Flow Hydrograph
Rainfall Design
Manning region
Luas Genangan di Lahan Sekitar Rencana Pompa: 26.87 Ha Luas Genangan di Lahan Sekitar Rencana Pompa: 3.92 Ha Luas Genangan di Lahan Sekitar Rencana Pompa: 1.23 Ha
Pola Operasi Pompa
Pompa 2 2 jam
Pompa 1
1 jam
5 jam 8 jam
Kapasitas 2 m3/dtk x 2. Dinyalakan secara bertahap. Pompa pertama nyala di +1.6, pompa kedua di +1.8.
Resume Pola Operasi Pompa
NO NAMA POMPA SUB DAS X Y KAPASITAS WS. On WS. Off
R1 Sungai Air Hitam Air Hitam 766677.4 60584.972 Kapasitas: 3 x 2 m3/dtk 1.8 1.4
R2 Parit Jembt. Siak II Air Hitam 767248.123 60980.774 Kapasitas: 3 x 2 m3/dtk 1.8 1.5
R3 Senapelan II (Pondok Mutiara) Sinapelan 768865.1196 60653.4445 Kapasitas: 1 x 2 m3/dtk 1.9 1.6
R4 Sungai Palas Umban Sari 766180.7323 61803.443 Kapasitas: 2 x 2 m3/dtk 2.2 2.0
R5 Sungai Umbansari Umban Sari 767839.422 60991.592 Kapasitas: 3 x 2 m3/dtk 2.0 1.7
R6 Parit Alam Parit Alam 768311.904 60989.732 Kapasitas: 2 x 2 m3/dtk 2.0 1.7
8
KRITERIA PEMILIHAN POMPA
Pompa Submersible
Pompa submersible sebenarnya merupakan alternatif yang menarik, selain bangunan sipil yang diperlukan relatif sederhana
dan murah, pompa ini tidak memerlukan gearbox dan sistem pemancingan. Selain itu pompa submersible ini mempunyai
karakteristik sebagai berikut :
Pompa terendan dalam air
Bagian mekanis yang bergerak relatif lebih sedikit dibanding dengan pompa aksial vertikal.
Biaya konstruksi dan operasional lebih murah dari pompa aksial vertikal.
Tidak memerlukan rumah pompa
Tidak terjadi kavitasi
Pompa Ulir
Dari segi biaya investasi pompa ulir merupakan pompa dengan biaya paling murah. Hal ini disebabkan karena struktur
pompa dan gedung pompa relatif sederhana. Kelebihan lain dari jenis pompa ini adalah tidak perlu paralatan penyering
sampah seperti weed screen. Sampah padat dapat melalui pompa ulir dengan leluasa.
Beberapa keunggulan penggunaan pompa ulir adalah :
• Perawatan mudah baik elektro motor, gearbox maupun pompa berada di atas permukaan air sehingga untuk
perawatan/perbaikan tidak perlu diangkat tetapi cukup ditempat saja.
• Daya pompa stabil sehingga elektro motor dan gearbox menjadi lebih tahan lama.
• Sampah ukuran tertentu diperbolehkan melewati pompa sehingga tidak diperlukan pengaring sampah secara khusus,
cukup bar screen saja dengan jarak antar bar 10 cm.
• Bangunan sipil relatif lebih sederhana dan murah.
Beberapa kerugian penggunaan pompa ulir adalah :
• Ukuran gearbox besar karena putaran pompa sangat rendah (biasanya tiga tingkat)
• Efisiensi rendah sehingga menimbulkan biaya operasional lebih tinggi
• Karena dimensi pompa cukup besar maka transportasinya lebih sulit
• Sampah yang terangkat berpindah ke tempat lain.
Perbandingan Beberapa Aspek Antara Pompa Ulir dan Submersible
2 Reabilitas *** **
3 Perawatan *** *
6 Biaya operasi * **
8 Kebisingan *** **
Peta Situasi Pompa Sail
6
4
9
5
C
B
A
KOLAM RETENS
LUA S = 2145 m I KOLAM RETENS
I
4
LUA S = 1400 m
1
D
D
7
1
C
B
A
2 .00
4 .00
3
2 .00
A 4 A
R. POMPA
4
B B
R. MAINTENANCE 1
R .TR AFO
TANK I H ARIAN
7
1 1 .50 1 .00 1 .50
R .GEN SET
5
+4. 500
2
C C
6
0 .50
D
KOLAM RETENSI
LUAS = 1400 m2
9
KOLAM RETENSI
LUAS = 2145 m2
12.20
+12.60
TOP BUILDING
6.00
5.00
+8.00
0. 3
0
3.50
1.20
6.25
1.00 1.35
1.30
+3.500 +3.900
2.00
1.20 1.20 1.20 1.20 1.20 1.20 1.35
3.90
2.00
+0.000
8.30
0.60
CCSP Pj. = 14 m
0.60
0.60
-3.50
0.80
Pj. = 6 m
35x35
1.80 1.80
SPUN PILE PRECAST Ø60 cm
L=9m
+12.60
TOP BUILDING
6.00
5.00
+8.00
0.
