Buku Panduan Telecom Implementasi BP TI NI SE 0009 FERRY MARTIN ATRI BOLIVAR ISHAK HALIM April 2009 NI/SE Indonesia
Type of Document
2 of 158
DAFTAR ISI ................................................................................................................................ 2 BAB I : PRINSIP DASAR PEKERJAAN........................................................................................ 6 I. II. III. IV. V. Tujuan.............................. 6 Proses Tahapan Pekerjaan ................................................................... 6 Persiapan Pekerjaan ................................... 7 Penurunan dan Penanganan Material ............................................................................... 7 Antena line........................................................................................................................... 9 V.1. Jumper Instalasi ........................................................................................................ 9 V.2. Pemasangan Feeder Utama .................................................................................. 13 V.3. Pemasangan Konnectors ...................................................................................... 17 V.4. Pemasangan Grounding feeder ............................................................................ 20 V.5. Pemasangan kedap air pada konektor dan grounding kit ................................. 24 V.6. Jalur pemasangan kabel feeder............................................................................. 28 V.7. Pemasangan Kabel Feeder..................................................................................... 30 V.8. Instalasi of Feeder Entry Ports ............................................................................. 31 V.9. Pemaangan flebel pada feeder .............................................................................. 32 V.10. Penempatan Antena dan braket pada kaki Tower................................................ 33 V.11. Instalasi of Sector Antena....................................................................................... 35 V.12. Mechanical Tilting of Sector Antena...................................................................... 38 V.13. Pengarahan Antena Sektor..................................................................................... 40 VI. VII. Pemasangan Distribusi Kabel Power DC........................................................................ 45 Tool Tool Keperluan Instalasi ....................................................................................... 47
VIII. Lebel................................................................................................................................... 48 VIII.1. Peralatan dan material-material yang dibutuhkan............................................... 48 VIII.2. Sistem Identifikasi Kabel ....................................................................................... 48 IX. Penyelesaian Akhir Pekerjaan ......................................................................................... 53 IX.1. Pemeriksaan akhir atau Penilaian Site.................................................................. 53 IX.2. Pre ATP Site............................................................................................................. 53 IX.3. Persiapan Dokumen ATP........................................................................................ 53 X. ATP Site ............................................................................................................................ 53
BAB II. BTS 24x .......................................................................................................................... 54 I. II. III. BTS Rack Instalasi ........................................................................................................... 56 Koneksi Grounding pada Rak BTS.................................................................................. 57 Koneksi DC Power ............................................................................................................ 58
Type of Document
3 of 158
A-bis Interface untuk 120 Ohm Kabel Impedance ......................................................... 59 PCM Kabel terpasang ke OPVT ...................................................................................... 60 Koneksi External Alarm.................................................................................................... 61 Pemasangan DDF.............................................................................................................. 62 VII.1. Kabel Alarm dan PCM Spesifik Untuk Proyek HCPT ........................................... 64 1. Persyaratan Kabel Alarm.................................................................................... 64 1.1 Environmental Alarms (ENVAs)................................................................... 64 1.2 ENVA Cabling .............................................................................................. 64 1.3 Base Stations ................................................................................................ 64 1.4 Pemasangan DDF Frame .............................................................................. 65 a. Perangkat Outdoor .................................................................................... 65 b. Perangkat Indoor....................................................................................... 68
VIII. FCU, DUAMCO, Flexi Rigid Connection, COBA 2P8 & 4P12......................................... 69 IX. X. XI. Sistem Pengkabelan RF .................................................................................................. 73 Pemasangan CAN-Bus ..................................................................................................... 74 MFDUAMCO + HYBRID4................................................................................................... 75
BAB 3. MEMULAI INSTALASI SISTEM FLEXI EDGE BTS ....................................................... 76 I. Instalasi Plinth................................................................................................................... 76 I.I. Space yang Harus Dilebihkan .................................................................................. 76 I.2. Posisi Plinth di Dalam SSite Indoor ........................................................................ 77 I.3. Site Posisi Plinth di Site Outdoor ............................................................................ 77 II. Mounting Adapter untuk Flexi Edge BTS ...................................................................... 78 II.1. Mounting Adapte ..................................................................................................... 78 III. IV. V. VI. Instalasi Plinth................................................................................................................... 79 Pemasangan Grounding Plinth........................................................................................ 81 Pemasangan Mechanical Unit ......................................................................................... 81 Pemasangan Mounting Plinth ke Dinding ...................................................................... 83 VI.1. Petunjuk Pemasangan Plinth ke Dinding ............................................................. 83 VI.2. Pemasangan Plat Pengikat .................................................................................... 87 VII. Pemasangan Plinth di Pole .............................................................................................. 88
VIII. Gambar tampak depan instalasi Flexi EDGE BTS di pole............................................. 90 IX. X. Flexi EDGE BTS................................................................................................................. 92 Instalasi Modul .................................................................................................................. 93 X.1. Module plag in ......................................................................................................... 93
Type of Document
4 of 158
XI. XII.
XIII. Instalasi Kabel ................................................................................................................ 100 XIII.1. Kabel Internal ...................................................................................................... 100 XIII.2. Kabel Eksternal................................................................................................... 101 XIII.3. Kabel Jumper RF ............................................................................................... 101 XIV. Penutup Samping............................................................................................................ 103 XV. Auxiliary Part .................................................................................................................. 105 XV.I. Instalasi Kabel Duct .................................................................................................. 104 XV.2. Kotak Panel Alarm ................................................................................................... 107
BAB IV FLEXI WCDMA SYSTEM INSTALASI.......................................................................... 108 I. Instalasi Plinth ................................................................................................................ 108 I.I. Space yang Harus Dilebihkan...................................................................................... 108 I.2. Mounting Adapter untuk Flexi WCDMA ...................................................................... 109 I.3. Mounting Adapter: ....................................................................................................... 109 I.4. Instalasi Plinth............................................................................................................... 110 II. III. IV. Pemasangan Grounding Plinth...................................................................................... 112 Pemasangan Mechanical Unit........................................................................................ 112 Pemasangan Mounting Plinth ke Dinding .................................................................... 114 IV.1. Install mounting plinth ............................................................................................. 114 IV.2. Fix the screws, do not tighten yet .......................................................................... 114 IV.3. Petunjuk Pemasangan Plinth ke Dinding................................................................ 114 V. VI. VII. Pemasangan Plinth di Pole ............................................................................................ 117 Instalasi Transmisi sebagai Sub-Module..................................................................... 122 Instalasi Masukkan Kabel............................................................................................... 123 VII.1. Kabel ties poin, suport kabel dan klem Kabel ........................................................ 123 VII.2. Susunan Masukkan Kabel pada beberapa modul .................................................. 124 VIII. Flexi WCDMA BTS CABLING ........................................................................................ 124 VIII.1. Koneksi External Power Feed: DC Cabling............................................................ 127 VIII.2. Koneksi Internal Kabel Power ................................................................................. 128 VIII.3. Sambungan kabel Optical Internal ......................................................................... 129 VIII.4. Sambungan kabel Transmisi ................................................................................... 130 VIII.5. Sambungan kabel External Alarm .......................................................................... 131 VIII.6. Sambungan kabel jumper Antena........................................................................... 132
Type of Document
5 of 158
VIII.7. RF Jumper Kabel ..................................................................................................... 133 VIII.8. Kabel Internal Antena............................................................................................... 134 VIII.9. Kabel Alarm............................................................................................................... 139
BAB V: PEMASANGAN SISTEM SRAL XD ............................................................................ 141 5.1. 5.2. 5.3. Pemasangan Mounting Antena...................................................................................... 141 Antena Instalasi............................................................................................................... 141 Instalasi ODU .................................................................................................................. 142 5.3.1. Instalasi ODU tanpa menggunakan frame .......................................................... 142 5.3.2. Instalasi ODU dengan menggunkan integrated frame ODU ............................. 143 5.4. 5.5. 5.6. 5.7. 5.8. 5.9. Instalasi ODU dengan menggunkan integrated frame ODU ....................................... 143 Instalasi ODU dengan menggunakan separated frame ODU...................................... 143 Pemasangan kabel koaxial............................................................................................. 145 Instalasi Grounding Kit................................................................................................... 147 Instalasi Rack ETSI ......................................................................................................... 148 Instalasi IDU..................................................................................................................... 149
5.9.1. Langkah-langkah untuk instalasi IDU ..................................................................... 148 5.9.2. Instalasi Cabel Tributary .......................................................................................... 150 5.9.3. Instalasi kabel Power................................................................................................ 151 5.10. Instalasi Frame DDF........................................................................................................ 152 5.11. Sistem Power................................................................................................................... 153 5.12. Antena Alignment ........................................................................................................... 153 5.13. Lebelling .......................................................................................................................... 155 APPENDIX LIST App. 1 App. 2 App. 3 App. 4 App. 5 App. 6 App. 7 PISM (Pre Instalasi Site Meeting) As Plan, Site Survey Report Dispath Note Material Request Procedure Instalasi Tools Safety Kit NI SE QA TI Checklist V02
Type of Document
6 of 158
I. Tujuan Dokumen ini merupakan acuan untuk pelaksanaan pekerjaan BTS indoor dan Outdoor berikut pekerjaan MW, juga diharapkan pekerjaan yang seragam dan memenuhi standart mutu. Dokumen ini juga membahas seluruh tahapan pekerjaan BTS dan MW. II. Proses Tahapan Pekerjaan
PENANGGUNGJAWAB
KETERANGAN
START
Network Data Base Service Procurement Standardization, NSN Project Project Engineering Logistic ,
No
Yes
Material Request
PARTNER TI
Installation Start
PARTNER TI
Installation Finish
Work Breakdown Structure/ activity list Safety inspection sheet, masukkan data ke ePM
No
PARTNER TI
Self Assessment
Documentation Photos Acceptante Instalasi check-list Document, SQI check-list Ready For Commissioning, masukkan data ke ePM
Yes
PARTNER TI
Integration Test
PARTNER TI
On Air ATP
Handover to NSN Project Overall instalasi & Commissioning final checklist with commissioner and supervisor instalasi, masukkan data ke ePM
END
Type of Document
7 of 158
III. Persiapan Pekerjaan Sebelum melakukan pekerjaan instalasi, ikuti step/alur pekerjaan dibawah ini: Jika tidak mengikuti, subcontraktor akan mengganti atau meralat seluruh kerja yang tidak sesuai spesifikasi dengan biaya sendiri. a. Siapkan dokumen pre-instalasi (ie. PISM, TSSR, Laporan RNP, gambar kerja
App1. PISM-01_V0 App1b. Final_Draft_Guideline_
b. Lakukan Pengecekan Kelayakan Tower (Beserta vertical dan horizontal kabel tray) Kelayakan Base frame Grounding system c. Beri tanda dimana BTS akan diletakkan d. Buatlah rencana kerja pekerjaan,
App2a. TSS Giri Mulya.pdf App2b. SITE SUREVEY REPORT LIW
IV. Penurunan dan Penanganan Material a. Cek kondisi box material (pastikan tidak ada kerusakan pada box). b. Periksa kebenaran alamat site dengan menggunakan GPS (Wajib). c. Cek indikator guncangan dan kemiringan pada box BTS. Jika indikator guncangan berwarna merah, box telah mengalami guncangan di luar toleransi selama pengiriman. d. Cek kelengkapan dan jumlah material yang terkirim dengan list material dari gudang.
e. Kirim laporan penerimaan material ke NSN Logistic. Jika tidak lengkap, rusak, hilang, lakukan permintaan material lengkap dengan foto Dispath Note yang sudah diberikan catatan ke PROJECT ENGINERING LOGISTIC
App7.Materials Request procedure ba
f.
Tandatangani Dispath Note dengan menuliskan nama penerima, perusahaan, no telephone, jam dan tanggal penerimaan.
Type of Document
8 of 158
BTS Box
Type of Document
9 of 158
V. V.1. 1.
ANTENA LINE Jumper Instalasi Pastikan tidak ada penambahan material antara Connector Antena dengan jumper feeder. Ini akan mengakibatkan terjadi rugi-rugi pada system dan memungkinkan akan kemasukan air. Jumper feeder berfungsi untuk mempermudah koneksi antara conector antena dengan fedeer utama dan feeder utama ke BTS.
Type of Document
10 of 158
2.
