•Basement
•Air Permukaan
•Dinding Penahan Tanah
Styrofoam
MATERIAL CONCRETE PILE
Sement Portland yang digunakan
Sement Tipe I dengan spesifikasi sbb :
Kandungan C3S = 45 – 55%
Kandungan C3A = 8 – 12%
Kehalusan = 350 – 400 m2/kg
MATERIAL
CONTIGUOUS
PILE
Volume of Aggregate
Fine aggregate = 674 kg
Coarse Aggregate = 1062 kg
TOTAL = 2316 kg
MATERIAL CONTIGUOUS PILE
Besi Ø 19 dan Ø 13 Styrofoam
PERALATAN
PERALATAN
Bentonite Pile
Seperangkat Bentonite Plant
Seperangkat Instalasi Listrik dan Genset
Pipa / selang penyaluran
Mesin Bor
Mata Bor Augher
Drilling Bucket
Pipa Tremie
Crawler Crane
PERALATAN
Bentonite Plant Genset
PERALATAN
Pipa Selang Penyaluran Mesin Bor
PERALATAN
Mata Bor Augher Drilling Bucket
PERALATAN
Pipa Tremie Crane 35 Ton
PERALATAN
Contiguous Pile :
Mesin Bor SoilMec R-416
Mata Bor Augher
Drilling Bucket
Cleaning Bucket
Seperangkat alat las listrik
Crawler Crane
Pipa Tremie dan Kepala Tremie
Casing
Back Hoe
PERALATAN
Start
Call :
Persiapan Kerja Semen Bentonite
Call :
Pengeboran Lobang Bentonite
Call :
Pembuatan Bentonite
Call :
Pengecoran Bentonite
TIDAK
Tunggu ± 1 hari
( hingga susut )
YA
Finish
FLOWCHART SUBROUTINE PERSIAPAN
KERJA SEMEN BENTONITE PILE
Gbr 2C Gbr 2B
FLOWCHART SUBROUTINE
PENGEBORAN LOBANG BENTONITE
Gunakan
Tanah Lempung YA Mata Bor
Auger Gambar 3C
TIDAK
TIDAK Gunakan
Tanah Pasir YA Mata Bor
Drill Gambar 3D
Bucket
TIDAK
Kedalaman
Rencana Gambar 3E
atau
Tanah Keras
YA
Gbr 3A Gbr 3B1
Gbr 3B2
Gbr 3E
FLOWCHART SUBROUTINE PEMBUATAN BENTONITE
PER 6M3 (PALING SERING DILAKUKAN)
Gambar 4A
Bentonite Bentonite
3 sak @ 50 kg 3 sak @ 50 kg
Gambar 4B
Gambar 4F
Tangki Aduk
(Aduk-aduk hingga merata ± 15 menit)
Gbr 4F1
NOTE :
Urutan Pengeboran
Untuk pengeboran semen bentonite yang berdekatan
atau bersebelahan disyaratkan semen bentonite
berumur minimal 3 hari.
Untuk pengeboran contiguous pile yang berada
diantara semen bentonite pile disyaratkan bentonite
berumur minimal 9 hari, untuk mencegah
terjadinya kebocoran yang dikarenakan rusak atau
patah semen bentonite pile. Pada umur 9 hari semen
bentonite sudah cukup keras.
Urutan Pengeboran semen Bentonite dan contiguous
pile terlihat pada gambar dibawah ini :
1 3 5 1 3 5 2 4 6 2 4 6
Dst………..
