Anda di halaman 1dari 2

KETERANGAN GAMBAR

PROGRAM STRUDI REKAYASA INFRASTRUKTUR LINGKUNGAN


FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN
UTARA INSTITUT TEKNOLOGI BANDUNG
2018

TUGAS MATA KULIAH


Media Pasir IL-4101
Perencanaan Instalasi
Media Antrasit Pengolahan Air Bersih
Media Penyangga Manhole
Pipa Manifold 20 Inch
Pipa Dari Backwash 12 Inch JUDUL GAMBAR
Pipa Lateral 2 Inch
Detail A Unit Pengolahan
Filtrasi
Muka Air
1m

KETERANGAN
0.2 m 0.3 m

Gutter
Tangga Monyet
3.5 m

0.6 m

Kerikil Pipa
0.58 m

Pipa Penguras Pasir Antrasit

ASISTEN
6.63 m Dhimas Dwinanda
PERENCANA
Anggita Larasati 15714001

DETAIL A UNIT FILTRASI M.Fathur Rofi


Dicky M. Nuryana
Azzahra Safira S
15714004
15714007
15714011
DENAH UNIT FILTRASI Kania Salmaa
Aulia Ulfatunnisa
15714016
15714020
SKALA 1 : 250 Christhoper H 15714027

SKALA 1 : 250
No Gambar No Lembar
A1 3
KETERANGAN GAMBAR

UTARA 1.27 cm

PROGRAM STRUDI REKAYASA INFRASTRUKTUR LINGKUNGAN


FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN
INSTITUT TEKNOLOGI BANDUNG
2018

5.08 cm
TUGAS MATA KULIAH
IL-4101
Perencanaan Instalasi
Pengolahan Air Bersih
Orifice
JUDUL GAMBAR
Orifice DETAIL C SISTEM UNDERDRAIN
DENAH UNIT FILTRASI
SKALA 1 : 250 Detail B & C Unit
Pipa Lateral 2 Inch Pengolahan Filtrasi

KETERANGAN
Pipa Manifold 20 Inch
Kerikil Pipa

Pasir Antrasit

ASISTEN
Detail C
Dhimas Dwinanda
1.4 m
PERENCANA
Anggita Larasati 15714001

DETAIL B SISTEM UNDERDRAIN


M.Fathur Rofi 15714004
Dicky M. Nuryana 15714007
Azzahra Safira S 15714011
Kania Salmaa 15714016
Aulia Ulfatunnisa 15714020

DENAH UNIT FILTRASI Christhoper H 15714027

SKALA 1 : 250
SKALA 1 : 250
No Gambar No Lembar
A1 4

Anda mungkin juga menyukai