Untuk Tower Mounted Amplifiers, (TMA) yang digunakan adalah yang jumper yang pendek kurang lebih 0.5 m pada input antena dan TMA output.
Antenna
TMA
MHA
BTS
12V DC Supply
Antenna Combiner
3.
Jumper cabel harus terpasang dengan ketat agar menghindari pergeseran atau goncangan akibat tertiup angin harus di beri cabel ties yang tahan ultraviolet (Warna Hitam) dengan ukuran 6.5 mm, juga hal ini berlaku untuk jumper diatas diameter . Untuk penggunaan didalam ruangan atau rack digunakan yang berwana putih.
Type of Document
11 of 158
4.
Kabel Jumper harus dipasang selurus mungkin dan diharapkan tidak melakukan penekukan tambahan
OK
Not OK
Type of Document
12 of 158
5. 6.
Pemasangan feeder 7/8, 1 1/4 , dan 1 5/8 ke cabel tray jangan gunakan Kabel ties Jumper Super flex sebaiknya digunakan untuk didalam rack BTS yaitu antara feeder utama dengan BTS. Batasan bendingan dan batasan gaya garik pada feeder seperti dijelaskan dibawah ini:
7.
NOTE : SEMUA koneksi eksternal di antara jumper/Feeder/Antena harus dibuat kedap air sesuai petunjuk instalasi. Yang menjadi perhatian ialah: pastikan semua koneksi terpasang dengan ketat, kering dan rapi.
Type of Document
13 of 158
V.2. Pemasangan Feeder Utama 1. Ada beberapa jenis kabel feeder sesuai kualitas/performance yang dubutuhkan. Tiap kabel feeder mempunyai karakteristik mekanin yang tersusun oleh penghantar dalam, penyekat, penghantar luar dan Selubung luar.
Penghantar luar Selubung Luar Penyekat Penghantar dalam
-Penghantar Luar : annular corrugated copper tube (Ring) -Penghantar dalam : spiral corrugated copper tube (spiral) -Penyekat: foam
-Penghantar luar: annular corrugated copper tube (Ring) -Pengahantar dalam: copper tube -Penyekat: foam
Outer Jacket
-Penghantar luar: copper tube -Penghantar dalam: copper tube -Penyekat: foam
-Penghantar luar: aluminum tube -Pnghantar dalam: copper tube -Penyekat: foam
Outer Jacket
-Penghatar luar: spiral corrugated copper tube (spiral) -Penghantar dalam: spiral corrugated copper tube (spiral) -Penyekat: foam -Penghantar luar: spiral corrugated copper tube (spiral) -Penghantar dalam: copper tube -Penyekat: foam
2.
Type of Document
14 of 158
3.
Batas minimum radius bengkokan beberapa jenis kabel feeder disebutkan dibawan ini. Pengukuran sederhana bisa dilakukan dengan menggunakan kayu atau kardus sisa material antena jika ingin memeriksa radius tiap bengkokan saat instalasi.
4.
Jarak maksimal antar klem feeder pada tray vertikal adalah 1 meter. Hal ini juga disamakan pada tray horizontal yaitu 1 meter. Tiap klem harus dikunci dengan mur ganda atau menggunakan ring per yang dipasang antara mur dan ring plat dan Angel Adaptor / siku penyambung harus terpasang kuat dan kencang pada tangga tray menggunakan mur ganda seperti pada gambar berikut.
Mur ganda atau menggunakan ring per diantara ring plat dan mur
Angle Adapter / siku penyambung harus terpasang pada tangga tray dengan baud khusus dan mur ganda
Type of Document
15 of 158
5.
Kabel feeder harus dipasang pada tempat khusus dimana tidak bisa digunakan untuk berjalan. Tidak harus terpasang pada atas plafon atau pada sudut sisi atas dimana orang yang melakukan perawatan mungkin bisa berjalan diatasnya. Jika hal ini tidak bisa dihindari, maka besi kerangka penutup harus digunakan untuk melindungi kabel feeder.
6. 7.
Letak penempatan Kabel feeder Tx dan Rx untk satu sektor harus mengikuti ketentuan. Semua kabel feeder utama untuk satu sektor atau omni sebaiknya diklem menjadi satu kelompok.
8.
Kebel feeder harus tidak menyilang terhadap kabel feeder yang lainnya pada waveguide atau jalur kabel. Kabel feeder tersusun pararel dengan yang lainnya dari atas tower sampai ke atas BTS.
Type of Document
16 of 158
9.
Banyaknya bengkokan dan radiusnya pada beberapa jalur usahakan sesedikit mungkin.
10.
Pada site Omni, kabel feeder utama sebaiknya di klem menjadi satu kelompok dan kabel ini berada pada satu sisi tersendiri di waveguide dan jalur kabel. Kabel tersebut sebaiknya masuk ke dalam ruang BTS dengan cara yang sama tanpa memotong sudut atau menyilang antara satu sisi kabel rak dengan sisi yang lainnya. PIKIRKAN PENGEMBANGAN SELANJUTNYA.
Type of Document
17 of 158
V. 3. Pemasangan Konektor 1. Hanya orang yang berpengalaman dan berkualitas terntunya yang diperbolehkan untuk pemasangan konektor feeder. Ada beberapa jenis konektor yang dalam pemasangannya harus disesuaikan dengan jenis kabel feedernya ( secara karakteristik mekanik ).
2.
7/8 - FEMALE
7/8 - MALE
N-TYPE
N-TYPE
Konektor DIN. Kedua sebelah kiri adalah dan kedua sebelah kanan adalah 7/8
Konektor 7/16 sebelah kiri adalah Male dan sebelah kakan Female.
3.
Petunjuk pemasangan yang tersedia dengan konektor harus dilaksanakan untuk memastikan pekerjaan pemasangan dengan kualitas yang bagus. Pengecualian untuk nomor 6 di bawah ini. Apabila memungkinkan, gunakan Trimming tool atau Stripping Tool untuk memotong kabel feeder dan memangkas selubung luar.
4.
Type of Document
18 of 158
5.
Besot listrik busa dan suar yang luar konduktor atau menggunakan alat pemotong.
6.
Petunjuk Instalasi yang diberikan oleh produsen jelas menunjukkan sangat kecil jumlah feeder sedang mempersiapkan untuk memotong kabel untuk konektor. Hal ini tidak baik karena dapat menghasilkan efek spiral dalam pemotongan. (The inner konduktor berarti lebih besar dari luar) Untuk mencegah hal ini, minimal 30 cm harus dilenyapkan dengan feeder. Berat ini panjang feeder membantu menjaga persegi dipotong. Setelah selesai memotong visual pastikan 2 conductors sama panjang. Sikat gigi tua sangat baik untuk membersihkan makanan ternak setelah pemotongan, terutama jika gergaji besi telah digunakan.
7. 8.
9.
Jika tua jenis konektor sedang digunakan (screw terpisah dengan orang-orang di pusat-pin) sangat hati-hati harus dilakukan ketika menginstal pin seperti pada acara-acara yang perak plating datang di spiral yang panjang dan pendek sirkuit yang Konektor.
Type of Document
19 of 158
10.
Memberikan perhatian lebih bagi langkah-langkah yang tightening Konektor sebagai The Instalasi Instruksi. Make sure that the connector tight assembled on feeder or jumper.
11.
12.
Type of Document
20 of 158
V.4. Pemasangan Grounding feeder 1. Hanya yang memenuhi syarat yang boleh memasang grounding kit feeder. 2. Petunjuk Instalasi yang disertakan dengan feeder pelarangan kit harus diikuti untuk menjamin kualitas pekerjaan instalasi. 3. Stripping tool atau Trimming tool dapat digunakan untuk memotong dan feeder strip di luar jaket. Perhatian untuk ukuran alat harus setuju dengan jenis kabel feeder.
4. Kabel grounding kit harus terpasang selurus mungkin dan harus mengarah ke bawah ( Antena ke BTS shelter ).
Type of Document
21 of 158
5. Sebaiknya grounding kit dihubungkan ke grounding bar dengan benar. Grounding bar ini harus dihubungkan ke system pentanahan site menggunakan kabel warna hijau atau hijau kuning ukuran 70mm.
6. Paling banyak 3 grounding kit boleh terpasang pada satu titik. Sebaiknya pasang masingmasing grounding kit secara terpisah. 7. Jika lubang lainnya telah penuh. Tetapi jika masih memiliki lubang kosong harus menginstal satu per satu.
Type of Document
22 of 158
8. Grounding kits harus dipasang pasa sisi lurus kabel feeder, jangan pada bengkokan. Untuk grounding kit bawah harus dipasang kira-kira 500-100mm sebelum tekukan horizontal.
1000-1500
9. Grounding kit feeder sebaiknya dipasang pada tempat berikut : a. Sisi atas pada jalur vertikal. b. Sisi bawah pada jalur vertikal jika lebih dari 5m. c. Titik tengah pada jalur vertikal jika jalur vertikal lebih dari 80m. d. Sisi luar pada jalur masuknya feeder ke shelter.
Jarak antara grounding kit atas dan grunding kit tengah 25-30 m
Top
Jika panjang feeder lebih dari / > 80m maka grounding kit tengah harus dipasang.
TO
Bottom
Type of Document
23 of 158
Grounding kit sebaiknya jangan dipasang pada tempat berikut : Didalam ruang/shelter atau gedung. Pada tekukan/bengkokan. Jika jarak FEP ke wave-guidekurang dari 4m, maka sebaiknya dipasang salahsatu pada sisi bawah jalur vertikal atau pada panel I/O, tapi jangan kedua sisi dipasang.
Grounding kit harus terpasang ke sentral grounding. Jangan pasang grounding di bendingan Dudukan kabel harus terpasang ke sentral grounding dari kedua ujung dudukan kabel. Kabel yang berada dibawah juga harus terpasang grounding kit dan terpasang di Busbar Jika panjang grounding kit lebih dari 45 m harus ditambahkan grounding kit. Pemasangan grounding kit tidak boleh melingkar. Resistansi grounding sistem tidak boleh lebih dari 10 Ohm.
Type of Document
24 of 158
Catatan : Pemasangan grounding kit a. Instalasi grounding kit harus dilakukan dengan mengikuti petunjuk instalasi b. Grounding kit harus dipasang sebelum tekukan feeder dekat antena dan sebelum tekukan feeder dekat feeder entry plate (FEP) c. Tambahan grounding kit harus diinstal di tengah kabel tray vertikal jika panjang kabel feeder lebih dari 80 m d. Grounding kit harus diinstal dengan lurus, kuat, dan posisi yang seragam e. Bersihkan grounding bar sebelum melakukan terminasi kabel grounding kit f. Sambungkan kabel grounding kit ke grounding bar dengan kuat dan benar dan menggunakan baut, mur, dan ring stainless
V.5. Pemasangan kedap air pada konektor dan grounding kit. 1. SEMUA koneksi eksternal di antara jumper/Feeder/Antena harus dibuat kedap air sesuai petunjuk instalasi. Yang menjadi perhatian ialah: Pastikan semua koneksi terpasang dengan ketat, kering dan rapi.
Pemasangan conektor feeder utama dengan jumper yang diatas didekat antena diharapkan terpasang vertical dan .
Type of Document
25 of 158
1 Rubber
2 Rubber
3 Rubber
4 Vinyl
5 Vinyl
Arah
Lapisan tunggal coatings ( jika digunakan ) harus dilakukan dengan arah ke atas. Tiap lapisan harus melebihi ujung lapisan sebelumnya sekitar 25-50 mm. Pada akhir lapisan jangan ditarik atau disobek, karena hal ini bisa menyebabkan mengelupasnya lapisan dalam beberapa waktu kedepan.
CABLE TIE
Layer 1, 2 and 3: STRETCH WRAPPED WRAPS OF SELF AMALGAMATING TAPE / RUBBER (STRETCH 30%, OVERLAPPING 50%) WRAP OF INSULATION TAPE (OVERLAPPING 50%)
Layer 4 : STRETCH WRAPS OF INSULATION TAPE / Vinyl (OVERLAPPING 50%) Layer 5 (last): WRAPS of INSULATION TAPE / Vinyl WITH No STRETCH or pull.
Ujung atas dan bawah lapisan kedap air harus diikat dengan kabel ties.
