 m3 Kayu jati (lokal) papan
0.2500 kg Flincoat
0.0400 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
26 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0190 m3 Kayu kamper papan
0.2500 kg Flincoat
0.0400 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
27 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0190 m3 Kayu kruing papan
0.2500 kg Flincoat
0.0400 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
28 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai
AK 0.5000 lbr Seng plat 3' x 6' BJLS 28
0.0150 kg Paku biasa 1/2" - 1"
0.0190 m3 Kayu bengkirai papan
0.2500 kg Flincoat
0.0400 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang kayu
0.0013 oh Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
@ Rp. -
@ Rp. -
@ Rp. 75,000.00 306,000.00
@ Rp. 175,000.00 294,000.00
@ Rp. 300,000.00 30,000.00
@ Rp. 60,000.00 9,000.00
@ Rp. 70,000.00 31,500.00
@ Rp. 80,000.00 3,600.00
@ Rp. 100,000.00 800.00
@ Rp. -
44,900.00 630,000.00 674,900.00
20,766.15
2,076.62
22,842.77
22,842.00
dengan bentang 7m
@ Rp. 118,000.00 781,160.00
@ Rp. 38,000.00 140,980.00
@ Rp. -
@ Rp. 60,000.00 6,000.00
@ Rp. 70,000.00 7,000.00
@ Rp. 80,000.00 800.00
@ Rp. 100,000.00 500.00
14,300.00 922,140.00 936,440.00
93,644.00
1,030,084.00
1,030,084.00
@ Rp. -
@ Rp. -
@ Rp. -
@ Rp. -
@ Rp. 60,000.00 100,200.00
@ Rp. 70,000.00 116,900.00
@ Rp. 80,000.00 13,360.00
@ Rp. 100,000.00 8,350.00
238,810.00 - 238,810.00
23,881.00
262,691.00
262,691.00
@ Rp. -
@ Rp. -
@ Rp. -
@ Rp. 60,000.00 78,000.00
@ Rp. 80,000.00 52,000.00
@ Rp. 80,000.00 5,200.00
@ Rp. 100,000.00 6,500.00
141,700.00 - 141,700.00
14,170.00
155,870.00
155,870.00
@ Rp. -
@ Rp. 60,000.00 3,750.00
@ Rp. 70,000.00 3,640.00
@ Rp. 100,000.00 1,000.00
8,390.00 - 8,390.00
839.00
9,229.00
9,229.00
@ Rp. 76,000.00 83,600.00
@ Rp. - -
@ Rp. 46,000 78,936.00
@ Rp. 60,000.00 6,000.00
@ Rp. 70,000.00 7,000.00
@ Rp. 80,000.00 800.00
@ Rp. 100,000.00 500.00
14,300.00 162,536.00 176,836.00
17,683.60
194,519.60
194,519.00
at bjls 30 lebar 45 cm
@ Rp. 47,000.00 49,350.00
@ Rp. 17,000.00 170.00
@ Rp. 18,000.00 9,000.00
@ Rp. 60,000.00 9,000.00
@ Rp. 70,000.00 21,000.00
@ Rp. 80,000.00 2,400.00
@ Rp. 100,000.00 800.00
24,200.00 67,520.00 91,720.00
9,172.00
100,892.00
100,892.00
jati (lokal)
@ Rp. 47,000.00 23,500.00
@ Rp. 17,000.00 255.00
@ Rp. 35,100,000.00 666,900.00
@ Rp. 35,000.00 8,750.00
@ Rp. 60,000.00 2,400.00
@ Rp. 75,000.00 30,000.00
@ Rp. 85,000.00 2,125.00
@ Rp. 100,000.00 125.00
34,650.00 699,405.00 734,055.00
73,405.50
807,460.50
807,460.00
bengkirai
@ Rp. 47,000.00 23,500.00
@ Rp. 17,000.00 255.00
@ Rp. 10,500,000.00 199,500.00
@ Rp. 6,550.00 1,637.50
@ Rp. 60,000.00 2,400.00
@ Rp. 75,000.00 30,000.00
@ Rp. 85,000.00 2,125.00
@ Rp. 100,000.00 125.00
34,650.00 224,892.50 259,542.50
25,954.25
285,496.75
285,496.00
PEKERJAAN PERSIAPAN
PEKERJAAN BONGKARAN
10 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digu
AK 6.0000 oh Tukang kayu @ Rp.
0.6000 oh Kep. Tk. Kayu @ Rp.
4.0000 oh Pekerja @ Rp.
0.2000 oh Mandor @ Rp.
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digun
AK 1.0000 oh Pekerja @ Rp.
0.2000 oh Mandor @ Rp.
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
3,500,000.00 42,000.00
3,500,000.00 24,500.00
66,125.00 1,322.50
60,000.00 6,000.00
75,000.00 7,500.00
85,000.00 850.00
100,000.00 500.00
14,850.00 67,822.50 82,672.50
8,267.25
90,939.75
90,939.00
60,000.00 4,800.00
100,000.00 2,000.00
130,000.00 650.00
100,000.00 2,000.00
200,000.00 2,000.00
11,450.00 - 11,450.00
1,145.00
12,595.00
12,595.00
60,000.00 6,000.00
100,000.00 5,000.00
11,000.00 - 11,000.00
1,100.00
12,100.00
12,100.00
- -
20,000.00 600.00
250,000.00 12,500.00
60,000.00 60,000.00
100,000.00 10,000.00
70,000.00 13,100.00 83,100.00
8,310.00
91,410.00
91,410.00
- -
20,000.00 1,800.00
250,000.00 2,500.00
60,000.00 60,000.00
100,000.00 5,000.00
65,000.00 4,300.00 69,300.00
6,930.00
76,230.00
76,230.00
13,000.00 16,250.00
3,500,000.00 630,000.00
27,000.00 22,950.00
16,000 17,600.00
180.00 6,300.00
250,000.00 37,500.00
250,000.00 25,000.00
20,000.00 3,000.00
190,000.00 5,700,000.00
37,000.00 9,250.00
48,000.00 24,000.00
35,000.00 2,800.00
- -
50,000.00 3,000.00
60,000.00 120,000.00
75,000.00 150,000.00
70,000.00 70,000.00
85,000.00 25,500.00
100,000.00 5,000.00
370,500.00 6,497,650.00 6,868,150.00
686,815.00
7,554,965.00
7,554,965.00
13,000.00 16,250.00
180.00 450.00
45,000.00 54,000.00
250,000.00 1,250.00
20,000.00 180.00
3,500,000.00 252,000.00
27,000.00 1,620.00
26,000.00 11,700.00
60,000.00 24,000.00
75,000.00 15,000.00
85,000.00 1,700.00
100,000.00 2,000.00
42,700.00 337,450.00 380,150.00
38,015.00
418,165.00
418,165.00
13,000.00 13,000.00
180.00 360.00
- -
250,000.00 1,250.00
20,000.00 180.00
27,000.00 1,620.00
60,000.00 18,000.00
75,000.00 15,000.00
85,000.00 1,700.00
100,000.00 2,000.00
36,700.00 16,410.00 53,110.00
5,311.00
58,421.00
58,421.00
13,000.00 16,250.00
180.00 450.00
250,000.00 1,250.00
20,000.00 180.00
3,500,000.00 252,000.00
27,000.00 1,620.00
2,500.00 1,000.00
60,000.00 24,000.00
75,000.00 15,000.00
85,000.00 1,700.00
100,000.00 2,000.00
43,700.00 271,750.00 315,450.00
31,545.00
346,995.00
346,995.00
18,000.00 7,812.00
60,000.00 2,520.00
70,000.00 2,940.00
80,000.00 320.00
100,000.00 200.00
5,980.00 7,812.00 13,792.00
1,379.20
15,171.20
15,171.00
13,000.00 22,100.00
3,500,000.00 735,000.00
27,000.00 8,100.00
180.00 1,890.00
250,000.00 7,500.00
20,000.00 1,000.00
85,000.00 127,500.00
60,000.00 60,000.00
75,000.00 150,000.00
85,000.00 17,000.00
100,000.00 5,000.00
232,000.00 903,090.00 1,135,090.00
113,509.00
1,248,599.00
1,248,599.00
13,000.00 39,000.00
3,500,000.00 966,000.00
27,000.00 18,900.00
85,000.00 127,500.00
60,000.00 60,000.00
75,000.00 112,500.00
85,000.00 12,750.00
100,000.00 5,000.00
190,250.00 1,151,400.00 1,341,650.00
134,165.00
1,475,815.00
1,475,815.00
13,000.00 16,250.00
3,500,000.00 651,000.00
27,000.00 8,100.00
180.00 3,240.00
250,000.00 7,500.00
20,000.00 1,000.00
85,000.00 127,500.00
50,000.00 67,500.00
60,000.00 60,000.00
75,000.00 150,000.00
85,000.00 17,000.00
100,000.00 5,000.00
232,000.00 882,090.00 1,114,090.00
111,409.00
1,225,499.00
1,225,499.00
3,500,000.00 126,000.00
27,000.00 2,160.00
25,000.00 25,000.00
75,000.00 2,250.00
100,000.00 150.00
2,400.00 153,160.00 155,560.00
15,556.00
171,116.00
171,116.00
15,000.00 15,000.00
5,000.00 1,250.00
60,000.00 120.00
75,000.00 1,275.00
85,000.00 21,250.00
100,000.00 1,250.00
23,895.00 16,250.00 40,145.00
4,014.50
44,159.50
44,159.00
110,000.00 108,460.00
100,000.00 52,500.00
250,000.00 18,500.00
- -
180.00 8,100.00
60,000.00 22,500.00
70,000.00 8,750.00
80,000.00 960.00
100,000.00 1,900.00
34,110.00 187,560.00 221,670.00
22,167.00
243,837.00
243,837.00
(bahan seng)
3,500,000.00 122,500.00
90,000.00 126,000.00
52,875.00 31,725.00
45,000.00 67,500.00
180.00 3,024.00
250,000.00 6,750.00
20,000.00 810.00
60,000.00 126,000.00
70,000.00 1,225.00
75,000.00 75,000.00
70,000.00 70,000.00
100,000.00 100,500.00
372,725.00 358,309.00 731,034.00
73,103.40
804,137.40
804,137.00
(bahan flexi)
3,500,000.00 122,500.00
90,000.00 90,000.00
52,875.00 31,725.00
180.00 3,024.00
250,000.00 6,750.00
20,000.00 810.00
60,000.00 60,000.00
70,000.00 1,225.00
75,000.00 75,000.00
70,000.00 -
100,000.00 10,000.00
146,225.00 254,809.00 401,034.00
40,103.40
441,137.40
441,137.00
70,000.00 280,000.00
60,000.00 24,000.00
304,000.00 - 304,000.00
30,400.00
334,400.00
334,400.00
embersihkan
70,000.00 140,000.00
60,000.00 6,000.00
146,000.00 - 146,000.00
14,600.00
160,600.00
160,600.00
70,000.00 14,000.00
60,000.00 480,000.00
100,000.00 10,000.00
504,000.00 - 504,000.00
50,400.00
554,400.00
554,400.00
gunakan lagi
60,000.00 12,000.00
100,000.00 1,000.00
13,000.00 - 13,000.00
1,300.00
14,300.00
14,300.00
60,000.00 7,500.00
100,000.00 1,250.00
8,750.00 - 8,750.00
875.00
9,625.00
9,625.00
unakan lagi
60,000.00 12,000.00
100,000.00 1,000.00
13,000.00 - 13,000.00
1,300.00
14,300.00
14,300.00
70,000.00 3,500.00
60,000.00 6,000.00
9,500.00 - 9,500.00
950.00
10,450.00
10,450.00
75,000.00 4,500.00
85,000.00 510.00
60,000.00 12,000.00
100,000.00 1,000.00
18,010.00 - 18,010.00
1,801.00
19,811.00
19,811.00
60,000.00 12,000.00
100,000.00 1,000.00
13,000.00 - 13,000.00
1,300.00
14,300.00
14,300.00
unakan lagi
60,000.00 9,000.00
100,000.00 750.00
9,750.00 - 9,750.00
975.00
10,725.00
10,725.00
g telah dibongkar
75,000.00 900,000.00
85,000.00 102,000.00
60,000.00 240,000.00
100,000.00 20,000.00
1,262,000.00 - 1,262,000.00
126,200.00
1,388,200.00
1,388,200.00
PEKERJAAN TANAH
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
(Digunakan analisa galian terendah dalam pekerjaan tersebut)
60,000.00 54,000.00
100,000.00 4,500.00
58,500.00 - 58,500.00
5,850.00
64,350.00
64,350.00
60,000.00 63,000.00
100,000.00 6,700.00
69,700.00 - 69,700.00
6,970.00
76,670.00
76,670.00
60,000.00 60,000.00
100,000.00 3,200.00
63,200.00 - 63,200.00
6,320.00
69,520.00
69,520.00
60,000.00 90,000.00
100,000.00 6,000.00
96,000.00 - 96,000.00
9,600.00
105,600.00
105,600.00
m 1 meter
60,000.00 72,000.00
100,000.00 4,500.00
76,500.00 - 76,500.00
7,650.00
84,150.00
84,150.00
setinggi 1 meter
60,000.00 3,000.00
100,000.00 500.00
3,500.00 - 3,500.00
350.00
3,850.00
3,850.00
60,000.00 11,520.00
100,000.00 1,900.00
13,420.00 13,420.00
1,342.00
14,762.00
14,762.00
60,000.00 19,800.00
100,000.00 1,000.00
20,800.00 20,800.00
2,080.00
22,880.00
22,880.00
60,000.00 19,800.00
100,000.00 1,000.00
20,800.00 20,800.00
2,080.00
22,880.00
22,880.00
60,000.00 30,960.00
100,000.00 5,000.00
35,960.00 - 35,960.00
3,596.00
39,556.00
39,556.00
60,000.00 30,000.00
100,000.00 5,000.00
35,000.00 35,000.00
3,500.00
38,500.00
38,500.00
60,000.00 15,000.00
100,000.00 1,000.00
16,000.00 16,000.00
1,600.00
17,600.00
17,600.00
150,000.00 180,000.00
60,000.00 18,000.00
100,000.00 1,000.00
19,000.00 180,000.00 199,000.00
19,900.00
218,900.00
218,900.00
puran 1 KP : 3 PP : 7 TL
75,000.00 10,125.00
250,000.00 100,000.00
250,000.00 237,000.00
60,000.00 48,000.00
70,000.00 28,000.00
80,000.00 3,200.00
100,000.00 8,000.00
87,200.00 347,125.00 434,325.00
43,432.50
477,757.50
477,757.00
puran 1 KP : 5 TL
75,000.00 18,600.00
250,000.00 310,000.00
60,000.00 48,000.00
70,000.00 28,000.00
80,000.00 3,200.00
100,000.00 8,000.00
87,200.00 328,600.00 415,800.00
41,580.00
457,380.00
457,380.00
5,000.00 30,000.00
60,000.00 9,000.00
100,000.00 1,500.00
10,500.00 30,000.00 40,500.00
4,050.00
44,550.00
44,550.00
75,000.00 90,000.00
60,000.00 9,000.00
100,000.00 1,500.00
10,500.00 90,000.00 100,500.00
10,050.00
110,550.00
110,550.00
60,000.00 15,000.00
100,000.00 1,000.00
16,000.00 16,000.00
1,600.00
17,600.00
17,600.00
85,000.00 170,000.00
60,000.00 60,000.00
60,000.00 44,100.00
100,000.00 7,350.00
111,450.00 170,000.00 281,450.00
28,145.00
309,595.00
309,595.00
10,000.00 2,000.00
- -
60,000.00 30,000.00
100,000.00 2,500.00
32,500.00 2,000.00 34,500.00
3,450.00
37,950.00
37,950.00
PEKERJAAN PONDASI
- -
180.00 48,060.00
250,000.00 106,750.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 154,810.00 310,810.00
31,081.00
341,891.00
341,891.00
campuran 1 PC : 3 PP
- -
180.00 36,360.00
250,000.00 121,250.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 157,610.00 313,610.00
31,361.00
344,971.00
344,971.00
campuran 1 PC : 4 PP
- -
180.00 29,340.00
250,000.00 130,000.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 159,340.00 315,340.00
31,534.00
346,874.00
346,874.00
campuran 1 PC : 5 PP
- -
180.00 24,480.00
250,000.00 136,000.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 160,480.00 316,480.00
31,648.00
348,128.00
348,128.00
campuran 1 PC : 6 PP
- -
180.00 21,060.00
250,000.00 140,250.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 161,310.00 317,310.00
31,731.00
349,041.00
349,041.00
campuran 1 PC : 8 PP
- -
180.00 16,380.00
250,000.00 146,000.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 162,380.00 318,380.00
31,838.00
350,218.00
350,218.00
- -
- -
49,000.00 11,221.00
250,000.00 136,000.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 147,221.00 303,221.00
30,322.10
333,543.10
333,543.00
campuran 1 KP : 1 SM : 2 PP
- -
- -
49,000.00 8,330.00
250,000.00 85,000.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 93,330.00 249,330.00
24,933.00
274,263.00
274,263.00
- -
180.00 17,175.60
- -
250,000.00 95,500.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 112,675.60 268,675.60
26,867.56
295,543.16
295,543.00
campuran 1 PC : 3 KP : 10 PP
- -
180.00 10,980.00
- -
250,000.00 123,000.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 133,980.00 289,980.00
28,998.00
318,978.00
318,978.00
campuran 1/4 PC : 1 KP : 4 PP
- -
180.00 7,380.00
- -
250,000.00 130,750.00
60,000.00 90,000.00
70,000.00 52,500.00
80,000.00 6,000.00
100,000.00 7,500.00
156,000.00 138,130.00 294,130.00
29,413.00
323,543.00
323,543.00
- -
150,000.00 64,800.00
60,000.00 46,800.00
70,000.00 27,300.00
80,000.00 3,120.00
100,000.00 3,900.00
81,120.00 64,800.00 145,920.00
14,592.00
160,512.00
160,512.00
% beton campuran 1 PC:2 PB:3 KR dan 40% batu belah tanpa besi
- -
180.00 34,920.00
250,000.00 78,000.00
20,000.00 9,360.00
60,000.00 204,000.00
70,000.00 59,500.00
80,000.00 6,800.00
100,000.00 17,000.00
287,300.00 122,280.00 409,580.00
40,958.00
450,538.00
450,538.00
diameter 100 cm
- -
180.00 34,920.00
250,000.00 78,000.00
20,000.00 9,360.00
60,000.00 144,000.00
70,000.00 56,000.00
80,000.00 6,400.00
100,000.00 11,900.00
218,300.00 122,280.00 340,580.00
34,058.00
374,638.00
374,638.00
PEKERJAAN DINDING
PEKERJAAN BETON
17.i 1.00 unit Stutwerk untuk 1m beton, tinggi 3-4 m (memakai scafo
AK 10.0000 unit Scafolding @ Rp.