14 16 18 14 16 18 15 17 19 15 17 19
= Contiguous Pile
Gambar 5B
Gbr 5C Gbr 5D
FLOW CHART PENGEBORAN
CONTIGUOUS PILE
FLOWCHART PENGERJAAN
CONTIGUOUS PILE
START
Call :
Fabrikasi Tulangan
Call :
Pengeboran
Pemasangan Casing,
Call :
Pemasangan Tulangan
Call :
Pemasangan Tremy dan
Pengecoran
FINISH
FLOWCHART SUBROUTINE FABRIKASI
TULANGAN CONTIGUOUS PILE
dalam = 125 mm
Gunakan
YA
Tanah Lempung Mata Bor
Auger
TIDAK TIDAK
Gunakan
YA
Mata Bor
Tanah Pasir
Drill Bucket
TIDAK
Kedalaman Rencana
atau
Tanah Keras
RETURN
Gbr7DC Gbr 9A
FLOWCHART SUBROUTINE PEMASANGAN TREMIE
DAN PENGECORAN CONTIGUOUS PILE
YA
PERIODE
S/D 10 JUNI S/D 17 JUNI
11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun
JUMLAH
JML % SISA SENIN SELASA RABU KAMIS JUMAT SABTU MINGU JML % SISA
27 20 110 6 6 5 7 6 6 6 42 50 36% 87
8 6% 135 6 7 2 7 4 0 0 23 34 25% 103
BN-136 BN-128 BN-131 BN-130 BN-109
BN-132 BN-124 BN-92 BN-123 BN-102
BN-111 BN-121 BN-116 BN-100
BN-108 BN-117 BN-110 BN-107S
NO LOBANG
BN-104 BN-114 BN-107
BN-101 BN-98 BN-103
BN-95 BN-89
PRODUKTIVITAS BENTONITE
MINGGU KEDUA
PERIODE
S/D 17 JUNI S/D 24 JUNI
18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun
JUMLAH
JML % SISA SENIN SELASA RABU KAMIS JUMAT SABTU MINGU JML % SISA
55 40 87 7 7 7 7 7 7 7 49 83 61% 54
BN-75 BN-86
PRODUKTIFITAS BENTONITE
Lama waktu rata-rata kegiatan pengerjaan Bentonite Pile.
PERIODE
S/D 24 JUNI S/D 1 JULI
25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jun
JUMLAH
JML % SISA SENIN SELASA RABU KAMIS JUMAT SABTU MINGU JML % SISA
20 15 114 5 5 5 5 5 25 35 26 99
10 7 124 4 2 3 4 6 19 29 22 105
CP- 95
CP- 92
PRODUKTIVITAS CONTIGUOUS PILE
MINGGU KEDUA
Untuk Bentonite :
Diameter lobang = 600 mm
Kedalaman = 15000 mm
Volume Teori = 4,3 m3
Untuk Contiguous Pile
Diameter lobang = 800 mm
Kedalaman = 15000 mm
Volume Teori = 7,5 m3 (min COL = 2 meter dari
tanah eksisting)
Waste Material Bentonite
TGL Titik Desain Elevasi Kedalaman Vol.aktual Durasi Bor Durasi Cor
No Elevasi Diameter Tanah Kedalaman
COR Bentonite Dasar asli Bor Akhir Bored (M3) Mulai Selesai Mulai selesai
1 11-Jun-07 BN 111 -18.00 600 -0.964 17.100 -18.064 8 8.30 9.10 10.00 10.25
2 11-Jun-07 BN 108 -18.00 600 -1.062 17.000 -18.062 10 9.15 9.45 10.55 11.25
3 11-Jun-07 BN 104 -18.00 600 -1.062 17.000 -18.062 6 9.55 10.35 13.15 13.40
4 11-Jun-07 BN 101 -18.00 600 -1.173 17.000 -18.173 6 10.40 11.15 14.25 14.50
5 11-Jun-07 BN 136 -18.00 600 -1.067 17.000 -18.067 6 16.10 16.50 17.35 17.50