Type of Document
26 of 158
Penggunaan beberapa bahan kedap air tergantung pada kebutuhan. Kebanyakan adalah rubber dan vinyl yang digunakan karena keduanya lebih flexible mengikuti bentuk permukaan konektor.
2.
SEMUA grounding feeder yang diluar harus dilapisi kedap air berdasarkan petunjuk pemasangan dari pabrikan. Catatan: Jika menggunakan jenis Butyl/aspal sebagai lapisan kedap air, maka aspal perlu dilekatkan atau ditekan tiap lapisannya agar agar lebih rapat dan kedap air.
Type of Document
27 of 158
3.
Tempat yang diperlukan untuk pemasangan lapisan kedap air pada kabel feeder ditunjukkan pada ganbar berikut :
Type of Document
28 of 158
V.6. Jalur pemasangan kabel feeder 1. Semua kabel feeder untuk sektor antena harus dipasang klem. The feeders should be stacked one above the other, with the transmit on the side or in the centre of the stack, if 3 feeders are used.
2.
Susunan sektor pada suatu site akan menentukan bagaiman feeder tersebut akan diklem dari sisi yang mana. Tidak terlalu penting apakah sektor diurutkan 1,2,3 atau 3,2,1. Sebaiknya diklem dengan cara yang tepat sehingga kabel feeder tidak bersilangan dengan yang lainnya. Namun disini, pihak customer punya aturan sendiri dalam penyusunannya.
ANT 0
ANT 1
ANT 1 ANT 0
CELL 2
CELL 1
CELL 0
Type of Document
29 of 158
3.
Dalam setiap pemasangan kabel feeder harus menpertimbangkan pengembangan kedepannya. Pada kabel tray atau wave-guide, kabel feeder sebaiknya menyisakan satu sisi pada tray yang tersedia untuk pengembangan selanjutnya.
OR
4.
Kabel feeder harus tersusun lurus dan teratur pada kabel tray atau wave-guide dari sisi atas tower ke arah BTS, kecuali pada ujung atas feeder jika memungkinkan boleh dibengkokkan untuk menyiasati jumper kabel yang pendek.
Type of Document
30 of 158
Tampak samping
Tampak atas
V.7. Pemasangan Kabel Feeder a. Kabel feeder harus dipotong sesuai dengan panjang yang dibutuhkan menggunakan Striping Tool. b. Bersihkan kabel feeder dari debu sisa potongan. c. Kupas kabel feeder menggunakan striping tool d. Pemasangan konektor feeder harus dilakukan mengikuti petunjuk manual instalasi menggunakan kunci 32, 36 dan 22. e. Kabel feeder harus dipasang secara paralel/berjajar searah dan dikencangkan menggunakan klem feeder pada kabel tray outdoor. f. Jarak antar klem feeder 100cm pada posisi vertikal dan 50cm pada posisi horizontal.
g. Bengkokkan kabel feeder pasa posisi horizontal untuk pemasangan konektor. h. Sambungkan kabel feeder dengan kabel jumper outdoor secara kencang dan benar. i. j. Sambungan kabel feeder dan jumper outdoor harus ditutup dengan lapisan rubber dan vinyl. Tarik kabel feeder ke arah BTS melalui tray horizontal.
k. Sambungkan kabel feeder dengan jumper dari rak BTS secara kencang dan benar dan juga pasang arester. l. Sambungan kabel feeder dan jumper BTS harus ditutup dengan lapisan rubber dan vinyl.
M. Gunakan kabel ties hitam hanya untuk pemasangan diourdoor. N. Setelah semua klem selesai dipasang, lakukan pemeriksaan ulang (termasuk washer/ring, lock washer / ring pengunci, dan baud) dari sisi atas sampai bawah.
Type of Document
31 of 158
V.8. Instalasi of Feeder Entry Ports 1. Feeder Entry Ports (I/O panels) dirancang untuk melindungi dari masuknya air, debu atau benda yang tidak diinginkan ke dalam shelter atau bangunan gedung. FEP digunakan sebagai jalur masuknya kabel feeder atau kabel lain ke bangunan gedung dan atau sebagai jalur masuk ke ruangan BTS.
2.
Sealant kualitas outdoor ( lunak ) harus digunakan untuk menutup sisi-sisi antara panel I/O dengan dinding. Penutup Karet digunakan untuk kabel masuk dan keluar dan penutup karet ini juga digunakan untuk kabel Microwave.
3.
4.
Seluruh lubah harus tertutup dengan silicon terutama pada gland yang kosong.
5.
Untuk mengurangi banyaknya air yang terdapat di pada jalur masuk dan keluar pemasangan ke kabel feeder harus serapat mungkin
Type of Document
32 of 158
V.9. Pemaangan flebel pada feeder 1. Seluruh lebel harus tahan pada suhu dan cahaya yang ada diluar ruangan 2. Pemasangan lebel pada kabel feeder dan antena adalah sebagai berikut. A. B. C. D. E. F. Antena (harus terpasang dengan baik). Disemua kabel penghubung jika lebih dari 2 m Di kabel feeder dekat antena. Dikabel feeder luar ruangan dan dalam ruangan. Disemua kabel masuk panel/rack BTS. Kabel feeder dekat BTS.
B
E D
3. 4. 5.
Lebel terbuat dari bakah Critchley dan sudah mendapat pesetujuan (Lihat hal 48) Lebel kabel feeder dipasang sesuai ketentuan yang disepakati denga customer Seluruh lebel yang terpasang harus mudah di baca dan di dilihat.
Type of Document
33 of 158
V.10. Penempatan Antena dan braket pada kaki Tower 1. Pastikan sudut arah antena berdasarkan data dari RNP. Sudut antara braket dengan arah anzimut antena harus 45 x 90. Lihat gambar dibawah. Catatan: Procedure ini hanya berlaku untuk Polarisasi ganda atau Cross.
2.
Atus jarak posisi antena pada bagian dalam siku horizontal dan vertikal untuk dua macam antena polasisasi tunggal dengan yang sama azimut (yang sama sektor). Harus ditempatkan dengan jarak maksimum. Dengan aturan ini akan di peroleh jarak terjauh antara main dan diversity. Lihat gambar dibawah.
Type of Document
34 of 158
3.
Antena Main berada disebelah kiri antena Diversity (dilihat dari dalam tower) dan pastikan kerapian kabel jumper agar tidak saling tindih.
4.
Pemasangan braket dan pole antena diharapkan berada pada posisi yang baik di kaki tower. Lihat gambar dibawah ini
5.
Ketinggian antena ditetapkan berdasarkan data dari departemen RNP. Untuk penempatan antena di atas menara harus dipertimbangkan dari tinggi menara dan panjang antena untuk menghindari dari sambaran petir/kilat.
Type of Document
35 of 158
V.11. Instalasi of Sector Antena 1. Angkat Antena dari antena membungkus dan ditempatkan pada pelindung di dasar yang datar dan bersih permukaan (bisa menggunakan kotak antena ).
Pastikan kelengkapan pada saat terima material di site dengan kondisi yang baik.
Mounting Bracket 3. 4.
Periksa kelengkapan tilt brackets berdasarkan data dari pabrik. Rakit mounting bracket, beserta mechanical tilt bracket apakah sudah sesuai dengan antena yang akan dipasang.
Mounting Bracket
Type of Document
36 of 158
5.
Periksa ke lurusan atau posisi semua pole pada semua arah antena
Pole
6.
Hati-hati pada saat mengangkat antena dan braket ke atas menara, jika menggukanan tali pastikan katrol dan pengikat katrol sudah terpasang dengan baik. Pada saat menaikkan antena dan braket pastikan tidak terbentur dengan menara
7.
Pastikan pemasangan monting beraket untuk atas antena adalah mechanical tilt bracket . Sedangkan untuk bawah antena adalah mounting braket. Ulangi langkah 6 & 7 untuk semua antena Arah kelurusan antena harus disesuaikan dengan perlengkapan yang ditetapkan.
8. 9.
Type of Document
37 of 158
10.
Periksa posisi terakhir antena. Kecenderungan bergeser sewaktu baut diperketat sering sekali terjadi, untuk mencegah hal ini, memperketat baut penjepit di harus setara ketatnya. contoh. belok ke sebelah kiri baut, belok ke sebelah kanan baut, memeriksa posisi, dan berulang sampai sepenuhnya ketat.
11. 12.
Seting mechanical tilt sesuai dengan rencana Pastikan penutup antena connector tetap terpasang sampai di pasang kabel jumper dan di beri karet sebagai penahan air.
Type of Document
38 of 158
Antena Mount
V.12. Mechanical Tilting of Sector Antena 1. Kebanyakan penyedia Antena menyediakan scala Tilt . Tetapi hal ini tidak dapat 100% akurat, (tergantung posisi vertical pole)
Type of Document
39 of 158
2. 3.
Jika pole tidak vertical maka scala tidak dapat digunakan. Level vertical harus benar-benar diukur pada mounting poles. Untuk memungkinkan hal ini harus diperhatikan posisi braket pada kaki tower sebelum antenna dinaikkan.
Pole
4.
Setelah antennas terpasang dan arahnya sudah tepat, lakukan penyetelan kemiringan berdasarkan data dari RNP. Procedure penyetelan kemiringan antena harus menggunakan syarat sebagai berikut: Pastikan pole sudah tegak lurus. Kendorkan semua baut penyetelan kemiringan agar mudah dilakukan penyetelan. Lakukan pengendoran dengan perlahan agar antena tidak melorot ataupun kejatuhan baut.
5.
Type of Document
40 of 158
Mechanical Tilt
Or
Type
Mechanical Tilt
Kencangkan semua baut kemiringan braket setelah dilakukan penyetelan kemiringan dengan hati-hati.
V.13. Pengarahan Antena Sektor 1. Pengarahan terakhir antena adalah bagian yang penting untuk fungsi system yang benar. Hal ini sangat penting dan harus diperhatikan untuk memastikan arah yang benar. Toleransi penyimpangan dari arah antena adalah +/- 1o. Kompas magnet tidak bisa digunakan pada setiap site rooftop, dan hanya bisa berguna pada site greendfield. Direkomendasikan untuk penggunaan kelengkapan antena katherin hanya untuk antena katherin saja. Lihat gambar dibawah. Perlengkapan ini berhubungan atas akurasi rencana OS dan menggunakan titik acuan untuk perhitungan sudutnya. Departemen RNP akan menyediakan pemetaan dari site dengan cukup detail untuk instalasi antena untuk mendapatkan arah agar titik-titik yang ditentukan terlihat, yang sejauh ini sudah cukup jelas memberikan akurasi yang dibutuhkan.
2. 3.
4.
5.
Type of Document
41 of 158
6.
Prosedur pemasangan antena menggunakan perlengkapan Katherin yakni dengan: Gunakan data pemetaan dengan sudut antara rencana azimuth antena dan target (menara di gereja, gedung dan perbukitan) Atur sudutnya dengan menggunakan ukuran yang ada pada perlengkapan adjustment Tempatkan perlengkapan adjustment pada antena dan kencangkan dengan menggunakan clamp Gunakan teleskop untuk melihat target, jika memungkinkan gunakan alat ukur ketinggian Putar antena sampai pada target yang terlihat pada teleskop Juga memungkinkan pemasangan antena dengan menggunakan sebuah peralatan yang disebut Winkelfix. Lihat gambar dibawah. Perbedaannya adalah disini tidak menggunakan teleskop. Antena terpasang dengan menggunakan Winkkelfix pada sebuah plat datar pada antena dan mengarahkannya disepanjang lengannya. Prosedur pemasangan pengarah dengan menggunakan ALANDICK Model 25687-120 Gunakan data pemetaan dengan sudut antara rencana azimuth antena dan target (menara di mesjid, gedung dan perbukitan) Sudutnya diatur pada pengukur yang ada pada pengatur yang ada pada perlengkapan Alandick No 25687-120 Perlengkapan pengarah ditempatkan pada antena dan dipasang pada posisi yang tepat dengan menggunakan clamp. Baut-baut pengencang antena terlebih dahulu dilonggarkan agar mempermudah pemutaran antena pada pole. Antena psecara perlahan diputar sampai pada sasaran yang terlihat pada teleskop Braket antena dikencangkan dengan perllahan dan hati-hati, dengan sesekali melihat pada teleskop untuk memastikan arah yang selalu sesuai. Kompas Magnet Suntoo Penggunaan kompas hanya berdasarkan arah utara Kompas tidak dapat digunakan untuk mengarahkan antena dikarenakan kurang akurat.