0.0420 m3 Kayu Glugu 5/7 @ Rp.
0.0240 m3 Papan Glugu 1/20 @ Rp.
2.2000 oh Pekerja @ Rp.
3.5000 oh Tukang kayu @ Rp.
0.3500 oh Kepala Tukang kayu @ Rp.
0.1200 oh Mandor @ Rp.
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
17.j 1.00 m3 Pekerjaan Beton K225, Plat Lantai tbl. 12 cm, besi 6 1
Beton mutu fc = 19,3 MPa
AK (K 225), slump (12 2) cm,
1.0000 m3 w/c=0,58 @ Rp.
8.8544 m2 Plat Bondex @ Rp.
27.1300 kg Tulangan wire mesh 6-15 @ Rp.
1.0000 unit Stutwerk untuk 1m beton @ Rp.
1.0000 unit Membongkar @ Rp.
JUMLAH ( BELUM PPN )
JUMLAH
DIBULATKAN
campuran spesi 1 PC : 3 PP
110,000.00 1,375,000.00
180.00 5,457.60
250,000.00 182,000.00
15,000.00 4,200.00
60,000.00 21,000.00
70,000.00 10,500.00
80,000.00 1,200.00
100,000.00 1,800.00
34,500.00 1,566,657.60 1,601,157.60
160,115.76
1,761,273.36
1,761,273.00
campuran spesi 1 PC : 4 PP
110,000.00 1,375,000.00
180.00 4,366.80
250,000.00 193,000.00
15,000.00 4,200.00
60,000.00 21,000.00
70,000.00 10,500.00
80,000.00 1,200.00
100,000.00 1,800.00
34,500.00 1,576,566.80 1,611,066.80
161,106.68
1,772,173.48
1,772,173.00
campuran spesi 1 PC : 3 PP
190,000.00 2,375,000.00
180.00 4,093.20
250,000.00 137,500.00
15,000.00 4,200.00
60,000.00 19,200.00
70,000.00 8,400.00
80,000.00 960.00
100,000.00 1,600.00
30,160.00 2,520,793.20 2,550,953.20
255,095.32
2,806,048.52
2,806,048.00
campuran spesi 1 PC : 4 PP
190,000.00 2,375,000.00
180.00 3,276.00
250,000.00 145,500.00
15,000.00 4,200.00
60,000.00 19,200.00
70,000.00 8,400.00
80,000.00 960.00
100,000.00 1,600.00
30,160.00 2,527,976.00 2,558,136.00
255,813.60
2,813,949.60
2,813,949.00
campuran spesi 1 PC : 3 PP
190,000.00 2,375,000.00
180.00 2,728.80
250,000.00 91,000.00
15,000.00 4,200.00
60,000.00 18,000.00
70,000.00 7,000.00
80,000.00 800.00
100,000.00 1,500.00
27,300.00 2,472,928.80 2,500,228.80
250,022.88
2,750,251.68
2,750,251.00
campuran spesi 1 PC : 4 PP
190,000.00 2,375,000.00
180.00 2,183.40
250,000.00 97,000.00
15,000.00 4,200.00
60,000.00 18,000.00
70,000.00 7,000.00
80,000.00 800.00
100,000.00 1,500.00
27,300.00 2,478,383.40 2,505,683.40
250,568.34
2,756,251.74
2,756,251.00
65,000.00 812,500.00
180.00 2,183.40
250,000.00 97,000.00
60,000.00 18,000.00
70,000.00 10,500.00
80,000.00 1,200.00
100,000.00 1,500.00
31,200.00 911,683.40 942,883.40
94,288.34
1,037,171.74
1,037,171.00
mpuran spesi 1 PC : 3 PP
190,000.00 3,230,000.00
180.00 889.65
250,000.00 3,425.00
60,000.00 5,400.00
70,000.00 2,100.00
80,000.00 240.00
100,000.00 450.00
8,190.00 3,234,314.65 3,242,504.65
324,250.47
3,566,755.12
3,566,755.00
lebar 200 mm
-
60,000.00 4,200.00
70,000.00 2,450.00
80,000.00 320.00
100,000.00 400.00
7,370.00 - 7,370.00
737.00
8,107.00
8,107.00
60,000.00 4,800.00
70,000.00 2,800.00
80,000.00 320.00
100,000.00 400.00
8,320.00 - 8,320.00
832.00
9,152.00
9,152.00
15,000.00 157,500.00
60,000.00 9,000.00
60,000.00 4,200.00
70,000.00 4,900.00
80,000.00 560.00
100,000.00 400.00
10,060.00 166,500.00 176,560.00
17,656.00
194,216.00
194,216.00
15,000.00 157,500.00
60,000.00 9,000.00
60,000.00 4,200.00
70,000.00 4,900.00
80,000.00 560.00
100,000.00 400.00
10,060.00 166,500.00 176,560.00
17,656.00
194,216.00
194,216.00
ed polos/strands
15,000.00 157,500.00
60,000.00 6,000.00
60,000.00 3,000.00
70,000.00 3,500.00
80,000.00 400.00
100,000.00 300.00
7,200.00 163,500.00 170,700.00
17,070.00
187,770.00
187,770.00
ja/wire mesh
- -
60,000.00 3,000.00
60,000.00 1,500.00
70,000.00 1,750.00
80,000.00 2,000.00
100,000.00 100.00
5,350.00 3,000.00 8,350.00
835.00
9,185.00
9,185.00
-
-
60,000.00 10,200.00
70,000.00 5,600.00
80,000.00 800.00
100,000.00 1,000.00
17,600.00 - 17,600.00
1,760.00
19,360.00
19,360.00
-
60,000.00 3,000.00
60,000.00 1,500.00
70,000.00 1,750.00
80,000.00 160.00
100,000.00 100.00
3,510.00 3,000.00 6,510.00
651.00
7,161.00
7,161.00
#REF!
-
60,000.00 132,000.00
70,000.00 245,000.00
80,000.00 28,000.00
100,000.00 12,000.00
417,000.00 - 417,000.00
41,700.00
458,700.00
458,700.00
-
-
-
-
- - -
#REF!
#REF!
-
60,000.00 31,200.00
70,000.00 18,200.00
80,000.00 2,080.00
100,000.00 2,600.00
54,080.00 - 54,080.00
5,408.00
59,488.00
59,488.00
-
- -
dos #VALUE!
60,000.00 31,200.00
70,000.00 18,200.00
80,000.00 2,080.00
100,000.00 2,600.00
54,080.00 #VALUE! #VALUE!
#VALUE!
#VALUE!
#VALUE!
-
-
60,000.00 39,600.00
70,000.00 23,100.00
80,000.00 2,640.00
100,000.00 3,300.00
68,640.00 - 68,640.00
6,864.00
75,504.00
75,504.00
-
-
60,000.00 39,600.00
70,000.00 23,100.00
80,000.00 2,640.00
100,000.00 3,300.00
68,640.00 - 68,640.00
6,864.00
75,504.00
75,504.00
-
-
#REF!
60,000.00 39,600.00
70,000.00 23,100.00
80,000.00 2,640.00
100,000.00 3,300.00
68,640.00 - 68,640.00
6,864.00
75,504.00
75,504.00
#REF!
60,000.00 39,600.00
70,000.00 23,100.00
80,000.00 2,640.00
100,000.00 3,300.00
68,640.00 - 68,640.00
6,864.00
75,504.00
75,504.00
-
-
#REF!
60,000.00 39,600.00
70,000.00 23,100.00
80,000.00 2,640.00
100,000.00 3,300.00
68,640.00 - 68,640.00
6,864.00
75,504.00
75,504.00
#REF!
60,000.00 9,000.00
70,000.00 3,500.00
80,000.00 400.00
100,000.00 800.00
13,700.00 - 13,700.00
1,370.00
15,070.00
15,070.00
50 kg besi + bekisting)
-
- -
bh
bh
60,000.00
70,000.00
70,000.00
70,000.00 73,500.00
80,000.00 20,960.00
100,000.00 26,500.00
120,960.00 - 120,960.00
12,096.00
133,056.00
133,056.00
kg besi + bekisting)
-
60,000.00
70,000.00
70,000.00
70,000.00 98,000.00
80,000.00 25,840.00
100,000.00 28,300.00
152,140.00 - 152,140.00
15,214.00
167,354.00
167,354.00
0 kg besi + bekisting)
-
60,000.00
70,000.00
70,000.00
70,000.00 147,000.00
80,000.00 32,240.00
100,000.00 35,300.00
214,540.00 - 214,540.00
21,454.00
235,994.00
235,994.00
kg besi + bekisting)
-
60,000.00
70,000.00
70,000.00
70,000.00 98,000.00
80,000.00 26,640.00
100,000.00 31,800.00
156,440.00 - 156,440.00
15,644.00
172,084.00
172,084.00
g besi + bekisting)
-
60,000.00 318,000.00
70,000.00 19,250.00
70,000.00 91,000.00
70,000.00 73,500.00
80,000.00 21,200.00
100,000.00 26,500.00
549,450.00 - 549,450.00
54,945.00
604,395.00
604,395.00
50 kg besi + bekisting)
-
60,000.00 318,000.00
70,000.00 19,250.00
70,000.00 91,000.00
70,000.00 73,500.00
80,000.00 20,960.00
100,000.00 26,500.00
549,210.00 - 549,210.00
54,921.00
604,131.00
604,131.00
00 kg besi + bekisting)
-
bh
60,000.00 339,000.00
70,000.00 19,250.00
70,000.00 109,200.00
70,000.00 98,000.00
80,000.00 25,840.00
100,000.00 28,300.00
619,590.00 - 619,590.00
61,959.00
681,549.00
681,549.00
(10 x 15) cm
-
60,000.00
70,000.00
70,000.00
70,000.00 2,310.00
80,000.00 800.00
100,000.00 1,500.00
4,610.00 - 4,610.00
461.00
5,071.00
5,071.00
memakai papan
3,500,000.00 59,500.00
1,050,000.00 25,200.00
66,125.00 26,450.00
60,000.00 12,000.00
75,000.00 37,500.00
85,000.00 4,250.00
100,000.00 1,000.00
54,750.00 111,150.00 165,900.00
16,590.00
182,490.00
182,490.00
memakai multiplek
3,500,000.00 59,500.00
80,000.00 27,760.00
66,125.00 26,450.00
60,000.00 12,000.00
75,000.00 37,500.00
85,000.00 4,250.00
100,000.00 1,000.00
54,750.00 113,710.00 168,460.00
16,846.00
185,306.00
185,306.00
60,000.00 240,000.00
240,000.00 - 240,000.00
24,000.00
264,000.00
264,000.00
100 KG BESI)
125 KG BESI)
150 KG BESI)
175 KG BESI)
200 KG BESI)
100 KG BESI)
125 KG BESI)
150 KG BESI)
175 KG BESI)
200 KG BESI)
100 KG BESI)
125 KG BESI)
150 KG BESI)
175 KG BESI)
200 KG BESI)
lebar 200 mm
- -
60,000.00 4,200.00
70,000.00 2,450.00
80,000.00 320.00
100,000.00 400.00
7,370.00 - 7,370.00
737.00
8,107.00
8,107.00
180.00 2,754.00
250,000.00 6,075.00
20,000.00 738.00
1,050,000.00 2,835.00
66,125.00 1,798.60
75,000.00 2,550.00
70,000.00 1,106.00
80,000.00 400.00
60,000.00 8,244.00
100,000.00 630.00
12,930.00 14,200.60 27,130.60
2,713.06
29,843.66
29,843.00
180.00 5,508.00
250,000.00 12,150.00
20,000.00 1,476.00
1,050,000.00 2,835.00
66,125.00 1,798.60
75,000.00 2,550.00
70,000.00 2,205.00
80,000.00 528.00
60,000.00 14,994.00
100,000.00 1,160.00
21,437.00 23,767.60 45,204.60
4,520.46
49,725.06
49,725.00
PEKERJAAN PLESTERAN
1.a 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas I
SNI 3434:20 1.1000 m3 Balok kay @ Rp. ### ###
1.2500 kg Paku 10 c @ Rp. ### ###
1.0000 kg Lem kayu @ Rp. ### ###
7.0000 oh Pekerja @ Rp. ### ###
21.0000 oh Tukang ka @ Rp. ### ###
2.1000 oh Kepala tu @ Rp. ### ###
0.3500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
1 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati (klas plitur)
SNI 3434:20 1.1000 m3 Balok kayu @ Rp. ### ###
1.2500 kg Paku 10 c @ Rp. ### ###
1.0000 kg Lem kayu @ Rp. ### ###
7.0000 oh Pekerja @ Rp. ### ###
21.0000 oh Tukang ka @ Rp. ### ###
2.1000 oh Kepala tu @ Rp. ### ###
0.3500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
2 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati lokal
SNI 3434:20 1.1000 m3 Balok kayu @ Rp. ### ###
1.2500 kg Paku 10 c @ Rp. ### ###
1.0000 kg Lem kayu @ Rp. ### ###
7.0000 oh Pekerja @ Rp. ### ###
21.0000 oh Tukang ka @ Rp. ### ###
2.1000 oh Kepala tu @ Rp. ### ###
0.3500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
2.a 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas II atau III
SNI 3434:20 1.2000 m3 Balok kay @ Rp. ### ###
1.2500 kg Paku 10 c @ Rp. ### ###
1.0000 kg Lem kayu @ Rp. ### ###
7.0000 oh Pekerja @ Rp. ### ###
18.0000 oh Tukang ka @ Rp. ### ###
1.8000 oh Kepala tu @ Rp. ### ###
0.3000 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
3 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kamper
SNI 3434:20 1.2000 m3 Balok kay @ Rp. ### ###
1.2500 kg Paku 10 c @ Rp. ### ###
1.0000 kg Lem kayu @ Rp. ### ###
6.0000 oh Pekerja @ Rp. ### ###
18.0000 oh Tukang ka @ Rp. ### ###
1.8000 oh Kepala tu @ Rp. ### ###
0.3000 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
4 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu bengkirai
SNI 3434:20 1.2000 m3 Balok kay @ Rp. ### ###
1.2500 kg Paku 10 c @ Rp. ### ###
1.0000 kg Lem kayu @ Rp. ### ###
6.0000 oh Pekerja @ Rp. ### ###
18.0000 oh Tukang ka @ Rp. ### ###
1.8000 oh Kepala tu @ Rp. ### ###
0.3000 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
5 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kruing
SNI 3434:20 1.2000 m3 Balok kay @ Rp. ### ###
1.2500 kg Paku 10 c @ Rp. ### ###
1.0000 kg Lem kayu @ Rp. ### ###
6.0000 oh Pekerja @ Rp. ### ###
18.0000 oh Tukang ka @ Rp. ### ###
1.8000 oh Kepala tu @ Rp. ### ###
0.3000 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
6 1.00 m2 Membuat dan memasang pintu klamp, kayu jati (klas plitur)
SNI 3434:20 0.0400 m3 Papan kayu @ Rp. ### ###
dalbang 9 0.0500 kg Paku 5 cm @ Rp. ### ###
0.3500 oh Pekerja @ Rp. ### ###
1.0500 oh Tukang ka @ Rp. ### ###
0.1050 oh Kepala tu @ Rp. ### ###
0.0180 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
10a 1.00 m2 Membuat dan memasang pintu klamp sederhana, kayu kelas III untuk gudang s
SNI 3434:20 0.0400 m3 Papan kay @ Rp. ### ###
0.0500 kg Paku 5 cm @ Rp. ### ###
0.3500 oh Pekerja @ Rp. ### ###
1.0500 oh Tukang ka @ Rp. ### ###
0.1050 oh Kepala tu @ Rp. ### ###
0.0180 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
10b 1.00 m2 Membuat dan memasang daun pintu panel, kayu kelas I atau II
SNI 3434:20 0.0400 m3 Papan kay @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 oh Pekerja @ Rp. ### ###
3.0000 oh Tukang ka @ Rp. ### ###
0.3000 oh Kepala tu @ Rp. ### ###
0.0500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
11 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (klas plitur)
SNI 3434:20 0.0400 m3 Papan kayu @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 oh Pekerja @ Rp. ### ###
3.0000 oh Tukang ka @ Rp. ### ###
0.3000 oh Kepala tu @ Rp. ### ###
0.0500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
12 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (lokal)
SNI 3434:20 0.0400 m3 Papan kayu @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 oh Pekerja @ Rp. ### ###
3.0000 oh Tukang ka @ Rp. ### ###
0.3000 oh Kepala tu @ Rp. ### ###
0.0500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
16a 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kelas I atau II
SNI 3434:20 0.0240 m3 Papan kay @ Rp. ### ###
0.3000 kg Lem kayu @ Rp. ### 380.70
0.8000 oh Pekerja @ Rp. ### ###
2.4000 oh Tukang ka @ Rp. ### ###
0.2400 oh Kepala tu @ Rp. ### ###
0.0400 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
16 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (klas plitur)
SNI 3434:20 0.0240 m3 Papan kayu @ Rp. ### ###
0.3000 kg Lem kayu @ Rp. ### 380.70
0.8000 oh Pekerja @ Rp. ### ###
2.4000 oh Tukang ka @ Rp. ### ###
0.2400 oh Kepala tu @ Rp. ### ###
0.0400 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
17 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (lokal)
SNI 3434:20 0.0240 m3 Papan kayu @ Rp. ### ###
0.3000 kg Lem kayu @ Rp. ### 380.70
0.8000 oh Pekerja @ Rp. ### ###
2.4000 oh Tukang ka @ Rp. ### ###
0.2400 oh Kepala tu @ Rp. ### ###
0.0400 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
18 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kamper
SNI 3434:20 0.0240 m3 Papan kay @ Rp. ### ###
0.3000 kg Lem kayu @ Rp. ### 380.70
0.8000 oh Pekerja @ Rp. ### ###
2.4000 oh Tukang ka @ Rp. ### ###
0.2400 oh Kepala tu @ Rp. ### ###
0.0400 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
19 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu bengkirai
SNI 3434:20 0.0240 m3 Papan kay @ Rp. ### ###
0.3000 kg Lem kayu @ Rp. ### 380.70
0.8000 oh Pekerja @ Rp. ### ###
2.4000 oh Tukang ka @ Rp. ### ###
0.2400 oh Kepala tu @ Rp. ### ###
0.0400 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
20 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kruing
