PEKERJAAN SURVEY TOWER

METODA PELAKSANAAN SURVEY


METODA PELAKSANAA PEKERJAAN SURVEY TOWER

I. PENG UKURA N DAN PENG ECEKA N FI SI K T OW ER


TYPE TOWER (SST, TRIANGLE, GUYED MAST ATAU MONOPOLE)
LENGKANG ATAS DAN LENGKANG BAWAH (JARAK LUAR), ARAH (AZIMUTH)
PENGUKURAN TINGGI PER SECTION KECUALI BENTUK A , TINGGI TOTAL, JUMLAH DAN TYPE TIAP SECTION
DIMENSI PROFIL BAJA PADA STRUKTUR TOWER, ANTARA LAIN BATANG MAIN LEG (BATANG UTAMA), BRACING / DIAGONAL,
HORIZONTAL, REDUNDANT DIAGONAL & HORIZONTAL, VERTICAL, HIP BRACING, PELAT BORDES, PLAT SIMPUL, BASE PLATE,
BAUT DAN ANGKUR . SEDANGKAN UNTUK GUYED MAST UKURAN KABEL DAN POSISINYA
DETAIL SAMBUNGAN BATANG MAIN LEG DAN UKURAN BAUT
PENGECEKAN KONDISI FISIK TOWER, ANTARA LAIN : KONDISI MATERIAL, VERTICALITY DAN HORIZONTALITY

I I . PENDAT AAN PO NDASI T OW ER


PENGUKURAN JARAK ANTARA KAKI TOWER (CENTRE LINE PEDESTAL)
LEBAR KAKI TOWER (PEDESTAL), TINGGI PEDESTAL DARI GROUND LEVEL, TINGGI GROUTING
MELAKUKAN PEMERIKSAAN PANJANG PEDESTAL (TINGGI) DENGAN MEMAKAI BESI DIA. 12 ATAU 16 MM

I I I . PENDAT AAN ANT ENNA EKSI ST I NG


PENDATAAN BERUPA TYPE, DIMENSI, POSISI, KETINGGIAN, DAN ARAH AZIMUTH ANTENNA

I V. MENDO KUME NT ASI K A N


TAMPAK TOWER (TIAP KAKI TOWER)
KONDISI TOWER (BILA TOWER MIRING, BAUT TIDAK TERPASANG, KARATAN)
POSISI TIAP ANTENNA EKSISTING BESERTA MOUNTING
SISTEM SAMBUNGAN STRUKTUR TOWER TIAP SECTION
KAKI DAN BASE PLATE TOWER,
PENGUKURAN DIMENSI PROFIL BAJA DAN PONDASI KAKI TOWER
DAN LAIN LAIN (BISA DILIHAT DALAM CEKLIST TERSENDIRI)

V. MEMBUAT G UI DE MAP DAN SI T E LAYO UT LO KASI


GUIDE MAP DIBUAT MELIPUTI DENAH LOKASI SAMPAI KESITE, ARAH UTARA
SITE LAYOUT MELIPUTI TATA LETAK TOWER, SHELTER/BTS, RUANG GENSET, POLE PLN, DLL SEMUANYA TERUKUR (ADA UKURAN
NYA)

PT. Tritech Consult


PENJELASAN ELEMEN STRUKTUR TOWER

LENGKANG ATAS

TYPE : Z
SECTION 4
TINGGI TOTAL

TYPE : A

D A
SECTION 3
1/2 SECTION

U a

SECTION 2
1 SECTION

C B
TYPE : X

SECTION 1 ARAH / AZIMUTH


1 SECTION

LENGKANG BAWAH

PT. Tritech Consult


ELEMEN STRUKTUR TOWER

MA IN L E G /
B A T A N G U T A MA
P L A N B R A C IN G 2

H OR IZ ON T A L

R E D U N D AN T 4

B R AC IN G
R E D U N D AN T 3

H IP B R A C IN G 2

P L AN B R AC IN G 1
REDUNDANT 2

R E D U N D AN T 1

H IP B R A C IN G 1

PT. Tritech Consult


ELEMEN STRUKTUR TOWER

REDUNDANT 7
REDUNDANT 6

REDUNDANT 5

H IP B R A C IN G 2

REDUNDANT 4
B R A C IN G

REDUNDANT 3

H IP B R A C IN G 1

REDUNDANT 2

REDUNDANT 1

PT. Tritech Consult


ELEMEN STRUKTUR TOWER

M AI N L E G
H I P B R AC I N G 2

R E D U N D AN T 3 R E D U N D AN T 4
P L AN B R AC I N G
1
P L AN B R AC I N G
2 H O R I Z O N T AL

R E D U N D AN T 2
H I P B R AC I N G 1

B R AC I N G R E D U N D AN T 1

PT. Tritech Consult


ELEMEN STRUKTUR TOWER
GUYED MAST TOWER
ELEMEN STRUKTUR GUYED MAST TOWER
MONOPOLE TOWER

Struktur Monopole merupakan


rangkaian pipa baja dengan
penampang bulat, segi enam
atau segi 12.

Material monopole dibuat dari


plat baja dengan dimensi lebih
tebal pada bagian bawah.
ELEMEN STRUKTUR MONOPOLE TOWER
AKTIFITAS SURVEY TOWER
A. Searching Site
B. Pendataan Elemen Tower
C. Pendataan Pondasi dan Verticality Tower
D. Pengukuran Grounding System dan Beton Pondasi Tower
Team Survey Assessment Tower