Anda di halaman 1dari 5

Bill Of Quantity (BoQ)

PENGADAAN JASA KONSULTAN PEMANTAUAN DAN PENGUKURAN LINGKUNGAN KERJA DAN LINGK
TAHUN 2023

VOLUME
URAIAN
Qty Satuan Waktu
I. BIAYA PERSONIL
A Tenaga Penunjang
1.Lead Sampling Engineer (Ahli K3 Umum /Himu) 1 orang 5 hari
2. Sampling Engineer 3 Orang 5 hari

TOTAL BIAYA PERSONIL

II. BIAYA NON PERSONIL


A. BIAYA SAMPLING DAN ANALISA LABORATORIUM (Detail Sampling Terlampir)

1. Ambient Udara 24 Jam


(SO2, CO, NO2, TSP, O3, PM10, PM2,5, HC, Pb) 5 Titik 1 Kali
Regulation : PPRI No.22 Th.2021

2. Dustfall
2 Titik 1 Kali
Regulation : Pergub Sumsel no 17 tahun 2005

3. Emisi Tidak Bergerak Isokinetik (Cerobong)


NO2, SO2, H2S, HCl, HF,NH3, Cl2, Partikulat,
1 Titik 1 Kali
Opasitas, Laju Alir, Hg, Sb, Cd, As, Zn, Pb
Regulation : Pergub Sumsel No. 06 Tahun 2012

4. Emisi Tidak Bergerak (Genset)


SO2, NO2, CO, Partikulat, Opasitas, Laju Alir 1 Titik 1 Kali
Regulation : Pergub Sumsel No. 06 Tahun 2012
5. Emisi Sumber Bergerak
4 Titik 1 Kali
Regulation : Pergub Sumsel No. 06 Tahun 2012
6. Kebisingan Outdoor 24 Jam
4 Titik 1 Kali
Kepmenlh 48/MENLH/XI/1996
7. Pengukuran Kebauan
NH3, H2S, CH3SH, (CH3)2S 3 Titik 1 Kali
Regulation : KepMenLH No 50 tahun 1996

8. Pengukuran Udara Lingkungan Kerja


Regulation : Permenaker No 5 Tahun 2018
a. Pengukuran Faktor Fisika
a. Pencahayaan 10 Titik 1 Kali
b. Laju Pertukaran Udara 1 Titik 1 Kali
c. Kebisingan Personal 10 Titik 1 Kali
d. Iklim Kerja 4 Titik 1 Kali
e. Getaran Whole Body (Forklift/Loader Oprt) 4 Titik 1 Kali
b. Pengukuran Faktor Kimia
a. Carbon Monoksida (CO) 7 Titik 1 Kali
b. Nitrogen Dioksida (NO2) 7 Titik 1 Kali
c. Sulphur Dioksida (SO2) 7 Titik 1 Kali
d. Debu Inhalable 8 Titik 1 Kali
e. Amoniak (NH3) 7 Titik 1 Kali
f. Ozon (O3) 7 Titik 1 Kali
g. Hidrogen Sulfida (H2S) 7 Titik 1 Kali
h. Timbal (Pb) 7 Titik 1 Kali
c. Pengukuran Faktor Biologi (Mikrobiologi)
a. Jamur 4 Titik 1 Kali
b. Bakteri 4 Titik 1 Kali
9. Faktor Ergonomi
1 lokasi kerja 1 Kali
Permenaker 5 tahun 2018
10. Faktor Psikososial
1 lokasi kerja 1 Kali
Permenaker 5 tahun 2018
11. Hygine dan Sanitasi Perkantoran 1 Paket 1 Kali

TOTAL BIAYA II.A

B. OPERASIONAL & AKOMODASI


1. Biaya Transportasi Darat Kantor Palembang - PT DKU 2 Orang 5 hari
2. Komsumsi Tenaga Sampling 4 Orang 5 hari
3. Akomodasi Tenaga Sampling 2 kamar 4 Malam
4. Peralatan dan Bahan Sampling 1 Paket 1 Kali
TOTAL BIAYA II.B

C. BIAYA PENYUSUNAN LAPORAN & Lainnya


1. Biaya SURKET Disnaker 2 paket 1 Ls
2. Biaya Pembuatan Laporan 2 paket 1 Ls
TOTAL BIAYA II.C

TOTAL BIAYA NON PERSONIL


TOTAL BIAYA PERSONIL + NON PERSONIL
PPN (11%)
SUBTOTAL
UNGAN KERJA DAN LINGKUNGAN HIDUP

HARGA JUMLAH
SATUAN Rp. Rp.

