LEMBAR ACP
1.22
2.44 2.9768
huruf
1,250,000.00
m2
acp
HURUF 19
6.38269282451
0.63826928245
7.02096210696
8,776,202.63
total 19,636,619.30
satuan 1,402,615.66
cctv
kamera 4 Unit
nvr + Hd 2 tera 1 Unit
kabel 200 M
konektor 12 BUAH
Power suplay 1
ongkir 1
uoah pasang 4
1,250,000.00 7,978,366.03
6.3826928245
416,666.00
125,000.00
m1
rangka kawat las upah asesorise
127
21.166666667 300,000.00
2.1166666667
23.283333333
2,910,416.67 750,000.00 5,700,000.00 1,500,000.00
6,270,000.00 25,080,000.00
3,300,000.00 3,300,000.00
100,000.00 20,000,000.00
15,000.00 180,000.00
2,000,000.00 2,000,000.00
1,500,000.00 1,500,000.00
250,000.00 1,000,000.00
53,060,000.00
Spek CCTV
LEMBAR ACP
1.22
2.44 2.9768
huruf
HURUF
total
satuan
cctv
kamera 4
nvr + Hd 2 tera 1
kabel 200
konektor 12
ongkir 1
Upah pasang 4
Overhead 10%
1,250,000.00 7,978,366.03
6.3826928245
416,666.00
1,250,000.00 125,000.00
m2 m1
acp rangka kawat las upah asesorise
19 127
1,402,615.66
REKAPITULASI
INSTANSI / SKPD : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
I II III
I PEKERJAAN PERSIAPAN Rp 200,000.00
II PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR Rp 64,145,571.07
III PEKERJAAN HURUF ALLUMINIUM COMPSOSITE PANEL Rp 23,737,209.60
IV PEKERJAAN PENGADAAN PLAKAT PENGHARGAAN DAN TEMPAT SAMPAH Rp 23,066,120.00
V PEKERJAAN AKHIR Rp 2,500,000.00
Jumlah Rp 113,648,900.67
Total Rp 125,013,790.73
Dibulatkan Rp 125,000,000.00
Gorontalo, 2019
Diperiksa Oleh : Dibuat Oleh :
Kepala Seksi Perencanaan Teknis Konsultan Individual Teknik
Ahli Perencanaan
Mengetahui
Kepala Bidang Cipta Karya
INSTANSI / SKPD : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PROVINSI GORONTALO
INSTANSI / SKPD : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PROVINSI GORONTALO
NAMA PAKET : PENINGKATAN PS TAMAN BJ HABIBIE
PROVINSI / KAB / KOTA : GORONTALO
TAHUN ANGGARAN : 2019
B. BAHAN PEREKAT
1 Semen (50 Kg) Indonesia Kg Rp 1,300- Rp 65,000- /Zak
2 Semen tegel Warna AM.50 Kg Rp 15,000- ###
C BAHAN BAJA
1 Besi Beton Kg Rp 13,000- ###
2 Kawat Beton Kg Rp 22,500-
3 Pipa Galvanis Medim A Dia. 1 1/2 Inch M Rp 130,833- Rp 785,000- / Ujung
4 Pipa Galvanis Medim A Dia.3 Inch M Rp 229,166.67 Rp 1,375,000- /Ujung
5 Besi Hollow 2 x 1.5 M Rp 22,500- Rp 135,000- Ujung
E BAHAN FINISHING
1 Cat Kayu / Besi Kg Rp 65,000-
2 Plamir Kayu Kg Rp 55,000-
3 Meni Kayu Kg Rp 40,000-
4 Thinner ltr Rp 40,000-
5 Amplas Kayu lbr Rp 10,000-
6 Kuas Cat bh Rp 25,000-
7 Seal Tape bh Rp 12,500-
8 Alluminium Composite Panel PVDF M Rp 419,914- Rp 1,250,000.00.- / Lbr
9 Sealant Silicont Tube Rp 45,000-
10 Plakat Tembaga Tube Rp 4,500,000-
11 Tempat Sampah Buah Rp 2,200,000-
12 Sticker Skotlight Lebar 2.5 Cm Cm Rp 3,500-
F BAHAN ELEKTRONIK
1 Ubiquity nanostation Bh Rp 1,550,000- Rp 31,000- Bh
2 Ubiquity rocket M5 Bh Rp 1,750,000-
3 Antenna omni ubiquity AMO-5G10 Bh Rp 2,750,000- Rp 27,500- Bh
4 Isolatip Bh Rp 2,500-
5 Ip Kamera Dome IR Bh Rp 6,000,000-
6 Network Video Recorder 4 Chanel (NVR) M Rp 2,500,000-
7 Hardisk 4 TB Bh Rp 1,700,000-
III. DAFTAR HARGA UPAH KERJA
A TENAGA
Pekerja L.01 OH 0.750 93,000.00 69,750.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 73,000.00
B BAHAN
A TENAGA
Pekerja L.01 OH 0.100 93,000.00 9,300.00
Tukang Listrik L.03 OH 0.200 135,000.00 27,000.00
Kepala Tukang L.03 OH 140,000.00 -
Mandor L.04 OH 130,000.00 -
JUMLAH TENAGA KERJA 36,300.00
B BAHAN
Kabel Listrik 2 x 1,5 mm M1 10.000 4,300.00 43,000.00
Kabel Listrik 3 x 1,5 mm M1 10.000 5,700.00 57,000.00
Tee Dos Bh 1.000 1,500.00 1,500.00
Pipa Instalasi M1 3.000 8,000.00 24,000.00
Isolatip Bh 0.650 2,500.00 1,625.00
1 m2 acian
A TENAGA
Pekerja L.01 OH 0.200 93,000.00 18,600.00
Tukang Batu L.02 OH 0.100 135,000.00 13,500.00
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 34,800.00
B BAHAN
Semen portland kg 5.184 1,300.00 6,739.20
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 93,000.00 27,900.00
Tukang batu L.02 OH 0.500 135,000.00 67,500.00
Kepala Tukang L.03 OH 0.050 140,000.00 7,000.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 104,350.00
B BAHAN
Semen (50 Kg)
Kg 11.250 1,300.00 14,625.00
Indonesia
#REF! Kg 0.019 72.22 1.37
JUMLAH HARGA BAHAN 14,626.37
C PERALATAN
Molen Jam 0.683 #REF! #REF!