7.
8.
9.
Type of Document
42 of 158
10. 11. .
Prosedur ini diulang untuk semua antena. Winkelfix juga dapat digunakan untuk pengaturan mechanical tilt.
KATHREIN TOOL
Type of Document
43 of 158
Winkelfix
scale
Type of Document
44 of 158
ALANDICK TOOL
RFS TOOLS Pengarah CEL adalah peralatan yang mempunyai dua fungsi untuk pengarahan antena. Bisa digunakan untuk pengaturan ketinggian (downtilt) dan azimuth. Pengarah CEL dilengkapi dengan tas yang bisa di gantungkan di bahu pada saat memanjat pada tiang antena atau tower..
Catatan: YANG DILAMPIRKAN DI DOKUMEN PADA SAAT ATP Rencana instalasi antena . Lembaran instruksi instalasi yang ada di setiap antena.
Type of Document
45 of 158
VI. Pemasangan Distribusi Kabel Power DC 1. Ukur ukuran kabel (min=16mm) dan jarak antara MSU/blok power terminal dan pendistribusian power DC, kemudian potong ujung kabel sepanjang yang dibutuhkan. Buka isolasi pada kabel sekitar 1cm dan potong bagian belakang isolasi, pastikan saklar pada power supply dalam keadaan mati sebelum menghubungkan kabel power ke terminal power pada BTS. Bagian kabel yang terbuka dimasukkan ke terminal dan dikencangkan. Inti kable konductor jangan sampai terlihat
2.
DC + DC -
DC +
DC -
3.
Kabel harus terhubung ke MSU blok terminal (terminal power BTS) seperti gambar dibawah.
BTS ULTRASITE
Type of Document
46 of 158
MSU terminal
BTSPLUS Family 4. Penempatan kabel harus benar sesuai dengan kutup power yang ditentukan. Kabel warna BIRU dipasang pada kutub negatif (-48 V) dan kabel warna HITAM dipasang pada kutub positif (+ 0 V). Prosedur ini dilakukan untuk mendapatkan power DC sebesar -45VDC untuk keperluan tegangan BTS Jika tidak menggunakan kabel yang sesuai dengan warna yang telah ditentukan, kabel harus diberi tanda dengan tape/shrinking warna merah (+ 0 V) dan warna biru (-48 V) pada kedua ujung kabel. Beri lebel pada setiap ujung kabel. Tidak ada toleransi untuk kesalahan pemasangan kabel
label
Rectifier/ DC distributi on
BTS
label
5. 6.
Ikat kabel power ke sepanjang kabel tray yang sesuai dengan jalur pemasangan kabel Pasang kabel warna biru (-) ke breaker 63A dan pasang kabel warna hitam (+) ke grounding bar yang ada di dalam rak rectifier.
63A breaker
common ground
Type of Document
47 of 158
Type of Document
48 of 158
VIII. Lebel VIII.1. Peralatan dan material-material yang dibutuhkan A. PERALATAN: Pisau potong Peralatan istallasi khusus untuk pengikatan kabel direkomendasikan, tetapi tidak menjadi keharusan B. MATERIAL: Tipe lebel yang digunakan adalah Critchley Kabel marking set for BTS lebel set consist of: -12 pcs small (1040) series 1xxx lebels for earthing kabels -8 pcs small (1040) series 3xxx lebels for DC supply kabels -42 pcs big (2250) series 4xxx lebels for RF kabels -8 pcs small (1040) series 5xxx lebels for PCM kabels -4 pcs small (1040) series 6xxx lebels for external alarm kabels -1 bag (100 pcs) small (2,492 mm) black kabel ties -1 bag (100 pcs) big (4,8186 mm) black kabel ties VIII.2. Sistem Identifikasi Kabel Sistem identifikasi kabel Nokia dilengkapi dengan dua lebel plastic pada masing-masing kabel, satu lebel pada kedua ujung kabel. Nomor identifikasi pada lebel memperlihatkan fungsi kabel dan juga nomor jalur kabel. Lebel-lebel pada kabel feeder juga diwarnai agar masing-masing sector mempunyai identifikasi warna sendiri. Material lebel yang dipilih juga yang bias digunakan untuk keperluan outdoor. Table 1. Kode identifikasi pada lebel
DIGIT 1st GROUNDIN G AC SUPPLY FUNCTION DC SUPPLY RF PCM ALARM 1 2 3 4 5 6 1...9 1 to 9 0 if no meaning 1...9 1 to 9 0 if no meaning 0...9 0 to 9 (See Note ) BASE STATION 2nd 3rd 4th
FUNCTIO N
Note:
Type of Document
49 of 158
Pemasangan lebel Lebel dipasang pada lebel seperti pada gambag 2 dan 3. Pengikat lebel besar
Ikatkan satu lebel di kedua ujung kabel. Potong bagian sisa pengikat yang lebih. Pastikan bahwa lebel kabel feeder dapat terlihat dengan baik dari bawah. Catatan! Cabel harus langsung diberi lebel begitu terpasang dan terhubungkan!
Type of Document
50 of 158
SPECIFIC USE 1st Sector TX/RX Feeder (WCDMA) 1st Sector RXd Feeder (WCDMA) 2nd Sector TX/RX Feeder (WCDMA) 2nd Sector RXd Feeder (WCDMA) 3rd Sector TX/RX Feeder (WCDMA) 3rd Sector RXd Feeder (WCDMA) DC Supply for BTS-Rack C / Blue DC Supply for BTS-Rack C / Black BTS Rack C, Earthing 16 mm E1 kabel from BTS to DDF External Alarm kabel
CODE 4510 4512 4520 4522 4530 4532 3130 3131 1130 5130 6003
SIZE 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm
QUANTITY 6 6 6 6 6 6 3 3 2 2 2
COLOUR White White Red Red Blue Blue Blue Hitam Hitam Hitam Hitam
GSM 900 BTS LEBELING SPECIFIC USE 1st Sector TX/RX Feeder (GSM 900) 1st Sector RXd Feeder (GSM 900) 2nd Sector TX/RX Feeder (GSM 900) 2nd Sector RXd Feeder (GSM 900) 3rd Sector TX/RX Feeder (GSM 900) 3rd Sector RXd Feeder (GSM 900) DC Supply for BTS-Rack A / Blue DC Supply for BTS-Rack A / Black BTS Rack A, Earthing 16 mm E1 kabel from BTS to DDF External Alarm kabel CODE 4110 4112 4120 4122 4130 4132 3110 3111 1110 5110 6001 SIZE 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm QUANTITY 6 6 6 6 6 6 3 3 2 2 2 COLOUR White White Red Red Blue Blue Blue Hitam Hitam Hitam Hitam
GSM 1800 BTS LEBELING SPECIFIC USE 1st Sector TX/RX Feeder (GSM 1800) 1st Sector RXd Feeder (GSM 1800) 2nd Sector TX/RX Feeder (GSM 1800) 2nd Sector RXd Feeder (GSM 1800) 3rd Sector TX/RX Feeder (GSM 1800) 3rd Sector RXd Feeder (GSM 1800) DC Supply for BTS-Rack B / Blue DC Supply for BTS-Rack B / Black BTS Rack B, Earthing 16 mm E1 kabel from BTS to DDF External Alarm kabel CODE 4110 4112 4120 4122 4130 4132 3120 3121 1120 5120 6002 SIZE 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm QUANTITY 6 6 6 6 6 6 3 3 2 2 2 COLOUR White White Red Red Blue Blue Blue Hitam Hitam Hitam Hitam
METRO BTS LEBELING SPECIFIC USE 2ND METROSITE ANTENA 1 2ND METROSITE ANTENA 2 2ND METROSITE ANTENA 3 2ND METROSITE ANTENA 4 3RD METROSITE ANTENA 1 3RD METROSITE ANTENA 2 3RD METROSITE ANTENA 3 3RD METROSITE ANTENA 4 DC Supply for BTS-Rack D / Blue DC Supply for BTS-Rack D / Black BTS Rack D, Earthing 16 mm E1 kabel from BTS to DDF External Alarm kabel CODE 4210 4212 4220 4222 4310 4312 4320 4322 3140 3141 1140 5140 6004 SIZE 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 21 x 50mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm QUANTITY 6 6 6 6 6 6 6 6 3 3 2 2 2 COLOUR White Red Blue Hitam White Red Blue Hitam Blue Hitam Hitam Hitam Hitam
Type of Document
51 of 158
RF MW LINK KABEL LEBELS SPECIFIC USE 1st MW-LINK KABEL 2st MW-LINK KABEL 3st MW-LINK KABEL 4st MW-LINK KABEL 5st MW-LINK KABEL 6st MW-LINK KABEL 7st MW-LINK KABEL CODE 4010 4020 4030 4040 4050 4060 4070 SIZE 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm QUANTITY 2 2 2 2 2 2 2 COLOUR Hitam Hitam Hitam Hitam Hitam Hitam Hitam
2G / 3G / METRO SHEERED EARTHING KABEL LEBELS SPECIFIC USE MAIN EARTHING 25mm SITE EARTHING BUSBAR 25mm FEEDER EARTHING 25mm BBU OR SSS EARTHING +POLE (25mm2) PDP EARTH KABEL BBU OR SSS EARTHING 16mm MDF/DDF EARTHING 16mm TRANSMISSION EARTHING 16mm BATTERY RACK 1 BATTERY RACK 1 CODE 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 SIZE 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm QUANTITY 2 2 2 2 2 2 2 2 2 2 COLOUR Hitam Hitam Hitam Hitam Hitam Hitam Hitam Hitam Hitam Hitam
2G / 3G / METRO SHEERED AC KABEL LEBELS SPECIFIC USE AC MAIN SUPPLY 1st RECTIFIER SUPPLY KABEL 2st RECTIFIER SUPPLY KABEL CODE 2000 2001 2002 SIZE 10 x 40mm 10 x 40mm 10 x 40mm QUANTITY 2 2 2 COLOUR Hitam Hitam Hitam
2G / 3G / METRO SHEERED DC KABEL LEBELS SPECIFIC USE DC KABEL OF 1st BATTERY STRING DC KABEL OF 2st BATTERY STRING DC KABEL OF 3st BATTERY STRING DC KABEL OF 4st BATTERY STRING TRANSMISSION RACK 1 PANEL1 TRANSMISSION RACK 1 PANEL2 TRANSMISSION RACK 2 PANEL1 CODE 3000 3001 3002 3003 3004 3005 3006 SIZE 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm QUANTITY 2 2 2 2 2 2 2 COLOUR Hitam Hitam Hitam Hitam Blue Blue Blue
2G / 3G SHEERED ALARM KABELS LEBELS SPECIFIC USE BBU MONITORING CUSTOMER CONTROLS 0-5 AND ALARMS 0-11 CUSTOMER ALARMS 12-23 SUPPORT ALARMS (EXTRATALK) CODE 6000 6110 6120 6130 SIZE 10 x 40mm 10 x 40mm 10 x 40mm 10 x 40mm QUANTITY 2 2 2 2 ONLY COLOUR Black Black Black Black
KABLE TIES:
Type of Document
52 of 158
Type of Document
53 of 158
IX. Penyelesaian Akhir Pekerjaan Setelah selesai denga pekerjaan instalasi, ada beberapa pekerjaan lain yang harus diselesaikan. IX.1. Pemeriksaan akhir atau Penilaian Site Pastikan semua pekerjaan instalasi telah selesai dan seluruh area di site telah bersih (tidak ada material atau sampah tertinggal di site) IX.2. Pre ATP Site IX.3. Persiapan Dokumen ATP Siapkan dan kumpulkan semua data yang dibutuhkan untuk membuat dokumen ATP yang akan diajukan ke Nokia Siemens Networks. Sediakan semua dokumen untuk semua pekerjaan yang dibutuhkan seperti: Form Safety Form material checklist dari Gudang atau Dispatch Note Form Material Request. Form kerusakan material Form kehilangan material Form kelebihan material Hasil pengukuran VSWR dan DTF Instalasi dari semua material Dokumen PISM (Pre Instalasi Site Meeting) Dokumen redline Rencana perbaikan jika ada Data rencana pemasangan antena Photo : 1. Photo shelter dan tower (horizontal tray terlihat) 2. Photo BTS dan Service Rack (jika ada) dengan kondisi terbuka dan tertutup 3. Photo View A (Semua terlihat) 4. Photo View B (Semua terlihat) 5. Photo View C (Semua terlihat) 6. Photo View D (Semua terlihat) 7. Photo Kabel Tray didalam shelter 8. Photo penangkal petir dan tabung pemadam kebakaran 9. Photo wallgland dari luar dan dari dalam 10. Photo DDF (Dari dekat) 11. Photo Panel ACPDB kondisi terbuka dan tertutup 12. Photo panel DCPDB( jika sudah ada terpasang) kondisi terbuka dan tertutup 13. Photo antena dari sisi bawah(4 sudut) dan dari bagian atas tower untuk melihat azimuth sector X. ATP Site Beritahukan kepada supervisor NSN jika instalasi sudah selesai, dan instalasi sudah bisa ditest. Test yang sudah dikatakan selesai adalah: pemeriksaan visual, pengukuran VSWR dan DTF, dll. Jika kesalahan ditemukan, harap diperbaiki atas sepengetahuan supervisor Nokia Siemens Network.
