LANJUTAN PENEGEMBANGAN GEDUNG SAT - INTEL DAN SAT - RESKIM LT. II POLRES KOTA TASIKMALAYA
A. PEK. PERSIAPAN 41.999.992,00
Sub jumlah 41.999.992,00
PEKERJAAN KONTRUKSI
B. PEKERJAAN LANTAI I
B.I. PEK. BONGKARAN -
B.II. PEK. TANAH DAN PONDASI -
B.III. PEK. BETON -
B.IV. PEK. DINDING DAN PASANGAN -
B.V. PEK. PLAFOND -
B.VI. PEK. LANTAI DAN DINDING KERAMIK -
B.VII. PEK. KUSEN,PINTU, JENDELA ALMUNIUM -
B.VIII. PEK. KUNCI DAN KACA -
B.IX. PEK. SANITASI -
B.X. PEK. INSTALASI LISTRIK -
B.XI. PEK. PENGECATAN -
B.XII. PEK. TANGGA -
B.XIII. PEK. SALURAN AIR HUJAN P= 33,13 m -
B.XIV. PEK. SALURAN AIR HUJAN P= 4,00 m -
Sub jumlah -
C. PEKERJAAN LANTAI II
C.I. PEK. BETON 399.271.900,66
C.II. PEK. DINDING DAN PASANGAN 293.329.425,96
C.III. PEK. KUDA - KUDA, ATAP DAN PLAFOND 498.602.298,71
C.IV. PEK. LANTAI DAN DINDING KERAMIK 229.426.861,79
C.V. PEK. KUSEN,PINTU, JENDELA ALMUNIUM 203.825.251,94
C.VI. PEK. KUNCI DAN KACA 78.182.077,96
C.VII. PEK. SANITASI 99.746.452,34
C.VIII. PEK. LISTRIK 34.596.550,00
C.IX. PEK. PENGECATAN 69.044.823,24
C.X. PEK. RAM 78.254.756,60
Sub jumlah 1.984.280.399,20
D. PEK. LAIN - LAIN 3.500.000,00
Sub jumlah 3.500.000,00
HARGA JUMLAH
KODE
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA SATUAN
ANALISIS
Rp. Rp.
1 2 3 4 5 6 7
A. PEK. PERSIAPAN
1 Pengukuran - 1,00 m' 750.000,00 750.000,00
2 Papan nama kegiatan - 1,00 ls 300.000,00 300.000,00
3 Pengadaan air kerja - 1,00 ls 2.500.000,00 2.500.000,00
4 Sistem Manajemen Keselamaan Kntruksi K.3 1,00 ls 20.025.000,00 20.025.000,00
5 Pembuatan direksikeet /pengadaan 1.1.e (c) 12,00 ls 1.535.416,00 18.424.992,00
Sub jumlah 41.999.992,00
C. PEKERJAAN LANTAI II
PEKERJAAN KONTRUKSI
C.I. PEK. BETON
1 Pek. Kolom beton, K1 25/30 cm
a. Pas. Bekisting A.4.1.1.20 133,65 m2 407.802,00 54.502.737,30
b. Pas. Besi beton polos/uril 2.2.6.1.b.(c) 1.695,23 kg 18.476,70 31.322.256,14
c. Beton Site Mix (K225) A.4.1.1.7. 9,12 m3 1.215.700,00 11.087.184,00
2 Pek. Kolom beton, K2 20/20 cm
a. Pas. Bekisting A.4.1.1.20 38,48 m2 407.802,00 15.692.220,96
b. Pas. Besi beton polos/uril 2.2.6.1.b.(c) 663,74 kg 18.476,70 12.263.724,86
c. Beton Site Mix (K225) A.4.1.1.7. 3,08 m3 1.215.700,00 3.744.356,00
3 Pek. Kolom beton, KP 12/12