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 93,000.00 153,450.00
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 205,285.00
B BAHAN
Semen (50 Kg)
Kg 371.000 1,300.00 482,300.00
Indonesia
#REF! Kg 698.000 72.22 50,411.11
Kerikil Kg 1,047.000 77.78 81,433.33
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 619,519.44
C PERALATAN
Molen Jam 0.683 #REF! #REF!
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 93,000.00 6,510.00
Tukang batu L.02 OH 0.070 135,000.00 9,450.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 17,460.00
B BAHAN
Besi beton Kg 10.500 13,000.00 136,500.00
Kawat beton / benrat Kg 0.150 22,500.00 3,375.00
Jumlah Jumlah
Jumlah Beton
No Uraian Bekisting Berat Besi Harga Satuan Total Harga
Per M3
Per M3 Per M3
1 Pondasi Telapak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 93,000.00 153,450.00
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 205,285.00
B BAHAN
Semen (50 Kg)
Kg 371.000 1,300.00 482,300.00
Indonesia
#REF! Kg 698.000 72.22 50,411.11
Kerikil Kg 1,047.000 77.78 81,433.33
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 619,519.44
C PERALATAN
Molen Jam 0.683 #REF! #REF!
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 93,000.00 6,510.00
Tukang batu L.02 OH 0.070 135,000.00 9,450.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 17,460.00
B BAHAN
Besi beton Kg 10.500 13,000.00 136,500.00
Kawat beton / benrat Kg 0.150 22,500.00 3,375.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 93,000.00 61,380.00
Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
Kepala Tukang L.03 OH 0.033 140,000.00 4,620.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,840.00
B BAHAN
Kayu Kls III M3 0.040 #REF! #REF!
Paku Kg 0.400 21,000.00 8,400.00
Minyak Bekisting Liter 0.200 419,914.00 83,982.80
Kayu Klas-II M3 0.015 #REF! #REF!
Plywood Tebal 9mm Lbr 0.350 #REF! #REF!
Dolken Kayu Btg 2.000 #REF! #REF!
Jumlah Jumlah
Jumlah Beton
No Uraian Bekisting Berat Besi Harga Satuan Total Harga
Per M3
Per M3 Per M3
1 PLAT BETON
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 93,000.00 153,450.00
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 205,285.00
B BAHAN
Semen (50 Kg)
Kg 371.000 1,300.00 482,300.00
Indonesia
#REF! Kg 698.000 72.22 50,411.11
Kerikil Kg 1,047.000 77.78 81,433.33
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 619,519.44
C PERALATAN
Molen Jam 0.683 #REF! #REF!
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 93,000.00 6,510.00
Tukang batu L.02 OH 0.070 135,000.00 9,450.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 17,460.00
B BAHAN
Besi beton Kg 10.500 13,000.00 136,500.00
Kawat beton / benrat Kg 0.150 22,500.00 3,375.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 93,000.00 61,380.00
Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
Kepala Tukang L.03 OH 0.033 140,000.00 4,620.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,840.00
B BAHAN
Kayu Kls III M3 0.040 #REF! #REF!
Paku Kg 0.400 21,000.00 8,400.00
Minyak Bekisting Liter 0.200 419,914.00 83,982.80
Kayu Klas-II M3 0.018 #REF! #REF!
Plywood Tebal 9mm Lbr 0.350 #REF! #REF!
Dolken Kayu Btg 2.000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
Jumlah Jumlah
Jumlah Beton
No Uraian Bekisting Berat Besi Harga Satuan Total Harga
Per M3
Per M3 Per M3
1 BALOK 15X20
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 93,000.00 153,450.00
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 205,285.00
B BAHAN
Semen (50 Kg)
Kg 371.000 1,300.00 482,300.00
Indonesia
#REF! Kg 698.000 72.22 50,411.11
Kerikil Kg 1,047.000 77.78 81,433.33
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 619,519.44
C PERALATAN
Molen Jam 0.683 #REF! #REF!
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 93,000.00 6,510.00
Tukang batu L.02 OH 0.070 135,000.00 9,450.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 17,460.00
B BAHAN
Besi beton Kg 10.500 13,000.00 136,500.00
Kawat beton / benrat Kg 0.150 22,500.00 3,375.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 93,000.00 61,380.00
Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
Kepala Tukang L.03 OH 0.033 140,000.00 4,620.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,840.00
B BAHAN
Kayu Kls III M3 0.040 #REF! #REF!
Paku Kg 0.400 21,000.00 8,400.00
Minyak Bekisting Liter 0.200 419,914.00 83,982.80
Kayu Klas-II M3 0.018 #REF! #REF!
Plywood Tebal 9mm Lbr 0.350 #REF! #REF!
Dolken Kayu Btg 2.000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
Jumlah Jumlah
Jumlah Beton
No Uraian Bekisting Berat Besi Harga Satuan Total Harga
Per M3
Per M3 Per M3
1 BALOK 20X30
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 93,000.00 153,450.00
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 205,285.00
B BAHAN
Semen (50 Kg)
Kg 371.000 1,300.00 482,300.00
Indonesia
#REF! Kg 698.000 72.22 50,411.11
Kerikil Kg 1,047.000 77.78 81,433.33
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 619,519.44
C PERALATAN
Molen Jam 0.683 #REF! #REF!
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 93,000.00 6,510.00
Tukang batu L.02 OH 0.070 135,000.00 9,450.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 17,460.00
B BAHAN
Besi beton Kg 10.500 13,000.00 136,500.00
Kawat beton / benrat Kg 0.150 22,500.00 3,375.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 93,000.00 61,380.00
Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
Kepala Tukang L.03 OH 0.033 140,000.00 4,620.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,840.00
B BAHAN
Kayu Kls III M3 0.040 #REF! #REF!
Paku Kg 0.400 21,000.00 8,400.00
Minyak Bekisting Liter 0.200 419,914.00 83,982.80
Kayu Klas-II M3 0.018 #REF! #REF!
Plywood Tebal 9mm Lbr 0.350 #REF! #REF!