Type of Document
54 of 158
Type of Document
55 of 158
Type of Document
56 of 158
I.
BTS Rack Instalasi 1. Tentukan posisi BTS di atas base frame berdasarkan rencana kerja. 2. Pasang rack pada base frame dengan menggunakan plat pengunci dan diberi baut dan mur serta ring per dan ring plat 3. Berikan seluruh lebel yang dibutuhkan pada rak BTS
4. Plat Pengunci di BTS terdapat 4 set dengan besar baut M12. 5. Pemasangan harus sesuai dengan foto diatas (tergantung kesepakatan project) a. Kepala baut berada dibawah dan murnya di dalam rak lengkap dengan ring per dan ring plat. b. Kepala baut berada di dalam rak dan murnya ada diluar lengkap dengan mur pengunci dan ring plat.
Type of Document
57 of 158
II. Koneksi Grounding pada Rak BTS 1. Gunakan titik koneksi terdekat dari sistem grounding. 2. Ukur jarak antara titik koneksi dari sistem grounding dengan baut grounding pada BTS atau shelter.. 3. Potong kabel grounding sesuai dengan panjang yang dibutuhkan. 4. Kupas dan lepaskan insulasi kabel pada ujung kabel untuk disambungkan pada mur grounding (panjang sekitar 10mm) dan crimp dengan menggunakan kabel lug M8. 5. Sambungkan kabel yang sudah dikupas dan disiapkan pada baut grounding. 6. Kencangkan baut. 7. Koneksi grounding diantara rak harus disediakan melalui plat grounding atau kabel grounding.
Type of Document
58 of 158
III. Koneksi DC Power 1. Kendorkan semua baut koper dan pindahkan dengan hati-hati. 2. Berdasarkan site document semua data site serta posisi distribusi DC harus sesuai 3. Tentukan jarak antara MSU terminal block dengan DC distribution, potong kabel sesuai dengan panjang yan diperlukan 4. Rutekan suplai DC melalui tabung besi diantara unit suplai DC eksternal dan shelters. Apabila diperlukan gunakan alat pembantu rute. 5. Kupas isolasi ujung kabel sepanjang 1cm dan hubungkan bagian kabel yang telah dikupas ini ke MSU terminal block 6. Masukkan kabel power ke dalam rak melalui lubang kabel yang terdapat di bawah ruangan 7. Rapikan kabel power dengan rapi menggunakan kabel ties 8. Masukkan kabel ke terminal dan periksa seluruh posisi kabel 9. Pasang kabel daya DC pada posisi -48 V DC panel distribution. 10. Hubungkan kabel biru (-) ke breaker 63A dan hubungkan kabel hitam (+) ke common ground didalam rak rectifier
Type of Document
59 of 158
IV. A-bis Interface untuk 120 Ohm Kabel Impedance 1. 2. 3. 4. 5. 6. 7. Potong kabel IUB sesuai dengan panjang yang dibutuhkan (1). Kupas isolasi kabelAbis sepanjang 13cm (2). Buang braided insulation sepanjang 11 cm (3). Potong sekitar bagian luar insulation(4). Potong pelapis aluminium dan plastic tambahan Potong 6 mm dari insulasi kabel (5). Untuk koneksi dari kabel, kendorkan mur seperti yang tampak pada gambar. Ambil plat yang membawa OVPT / ABISCON dan pilin pada posisi sambungan. Pasang kabel yang sudah disiapkan dan ikat dengan kabel ties, sehingga permukaan kabel yang sudah dikelupas benar benar bersentuhan dengan braket..
Type of Document
60 of 158
1 Red 3 Brown 5 Idle 7 Red 9 Green 11 Idle 13 Red 15 Orange 17 Idle 19 Red 21 Blue 23 Idle 25 idle 27 idle
2 White 4 Brown 6 Idle 8 White 10 Green 12 Idle 14 White 16 Orange 18 Idle 20 White 22 Blue 24 Ground 26 Idle 28 Idle
Type of Document
61 of 158
Type of Document
62 of 158
VII. Pemasangan DDF 1. Pasang frame DDF pada DDF suport didalam bagian depan service rak 2. Pasang tiap LSA ke frame DDF dan hubungkan kabel IUB, kabel Alarm dan kabel Enva sesuai dengan diagram kabel
Type of Document
63 of 158
3. Hubungkan kabel ground dari LSA ke common grounding bar di dalam rak rectifier
Type of Document
64 of 158
VII.1. Kabel Alarm dan PCM Spesifik Untuk Proyek HCPT 1. Persyaratan Kabel Alarm 1.1 Environmental Alarms (ENVAs) Shelter / rak BTS harus dilengkapi dengan sistem alarm yang dapat bereaksi pada setiap even / kejadian yang secara potensial dapat membahayakan fungsi site. Input alarm eksternal harus diterminasi pada panel control yang sesuai dengan perangkat BTS / NODE B. a. Alarm Api b. Alarm penyusup c. Alarm Power AC d. Alarm deteksi kerusakan pada Air Conditioner e. Alarm deteksi kerusakan power pada Air Craft Warning Light f. Alarm deteksi kerusakan Lightning Arrester g. Alarm kerusakan AC Outdoor
1. 2
ENVA Cabling
1.3. Base Stations Tipe base station: BS-240 II, BS-241II, BS-288, and BS-82 II dapat mensuport 4 E1 links (opsional 8 E1) diterminasi dengan sebuah ABISCON (tanpa proteksi Over voltage untuk aplikasi indoor) atau dengan proteksi Over voltage opsional (OVPT) yang meproteksi papan panel didalam rak terhadap kelebihan tegangan (teganngan residual < 1 KV). Pada proyek HCPT , digunakan ABISCON / OVPT untuk kabel 120 ohm (yang diseimbangkan)
Type of Document
65 of 158
1.4
a. Perangkat Outdoor Untuk perangkat outdoor, frame DDF diinstal pada rak service tambahan (Extension Service Rack) dari BTS untuk semua rak BTS, Node-B and PDH Microwave diatas rak baterai dengan menggunakan rel anchor sebagai penopang. Untuk SRA L XD yang dilengkapi dengan sistem 4 E1, pihak instalator harus melakukan terminasi sistem 8 E1 karena perangkat sudah dilengkapii dengan kabel transmisi 16 pasang. Pilin semua kabel grounding, berikan kabel lug dan lakukan crimping, dan sambungkan kabel grounding pada badan shelter dan rapatkan dengan menggunakan mur dan baut.
GROUP 1
GROUP 2
GROUP 3
Type of Document
66 of 158
Type of Document
67 of 158
Type of Document
68 of 158
b. Perangkat Indoor Untuk site Repeater, HUB dan BSC, instalasi frame DDF Frame harus dilakukan seperti sebagai berikut: Alarm Eksternal dan interface PCM dari kabel BTS dan Node-B diterminasi pada frame DDF yang diinstal pada rak slim SDH dibawah frame kabel coaxial. Alarm Eksternal dan interface PCM dari BTS dan Node-B menggunakan satu dari empat modul dari LSA pada frame DDF. Modul LSA lainnya akan digunakan untuk alarm housekeeping dari perangkat backbone..
Type of Document
69 of 158
VIII. FCU, DUAMCO, Flexi Rigid Connection, COBA 2P8 & 4P12 1. Cek apakah koneksi setiap kabel semi rigid tersambung sesuai dengan sistem kabel yang ada pada dokumen as plan. 2. Pastikan bahwa semua konektor semi rigid kencang. Catatan: untuk mengencangkan kabel semi rigid, hanya gunakan kunci spanner dengan torsi yang sesuai. 3. Kabel harus dialurkan melalui jalur yang memberikan kemudahan untuk melakukan pergantian modul (CUs, Combiners dan FANs). Untuk alas an ini BTS Base- / cabinet Extension yang sudah dilengkapi dengan kabel flexible HF dari pabrikan, selalu disertakan dengan sepasang kabel retainers yang terpasang pada sisi sebelah kiri dan kanan pada bagian bawah dari setiap sub rak (pada rak bagian terbawah dari suatu kabinet). 4. Alurkan kabel, sehingga indikasi LED dari modul dapat mudah terlihat dan konektor tes adapter dapat mudah diakses. 5. Ikatkan kabel semi rigid pada rak dengan menggunakan kabel ties
Type of Document
70 of 158
TX
RX Main RX Diversity
Type of Document
71 of 158
Type of Document
72 of 158
COAMCO (Co-Duplexer dan Multi coupler) digunakan bersamaan dengan sebuah FDUAMCO pada konfigurasi 4:2 untuk menyediakan konfigurasi 8:2 (2 antena dengan 8 carriers)..
Type of Document
73 of 158
IX. Sistem Pengkabelan RF Ada beberapa plat interkoneksi RF dengan kabel-kabel RF. Periksa kesesuaian bersamaan dengan carrier unit (CU module) dihubungkan ke perangkat FICOM, (F)DUAMCO, DIAMCO. Pegang dengan hati-hati pada saat pemasangan modul!
Type of Document
74 of 158
X. Pemasangan CAN-Bus Kabel CAN-Bus digunakan pada saat ada penggunaan service rack 1 dan service rack 2 dari perangkat SIEMENS 1. CAN-Bus disalurkan pada konfigurasi rangkaian melalui shelter rack untuk mendapatkan internal dan external alarm dan menghubungkannya ke ACTP dari rak utama. 2. Kabel CAN-Bus terdiri dari hubungan antara BUS interface dari beberapa rak, yang dimulai dari rak utama. Diproduksi dengan mempunyai 15 konektor SubD dikesua ujungnya dengan panjang yang berbeda-beda tergantung penggunaan. 3. Slot penghubung terakhir harus ditutup dengan terminating resistor (dummy) S30861-K2047-X, yang dikirimkan bersamaan dengan base rack.
Type of Document
75 of 158
XI. MFDUAMCO + HYBRID4 MFDUAMCO (Multi-standard FDUAMCO) dengan HYBRID4 adalah penghubung yang diutamakan untuk flexible duplex scenario combining. 1. Double-Duplexer di dalam satu box 2 sub modul terpisah yang masing-masing 1:1 combining dengan port 4 Rx 2. Ketersediaan expand per Sub-Module 2:1 combining menggunakan HYBRID4 4:1 combining menggunakan HYBRID4 dan COAMCO 3. Advanced features Integrasi TMA power supply + alarm interface RX jumper untuk menyambungkan filter tambahan
Type of Document
76 of 158
133 mm 422* 560 mm 447 mm Weight approx 15-25 kg * 422 mm depth for cabinet-installed modules I. Instalasi Plinth I.I. Space yang Harus Dilebihkan Periksa area disekitar Flexi BTS; pastikan ruang kosong yang harus tersedia sesuai gambar dibawah:
Facility wall 200-250 mm Plinth
75 mm
75 mm
600 mm
FRONT
Type of Document
77 of 158
I.2. Posisi Plinth di Dalam SSite Indoor General Layout untuk site indoor, position untuk Flexi Edge BTS didepan FEP
FEP
ACPDB Pole
Type of Document
78 of 158
II. Mounting Adapter untuk Flexi Edge BTS Secara umum, Ukuran H-Beam terlalu besar untuk Flexi Edge BTS. Ukur jarak antara H-Beam, Jika jarak antar H-Beam lebih besar dari 28 cm maka dibutuhkan Flexi Mounting Adapter
II.1.Mounting Adapter:
300 mm
360 mm
Type of Document
79 of 158
III. Instalasi Plinth Setelah kita menentukan posisinya, kemudian kita mulai memasang plinth (FMFA Flexi Mounting Kit). Ketika kita memasang plinth ke H-Beam atau lantai/Concrete, pastikan jarak sisa antar H-Beam mini 3 cm.