6 11-Jun-07 BN 132 -18.00 600 -0.933 17.100 -18.033 5 16.55 17.35 18.40 18.55
7 11-Jun-07 BN 126 -18.00 600 -0.947 17.200 -18.147 6 17.45 18.20 19.50 20.15
8 12-Jun-07 BN 128 -18.00 600 -0.829 17.200 -18.029 6 8.30 9.30 11.00 11.20
9 12-Jun-07 BN 124 -18.00 600 -0.955 17.100 -18.055 6 9.30 10.30 12.00 12.20
10 12-Jun-07 BN 121 -18.00 600 -0.904 17.100 -18.004 6 10.30 11.30 13.00 13.20
11 12-Jun-07 BN 117 -18.00 600 -0.167 17.000 -17.167 6 11.30 12.30 14.00 14.30
12 12-Jun-07 BN 114 -18.00 600 -0.949 17.100 -18.049 6 13.30 14.30 15.00 15.20
13 12-Jun-07 BN 95 -18.00 600 -1.187 16.900 -18.087 6 14.30 15.30 16.00 16.30
14 12-Jun-07 BN 98 -18.00 600 -1.206 16.900 -18.106 6.0 16.30 17.30 18.00 18.30
15 13-Jun-07 BN 113 -18.00 600 -0.932 17.000 -17.932 6.5 13.15 14.10 16.10 16.30
16 13-Jun-07 BN 119 -18.00 600 -0.930 17.200 -18.130 6.0 11.35 12.15 15.10 15.35
17 13-Jun-07 BN 134 -18.00 600 -0.992 17.000 -17.992 8.0 10.40 11.25 14.00 14.20
18 13-Jun-07 BN 131 -18.00 600 -0.998 17.100 -18.098 12.0 8.15 9.00 10.25 10.40
19 13-Jun-07 BN 92 -18.00 600 -1.211 16.900 -18.111 12.0 9.40 10.25 12.15 12.40
20 13-Jun-07 BN 130 -18.00 600 -1.044 17.000 -18.044 6.0 8.00 8.50 10.20 10.35
21 13-Jun-07 BN 123 -18.00 600 -1.262 16.900 -18.162 6.0 8.55 9.35 11.20 11.45
22 14-Jun-07 BN 116 -18.00 600 -1.256 17.000 -18.256 6.0 10.35 11.10 13.50 14.15
23 14-Jun-07 BN 110 -18.00 600 -0.966 17.200 -18.166 5.0 13.00 13.40 15.10 15.25
24 14-Jun-07 BN 107 -18.00 600 -1.026 17.000 -18.026 6 14.10 14.50 16.35 16.45
25 14-Jun-07 BN 103 -18.00 600 -1.104 16.900 -18.004 6 15.05 15.50 17.50 18.00
26 14-Jun-07 BN 89 -18.00 600 -1.256 17.000 -18.256 5 17.00 17.45 19.20 19.40
Waste Material Bentonite
TANGGA Vol.aktua
Desain
L Titik Elevasi Kedalaman l Durasi Bor Durasi Cor
No Elevasi Diameter
Tanah Kedalaman Akhir
Dasar
COR Bentonite asli Bor Bored (M3) Mulai Selesai Mulai selesai
27 15-Jun-07 BN 109 -18.00 600 -0.954 17.200 -18.154 6 8.10 8.50 10.00 10.20
28 15-Jun-07 BN 102 -18.00 600 -1.192 17.000 -18.192 6 9.20 10.00 11.25 11.45
29 15-Jun-07 BN 100 -18.00 600 -1.215 16.900 -18.115 6 10.10 11.50 13.20 13.45
30 15-Jun-07 BN 107 -18.00 600 -1.224 16.900 -18.124 6 13.00 13.40 14.50 15.15
31 18-Jun-07 BN 106 -18.00 600 -1.020 17.000 -18.020 6 16.15 17.00 18.10 18.30
31 18-Jun-07 BN 99 -18.00 600 -1.216 -16.900 15.684 6 9.00 9.40 10.35 10.40
32 18-Jun-07 BN 96 -18.00 600 -1.158 17.000 -18.158 6 9.45 10.30 11.25 11.40
33 18-Jun-07 BN 94 -18.00 600 -1.139 17.000 -18.139 6 10.50 11.35 12.50 13.05