30
3.50
1.20
1.00 1.35
1.30
1.35 1.00
+3.500 +3.900
2.00 2.00
1.35
1.35
3.90
2.00
+0.000
8.30
0.80
0.60
0.80 2.40 0.80 2.40 0.80 2.40
-1.00
CCSP Pj. = 14 m
-3.50
0.80
Pj. = 6 m
35x35
1.80 1.80
SPUN PILE PRECAST Ø60 cm
L=9m
6.00
5.00
+8.00
3.50
5.35
+3.900 +3.900 +3.90
TOP FLOOR
1.00
+3.500 +3.50
TOP DIKE /GROUND
4.70
2.00
+0.000
-1.200 -1.20
0.80
Pj. = 6 m
35x35 1.40 1.70 1.50 1.65 1.50 1.70 1.40
+12.60
TOP BUILDING
2.35
CRANE KAP. 15 TON
8.70
6.45
+3.90
+3.50
MAB +2.900
Merah
Muka tanah +2.00
Pompa dihidupkan +1.80
4.90
Pintu air ditutup +1.50 Siaga
Normal
MSL +0.40
7.40
Pj. = 6 m
35x35
-1.00
Dasar kolam Retensi -1.50
2.50
BED RETENTION POND -3.50
-3.500 -3.50
0.60
SPUN PILE PRECAST Ø60 cm
L=9m
1.35 2.50 2.50 2.50 2.50
KOLAM RETENSI
Luas Kolam Retensi 3545 m2
Elevasi dasar Kolam Retensi - 1.500
Elevasi Top Tanggul Kolam Retensi + 3.900
Material tanggul Kolam Retensi CCSP W.400, Panjang 14 m
Saringan sampah manual Jarak Bar Screen 10 cm
Situasi Pompa
Auger SAIL
6
4
9
5
C
B
A
LUAS = 2145 m KOLAM RET ENS
I
4
LUAS = 1400 m
1
D
D
7
1
C
B
A
2.00
4.00
3
2.00
A 4 A
R. P OMPA
4
B B
R. MA INTE NANCE 1
R .TR AFO
TAN KI H AR IAN
7
1 1.50 1.00 1.50
R .G ENSET
5
+4.500
2
C C
6
0.50
D
KOLAM RETENSI
LUAS = 1400 m2
9
AN
JAL
KOLAM RETENSI
LUAS = 2145 m2
1.66 4.55 4.55 1.66
5 Ton
12.95
C
2.00
1.44
11.28
3.90
5.80
0.80
3.42 3.81 3.00
0.60
2.20
POTONGAN A-A
Skala 1 :
6.90
0.50 5.90 0.50
1.00
7.00
POTONGAN B-B
CCSP Pj. = 14 m Skala 1 :
0.80
Pj. = 6 m
35x35
1.80 1.80
6.90
5.90 0.50
0.40
1.90 1.00 1.00
1.90
5.39
POTONGAN C-C
0.80
Skala 1 :
CCSP Pj. = 14 m
Pj. = 6 m
35x35
1.80 1.80
SPUN PILE PRECAST Ø60 cm
L=9m
SPESIFIKASI RUMAH POMPA TYPE AUGER DAN KELENGKAPANNYA
KOLAM RETENSI
Luas Kolam Retensi 3545 m2
Elevasi dasar Kolam Retensi - 1.500
Elevasi Top Tanggul Kolam Retensi + 3.900
Material tanggul Kolam Retensi CCSP W.400, Panjang 14 m
Saringan sampah manual Jarak Bar Screen 10 cm
1. PERHITUNGAN DAYA POMPA
Perhitungan daya teoritis b. Daya penggerak yang diperlukan pompa ( Np )
Kondisi perencanaan
Nw
- Type : Pompa Submersible Np
p
- Jumlah pompa : 2 unit Dimana :
- Discharge ( Q ) : 120 m3/min per unit Np = Daya yang diperlukan pompa , kW
: 2,00 m³/dt p = Effisiensi pompa, 80%
- Total head ( H ) : 6 meter
- Efficiency ( p ) : Tidak kurang dari 80 % 115 ,38
Np
- Rpm : 743 rpm 0.80
= 144,23 kW
a. Daya air (Nw)
Q HT c. Daya motor (Nm)
Nw
104 Nm = Nw X ( 1 + sf )
Dimana : Dimana:
Nw = Daya air, kW Sf = Service factor, 15%
Q = Kapasitas pompa, m³/dt Nm = 144,23 X ( 1 + 0,15 )
Þ = Berat jenis air, 1000 kg/m³ = 165,87 kW
HT = Total head pompa, m
2,00 1000 6
Nw
104
= 115.38 kW
PERHITUNGAN KEBUTUHAN DAYA PLN
LOKASI POMPA SUNGAI SAIL
1 Pompa 1 Kap. 2000 lps, Head 6 m 380 220 0,85 0,53 166 369,59 80 243,93 128,50
2 Pompa 2 Kap. 2000 lps, Head 6 m 380 220 0,85 0,53 166 369,59 80 243,93 128,50
3 Pompa 3 Kap. 2000 lps, Head 6 m 380 220 0,85 0,53 0 - 80 - -
4 Crane di dalam R. Pompa Kap. 5 Ton 380 220 0,85 0,53 3,7 8,24 80 5,44 2,87
5 Crane di luar R. Pompa Kap. 15 Ton 380 220 0,85 0,53 5 11,14 80 7,35 3,87
6 Rotary Screen No. 1 380 220 0,85 0,53 3,7 8,24 80 5,44 2,87
7 Rotary Screen No. 2 380 220 0,85 0,53 3,7 8,24 80 5,44 2,87
8 Rotary Screen No. 3 380 220 0,85 0,53 0 - 80 - -
9 Horizontal Conveyor 380 220 0,85 0,53 3,7 8,24 80 5,44 2,87
10 Inclined Conveyor 380 220 0,85 0,53 5 11,14 80 7,35 3,87
11 Penerangan Fasilitas R. Pompa 380 220 0,85 0,53 3 5,35 100 3,53 1,86
Keterangan :
1 Perhitungan di atas dengan asumsi efisiensi peralatan seperti yang tertera (bukan 100%)
2 Cos Phi yang diijinkan oleh PLN minimal 0,85 (untuk aman 0,9) supaya tidak terkena biaya KVARH