Dolken Kayu Btg 2.000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
Jumlah Jumlah
Jumlah Beton
No Uraian Bekisting Berat Besi Harga Satuan Total Harga
Per M3
Per M3 Per M3
1 BALOK 25X40
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 93,000.00 153,450.00
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 205,285.00
B BAHAN
Semen (50 Kg)
Kg 371.000 1,300.00 482,300.00
Indonesia
#REF! Kg 698.000 72.22 50,411.11
Kerikil Kg 1,047.000 77.78 81,433.33
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 619,519.44
C PERALATAN
Molen Jam 0.683 #REF! #REF!
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 93,000.00 6,510.00
Tukang batu L.02 OH 0.070 135,000.00 9,450.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 17,460.00
B BAHAN
Besi beton Kg 10.500 13,000.00 136,500.00
Kawat beton / benrat Kg 0.150 22,500.00 3,375.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 93,000.00 61,380.00
Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
Kepala Tukang L.03 OH 0.033 140,000.00 4,620.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,840.00
B BAHAN
Kayu Kls III M3 0.040 #REF! #REF!
Paku Kg 0.400 21,000.00 8,400.00
Minyak Bekisting Liter 0.200 419,914.00 83,982.80
Kayu Klas-II M3 0.018 #REF! #REF!
Plywood Tebal 9mm Lbr 0.350 #REF! #REF!
Dolken Kayu Btg 2.000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
Jumlah Jumlah
Jumlah Beton
No Uraian Bekisting Berat Besi Harga Satuan Total Harga
Per M3
Per M3 Per M3
1 BALOK 20X25
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 93,000.00 153,450.00
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 205,285.00
B BAHAN
Semen (50 Kg)
Kg 371.000 1,300.00 482,300.00
Indonesia
#REF! Kg 698.000 72.22 50,411.11
Kerikil Kg 1,047.000 77.78 81,433.33
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 619,519.44
C PERALATAN
Molen Jam 0.6827 #REF! #REF!
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 93,000.00 6,510.00
Tukang batu L.02 OH 0.070 135,000.00 9,450.00
Kepala Tukang L.03 OH 0.007 140,000.00 980.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 17,460.00
B BAHAN
Besi beton Kg 10.500 13,000.00 136,500.00
Kawat beton / benrat Kg 0.150 22,500.00 3,375.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.520 93,000.00 48,360.00
Tukang Kayu L.02 OH 0.260 135,000.00 35,100.00
Kepala Tukang L.03 OH 0.026 140,000.00 3,640.00
Mandor L.04 OH 0.026 130,000.00 3,380.00
JUMLAH TENAGA KERJA 90,480.00
B BAHAN
Kayu Kls III M3 0.045 #REF! #REF!
Paku Kg 0.300 21,000.00 6,300.00
Minyak Bekisting Liter 0.100 419,914.00 41,991.40
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Alat Bantu Set 1.000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
Jumlah Jumlah
Jumlah Beton
No Uraian Bekisting Berat Besi Harga Satuan Total Harga
Per M3
Per M3 Per M3
1 SLOOF 20x30
BERAT BERAT
NO. UKURAN (mm) PANJANG
(Kg) / Batang (Kg) / Meter
Besi Beton Polos
1 Ø 6 12 m 2.660 0.222
2 Ø 8 12 m 4.740 0.395
3 Ø 10 12 m 7.404 0.617
4 Ø 12 12 m 10.656 0.888
5 Ø 13 12 m 12.480 1.040
6 Ø 14 12 m 14.500 1.208
7 Ø 16 12 m 18.960 1.580
8 Ø 19 12 m 26.760 2.230
9 Ø 22 12 m 35.760 2.980
10 Ø 25 12 m 46.200 3.850
11 Ø 28 12 m 58.000 4.833
12 Ø 32 12 m 75.720 6.310
Besi Beton Ulir / Spiral
1 Ø 10 12 m 7.404 0.617
2 Ø 13 12 m 12.480 1.040
3 Ø 16 12 m 18.960 1.580
4 Ø 19 12 m 26.760 2.230
5 Ø 22 12 m 35.760 2.980
6 Ø 25 12 m 46.200 3.850
7 Ø 29 12 m 62.280 5.190
8 Ø 32 12 m 75.720 6.310
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
1 #REF!
Panjang
Vertikal = 25.80
Horizontal = 41.70
jumlah P = 67.50
Lebar = 0.50
Tinggi = 0.40
Rumus = JP x L x T
Jumlah 13.50 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
Jumlah 276.40 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
Jumlah 35.20 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
### #REF!
Volume Galian Tanah Pondasi Jalur A = 276.40
Volume Galian Tanah Pondasi Jalur B = 13.50
Volume Galian Tanah Pondasi Telapak = 35.20
Volume 81.28 M3
Jumlah 81.28 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
Rumus = P x L x T =
Volume = 691.00 x 0.80 x 0.05 = 27.64 M3
Rumus = P x L x T =
Volume = 67.50 x 0.50 x 0.05 = 1.69 M3
Volume VA + VB = 29.33 M3
Jumlah 29.33 M3
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
9 #REF!
Panjang pondasi = 691.00 M
Lebar = 0.80 M
Tinggi = 0.15 M
Rumus = (P-PKP) x L x T
Volume = 665.25 x 0.80 x 0.15 = 79.83 M3
Rumus = L x JT
Volume = 0.25 x 103.00 = 25.75 M1
Volume 79.83 M3
Jumlah 79.83 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
9 #REF!
Panjang = 67.50 M
Lebar = 0.40 M
Tinggi = 0.60 M
Rumus = P-PKP x L x T
Volume = 62.70 x 0.40 x 0.60 = 15.05 M3
Rumus = L x JT
Volume = 0.40 x 7.00 = 2.80 M1
Rumus = L x JT
Volume = 0.25 x 8.00 = 2.00 M1
Volume 15.05 M3
Jumlah 15.05 M3
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
9 #REF!
Panjang = 0.80 M
Lebar = 0.80 M
Tinggi = 0.05 M
Jumlah = 110.00 M
Rumus = P x L x T x J
Volume = 0.80 x 0.80 x 0.05 x 110.00 = 3.52 M3
Volume 3.52 M3
Jumlah 3.52 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
Rumus = P x L x T
Volume = 665.25 x 0.55 x 1.35 = 493.95 M3
Volume 493.95 M3
Jumlah 493.95 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
9 #REF!