SNI 3434:20 0.0240 m3 Papan kay @ Rp. ### ###
0.3000 kg Lem kayu @ Rp. ### 380.70
0.8000 oh Pekerja @ Rp. ### ###
2.4000 oh Tukang ka @ Rp. ### ###
0.2400 oh Kepala tu @ Rp. ### ###
0.0400 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
21a 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kelas I atau II
SNI 3434:20 0.0640 m3 Papan kay @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 oh Pekerja @ Rp. ### ###
3.0000 oh Tukang ka @ Rp. ### ###
0.3000 oh Kepala tu @ Rp. ### ###
0.0500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
21 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas plitur)
SNI 3434:20 0.0640 m3 Papan kayu @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 oh Pekerja @ Rp. ### ###
3.0000 oh Tukang ka @ Rp. ### ###
0.3000 oh Kepala tu @ Rp. ### ###
0.0500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
22 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal)
SNI 3434:20 0.0640 m3 Papan kayu @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 oh Pekerja @ Rp. ### ###
3.0000 oh Tukang ka @ Rp. ### ###
0.3000 oh Kepala tu @ Rp. ### ###
0.0500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
23 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kamper
SNI 3434:20 0.0640 m3 Papan kay @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 oh Pekerja @ Rp. ### ###
3.0000 oh Tukang ka @ Rp. ### ###
0.3000 oh Kepala tu @ Rp. ### ###
0.0500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
24 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai
SNI 3434:20 0.0640 m3 Papan kay @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 oh Pekerja @ Rp. ### ###
3.0000 oh Tukang ka @ Rp. ### ###
0.3000 oh Kepala tu @ Rp. ### ###
0.0500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
25 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kruing
SNI 3434:20 0.0640 m3 Papan kay @ Rp. ### ###
dalbang 32 0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 oh Pekerja @ Rp. ### ###
3.0000 oh Tukang ka @ Rp. ### ###
0.3000 oh Kepala tu @ Rp. ### ###
0.0500 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
26a 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas
SNI 3434:20 0.0250 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 lbr Plywood t @ Rp. ### ###
0.7000 oh Pekerja @ Rp. ### ###
2.1000 oh Tukang ka @ Rp. ### ###
0.2100 oh Kepala tu @ Rp. ### ###
0.0350 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
26 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu jati lo
SNI 3434:20 0.0250 m3 Papan kayu @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 lbr Plywood t @ Rp. ### ###
0.7000 oh Pekerja @ Rp. ### ###
2.1000 oh Tukang ka @ Rp. ### ###
0.2100 oh Kepala tu @ Rp. ### ###
0.0350 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
27 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamp
SNI 3434:20 0.0250 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 lbr Plywood t @ Rp. ### ###
0.7000 oh Pekerja @ Rp. ### ###
2.1000 oh Tukang ka @ Rp. ### ###
0.2100 oh Kepala tu @ Rp. ### ###
0.0350 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
28 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu beng
SNI 3434:20 0.0250 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 lbr Plywood t @ Rp. ### ###
0.7000 oh Pekerja @ Rp. ### ###
2.1000 oh Tukang ka @ Rp. ### ###
0.2100 oh Kepala tu @ Rp. ### ###
0.0350 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
29 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kruin
SNI 3434:20 0.0250 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 lbr Plywood t @ Rp. ### ###
0.7000 oh Pekerja @ Rp. ### ###
2.1000 oh Tukang ka @ Rp. ### ###
0.2100 oh Kepala tu @ Rp. ### ###
0.0350 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
29a 1.00 m2 Membuat pintu plywood rangkap, rangka expose kayu kelas I atau II
SNI 3434:20 0.0256 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.5000 kg Lem kayu @ Rp. ### 634.50
1.0000 lbr Plywood t @ Rp. ### ###
0.8000 oh Pekerja @ Rp. ### ###
2.4000 oh Tukang ka @ Rp. ### ###
0.2400 oh Kepala tu @ Rp. ### ###
0.0400 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
35a 1.00 m2 Pasang pintu teakwood rangkap, rangka expose kayu kelas I
SNI 3434:20 0.0196 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku biasa @ Rp. ### ###
0.3000 kg Lem kayu @ Rp. ### 380.70
1.0000 lbr Teakwood @ Rp. ### ###
0.8000 oh Pekerja @ Rp. ### ###
2.4000 oh Tukang ka @ Rp. ### ###
0.2400 oh Kepala tu @ Rp. ### ###
0.0400 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
39a 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kelas II
SNI 3434:20 0.0250 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.8000 kg Lem kayu @ Rp. ### ###
1.0000 lbr Teakwood @ Rp. ### ###
0.5000 lbr Formika @ Rp. ### ###
0.8500 oh Pekerja @ Rp. ### ###
2.5500 oh Tukang ka @ Rp. ### ###
0.2550 oh Kepala tu @ Rp. ### ###
0.0430 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
39 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kamper
SNI 3434:20 0.0250 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.8000 kg Lem kayu @ Rp. ### ###
1.0000 lbr Teakwood @ Rp. ### ###
0.5000 lbr Formika @ Rp. ### ###
0.8500 oh Pekerja @ Rp. ### ###
2.5500 oh Tukang ka @ Rp. ### ###
0.2550 oh Kepala tu @ Rp. ### ###
0.0430 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
40 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu bengkirai
SNI 3434:20 0.0250 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.8000 kg Lem kayu @ Rp. ### ###
1.0000 lbr Teakwood @ Rp. ### ###
0.5000 lbr Formika @ Rp. ### ###
0.8500 oh Pekerja @ Rp. ### ###
2.5500 oh Tukang ka @ Rp. ### ###
0.2550 oh Kepala tu @ Rp. ### ###
0.0430 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
41 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kruing
SNI 3434:20 0.0250 m3 Papan kay @ Rp. ### ###
0.0300 kg Paku 1 cm @ Rp. ### ###
0.8000 kg Lem kayu @ Rp. ### ###
1.0000 lbr Teakwood @ Rp. ### ###
0.5000 lbr Formika @ Rp. ### ###
0.8500 oh Pekerja @ Rp. ### ###
2.5500 oh Tukang ka @ Rp. ### ###
0.2550 oh Kepala tu @ Rp. ### ###
0.0430 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
42a 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kelas I, II, III
SNI 3434:20 1.1000 m3 Balok kay @ Rp. ### ###
15.0000 kg Besi strip @ Rp. 46,000 ###
5.6000 kg Paku 12 c @ Rp. ### ###
4.0000 oh Pekerja @ Rp. ### ###
12.0000 oh Tukang ka @ Rp. ### ###
1.2000 oh Kepala tu @ Rp. ### ###
0.2000 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
42 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas plitur) bentang 6
SNI 3434:20 1.1000 m3 Kayu jati ( @ Rp. ### ###
dalbang 55 15.0000 kg Besi strip @ Rp. 46,000 ###
5.6000 kg Paku 12 c @ Rp. ### ###
4.0000 oh Pekerja @ Rp. ### ###
12.0000 oh Tukang ka @ Rp. ### ###
1.2000 oh Kepala tu @ Rp. ### ###
0.2000 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
43 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) bentang 6 mete
SNI 3434:20 1.1000 m3 Kayu jati @ Rp. ### ###
15.0000 kg Besi strip @ Rp. 46,000 ###
5.6000 kg Paku 12 c @ Rp. ### ###
4.0000 oh Pekerja @ Rp. ### ###
12.0000 oh Tukang ka @ Rp. ### ###
1.2000 oh Kepala tu @ Rp. ### ###
0.2000 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
59 1.00 m2 Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3
SNI 3434:20 0.0140 m3 Kaso-kaso @ Rp. -
0.0036 m3 Reng (2 x @ Rp. -
0.2500 kg Paku 5 cm @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.1000 oh Tukang ka @ Rp. ### ###
0.0100 oh Kep. Tk. @ Rp. ### 850.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
66 1.00 m2 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1)
SNI 3434:20 0.0140 m3 Kaso-kaso @ Rp. ### 420.00
0.0072 m3 Reng (3 x @ Rp. ### 266.40
0.2500 kg Paku 5 cm @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.1000 oh Tukang ka @ Rp. ### ###
0.0100 oh Kep. Tk. @ Rp. ### 850.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
76.a 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kelas II atau III
SNI 3434:20 0.0154 m3 Kaso-kaso @ Rp. ### ###
0.2000 kg Paku 7 cm @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.3000 oh Tukang ka @ Rp. ### ###
0.0300 oh Kepala tu @ Rp. ### ###
0.0750 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
77 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu jati (lokal)
SNI 3434:20 0.0154 m3 Kaso-kaso @ Rp. ### ###
0.2000 kg Paku 7 cm @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.3000 oh Tukang ka @ Rp. ### ###
0.0300 oh Kepala tu @ Rp. ### ###
0.0750 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
80.a 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kelas II atau III
SNI 3434:20 0.0163 m3 Kaso-kaso @ Rp. ### ###
0.2500 kg Paku 7 cm @ Rp. ### ###
0.2000 oh Pekerja @ Rp. ### ###
0.3000 oh Tukang ka @ Rp. ### ###
0.0300 oh Kepala tu @ Rp. ### ###
0.0100 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
81 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu jati (lokal)
SNI 3434:20 0.0163 m3 Kaso-kaso @ Rp. ### ###
0.2500 kg Paku 7 cm @ Rp. ### ###
0.2000 oh Pekerja @ Rp. ### ###
0.3000 oh Tukang ka @ Rp. ### ###
0.0300 oh Kepala tu @ Rp. ### ###
0.0100 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
82 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kamper
SNI 3434:20 0.0163 m3 Kaso-kaso @ Rp. ### ###
0.2500 kg Paku 7 cm @ Rp. ### ###
0.2000 oh Pekerja @ Rp. ### ###
0.3000 oh Tukang ka @ Rp. ### ###
0.0300 oh Kepala tu @ Rp. ### ###
0.0100 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
85 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu jati (lokal)
AK 0.0130 m3 Kayu jati @ Rp. ### 975.00
0.1200 kg Paku @ Rp. ### ###
0.1700 oh Pekerja @ Rp. ### ###
0.2700 oh Tukang ka @ Rp. ### ###
0.0270 oh Kepala tu @ Rp. ### ###
0.0085 oh Mandor @ Rp. ### 850.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
92.a 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kelas I atau II
SNI 3434:20 0.0108 m3 Papan kay @ Rp. -
0.1000 kg Paku 5 cm @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.2000 oh Tukang ka @ Rp. ### ###
0.0250 oh Kepala tu @ Rp. ### ###
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
93 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas plitur)
AK 0.0072 m3 Papan kayu @ Rp. ### ###
0.0500 kg Paku biasa @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.2000 oh Tukang ka @ Rp. ### ###
0.0250 oh Kepala tu @ Rp. ### ###
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
97.a 1.00 m2 Memasang lisplank ukuran (3 x 30) cm, kayu kelas I atau II
SNI 3434:20 0.0110 m3
Papan kay @ Rp. -
0.0500 kg Paku 5 cm @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.2000 oh Tukang ka @ Rp. ### ###
0.0200 oh Kepala tu @ Rp. ### ###
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
98 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur)
SNI 3434:20 0.0110 m3 Papan kayu @ Rp. ### ###
Paku 5
cm dan 7
0.0500 kg cm @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
Tukang
0.2000 oh kayu @ Rp. ### ###
Kepala
0.0200 oh tukang @ Rp. ### ###
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
101 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai
SNI 3434:20 0.0110 m3 Papan kay @ Rp. ### ###
Paku 5
cm dan 7
0.0500 kg cm @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
Tukang
0.2000 oh kayu @ Rp. ### ###
Kepala
0.0200 oh tukang @ Rp. ### ###
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
103 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur)
AK 0.0145 m3
Papan kayu @ Rp. ### ###
0.0600 kg Paku biasa @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ka @ Rp. ### ###
0.0250 oh Kepala tu @ Rp. ### ###
0.0075 oh Mandor @ Rp. ### 750.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
104 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal)
AK 0.0145 m3
Papan kayu @ Rp. ### ###
0.0600 kg Paku biasa @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ka @ Rp. ### ###
0.0250 oh Kepala tu @ Rp. ### ###
0.0075 oh Mandor @ Rp. ### 750.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
108 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas plitur)
AK 0.0086 m3 Papan kayu @ Rp. ### ###
0.0600 kg Paku biasa @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.1000 oh Tukang ka @ Rp. ### ###
0.0100 oh Kepala tu @ Rp. ### 850.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
109 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lokal)
AK 0.0086 m3 Papan kayu @ Rp. ### ###
0.0600 kg Paku biasa @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.1000 oh Tukang ka @ Rp. ### ###
0.0100 oh Kepala tu @ Rp. ### 850.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
113 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas plitur)
AK 0.0060 m3 Papan kayu @ Rp. ### ###
0.0600 kg Paku biasa @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.1000 oh Tukang ka @ Rp. ### ###
0.0100 oh Kepala tu @ Rp. ### 850.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
114 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal
AK 0.0060 m3 Papan kayu @ Rp. ### ###
0.0600 kg Paku biasa @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.1000 oh Tukang ka @ Rp. ### ###
0.0100 oh Kepala tu @ Rp. ### 850.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
118 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur)
AK 0.0048 m3
Papan kayu @ Rp. ### ###
0.0600 kg Paku biasa @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.1000 oh Tukang ka @ Rp. ### ###
0.0100 oh Kepala tu @ Rp. ### 850.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
