Anda di halaman 1dari 59

PROJECT Expansion PE Product W/H JOB NO.

- PAGE 1

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

DAFTAR ISI Hal.

1. Pendahuluan ...........................................................................................................................2
2. Lingkup Pekerjaan ..................................................................................................................2
3. Data Perhitungan Struktur........................................................................................................3
4. Perhitungan Struktur.................................................................................................................3

LAMPIRAN:
A. Data Perhitungan Struktur
B. Perhitungan Struktur

1. PENDAHULUAN

Halaman 1 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 2

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

1.1 Latar Belakang


Sehubungan dengan akan dibangunnya Expansion PE Product W/H maka diperlukan suatu
pengecekan pondasi pada bangunan tersebut berdasarkan rencana struktur atas yang ada dari pihak
owner.
1.2 Pemberi Tugas
Pemberi Tugas pekerjaan pengecekan pondasi Expansion PE Product W/H ini adalah
PT.CHANDRA ASRI PETTROCHEMICAL.
1.3 Tujuan Pekerjaan
Mendesain struktur bawah Expansion PE Product W/H.

2. LINGKUP PEKERJAAN
Lingkup pekerjaan pengecekan struktur ini meliputi :
1. Melakukan Desain Struktur Expansion PE Product W/H.
2. Membuat Laporan Struktur.

3. DATA PERHITUNGAN STRUKTUR

Data – data acuan dalam melakukan perhitungan struktur Expansion PE Product W/H ini ada
pada Lampiran A.

4. PERHITUNGAN STRUKTUR
Perhitungan struktur bangunan ini dapat dilihat pada Lampiran B.

5. HASIL DESAIN DAN GAMBAR DESAIN STRUKTUR

Berdasarkan perhitungan struktur yang dilakukan, maka didapat hasil desain dan gambar desain
struktur sesuai dengan acuan yang ada.

Halaman 2 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 3

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

LAMPIRAN – A

DATA - DATA ACUAN DESAIN

Halaman 3 dari 59

19000 19000
PROJECT Expansion PE Product W/H JOB NO. - PAGE 4

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 4 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 5

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 5 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 6

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 6 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 7

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 7 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 8

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

LAMPIRAN – B

PERHITUNGAN STRUKTUR

Halaman 8 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 9

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

1. PROJECT INFORMATION

1.1. Material Properties


A. Baja
 Mutu Profil ASTM – A36
 Mutu Baja : ST-37 (Fu 370 Mpa)
 Kuat Tarik/Tekan : Fy 240 Mpa
 Berat Jenis : 7850 kg/cm3
 Poison Ratio : 0.30
 Modulus Elastisitas : 210000 Mpa
 Baut : A-325
 Anker : ST-41
 Las : E - 70

1.2. Frame Section


Type Notasi Section / Profil
Balok HC-300 HC 300X100X5.5X8
HC-600 HC 600X200X8X13

Kolom HB-250 HB 250X250X9X14


WF-300 WF 300X150X6.5X9

Bracing 2L 100 2L 100X100X7X10

1.3. Load Combination Beban Ultimate

Halaman 9 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 10

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Struktur, komponen-elemen struktur dan elemen-elemen pondasi harus dirancang