3 Untuk mendapatkan Cos Phi minimal 0,85 dapat menggunakan/memasang kapasitor bank
4 Kebutuhan kapasitor bank dapat dihitung setelah beban terpasang sehingga tau cosh phi yang sebenarnya
5 Untuk Arus kejut awal (I starting) biasanya sudah dapat diakomodir oleh PLN (melalui setting relay di kubikel PLN)
PERHITUNGAN KEBUTUHAN DAYA DIESEL ENGINE GENERATOR
LOKASI POMPA SUNGAI SAIL
1 Pompa 1 Kap. 2000 lps, Head 6 m 380 220 0,85 0,53 166 369,59 80 243,93 128,50
2 Pompa 2 Kap. 2000 lps, Head 6 m 380 220 0,85 0,53 166 369,59 80 243,93 128,50
3 Pompa 3 Kap. 2000 lps, Head 6 m 380 220 0,85 0,53 0 - 80 - -
4 Crane di dalam R. Pompa Kap. 5 Ton 380 220 0,85 0,53 3,7 8,24 80 5,44 2,87
5 Crane di luar R. Pompa Kap. 15 Ton 380 220 0,85 0,53 5 11,14 80 7,35 3,87
6 Rotary Screen No. 1 380 220 0,85 0,53 3,7 8,24 80 5,44 2,87
7 Rotary Screen No. 2 380 220 0,85 0,53 3,7 8,24 80 5,44 2,87
8 Rotary Screen No. 3 380 220 0,85 0,53 0 - 80 - -
9 Horizontal Conveyor 380 220 0,85 0,53 3,7 8,24 80 5,44 2,87
10 Inclined Conveyor 380 220 0,85 0,53 5 11,14 80 7,35 3,87
11 Penerangan Fasilitas R. Pompa 380 220 0,85 0,53 3 5,35 100 3,53 1,86
TOTAL 359,54 799,78 527,85 278,06
Perhitungan ini dibuat sebagai pertimbangan kebutuhan biaya Operasional baik dengan menggunakan
sumber daya dari PLN ataupun sumber daya dari Genset.
2. Asumsi pompa beroperasi dalam 1 bulan 3 Hari selama @ 3 Jam & Pemanasan 1 jam
Maka Biaya Solar per bulan hanya untuk Pemanasan =
= 0,21 x 500 x 3 x 4
= 1.260 Liter
= 1260 x 16.250
= Rp 20.475.000,00 /bulan
8.70
?
4.90
6.50
?
1.60
?
0.60
20 M
2.50 2.50
KOLAM RETENSI
D
C C
2.50
0.50
0.50
2
0. 60
1
B R. MAINTENANCE B
6
R. POMPA
A A
0.60
5. 03
5. 00
5
10.00
D
D
4
3
3.00
1.75
1.50
2.00 2.00
4.00
STRUKTUR BANGUNAN POMPA AUGER
STRUKTUR BANGUNAN POMPA
SUBMERSIBLE
STANDART DAN PERATURAN
Berikut standar dan code yang digunakan dalam perencanaan, antara lain :
– SNI 1726 – 2019 – Tata Cara Perencanaan Ketahanan Gempa untuk Struktur Bangunan Gedung dan Non Gedung
– SNI 1727 – 2020 – Beban Minimum untuk Perancangan Bangunan Gedung dan Struktur Lain
– Prequalified Connection fo Special & Intermediate Steel moment frames for seismic Application (AISC 358-16)
– ASCE 7 – 16; American Standards for Civil Engineer – Minimum Design Load for Building and Other Structure
Beton :
• Mutu beton f’c = 25 Mpa (K300) untuk balok dan pelat, kolom
• Mutu beton f’c = 30 Mpa (K350) untuk dinding culvert, slab pilcap
Tulangan baja
Tulangan baja yang akan digunakan yaitu :
• Tulangan baja ≥ 10 mm : BjTS-420A, Fy = 420 Mpa
• Tulangan wiremesh : Fy = 500 mPa
Struktur baja
Struktur baja menggunakan ASTM A36 dengan mutu Fy = 240 Mpa
Baut
Mutu baut menggunakan ASTM A36
Mutu baut menggunakan ASTM F3125 (High Tension Bolt)
Baut Angkur
Mutu baut menggunakan ASTM A3125
Design Load Pump House
• Beban Mati yang dikonsider pada pemodelan
RINCIAN NILAI PROYEK
o Baja : 7850 kg/m3
o Beton : 2400 kg/m3
Beban Mati Tambahan
o Mekanikal, Elektrikal, Roof sheeting & insulasi = 10 kg/m2
o Beban crane = kap. 5 Ton
o Dinding Batu Bata = 250 kg/m2
o Pompa kap. 1000-3000 liter/s
Soil Lateral : Soil Density x ka x Soil Height
Soil Earthquake Lateral : Soil Density x kae x soil Height
Beban Hidup
Beban hidup yang diterapkan pada perencanaan struktur, antara lain :
o Beban lantai workshop = 0,5 ton/m2
o Beban hidup Crane l = Cap. 5 ton
Beban Hidup atap
Beban hidup yang diterapkan pada perencanaan struktur, antara lain :
o Beban hidup atap reduksi = 100 kG/m2
o Beban Angin
Beban angin merujuk terhadap SNI 1727 – 2020 dengan tekanan angin minimumsebesar 0.77 kN/m2 dan 0.38 kN/m2 untuk
atap.