119 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal)
AK 0.0048 m3 Papan kayu @ Rp. ### ###
0.0600 kg Paku biasa @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.1000 oh Tukang ka @ Rp. ### ###
0.0100 oh Kepala tu @ Rp. ### 850.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
123 1.00 m2 Membuat listplank asbes plat ram kayu jati (lokal)
AK 0.0250 m3 Ram kayu j @ Rp. ### ###
1.0000 m2
Asbes plat @ Rp. ### ###
0.3000 kg Paku reng @ Rp. ### ###
0.6000 oh Pekerja @ Rp. ### ###
1.8000 oh Tukang ka @ Rp. ### ###
0.1800 oh Kep. Tk. @ Rp. ### ###
0.0300 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
126.a 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
SNI 3434:20 0.0280 m3
Balok kay @ Rp. 0 0
0.1500 kg Paku 5 cm @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
127 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal)
SNI 3434:20 0.0280 m3
Balok kayu @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
128 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kamper
SNI 3434:20 0.0280 m3
Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
129 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai
SNI 3434:20 0.0280 m3
Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
130 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kruing
SNI 3434:20 0.0280 m3 Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
130.a 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kelas II
SNI 3434:20 0.0280 m3 Balok kay @ Rp. -
0.1500 kg Paku 5 cm @ Rp. ### ###
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
131 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu jati (lokal)
SNI 3434:20 0.0280 m3 Balok kayu @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.8600 lbr Teakwood @ Rp. ### ###
0.5600 kg Lem kayu @ Rp. ### 710.64
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
132 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kamper
SNI 3434:20 0.0280 m3 Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.8600 lbr Teakwood @ Rp. ### ###
0.5600 kg Lem kayu @ Rp. ### 710.64
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
133 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai
SNI 3434:20 0.0280 m3 Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.8600 lbr Teakwood @ Rp. ### ###
0.5600 kg Lem kayu @ Rp. ### 710.64
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
134 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kruing
SNI 3434:20 0.0280 m3 Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.8600 lbr Teakwood @ Rp. ### ###
0.5600 kg Lem kayu @ Rp. ### 710.64
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
134.a 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kelas II
SNI 3434:20 0.0280 m3 Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.8600 lbr Teakwood @ Rp. ### ###
0.5600 kg Lem kayu @ Rp. ### 710.64
0.1500 oh Pekerja @ Rp. ### ###
0.4500 oh Tukang ka @ Rp. ### ###
0.0450 oh Kepala tu @ Rp. ### ###
0.0080 oh Mandor @ Rp. ### 800.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
135 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kamper
SNI 3434:20 0.0280 m3 Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.8600 lbr Plywood t @ Rp. ### ###
0.5600 kg Lem kayu @ Rp. ### 710.64
0.2000 oh Pekerja @ Rp. ### ###
0.6000 oh Tukang ka @ Rp. ### ###
0.0600 oh Kepala tu @ Rp. ### ###
0.0100 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
136 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai
SNI 3434:20 0.0280 m3 Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.8600 lbr Plywood t @ Rp. ### ###
0.5600 kg Lem kayu @ Rp. ### 710.64
0.2000 oh Pekerja @ Rp. ### ###
0.6000 oh Tukang ka @ Rp. ### ###
0.0600 oh Kepala tu @ Rp. ### ###
0.0100 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
137 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kruing
SNI 3434:20 0.0280 m3 Balok kay @ Rp. ### ###
0.1500 kg Paku 5 cm @ Rp. ### ###
0.8600 lbr Plywood t @ Rp. ### ###
0.5600 kg Lem kayu @ Rp. ### 710.64
0.2000 oh Pekerja @ Rp. ### ###
0.6000 oh Tukang ka @ Rp. ### ###
0.0600 oh Kepala tu @ Rp. ### ###
0.0100 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
138 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (klas plitur)
SNI 3434:20 0.0070 m3 Papan kayu @ Rp. ### ###
0.1000 kg Paku 5 cm @ Rp. ### ###
0.1500 kg Paku skru @ Rp. ### ###
0.6000 oh Pekerja @ Rp. ### ###
1.8000 oh Tukang ka @ Rp. ### ###
0.1800 oh Kepala tu @ Rp. ### ###
0.0300 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
139 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (lokal)
SNI 3434:20 0.0070 m3 Papan kayu @ Rp. ### ###
0.1000 kg Paku 5 cm @ Rp. ### ###
0.1500 kg Paku skru @ Rp. ### ###
0.6000 oh Pekerja @ Rp. ### ###
1.8000 oh Tukang ka @ Rp. ### ###
0.1800 oh Kepala tu @ Rp. ### ###
0.0300 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
143 1.00 m2 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm
SNI 3434:20 0.4000 lbr Plywood t @ Rp. ### ###
0.0500 kg Paku 1 cm @ Rp. ### ###
0.0250 oh Pekerja @ Rp. ### ###
0.0750 oh Tukang ka @ Rp. ### ###
0.0080 oh Kepala tu @ Rp. ### 480.00
0.0010 oh Mandor @ Rp. ### 100.00
JUMLAH ( BELUM PPN ) 580.00 ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
143.a 1.00 m2 Memasang dinding bilik, rangka kayu kelas III atau IV
SNI 3434:20 1.5000 m2 Bilik bam @ Rp. ### ###
0.0140 m3 Kaso-kaso @ Rp. ### ###
0.0030 m3 List kayu @ Rp. ### ###
0.0120 kg Paku @ Rp. ### 324.00
0.1000 oh Pekerja @ Rp. ### ###
0.0500 oh Tukang ka @ Rp. ### ###
0.0050 oh Kepala tu @ Rp. ### 425.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
150 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu jati (lokal) tanpa p
AK 0.0120 m3 Kayu jati @ Rp. ### 900.00
0.0600 kg Paku bias @ Rp. ### ###
1.1000 lbr Asbes plat @ Rp. ### ###
0.1800 oh Pekerja @ Rp. ### ###
0.3200 oh Tukang ka @ Rp. ### ###
0.0320 oh Kepala tu @ Rp. ### ###
0.0090 oh Mandor @ Rp. ### 900.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
151 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kamper tanpa ple
AK 0.0120 m3 Kayu kamp @ Rp. ### ###
0.0600 kg Paku bias @ Rp. ### ###
1.1000 lbr Asbes plat @ Rp. ### ###
0.1800 oh Pekerja @ Rp. ### ###
0.3200 oh Tukang ka @ Rp. ### ###
0.0320 oh Kepala tu @ Rp. ### ###
0.0090 oh Mandor @ Rp. ### 900.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
152 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu bengkirai tanpa p
AK 0.0120 m3 Kayu beng @ Rp. ### ###
0.0600 kg Paku bias @ Rp. ### ###
1.1000 lbr Asbes plat @ Rp. ### ###
0.1800 oh Pekerja @ Rp. ### ###
0.3200 oh Tukang ka @ Rp. ### ###
0.0320 oh Kepala tu @ Rp. ### ###
0.0090 oh Mandor @ Rp. ### 900.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
153 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kruing tanpa plep
AK 0.0120 m3 Kayu krui @ Rp. ### ###
0.0600 kg Paku bias @ Rp. ### ###
1.1000 lbr Asbes plat @ Rp. ### ###
0.1800 oh Pekerja @ Rp. ### ###
0.3200 oh Tukang ka @ Rp. ### ###
0.0320 oh Kepala tu @ Rp. ### ###
0.0090 oh Mandor @ Rp. ### 900.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
154 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu jati (lokal) memak
AK 0.0120 m3 Kayu jati @ Rp. ### 900.00
0.0600 kg Paku bias @ Rp. ### ###
1.1000 lbr Asbes plat @ Rp. ### ###
2.6000 m1 Plepet kay @ Rp. ### ###
0.0100 kg Paku etern @ Rp. ### 300.00
0.0100 kg Paku plepe @ Rp. ### 528.75
0.1800 oh Pekerja @ Rp. ### ###
0.3200 oh Tukang ka @ Rp. ### ###
0.0320 oh Kepala tu @ Rp. ### ###
0.0090 oh Mandor @ Rp. ### 900.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
155 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kamper memakai
AK 0.0120 m3 Kayu kamp @ Rp. ### ###
0.0600 kg Paku bias @ Rp. ### ###
1.1000 lbr Asbes plat @ Rp. ### ###
2.6000 m1 Plepet kay @ Rp. ### ###
0.0100 kg Paku etern @ Rp. ### 300.00
0.0100 kg Paku plepe @ Rp. ### 528.75
0.1800 oh Pekerja @ Rp. ### ###
0.3200 oh Tukang ka @ Rp. ### ###
0.0320 oh Kepala tu @ Rp. ### ###
0.0090 oh Mandor @ Rp. ### 900.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
156 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu bengkirai memak
AK 0.0120 m3 Kayu beng @ Rp. ### ###
0.0600 kg Paku bias @ Rp. ### ###
1.1000 lbr Asbes plat @ Rp. ### ###
2.6000 m1 Plepet kay @ Rp. ### ###
0.0100 kg Paku etern @ Rp. ### 300.00
0.0100 kg Paku plepe @ Rp. ### 528.75
0.1800 oh Pekerja @ Rp. ### ###
0.3200 oh Tukang ka @ Rp. ### ###
0.0320 oh Kepala tu @ Rp. ### ###
0.0090 oh Mandor @ Rp. ### 900.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
157 1.00 m2 Langit-langit asbes (1,00 x 1,00) m tebal 0.3 mm, rangka kayu kruing memakai p
AK 0.0120 m3 Kayu krui @ Rp. ### ###
0.0600 kg Paku bias @ Rp. ### ###
1.1000 lbr Asbes plat @ Rp. ### ###
2.6000 m1 Plepet kay @ Rp. ### ###
0.0100 kg Paku etern @ Rp. ### 300.00
0.0100 kg Paku plepe @ Rp. ### 528.75
0.1800 oh Pekerja @ Rp. ### ###
0.3200 oh Tukang ka @ Rp. ### ###
0.0320 oh Kepala tu @ Rp. ### ###
0.0090 oh Mandor @ Rp. ### 900.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
158 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati (lokal)
AK 0.0130 m3 Kayu jati @ Rp. ### 975.00
0.3600 lbr Gypsum b @ Rp. ### ###
0.0500 roll Kasa gyp @ Rp. ### ###
0.4500 kg Tepung g @ Rp. ### ###
0.0030 kg Alkasit @ Rp. ### 12.00
0.0500 kg Paku gyp @ Rp. ### 300.00
0.1200 kg Paku usuk @ Rp. ### ###
0.2400 oh Pekerja @ Rp. ### ###
0.3700 oh Tukang ka @ Rp. ### ###
0.0370 oh Kepala tu @ Rp. ### ###
0.0120 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
159 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper
AK 0.0130 m3 Kayu kamp @ Rp. ### ###
0.3600 lbr Gypsum b @ Rp. ### ###
0.0500 roll Kasa gyp @ Rp. ### ###
0.4500 kg Tepung g @ Rp. ### ###
0.0030 kg Alkasit @ Rp. ### 12.00
0.0500 kg Paku gyp @ Rp. ### 300.00
0.1200 kg Paku usuk @ Rp. ### ###
0.2400 oh Pekerja @ Rp. ### ###
0.3700 oh Tukang ka @ Rp. ### ###
0.0370 oh Kepala tu @ Rp. ### ###
0.0120 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
160 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai
AK 0.0130 m3 Kayu beng @ Rp. ### ###
0.3600 lbr Gypsum b @ Rp. ### ###
0.0500 roll Kasa gyp @ Rp. ### ###
0.4500 kg Tepung g @ Rp. ### ###
0.0030 kg Alkasit @ Rp. ### 12.00
0.0500 kg Paku gyp @ Rp. ### 300.00
0.1200 kg Paku usuk @ Rp. ### ###
0.2400 oh Pekerja @ Rp. ### ###
0.3700 oh Tukang ka @ Rp. ### ###
0.0370 oh Kepala tu @ Rp. ### ###
0.0120 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
161 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing
AK 0.0130 m3 Kayu krui @ Rp. ### ###
0.3600 lbr Gypsum b @ Rp. ### ###
0.0500 roll Kasa gyp @ Rp. ### ###
0.4500 kg Tepung g @ Rp. ### ###
0.0030 kg Alkasit @ Rp. ### 12.00
0.0500 kg Paku gyp @ Rp. ### 300.00
0.1200 kg Paku usuk @ Rp. ### ###
0.2400 oh Pekerja @ Rp. ### ###
0.3700 oh Tukang ka @ Rp. ### ###
0.0370 oh Kepala tu @ Rp. ### ###
0.0120 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
163 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati (lokal)
AK 0.0130 m3 Kayu jati @ Rp. ### 975.00
0.3600 lbr Kalsiboar @ Rp. ### ###
0.0500 roll Kasa gyp @ Rp. ### ###
0.4500 kg Tepung g @ Rp. ### ###
0.0030 kg Alkasit @ Rp. ### 12.00
0.0500 kg Paku gyp @ Rp. ### 300.00
0.1200 kg Paku usuk @ Rp. ### ###
0.2400 oh Pekerja @ Rp. ### ###
0.3700 oh Tukang ka @ Rp. ### ###
0.0370 oh Kepala tu @ Rp. ### ###
0.0120 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
164 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper
AK 0.0130 m3 Kayu kamp @ Rp. ### ###
0.3600 lbr Kalsiboar @ Rp. ### ###
0.0500 roll Kasa gyp @ Rp. ### ###
0.4500 kg Tepung g @ Rp. ### ###
0.0030 kg Alkasit @ Rp. ### 12.00
0.0500 kg Paku gyp @ Rp. ### 300.00
0.1200 kg Paku usuk @ Rp. ### ###
0.2400 oh Pekerja @ Rp. ### ###
0.3700 oh Tukang ka @ Rp. ### ###
0.0370 oh Kepala tu @ Rp. ### ###
0.0120 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
165 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai
AK 0.0130 m3 Kayu beng @ Rp. ### ###
0.3600 lbr Kalsiboar @ Rp. ### ###
0.0500 roll Kasa gyp @ Rp. ### ###
0.4500 kg Tepung g @ Rp. ### ###
0.0030 kg Alkasit @ Rp. ### 12.00
0.0500 kg Paku gyp @ Rp. ### 300.00
0.1200 kg Paku usuk @ Rp. ### ###
0.2400 oh Pekerja @ Rp. ### ###
0.3700 oh Tukang ka @ Rp. ### ###
0.0370 oh Kepala tu @ Rp. ### ###
0.0120 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
166 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing
AK 0.0130 m3 Kayu krui @ Rp. ### ###
0.3600 lbr Kalsiboar @ Rp. ### ###
0.0500 roll Kasa gyp @ Rp. ### ###
0.4500 kg Tepung g @ Rp. ### ###
0.0030 kg Alkasit @ Rp. ### 12.00
0.0500 kg Paku gyp @ Rp. ### 300.00
0.1200 kg Paku usuk @ Rp. ### ###
0.2400 oh Pekerja @ Rp. ### ###
0.3700 oh Tukang ka @ Rp. ### ###
0.0370 oh Kepala tu @ Rp. ### ###
0.0120 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
178 1.00 m2 Memasang langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
SNI 2839:20 0.3640 lbr Gypsum b @ Rp. ### ###
0.1100 kg Paku skru @ Rp. ### ###
0.1000 oh Pekerja @ Rp. ### ###
0.0500 oh Tukang ka @ Rp. ### ###
0.0050 oh Kepala tu @ Rp. ### 425.00
0.0050 oh Mandor @ Rp. ### 500.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
179 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium
SNI 2839:20 3.6000 m Profil Al @ Rp. ### ###
0.1500 kg Kawat dia @ Rp. ### ###
1.0500 bh Ramset @ Rp. ### ###
1.5000 lbr Akustik U @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.5000 oh Tukang ka @ Rp. ### ###
0.0500 oh Kepala tu @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