34 18-Jun-07 BN 91 -18.00 600 -1.221 18.000 -19.221 6 13.35 14.00 14.40 14.55
35 18-Jun-07 BN 88 -18.00 600 -1.238 17.000 -18.238 6 14.10 14.45 15.35 15.40
36 18-Jun-07 BN 85 -18.00 600 -1.296 17.000 -18.296 6 15.20 16.05 16.50 17.05
36 19-Jun-07 BN 82 -18.00 600 -1.296 17.000 -18.296 6 8.00 8.40 10.10 10.20
37 19-Jun-07 BN 79 -18.00 600 -1.224 17.000 -18.224 6 8.45 9.30 11.15 11.30
38 19-Jun-07 BN 76 -18.00 600 -1.145 17.000 -18.145 6 10.20 11.40 14.05 14.25
39 19-Jun-07 BN 73 -18.00 600 -1.173 17.000 -18.173 6 13.20 14.00 15.30 15.45
40 19-Jun-07 BN 70 -18.00 600 -0.076 17.000 -17.076 6 14.10 15.00 16.50 17.10
41 19-Jun-07 BN 67 -18.00 600 -1.125 17.000 -18.125 10 15.10 16.00 19.00 19.20
41 20-Jun-07 BN 105 -18.00 600 -1.086 17.000 -18.086 6 19.00 19.45 22.10 22.25
42 20-Jun-07 BN 112 -18.00 600 -0.911 17.200 -18.111 6.5 18.10 18.55 21.20 21.35
43 20-Jun-07 BN 64 -18.00 600 -0.993 17.200 -18.193 6 13.10 13.45 14.20 14.35
44 20-Jun-07 BN 61 -18.00 600 -1.060 17.000 -18.060 6 14.00 14.40 15.40 16.00
45 20-Jun-07 BN 58 -18.00 600 -1.058 17.000 -18.058 6 14.10 15.00 17.30 17.50
46 20-Jun-07 BN 55 -18.00 600 -1.055 17.000 -18.055 6 15.10 16.00 18.50 19.10
47 20-Jun-07 BN 52 -18.00 600 -0.985 17.100 -18.085 6 16.20 18.05 20.25 20.40
Waste Material Bentonite
TANGGA
Desain
L Titik Elevasi Kedalaman Vol.aktual Durasi Bor Durasi Cor
No Elevasi Diameter
Tanah Kedalaman Akhir
Dasar
COR Bentonite asli Bor Bored (M3) Mulai Selesai Mulai selesai
48 21-Jun-07 BN 93 -18.00 600 -1.171 17.000 -18.171 6 8.10 8.50 10.00 10.15
49 21-Jun-07 BN 90 -18.00 600 -1.221 17.000 -18.221 6 9.00 9.45 11.10 11.20
50 21-Jun-07 BN 87 -18.00 600 -1.231 17.000 -18.231 6 11.00 11.40 12.15 12.25
51 21-Jun-07 BN 84 -18.00 600 -1.326 16.800 -18.126 6 13.10 13.50 14.00 14.20
52 21-Jun-07 BN 81 -18.00 600 -1.278 17.000 -18.278 6 14.00 14.50 15.40 15.55
53 21-Jun-07 BN 78 -18.00 600 -1.215 17.000 -18.215 6 14.55 15.40 17.40 17.55
53 22-Jun-07 BN 75 -18.00 600 -1.146 17.000 -18.146 6 8.00 8.45 10.00 10.15
54 22-Jun-07 BN 72 -18.00 600 -1.115 17.000 -18.115 6 8.50 9.35 11.20 11.35
55 22-Jun-07 BN 69 -18.00 600 -1.159 17.000 -18.159 6 10.00 11.00 13.30 13.45
56 22-Jun-07 BN 66 -18.00 600 -1.118 17.000 -18.118 6 11.15 12.00 14.50 15.05
57 22-Jun-07 BN 63 -18.00 600 -1.073 17.000 -18.073 6 13.25 14.10 15.50 16.10
58 22-Jun-07 BN 60 -18.00 600 -1.026 17.000 -18.026 6 15.10 16.00 17.25 17.40
59 22-Jun-07 BN 57 -18.00 600 -1.078 17.000 -18.078 6 16.10 17.00 18.50 19.10