Kamar
luas = 12.02 M2
Tinggi = 0.00 M
Jumlah = 24.00
Rumus = L x T x J
Volume = 12.02 x - x 24.00 = 288.48 M2
Koridor Kamar
luas = 37.95 M2
Tinggi = 0.00 M
Jumlah = 2.00
Rumus = L x T x J
Volume = 37.95 x - x 2.00 = 75.90 M3
Rumus = L x T x J
Volume = 42.81 x - x 1.00 = 42.81 M3
Rumus = L x T x J
Volume = 9.10 x - x 2.00 = 18.20 M3
Rumus = L x T x J
Volume = 17.70 x - x 2.00 = 35.40 M3
Klinik
luas = 8.07 M2
Tinggi = 0.00 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 8.07 0.00 x 1.00 = 8.07 M3
Rumus = L x T x J
Volume = 4.75 0.00 x 1.00 = 4.75 M3
Receptionist
luas = 109.43 M2
Tinggi = 0.00 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 109.43 0.00 x 1.00 = 109.43 M3
Rumus = L x T x J
Volume = 14.81 0.00 x 1.00 = 14.81 M3
Musholla
luas = 14.81 M2
Tinggi = 0.00 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 14.81 0.00 x 1.00 = 14.81 M3
Rg. Makan
luas = 52.06 M2
Tinggi = 0.00 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 52.06 0.00 x 1.00 = 52.06 M3
Rg. Kelas
luas = 122.43 M2
Tinggi = 0.00 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 122.43 0.00 x 1.00 = 122.43 M3
Mainentrance
luas = 31.90 M2
Tinggi = 0.00 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 31.90 0.00 x 1.00 = 31.90 M3
Lobby
luas = 55.55 M2
Tinggi = 0.00 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 55.55 0.00 x 1.00 = 55.55 M3
Rumus = L x T x J
Volume = 16.74 0.00 x 2.00 = 33.48 M3
Rumus = L x T x J
Volume = 13.47 0.00 x 1.00 = 13.47 M3
Rg. IT
luas = 7.27 M2
Tinggi = 0.00 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 7.27 0.00 x 1.00 = 7.27 M3
Rg. Admin
luas = 8.81 M2
Tinggi = 0.00 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 8.81 0.00 x 1.00 = 8.81 M3
Volume 969.57 M2
Jumlah 969.57 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
9 #REF!
Rumus = L x T x J
Volume = 6.60 x 1.50 x 24.00 = 237.60 M2
Rumus = L x T x J
Volume = 5.10 1.50 x 2.00 = 15.30 M2
Volume 252.90 M2
Jumlah 252.90 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
9 #REF!
Rumus = L x T x J
Volume = 3.17 x - x 24.00 = 76.08 M2
Rumus = L x T x J
Volume = 2.15 0.00 x 2.00 = 4.30 M2
Volume 80.38 M2
Jumlah 80.38 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
9 #REF!
Kamar
luas = 12.02 M2
Tinggi = 0.07 M
Jumlah = 24.00
Rumus = L x T x J
Volume = 12.02 x 0.07 x 24.00 = 20.19 M3
Rumus = L x T x J
Volume = 3.17 x 0.07 x 24.00 = 5.33 M3
Koridor Kamar
luas = 37.95 M2
Tinggi = 0.07 M
Jumlah = 2.00
Rumus = L x T x J
Volume = 37.95 x 0.07 x 2.00 = 5.31 M3
Rumus = L x T x J
Volume = 42.81 x 0.07 x 1.00 = 3.00 M3
Rumus = L x T x J
Volume = 9.10 x 0.07 x 2.00 = 1.27 M3
Rumus = L x T x J
Volume = 17.70 x 0.07 x 2.00 = 2.48 M3
Samping Taman
luas = 92.09 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 92.09 0.07 x 1.00 = 6.45 M3
Klinik
luas = 8.07 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 8.07 0.07 x 1.00 = 0.56 M3
Rumus = L x T x J
Volume = 2.15 0.07 x 2.00 = 0.30 M3
Rumus = L x T x J
Volume = 4.75 0.07 x 1.00 = 0.33 M3
Receptionist
luas = 109.43 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 109.43 0.07 x 1.00 = 7.66 M3
Rumus = L x T x J
Volume = 14.81 0.07 x 1.00 = 1.04 M3
Musholla
luas = 14.81 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 14.81 0.07 x 1.00 = 1.04 M3
Rg. Makan
luas = 52.06 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 52.06 0.07 x 1.00 = 3.64 M3
Rg. Kelas
luas = 122.43 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 122.43 0.07 x 1.00 = 8.57 M3
Mainentrance
luas = 31.90 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 31.90 0.07 x 1.00 = 2.23 M3
Lobby
luas = 55.55 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 55.55 0.07 x 1.00 = 3.89 M3
Rumus = L x T x J
Volume = 16.74 0.07 x 2.00 = 2.34 M3
Rumus = L x T x J
Volume = 13.47 0.07 x 1.00 = 0.94 M3
Rg. IT
luas = 7.27 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 7.27 0.07 x 1.00 = 0.51 M3
Rg. Admin
luas = 8.81 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 8.81 0.07 x 1.00 = 0.62 M3
Dropoff
luas = 40.44 M2
Tinggi = 0.07 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 40.44 0.07 x 1.00 = 2.83 M3
Volume 82.77 M3
Jumlah 82.77 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
9 #REF!