3 cm
Type of Document
80 of 158
Safe distance from the edge of plinth to the facility (existing) wall: 200-250 mm
360 mm
300 mm
Pasang M12 Dyna Bolt (untuk lantai/concrete), Baut M12 untuk H-Beam dan S12 Screw w/ Fisher untuk CKD.
Type of Document
81 of 158
IV. Pemasangan Grounding Plinth Begitu plinth terpasang, hal pertama yang harus dilakukan yang sangat dibutuhkan adalah pemasangan grounding pada plinth. Untuk site outdoor, gunakan konduit metal berwarna hitam.
Metal Conduit
V. Pemasangan Mechanical Unit. Ada terdapat stud di bagian atas plinth dan ada 4 lubang pada bagian bawah EMHA:
Letakkan mechanical unit pada bagian atas plinth; pastikan ke 4 lubang pada mechanical unit masuk ke 4 stud yang ada pada plinth.
Type of Document
82 of 158
Setelah masuk, tekan secara perlahan mechanical unit ke bagian belakang, kemudian kencangkan bautnya.
1. Push Down
2. Shift Back
Pastikan 2 lubang (antara plinth dan mechanical unit) satu sumbu lubang Ulangi prosedur diatas untuk semua mechanical unit Setelah semua mechanical unit terpasang kemudian lepaskan sticker untul lubang masuk kabel.
Type of Document
83 of 158
VI. Pemasangan Mounting Plinth ke Dinding 1. Pasang mounting plinth ke plinth dengan baut ke plinth on bottom sidpada bagian bawah 2. Pasang baut, jangan dikencangkan dahulu
VI.1. Petunjuk Pemasangan Plinth ke Dinding 1. 2. 3. 4. 5. 6. Buat lubang dengan bor mesin untuk pemasangan baut Pasang baut-baut untuk mounting hardware Pasang mounting plinth dan kencangkan dengan memutar kea rah kanan Pastikan mounting plinth dapat dipasang pada bagian bawah plinth Kencangkan baut-baut ke arah kanan Kencangkan baut pada mounting plinth ke plinth
Type of Document
84 of 158
Bersihkan bagian antara plinth yang didinding dan modul Pasang plinth ke didinding
Type of Document
85 of 158
S1 S1
Type of Document
86 of 158
Catatan: Plinth harus dipasang grounding Grounding modul harus dipasang langsung setelah instalasi 4 baut pengencang module harus dikencangkan dengan kekuatan 5Nm Maximum hanya 2 module per plinth Jika ada pemasangan Flexi Power Module (FPMA), harus dipasang pada plinth yang sama
Type of Document
87 of 158
Kencangkan plat setelah instalasi selesai dengan menggunakan baud dan kencangkan semua baut dengan menggunakan obeng.
Type of Document
88 of 158
VII. Pemasangan Plinth di Pole Ikuti spesifikasi panjang baut, nomor lubang dan ukuran torsi tergantung dari ukuran diameter pole.
Type of Document
89 of 158
1. 2. 3. 4. 5. 6. 7.
Pasang mounting ke Pole Kencangkan mounting plinth ke mounting pole pada bagian bawah Kencangkan mounting plinth ke mounting pole pada bagian atas Tekan plinth ke bagian bawah Pasang mounting yang lain ke pole ke sisi yang lain Kencangkan mounting plinth ke mounting pole pada bagian bawah Kencangkan mounting plinth ke mounting pole ke bagian atas
Type of Document
90 of 158
S3
S2
S1
Type of Document
91 of 158
Modul harus diinstalasi dengan panel depan menghadap kekiri atau kekanan. Jangan melakukan instalasi dengan arah modul menghadap ke atas atau kebawah dimana hal ini dapat menyebabkan kerusakan pada modul.
Catatan: Plinth harus diground sebelum instalasi modul. Grounding pada Modul harus tersambung segera setelah instalasi. Empat baut untuk pemasangan modul harus dikencangkan hingga 5Nm. Maximum 2 modul dapat diinstal pada satu plinth. Jika Flexi Power Module (FPMA) akan diinstal, maka harus diinstal dengan menggunakan sistem modul pada plinth yang sama. Setelah selesai, Instal fixing plat untuk modul.
Type of Document
92 of 158
IX. Flexi EDGE BTS: dari konfigurasi instalasi kecil hingga konfigurasi instalasi besar
Peningkatan kapasitas Flexible dari konfigurasi kecil hingga kepada konfigurasi besar 1 hingga 24 TRX pada sector 1-6 dibawah 1 BCF hingga 216 TRX untuk 1 site Site dengan kapasitas tinggi dimungkinkan walaupun tanpa adanya kabinet. Frequency bands GSM 800, 900, 1800 and 1900 Konfigurasi Single dan dual band
Min configuration 1-2 TRX , 2 modules Flexi EDGE BTS Max configuration / BCF 24 TRX, 14 modules
4+4+4 860mm
2+2+2 600mm
Type of Document
93 of 158
X. Instalasi Modul Flexi EDGE BTS mempunyai konfigurasi yang bervariasi dari satu instalasi dengan instalasi lainnya. Panduan ini hanya mengajarkan konfigurasi maksimum pada satu stack hingga kongurasi 444. Sebelum memasang modul Flexi EDGE BTS, harap diingat bahwa dimensi dari casing / unit mekanikal adalah satu unit casing untuk setiap modul major. X.1. Modul Plug-In Sistem Modul (ESMA):
Type of Document
94 of 158
Type of Document
95 of 158
3HU
Opt. Converter
DTRX
XI. Various Module Arrangement on Mechanical Unit Flexi Edge BTS 200: - ESMA (1 UNIT) - DTRX (1 UNIT) - DDU (1 UNIT)
Type of Document
96 of 158
Flexi Edge BTS 222: - ESMA (1 UNIT) - DTRX (3 UNIT) - DDU (3 UNIT)
Flexi Edge BTS 444: - ESMA (1 UNIT) - DTRX (6 UNIT) - DDU (3 UNIT)
DTRX Sect m odule Sect module Sys module Sys module DTRX Sect m odule Sect module DTRX Sect m odule Sect module
Type of Document
97 of 158
XII. Instalasi Masukkan Kabel Kabel ties poin, suport kabel dan klem Kabel. Gunakan klem kabel untuk suplai power & kabel transmisi. Gunakan kabel ties standar.
Type of Document
98 of 158
Pasang dan rapihkan kabel pada slot yang berada pada sisi samping dan atas dari inti cabinet.
Type of Document
99 of 158
KABEL TRANSMISI
Type of Document
100 of 158
XIII. Instalasi Kabel XIII.1. Kabel Internal Semua kabel internal (kabel Power dan kabel Bus) dialurkan melalui sisi kiri dari unit mekanikal.
1 EXxA1 1 2
3 EXxA2 3 4
4 5
5 EXxA3 6
Power & Bus Kabel EXxA1 dikoneksikan ke Power & Bus 1 ESMA Power & Bus Kabel EXxA2 dikoneksikan ke Power & Bus 3 ESMA Power & Bus Kabel EXxA3 dikoneksikan ke Power & Bus 5 ESMA
Type of Document
101 of 158
XIII.2. Kabel Eksternal Kabel Eksternal: Kabel RF Kabel Power Eksternal Kabel Transmisi Kabel Grounding Kabel Auxiliary (Alarm, Optic, Sinkronisasi) Semua kabel eksternal dialurkan melalui sisi kanan dari Unit Mekanikal.
Kabel DC Power Kabel Transmisi & Auxiliary Kabel Grounding Internal Kabel RF
XIII.3. Kabel Jumper RF Dua dari jumper RF adalah kabel eksternal, sehingga kabel harus dialurkan melalui sisi kanan dari BTS, radius tekuk dari kabel ini sangatlah pendek sejak diharuskannya penutup samping harus terpasang. Jadi harap berhati hati pada saat melakukan penekukan kabel RF, harus memiliki radius yang kecil tetapi tidak boleh sampai merusakkan kabel. Jarak klem feeder disesuaikan dengan instruksi instalasi dari pabrikan.
Catatan: Angka yang dicantumkan adalah untuk kabel feeder NK, untuk feeder pabrikan lain mungkin memiliki angka yang berbeda. Cek angka yang sesuai dari pihak pabrikan sebelum melakukan instalasi.
Type of Document
102 of 158
Untuk memastikan bahwa jumper RF dipotong dengan panjang yang benar untuk semua sektor, instalasi konektor untuk kabel RF pada Flexi Edge BTS harus yang pertama terlebih dahulu
dilakukan.
Type of Document
103 of 158
XIV.2. Penutup Samping Penutup Samping (FMHA) mempunyai paket yang berbeda
Buka dan lepaskan mur didalam penutup, gantikan mur dengan mur yang ada pada penutup samping.
Type of Document
104 of 158
Type of Document
105 of 158
XV.Auxiliary Part XV.I. Instalasi Kabel Duct Kabel Duct is installed on Indoor Site. Kabel Duct should install behind Flexi BTS, 1st Kabel Duct are used for RF Jumper Kabel, make sure that 1st Kabel Duct Position are exactly behind right side cover of Flexi BTS so it can make minimum number of bending for RF Jumper Kabel. The 2nd installed right next on left side of 1st Kabel Duct
1st Kabel Duct are used only for RF Kabel Jumper 2nd Kabel Duct is used for Others Kabel. Without Cable duct
1st Cable Duct for RF Jumper Cable
Type of Document
106 of 158
Ladder kabel diinstal untuk site Outdoor. Ladder kabel harus diinstal dibelakang Flexi BTS, pastikan bahwa posisi ladder kabel secara pasti dibelakang sisi kanan penutup Flexi BTS sehingga dapat mencapai tekukan minimum dari kabel jumper RF.
Type of Document
107 of 158
XV.2.Kotak Panel Alarm Untuk site Indoor, kotak panel Alarm diinstal dibelakang Flexi BTS, pada sisi kiri dari pipa kabel kedua dengan minimum dengan tinggi 100 cm dari lantai.
> 100 cm
Untuk site Outdoor, kotak panel Alarm diinstal pada belakang Flexi BTS, pada sisi kiri dari ladder kabel dan dengan ketinggian minimum 100 cm dari lantai (H Beam)
> 100 cm
Type of Document
108 of 158
BAB IV Flexi WCDMA System Instalasi a. Instalasi di lantai b. Instalasi didinding c. Instalasi pole d. Instalasi di Hbeam e. Instalasi dikabine f. Instalasi di rak
I. Instalasi Plinth I.I. Space yang Harus Dilebihkan Periksa area disekitar Flexi BTS; pastikan ruang kosong yang harus tersedia sesuai gambar dibawah:
Facility wall 200-250 mm Plinth
75 mm
75 mm
600 mm
FRONT
Jarak plint ke dinding harus diberikan jarak minimum 260 mm agar mempermudah dalam perbaikan kipas BTS.
Type of Document
109 of 158
I.2. Mounting Adapter untuk Flexi WCDMA Secara umum, Ukuran H-Beam terlalu besar untuk Flexi WCDMA BTS. Ukur jarak antara H-Beam, Jika jarak antar H-Beam lebih besar dari 28 cm maka dibutuhkan Flexi Mounting Adapter
300 mm
360 mm
Type of Document
110 of 158
I.4. Instalasi Plinth Setelah kita menentukan posisinya, kemudian kita mulai memasang plinth (FMFA Flexi Mounting Kit). Ketika kita memasang plinth ke H-Beam atau lantai/Concrete, pastikan jarak sisa antar H-Beam minimum 3 cm.
3 cm
Type of Document
111 of 158
360 mm
300 mm
Pasang M12 Dyna Bolt (untuk lantai/concrete), Baut M12 untuk H-Beam dan S12 Screw w/ Fisher untuk CKD.
Type of Document
112 of 158
II. Pemasangan Grounding Plinth Begitu plinth terpasang, hal pertama yang harus dilakukan yang sangat dibutuhkan adalah pemasangan grounding pada plinth. Untuk site outdoor, gunakan konduit metal berwarna hitam.