183 1.00 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm
AK 1.1000 m1 List profi @ Rp. ### ###
1.0500 kg Tepung g @ Rp. ### ###
0.0053 kg Alkasit @ Rp. ### 21.20
0.1125 oh Pekerja @ Rp. ### ###
0.0400 oh Tukang ka @ Rp. ### ###
0.0040 oh Kepala tu @ Rp. ### 340.00
0.0065 oh Mandor @ Rp. ### 650.00
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
184 1.00 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak berluban
AK Membuat pola ukir dan memindahkan pola
1.0000 lb Kertas 10 @ Rp. ### ###
15.0000 lbr Kerta kar @ Rp. ### ###
2.0000 org Tukang ga @ Rp. ### ###
JUMLAH ( A ) ### ### ###
Mengukir
16.0000 org Tukang Uk @ Rp. ### ###
1.0000 org Kepala Tk @ Rp. ### ###
JUMLAH ( B ) ### - ###
kayu bengkirai
kayu kruing
las III untuk gudang sementara
las I atau II
ti (klas plitur)
las I atau II
i (klas plitur)
ka tertutup kayu kelas II (lebar sampai 90 cm)
as I atau II
se kayu kelas II
se kayu kamper
se kayu bengkirai
se kayu kruing
(klas plitur) bentang 6 meter
ng bentang 6 meter
u bentang 6 meter
las II atau III
ayu kelas II
ayu bengkirai
ayu kruing
yu kelas II
yu kamper
yu bengkirai
0 x 240) cm
ayu jati (lokal) tanpa plepet
kayu kamper
kayu bengkirai
kayu kruing
yu jati (lokal)
yu kamper
yu bengkirai
yu kruing
9) mm, tebal 9 mm
ngka alluminium
n 1 cm, tidak berlubang
PEKERJAAN PENUTUP ATAP
46 1.00 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat
AK 9.0000 bh Genteng beton natural @ Rp. ###
0.3000 oh Pekerja @ Rp. ###
0.1000 oh Tukang batu @ Rp. ###
0.0100 oh Kep. Tk. Batu @ Rp. ###
0.0150 oh Mandor @ Rp. ###
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
47 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 )
AK 9.0000 bh Genteng beton Warna @ Rp. ###
0.2000 oh Pekerja @ Rp. ###
0.1000 oh Tukang batu @ Rp. ###
0.0100 oh Kep. Tk. Batu @ Rp. ###
0.0100 oh Mandor @ Rp. ###
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
48 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat
AK 9.0000 bh Genteng beton Warna @ Rp. ###
0.3000 oh Pekerja @ Rp. ###
0.1000 oh Tukang batu @ Rp. ###
0.0100 oh Kep. Tk. Batu @ Rp. ###
0.0150 oh Mandor @ Rp. ###
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
50 1.00 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat
AK 14.5000 bh Genteng beton natural @ Rp. ###
0.3000 oh Pekerja @ Rp. ###
0.1000 oh Tukang batu @ Rp. ###
0.0100 oh Kep. Tk. Batu @ Rp. ###
0.0150 oh Mandor @ Rp. ###
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
51 1.00 m2 Pasang bubungan genteng beton Warna
AK 4.0000 bh Bubungan genteng beto @ Rp. ###
0.0152 m3 Kapur pasang @ Rp. -
0.0152 m3 Pasir pasang @ Rp. ###
1.5240 kg PC @ Rp. 180.00
0.4000 oh Pekerja @ Rp. ###
0.2000 oh Tukang batu @ Rp. ###
0.0200 oh Kep. Tk. Batu @ Rp. ###
0.0200 oh Mandor @ Rp. ###
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
###
12,000.00
7,000.00
800.00
1,000.00
20,800.00 ### ###
###
###
###
###
12,000.00
7,000.00
800.00
1,000.00
20,800.00 ### ###
###
###
###
###
###
###
###
15,000.00
1,700.00
200.00
16,900.00 ### ###
###
###
###
###
###
###
5.76
11,340.00
24,000.00
15,000.00
1,700.00
2,000.00
54,040.00 ### ###
###
###
###
###
-
###
274.32
24,000.00
14,000.00
1,600.00
2,000.00
41,600.00 ### ###
###
###
###
###
###
8,400.00
5,625.00
680.00
800.00
15,505.00 ### ###
###
###
###
###
###
8,400.00
5,625.00
680.00
800.00
15,505.00 ### ###
###
###
###
###
###
8,400.00
5,250.00
595.00
700.00
14,945.00 ### ###
###
###
###
###
###
8,400.00
5,250.00
595.00
700.00
14,945.00 ### ###
###
###
###
###
###
8,400.00
5,250.00
595.00
700.00
14,945.00 ### ###
###
###
###
###
###
8,400.00
5,250.00
595.00
700.00
14,945.00 ### ###
###
###
###
###
###
8,400.00
5,025.00
595.00
700.00
14,720.00 ### ###
###
###
###
###
###
8,400.00
5,025.00
595.00
700.00
14,720.00 ### ###
###
###
###
###
###
8,400.00
5,025.00
595.00
700.00
14,720.00 ### ###
###
###
###
###
###
8,400.00
5,025.00
595.00
700.00
14,720.00 ### ###
###
###
###
###
###
8,400.00
5,025.00
595.00
700.00
14,720.00 ### ###
###
###
###
###
###
8,400.00
5,025.00
595.00
700.00
14,720.00 ### ###
###
###
###
###
###
8,400.00
5,025.00
595.00
700.00
14,720.00 ### ###
###
###
###
###
###
8,400.00
5,025.00
595.00
700.00
14,720.00 ### ###
###
###
###
###
###
5,040.00
9,375.00
1,105.00
400.00
15,920.00 ### ###
###
###
###
###
###
5,040.00
9,375.00
1,105.00
400.00
15,920.00 ### ###
###
###
###
-
###
5,040.00
9,375.00
1,105.00
400.00
15,920.00 ### ###
###
###
###
###
###
5,040.00
9,375.00
1,105.00
400.00
15,920.00 ### ###
###
###
###
-
###
5,040.00
9,375.00
1,105.00
400.00
15,920.00 ### ###
###
###
###
-
###
7,140.00
7,500.00
975.00
400.00
16,015.00 ### ###
###
###
###
###
###
6,000.00
11,250.00
1,105.00
400.00
18,755.00 ### ###
###
###
###
-
###
5,040.00
9,375.00
1,105.00
400.00
15,920.00 ### ###
###
###
###
-
###
900.00
5,250.00
680.00
600.00
7,430.00 ### ###
###
###
###
###
370.00
900.00
5,625.00
680.00
600.00
7,805.00 ### ###
###
###
###
###
740.00
6,000.00
75,000.00
850.00
1,000.00
82,850.00 ### ###
###
###
###
###
9,000.00
3,750.00
425.00
800.00
13,975.00 ### ###
###
###
###
###
###
###
-
12,000.00
22,500.00
255.00
1,000.00
35,755.00 ### ###
###
###
###
#REF!
###
12,000.00
7,500.00
850.00
100.00
20,450.00 #REF! #REF!
#REF!
#REF!
#REF!
###
9,000.00
5,625.00
680.00
800.00
16,105.00 ### ###
###
###
###
###
9,000.00
4,500.00
510.00
800.00
14,810.00 ### ###
###
###
###
-
###
###
###
2,125.00
800.00
2,925.00 ### ###
###
###
###
###
###
###
###
15,000.00
1,700.00
200.00
16,900.00 ### ###
###
###
###
###
###
###
###
15,000.00
1,700.00
200.00
16,900.00 ### ###
###
###
###
###
###
8,400.00
5,025.00
595.00
700.00
14,720.00 ### ###
###
###
###
###
###
###
7,500.00
18,750.00
2,125.00
600.00
28,975.00 ### ###
###
###
###
-
###
15,000.00
11,250.00
1,275.00
1,300.00
28,825.00 ### ###
###
###
###
-
###
###
###
7,500.00
18,750.00
2,125.00
600.00
28,975.00 ### ###
###
###
###
-
###
###
###
510.00
600.00
1,110.00 ### ###
###
###
###
###
18,000.00
7,000.00
800.00
1,500.00
27,300.00 ### ###
###
###
###
###
12,000.00
7,000.00
800.00
1,000.00
20,800.00 ### ###
###
###
###
Kanmuri Natural
###
-
###
274.32
24,000.00
14,000.00
1,600.00
2,000.00
41,600.00 ### ###
###
###
###
###
#REF!
12,000.00
7,500.00
850.00
100.00
20,450.00 #REF! #REF!
#REF!
#REF!
#REF!
###
#REF!
15,000.00
11,250.00
1,275.00
1,300.00
28,825.00 #REF! #REF!
#REF!
#REF!
#REF!
#REF!
###
#REF!
30,000.00
35,000.00
4,000.00
250.00
69,250.00 #REF! #REF!
#REF!
#REF!
#REF!
PEKERJAAN SANITASI
13 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35 cm
AK 87.0000 bh Batu bata @ Rp. ### ###
44.0000 kg PC @ Rp. 180.00 ###
0.0700 m3 Pasir pasa @ Rp. ### ###
0.0700 m3 Batu kerik @ Rp. ### ###
1.6000 kg Besi beton @ Rp. ### ###
0.0600 m3 Pasir beto @ Rp. ### ###
3.2000 oh Pekerja @ Rp. ### ###
1.0150 oh Tukang ba @ Rp. ### ###
0.0015 oh Kepala tu @ Rp. ### 120.00
0.0160 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM TERMAS ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
14 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50 cm
AK 150.0000 bh Batu bata @ Rp. ### ###
77.0000 kg PC @ Rp. 180.00 ###
0.1300 m3 Pasir pasa @ Rp. ### ###
0.0200 m3 Batu kerik @ Rp. ### ###
2.6000 kg Besi beton @ Rp. ### ###
0.0900 m3 Pasir beto @ Rp. ### ###
1.4200 oh Pekerja @ Rp. ### ###
0.4730 oh Tukang ba @ Rp. ### ###
0.0470 oh Kepala tu @ Rp. ### ###
0.0710 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM TERMAS ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
15 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65 cm
AK 222.0000 bh Batu bata @ Rp. ### ###
114.0000 kg PC @ Rp. 180.00 ###
0.1840 m3 Pasir pasa @ Rp. ### ###
0.0330 m3 Batu kerik @ Rp. ### ###
4.8500 kg Besi beton @ Rp. ### ###
0.1200 m3 Pasir beto @ Rp. ### ###
2.1600 oh Pekerja @ Rp. ### ###
0.7200 oh Tukang ba @ Rp. ### ###
0.0720 oh Kepala tu @ Rp. ### ###
0.1080 oh Mandor @ Rp. ### ###
0.1000 oh Tukang Ga @ Rp. ### ###
JUMLAH ( BELUM TERMAS ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
32.C 1.00 bh Pekerjaan Sumur Peresapan Air Kotor dalam 3 meter, tanpa tutup
AK 3.0000 m1 Memasang @ Rp. -
0.0900 m3 Urugan bat @ Rp. -
0.1200 m3 Urugan pas @ Rp.
0.0630 oh Pekerja @ Rp. ### ###
0.0021 oh Mandor @ Rp. ### 210.00
JUMLAH ( BELUM TERMAS ### - ###
JASA 10 % 399.00
JUMLAH ###
DIBULATKAN ###
32.D 1.00 bh Pekerjaan Sumur Peresapan Air Kotor dalam 5 meter, tanpa tutup
AK 5.0000 m1 Memasang @ Rp. -
0.0900 m3 Urugan bat @ Rp. -
0.1200 m3 Urugan pas @ Rp.
0.0630 oh Pekerja @ Rp. ### ###
0.0021 oh Mandor @ Rp. ### 210.00
JUMLAH ( BELUM TERMAS ### - ###
JASA 10 % 399.00
JUMLAH ###
DIBULATKAN ###
36.G 1.000 unit Memasang beton precast jenis U-Ditch /Box Culvert
AK 1.000 unit Beton Pre @ Rp. -
1.000 set Cover U-6 @ Rp. -
0.250 hari Sewa Pick @ Rp. -
0.0625 hari Sewa Trip @ Rp. -
0.0625 ls Alat dan @ Rp. -
1.5000 oh Pekerja @ Rp. ### ###
0.750 oh Tukang Ba @ Rp. ### ###
0.075 oh Kepala Tu @ Rp. ### ###
0.001 oh Mandor @ Rp. ### 75.00
JUMLAH ( BELUM TERMAS ### - ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
36.H 1.0000 m' Memasang kerb
AK 2.1000 bh Kerb @ Rp. -
0.5850 kg Portland @ Rp. -
0.0250 oh Pekerja @ Rp. ### ###
0.00250 oh Tukang ba @ Rp. ### 175.00
0.00025 oh Kepala tu @ Rp. ### 20.00
0.00125 oh Mandor @ Rp. ### 125.00
JUMLAH ( BELUM TERMAS ### - ###
JASA 10 % 182.00
JUMLAH ###
DIBULATKAN ###
60 )cm, t = 65 cm
PEKERJAAN KUNCI DAN KACA
34 1.00 m2 Memasang lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm
SNI 7395:20 1.0600 m2 Ubin keram @ Rp. - -
8.1900 kg Portland @ Rp. 180.00 ###
0.0450 m3 Pasir Pasa @ Rp. ### ###
3.2000 kg Semen wa @ Rp. ### ###
0.7000 oh Pekerja @ Rp. ### ###
0.3500 oh Tukang ba @ Rp. ### ###
0.0350 oh Kepala tu @ Rp. ### ###
0.0350 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM TERMAS ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
39 1.00 m2 Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP
SNI 7395:20 1.0683 m2 Mosaik @ Rp. ### ###
14.1500 kg Portland @ Rp. 180.00 ###
0.0390 m3 Pasir Pasa @ Rp. ### ###
2.0000 kg Semen wa @ Rp. ### ###
0.7000 oh Pekerja @ Rp. ### ###
0.3500 oh Tukang ba @ Rp. ### ###
0.0350 oh Kepala tu @ Rp. ### ###
0.0350 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM TERMAS ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
61.a 1.00 m1 Memasang plint vinyl karet ukuran (15 x 30) cm dengan perekat
SNI 7395:20 1.7600 m1 Vinyl kare @ Rp. -
0.0800 kg Lem vinyl @ Rp. -
0.0800 oh Pekerja @ Rp. ### ###
0.0800 oh Tukang @ Rp. ### ###
0.0080 oh Kepala tu @ Rp. ### 680.00
0.0040 oh Mandor @ Rp. ### 400.00
JUMLAH ( BELUM PPN ) ### - ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
PEKERJAAN CONBLOCK
1 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400tebal pasir
AK 1.0000 m2
Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
2 1.00 m2 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
3 1.00 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2
Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
4 1.00 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
5 1.00 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2
Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
6 1.00 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2
Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
7 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400 tebal pasir 5
AK 1.0000 m2 Conblock @ Rp. ### ###
0.0500 m3
Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
8 1.00 m2 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 tebal pasir 5 cm
AK 1.0000 m2
Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
9 1.00 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
10 1.00 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2
Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
11 1.00 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2 Conblock @ Rp. ### ###
0.0500 m3
Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
12 1.00 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200 tebal pasir 5 cm
AK 1.0000 m2
Conblock @ Rp. ### ###
0.0500 m3 Pasir urug @ Rp. ### ###
0.5000 oh Pekerja @ Rp. ### ###
0.2500 oh Tukang ba @ Rp. ### ###
0.0250 oh Kep. Tk. @ Rp. ### ###
0.0250 oh Mandor @ Rp. ### ###
JUMLAH ( BELUM PPN ) ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
al pasir 5 cm
al pasir 5 cm
l pasir 5 cm
l pasir 5 cm
ebal pasir 5 cm
pasir 5 cm
pasir 5 cm
pasir 5 cm
pasir 5 cm
PEKERJAAN PENGECATAN
2 1.00 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual
AK 0.0500 kg Sabun @ Rp. ### 630.00
0.1500 oh Pekerja @ Rp. ### ###
0.0025 oh Mandor @ Rp. ### 250.00
JUMLAH ( BELUM TERMAS ### 630.00 ###
JASA 10 % 988.00
JUMLAH ###
DIBULATKAN ###
5 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Ca
AK 0.2000 kg Cat meni @ Rp. ### ###
0.1500 kg Plamir @ Rp. ### ###
0.1700 kg Cat dasar @ Rp. ### ###
0.2600 kg Cat penut @ Rp. ### ###
0.0700 oh Pekerja @ Rp. ### ###
0.0090 oh Tukang Ca @ Rp. ### 630.00
0.0060 oh Kepala tu @ Rp. ### 480.00
0.0025 oh Mandor @ Rp. ### 250.00
JUMLAH ( BELUM TERMAS ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
6 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Ca
AK 0.2000 kg Cat meni @ Rp. ### ###
0.1500 kg Plamir @ Rp. ### ###
0.1700 kg Cat dasar @ Rp. ### ###
0.3500 kg Cat penut @ Rp. ### ###
0.0700 oh Pekerja @ Rp. ### ###
0.1050 oh Tukang Ca @ Rp. ### ###
0.0040 oh Kepala tu @ Rp. ### 320.00
0.0025 oh Mandor @ Rp. ### 250.00
JUMLAH ( BELUM TERMAS ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
11 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
AK 0.1000 Kg Plamir te @ Rp. ### ###