Kamar
luas = 12.02 M2
Tinggi = 0.05 M
Jumlah = 24.00
Rumus = L x T x J
Volume = 12.02 x 0.05 x 24.00 = 14.42 M3
Rumus = L x T x J
Volume = 3.17 x 0.05 x 24.00 = 3.80 M3
Koridor Kamar
luas = 37.95 M2
Tinggi = 0.05 M
Jumlah = 2.00
Rumus = L x T x J
Volume = 37.95 x 0.05 x 2.00 = 3.80 M3
Rumus = L x T x J
Volume = 42.81 x 0.05 x 1.00 = 2.14 M3
Rumus = L x T x J
Volume = 9.10 x 0.05 x 2.00 = 0.91 M3
Rumus = L x T x J
Volume = 17.70 x 0.05 x 2.00 = 1.77 M3
Samping Taman
luas = 92.09 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 92.09 0.05 x 1.00 = 4.60 M3
Klinik
luas = 8.07 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 8.07 0.05 x 1.00 = 0.40 M3
Rumus = L x T x J
Volume = 2.15 0.05 x 2.00 = 0.22 M3
Rumus = L x T x J
Volume = 4.75 0.05 x 1.00 = 0.24 M3
Receptionist
luas = 109.43 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 109.43 0.05 x 1.00 = 5.47 M3
Rumus = L x T x J
Volume = 14.81 0.05 x 1.00 = 0.74 M3
Musholla
luas = 14.81 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 14.81 0.05 x 1.00 = 0.74 M3
Rg. Makan
luas = 52.06 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 52.06 0.05 x 1.00 = 2.60 M3
Rg. Kelas
luas = 122.43 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 122.43 0.05 x 1.00 = 6.12 M3
Mainentrance
luas = 31.90 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 31.90 0.05 x 1.00 = 1.60 M3
Lobby
luas = 55.55 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 55.55 0.05 x 1.00 = 2.78 M3
Rumus = L x T x J
Volume = 16.74 0.05 x 2.00 = 1.67 M3
Rumus = L x T x J
Volume = 13.47 0.05 x 1.00 = 0.67 M3
Rg. IT
luas = 7.27 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 7.27 0.05 x 1.00 = 0.36 M3
Rg. Admin
luas = 8.81 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 8.81 0.05 x 1.00 = 0.44 M3
Dropoff
luas = 40.44 M2
Tinggi = 0.05 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 40.44 0.05 x 1.00 = 2.02 M3
Volume 59.12 M3
Jumlah 59.12 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : PEKERJAAN PENGADAAN DAN PEMASANGAN CCTV DAN WIFI OUTDOOR
Kamar
luas = 9.73 M2
Tinggi = 1.08 M
Jumlah = 24.00
Rumus = L x T x J
Volume = 9.73 x 1.08 x 24.00 = 252.20 M3
Rumus = P x L x T x J
Volume = 1.20 2.20 x 1.05 x 24.00 = 66.53 M3
Koridor Kamar
Panjang = 23.70 M
Lebar = 1.45 M
Tinggi = 1.08 M
Jumlah = 2.00
Rumus = P x L x T x J
Volume = 23.70 1.45 x 1.08 x 2.00 = 74.23 M3
Rumus = P x L x T x J
Volume = 22.70 1.70 x 1.08 x 1.00 = 41.68 M3
Rumus = P x L x T x J
Volume = 4.45 1.70 x 1.08 x 2.00 = 16.34 M3
Rumus = P x L x T x J
Volume = 3.70 4.45 x 1.08 x 2.00 = 35.56 M3
Taman
Panjang = 22.20 M
Lebar = 2.20 M
Tinggi = 0.68 M
Jumlah = 1.00
Rumus = P x L x T x J
Volume = 22.20 2.20 x 0.68 x 1.00 = 33.21 M3
Samping Taman
luas = 87.95 M2
Tinggi = 1.08 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 87.95 1.08 x 1.00 = 94.99 M3
Klinik
Panjang = 3.70 M
Lebar = 1.95 M
Tinggi = 1.08 M
Jumlah = 1.00
Rumus = P x L x T x J
Volume = 3.70 1.95 x 1.08 x 1.00 = 7.79 M3
Rumus = P x L x T x J
Volume = 1.45 1.20 x 1.05 x 2.00 = 3.65 M3
Rumus = L x T x J
Volume = 2.91 1.08 x 1.00 = 3.14 M3
Receptionist
luas = 100.85 M2
Tinggi = 1.08 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 100.85 1.08 x 1.00 = 108.92 M3
Musholla
Panjang = 3.70 M
Lebar = 3.70 M
Tinggi = 1.08 M
Jumlah = 1.00
Rumus = P x L x T x J
Volume = 3.70 3.70 x 1.08 x 1.00 = 14.79 M3
Rg. Makan
Panjang = 10.70 M
Lebar = 4.45 M
Tinggi = 1.28 M
Jumlah = 1.00
Rumus = P x L x T x J
Volume = 10.70 4.45 x 1.28 x 1.00 = 60.95 M3
Rg. Kelas
Panjang = 13.70 M
Lebar = 8.70 M
Tinggi = 1.08 M
Jumlah = 1.00
Rumus = P x L x T x J
Volume = 13.70 8.70 x 1.08 x 1.00 = 128.73 M3
Mainentrance
Panjang = 7.95 M
Lebar = 3.70 M
Tinggi = 1.08 M
Jumlah = 1.00
Rumus = P x L x T x J
Volume = 7.95 3.70 x 1.08 x 1.00 = 31.77 M3
Lobby
Panjang = 9.70 M
Lebar = 5.45 M
Tinggi = 1.28 M
Jumlah = 1.00
Rumus = P x L x T x J
Volume = 9.70 5.45 x 1.28 x 1.00 = 67.67 M3
Rumus = P x L x T x J
Volume = 4.20 3.70 x 1.28 x 2.00 = 39.78 M3
Rumus = P x L x T x J
Volume = 2.95 4.20 x 1.28 x 1.00 = 15.86 M3
Rg. IT
Panjang = 2.95 M
Lebar = 2.20 M
Tinggi = 1.28 M
Jumlah = 1.00
Rumus = P x L x T x J
Volume = 2.95 2.20 x 1.28 x 1.00 = 8.31 M3
Rg. Admin
Panjang = 2.95 M
Lebar = 2.70 M
Tinggi = 1.28 M
Jumlah = 1.00
Rumus = P x L x T x J
Volume = 2.95 2.70 x 1.28 x 1.00 = 10.20 M3
Dropoff
luas = 36.26 M2
Tinggi = 0.28 M
Jumlah = 1.00
Rumus = L x T x J
Volume = 36.26 0.28 x 1.00 = 10.15 M3
Volume 1,172.18 M3
Jumlah 1,172.18 M3
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi
0.006165 Kg
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 6.68 9.73 0.12 1.00 7.80 M3
(PxLxTxJ) 13.80 1.08 0.08 1.00 1.19 M3
23.09 0.95 0.12 1.00 2.63 M3
11.62 M3
Pembesian =
( P x B x JT x J ) = T. Utama 6.68 0.89 90.00 1.00 533.72 Kg
( P x B x JT x J ) = T. Tengah 9.73 0.89 150.00 1.00 1,295.69 Kg
( P x B x JT x J ) = T. Begel 0.00 0.39 44.53 1.00 - Kg