RINCIAN
Design NILAI
Load (2)PROYEK
Data gempa
Ss :
0,08 g
S1 :
0,124 g
Fa :
2,4 g
Fv :
4,2 g
SMS :
0.192 g
SM1: 0,5208 g
Berdasarkan hasil penyelidikan
SDS tanah,
: klasifikasi tanah
pada area tersebut yaitu E
0.128 g
SD1 :
0.3472 g
Sistem Struktur Pump House
Sistem Struktur
Rangka Beton Pemikul
momen Biasa
•R = 3
•Ω = 2
•Cd = 2,5
Sistem Struktur Box Culvert
Sistem Struktur
Rangka Beton Pemikul
momen Biasa
•R = 2
•Ω = 2
•Cd = 2,5
Analisis Struktur
Tipe analisis Pump House : Sistem Rangka beton Pemikul Momen menengah
menyerupai Gedung dengan tambahan ketinggian
Tipe analisis Box culvert : Sistem Dinding Beton Bertulang
Software : SAP2000 V24.0.2
Analisis gempa : Static Linier
Kombinasi beban :
Kombinasi Beban Terfaktor Kombinasi Beban Nominal
1. 1.4 D 1. D
2. 1.2 D + 1.6 L + 0.5 (Lr atau R) 2. D+L
3. 1.2 D + 1.6 (Lr atau R) + (L atau 0.5 W) 3. D + (Lr or R)
4. 1.2 D + 1.0 W + L + 0.5 (Lr atau R) 4. D + 0.75 L + 0.75 (Lr or R)
5. 1.2 D + 1.0 E + L 5. D + (0.6 W or 0.7E)
6. 0.9 D + 1.0 W 6. D + 0.75 (0.6 W or 0.7 E) + 0.75 (Lr or R)
7. 0.9 D + 1.0 E 7. 0.6 D + 0.6 W
Where: 8. 0.6 D + 0.7 E
DL : Beban Mati
E : Beban Gempa
SDL : Beban Mati Tambahan
LL : Beban Hidup
W : Beban Angin
R : Beban Hujan
Lr : Beban Hidup Atap
Hasil Penulangan Struktur
Bore
Location Depth (m) Description
Hole
CLAYEY SILT; low to medium plasticity, brown to
0.00 – 0.44
greyish brown
0.44 – 1.00 SILTY CLAY; medium to high plasticity,light grey, lime
1.00 – 2.24 SILTY CLAY; medium to high plasticity, grey, very soft
SANDY CLAY; low plasticity, grey to light grey, very
2.24 – 6.66
soft
BHR-11 Rumah Pompa Sail - Riau
CLAY WITH PEAT; medium to high plasticity, grey to
(UTM 47 N) 6.66 – 7.00
blackish grey, very soft
7.00 – 7.75 CLAY WITH PEAT; black to greyish black, very soft
7.75 – 9.40 CLAY WITH PEAT; low plasticity, grey to blackish grey
9.40 – 11.10 CLAY WITH PEAT; low plasticity, grey to blackish grey
11.10 – 15.38 SAND; poorly graded, brown, dense to very dense
15.38 – 18.21 SAND; poorly graded, very dense, founded silica
Kondisi Geoteknik Untuk Pintu Air Rumbai
53
Rencana Tipe Pondasi Bangunan Pintu Air Rumbai
Konstruksi pondasi menggunakan square pile 30x30 cm dengan panjang L = 12 m, dengan prediksi
maksimum penurunan 2.00 cm (penurunan ijin < 15 cm)
54
Rencana Tipe Pondasi Bangunan Pintu Air Rumbai
Konstruksi pondasi menggunakan square pile 30x30 cm dengan panjang L = 12 m, dengan prediksi
maksimum penurunan 2.00 cm (penurunan ijin < 15 cm)
55
Normalisasi, Tanggul, dan Kolam
Retensi.
Geometri Data Normalisasi Anak Sungai Siban
Anak Sungai - 16_HY_Siban
25 Legend
Cut Invert
20
Ground
.0004 8
esain : 0 LOB
15 Slope d
Elevation
ROB
10
-5
0 2000 4000 6000 8000 10000 12000 14000
Station
Elevation
3 BankBank
StaSta
Template
Elevation
6 Template
Template 2
Elevation
Bank Sta
2 BankBank
StaSta
5
0
1
4
0 -2
-5 -10
0 5 -5 10 15 0 20 25 -40 -30 -20 -10 0 10
Station
Station Station
B= 5 S=1 B= 15 S=1
10 Cut In vert
Ground
8
LOB
Elevation
6 ROB
-2
0 2000 4000 6000 8000 10000
Station
Modified XS Modified XS
9
6 Ground Ground
Bank Sta 8 Bank Sta
Elevation
Elevation
4 Template Template
Bank Sta 7 Bank Sta
2
6
0 5
B= 10 S=1
B= 10 S=1
Cross Section Anak Sungai Air Hitam
-5
0
5
10
15
20
25
0
202 HY.2
303 HY.3
415 HY.4
510 HY.5
616 HY.6
706 BM.216
710 HY.8
867 HY.9
963 HY.10
1066 HY.11
1180 CP.1HY
1383 HY.14
Siban
1500
1569 CP.2HY
1676 HY.17
1787 HY.18
2000
1882 HY.19
1982 HY.20
2093 HY.21
2287 HY.23
2401 HY.24
2499 HY.25
2607 HY.26
2713 CP.3HY
2824 HY.28
2927 HY.29
3027 HY.30
3132 BM.218
3217 HY.32
3343 HY.33
3449 HY.34
3553 CP.4HY
3658 HY.36
3771 HY.37
4000
3879 HY.38
4101 HY.40
4286 HY.42
4429 HY.43
4574 HY.44
4679 HY.45
4787 CP.5HY
4942 HY.48
5123 HY.50
5233 BM.220
5340 HY.52
5421.5
5562 CP.6HY
5655 HY.55
5756 HY.56
6000
5850 HY.57
5952 HY.58
6060 HY.59
6259 BM.221
Anak Sungai Siak
6439 HY.63
6599 HY.65
Anak Sungai 16_HY_Siban
6700
Plan:
6764 HY.67
6943 HY.69
7037 HY.70
8000
Geom: Desain_Geo_rev Flow:
7815 HY.78
7930 HY.79
8063 BM.223
8162 HY.82
8285 HY.83
8395 HY.84
8490 HY.85
8601 CP.9HY
8697 HY.87
8830
1) Eksisting Q25_rev 2) Desain_Q25_rev
8934 HY.89
9104 HY.91
9225 BM.224
9448 HY.93
9572 HY.94
10000
9774 CP.10HY
9880 HY.97
10003 HY.98
10127 HY.99
10227 HY.100
10408 HY.102
10517 BM.225
10634 HY.104
10742 HY.105
10927 CP.11HY
11047 HY.107
11141 HY.108
11248 BM.226
11300 HY.110
11513 HY.111
11627 HY.112
12000
11814 HY.113
11949 HY.114
12053 HY.115
12145 HY.116
12294 HY.118
14000
LOB
ROB
Ground
Legend
WS Max WS - Desain_Q25_rev
WS Max WS - Eksisting Q25_rev
Elevation (m)