Metal Conduit
III. Pemasangan Mechanical Unit. Ada terdapat stud di bagian atas plinth dan ada 4 lubang pada bagian bawah EMHA:
Letakkan mechanical unit pada bagian atas plinth; pastikan ke 4 lubang pada mechanical unit masuk ke 4 stud yang ada pada plinth.
Type of Document
113 of 158
Setelah masuk, tekan secara perlahan mechanical unit kebagian belakang, kemudian kencangkan bautnya.
1. Push Down
2. Shift Back
Pastikan 2 lubang (antara plinth dan mechanical unit) satu sumbu lubang Ulangi prosedur diatas untuk semua mechanical unit Setelah semua mechanical unit terpasang kemudian lepaskan sticker untul lubang masuk kabel.
Type of Document
114 of 158
IV. Pemasangan Mounting Plinth ke Dinding IV.1. Pasang mounting plinth ke plinth dengan baut ke plinth pada bagian bawah IV.2. Pasang baut, jangan dikencangkan dahulu
IV.3. Petunjuk Pemasangan Plinth ke Dinding 1. 2. 3. 4. 5. 6. Buat lubang dengan bor mesin untuk pemasangan baut Pasang baut-baut untuk mounting hardware Pasang mounting plinth dan kencangkan dengan memutar kea rah kanan Pastikan mounting plinth dapat dipasang pada bagian bawah plinth Kencangkan baut-baut ke arah kanan Kencangkan baut pada mounting plinth ke plinth
Type of Document
115 of 158
Type of Document
116 of 158
Catatan: Plinth harus dipasang grounding Grounding modul harus dipasang langsung setelah instalasi 4 baut pengencang module harus dikencangkan dengan kekuatan 5Nm Maximum hanya 2 module per plinth Jika ada pemasangan Flexi Power Module (FPMA), harus dipasang pada plinth yang sama
Type of Document
117 of 158
Kencangkan plat setelah instalasi selesai dengan menggunakan baud dan kencangkan semua baut dengan menggunakan obeng
Type of Document
118 of 158
V. Pemasangan Plinth di Pole Ikuti spesifikasi panjang baut, nomor lubang dan harga torsi tergantung dari ukuran diameter pole.
Type of Document
119 of 158
1. 2. 3. 4. 5. 6. 7.
Pasang mounting ke Pole Kencangkan mounting plinth ke mounting pole pada bagian bawah Kencangkan mounting plinth ke mounting pole pada bagian atas Tekan plinth ke bagian bawah pasang mounting yang lain ke pole ke sisi yang lain Kencangkan mounting plinth ke mounting pole pada bagian bawah Kencangkan mounting plinth ke mounting pole ke bagian atas
Type of Document
120 of 158
Type of Document
121 of 158
Modul harus diinstalasi dengan panel depan menghadap kekiri atau kekanan. Jangan melakukan instalasi dengan arah modul menghadap ke atas atau kebawah dimana hal ini dapat menyebabkan kerusakan pada modul.
Catatan: Plinth harus ground sebelum instalasi modul. Grounding pada Modul harus tersambung segera setelah instalasi. Empat baut untuk pemasangan modul harus dikencangkan hingga 5Nm. Maximum 2 modul dapat diinstal pada satu plinth. Jika Flexi Power Module (FPMA) akan diinstal, maka harus diinstal dengan menggunakan sistem modul pada plinth yang sama. Setelah selesai, Instal fixing plat untuk modul.
Type of Document
122 of 158
1. 2. 3. 4. 5. 6. 7. 8.
Buka cover Kendorkan semua baut Angkat system modul dari kashing Keluarkan Sub Modul dari Pin (Slot) Pasang Slot Konector pada System Modul Periksa kelurusan konector Pasang Sub Modul Pada system Module Kencangkan system Modul dengan menggunkan baut.
Transmission Sub-Module terpasang ke system module menggunkan baut 4 x M5x25 dan dikencangkan dengan 4Nm
Type of Document
123 of 158
VII. Instalasi Masukkan Kabel VII.1. Kabel ties poin, suport kabel dan klem Kabel Gunakan klem kabel untuk suplai power & kabel transmisi. Gunakan kabel ties standar.
Pasang dan rapihkan kabel pada slot yang berada pada sisi samping dan atas dari inti cabinet.
Type of Document
124 of 158
Type of Document
125 of 158
Setiap Module Every module have to connected to the plinth as a central module grounding Use kabel entry for the kabel grounding route (center hole) Make sure plinth connected to main grounding system
VIII. Flexi WCDMA BTS CABLING Modul penghubung pada Flexi WCDMA BTS : System Module
Type of Document
126 of 158
Prosedur instalasi kabel Untuk membuatkan kualitas profesional dan instalasi yang baik harus mengikuti aturan sebagai berikut: 1. Kabel rangkaian Internal RX, lihat paragraph RF Koneksi rangkaian RF 2. Kabel internal antena 3. Kabel antara internal HW 4. Setelah kerja instalasi selesai, pastikan lobang slot terpasang panel penutup.
Type of Document
127 of 158
Potong kabel pembungkus DC agar kabel yang masuk ke terminal terhubung dengan baik.
1. Memasukkan kabel listrik ke kabel entry 2. Lepaskan penutup power connector dari system module 3. Pasang kabel listrik dengan kabel clamp 4. Kendorkan baut di terminal 5. Memasukkan kabel listrik ke terminal pangkat. Biru ke (-) dan hitam ke (+) 6. Perketat sekrup dan pastikan kabel terhubung dengan ketat. 7. Pasang penutup power konector dengan cara menekan dan mendorong. 8. Pasang system module ke dalam cashing 9. Kencangkan semua skrup bagian belakang 10. Pasang tempat masuk kabel ke cashing
Type of Document
128 of 158
Type of Document
129 of 158
1. 2. 3. 4. 5. 6. 7.
Lepaskan stiker pada kasing modul lepaskan penutup slot internal power Pasang kabel power internal ke system modul Pasang kabel power internal ke semua modul Susun kabel power. Pastikan instalasi kabel power rapi Pastikan Kabel Power tersambung dengan benar dan tertutup dengan benar Pasang kabel Power tidak tersambung ke kasing modul
Type of Document
130 of 158
Lepaskan penutup konektor Bersihkan konektor kabel optical: dengan alkohol 99% Penggunaan yang benar tanpa kain/kapas penyeka atau mengelap tanpa kain/kapas Tutup dengan penutup konektor
Penanganan dan arah kabel Optical. Tempatkan pada celah module pada Module RF Batasan yang dapat ditekuk pada kabel optic : 70mm
Type of Document
131 of 158
1. 2. 3. 4. 5.
Lepaskan karet penutup Pasang kabel transmisi pada kabel masuk Tempatkan konektor kabel transmisi Pastikan lubang kabel bersih Pasang konektor kabel transmisi ke lubang transmisi
Lakukan hal yang sama pada kabel transmisi yang lain terpasang dengan bersih VIII.5. Sambungan kabel External Alarm
1. Lepaskan alarm karet penutup 2. Siapkan kabel masuk untuk kabel alarm 3. Pasang kabel alarm ke system module. Pastikan kabel alarm ditutup kembali dengan karet penutup.
Type of Document
132 of 158
Type of Document
133 of 158
VIII.7. RF Jumper Kabel Dua dari jumper RF adalah kabel eksternal, sehingga kabel harus dialurkan melalui sisi kanan dari BTS, radius tekuk dari kabel ini sangatlah pendek sejak diharuskannya penutup samping harus terpasang. Jadi harap berhati hati pada saat melakukan penekukan kabel RF, harus memiliki radius yang kecil tetapi tidak boleh sampai merusakkan kabel. Jarak klem feeder disesuaikan dengan instruksi instalasi dari pabrikan.
Catatan: Angka yang dicantumkan adalah untuk kabel feeder NK, untuk feeder pabrikan lain mungkin memiliki angka yang berbeda. Cek angka yang sesuai dari pihak pabrikan sebelum melakukan instalasi.
Untuk memastikan bahwa jumper RF dipotong dengan panjang yang benar untuk semua sektor, instalasi konektor untuk kabel RF pada Flexi WCDMA BTS harus yang pertama terlebih
dahulu dilakukan.
Type of Document
134 of 158
VIII.8. Kabel Internal Antena 1. Kenali posisi lubang untuk masing-masing sektor. 2. Bendingna kabel jumper disesuaikan pada standard bendingan setiap sektor Rute kabel dipasang dengan hati-hati pada bagian atas unit WAF sesuai dengan lubang yang ditunjuk Stand-Alone Flexi BTS Kabel Routing Principle
Type of Document
135 of 158
Type of Document
136 of 158
Catatan Kabel tambahan harus di arahkan di pinggir kabinet Kabels harus terpasang dan dirapikan dengan kabel ties Beberapa modul tidak membutuhkan grounding Kabels harus diarahkan turun dari connector (diharapkan jika ada air tidak turun ke connector)
Type of Document
137 of 158
Semua kabel eksternal dialurkan melalui sisi kanan dari Unit Mekanikal.
DC Power Cable Transmission & Auxiliary Cable Internal Grounding Cable RF Cable
Front cover has to install together with Side Cover Instalasi. Penutup Samping Penutup Samping (FMHA) mempunyai paket yang berbeda
Type of Document
138 of 158
Buka dan lepaskan mur didalam penutup, gantikan mur dengan mur yang ada pada penutup samping
Type of Document
139 of 158
VIII.9. KABEL Alarm Type DDF alarm connector adalah Krone LSA-PLUS Kabel dari BTS harus tersambung pada bagian samping atas pada modul yang tidak terpasang Kabel dari sensor harus terpasang pada bagian bawah pada modul yang tidak terpasang Grounding module dipakai hanya pada generasi ke2 GSM BTS, pda WDCMA dan generasi ke3 grounding tidak dibutuhkan Gunakan peralatan yang distandarkan pada saat terjadi alarm kabel Seluruh kabel harus terpasang dengan baik
DDF
Alarm Box
FROM SENSORS
Type of Document
140 of 158
Alarm Kabel D37-Open: MMHS,HF 4x5x2x 0.4, Length: Site Specific Alarm Kabel Connections D37 male colour code BLUE blue/blue-white BLUE orange/orangewhite BLUE green/green-white BLUE brown/brownwhite BLUE grey/grey-white ORANGE blue/blue-white ORANGE orange/orangewhite ORANGE green/green-white ORANGE brown/brownwhite ORANGE grey/grey-white GREEN blue / blue-white GREEN orange / orangewhite Pins 1 / 20
EAC Alarm connector 13-24(D37) Pins 1 / 20 EAC Alarm EXT_AL1 2 EXT_AL1 3 EXT_AL1 4 EXT_AL1 5 EXT_AL1 6 EXT_AL1 7 EXT_AL1 8 EXT_AL1 9 EXT_AL2 0 EXT_AL2 1 EXT_AL2 2 EXT_AL2 3 GND Alarm line in comm Ext alarm 13 Alarm Description Mains Failure Rectifier Failure (1 or more) Urgent Alarm (LowBatt2, HighBatt1, HighBatt1 or HighTemp2) Non Urgent Alarm (LowBatt1 or HighTemp1) High Temp2 Fire Alarm Pola rity NC Seve rity Critical
2 / 21
2 / 21
Ext alarm 14
NC
Major
3 / 22
3 / 22
Ext alarm 15
NC
Critical
4 / 23 5 / 24 6 / 25
4 / 23 5 / 24 6 / 25
NC NC NC
7 / 26 8 / 27
7 / 26 8 / 27
9 / 28 10 / 29 11 / 30 12 / 31 19
9 / 28 10 / 29 11 / 30 12 / 31 19
Ext alarm 24
E1 120ohm KABEL TRANSMISI DDF E1 120ohm terpasang padaKrone LSA-PLUS Transmisi utama terpasang pada module pertama yang tidak tersambung pada modul paling atas Transmisi yang dating dari BTS tersambung pada uruktan ke 2 ke modul yang dibawahnya Gunakan peralatan yang dianjurkan selama pemasangan kabel transmisi Seluruh kabel harus terpasang dengan baik
Type of Document
141 of 158
BAB V : Pemasangan Sistem SRAL XD 5.1. Pemasangan Mounting Antena a. Periksa tempat pemasangan braket dan antena di tower b. Periksa ukuran braket berdasarkan besar kaki tower c. Pemasangan Bracket harus sesuai dengan ketinggian yang sudah ditetapkan d. Pastikan ring plat dan ring per, mur dan baut terbuat dari galvanize atau besi putih e. Pemasangan pipa Mounting antena harus terpasang vertical (90O) f. Dari bawah harus sudah dikencangkan
Mounting Antena g. Pemasangan Mounting Bracket mounting harus lengkap, baut, ring per, ring palt, dan mur
Mounting Bracket 5.2 Antena Instalasi note: demi alasan keselamatan, langkah a harus dilakukan di bawah tower a. Rakit antena berdasarkan petunjuk pemasangan yang terdapat di dalam equipment. 1. Perikasa seluruh baut 2. Pemasangan Baut harus kencang 3. Lubang pembuangan air harus berada di bawah antena b. Untuk konfigurasi space diversity perhatikan jarak antara antena main dan diversity.. c. Antena terpasang dengan benar ke mounting antena dan dikencangkan dengan U-bolt ring per dan mur. d. Pastikan stopper terpasang dibawah U-bolt mounting antena e. Pastikan arah azimuth, ketinggian dan polarisasi antena sesuai dengan site survey report dan terpasang pada tower leg yang benar.. f. Fixed strut dan adjustable strut terpasang dengan benar ke leg tower untuk antena 2.4 and 3.0. (lihat gambar 2.4)
Type of Document
142 of 158
Antenna setting for pointing and antenna supporting to fixed the antenna
Antena Strut and adjustable g. Adjustable strut terpasang dengan benar ke leg tower untuk antena 1.2 dan 1.8 m.