a. Pas. Bekisting A.4.1.1.20 52,25 m2 407.802,00 21.307.654,50
b. Pas. Besi beton polos 2.2.6.1.b.(c) 635,09 kg 18.476,70 11.734.367,40
c. Beton Site Mix (K225) A.4.1.1.7. 2,51 m3 1.215.700,00 3.051.407,00
4 Pek. balok lintel beton, BL 12/20 cm
a. Pas. Bekisting A.4.1.1.21 56,77 m2 417.462,00 23.699.317,74
b. Pas. Besi beton polos 2.2.6.1.b.(c) 3.053,63 kg 18.476,70 56.421.005,42
c. Beton Site Mix (K225) A.4.1.1.7. 3,41 m3 1.215.700,00 4.145.537,00
5 Pek. balok beton, B/RB2, 15/20 cm
a. Pas. Bekisting A.4.1.1.21 1,13 m2 417.462,00 471.732,06
b. Pas. Besi beton polos/uril 2.2.6.1.b.(c) 16,12 kg 18.476,70 297.844,40
c. Beton Site Mix (K225) A.4.1.1.7. 0,09 m3 1.215.700,00 109.413,00
6 Pek. balok beton, B3 20/30 cm
a. Pas. Bekisting A.4.1.1.21 22,25 m2 417.462,00 9.288.529,50
b. Pas. Besi beton polos/uril 2.2.6.1.b.(c) 244,91 kg 18.476,70 4.525.128,60
c. Beton Site Mix (K225) A.4.1.1.7. 1,67 m3 1.215.700,00 2.030.219,00
7 Pek. balok beton, B3A 20/30 cm
a. Pas. Bekisting A.4.1.1.21 7,58 m2 417.462,00 3.164.361,96
b. Pas. Besi beton polos/uril 2.2.6.1.b.(c) 75,07 kg 18.476,70 1.387.045,87
c. Beton Site Mix (K225) A.4.1.1.7. 0,57 m3 1.215.700,00 692.949,00
8 Pek. plat Lantai beton t = 10 cm,
a. Pas. Floordeck B.12.b 54,36 m2 243.541,00 13.238.888,76
a. Pas. Besi Wiremesh M 8 + Plastik 2.2.7.a.(a) 54,36 kg 16.526,79 898.396,30
c. Beton Site Mix (K. 225) A.4.1.1.7. 5,44 m3 1.215.700,00 6.613.408,00
9 Pek. Lesplank beton t = 7 cm,
a. Pas. Bekisting A.4.1.1.22 15,07 m2 465.302,00 7.012.101,14
b. Pas. Besi beton polos 2.2.6.1.b.(c) 85,29 kg 18.476,70 1.575.877,74
c. Beton Site Mix (K. 225) A.4.1.1.7. 0,92 m3 1.215.700,00 1.118.444,00
10 Pek. Topi beton t = 7 cm,
a. Pas. Bekisting A.4.1.1.22 37,34 m2 465.302,00 17.374.376,68
b. Pas. Besi beton polos 2.2.6.1.b.(c) 211,30 kg 18.476,70 3.904.126,71
c. Beton Site Mix (K. 225) A.4.1.1.7. 2,28 m3 1.215.700,00 2.771.796,00
11 Pek. Ring balok beton, RB1 20/30 cm
a. Pas. Bekisting A.4.1.1.21 67,83 m2 417.462,00 28.316.447,46
b. Pas. Besi beton polos/uril 2.2.6.1.b.(c) 896,96 kg 18.476,70 16.572.860,83
c. Beton Site Mix (K225) A.4.1.1.7. 5,82 m3 1.215.700,00 7.075.374,00
Page 3
HARGA JUMLAH
KODE
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA SATUAN
ANALISIS
Rp. Rp.