-2
0
2
4
6
8
10
12
2 HZ.3
3 H...
4 HZ.5
5 CP.1HZ
6 HZ.7
7 HZ.8
8 HZ.9
9 HZ.10
10 BM.229
11 HZ.11
12 HZ.12
13 HZ.13
14 HZ.14
15 HZ.15
16.5
Air Hitam
18 BM.230
19 HZ.17
20 HZ.18
21 HZ.19
2000
22 HZ.20
23 HZ.21
24 HZ.22
25 HZ.23
27 HZ.24
28 HZ.25
29 HZ.26
30 HZ.27
31.4
32 HZ.28
33 HZ.29
34 HZ.30
35 HZ.31
37 HZ.33
38 HZ.34
39 HZ.35
40 HZ.36
41 BM.232
4000
42 HZ.37
43 HZ.38
44 HZ.39
45 HZ.40
46 CP.5HZ
47 HZ.42
48 HZ.43
Anak Sungai Siak
49 HZ.44
50 BM.233
51 HZ.45
Plan:
52 HZ.46
53 HZ.47
54 HZ.48
Main Channel Distance (m)
55 HZ.49
56 CP.6HZ
57 HZ.51
58 HZ.52
59 HZ.53
Geom: Desain_Geo_rev Flow:
60 HZ.54
Hasil Running Kondisi Eksisting dan Normalisasi
61 HZ.55
6000
62 BM.234
63 HZ.56
64 HZ.57
65 HZ.58
66 CP.7HZ
1) Eksisting Q25_rev 2) Desain_Q25_rev
67 HZ.60
68 HZ.61
69 HZ.62
70 BM.235
71 HZ.63
72 HZ.64
73 HZ.65
74 CP.8HZ
74.3
75 HZ.66
76 HZ.67
77 HZ.68
79 BM.236
80 HZ.71
81 HZ.72
8000
82 HZ.73
83 HZ.74
84 CP.9HZ
85 HZ.76
86 HZ.77
87 HZ.78
10000
LOB
ROB
Ground
Legend
WS Max WS - Desain_Q25_rev
WS Max WS - Eksisting Q25_rev
Geometri Data Normalisasi Anak Sungai Sail
Anak Sungai - L_Sail
10 Legend
Cut Invert
8
Ground
LOB
6
Slope desain: 0.00348
ROB
4
Elevation
-4
-6
0 2000 4000 6000 8000 10000 12000 14000 16000
Station
Elevation
Elevation
2
7
0 6
5
-50 -40 -30 -20 -10 0 10 -30 -20 -10 0 10
Station Station
B= 10 S=1
B= 20 S=1
-6
-4
-2
0
2
4
6
8
10
0
198 L.2
312 L.3
511 L.5
570
735 L.7
937 L.9
1133 BM.269
Sail
1258 L.12
1445 L.14
1559 L.15
1668 CP.2L
1809
1853 L.18
1962 L.19
2000
2076 L.20
2228 L.22
2349 L.23
2575 L.25
2768 L.27
2859 L.28
2977 L.29
3137 BM.271
3329 L.33
3492 L.34
3633 L.35
3788 L.37
4000
3980 L.39
4088 L.40
4251 L.42
4384 L.43
4584 L.45
4781 L.47
4984 L.49
5100 L.50
5233 BM.273
5388 L.53
5615 L.55
5754 CP.6L
6000
5903 L.58
6013 L.59
6175 BM.274
6301 L.62
6438 L.63
6439
6515 L.64
6627 L.65
6737 CP.7L
Anak Sungai Sail
6920 L.68
Anak Sungai L_Sail
7025 L.69
7200 BM.275
7323 L.72
Plan:
8232 L.81
8356 BM.276
8533 L.84
8649 L.85
8769 CP.9L
8930 L.88
9043 L.89
Geom: Desain_Geo2_S.Sail Flow:
1) Q25_Eksisting_S.Sail_rev
9350 L.92
9550 L.94
10000
9654
9749 CP.10L
9857 L.97
10052 L.99
10247 BM.278
10462 L.103
2) Q25_Desain_S.Sail2
10626 CP.11L
10982 L.108
11092 L.109
11193 L.110
11385 L.112
12000
11567 L.114
11687 L.115
11859 L.117
11973 L.118
12079 L.119
12191 BM.280
12422 L.122
12528 L.123
12768 L.125
12903 L.127
13100 L.129
13329 L.131
13405 BM.281
14000
Hasil Running Kondisi Eksisting dan Normalisasi
16000
LOB
ROB
Ground
Legend
WS Max WS - Q25_Desain_S.Sail2
WS Max WS - Q25_Eksisting_S.Sail_rev
Geometri Data Normalisasi Anak Sungai Senepelan
Anak Sungai - 29_K_Senepelan
14 Legend
12 Cut Invert
Ground
10
LOB
Elevation
8
ROB
Slope desain : 0.00343
6
-2
0 1000 2000 3000 4000 5000 6000
Station
8 Modified XS 8 Modified XS
Ground Ground
6
Bank Sta Bank Sta
7
Elevation
Elevation
Template Template
4
Bank Sta Bank Sta
6
2
5
0
-20 -10 0 10 20 0 20 40
Station Station
B= 15 S=1
B= 5 S=1
Cross Section Anak Sungai Senepelan
12 Cut Invert
Ground
10
LOB
Elevation
2
Slope desain: 0.00006
Slope desain: 0.00248
0
0 1000 2000 3000 4000 5000 6000
Station
11.5 Modified XS 4
Modified XS
Ground Ground
11.0 3
