BANGUNAN
LEPAS PANTAI
STATIS
JURUSAN TEKNIK KELAUTAN
FTK ITS SURABAYA
No.
Deskripsi
Checklist
1.
Input nilai Water Depth, tinggi elevasi mudline, dan massa jenis air
4.
laut.
Penentuan Member group (dalam hal ini adalah pengelompokan
member dengan properties yang sama)
5.
Input beban (live load, dead load, equipment, crane, WOR, dsb)
6.
7.
10
11
Analisa + Running
Data :
Working point : 10
Pile Connecting : 8
Water Depth
: 60
Mudline Elev
: -58
Pile Stub Elev : -64
Other Elev
:
-27.5 & 2.5
Data :
Number Leg : 4
Leg Spacing at
working point
X1 : 45
Y1 : 30
Batter X & Y : 10
Bracing (X brace)
Deck Leg
+15 ft dari working
point
9 ft
5 x @9 ft = 45 ft
9 ft
Cellar Deck
5 ft
5 x 9 ft = 45 ft
5 ft
Properties
Moment crane
: 100 kips-ft
Living Quarter : 5 kips
Live load
: 25 psf
Selfweight
Dan Plat
: 0.2 in thick
Environmental Loading
Beban Gelombang
15,0 ft
Periode gelombang
7,1 det
4,0 ft/det
Beban Angin
1,2 ft/det
50 mph
Kondisi Operasi
Marine Growth
Corrotion Allowance
API RP 2A-WSD
4 inch
1/8 in
Combine Load
Load Combine name 1001 (untuk arah 0 deg)
- Dead load (Crane, Living quarter, Self weight, Plat)
- Live load
- Env load arah 0 deg
Load combine name 1002 (untuk arah 90 deg)
- Dead load (Crane, Living quarter, Self weight, Plat)
- Live load
- Env load arah 90 deg
Code Checking
AISC ASD 9th / API WSD 21th
Allowable Stress Modifier (AMOD)
untuk operasi 1
untuk badai 1.33
Load Condition Selection (LCSEL)
Running analysis
Check Hasil
Unity Check List
Interface UC
Deflection Shape Mode