0.1000 Kg Cat dasar @ Rp. ### ###
0.2600 Kg Cat penutu @ Rp. ### ###
0.0200 oh Pekerja @ Rp. ### ###
0.0630 oh Tukang Ca @ Rp. ### ###
0.0063 oh Kepala tu @ Rp. ### 504.00
0.0025 oh Mandor @ Rp. ### 250.00
JUMLAH ( BELUM TERMAS ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
12 1.00 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
AK 0.1200 kg Cat dasar @ Rp. ### ###
0.1800 lbr Cat penutu @ Rp. ### ###
0.0280 oh Pekerja @ Rp. ### ###
0.0420 oh Tukang Ca @ Rp. ### ###
0.0042 oh Kepala tu @ Rp. ### 336.00
0.0025 oh Mandor @ Rp. ### 250.00
JUMLAH ( BELUM TERMAS ### ### ###
JASA 10 % ###
JUMLAH ###
DIBULATKAN ###
37 1.00 Unit Upah Pasang Box Panel dan Panel Kontrol 1 Unit
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
44 1.00 Buah Pasang MCB Ampere + box tutup panel ukuran 30x30
1.0000 bh MCB 10 Ampere @ Rp. 55,000.00 55,000.00
1.0000 bh Tutup panel 30x30 @ Rp. 37,200.00 37,200.00
0.2500 org Tukang Listrik @ Rp. 70,000.00 17,500.00
0.2000 org Pekerja @ Rp. 60,000.00 12,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
JUMLAH 54,500.00 92,200.00 146,700.00
JASA 10 % 14,670.00
JUMLAH 161,370.00
DIBULATKAN 161,370.00
46 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 1300 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 140,000.00 140,000.00
3.0000 bh MCB 6 A @ Rp. 55,000.00 165,000.00
1.0000 bh MCB 10 A @ Rp. 55,000.00 55,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00 153,791.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
1,300.00 VA Administrasi 900 - 2200 VA @ Rp. 850.00 1,105,000.00
JUMLAH 1,567,000.00 758,041.00 2,325,041.00
JASA 10 % 232,504.10
JUMLAH 2,557,545.10
DIBULATKAN 2,557,545.00
47 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 2200 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 140,000.00 140,000.00
3.0000 bh MCB 10 A @ Rp. 55,000.00 165,000.00
1.0000 bh MCB 16 A @ Rp. 55,000.00 55,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00 153,791.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
2,200.00 VA Administrasi 900 - 2200 VA @ Rp. 850.00 1,870,000.00
JUMLAH 2,332,000.00 758,041.00 3,090,041.00
JASA 10 % 309,004.10
JUMLAH 3,399,045.10
DIBULATKAN 3,399,045.00
48 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 3500 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 140,000.00 140,000.00
3.0000 bh MCB 16 A @ Rp. 55,000.00 165,000.00
1.0000 bh MCB 20 A @ Rp. 65,000.00 65,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00 153,791.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
3,500.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 3,500,000.00
JUMLAH 3,962,000.00 768,041.00 4,730,041.00
JASA 10 % 473,004.10
JUMLAH 5,203,045.10
DIBULATKAN 5,203,045.00
49 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 4400 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 140,000.00 140,000.00
3.0000 bh MCB 20 A @ Rp. 65,000.00 195,000.00
1.0000 bh MCB 25 A @ Rp. 65,000.00 65,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00 153,791.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
4,400.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 4,400,000.00
JUMLAH 4,862,000.00 798,041.00 5,660,041.00
JASA 10 % 566,004.10
JUMLAH 6,226,045.10
DIBULATKAN 6,226,045.00
50 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 7700 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 140,000.00 140,000.00
3.0000 bh MCB 25 A @ Rp. 65,000.00 195,000.00
1.0000 bh MCB 35 A @ Rp. 65,000.00 65,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00 153,791.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
7,700.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 7,700,000.00
JUMLAH 8,162,000.00 798,041.00 8,960,041.00
JASA 10 % 896,004.10
JUMLAH 9,856,045.10
DIBULATKAN 9,856,045.00
51 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 11000 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 140,000.00 140,000.00
3.0000 bh MCB 35 A @ Rp. 65,000.00 195,000.00
1.0000 bh MCB 40 A @ Rp. 104,000.00 104,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00 153,791.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
11,000.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 11,000,000.00
JUMLAH 11,462,000.00 837,041.00 12,299,041.00
JASA 10 % 1,229,904.10
JUMLAH 13,528,945.10
DIBULATKAN 13,528,945.00
52 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 11000 VA (2 Unit Box Panel)
2.0000 Unit Box Panel 20x40x50 @ Rp. 140,000.00 280,000.00
4.0000 bh MCB 35 A @ Rp. 65,000.00 260,000.00
2.0000 bh MCB 40 A @ Rp. 104,000.00 208,000.00
0.6000 m1 Rel MCB @ Rp. 52,500.00 31,500.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
5.0000 bh Pilot Lamp @ Rp. 13,000.00 65,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
2.0000 bh Terminal Nol @ Rp. 45,000.00 90,000.00
4.0000 bh Sekering kecil @ Rp. 9,000.00 36,000.00
3.0000 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00 135,300.00
4.0000 org Pekerja @ Rp. 60,000.00 240,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
2.0000 org Tukang Listrik @ Rp. 70,000.00 140,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
11,000.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 11,000,000.00
JUMLAH 11,557,000.00 1,232,300.00 12,789,300.00
JASA 10 % 1,278,930.00
JUMLAH 14,068,230.00
DIBULATKAN 14,068,230.00
6 1.00 Gawang Pasang Kabel DX 2x10 Sqmm + Accessories (Gawang) untuk Lampu Ekorola
50.0000 m1 Kabel DX 2x10 Sqmm @ Rp. 9,500.00 475,000.00
2.0000 bh Stoping Buckle @ Rp. 3,500.00 7,000.00
2.0000 bh Wadge tape @ Rp. 8,500.00 17,000.00
0.3000 m1 Stainless Steel @ Rp. 15,000.00 4,500.00
1.0000 set Service Link dan Clamp @ Rp. 7,000.00 7,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
0.5000 org Pekerja @ Rp. 60,000.00 30,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
JUMLAH 118,250.00 510,500.00 628,750.00
JASA 10 % 62,875.00
JUMLAH 691,625.00
DIBULATKAN 691,625.00
7 1.00 Gawang Pasang Kabel DX 2x16 Sqmm + Accessories (Gawang) untuk Lampu Ekorola
50.0000 m1 Kabel DX 2x16 Sqmm @ Rp. 13,500.00 675,000.00
2.0000 bh Stoping Buckle @ Rp. 3,500.00 7,000.00
2.0000 bh Wadge tape @ Rp. 8,500.00 17,000.00
0.5000 m1 Stainless Steel @ Rp. 15,000.00 7,500.00
1.0000 set Service Link dan Clamp @ Rp. 7,000.00 7,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
0.5000 org Pekerja @ Rp. 60,000.00 30,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
JUMLAH 118,250.00 713,500.00 831,750.00
JASA 10 % 83,175.00
JUMLAH 914,925.00
DIBULATKAN 914,925.00
8 32.00 m1 Pasang Kabel DX 2x10 Sqmm + Accessories (Gawang) untuk Lampu Ekorola
32.0000 m 1
Kabel DX 2x10 Sqmm @ Rp. 9,500.00 304,000.00
2.0000 bh Stoping Buckle @ Rp. 3,500.00 7,000.00
2.0000 bh Wadge tape @ Rp. 8,500.00 17,000.00
0.3000 m1 Stainless Steel @ Rp. 15,000.00 4,500.00
1.0000 set Service Link dan Clamp @ Rp. 7,000.00 7,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
0.5000 org Pekerja @ Rp. 60,000.00 30,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
JUMLAH 118,250.00 339,500.00 457,750.00
JASA 10 % 45,775.00
JUMLAH 503,525.00
DIBULATKAN 503,525.00
9 40.00 m1 Pasang Kabel DX 2x16 Sqmm + Accessories (Gawang) untuk Lampu PJU
40.0000 m1 Kabel DX 2x16 Sqmm @ Rp. 13,500.00 540,000.00
2.0000 bh Stoping Buckle @ Rp. 3,500.00 7,000.00
2.0000 bh Wadge tape @ Rp. 8,500.00 17,000.00
0.3000 m1 Stainless Steel @ Rp. 15,000.00 4,500.00
1.0000 set Service Link dan Clamp @ Rp. 7,000.00 7,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
0.5000 org Pekerja @ Rp. 60,000.00 30,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
JUMLAH 118,250.00 575,500.00 693,750.00
JASA 10 % 69,375.00
JUMLAH 763,125.00
DIBULATKAN 763,125.00
22 1.00 m1 Pasang Kabel NYY 3x4 Sqmm dibawah Aspal dengan sistem bor
1.0000 m1 Pipa PVC 1" @ Rp. 43,750.00 43,750.00
1.0000 m1 Kabel NYY 3x4 Sqmm @ Rp. 32,100.00 32,100.00
1.0000 m 1
Bor lubang dibawah aspal @ Rp. 350,000.00 350,000.00
0.0050 org Tukang Listrik @ Rp. 70,000.00 350.00
0.0050 org Pekerja @ Rp. 60,000.00 300.00
0.0050 org Mandor @ Rp. 100,000.00 500.00
JUMLAH 351,150.00 75,850.00 427,000.00
JASA 10 % 42,700.00
JUMLAH 469,700.00
DIBULATKAN 469,700.00
23 1.00 m1 Pasang Kabel NYY 3x4 Sqmm dengan PVC tanpa galian
1.0000 m1 Kabel NYY 3x4 Sqmm @ Rp. 32,100.00 32,100.00
1.0000 m1 Pipa PVC 1" @ Rp. 43,750.00 43,750.00
0.0150 org Tukang Listrik @ Rp. 70,000.00 1,050.00
0.0250 org Pekerja @ Rp. 60,000.00 1,500.00
0.0050 org Mandor @ Rp. 100,000.00 500.00
JUMLAH 3,050.00 75,850.00 78,900.00
JASA 10 % 7,890.00
JUMLAH 86,790.00
DIBULATKAN 86,790.00
24 1.00 Unit Upah Pasang Box Panel dan Panel Kontrol 1 Unit
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
0.7500 org Pekerja @ Rp. 60,000.00 45,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 ls Pasang Panel Kontrol @ Rp. 12,600.00 12,600.00
JUMLAH 117,600.00 117,600.00
JASA 10 % 11,760.00
JUMLAH 129,360.00
DIBULATKAN 129,360.00
35 1.00 Buah Pasang MCB Ampere + box tutup panel ukuran 30x30
1.0000 bh MCB 10 Ampere @ Rp. 55,000.00 55,000.00
1.0000 bh Tutup panel 30x30 @ Rp. 37,200.00 37,200.00
0.2500 org Tukang Listrik @ Rp. 70,000.00 17,500.00
0.2000 org Pekerja @ Rp. 60,000.00 12,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
JUMLAH 54,500.00 92,200.00 146,700.00
JASA 10 % 14,670.00
JUMLAH 161,370.00
DIBULATKAN 161,370.00
38 1.00 Set Upah Pasang Stang Ornamen 2 meter + Lampu SRP 822/250 Watt Son
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 283,250.00 - 283,250.00
JASA 10 % 28,325.00
JUMLAH 311,575.00
DIBULATKAN 311,575.00
39 1.00 Set Upah Pasang Stang Ornamen 2.2 meter + Lampu SRP 822/250 Watt Son
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 283,250.00 - 283,250.00
JASA 10 % 28,325.00
JUMLAH 311,575.00
40 1.00 Set Upah Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
0.6500 org Tukang Listrik @ Rp. 70,000.00 45,500.00
2.5000 org Pekerja @ Rp. 60,000.00 150,000.00
0.3500 org Mandor @ Rp. 100,000.00 35,000.00
0.5500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 165,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 440,000.00 - 440,000.00
JASA 10 % 44,000.00
JUMLAH 484,000.00
DIBULATKAN 484,000.00
41 1.00 Set Upah Pasang Tiang Octogonal Cabang 1, h= 7 meter + lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi tiang beton bertulang @ Rp. 2,191,140.00 920,278.80
2.8500 org Pekerja @ Rp. 60,000.00 171,000.00
2.8500 org Tukang Listrik @ Rp. 70,000.00 199,500.00
2.0075 org Pengawas @ Rp. 130,000.00 260,975.00
1.0000 org Mandor @ Rp. 100,000.00 100,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 743,475.00 920,278.80 1,663,753.80
JASA 10 % 166,375.38
JUMLAH 1,830,129.18
DIBULATKAN 1,830,129.00
42 1.00 Set Upah Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi tiang beton bertulang @ Rp. 2,191,140.00 920,278.80
3.1000 org Pekerja @ Rp. 60,000.00 186,000.00
3.1000 org Tukang Listrik @ Rp. 70,000.00 217,000.00
2.5000 org Pengawas @ Rp. 130,000.00 325,000.00
1.2100 org Mandor @ Rp. 100,000.00 121,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 861,000.00 920,278.80 1,781,278.80
JASA 10 % 178,127.88
JUMLAH 1,959,406.68
DIBULATKAN 1,959,406.00
43 1.00 Set Upah Pasang Tiang Octogonal Cabang 2, h= 9 meter + lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi tiang beton bertulang @ Rp. 2,191,140.00 920,278.80
3.3000 org Pekerja @ Rp. 60,000.00 198,000.00
3.3000 org Tukang Listrik @ Rp. 70,000.00 231,000.00
2.5782 org Pengawas @ Rp. 130,000.00 335,166.00
1.2433 org Mandor @ Rp. 100,000.00 124,330.00
1.0000 ls Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 900,496.00 920,278.80 1,820,774.80
JASA 10 % 182,077.48
JUMLAH 2,002,852.28
DIBULATKAN 2,002,852.00
44 1.00 Set Upah Pasang Tiang Octogonal Cabang 3, h= 9 meter + lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi tiang beton bertulang @ Rp. 2,191,140.00 920,278.80
3.8100 org Pekerja @ Rp. 60,000.00 228,600.00
3.8100 org Tukang Listrik @ Rp. 70,000.00 266,700.00
2.6626 org Pengawas @ Rp. 130,000.00 346,138.00
1.2650 org Mandor @ Rp. 100,000.00 126,500.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 979,938.00 920,278.80 1,900,216.80
JASA 10 % 190,021.68
JUMLAH 2,090,238.48
DIBULATKAN 2,090,238.00
45 1.00 Set Upah Pasang Tiang Octogonal Cabang 3, h= 11 meter + lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi tiang beton bertulang @ Rp. 2,191,140.00 920,278.80
4.2500 org Pekerja @ Rp. 60,000.00 255,000.00
4.2500 org Tukang Listrik @ Rp. 70,000.00 297,500.00
2.9287 org Pengawas @ Rp. 130,000.00 380,731.00
1.2939 org Mandor @ Rp. 100,000.00 129,390.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 1,074,621.00 920,278.80 1,994,899.80
JASA 10 % 199,489.98
JUMLAH 2,194,389.78
DIBULATKAN 2,194,389.00
46 1.00 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/70 Watt SON + retur ke gudang Pemda
0.7500 org Pengawas @ Rp. 130,000.00 97,500.00
0.8750 org Tukang Listrik @ Rp. 70,000.00 61,250.00
1.6995 org Pekerja @ Rp. 60,000.00 101,970.00
0.6798 org Mandor @ Rp. 100,000.00 67,980.00
0.0500 unit Retur material existing ke gudang Pemda @ Rp. 125,000.00 6,250.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 346,950.00 - 346,950.00
JASA 10 % 34,695.00
JUMLAH 381,645.00
DIBULATKAN 381,645.00
47 1.00 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/150 Watt SON + retur ke gudang Pemda
0.7500 org Pengawas @ Rp. 130,000.00 97,500.00
0.8750 org Tukang Listrik @ Rp. 70,000.00 61,250.00
1.6995 org Pekerja @ Rp. 60,000.00 101,970.00
0.8418 org Mandor @ Rp. 100,000.00 84,180.00
0.0500 unit Retur material existing ke gudang Pemda @ Rp. 125,000.00 6,250.00