Jumlah 1,829.41 Kg
Pembesian =
( P x B x JT x J ) = T. Utama 13.80 0.89 8.00 1.00 98.01 Kg
( P x B x JT x J ) = T. Tengah 1.08 0.89 95.00 1.00 91.08 Kg
( P x B x JT x J ) = T. Begel 0.00 0.00 92.00 1.00 - Kg
Jumlah 189.09 Kg
Pembesian =
( P x B x JT x J ) = T. Utama 23.09 0.89 6.33 1.00 129.75 Kg
( P x B x JT x J ) = T. Tengah 0.95 0.89 153.93 1.00 129.82 Kg
( P x B x JT x J ) = T. Begel 0.00 0.00 153.93 1.00 - Kg
Jumlah 259.58 Kg
Total 2,278.08
Jumlah Sisi Jumlah
Tinggi Bekisting Lebar Bekisting
Bekisting Bekisting
Bekisiting
(PxTxJ) = 6.68 9.73 1.00 1.00 65.00 M2
6.68 0.12 2.00 1.00 1.60 M2
9.73 0.12 1.00 1.00 1.17 M2
Jumlah 67.77 M2
Total 131.23 M2
Jumlah
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi
0.006165 Kg
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 0.40 0.4 6.25 9.00 9.00 M3
Pembesian =
( P x B x JT x J ) = T. Utama 6.25 0.89 6.00 9.00 299.62 Kg
( P x B x JT x J ) = T. Tengah 6.25 0.89 2.00 9.00 99.87 Kg
( P x B x JT x J ) = T. Begel 1.60 0.39 41.67 9.00 236.74 Kg
Jumlah 636.23 Kg
Bekisiting
(PxTxJ) = 6.25 0.4 4.00 9.00 90.00 M2
Jumlah
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Horizontal + Vertikal
273.20 + 393.00 = 666.20
Jumlah 666.20 M1
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Tinggi x Jumlah
4.00 x 81.00 = 324.00
Jumlah 324.00 M1
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi
0.006165 Kg
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 0.23 0.23 6.25 103.00 34.05 M3
Pembesian =
( P x B x JT x J ) = T. Utama 6.25 0.89 6.00 103.00 3,428.97 Kg
( P x B x JT x J ) = T. Tengah 6.25 0.89 2.00 103.00 1,142.99 Kg
( P x B x JT x J ) = T. Begel 0.92 0.39 41.67 103.00 1,557.85 Kg
Jumlah 6,129.82 Kg
Bekisiting
(PxTxJ) = 6.25 0.23 4.00 103.00 592.25 M2
Jumlah
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi
0.006165 Kg
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 0.80 0.8 0.20 110.00 14.08 M3
Pembesian =
( P x B x JT x J ) = T. Utama 0.80 0.89 12.00 110.00 937.47 Kg
( P x B x JT x J ) = T. Tengah 0.00 0.00 0.00 0.00 - Kg
( P x B x JT x J ) = T. Begel 2.00 0.89 5.33 110.00 1,041.64 Kg
Jumlah 1,979.11 Kg
Jumlah
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi Horizontal = 32
0.006165 Kg Vertikal = 18
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 50.00 0.2 0.30 1.00 3.00 M3
Pembesian =
( P x B x JT x J ) = T. Utama 50.00 0.89 9.00 1.00 399.49 Kg
( P x B x JT x J ) = T. Tengah 50.00 0.89 0.00 1.00 - Kg
( P x B x JT x J ) = T. Begel 1.00 0.39 333.33 1.00 131.52 Kg
Jumlah 531.01 Kg
Pembesian =
( P x B x JT x J ) = T. Utama 50.00 0.89 2.00 1.00 88.78 Kg
( P x B x JT x J ) = T. Tengah 50.00 0.89 0.00 1.00 - Kg
( P x B x JT x J ) = T. Begel 0.90 0.39 333.33 1.00 118.37 Kg
Jumlah 207.14 Kg
Jumlah
Panjang
Tinggi Bekisting Sisi
Bekisting
Bekisting
Bekisting
(PxTxJ) = 50.00 0.30 2.00 30.00 M2
Jumlah
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi Horizontal = 18
0.006165 Kg Vertikal = 23.6
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 38.00 0.25 0.40 1.00 3.80 M3
Pembesian =
( P x B x JT x J ) = T. Utama 38.00 0.89 6.00 1.00 202.41 Kg
( P x B x JT x J ) = T. Tengah 38.00 0.89 4.00 1.00 134.94 Kg
( P x B x JT x J ) = T. Begel 1.30 0.39 253.33 1.00 129.94 Kg
Jumlah 467.29 Kg
Jumlah
Panjang
Tinggi Bekisting Sisi
Bekisting
Bekisting
Bekisting
(PxTxJ) = 38.00 0.40 2.00 30.40 M2
Jumlah
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi bagian depan = 50
0.006165 Kg bagian belakang = 137.2
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 187.20 0.15 0.20 1.00 5.62 M3
Pembesian =
( P x B x JT x J ) = T. Utama 187.20 0.89 4.00 1.00 664.75 Kg
( P x B x JT x J ) = T. Tengah 187.20 0.89 0.00 1.00 - Kg
( P x B x JT x J ) = T. Begel 0.70 0.39 1248.00 1.00 344.69 Kg
Jumlah 1,009.44 Kg
Jumlah
Panjang
Tinggi Bekisting Sisi
Bekisting
Bekisting
Bekisting
(PxTxJ) = 187.20 0.20 2.00 74.88 M2
Jumlah
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi Horizontal = 307
0.006165 Kg Vertikal = 360.5
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 628.00 0.18 0.23 1.00 25.79 M3
Pembesian =
( P x B x JT x J ) = T. Utama 628.00 0.89 6.00 1.00 3,345.08 Kg
( P x B x JT x J ) = T. Tengah 628.00 0.89 2.00 1.00 1,115.03 Kg
( P x B x JT x J ) = T. Begel 0.82 0.39 4186.67 1.00 1,348.29 Kg
Jumlah 5,808.40 Kg
Jumlah
Panjang
Tinggi Bekisting Sisi
Bekisting
Bekisting
Bekisting
(PxTxJ) = 628.00 0.23 2.00 286.50 M2
Jumlah
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi
0.006165 Kg
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 7.70 0.15 0.20 1.00 0.23 M3
Pembesian =
( P x B x JT x J ) = T. Utama 7.70 0.89 4.00 1.00 27.34 Kg
( P x B x JT x J ) = T. Tengah 7.70 0.89 0.00 1.00 - Kg
( P x B x JT x J ) = T. Begel 0.70 0.39 51.33 1.00 14.18 Kg
Jumlah 41.52 Kg
Jumlah
Panjang
Tinggi Bekisting Sisi
Bekisting
Bekisting
Bekisting
(PxTxJ) = 7.70 0.20 2.00 3.08 M2
Jumlah
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
9 #REF!