Adjustable strut h. Periksa alignment strut sesuai dengan instruksi instalasi dari vendor antena.. i. Jika antena yang terpasang menggunakan dua feed horn (horizontal dan vertical), pasang termination load pada feed horn yang tidak terpakai.. 5.3 Instalasi ODU a. Instalasi ODU dibagi menjadi dua yaitu 1. Instalasi ODU tanpa menggunakan Frame 2. Instalasi ODU dengan menggunakan Frame b. ODU harus digrounding ke busbar paling bawah (Busbar yang terdekat dengan tray vertikal) 5.3.1 Instalasi ODU tanpa menggunakan frame Untuk instalasi ODU tanpa menggunakan frame sama artinya dengan ODU terinstal langsung ke antena, dan umumnya konfigurasi yang digunakan adalah 1+0. a. ODU harus ditempelkan dengan benar ke antena sesuai dengan polarisasi yang diinginkan
Fig.5.5 ODU 1+0 Placement b. Semua clamp pengunci ODU harus terkait dengan benar ke antena c. Pastikan antara ODU dan antena tidak ada celah yang memungkinkan air dapat masuk.
Type of Document
143 of 158
5.3.2
Instalasi ODU dengan menggunakan frame sama artinya dengan ODU terinstal terpisah dengan antena, dan umumnya konfigurasi yang digunakan adalah 1+1 dan 2+0. Untuk frame yang digunakan ada dua macam yaitu: 1. Menggunakan integrated ODU frame 2. Menggunakan separated ODU frame 5.4. Instalasi ODU dengan menggunkan integrated frame ODU a. Pasang Integrated frame ODU ke antena dengan benar dan dibaut dengan kencang sesuai dengan polarisasi yang diinginkan
b. c. d. e.
ODU 1+1 Integrated frame Placement Pastikan tidak ada celah antara antena dengan integrated frame ODU yang memungkinkan air dapat masuk Pasang ODU main di sisi bagian atas Integrated frame ODU dan ODU standby sisi dibagian bawah Integrated frame ODU Semua clamp pengunci ODU harus terkait dengan benar ke integrated frame ODU Pastikan tidak ada celah antara integrated frame ODU dengan ODU yang memungkinkan air dapat masuk
5.5. Instalasi ODU dengan menggunakan separated frame ODU a. Install separated frame ODU under the antena b. Make sure it installed to the boom tightly and so did stopper frame.
Frame ODU harus terpasang dengan kuat ke boom MW atau kaki tower
Type of Document
144 of 158
c. Pasang flexible wave guide dari antena ke separated Frame ODU dengan benar sesuai dengan polarisasi yang diinginkan
Gunakan baut yang benar jika hendak memasang flexible wave guide ke frame ODU
Flexible correct screws d. Pastikan antara antena, flexible wave guide dan frame ODU tidak ada celah yang memungkinkan air dapat masuk
Type of Document
145 of 158
Flexible Waveguide Instalasi e. Pasang ODU main di sisi bagian bawah separated frame ODU dan ODU standby di sisi bagian atas separated frame ODU f. Semua clamp pengunci ODU harus terkait dengan benar ke separated frame ODU
ODU 1+1 Separated frame Placement 5.6. Pemasangan kabel koaxial a. Untuk pemasangan konektor coaxial harus mengikuti petunjuk / manual instalasi b. Konektor indoor harus terhubung ke IDU dengan benar, dikondom dan di hot gun
Connector Indoor c. Konektor outdoor harus terhubung ke ODU dengan benar, dirubber dan diberi vinyl 3 lapis dan di beri kabel ties warna hitam
Type of Document
146 of 158
Connector Outdoor d. Instalasi kabel coaxial didalam shelter harus diikat dengan rapi menggunakan kabel ties dan diberi spare didalam ETSI rack.
Coaxial Kabel spare e. Instalasi kabel coaxial outdoor pada horizontal dan vertical tray harus diberi kabel ties dengan rapi dan harus terpasang masing-masing di tiap section tray f. Penarikan kabel coaxial harus satu demi satu dan hindari benturan dengan benda lain g. Kabel coaxial harus terpasang dengan baik pada tray outdoor maupun indoor dan tidak boleh melintir h. Untuk lekukan kabel coaxial minimum harus sesuai dengan spesifikasi kabel coaxial itu sendiri i. Untuk site indoor, pastikan kabel coax yang masuk melalui FEP (Feeder Entry Point) sudah diberi sealant dan kabel coax sudah di-driploop seperti gambar berikut:
Type of Document
147 of 158
Coaxial Sealant
Kabel coax, harus diberi sealant dari luar maupun dari dalam.
Coaxial Drip loop 5.7. Instalasi Grounding Kit a. Grounding kit dipasang di dua tempat dan terkoneksi dengan kencang ke busbar. b. Grounding kit pertama dipasang dan terkoneksi ke busbar FEP bagian luar
Type of Document
148 of 158
c. Grounding kit kedua dipasang dan terkoneksi ke busbar sebelum belokan tray horizontal
Grounding Kit Instalasi 5.8. Instalasi Rack ETSI Berikut adalah langkah-langkah untuk instalasi ETSI Rack: a. Untuk pemasangan baru tentukan posisi ETSI rack didalam shelter sesuai as plan b. Posisikan agar ETSI rack pada posisi datar, gunakan spirit level
Rack harus rata berdasarkan alat pengukur. c. ETSI rack harus disekrup kelantai dengan kencang menggunakan baut ulir dan fisher
Fix ETSI rack to the floor tightly by using screw bolt and fisher
Rack terpasang ke lantai d. ETSI rack harus digrounding (terhubung dengan grounding bar / busbar dibawah FEP di dalam shelter)
Type of Document
149 of 158
Rack grounding 5.9. Instalasi IDU Untuk instalasi IDU terdapat 3 aktifitas yang harus kita lakukan: 1. Instalasi IDU 2. Instalasi kabel Tributary 3. Instalasi kabel power 5.9.1. Langkah-langkah untuk instalasi IDU: a. Untuk pemasangan baru tempatkan IDU SRAL XD 160cm dari bawah, sedangkan untuk pemasangan berikutnya tempatkan IDU SRAL XD dibawah pemasangan baru dan seterusnya
160 cm
IDU placement
Type of Document
150 of 158
b. Tempatkan IDU SRAL XD menempel ke ETSI rack dan dibaut dengan kencang
IDU fixed to the rack 5.9.2. Instalasi Cabel Tributary Instalasi kabel Tributary tergantung kepada berapa E1 yang akan digunakan disite tersebut. a. Sebelum dihubungkan ke port tributary di IDU pastikan terlabih dahulu semua kabel didalam konektor kabel tributary tersolder dengan rapi dan tidak ada yang short b. Kabel tributary tidak boleh dipasang terlalu tegang, berikan spare wajar dan secukupnya. Spare harus diikat dengan kabel ties, rapi dan jangan mengganggu pemasangan kabel tributary berikutnya.
Tributary kabel c. Pastikan kabel tributary terhubung ke LSA dengan benar dan dimulai dengan TX Tributary dibagian atas (terpisah dengan LSA RX), RX tributary dibawah LSA TX Tributary d. Hubungkan grounding kabel tributary ke body DDF Frame
Type of Document
151 of 158
Kabel tributary grounding 5.9.3. Instalasi kabel Power a. Periksalah koneksi kabel dengan teliti, pastikan kabel power berwarna hitam terkoneksi ke kutup + dan kabel power berwarna biru terkoneksi ke kutup , tidak terbalik dan tidak short.
Vinyl
Kabel Power Instalasi b. Ukur tegangan dengan Voltmeter sebelum dihubungkan dengan IDU SRAL XD dan pastikan tegangan yang masuk ke IDU - 48 20 % Volt. c. Koneksi kabel power ke rectifier harus menggunakan MCB 4 Ampere, terkoneksi dengan benar dan kencang
Type of Document
152 of 158
MCB usage d. Untuk istalasi kabel power disite indoor, kabel power yang melewati kabel tray harus terpisah dan tidak bersilangan dengan kabel Tributary dan diikat dengan kabel ties
Kabel Power and Kabel Tributary separation 5.10. Instalasi Frame DDF a. DDF Frame dipasang di dinding shelter sesuai dengan as plan, pasang semua baut yang dibutuhkan. b. DDF rack harus digrounding dan dihubungkan ke busbar dibawah FEP.
DDF rack grounding c. Pastikan LSA terhubung ke kabel tributary dengan benar.
Type of Document
153 of 158
5.11. Sistem Power a. Panel DCPDB (jika dibutuhkan) harus terpasang ke dinding shelter dengan benar dan datar diukur menggunakan spirit level. b. Kable power DC terpasang dari rectifier ke DCPDB. c. Periksa arus MCB yang akan digunakan sesuai dengan kebutuhan. d. Periksa kapasitas dari rectifier (konsumsi power) dan jika perlu lakukan pengukuran dengan tang ampere. 5.12. Antena Alignment Terlebih dahulu mulai dengan perubahan posisi, mencek status APC di baik stasiun akhir dan station awal dan mode disabled. Cek juga power transmisi berdasarkan power maksimum. Catat nilai seting nominal berdasarkan type ODU dan batasan frekuensi. Lakukan setingan ini di kesua stasiun Gunakan alat keamanan dan safety untuk memanjat tower dekat ODU dan menyambung MultiMeteran di utama ODU di BNC connector. (biasanya ODU bersambungan dengan East Modem Module) Dihaharapkan menggunakan multimeter digital Multimeter harus tersambung pada voltage DC
Mulai dengan melihat antena dan laporan indikasi yang dikeluarkan oleh pembuat antenna. Setelah dicek untuk kedua station serta seluruh Rf saluran, disesuaikan dengan Power Recive dibawah spesifikasi Project. Peringatan Memperbarui dan menyegarkan waktu nilai RSL atas lambatnya Status Bar, Jangan hanya memakai Barang ini untuk penyesuaian antena, tetapi disarankan penggunaan multimeteran di atas port BNC ODU dan merujuk pada nilai Voltase Maksimal menerima dan sesudah membaca nilai RSL. Untuk RSL, mempertimbangkan toleransi karena Power x nilai di sekitar 3 dB.
Type of Document
154 of 158
Langkah posisi dan cara tujuan Antenas bergantung sampai macam sistem dan spesifikasi proyek.
Type of Document
155 of 158
5.13. Lebel Pastikan seluruh lebel terpasang pada tempat yang benar sesuai dengan metode lebel pada hal 48 Lebel kabel Power (far end)
Lebel MCB
Type of Document
156 of 158
b. IDU lebel
IDU Lebel
DDF lebel
Type of Document
157 of 158
Lebel ODU
Type of Document
158 of 158