60 23-Jun-07 BN 86 -18.00 600 -1.286 17.000 -18.286 6 8.00 8.50 9.40 9.55
61 23-Jun-07 BN 83 -18.00 600 -1.321 17.000 -18.321 6 9.00 9.50 11.20 11.35
62 23-Jun-07 BN 80 -18.00 600 -1.244 17.000 -18.244 6 10.00 11.50 13.50 13.10
63 23-Jun-07 BN 77 -18.00 600 -1.166 17.000 -18.166 6 13.10 13.55 14.20 14.35
64 23-Jun-07 BN 54 -18.00 600 -1.067 17.000 -18.067 6 14.00 14.50 15.50 16.05
65 23-Jun-07 BN 51 -18.00 600 -0.928 17.200 -18.128 6 14.55 16.00 17.40 17.55
66 23-Jun-07 BN 48 -18.00 600 -0.881 17.200 -18.081 6 16.10 17.20 18.50 19.00
67 24-Jun-07 BN 74 -18.00 600 -1.158 17.000 -18.158 6 8.00 9.00 10.10 10.15
68 24-Jun-07 BN 71 -18.00 600 -1.102 17.000 -18.102 6 9.05 10.00 11.25 11.40
69 24-Jun-07 BN 68 -18.00 600 -1.132 17.000 -18.132 6 10.10 11.00 13.00 13.15
70 24-Jun-07 BN 65 -18.00 600 -1.114 17.000 -18.114 6 13.15 14.00 14.30 14.45
71 24-Jun-07 BN 62 -18.00 600 -1.047 17.000 -18.047 6 14.10 15.05 15.50 16.10
72 24-Jun-07 BN 59 -18.00 600 -1.060 17.000 -18.060 6 15.10 16.00 17.40 17.55
Waste Material Bentonite
Volume Pakai
12
10
0
121
109
105
111
108
104
101
136
132
126
128
124
117
114
113
119
134
131
130
123
116
110
107
103
102
100
107
106
112
63
95
98
92
89
99
96
94
91
88
85
82
79
76
73
70
67
64
61
58
55
52
93
90
87
84
81
78
75
72
69
66
60
57
86
83
80
77
54
51
48
74
71
68
65
62
59
BN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BNBN
BN
WASTE MATERIAL
Waste material rata-rata BN = ±1.7 m3 = 39%
Permukaan
TANGGAL Titik Elevasi Elevasi Elevasi Kedalaman Vol.aktual Beton Durasi Pengecoran Elv.akhir
No
Tanah Beton
Bor / Cor Bore Pile Casing asli Desain Bor (M3) 1 2 Mulai selesai Beton
1 8-Jul-07 CP 73 -0.730 -1.163 3.000 16.367 8.0 8.40 1.50 11.50 12.10 -2.230
2 8-Jul-07 CP 76 -0.715 -1.145 3.000 16.270 8.0 8.90 2.00 11.10 11.30 -2.715
3 7-Jul-07 CP 52 -0.582 -0.892 3.000 16.490 8.0 8.20 1.00 11.25 11.40 -1.582
4 7-Jul-07 CP 55 -0.534 -0.985 3.000 16.449 8.0 8.60 1.10 12.25 12.40 -1.634
5 7-Jul-07 CP 58 -0.512 -1.055 3.000 16.357 8.0 8.60 1.10 15.25 15.45 -1.612
6 7-Jul-07 CP 61 -0.583 -1.060 3.000 16.423 8.0 8.60 1.00 17.20 17.35 -1.583
7 7-Jul-07 CP 64 -0.645 -0.993 3.000 16.452 8.0 8.30 1.20 10.15 10.30 -1.845
8 7-Jul-07 CP 66 -0.820 -1.118 3.000 16.302 8.0 8.20 1.40 18.10 18.30 -2.220
9 7-Jul-07 CP 69 -0.715 -1.159 3.000 16.256 8.0 8.60 1.50 16.45 16.50 -2.215
10 7-Jul-07 CP 72 -0.802 -1.115 3.000 16.287 8.0 8.80 1.10 14.35 14.50 -1.902
11 7-Jul-07 CP 75 -0.745 -1.146 3.000 16.399 8.0 9.00 1.30 11.55 12.20 -2.045