sedemikian hingga kuat rencananya sama atau melebihi pengaruh beban-beban terfaktor
dengan kombinasi-kombinasi sebagai berikut:
1. 1,4D
2. 1,2D + 1,6L + 0,5 (Lr atau R)
3. 1,2D + 1,6 (Lr atau R) + (L atau 0,5 W)
4. 1,2D + 1,0W + L+ 0,5 (Lr atau R)
5. 1,2D + 1,0E + L
6. 0,9D + 1,0W
7. 0,9D + 1,0E
PENGECUALIAN: Faktor beban untuk L pada kombinasi 3, 4, dan 5 boleh diambil
sama dengan 0,5 kecuali untuk ruangan garasi, ruangan pertemuan dan semua ruangan
yang nilai beban hidupnya lebih besar daripada 500 kg/m2.
Bila beban air F bekerja pada struktur, maka keberadaannya harus diperhitungkan
dengan nilai faktor beban yang sama dengan faktor beban untuk beban mati D pada
kombinasi 1 hingga 5 dan 7.
Bila beban tanah H bekerja pada struktur, maka keberadaannya harus diperhitungkan
sebagai berikut:
Bila adanya beban H memperkuat pengaruh variabel beban utama, maka perhitungkan
pengaruh H dengan faktor beban = 1,6.
Bila adanya beban H memberi perlawanan terhadap pengaruh variabel beban utama,
maka perhitungkan pengaruh H dengan faktor beban = 0,9 (jika bebannya bersifat
permanen) atau dengan faktor beban = 0 (untuk kondisi lainnya).
Pengaruh yang paling menentukan dari beban-beban angin dan gempa harus ditinjau,
namun kedua beban tersebut tidak perlu ditinjau secara simultan. Lihat Pasal 7.4 untuk
definisi khusus mengenai pengaruh beban gempa E.

1.4. Pembebanan

Halaman 10 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 11

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

a. Beban Gravitasi

b. Beban Angin

c. Beban Lateral
Beban Gempa ditentukan sesuai dengan yang disyaratkan oleh Tata Cara Perencanaan
Ketahanan Gempa Untuk Bangunan Gedung, SNI 03-1726-2012.

Halaman 11 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 12

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Beban gempa direncanakan berdasarkan SNI 1726-2012; dengan terletak pada Ss


0.942 g ; S1 0.383 g , adapun sesuai faktor peruntukannya
yaitu Gudang, maka termasuk kepada katagori resiko II dan faktor keutamaanya Ie = 1.
Maka didapat koefisien situs Fa = 0.97 dan Fv = 2.47 , dengan koefisien tersebut maka
didapatkan Spektral Respons Percepatan SDS = (2/3)x Fa x ss = 0.609 g; SD1 = (2/3)x
Fv x s1 = 0.63 g.
Dari perhitungan dan fungsi bangunan diatas maka bangunan termasuk kedalam
Katagori Disain Seismik (KDS) “D”.
Bangunan ini akan dianalisa dinamik dengan Modal Statik Ekivalen dengan parameter-
parameter sebagai berikut :
- Wilayah gempa (Banten)
- Koefisien gempa dasar C dihitung dari perioda bangunan hasil output komputer
- Faktor Keutamaan I = 1 (KRB = II)
- Faktor Reduksi Gempa R = 8

Beban horisontal akibat gaya gempa (analisis statik ekivalen 3 dimensi) yang bekerja
pada tiap lantai dihitung berdasarkan langkahlangkah sebagai berikut :
1. Penentuan massa tiap lantai
Massa tiap lantai yang dapat diwakili oleh normal kolom pada masing-masing kolom
dan masing-masing lantai ditentukan dengan menggunakan rumus :

Beban Mati + Beban Hidup


Massa =
Percepatan Gravitasi

Besarnya percepatan gravitasi (g) adalah 9.81 meter/detik2.


2. Analisa respons spektrum dilakukan dengan menggunakan bantuan program komputer
SAP2000. Dari hasil analisa respons spektrum ini diperoleh :
- Waktu getar bangunan (T) untuk masing-masing arah bangunan
3. Dari link http://puskim.pu.go.id/Aplikasi/desain_spektra_indonesia_2011/ didapat
grafik respon spektra untuk wilayah Banten sebagai berikut ini :

Halaman 12 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 13

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

1.5. Analysis Procedure


Analysis base on 3D Finite Element Analisis (SAP2000).

