Anda di halaman 1dari 2

INTERNAL MEMO

HS/FSW/20/XII/2023

To : All Dept. Manager, All Dept Head, Supervisors


Cc. : Mr. Thalengsak Ratchburi
Mr. Yustinus Jusuf Kusumah
All General Managers
Date : December 2, 2023
Subject : Percobaan Fungsi Safety Device Setiap Shift
Safety Device Function Test Every Shift

Dengan hormat, Sincerely,

Dalam upaya mencegah terjadinya kecelakaan kerja akibat tidak To prevent work accidents due to malfunctioning of safety devices
berfungsinya safety device pada mesin atau peralatan, dengan on machines or work equipment, we hereby convey the
ini kami sampaikan kewajiban melakukan percobaan fungsi requirement to check the function of safety devices before
safety device sebelum dimulai pekerjaan setiap shift. Adapun starting work every shift. Safety devices is a tool or system that
yang termasuk dalam safety device adalah alat atau sistem yang functions to prevent accidents to workers, such as, but not limited
berfungsi mencegah terjadinya kecelakaan pada pekerja, to, Interlock Systems, Emergency Stops, Safety Fences/Door,
seperti, namun tidak terbatas pada, Safety Interlock System, Reflector Sensors etc.
Emergency Stop, Safety Fence, Reflector Sensor dan lainnya.

Daftar mesin/peralatan yang wajib dilakukan percobaan fungsi Machinery/Equipment which are required for function testing
setiap shift seperti terlampir. every shift is attached.

Untuk mesin / peralatan lain yang dijalankan secara terus- For Machinery / Equipment that is run continuously and not
menerus dan tidak mungkin dilakukan pemeriksaan setiap shift, feasible to do testing every shift, inspection and function test shall
inspeksi dan percobaan fungsi safety device dilakukan pada saat be done during Planned Shut Down (PSD), such as Pit Stop or
Planned Shut Down (PSD), seperti Pit Stop atau Shut Down monthly Shut Down. Safety device function testing shall be put
bulanan. Pemeriksaan fungsi Safety Device agar dimasukkan ke into PSD job list.
dalam daftar pekerjaan/job list PSD.

Setiap ketidaksesuaian/ kerusakan dari safety device wajib Any non-compliance/malfunction to the safety device shall be
dilaporkan dengan segera dan mesin/ peralatan dilarang reported immediately and the machine/equipment is prohibited
dioperasikan sampai perbaikan selesai dilakukan. Semua from being operated until corrective action / repair is done. All
Departemen Head & Supervisor bertugas untuk memastikan Department Heads & Supervisors are responsible to ensure these
pemeriksaan setiap shift ini dilakukan sebagaimana mestinya. testing for each shift or during PSD are carried out accordingly.

Demikian, atas perhatian dan kerjasamanya kami ucapkan Thank you for your kind attention and cooperation.
terimakasih.

Prepared by, Acknowledged by,

Putera Lukito Hadisantoso Kiattisak Loruthai


Sustainability Development Manager Director
Lampiran / Attachment
Daftar Mesin Yang Wajib Dilakukan Percobaan Fungsi Safety Device Setiap Shift
List of machines that must be checked for safety devices every shift

No Machine/Equipment Area/location Department/Subdivivion

1 Manual Cutter, Finishing Converting/PRD 1

2 Safety Fence & Light Reflector Sensor Yueli Rewinder (Converting) Converting/PRD 1

3 Layboy Output Table Manual Wrapping #1 Converting/PRD 1


Manual Wrapping #2
Simplex 2.8, Simplex 2.6
Maruishi Sheeter

4 Lifter table Maruishi Wrapping #1 Converting/PRD 1

5 Hood Dryer Dryer section PM 1 & PM 2/PRD 1

6 Safety Fence & Light Reflector Sensor Rewinder PM 2/PRD 1

7 Safety Fence & Light Reflector Sensor Rewinder PM 3 & PM 7/PRD 2

8 Pope Reel Pope Reel PM 3 & PM 7 PM 3 & PM 7/PRD 2

9 Hood Dryer Dryer section PM 3 & PM 7/PRD 2

10 Hood Dryer Dryer section PM 5 & PM 8/ PRD 3

11 Pope Reel Pope Reel PM 5 & PM 8/ PRD 3

12 Safety Fence & Light Reflector Sensor Rewinder PM 5 & PM 8/ PRD 3

13 Conveyor 3.7 KW & Conveyor 7.5 KW Incinerator 1 Incinerator 1/ Energy 1

14 Conveyor C-101, Conveyor C-102, Conveyor C-103 Incinerator 2 Incinerator 2/ Energy 1

15 Slag Conveyor 1, Slag Conveyor 2 Elevasi 0 Boiler 3/ Energy 1

16 Crusher (FP-01-IN2-WFF-X101) Incinerator 2 Incinerator 2/ Energy 1

17 Belt Conveyor Squeezing No 1, 2, 3, 4, 5 & 6 Squeezing machine Recycle Plant/ Energy 2

18 Belt Conveyor Output No 1, 2, 3, 4, 5 & 6 Squeezing machine Recycle Plant/ Energy 2

19 Belt Conveyor Shreder 22 KW No 1 & No 2 Shreder 22 KW Recycle Plant/ Energy 2

20 Belt Conveyor Tromel No 1, 2, 3, 4 & 5 Tromel machine Recycle Plant/ Energy 2

21 Conveyor No 1, 2 & 3 Boiler 3 Logistic/ Energy 2

22 Belt Conveyor No 1, 2, 3, 4 & 5 Boiler 5.6 Logistic/ Energy 2

Anda mungkin juga menyukai