DESA
KECAMATAN
KABUPATEN
:
:
:
PEKERJAAN
Lokasi
Patok
:
:
Ruas Jalan
0+200 s/d 0+242
(21 m)
Rencana Talud
Ijuk
Suling-suling
per jarak 5 m
2
Pasir Urug
Batu kosong
###
c
TIPIKAL TALUD
Perhitungan Volume Talud
0+200
Ukuran/Dimensi (m)
a
b
c
d
0.3
1
0.5
0.3
0+205
0.3
1.5
0.6
0.5
0+215
0.3
1.5
0.6
0.5
0+221
0.3
0.5
0.3
Patok
21
Volume
(m3)
3.81
9.75
4.58
18.14
Keterangan
0.65
Panjang Talud
21.00 m
Volume
0.65 x 0.7 x 21
9.56 m3
Batu Kosong
2.43 m3
2.43
Galian
0.7
ANALISA :
BOW G32h
1m3 Pasangan Batu Belah 1:4
Batu Belah
:
1.1
x
18.14
Pasir
:
### x
18.14
Semen
:
3.2 x
18.14
Pekerja
:
3.6 x
18.14
Tukang
:
1.2 x
18.14
BOW A1
1m3 Galian Tanah Biasa
Pekerja
:
### x
9.56
=
=
=
=
=
22.38
9.43
58.04
65.30
21.77
7.17
22
9
58
65
22
m3
m3
zak
HOK
HOK
7 HOK
:
:
:
:
No. Rab
:
Program
:
Jenis Kegiatan :
Konstruksi
:
Ukuran/Dimensi :
0
0
URAIAN
VOLUME
DARI
DARI
TOTAL SWADAYA PPK
Bahan
Batu Belah
Pasir
Semen
SAT
HARGA
SATUAN
(Rp.)
JUMLAH HARGA
DARI SWADAYA
(Rp.)
TOTAL
(Rp.)
22
9
22 m3
9 m3
135,000
65,000
2,970,000
585,000
2,970,000
585,000
58
58 zak
40,000
2,320,000
-
2,320,000
-
5,875,000
5,875,000
Sub Total
Alat
Cangkul
JUMLAH HARGA
DARI PPK
(Rp.)
2
PPK
TPT
Pasangan Batu
Panjang 21 m
10
5 bh
30,000
150,000
150,000
300,000
Sendok Semen
Ember
5
20
5
10
- bh
10 bh
15,000
5,000
75,000
50,000
50,000
75,000
100,000
Benang
Papan Bekisting
2
0.1
Paku
Selang Waterpas
1
25
2 roll
0 m3
1 kg
25 m
2,500
750,000
5,000
75,000
5,000
75,000
9,000
3,000
9,000
75,000
9,000
75,000
275,000
364,000
639,000
175,000
-
1,625,000
715,000
1,800,000
715,000
Sub Total
Upah
Pekerja
Tukang
72
22
7
-
65 hok
22 hok
OPERASIONAL
JUMLAH
25,000
32,500
Sub Total
175,000
2,340,000
2,515,000
TOTAL
450,000
8,579,000
9,029,000
UPK
TPK
2%
3%
450,000
180,611
270,916
9,030,527
9,480,527
Disetujui oleh
PjOK
Dibuat Oleh
Kader Teknis/TPK
Di periksa Oleh
FK / FT
..
NIP. .. .. ..
.. / .
. /
:
:
:
:
No
Uraian
Bahan
Peralatan
Upah
Kegiatan
Ukuran
Talud
21 m
Jumlah
No. RAB
1
2
PPK
Swadaya
5,875,000.00
Jumlah Total
Bobot %
PPK
-
68.48%
Bobot %
Swadaya
5,875,000.00
364,000.00
275,000.00
4.24%
364,000.00
275,000.00
4.24%
2,340,000.00
175,000.00
27.28%
2,340,000.00
175,000.00
27.28%
8,579,000.00
100.00%
Jumlah
8,579,000.00 100.00%
Operasional UPK 2 %
180,611.00
180,611.00
Operasional TPK 3 %
270,916.00
270,916.00
Jumlah Total
Jumlah Biaya Upah
Jumlah HOK Konstruksi
68.48%
9,030,527.00
2,340,000.00
65.00
9,030,527.00
175,000.00
7.00
2,340,000.00
HOK
65.00
175,000.00
7.00
Disetujui oleh
PjOK
Dibuat Oleh
Kader Teknis/TPK
Di periksa Oleh
FK / FT
NIP. .. .. ..
.. / .
. / ..
HOK