1 2 3 4 5 6 7
12 Pek. Ring balok beton, RB2 0,15/20 cm
a. Pas. Bekisting A.4.1.1.21 25,43 m2 417.462,00 10.616.058,66
b. Pas. Besi beton polos/uril 2.2.6.1.b.(c) 363,69 kg 18.476,70 6.719.791,02
c. Beton Site Mix (K225) A.4.1.1.7. 1,90 m3 1.215.700,00 2.309.830,00
13 Pek. Meja beton wastafel t = 10 cm,
a. Pas. Bekisting A.4.1.1.22 2,93 m2 465.302,00 1.363.334,86
b. Pas. Besi beton polos 2.2.6.1.b.(c) 30,31 kg 18.476,70 560.028,78
c. Beton Site Mix (K. 225) A.4.1.1.7. 0,24 m3 1.215.700,00 291.768,00
Sub jumlah 399.271.900,66
C.II. PEK. DINDING DAN PASANGAN
1 Pek. dinding 1/2 bata ringan t =7,5 cm, dengan mortar siap pakai A.4.4.1.25. 616,84 m2 202.219,00 124.736.767,96
2 Pek. plesteran 1 : 5 T= 15 mm 3.2.1. (c) 1.233,68 m2 70.627,00 87.131.117,36
3 Pek. Acian plesteran dan beton. 3.2.2.(c) 1.474,68 m2 43.573,00 64.256.231,64
4 Pas. Partisi Gypsum, Type A Dihitung 4,00 unt 3.848.984,00 15.395.936,00
5 Pas. Partisi Gypsum, Type B Dihitung 1,00 unt 1.809.373,00 1.809.373,00
Sub jumlah 293.329.425,96
C.III. PEK. KUDA - KUDA, ATAP DAN PLAFOND
1 Pas. rangka atap dan kuda - kuda baja ringan t= 1 mm Upah+Bahan 583,66 m2 344.500,00 201.070.870,00
2 Pas. Genteng Keramik KIA A.4.5.2.2.a 587,86 m2 258.373,00 151.887.151,78
3 Pas. Bubung Keramik KIA A.4.5.2.5.a 66,00 m' 250.918,00 16.560.588,00
4 Pas. Lispank Wood flange L= 30 cm, T= 8 mm A.4.6.1.22.a 108,20 m' 79.194,00 8.568.790,80
5 Pas. Rangka Plafon dari besi hollow A.4.2.1.21. 471,00 m2 133.564,00 62.908.644,00
6 Pas. Plafon dari Gypsum T= 9 mm A.4.5.1.7. 375,05 m2 51.509,00 19.318.450,45
7 Pas. Plafon dari GRC T= 4 mm A.4.5.1.7.a 95,96 m2 47.868,00 4.593.413,28
8 Pas. List Plafon dari Gypsum L = 10 cm A.4.5.1.10.a 632,60 m' 34.152,00 21.604.555,20
9 Pas. Talang dari plat besi Ø 20 cm A.4.2.1.19 .a 108,20 m' 111.736,00 12.089.835,20
Sub jumlah 498.602.298,71
PEKERJAAN
RENOVASI / PENGEMBANGAN
GEDUNG INTEL DAN RESKRIM
POLRES TASIKMALAYA KOTA
CATATAN
TANGGAL URAIAN PARAF
a
R. WC
LAKTASI FFL.+3.95
TOILET TOILET TOILET
R. KA UNIT 4 R. RAPAT R. PPA DISABILITAS
R. RESMOB FFL.+4.00
R. URMIN
FFL.+4.00 FFL.+4.00 FFL.+4.00
FFL.+4.00 R.
R. GANTI
RAMAH FFL.+4.00
ANAK
TURUN b
KORIDOR KORIDOR
FFL.+4.00 FFL.+4.00
GANTI
R. TUNGGU
R. KA UNIT 3 R. KASAT FFL.+4.00 R. KBO R. KA UNIT 2 R. KA UNIT 1 R. GDG
FFL.+4.00 FFL.+4.00 FFL.+4.00 FFL.+4.00 FFL.+4.00 FFL.+4.00
WC WC
WC
FFL.+3.95 FFL.+3.95 FFL.-0.05
c
DAK BETON
FFL.+3.95
d
1 2 3 4 5 6 7 8 9 10 11 12 13 14
2022
PEMBERI TUGAS
PEKERJAAN
RENOVASI / PENGEMBANGAN
GEDUNG INTEL DAN RESKRIM
400
CATATAN
TANGGAL URAIAN PARAF
400
1 2 3 4 5 6 7 8 9 10 11 12 13 14
POTONGAN A-A
100 105
80
80
RENCANA PLAFOND +7.70 RENCANA PLAFOND +7.70
400
400
PENDAFTARAN
400
400
POTONGAN A-A
POTONGAN B-B 1 :150
POTONGAN C-C
d c b a d c b a
2022 21
PEMBERI TUGAS
PEKERJAAN
RENOVASI / PENGEMBANGAN
GEDUNG INTEL DAN RESKRIM
POLRES TASIKMALAYA KOTA
CATATAN
TANGGAL URAIAN PARAF
TAMPAK DEPAN
2022 21
PEMBERI TUGAS
PEKERJAAN
RENOVASI / PENGEMBANGAN
GEDUNG INTEL DAN RESKRIM
POLRES TASIKMALAYA KOTA