Bank Sta Bank Sta
Elevation
Elevation
10.5 Template Template
2
Bank Sta Bank Sta
10.0
1
9.5
0
9.0
-40 -20 0 20 40 -20 0 20 40
Station Station
B= 10 S=1
B= 10 S=1
Cross Section Anak Sungai Teleju
-2
0
2
4
6
8
10
12
14
0
0.8
2 K.3
3 K.4
3.5
4 K.5
5 K.6
6 CP.1K
7 K.7
7.5
7.8
9 K.9
Senepelan
10 K.10
11 BM.258
1000
11.5
11.8
13 K.13
14 CP.2K
15 K.16
16 K.17
17 K.18
18 K.19
18.8
20 BM.259
2000
21 K.22
22 K.23
23 K.24
24 K.25
24.5
24.8
26 K.27
27 K.28
Anak Sungai 29_K_Senepelan
Anak Sungai Siak
28 K.29
29 K.30
Plan:
3000
30 BM.260
31 K.32
31.5
33 K.34
34 K.35
Geom: Desain_Geo_rev Flow:
34.5
34.8
36 CP.4K
37 K.38
37.5
37.8
1) Eksisting Q25_rev 2) Desain_Q25_rev
39 K.40
4000 40 K.41
41 BM.261
42 K.43
43 K.44
44 K.45
45 K.46
45.5
45.8
47 CP.5K
48 K.49
49 K.50
5000
50 K.51
Elevation (m)
0
2
4
6
8
10
12
14
0
6000
5...
6...
Teleju
7...
8 ...
LOB
ROB
Ground
Legend
9 ...
10...
WS Max WS - Desain_Q25_rev
WS Max WS - Eksisting Q25_rev
1000
11...
12 ...
13 ...
14 ...
15 ...
15.3...
15.5
17 L...
18 LM...
18.5
18.8
2000
20 LM....
21 LM....
22 BM....
23 LM.2...
24 LM.24
25 LM.25
26 LM.26
27 CP.3LM
Anak Sungai 57_LM_Teleju
28 LM.28
Anak Sungai Siak
29 LM.29
30 LM.30
Plan:
3000
31 LM.31
31.5
31.8
Main Channel Distance (m)
32.8
33.5
33.8
Geom: Desain_Geo_rev Flow:
Hasil Running Kondisi Eksisting dan Normalisasi
35 LM.35
36 LM.36
37 LM.37
38 CP.4LM
39 LM.39
1) Eksisting Q25_rev 2) Desain_Q25_rev
4000
40 LM.40
41 LM.41
42 BM.285
43 LM.43
44 LM.44
45 LM.45
46 LM.46
47 LM.47
48 LM.48
49 CP.5LM
5000
50 LM.50
6000
LOB
ROB
Ground
Legend
WS Max WS - Desain_Q25_rev
WS Max WS - Eksisting Q25_rev
Geometri Data Normalisasi Anak Sungai Lukud
Anak Sungai - 69_MI_Lukud
40 Lege nd
35 Cut In vert
30 Ground
25 LOB
Slope desain 0.00112
Elevation
ROB
20
Slope desain: 0.00274
15
20 Ground Ground
Bank Sta Bank Sta
Elevation
Elevation
2
19 Template Template
Bank Sta Bank Sta
18 0
17
-2
-10 0 10 20 30 40 10 20 30 40 50
Station Station
B= 15 S=1
B= 5 S=1
Cross Section Anak Sungai Lukud
-5
0
5
10
15
20
25
30
35
40
0
4 MI.4
7 MI.6
9 MI.8
12 MI.10
14 MI.12
17 MI.14
19 BM.355
22 MI.18
24 MI.20
27 MI.22
29 MI.24
31 BM.356
34 MI.28
36 CP.4MI
Lukud
38 MI.31
40.5
43 MI.35
46 CP.5MI
48 MI.39
50 MI.41
52 MI.42
54 MI.44
55 CP.6MI
58 MI.47
60 MI.49
5000
62 MI.50
64 MI.52
66 CP.7MI
68 MI.55
70 MI.57
72 MI.58
74 MI.60
76 MI.62
78 CP.8MI
80 MI.65
82 BM.361
85 MI.69
87 CP.9MI
89 BM.362
91 MI.73
93 MI.75
95 MI.77
97 MI.78
100 MI.81
103 MI.83
105 MI.85
108 MI.87
111 MI.89
113 MI.91
115 MI.93
118 MI.95
10000
120 MI.97
122 MI.98
124 MI.100
126 CP.13MI
128 MI.103
130 BM.366
132 MI.106
134 MI.108
136 CP.14MI
Anak Sungai Siak
138 MI.111
140 MI.113
142 MI.114
144 MI.116
Anak Sungai 69_MI_Lukud
Plan:
146 CP.15MI
148 MI.119
151 MI.122
154 MI.124
169 MI.136
171 BM.370
173 MI.139
175 MI.141
15000
177 MI.142
179 MI.144
182 MI.146
184 MI.148
186 CP.19MI
188 MI.151
191 BM.372
1) Eksisting Q25_rev 2) Desain_Q25_rev
193 MI.155
195 MI.157
197 MI.158
199 MI.160
201 MI.162
201.8
205 MI.165
207 MI.166
209 MI.168
211 BM.374
213 MI.171
215 MI.173
217 MI.174
219 MI.176
221 BM.375
224 MI.180
20000
227 MI.182
229 BM.376
231 MI.185
234 MI.188
236 CP.24MI
238 MI.191