12 7-Jul-07 CP 78 -0.802 -1.215 3.000 16.287 8.0 8.50 1.20 10.30 10.45 -2.002
13 6-Jul-07 CP 62 -0.722 -1.047 3.000 16.475 8.0 9.00 1.30 18.35 19.00 -2.022
14 6-Jul-07 CP 65 -0.835 -1.114 3.000 16.421 8.0 8.90 1.30 17.35 17.50 -2.135
15 6-Jul-07 CP 68 -0.702 -1.132 3.000 16.370 8.0 8.00 1.00 16.00 16.20 -1.702
16 6-Jul-07 CP 111 -0.654 -0.964 3.000 19.290 8.0 11.80 3.50 12.15 12.30 -4.154
17 6-Jul-07 CP 81 -0.710 -1.278 3.000 16.232 8.0 9.20 1.00 19.25 19.40 -1.710
18 6-Jul-07 CP 84 -0.700 -1.326 3.000 16.174 8.0 9.10 1.00 18.55 19.10 -1.700
19 6-Jul-07 CP 87 -0.880 -1.231 3.000 16.349 8.0 8.80 1.00 18.05 18.20 -1.880
20 6-Jul-07 CP 90 -0.840 -1.214 3.000 16.308 8.0 8.20 1.10 14.05 14.25 -1.940
21 6-Jul-07 CP 94 -0.723 -1.139 3.000 15.384 8.0 7.20 1.00 11.15 11.50 -1.723
Waste Material CP
Permukaan
TANGGAL Titik Elevasi Elevasi Elevasi Kedalaman Vol.aktual Beton Durasi Pengecoran Elv.akhir
No
Tanah Beton
Bor / Cor Bore Pile Casing asli Desain Bor (M3) 1 2 Mulai selesai Beton
22 5-Jul-07 CP 79 -0.710 -1.224 3.000 16.286 7.5 3.40 1.00 16.15 16.30 -1.710
23 5-Jul-07 CP 82 -0.658 -1.296 3.000 16.162 12.0 12.10 8.00 15.00 16.45 -2.258
24 5-Jul-07 CP 85 -0.711 -1.294 3.000 16.217 8.0 8.20 1.00 13.15 13.30 -1.711
25 5-Jul-07 CP 88 -0.722 -1.138 3.000 16.284 8.0 7.80 2.00 12.00 12.25 -2.722
26 5-Jul-07 CP 91 -0.760 -1.223 3.000 16.337 8.0 8.80 1.10 10.15 10.30 -1.860
27 4-Jul-07 CP 77 -0.875 -1.166 3.000 16.499 8.0 8.90 1.10 16.05 16.25 -1.975
28 4-Jul-07 CP 80 -0.874 -1.244 3.000 16.330 8.0 8.90 1.20 15.00 15.15 -2.074
29 4-Jul-07 CP 83 -0.770 -1.321 3.000 16.249 8.0 8.70 0.90 12.00 12.15 -1.670
30 4-Jul-07 CP 86 -0.779 -1.286 3.000 16.293 8.0 8.80 1.10 11.05 11.20 -1.879
31 4-Jul-07 CP 89 -0.723 -1.256 3.000 16.167 8.0 8.80 1.60 10.00 10.45 -2.323
32 3-Jul-07 CP 93 -0.569 -1.171 1.800 15.298 8.0 8.90 0.80 19.15 19.30 -1.369
33 3-Jul-07 CP 96 -0.497 -1.196 2.323 15.801 8.5 7.90 0.80 18.35 18.50 -1.297
34 3-Jul-07 CP 99 -0.487 -1.216 2.845 16.271 8.0 9.70 2.00 16.55 17.10 -2.487
35 3-Jul-07 CP 102 -0.548 -1.192 3.372 16.856 8.0 9.70 2.30 15.20 15.35 -2.848
36 3-Jul-07 CP 108 -0.413 -1.012 4.520 18.001 8.0 11.20 3.00 11.40 11.50 -3.413
37 2-Jul-07 CP 97 -0.659 -1.224 2.496 15.735 9.5 7.70 0.60 19.00 19.20 -1.259
38 2-Jul-07 CP 100 -0.770 -1.215 3.000 16.555 10.0 7.60 1.00 17.15 17.30 -1.770
39 2-Jul-07 CP 103 -0.584 -1.104 3.548 17.180 8.5 11.20 2.30 16.40 17.00 -2.884
40 2-Jul-07 CP 106 -0.295 -1.026 4.147 17.748 10.5 10.80 5.80 15.30 16.40 -3.295