1.0000 ls Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 363,150.00 - 363,150.00
JASA 10 % 36,315.00
JUMLAH 399,465.00
DIBULATKAN 399,465.00
48 1.00 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt SON + retur ke gudang Pemda
0.7500 org Pengawas @ Rp. 130,000.00 97,500.00
0.8750 org Tukang Listrik @ Rp. 70,000.00 61,250.00
1.6995 org Pekerja @ Rp. 60,000.00 101,970.00
0.8418 org Mandor @ Rp. 100,000.00 84,180.00
0.0500 unit Retur material existing ke gudang Pemda @ Rp. 125,000.00 6,250.00
1.0000 ls Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 363,150.00 - 363,150.00
JASA 10 % 36,315.00
JUMLAH 399,465.00
DIBULATKAN 399,465.00
49 1.00 Set Bongkar komponen lama existing + pasang Lampu SRP 822/250 Watt SON + retur ke gudang Pemda
0.7500 org Pengawas @ Rp. 130,000.00 97,500.00
0.8750 org Tukang Listrik @ Rp. 70,000.00 61,250.00
1.6995 org Pekerja @ Rp. 60,000.00 101,970.00
0.7822 org Mandor @ Rp. 100,000.00 78,220.00
0.0500 unit Retur material existing ke gudang Pemda @ Rp. 125,000.00 6,250.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 357,190.00 - 357,190.00
JASA 10 % 35,719.00
JUMLAH 392,909.00
DIBULATKAN 392,909.00
50 1.00 Batang Pasang Stang ornamen 1 m + Lampu sekualitas SRP 810 SON 70 W
1.0000 bh Stang Ornamen GIP dia. 2" L= 1 m @ Rp. 240,800.00 240,800.00
1.0000 bh Armature IP 65 Komplit (sekualitas SRP 810 SON 70 W) @ Rp. 29,300,000.00 29,300,000.00
2.0000 bh Beugel @ Rp. - -
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
1.0000 set Box MCB @ Rp. 7,000.00 7,000.00
2.0000 m1 Kabel NYM 2 x 2.5 sqmm @ Rp. 15,500.00 31,000.00
2.0000 bh Banded @ Rp. 7,000.00 14,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 283,250.00 29,667,800.00 29,951,050.00
JASA 10 % 2,995,105.00
JUMLAH 32,946,155.00
DIBULATKAN 32,946,155.00
51 1.00 Batang Pasang Stang ornamen 3 m + Armature IP 65 (sekualitas SGP 328 SON=T 150 W)
1.0000 bh Stang Ornamen GIP dia. 2" L= 3 m @ Rp. 400,000.00 400,000.00
2.0000 bh Armature IP 65 (sekualitas SGP 328 SON-T 150 W) @ Rp. 4,100,000.00 8,200,000.00
2.0000 bh Beugel @ Rp. - -
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
1.0000 bh Cover MCB @ Rp. 7,100.00 7,100.00
4.0000 m1 Kabel NYM 2 x 2.5 sqmm @ Rp. 15,500.00 62,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 283,250.00 8,744,100.00 9,027,350.00
JASA 10 % 902,735.00
JUMLAH 9,930,085.00
DIBULATKAN 9,930,085.00
52 1.00 Batang Pasang Stang ornamen 3 m + Armature IP 65 (sekualitas SGP 328 SON-T 250 W)
1.0000 bh Stang Ornamen GIP dia. 2" L = 3 m @ Rp. 400,000.00 400,000.00
1.0000 bh Armature IP 65 (sekualitas SGP 828 SON-T 250 W) @ Rp. 4,300,000.00 4,300,000.00
2.0000 bh Beugel @ Rp. - -
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
1.0000 bh Cover MCB @ Rp. 7,100.00 7,100.00
4.0000 m1 Kabel NYM 2 x 2.5 sqmm @ Rp. 15,500.00 62,000.00
2.0000 bh Banded @ Rp. 7,000.00 14,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 283,250.00 4,858,100.00 5,141,350.00
JASA 10 % 514,135.00
JUMLAH 5,655,485.00
DIBULATKAN 5,655,485.00
55 1.00 Batang Pasang Tiang GIP Cb.1 2",3", 3", 4", h = 9 m / Tiang Bulat 7 m Cb.1 + Umpak
1.0000 btg Tiang GIP Cb. 2 2", 3", 4", t = 7 m, tanam @ Rp. 2,800,000.00 2,800,000.00
1.0000 bh Umpak @ Rp. 289,000.00 289,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
JUMLAH 271,250.00 3,089,000.00 3,360,250.00
JASA 10 % 336,025.00
JUMLAH 3,696,275.00
DIBULATKAN 3,696,275.00
56 1.00 Batang Pasang Tiang GIP Cb.1 2",3", 3", 4", h = 9 m / Tiang Bulat 9 m Cb.1 + Umpak
1.0000 btg Tiang GIP Cb. 2 2", 3", 4", t = 9 m, tanam @ Rp. 3,100,000.00 3,100,000.00
1.0000 bh Umpak @ Rp. 289,000.00 289,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
JUMLAH 271,250.00 3,389,000.00 3,660,250.00
JASA 10 % 366,025.00
JUMLAH 4,026,275.00
DIBULATKAN 4,026,275.00
57 1.00 Batang Pasang Kembali Tiang Bulat 7 m Cb.1 (GIP cb.1 2", 3", 4" h = 7 m) + Umpak
2.0000 bh Wadge tape @ Rp. 8,500.00 17,000.00
0.5000 m1 Stainless Steel @ Rp. 15,000.00 7,500.00
2.0000 bh Banded @ Rp. 7,000.00 14,000.00
1.0000 bh Umpak @ Rp. 289,000.00 289,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
JUMLAH 271,250.00 327,500.00 598,750.00
JASA 10 % 59,875.00
JUMLAH 658,625.00
DIBULATKAN 658,625.00
58 1.00 Batang Pasang Kembali Tiang Bulat 9 m Cb.1 (GIP cb.1 2", 3", 4" h = 7 m) + Umpak
2.0000 bh Wadge tape @ Rp. 8,500.00 17,000.00
0.5000 m1 Stainless Steel @ Rp. 15,000.00 7,500.00
2.0000 bh Banded @ Rp. 7,000.00 14,000.00
1.0000 bh Umpak @ Rp. 289,000.00 289,000.00
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
JUMLAH 271,250.00 327,500.00 598,750.00
JASA 10 % 59,875.00
JUMLAH 658,625.00
DIBULATKAN 658,625.00
64 1.00 Set Pasang Lp sorot Tango SMF 383 SON-T 150 Watt
1.0000 unit Armature Tango SMF 383 1xSON-T 150W SYMETRIC @ Rp. 2,550,000.00 2,550,000.00
1.0000 m 1
Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00 15,500.00
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
0.7500 org Pekerja @ Rp. 60,000.00 45,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 set Alat Bantu Pasang/Bongkar - (Lampu, Armature, Stang) @ Rp. 17,000.00 17,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 134,000.00 2,640,500.00 2,774,500.00
JASA 10 % 277,450.00
JUMLAH 3,051,950.00
DIBULATKAN 3,051,950.00
65 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 1300 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00 180,000.00
4.0000 bh Beugel @ Rp. - -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 33,500.00 201,000.00
21.0000 m 1
Kabel DX 2 x 16 Sqmm @ Rp. 13,500.00 283,500.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00 1,000.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00 17,500.00
3.0000 bh MCB 6 A @ Rp. 55,000.00 165,000.00
1.0000 bh MCB 10 A @ Rp. 55,000.00 55,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00 2,250.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
1,300.00 VA Adminatrasi 900 - 2200 VA @ Rp. 850.00 1,105,000.00
JUMLAH 1,567,000.00 2,184,500.00 3,751,500.00
JASA 10 % 375,150.00
JUMLAH 4,126,650.00
DIBULATKAN 4,126,650.00
66 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 2200 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00 180,000.00
4.0000 bh Beugel @ Rp. - -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 33,500.00 201,000.00
21.0000 m 1
Kabel DX 2 x 16 Sqmm @ Rp. 13,500.00 283,500.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00 1,000.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00 17,500.00
3.0000 bh MCB 10 A @ Rp. 55,000.00 165,000.00
1.0000 bh MCB 16 A @ Rp. 55,000.00 55,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00 2,250.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
2,200.00 VA Adminatrasi 900 - 2200 VA @ Rp. 850.00 1,870,000.00
JUMLAH 2,332,000.00 2,184,500.00 4,516,500.00
JASA 10 % 451,650.00
JUMLAH 4,968,150.00
DIBULATKAN 4,968,150.00
67 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 3500 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00 180,000.00
4.0000 bh Beugel @ Rp. - -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 33,500.00 201,000.00
21.0000 m1 Kabel DX 2 x 16 Sqmm @ Rp. 13,500.00 283,500.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00 1,000.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00 17,500.00
3.0000 bh MCB 16 A @ Rp. 55,000.00 165,000.00
1.0000 bh MCB 20 A @ Rp. 65,000.00 65,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00 2,250.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
3,500.00 VA Adminatrasi 3500 - 11000 VA @ Rp. 1,000.00 3,500,000.00
JUMLAH 3,962,000.00 2,194,500.00 6,156,500.00
JASA 10 % 615,650.00
JUMLAH 6,772,150.00
DIBULATKAN 6,772,150.00
68 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 4400 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00 180,000.00
4.0000 bh Beugel @ Rp. - -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 33,500.00 201,000.00
21.0000 m 1
Kabel DX 2 x 16 Sqmm @ Rp. 13,500.00 283,500.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00 1,000.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00 17,500.00
3.0000 bh MCB 20 A @ Rp. 65,000.00 195,000.00
1.0000 bh MCB 25 A @ Rp. 65,000.00 65,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00 2,250.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
4,400.00 VA Adminatrasi 3500 - 11000 VA @ Rp. 1,000.00 4,400,000.00
JUMLAH 4,862,000.00 2,224,500.00 7,086,500.00
JASA 10 % 708,650.00
JUMLAH 7,795,150.00
DIBULATKAN 7,795,150.00
69 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 7700 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00 180,000.00
4.0000 bh Beugel @ Rp. - -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 33,500.00 201,000.00
21.0000 m1 Kabel DX 2 x 16 Sqmm @ Rp. 13,500.00 283,500.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00 1,000.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00 17,500.00
3.0000 bh MCB 25 A @ Rp. 65,000.00 195,000.00
1.0000 bh MCB 35 A @ Rp. 65,000.00 65,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00 2,250.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
7,700.00 VA Adminatrasi 3500 - 11000 VA @ Rp. 1,000.00 7,700,000.00
JUMLAH 8,162,000.00 2,224,500.00 10,386,500.00
JASA 10 % 1,038,650.00
JUMLAH 11,425,150.00
DIBULATKAN 11,425,150.00
70 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 11000 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00 180,000.00
4.0000 bh Beugel @ Rp. - -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 33,500.00 201,000.00
21.0000 m 1
Kabel DX 2 x 16 Sqmm @ Rp. 13,500.00 283,500.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00 1,000.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00 17,500.00
3.0000 bh MCB 35 A @ Rp. 65,000.00 195,000.00
1.0000 bh MCB 40 A @ Rp. 104,000.00 104,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00 15,750.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
3.0000 bh Pilot Lamp @ Rp. 13,000.00 39,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00 18,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00 2,250.00
3.0000 org Pekerja @ Rp. 60,000.00 180,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
1.5000 org Tukang Listrik @ Rp. 70,000.00 105,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
11,000.00 VA Adminatrasi 3500 - 11000 VA @ Rp. 1,000.00 11,000,000.00
JUMLAH 11,462,000.00 2,263,500.00 13,725,500.00
JASA 10 % 1,372,550.00
JUMLAH 15,098,050.00
DIBULATKAN 15,098,050.00
71 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 11000 VA (2 Unit Box Panel)
2.0000 Unit Box Panel 20x40x50 @ Rp. 140,000.00 280,000.00
8.0000 bh Beugel @ Rp. - -
12.0000 m1 Pipa Galvanis 1.5" @ Rp. 33,500.00 402,000.00
27.0000 m1 Kabel DX 2 x 16 Sqmm @ Rp. 13,500.00 364,500.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00 1,000.00
2.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00 650,000.00
1.0000 bh Invoring @ Rp. 17,500.00 17,500.00
4.0000 bh MCB 35 A @ Rp. 65,000.00 260,000.00
2.0000 bh MCB 40 A @ Rp. 104,000.00 208,000.00
0.6000 m1 Rel MCB @ Rp. 52,500.00 31,500.00
2.0000 bh Timer TB 388 @ Rp. 710,000.00 1,420,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00 30,000.00
5.0000 bh Pilot Lamp @ Rp. 13,000.00 65,000.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00 57,500.00
2.0000 bh Terminal Nol @ Rp. 45,000.00 90,000.00
4.0000 bh Sekering kecil @ Rp. 9,000.00 36,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00 2,250.00
3.0000 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00 135,300.00
4.0000 org Pekerja @ Rp. 60,000.00 240,000.00
0.2500 org Tenaga Ahli @ Rp. 130,000.00 32,500.00
2.0000 org Tukang Listrik @ Rp. 70,000.00 140,000.00
0.5000 org Mandor @ Rp. 100,000.00 50,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
11,000.00 VA Adminatrasi 3500 - 11000 VA @ Rp. 1,000.00 11,000,000.00
JUMLAH 11,557,000.00 4,089,550.00 15,646,550.00
JASA 10 % 1,564,655.00
JUMLAH 17,211,205.00
DIBULATKAN 17,211,205.00
75 1.00 Batang Pasang armature (sekualitas SGP 328 SON 250W) - Komplit
1.0000 bh Armature IP 65 (sekualitas SGP 328 SON 250W) @ Rp. 4,300,000.00 4,300,000.00
2.0000 bh Beugel @ Rp. - -
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
1.0000 bh Cover MCB @ Rp. 7,100.00 7,100.00
4.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00 62,000.00
2.0000 bh Banded @ Rp. 7,000.00 14,000.00
0.5000 org Pengawas @ Rp. 130,000.00 65,000.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 257,000.00 4,458,100.00 4,715,100.00
JASA 10 % 471,510.00
JUMLAH 5,186,610.00
DIBULATKAN 5,186,610.00
79 1.00 Buah Bongkar lampu dan balast + Pasang Lampu SON-T 250W dan balast
1.0000 bh Lampu SON-T 250W 220V @ Rp. 306,000.00 306,000.00
1.0000 bh Balast SON 250w 220V @ Rp. 356,000.00 356,000.00
1.0000 bh Ignitor Metal Halide 250W 220V @ Rp. 145,000.00 145,000.00
0.0625 org Pengawas @ Rp. 130,000.00 8,125.00
0.1250 org Mandor @ Rp. 100,000.00 12,500.00
0.1750 org Tukang Listrik @ Rp. 70,000.00 12,250.00
0.3750 org Pekerja @ Rp. 60,000.00 22,500.00
0.1200 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 36,000.00
0.1250 jam Alat angkut @ Rp. 12,500.00 1,562.50
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 104,937.50 807,000.00 911,937.50
JASA 10 % 91,193.75
JUMLAH 1,003,131.25
DIBULATKAN 1,003,131.00
81 1.00 Unit Pasang Tiang Oktagonal Cb. 1, t=11m + Armature Komplit (sekualitas SGP 328 SON-T 250W) + Lampu Tango SMF 383
1xSON-T 250 Symmetric - Kabel Udara
1.0000 btg Tiang lampu Octagonal Cb. 1, t=11m @ Rp. 4,800,000.00 4,800,000.00
1.0000 unit Armature IP 65 Komplit (sekualitas SGP 822 SON 250W) @ Rp. 4,300,000.00 4,300,000.00