240 MI.193
242 MI.194
244 MI.196
247 MI.198
249 BM.378
251 MI.201
253 MI.203
255 MI.205
257 CP.26MI
25000
LOB
ROB
Ground
Legend
WS Max WS - Desain_Q25_rev
WS Max WS - Eksisting Q25_rev
Elevation (m)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
2...
3...
4...
5 ...
6 ...
500
7 ...
8 ...
9 W...
10 ...
Pengambang
1000
11 ...
12 ...
13 ...
14 W...
1500
15 C...
16 W...
17 W...
18 W...
Anak Sungai Siak
19 WA...
Anak Sungai 70_WA_Pengambang
Plan:
2000
20 BM...
Main Channel Distance (m)
21 WA...
22 WA...
Geom: Desain_Geo_rev Flow:
Hasil Running Kondisi Eksisting dan Normalisasi
23 WA....
24 CP....
2500
24.2
1) Eksisting Q25_rev 2) Desain_Q25_rev
25 WA....
26 WA....
2...
28 WA.2...
3000
29 WA.2...
30 BM.3...
31 WA.2...
32 WA.27...
3500
33 WA.28...
4000
LOB
ROB
Ground
Legend
WS Max WS - Desain_Q25_rev
WS Max WS - Eksisting Q25_rev
Geometri Data Normalisasi Anak Sungai Ukai
Anak Sungai - 71_ME_Ukai
50 Lege nd
Cut In vert
40
Ground
30 LOB
Elevation
ROB
.0 016
esain: 0
20 Slope d
10
Slope desain: 0.00037
Elevation
Elevation
2
Template Template
0
Bank Sta 0 Bank Sta
-1
-2
-2
-4
-3
B= 15 S=1
B= 5 S=1
Cross Section Anak Sungai Ukai
-10
0
10
20
30
40
50
0
4 ME.4
6 ME.6
9 BM.308
12 ME.12
15 ME.14 Ukai
18 ME.17
21 ME.19
24 CP.3ME
27 ME.24
30 ME.26
33 ME.29
36 ME.31
39 BM.311
42 ME.36
45 ME.38
48 BM.312
50 ME.42
5000
53 ME.45
57 ME.48
60 ME.50
63 ME.53
66 ME.55
69 ME.58
72 ME.61
75 ME.63
78 BM.315
81 ME.69
84 ME.71
87 ME.74
90 ME.77
93 ME.79
96 ME.82
99 ME.84
101 CP.11ME
103 ME.87
105 BM.318
10000
108 ME.91
111 CP.12ME
114 ME.96
117 ME.98
119 ME.100
121 CP.13ME
124 ME.104
127 ME.107
130 ME.109
133 ME.111
136 ME.114
139 ME.117
142 ME.119
145 ME.122
148 ME.125
151 ME.127
154 ME.130
15000
157 ME.133
160 ME.135
163 BM.324
166 ME.140
Anak Sungai Siak
169 ME.142
Anak Sungai 71_ME_Ukai
172 ME.145
175 ME.147
178 CP.19ME
Plan:
181 ME.152
184 ME.154
188 CP.20ME
206 ME.172
Geom: Desain_Geo_rev Flow:
209 ME.174
212 ME.177
215 ME.179
218 ME.182
221 ME.185
224 ME.187
227 CP.24ME
230 ME.192
233 ME.194
236 ME.197
1) Eksisting Q25_rev 2) Desain_Q25_rev
238 ME.198
241 BM.332
244 ME.203
247 CP.26ME
250 ME.208
252 BM.333
255 ME.212
25000
258 ME.214
261 ME.217
264 ME.219
267 CP.28ME
269 ME.223
272 BM.335
275 ME.228
278 ME.230
281 ME.233
283 ME.234
286 ME.237
289 ME.239
292 BM.337
295 ME.244
298 ME.246
300 ME.249
303 ME.251
306 CP.32ME
30000
309 BM.339
Hasil Running Kondisi Eksisting dan Normalisasi
312 ME.258
35000
LOB
ROB
Ground
Legend
WS Max WS - Desain_Q25_rev
WS Max WS - Eksisting Q25_rev
Kolam Retensi (Sail 2)
Kurva Elevasi-Volume – Luas Genangan Kolam Retensi Sail-2
Genangan Embung Sail 2
mdpl Tinggi Air (m) Luas (Ha) Volume (m3)
0,00 0,00 - -
0,25 0,25 0,44 507,33 Kurva perbandingan Luas dan volume SAIL 2
"Volume (m3)" "Luas (ha)"
0,50 0,50 0,97 2.193,55
0,75 0,75 2,01 5.887,70 Luas (ha)
4,00 3,50 3,00 2,50 2,00 1,50 1,00 0,50 -
1,00 1,00 2,87 12.185,52 4,50
1,25 1,25 2,94 19.447,27
4,00
1,50 1,50 3,01 26.886,09
1,75 1,75 3,08 34.502,36 3,50
2,00 2,00 3,15 42.296,71
3,00
2,25 2,25 3,23 50.270,56
2,50 2,50 3,30 58.424,91
Elevasi (m)
2,50
2,75 2,75 3,37 66.760,53
2,00
3,00 3,00 3,44 75.278,75 SPILLWAY