41 2-Jul-07 CP 109 -0.479 -0.954 4.706 18.025 8.0 10.00 4.50 12.10 12.25 -4.979
42 2-Jul-07 CP 112 -0.518 -0.964 5.324 18.554 11.0 11.20 6.10 11.35 12.05 -4.618
Waste Material CP
Permukaan
TANGGAL Titik Elevasi Elevasi Elevasi Kedalaman Vol.aktual Beton Durasi Pengecoran Elv.akhir
No
Tanah Beton
Bor / Cor Bore Pile Casing asli Desain Bor (M3) 1 2 Mulai selesai Beton
43 30-Jun-07 CP 92 -0.994 -1.211 1.800 16.783 8.0 8.40 0.20 16.00 16.30 -1.194
44 30-Jun-07 CP 95 -0.725 -1.187 2.151 16.538 8.0 7.00 1.00 15.05 15.20 -1.725
45 30-Jun-07 CP 98 -0.763 -1.206 2.668 16.857 8.0 7.80 1.00 14.30 14.45 -1.763
46 30-Jun-07 CP 101 -0.781 -1.173 3.195 17.108 8.0 9.00 1.00 12.10 12.25 -1.781
47 30-Jun-07 CP 104 -0.585 -1.062 3.725 17.223 8.0 10.20 3.00 10.40 10.55 -3.585
48 30-Jun-07 CP 107 -0.564 -1.206 4.333 18.038 8.0 10.40 2.80 9.55 10.05 -3.364
49 29-Jun-07 CP 110 0.880 0.966 4.892 19.314 10.0 8.10 2.75 17.35 17.50 -1.870
50 29-Jun-07 CP 114 -0.468 -0.949 5.700 19.189 9.5 11.20 4.00 15.45 16.05 -4.468
51 29-Jun-07 CP 120 -0.513 -0.904 5.700 19.309 9.0 13.70 4.00 14.35 15.00 -4.513
52 29-Jun-07 CP 117 -0.554 -1.006 -5.700 19.248 8.0 12.70 4.70 9.50 1.00 -5.254
53 28-Jun-07 CP 130 -0.505 -1.044 3.000 17.061 8.0 10.00 1.90 14.45 15.05 -2.405
54 28-Jun-07 CP 125 -0.519 -0.925 3.000 17.154 8.0 9.70 1.50 12.55 13.10 -2.019
55 28-Jun-07 CP 118 -0.440 -0.984 5.700 19.256 8.0 12.00 4.00 11.20 11.35 -4.440
56 27-Jun-07 CP 113 -0.580 -0.949 5.510 19.331 8.0 11.20 3.30 12.35 13.05 -3.880
57 27-Jun-07 CP 131 -0.571 -0.998 3.000 17.073 9.0 12.70 2.20 19.00 19.15 -2.771
58 26-Jun-07 CP 123 -0.562 -1.262 5.700 19.100 8.0 11.40 3.50 17.55 18.10 -4.062
59 26-Jun-07 CP 132 -0.593 -0.933 3.000 17.260 8.0 10.60 2.60 13.15 13.35 -3.193
60 26-Jun-07 CP 127 -0.569 -0.829 3.000 17.340 8.0 8.70 1.60 15.35 15.45 -2.169
Waste Material CP
Volume Pakai
12.0
10.0
8.0
6.0
Volume Pakai
4.0
2.0
0.0
113
111
102
108
100
103
106
109
112
101
104
107
110
114
120
117
130
125
118
131
123
132
127
73
78
82
99
98
76
52
55
58
61
64
66
69
72
75
62
65
68
81
84
87
90
94
79
85
88
91
77
80
83
86
89
93
96
97
92
95
CPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCP
WASTE MATERIAL
Waste material rata-rata CP = ± 0.5 m3
- 1.00
URUTAN PENGERJAAN CP DAN GA
Tahap II – Pembobokan dan Caping Beam
- 3.00
URUTAN PENGERJAAN CP DAN GA
Tahap III – Galian Tanah dan Ground Anchor
- 6.00
URUTAN PENGERJAAN CP DAN GA
Tahap IV – Perimeter Beam
TERIMA KASIH