Hitungan Total
Berat Koof. Besi
0.006165 Kg
Diameter Besi
12.00 T. Utama
Beton
(PxLxTxJ) 720.25 0.18 0.23 1.00 29.82 M3
Pembesian =
( P x B x JT x J ) = T. Utama 720.25 0.89 6.00 1.00 3,836.45 Kg
( P x B x JT x J ) = T. Tengah 720.25 0.89 2.00 1.00 1,278.82 Kg
( P x B x JT x J ) = T. Begel 0.82 0.39 4801.67 1.00 1,553.53 Kg
Jumlah 6,668.80 Kg
Jumlah
Panjang
Tinggi Bekisting Sisi
Bekisting
Bekisting
Bekisting
(PxTxJ) = 720.25 0.23 2.00 331.32 M2
Jumlah
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Panjang (P) L. Luas
Lebar (L) Berat Tinggi (T) Jmlh
Penampang
(B) Keliling (K) (J)
Lubang KET
(LP) (LL)
Dikurangi Luasan
Glass Block
Panjang : 3.00
Lebar : 0.80
Jumlah : 2.00
Volume = P x L x J
3.00 x 0.80 x 2.00 = 4.80 M2
Roster Beton
Panjang : 3.00
Lebar : 1.25
Jumlah : 1.00
Volume = P x L x J
3.00 x 1.25 x 1.00 = 3.75 M2
P1 pintu kamar
Panjang : 2.20
Lebar : 0.90
Jumlah : 24.00
Volume = P x L x J
2.20 x 0.90 x 24.00 = 47.52 M2
Panjang : 2.20
Lebar : 0.80
Jumlah : 24.00
Volume = P x L x J
2.20 x 0.80 x 24.00 = 42.24 M2
PV1
Panjang : 2.60
Lebar : 1.70
Jumlah : 2.00
Volume = P x L x J
2.60 x 1.70 x 2.00 = 8.84 M2
PV2
Panjang : 2.60
Lebar : 0.90
Jumlah : 9.00
Volume = P x L x J
2.60 x 0.90 x 9.00 = 21.06 M2
P3
Panjang : 2.05
Lebar : 0.80
Jumlah : 2.00
Volume = P x L x J
2.05 x 0.80 x 2.00 = 3.28 M2
P4
Panjang : 2.15
Lebar : 1.00
Jumlah : 1.00
Volume = P x L x J
2.15 x 1.00 x 1.00 = 2.15 M2
JV1
Panjang : 2.20
Lebar : 2.00
Jumlah : 24.00
Volume = P x L x J
2.20 x 2.00 x 24.00 = 105.60 M2
J1
Panjang : 2.20
Lebar : 0.65
Jumlah : 14.00
Volume = P x L x J
2.20 x 0.65 x 14.00 = 20.02 M2
J2
Panjang : 3.05
Lebar : 1.20
Jumlah : 7.00
Volume = P x L x J
3.05 x 1.20 x 7.00 = 25.62 M2
V1
Panjang : 0.50
Lebar : 0.70
Jumlah : 2.00
Volume = P x L x J
0.50 x 0.70 x 2.00 = 0.70 M2
Pintu Depan
Panjang : 3.10
Lebar : 3.75
Jumlah : 1.00
Volume = P x L x J
3.10 x 3.75 x 1.00 = 11.63 M2
Ditambah
Pondasi
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
VOLUME
M2
M2
M2
M2
M2
M2
M3
M2
M2
M2
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Panjang (P) L. Luas
Lebar (L) Berat Tinggi (T) Jmlh
Penampang
(B) Keliling (K) (J)
Lubang KET
(LP) (LL)
pasangan dinding Utuh Bagian Bawah Ring Balok Sudah Kurang Tinggi Latey t=3.85m
Dikurangi Luasan
Glass Block
Panjang : 3.00
Lebar : 0.80
Jumlah : 2.00
Volume = P x L x J
3.00 x 0.80 x 2.00 = 4.80 M2
Roster Beton
Panjang : 3.00
Lebar : 1.25
Jumlah : 1.00
Volume = P x L x J
3.00 x 1.25 x 1.00 = 3.75 M2
P1 pintu kamar
Panjang : 2.20
Lebar : 0.90
Jumlah : 24.00
Volume = P x L x J
2.20 x 0.90 x 24.00 = 47.52 M2
Panjang : 2.20
Lebar : 0.80
Jumlah : 24.00
Volume = P x L x J
2.20 x 0.80 x 24.00 = 42.24 M2
PV1
Panjang : 2.60
Lebar : 1.70
Jumlah : 2.00
Volume = P x L x J
2.60 x 1.70 x 2.00 = 8.84 M2
PV2
Panjang : 2.60
Lebar : 0.90
Jumlah : 9.00
Volume = P x L x J
2.60 x 0.90 x 9.00 = 21.06 M2
P3
Panjang : 2.05
Lebar : 0.80
Jumlah : 2.00
Volume = P x L x J
2.05 x 0.80 x 2.00 = 3.28 M2
P4
Panjang : 2.15
Lebar : 1.00
Jumlah : 1.00
Volume = P x L x J
2.15 x 1.00 x 1.00 = 2.15 M2
JV1
Panjang : 2.20
Lebar : 2.00
Jumlah : 24.00
Volume = P x L x J
2.20 x 2.00 x 24.00 = 105.60 M2
J1
Panjang : 2.20
Lebar : 0.65
Jumlah : 14.00
Volume = P x L x J
2.20 x 0.65 x 14.00 = 20.02 M2
J2
Panjang : 3.05
Lebar : 1.20
Jumlah : 7.00
Volume = P x L x J
3.05 x 1.20 x 7.00 = 25.62 M2
V1
Panjang : 0.50
Lebar : 0.70
Jumlah : 2.00
Volume = P x L x J
0.50 x 0.70 x 2.00 = 0.70 M2
Pintu Depan
Panjang : 3.10
Lebar : 3.75
Jumlah : 1.00
Volume = P x L x J
3.10 x 3.75 x 1.00 = 11.63 M2
Kolom 25x25
Panjang : 4.00
Lebar : 0.23
Jumlah : 103.00
Volume = P x L x J
4.00 x 0.23 x 103.00 = 94.76 M2
Kolom Praktis
Panjang : 4.00
Lebar : 0.15
Jumlah : 81.00
Volume = P x L x J
4.00 x 0.15 x 81.00 = 48.60 M2
Jumlah 2,500.98
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
VOLUME
M2
M2
M2
M2
M2
M2
M3
M2
M2
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Luasan Di List Area dalam CAD
Luas = 1398.67 M2
Jumlah 1,398.67 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
#REF!