1.0000 bh Armature Tango SMF 383 1xSON-T 250W Symmetric @ Rp. 2,800,000.00 2,800,000.00
2.0000 bh MCB 6 A @ Rp. 55,000.00 110,000.00
0.2000 m1 Rel MCB @ Rp. 52,500.00 10,500.00
30.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00 465,000.00
4.0000 bh Banded @ Rp. 7,000.00 28,000.00
0.4200 m3 Pondasi tiang beton bertulang @ Rp. 2,191,140.00 920,278.80
4.2500 org Pekerja @ Rp. 60,000.00 255,000.00
4.2500 org Tukang Listrik @ Rp. 70,000.00 297,500.00
2.9287 org Pengawas @ Rp. 130,000.00 380,731.00
1.2939 org Mandor @ Rp. 100,000.00 129,390.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 1,074,621.00 13,433,778.80 14,508,399.80
JASA 10 % 1,450,839.98
JUMLAH 15,959,239.78
DIBULATKAN 15,959,239.00
82 1.00 Unit Pasang Tiang Oktagonal Cb. 1, t=11m + Armature Komplit (sekualitas SGP 328 SON-T 250W) - Kabel Tanah
1.0000 btg Tiang lampu Octagonal Cb. 1, t=11m @ Rp. 4,800,000.00 4,800,000.00
1.0000 unit Armature IP 65 Komplit (sekualitas SGP 822 SON 250W) @ Rp. 3,800,000.00 3,800,000.00
1.0000 bh MCB 6 A @ Rp. 55,000.00 55,000.00
0.1000 m1 Rel MCB @ Rp. 52,500.00 5,250.00
12.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00 186,000.00
0.4200 m3 Pondasi tiang beton bertulang @ Rp. 2,191,140.00 920,278.80
4.2500 org Pekerja @ Rp. 60,000.00 255,000.00
4.2500 org Tukang Listrik @ Rp. 70,000.00 297,500.00
2.9287 org Pengawas @ Rp. 130,000.00 380,731.00
1.2939 org Mandor @ Rp. 100,000.00 129,390.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 1,074,621.00 9,766,528.80 10,841,149.80
JASA 10 % 1,084,114.98
JUMLAH 11,925,264.78
DIBULATKAN 11,925,264.00
83 1.00 Set Pasang Lampu Spot MMF 283 MHN TD 150W + Pondasi
1.0000 bh Armature Tango MMF 283 1xMHN-TD 70W Symmetric @ Rp. 2,200,000.00 2,200,000.00
1.0000 m 1
Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00 15,500.00
1.0000 bh Cover MCB @ Rp. 7,100.00 7,100.00
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
1.0000 bh Pondasi / Umpak @ Rp. 58,000.00 58,000.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
0.7500 org Pekerja @ Rp. 60,000.00 45,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.0600 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 18,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 135,000.00 2,355,600.00 2,490,600.00
JASA 10 % 249,060.00
JUMLAH 2,739,660.00
DIBULATKAN 2,739,660.00
84 1.00 Set Pasang Lampu Sorot Tango SMF 383 SON-T 150 Watt + Pondasi
1.0000 bh Armature Tango SMF 383 1x SON-T 150W Symmetric @ Rp. 2,550,000.00 2,550,000.00
1.0000 m 1
Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00 15,500.00
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
1.0000 bh Cover MCB @ Rp. 7,100.00 7,100.00
1.0000 bh Pondasi / Umpak @ Rp. 58,000.00 58,000.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
0.7500 org Pekerja @ Rp. 60,000.00 45,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.0600 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 18,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 135,000.00 2,705,600.00 2,840,600.00
JASA 10 % 284,060.00
JUMLAH 3,124,660.00
DIBULATKAN 3,124,660.00
93 1.00 Unit Pasang Tiang Oktagonal Cb. 1, t=11m + Armature Komplit (sekualitas SGP 328 HPIT 250W) - Kabel Tanah
1.0000 btg Tiang lampu Octagonal Cb. 1, t=11m @ Rp. 4,800,000.00 4,800,000.00
1.0000 unit Armature IP 65 Komplit (sekualitas SGP 822 HPIT 250W) @ Rp. 3,869,500.00 3,869,500.00
1.0000 bh MCB 6 A @ Rp. 55,000.00 55,000.00
0.1000 m1 Rel MCB @ Rp. 52,500.00 5,250.00
12.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00 186,000.00
0.4200 m3 Pondasi tiang beton bertulang @ Rp. 2,191,140.00 920,278.80
4.2500 org Pekerja @ Rp. 60,000.00 255,000.00
4.2500 org Tukang Listrik @ Rp. 70,000.00 297,500.00
2.9287 org Pengawas @ Rp. 130,000.00 380,731.00
1.2939 org Mandor @ Rp. 100,000.00 129,390.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 1,074,621.00 9,836,028.80 10,910,649.80
JASA 10 % 1,091,064.98
JUMLAH 12,001,714.78
DIBULATKAN 12,001,714.00
98 1.00 Unit Pasang Armatur lampu saja (sekualitas SGP 328 SON 150W)
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
1.0000 bh Cover MCB @ Rp. 7,100.00 7,100.00
0.5000 org Pengawas @ Rp. 130,000.00 65,000.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 257,000.00 82,100.00 339,100.00
JASA 10 % 33,910.00
JUMLAH 373,010.00
DIBULATKAN 373,010.00
100 1.00 Unit Bongkar dan Ganti Komponen lama pada Armature IP 65 (sekualitas SGP 326) komplit + Pasang kembali
1.0000 bh Lampu SON-T 150W 220V @ Rp. 197,500.00 197,500.00
1.0000 bh Balast SON 150W 220V @ Rp. 220,000.00 220,000.00
1.0000 bh Kapasitor 20 mF @ Rp. 63,000.00 63,000.00
1.0000 bh Ignitor Metal Halide 150W 220V @ Rp. 95,000.00 95,000.00
0.0625 org Pengawas @ Rp. 130,000.00 8,125.00
0.1250 org Mandor @ Rp. 100,000.00 12,500.00
0.1750 org Tukang Listrik @ Rp. 70,000.00 12,250.00
0.3750 org Pekerja @ Rp. 60,000.00 22,500.00
0.1200 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 36,000.00
0.1250 jam Alat angkut @ Rp. 12,500.00 1,562.50
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 104,937.50 575,500.00 680,437.50
JASA 10 % 68,043.75
JUMLAH 748,481.25
DIBULATKAN 748,481.00
106 1.00 Batang Pasang Lampu Sorot Tango SMF 383 Symetric CDMT-D 400 W
1.0000 Unit Armature Tango SMF 383 1xHPI-T 400W Symmetric @ Rp. 2,780,000.00 2,780,000.00
2.0000 bh Beugel @ Rp. - -
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
1.0000 bh Cover MCB @ Rp. 7,100.00 7,100.00
4.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00 62,000.00
2.0000 bh Banded @ Rp. 7,000.00 14,000.00
0.4000 org Pengawas @ Rp. 130,000.00 52,000.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 244,000.00 2,938,100.00 3,182,100.00
JASA 10 % 318,210.00
JUMLAH 3,500,310.00
DIBULATKAN 3,500,310.00
107 1.00 Batang Pasang Lampu Sorot Tango SMF 383 Symetric CDMT-D 150 W
1.0000 Unit Armature Tango SMF 383 1xHPI-T 400W Symmetric @ Rp. 2,250,000.00 2,250,000.00
2.0000 bh Beugel @ Rp. - -
1.0000 bh MCB 4 A @ Rp. 75,000.00 75,000.00
1.0000 bh Cover MCB @ Rp. 7,100.00 7,100.00
4.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00 62,000.00
2.0000 bh Banded @ Rp. 7,000.00 14,000.00
0.4000 org Pengawas @ Rp. 130,000.00 52,000.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 244,000.00 2,408,100.00 2,652,100.00
JASA 10 % 265,210.00
JUMLAH 2,917,310.00
DIBULATKAN 2,917,310.00
108 1.00 Bh Bongkar lampu dan balast + pasang lampu SON 70W (setipe) dan balast
1.0000 bh Lampu SON 70W 220V @ Rp. 175,500.00 175,500.00
1.0000 bh Balast SON 70W 220V @ Rp. 165,000.00 165,000.00
1.0000 bh Kapasitor 12.5 mF @ Rp. 34,000.00 34,000.00
0.0625 org Pengawas @ Rp. 130,000.00 8,125.00
0.1250 org Mandor @ Rp. 100,000.00 12,500.00
0.1750 org Tukang Listrik @ Rp. 70,000.00 12,250.00
0.3750 org Pekerja @ Rp. 60,000.00 22,500.00
0.1200 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 36,000.00
0.1250 jam Alat angkut @ Rp. 12,500.00 1,562.50
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 104,937.50 374,500.00 479,437.50
JASA 10 % 47,943.75
JUMLAH 527,381.25
DIBULATKAN 527,381.00
110 1.00 Set Upah Pasang stang Ornamen 3 meter + Lampu SRP 822/250 Watt Son
0.1250 org Tenaga Ahli @ Rp. 130,000.00 16,250.00
0.5000 org Tukang Listrik @ Rp. 70,000.00 35,000.00
2.0000 org Pekerja @ Rp. 60,000.00 120,000.00
0.2500 org Mandor @ Rp. 100,000.00 25,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00 75,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00 12,000.00
JUMLAH 283,250.00 - 283,250.00
JASA 10 % 28,325.00
JUMLAH 311,575.00
DIBULATKAN 311,575.00
118 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
0.1000 Kg Plamir tembok @ Rp. 115,000.00 11,500.00
0.1000 Kg Cat dasar @ Rp. 93,500.00 9,350.00
0.2600 Kg Cat penutup 2 x @ Rp. 93,500.00 24,310.00
0.0200 oh Pekerja @ Rp. 60,000.00 1,200.00
0.0630 oh Tukang Cat @ Rp. 70,000.00 4,410.00
0.0063 oh Kepala tukang @ Rp. 80,000.00 504.00
0.0025 oh Mandor @ Rp. 100,000.00 250.00
JUMLAH 6,364.00 45,160.00 51,524.00
DIBULATKAN 51,524.00
a x (L + 75)
k =
275
k = Biaya yang dicari per m3
a = Upah pekerja per hari
L = Jarak pengangkutan dalam m1
Dalam perhitungan biaya diatas sudah termasuk harga alat yang dipakai
Dalam perhitungan biaya diatas sudah termasuk harga alat yang dipakai
Dalam perhitungan biaya diatas sudah termasuk harga alat yang dipakai
Dalam perhitungan biaya diatas sudah termasuk harga alat yang dipakai
II TANAMAN HIAS
a. Rumput
1 Rumput Gajah m2 30,000.00 tanam
2 Rumput Gajah m2
20,000.00 gebalan
3 Rumput Gajah Mini m2 20,000.00 tanam
4 Rumput Manila m2
15,000.00 gebalan
5 Rumput golf m2
25,000.00 #
6 Rumput gebalan m2
- #
b. Perdu
1 Bambu Air rumpun 10,000.00 tinggi 1.5 m
2 Batavia/Jatropa batang 25,000.00 tinggi 0.5 m
3 Batavia/ Jatropa batang 130,000.00 tinggi 1.5 m
4 Bougenville batang 25,000.00 tinggi 0.5 m
5 Bougenville batang 50,000.00 tinggi 0,7 m
6 Bougenville varigata batang 70,000.00 tinggi 0,8 m
7 Classia planisicua batang 20,000.00 tinggi 0.5 m
8 Cordata rumpun 25,000.00 tinggi 0.4 m
9 Kembang Sepatu (Bangkok) batang 15,000.00 tinggi 0.2 m
10 Kembang Sepatu (lokal) batang 7,000.00 tinggi 0.4 m
11 Mawar batang 7,000.00 tinggi 0,25 m
12 Melati Air rumpun 20,000.00 tinggi 0.4 m
13 Palem Botol batang 75,000.00 tinggi 0,8 m
14 Palem kuning rumpun 25,000.00 tinggi 0.6 m
15 Palem kuning rumpun 50,000.00 tinggi 1 m
16 Palem kuning rumpun 120,000.00 tinggi 1,5 - 2 m
17 Palem kuning rumpun 175,000.00 tinggi 2-3 m
18 Palem Merah rumpun 300,000.00 tinggi 2-3 m
No. URAIAN SATUAN HARGA ( Rp ) KETERANGAN
19 Palem wregu rumpun 25,000.00 tinggi 0.6 m
20 Palem Putri batang 50,000.00 tinggi 1 m
21 Palem Putri batang 100,000.00 tinggi 2 m
22 Papyrus rumpun 35,000.00 tinggi 0,7 m
23 Parikesit rumpun 25,000.00 tinggi 0,7 m
24 Puring Bangkok batang 20,000.00 tinggi 0,6 m
25 Phonix batang 100,000.00 tinggi 1 m
26 Serut batang 500,000.00 tinggi 1 - 1.5 m
27 Serut batang 750,000.00 tinggi 1.5 m
28 Soka pagar batang 5,000.00 # tinggi 0.3 m
29 Bougenville batang 75,000.00 tinggi 1 m
c. Pohon
1 Cemara kipas batang 30,000.00 tinggi 0.5 m
2 Cemara kipas batang 100,000.00 tinggi 1.5 m
3 Cemara lilin batang 100,000.00 tinggi 1.5 m
4 Cemara Rantes batang 75,000.00 tinggi 1 m
5 Cemara Udang batang 200,000.00 tinggi 1 - 1,5 m
6 Cemara Norvox batang 50,000.00 tinggi 0.6 m
7 Cemara Norvox batang 75,000.00 tinggi 1.5 m
8 Cepoko Mulyo batang 50,000.00 tinggi 0.5 m
9 Cepoko Mulyo batang 75,000.00 tinggi 1 m
10 Ceplok Piring batang 50,000.00 tinggi 0.5 m
11 Ceplok Piring batang 75,000.00 tinggi 1 m
12 Kelapa gading batang 500,000.00 tinggi 3 m
13 Nusa Indah batang 30,000.00 tinggi 0.5 m
14 Nusa Indah batang 50,000.00 tinggi 1 m
15 Palem ekor tupai batang 250,000.00 tinggi 2 m
16 Palem ekor tupai batang 250,000.00 tinggi 2 m
17 Palem Jepang rumpun 75,000.00 tinggi 1 m
18 Palem Jepang rumpun 150,000.00 tinggi 2 m
19 Palem raja batang 250,000.00 tinggi 4 m
20 Palem raja batang 400,000.00 tinggi 6 m
21 Palem raja batang 550,000.00 tinggi 7 m
22 Glodogan Pecut batang 50,000.00 tinggi 1 m
23 Glodogan Pecut batang 100,000.00 tinggi 2 m
d. Semak
1 Alamanda rumpun 25,000.00 tinggi 0.2 m
2 Anthurium rumpun 20,000.00 tinggi 0.3 m
3 Bakung rumpun 6,000.00 tinggi 0.3 m
4 Bambu pangkas batang 15,000.00 tinggi 0.15 m
5 Canna holland rumpun 20,000.00 tinggi 0.3 m
6 Canna Lokal rumpun 15,000.00 tinggi 0.5 m
7 Cendrawasih batang 10,000.00 tinggi 0.15 m
8 Cantik manis batang 10,000.00 tinggi 0.2 m
9 Dieffenbachia batang 20,000.00 tinggi 0.2 m
10 Dracaena rumpun 35,000.00 tinggi 1 m
11 Ficus repens batang 15,000.00
12 Hanjuang batang 10,000.00 tinggi 0.25 m
13 Helogenia rumpun 15,000.00 tinggi 0.4 m
14 Iler rumpun 15,000.00
15 Kayu besi batang 7,500.00 tinggi 0.5 m
16 Krisdoren rumpun 20,000.00 tinggi 0.5 m
17 Kayu besi rumpun 7,500.00 tinggi 0.5 m
18 Kuncira rumpun 4,000.00 tinggi 0.3 m
19 Kuping gajah rumpun 20,000.00 tinggi 0.25 m
20 Lantana rumpun 6,000.00 tinggi 0.2 m
21 Lantana rumpun 8,000.00 tinggi 0.3 m
22 Melati batang 5,000.00 tinggi 0.2 m
23 Nanas Kuning rumpun 5,000.00 tinggi 0.2 m
24 Nanas Merah rumpun 5,000.00 tinggi 0.2 m
No. URAIAN SATUAN HARGA ( Rp ) KETERANGAN
25 Patah Tulang rumpun 15,000.00 tinggi 0.3 m
26 Phylodendron rumpun 15,000.00 tinggi 0.4 m
27 Sansivera rumpun 10,000.00 1 rumpun
28 Sirih Gading rumpun 5,000.00 tinggi 0.25 m
29 Soka Bangkok batang 6,000.00 tinggi 0.2 m
30 Soka Jepang batang 6,000.00 tinggi 0.2 m
31 Stevanut batang 25,000.00 tinggi 0.3 m
32 Stivera batang 35,000.00
33 Taiwan beauty rumpun 5,000.00 tinggi 0.2 m
34 Teh-tehan hijau bulat batang 3,000.00 tinggi 0.25 m
35 Teh-tehan hijau bulat batang 15,000.00 tinggi 0.5 m
36 Teh-tehan hijau bulat (pagar) batang 15,000.00 tinggi 0.4 m
37 Teh-tehan hijau bulat (pagar) batang 3,000.00 tinggi 0.25 m
38 Teh-tehan kuning batang 3,000.00 tinggi 0.15 m
39 Teh-tehan kuning bulat batang 5,000.00 tinggi 0.3 m
40 Tela-tela rumpun 3,000.00 tinggi 0.2 m
41 Tricolour batang 6,000.00 tinggi 0.2 m
42 Tricolour batang 7,000.00 tinggi 0.25 m
43 Varent rumpun 4,500.00 tinggi 0.25 m
44 Yuca batang 35,000.00 tinggi 0.4 m
45 Yuca batang 100,000.00 tinggi 0.75 m
46 Yuliana rumpun 5,000.00 tinggi 0.3 m
47 Phylodendron rumpun 7,500.00 # tinggi 0.7 m
48 Dieffenbachia batang 15,000.00 # tinggi 0.5 m
h Pelengkap Taman
1 Kerb Taman tinggi 50 cm m 75,000.00 terpasang
2 Pengecatan Kerb Taman m2
17,500.00 terpasang
3 Para/ Jala m 15,000.00
4 Polybag kg 25,000.00
5 Pot Tanah kecil buah 5,000.00
6 Pot Tanah sedang buah 15,000.00
7 Pot Tanah besar buah 25,000.00
8 Pot Hias buah 15,000.00 dim 30 cm
No. URAIAN SATUAN HARGA ( Rp ) KETERANGAN