2. STRUKTUR MODELING

Halaman 13 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 14

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Untuk struktur modeling konstruksi Expansion PE Product W/H menggunakan bantuan program SAP2000,
sebagai berikut:

Frame Section Line As 1 & As 27

Frame Section Line As 2 – As 26

Halaman 14 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 15

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

3d Frame Section

3d Extrude

Halaman 15 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 16

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

3. OUTPUT DESIGN
3.1. Ketahanan Struktur (Steel Stress Ratio)

Berdasarkan gambar output desain diatas, struktur kolom tidak ada yang
berwarna merah atau nilai stress steel rasio yang terjadi adalah < 1; maka desain struktur
cukup kuat menahan beban yang terjadi.

Halaman 16 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 17

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

3.2. Perhitungan Tie beam


a. Modeling Tiebeam

TB1 = 250/400 mm

Gambar Modeling Tie Beam


b. Penulangan

Halaman 17 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 18

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

c. Gambar

Halaman 18 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 19

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

3.3. Perhitungan Pedestal


a. Desain Tulangan Pedestal
Untuk Perhitungan Tulangan, Pedestal di diasumsikan sebagai kolom kotak dan di
analisis menggunakan bantuan program etabs. Adapun untuk analisanya sebagai
berikut :
 Jadi untuk Reaksi Pondasi Dalam diambil yang terbesar, Sebagai berikut:

 L=2m
 Pedestal = 450 x 450 mm
11.31
-0.68

2m

Gambar input beban


b. Output

Halaman 19 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 20

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

 Penulangan

Halaman 20 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 21

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

c. Perhitungan Tumpuan (Baseplate dan angkur)

Halaman 21 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 22

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

- Baseplate dan angkur (HB – 250X250X9X14)

Halaman 22 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 23

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 23 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 24

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 24 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 25

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 25 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 26

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 26 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 27

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

d. Perhitungan Tumpuan (Baseplate dan angkur)


- Baseplate dan angkur (HB – 300X150X6.5X9)

Halaman 27 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 28

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 28 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 29

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 29 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 30

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 30 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 31

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 31 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 32

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

3.4. Perhitungan Pondasi Telapak


a. Gambar Rencana

b. Poin Reaksi Pondasi

Halaman 32 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 33

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Gambar Poin Pondasi


Kombinasi untuk pondasi, POND : DL+LL+W+Q
TABLE: Joint Reactions

Halaman 33 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 34

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Joint OutputCase CaseType F1 F2 F3 M1 M2 M3


Text Text Text Tonf Tonf Tonf Tonf-m Tonf-m Tonf-m
3 POND Combination 0 -0.28 0.36 0 0 0
5 POND Combination -0.35 -0.11 0.19 0 0 0
7 POND Combination 0 -0.28 1.6 0 0 0
17 POND Combination 0 -0.02 2.31 0 0 0
19 POND Combination 0 -0.02 1.55 0 0 0
21 POND Combination 0 -0.03 2.21 0 0 0
23 POND Combination 0.01 -0.03 2.48 0 0 0
25 POND Combination 0 -0.02 1.84 0 0 0
27 POND Combination 0 -0.02 1.79 0 0 0
29 POND Combination 0 -0.02 2.24 0 0 0
31 POND Combination 0 -0.02 1.81 0 0 0
33 POND Combination 0.01 -0.03 2.45 0 0 0
35 POND Combination 0 -0.04 1.02 0 0 0
67 POND Combination -0.18 -0.03 2.47 0 0 0
69 POND Combination -0.43 -0.12 9.84 0 0 0
71 POND Combination -0.17 -0.51 2.8 0 0 0
73 POND Combination -0.28 0.1 4.66 0 0 0
75 POND Combination -0.38 -0.14 11.32 0 0 0
77 POND Combination -0.27 -0.68 4.84 0 0 0
79 POND Combination -0.17 0.09 3.53 0 0 0
81 POND Combination -0.39 -0.15 11.17 0 0 0
83 POND Combination -0.16 -0.68 3.75 0 0 0
85 POND Combination -0.25 0.07 4.45 0 0 0
87 POND Combination -0.39 -0.15 10.91 0 0 0
89 POND Combination -0.25 -0.67 4.65 0 0 0
91 POND Combination -0.16 0.07 3.46 0 0 0
93 POND Combination -0.39 -0.15 10.89 0 0 0
95 POND Combination -0.15 -0.67 3.69 0 0 0
97 POND Combination -0.24 0.07 4.42 0 0 0
99 POND Combination -0.39 -0.15 10.91 0 0 0
101 POND Combination -0.24 -0.67 4.63 0 0 0
103 POND Combination -0.15 0.07 3.48 0 0 0
105 POND Combination -0.39 -0.15 10.91 0 0 0
107 POND Combination -0.15 -0.67 3.71 0 0 0
109 POND Combination -0.24 0.07 4.4 0 0 0
111 POND Combination -0.39 -0.15 10.91 0 0 0
113 POND Combination -0.24 -0.67 4.62 0 0 0