Bagian Depan 10.60 17.00 2.00 360.40 M2
Bagian Tengah' 15.50 12.83 2.00 397.73 M2
Bagian Belakang 26.00 12.71 2.00 660.92 M2
Jumlah 1,419.05 M2
#REF!
Bagian Depan 10.60 17.00 2.00 360.40 M2
Bagian Tengah' 15.50 12.83 2.00 397.73 M2
Bagian Belakang 26.00 12.71 2.00 660.92 M2
Jumlah 1,419.05 M2
#REF!
( P x T - LL) 324.36 - - ### 324.36 M1
Jumlah M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) L. Lebar (L) Berat Jumlah
Lantai (LL) (B) Keliling (K)
Jmlh.Tulagan
sisi (LL)
KET
(JT)
Kusen Pintu P1
4.30 0.90 0.00 24.00 124.80 M
Kusen Pintu P2
4.30 0.80 0.00 24.00 122.40 M
Kusen Pintu PV1
5.40 3.40 0.00 2.00 17.60 M
Kusen Pintu PV2
5.00 1.80 0.00 9.00 61.20 M
Kusen Pintu VJ1
8.20 7.20 0.00 24.00 369.60 M
Kusen Pintu J1
4.20 1.30 0.00 14.00 77.00 M
Kusen Pintu J2
8.02 7.70 0.00 7.00 110.04 M
Kusen Pintu V1
1.40 0.80 0.00 2.00 4.40 M
Jumlah 887.04 M
GAMBAR SKETSA
Dibuat Oleh Dibuat Oleh
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
0.60 0.40 1.00 2.00 0.48 M2
Jumlah 0.48 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
0.48 0.53 8.00 7.00 14.25 M2
Jumlah 14.25 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
2.10 0.55 1.00 14.00 16.17 M2
Jumlah 16.17 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
0.60 0.40 3.00 24.00 17.28 M2
1.65 0.40 1.00 24.00 15.84 M2
Jumlah 33.12 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
2.10 0.80 1.00 9.00 15.12 M2
0.40 0.80 1.00 9.00 2.88 M2
Jumlah 18.00 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
2.10 1.60 1.00 2.00 6.72 M2
0.78 0.40 2.00 2.00 1.25 M2
Jumlah 7.97 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
2.15 0.70 24.00 36.12 M2
#REF!
Jumlah 36.12 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
Pintu Depan 2.40 0.68 2.00 1.00 3.26 M2
3.75 0.70 1.00 1.00 2.63 M2
Jumlah 5.89 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
VJ1 1.20 0.60 2.00 24.00 34.56 M2
0.40 0.60 2.00 24.00 11.52 M2
J2 1.10 0.40 2.00 7.00 6.16 M2
Jumlah 52.24 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
PV1 2.00 0.00 2.00 4.00 M2
PV2 1.00 0.00 9.00 9.00
VJ1 4.00 0.00 24.00 96.00
J1 1.00 0.00 14.00 14.00
J2 8.00 0.00 7.00 56.00
V1 1.00 0.00 2.00 2.00
Jumlah 181.00 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
PV1 4.00 0.00 2.00 8.00 M2
PV2 2.00 0.00 9.00 18.00
VJ1 8.00 0.00 24.00 192.00
J1 2.00 0.00 14.00 28.00
J2 16.00 0.00 7.00 112.00
V1 2.00 0.00 2.00 4.00
Jumlah 362.00 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
PV1 4.00 0.00 2.00 8.00 M2
PV2 2.00 0.00 9.00 18.00
VJ1 8.00 0.00 24.00 192.00
J1 2.00 0.00 14.00 28.00
J2 16.00 0.00 7.00 112.00
V1 2.00 0.00 2.00 4.00
Jumlah 362.00 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
PV1 1.00 0.00 2.00 2.00
PV2 1.00 0.00 9.00 9.00
P1 1.00 0.00 24.00 24.00
P2 1.00 0.00 24.00 24.00
Jumlah 59.00
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
PV1 6.00 0.00 2.00 12.00 M2
PV2 3.00 0.00 9.00 27.00
P1 3.00 0.00 24.00 72.00
P2 3.00 0.00 24.00 72.00
Jumlah 183.00 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!
K/D/L/I :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN REHAB RUANG ENDOSKOPI RS DUNDA
LOKASI : RS DUNDA KABUPATEN GORONTALO
TAHUN ANGGARAN : 2018
BACK UP DATA
ITEM PEKERJAAN : #REF!
#REF!
Tinggi (T)
Panjang (P) j. Lebar (L) Berat Jumlah L
daun (JD) (B) Keliling (K)
Jmlh.Tulagan
kaca (LL)
KET
(JT)
#REF!
2.15 0.80 24.00 41.28 M2
#REF!
Jumlah 41.28 M2
GAMBAR SKETSA
#REF! #REF!
#REF! #REF!