3,25 3,25 3,52 83.980,42 1,50
3,50 3,50 3,59 92.866,80
1,00
3,75 3,75 3,67 101.938,51
4,00 4,00 3,74 111.203,12 Elv Tanggul 0,50
0,00
Renc Pembangunan - 20.000,00 40.000,00 60.000,00 80.000,00 100.000,00 120.000,00
Total Area Embung 4,05 Ha Volume (m3)
Total Galian : 69.926,77 cubic meters
Total Timbunan : 7.236,37 cubic meters
REDUKSI BANJIR KOLAM RETENSI
Pengaruh Reduksi
Pengaruh Reduksi Embung
Kolam RetensididiSungai
Sungai Sail
Sail
(Rata-rata reduksi 10.88%)
180
160
140
Debit (m3/dtk)
120
100 Debit Eksisting (Q25)
Debit Inflow Embung Taki
80
Debit Rencana
Debit Rencana Kolam Embung
Retensi Sail 1 Sail 1
60 Debit Rencana
Debit Rencana Kolam Embung
Retensi Sail 2 Sail 2
40
20
0
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
Waktu (Jam)
Denah Inlet
Potongan Inlet
Potongan Inlet
Denah
Outlet
Potongan Outlet
Potongan Outlet
Penampang Melintang Kolam Retensi
Penampang Melintang Kolam Retensi
Penampang Melintang Simetris Kolam Retensi
Tanggul Sungai Siak
93
Hasil Pengujian Konsolidasi Tanah Lunak Menggunakan Odometer
Konvensional Tanggul Kanan
Berdasarkan hasil pengujian odometer dilaboratorium menunjukan nilai koefisien kompresi, Cc sekitar 0.16
dan angka pori initial, e0 sekitar 0.83. Sementara itu, nilai Cc/1+e0 diprediksi sebesar 0.09 - 0.13 (slightly to
moderately compressible)
94
Properties Tanah Tanggul Kanan Sungai Siak
Berdasarkan hasil pengujian Atterberg Limit dilaboratorium menunjukan bahwa tanah umumnya
memiliki nilai PI kisaran 9-28 dan berada diatas A-Line sehingga termasuk pada klasifikasi CL
(Lempung plastisitas rendah)
95
Sheetpile L = 15 m dan backpile Dia. 30 cm, L = 12 m
Parameter Tanah Disain
Depth (m) Material 3
g kN/m c' kN/m
2
f' E cu Disarankan menggunakan sheetpile
0 - 3.0 Silty Clay, very soft 15 5 26 2001 10 W500 A 1000 L = 15 m, backpile
3.0 - 8.0 Silty Clay, very soft 15 5 27 2501 12.5 D30 cm, L = 12 m, timbunan
8.0 - 30.0 Silty Sand, medium to dense 18 1 37 20000 1
hingga elev. +4.00 m, SF = 1.60 ≥
Timbunan 17 7 29 10005 30
1.50
Spesifikasi Sheetpile :
W500 A 1000, L=15 m
Spesifikasi double backpile :
Spunpile diameter = 30 cm, L=12 m
Spunpile miring 4:1 (75°)
Spesifikasi tieback/anchor:
7 strand 0.6 inch.
97 – Tanggul Riau
SEGMEN TIMBUNAN DI ATAS TANAH LUNAK
g unsat g sat c' f' cu E'
Depth (m) Soil Type
(kN/m 3) (kN/m 3) (kPa) (˚) (kPa) (kPa)
0.00 - 2.50 Clayey Silt, Very Soft 14 15 2 23 9 2401
2.50 - 5.00 Clayey Silt, Very Soft 14 15 3 24 10 2668
5.00 - 7.50 Clay with peat, Very Soft 14 15 4 25 11 2935
7.50 - 10.00 Clay with peat, Very Soft 14 15 5 26 12 3202
10.00 - 12.00 Peat with clay, Medium 4.7 12.3 5 27 15 4002
12.00 - End Silty Sand, Very Dense 18 19 1 40 38300
Sedimen 13 14 2 23 6 1601
Timbunan 16 17 5 27 33 8804
• Waktu yang dibutuhkan hingga kondisi end of consolidation U99% (Δu~1 kPa) : 173 hari ~ 5.77 bulan
• Prediksi settlement sampai dengan kondisi end of construction (berdasarkan FEM) : ±0.87 m
• Prediksi settlement sampai dengan kondisi end of consolidation : ±0.89 m
GAMBAR TIPIKAL SEGMEN TIMBUNAN DI ATAS TANAH LUNAK
99 – Engineering Services For Siak River Basin Flood Management Subproject In Riau Province
TERIMA KASIH
Diskusi Teknis
100