Halaman 34 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 35

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

115 POND Combination -0.15 0.07 3.49 0 0 0


117 POND Combination -0.39 -0.15 10.91 0 0 0
119 POND Combination -0.14 -0.67 3.71 0 0 0
121 POND Combination -0.23 0.07 4.39 0 0 0
123 POND Combination -0.39 -0.15 10.91 0 0 0
125 POND Combination -0.23 -0.67 4.61 0 0 0
127 POND Combination -0.14 0.07 3.5 0 0 0
129 POND Combination -0.39 -0.15 10.91 0 0 0
131 POND Combination -0.14 -0.67 3.72 0 0 0
133 POND Combination -0.23 0.07 4.39 0 0 0
135 POND Combination -0.39 -0.15 10.91 0 0 0
137 POND Combination -0.23 -0.67 4.61 0 0 0
Max POND Combination 0.01 0.1 11.32 0 0 0

Jadi untuk Reaksi Pondasi Telapak diambil yang terbesar, Sebagai berikut:
TABLE: Joint Reactions
Joint OutputCase CaseType F1 F2 F3 M1 M2 M3
Text Text Text Tonf Tonf Tonf Tonf-m Tonf-m Tonf-m
Max POND Combination 0.01 0.1 11.32 0 0 0

c. Desain Pondasi Telapak


Pondasi yang akan digunakan adalah pondasi telapak dengan kedalaman – 2 m.
- Soil Test

Halaman 35 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 36

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 36 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 37

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 37 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 38

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 38 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 39

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 39 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 40

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 40 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 41

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 41 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 42

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 42 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 43

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 43 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 44

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 44 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 45

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

3.5. Perhitungan Pondasi Borepile


a. Gambar Rencana

Halaman 45 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 46

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

b. Poin Reaksi Pondasi

Halaman 46 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 47

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Gambar Poin Pondasi


Kombinasi untuk pondasi, POND : DL+LL+W+Q
TABLE: Joint Reactions

Halaman 47 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 48

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Joint OutputCase CaseType F1 F2 F3 M1 M2 M3