500,000 2,500,000
350,000 5,250,000

TOTAL BIAYA PERSONIL 7,750,000

2,000,000 10,000,000

350,000 700,000

4,000,000 4,000,000

1,000,000 1,000,000

350,000 1,400,000

300,000 1,200,000

1,400,000 4,200,000

75,000 750,000
75,000 75,000
350,000 3,500,000
125,000 500,000
225,000 900,000
28,225,000
90,000 630,000
125,000 875,000
125,000 875,000
250,000 2,000,000
200,000 1,400,000
200,000 1,400,000
200,000 1,400,000
200,000 1,400,000
13,180,000
400,000 1,600,000
400,000 1,600,000

4,000,000 4,000,000

4,000,000 4,000,000

4,000,000 4,000,000

TOTAL BIAYA II.A 53,405,000 53405000

400,000 4,000,000
150,000 3,000,000
Client 0
1,500,000 1,500,000
TOTAL BIAYA II.B 8,500,000

4,000,000 8,000,000
1,500,000 3,000,000
TOTAL BIAYA II.C 11,000,000

AL BIAYA NON PERSONIL 72,905,000


RSONIL + NON PERSONIL 80,655,000
PPN (11%) 8,872,050
SUBTOTAL 89,527,050

Kerjaan IH 47225000
PT. CHEMVIRO BUANA INDONESIA
RENCANA ANGGARAN BIAYA PROYEK
NOMOR PROYEK 05 MARKETING / PIC NUR HAUDI

CLIENT PT Dunia Kimia Utama KONTRAK/SPK/PO PO Number 6895

PEKERJAAN Industrial Hygiene dan Monling MULAI


LOKASI Kab. Ogan Ilir SELESAI

A PENERIMAAAN
1 NILAI INVOICE 89,527,050
2 PPN 8,872,050
3 DASAR PERHITUNGAN PAJAK (DPP) (1-2) 80,655,000
4 PPh 2.0% 1,613,100
5 Kick Back 10.0% 5,340,500
PENERIMAAN BERSIH (3-4) 73,701,400

B PENGELUARAN
BIAYA PRODUKSI

NO U R A I A N QTY STN VOL STN HARGA SATUAN JUMLAH

I MATERIAL
a. Subkon BTKL Analisa Udara Ambien 5 titik
5 Titik 1 kali Rp 1,000,000 Rp 5,000,000
(Include sewa alat) (ISC)
b. Subkon BTKL Analisa Dustfall (ISC) 2 Titik 1 kali Rp 175,000 Rp 350,000
c. Subkon BTKL Analisa Emisi Genset (Partikulat) 1 Titik 1 kali Rp 150,000 Rp 150,000
d. Subkon BTKL Analisa Emisi Cerobong (Isokinetik) 1 Titik 1 kali Rp 1,500,000 Rp 1,500,000
e. Subkon BTKL Analisa Kebauan 4 Titik 1 kali Rp 500,000 Rp 2,000,000
f. Inlab Analisa IH ke pusat 40% Faktor Kimia dan Fisika 40% Paket 1 kali Rp 13,180,000 Rp 5,272,000

g. Fee Subcont ISC 15% Paket 1 kali Rp 28,225,000 Rp 4,233,750

TOTAL MATERIAL Rp 18,505,750


II TENAGA KERJA
a Teknisi Sampling IH 1 orang 5 Hari Rp 300,000 Rp 1,500,000
b Travelling Fee 2 orang 1 hari Rp 75,000 Rp 150,000
c Teknisi Sampling Monling 24 Jam 3 orang 5 hari Rp 200,000 Rp 3,000,000

TOTAL TENAGA KERJA Rp 4,650,000


III OPERASIONAL
a. Sewa Alat Isokinetik 1 Paket 1 Hari Rp 1,500,000 Rp 1,500,000
b. Transport + Driver 5 Hari 1 Paket Rp 200,000 Rp 1,000,000
d. Konsumsi Tenaga Sampling 4 Orang 5 Hari Rp 100,000 Rp 2,000,000
h. Entertain Pak Efrin 1 Kali 1 Paket Rp 500,000 Rp 500,000
i. Entertain Petugas Pendamping 1 Orang 1 Ls Rp 500,000 Rp 500,000
j. Batu Baterai 1 Paket 1 Ls Rp 250,000 Rp 250,000
k. Surket Disnaker 2 Paket 1 Ls Rp 3,500,000 Rp 7,000,000
l Biaya Pembuatan Laporan 1 Paket 1 Kali Rp 2,000,000 Rp 2,000,000
TOTAL OPERASIONAL Rp 14,750,000
TOTAL BIAYA PRODUKSI I + II + III Rp 37,905,750
LAIN-LAIN
a Biaya Tak Terduga 0% x Penerimaan Bersih Rp -
b Commitment Fee 0% x Penerimaan Bersih Rp -
c Marketing Fee 5% x Penerimaan Bersih Rp 3,685,070
d Management Fee 0.0% x Penerimaan Bersih Rp -
e Cost of Money 2 bulan 0.0% x Penerimaan Bersih Rp -
f Biaya Lainnya 0% x Penerimaan Bersih Rp -
TOTAL LAIN-LAIN Rp 3,685,070
B TOTAL PENGELUARAN Rp 41,590,820
Rp 32,110,580
C LABA (RUGI)
39.81%

Diajukan oleh Disetujui oleh