Text Text Text Tonf Tonf Tonf Tonf-m Tonf-m Tonf-m
41 POND Combination -0.22 -0.27 0.94 0 0 0
43 POND Combination -0.29 -0.11 2.97 0 0 0
45 POND Combination -0.22 -0.28 2.17 0 0 0
47 POND Combination -0.03 -0.02 1.98 0 0 0
49 POND Combination 0 -0.02 1.63 0 0 0
51 POND Combination 0 -0.03 2.18 0 0 0
53 POND Combination -0.04 -0.03 2 0 0 0
55 POND Combination 0 -0.02 1.75 0 0 0
57 POND Combination 0 -0.02 1.86 0 0 0
59 POND Combination -0.03 -0.02 1.91 0 0 0
61 POND Combination 0 -0.02 1.73 0 0 0
63 POND Combination -0.03 -0.03 2.04 0 0 0
65 POND Combination 0 -0.03 1.02 0 0 0
139 POND Combination -0.14 0.07 3.5 0 0 0
141 POND Combination -0.39 -0.15 10.91 0 0 0
143 POND Combination -0.14 -0.67 3.72 0 0 0
145 POND Combination -0.23 0.07 4.38 0 0 0
147 POND Combination -0.39 -0.15 10.91 0 0 0
149 POND Combination -0.23 -0.67 4.6 0 0 0
151 POND Combination -0.14 0.07 3.5 0 0 0
153 POND Combination -0.39 -0.15 10.91 0 0 0
155 POND Combination -0.14 -0.67 3.72 0 0 0
157 POND Combination -0.23 0.07 4.38 0 0 0
159 POND Combination -0.39 -0.15 10.91 0 0 0
161 POND Combination -0.23 -0.67 4.6 0 0 0
163 POND Combination -0.14 0.07 3.51 0 0 0
165 POND Combination -0.39 -0.15 10.91 0 0 0
167 POND Combination -0.14 -0.67 3.72 0 0 0
169 POND Combination -0.23 0.07 4.38 0 0 0
171 POND Combination -0.39 -0.15 10.91 0 0 0
173 POND Combination -0.23 -0.67 4.6 0 0 0
175 POND Combination -0.14 0.07 3.51 0 0 0
177 POND Combination -0.39 -0.15 10.91 0 0 0
179 POND Combination -0.14 -0.67 3.73 0 0 0
181 POND Combination -0.23 0.07 4.37 0 0 0
183 POND Combination -0.39 -0.15 10.91 0 0 0
185 POND Combination -0.23 -0.67 4.6 0 0 0

Halaman 48 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 49

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

187 POND Combination -0.14 0.07 3.51 0 0 0


189 POND Combination -0.39 -0.15 10.9 0 0 0
191 POND Combination -0.14 -0.67 3.72 0 0 0
193 POND Combination -0.22 0.07 4.37 0 0 0
195 POND Combination -0.39 -0.15 10.9 0 0 0
197 POND Combination -0.23 -0.67 4.59 0 0 0
199 POND Combination -0.13 0.08 3.57 0 0 0
201 POND Combination -0.39 -0.15 11.03 0 0 0
203 POND Combination -0.14 -0.67 3.77 0 0 0
205 POND Combination -0.22 0.09 4.49 0 0 0
207 POND Combination -0.38 -0.14 11.31 0 0 0
209 POND Combination -0.23 -0.68 4.7 0 0 0
211 POND Combination -0.13 0.03 3.16 0 0 0
213 POND Combination -0.4 -0.13 9.59 0 0 0
215 POND Combination -0.14 -0.6 3.41 0 0 0
MAX POND Combination -0.4 -0.68 11.31 0 0 0

Jadi untuk Reaksi Pondasi Dalam diambil yang terbesar, Sebagai berikut:

c. Desain Pondasi Bore pile


Pondasi yang akan digunakan adalah pondasi bore pile dengan kedalaman – 5 m.
- Soil Test

Halaman 49 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 50

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

- Daya Dukung Aksial Pondasi Borepile

Halaman 50 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 51

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

- Daya Dukung Lateral Pondasi Borepile

Halaman 51 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 52

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 52 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 53

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

- Desain Tulangan Borepile


Untuk Perhitungan Tulangan, Borepile di diasumsikan sebagai kolom bulat dan di
analisis menggunakan bantuan program etabs. Adapun untuk analisanya sebagai
berikut :
 Input beban, didapat sebesar :
P lateral = -0.68 Ton
P Vertikal = 11.31 ton
 L=5m
 Borepile D400 mm
11.31

Halaman 53 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 54

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

-0.68

5m

Gambar input beban

 Output

Halaman 54 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 55

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

 Penulangan

Halaman 55 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 56

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

- Desain Pilecap

Halaman 56 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 57

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 57 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 58

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 58 dari 59
PROJECT Expansion PE Product W/H JOB NO. - PAGE 59

SUBJECT Calculation Report DATE 4/26/2018


DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Gambar Detail Pondasi dan Pilecap Borepile

Halaman 59 dari 59