Anda di halaman 1dari 61

PROJECT Sapa Cafe JOB NO.

- PAGE 1
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -

DAFTAR ISI Hal.


1. PENDAHULUAN ........................................................................................................................2
2. LINGKUP PEKERJAAN...............................................................................................................2
3. DATA PERHITUNGAN STRUKTUR..........................................................................................2
4. REFERENSI ................................................................................................................................2
5. PERHITUNGAN STRUKTUR......................................................................................................3
6. HASIL DESAIN DAN GAMBAR DESAIN STRUKTUR................................................................3

LAMPIRAN:
A. Data Perhitungan Struktur
B. Perhitungan Struktur

Halaman 1 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 2
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -

1. PENDAHULUAN

1.1 Latar Belakang


Sehubungan dengan akan dibangunnya Sapa Cafe Warehouse maka diperlukan suatu
pengecekan beban lighting pada bangunan tersebut berdasarkan rencana struktur atas yang
ada dari pihak owner.
1.2 Pemberi Tugas
Pemberi Tugas pekerjaan pengecekan struktur atas dan pondasi Sapa Cafe
1.3 Tujuan Pekerjaan
Mendesain struktur atas dan bawah Gable Sapa Café

2. LINGKUP PEKERJAAN
Lingkup pekerjaan pengecekan struktur ini meliputi :
1. Melakukan Desain Struktur Gable Sapa Café
2. Membuat Laporan Struktur.

3. DATA PERHITUNGAN STRUKTUR

Data – data acuan dalam melakukan perhitungan struktur Gable Sapa Cafe ini ada pada
Lampiran A.

4. REFERENSI

Acuan pada bangunan gedung ditentukan berdasarkan peraturan, standard atau


data sebagai berikut :
- SNI-2847-2019 tentang persyaratan beton struktural untuk bangunan gedung,
- SNI-1726-2019 tentang tata cara perancanaan ketahanan gempa untuk gedung dan
non gedung,
- SNI-1729-2020 spesifikasi untuk bangunan gedung baja struktural,
- SNI-1727-2020 tentang beban minimum untuk perancangan gedung dan struktur
lain,
- SNI-2052-2017 baja tulangan beton.
Halaman 2 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 3
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -

5. PERHITUNGAN STRUKTUR
Perhitungan struktur bangunan ini dapat dilihat pada Lampiran B.

6. HASIL DESAIN DAN GAMBAR DESAIN STRUKTUR

Berdasarkan perhitungan struktur yang dilakukan, maka didapat hasil desain dan gambar
desain struktur sesuai dengan acuan yang ada.

Halaman 2 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 3
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 3
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 3 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 4
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 4
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 4 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 5
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 5
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 5 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 6
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 6
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 6 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 7
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT JOB NO. - PAGE 7
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 7 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 8
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 8
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 8 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 9
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 9
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 8 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 10
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 10
SUBJECT Calculation Report DATE 7/31/2018
1. PROJECT INFORMATION
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

1.1. Material Properties


A. Baja
 Mutu Profil ASTM – A36
 Mutu Baja : ST-37 (Fu 370 Mpa)
 Kuat Tarik/Tekan : Fy 240 Mpa
 Berat Jenis : 7850 kg/cm3
 Poison Ratio : 0.30
 Modulus Elastisitas : 210000 Mpa
 Baut : A-325
 Anker : ST-41
 Las : E - 70

B. Baja Tulangan
 Mutu Baja : BjTP 280 < Ø10 mm
: BjTS 420B > Ø10 mm
 Kuat tarik/tekan : 280 - 420 Mpa
 Berat Jenis : 7833 kg/cm2
 Poisson Ratio : 0,3
 Modulus Elastisitas : 2 x 1010
 Massa per unit volume : 798,1
C. Beton
 Mutu Beton : Fc’ 24,9 Mpa
 Kuat tarik/tekan : 300 kg/cm2
 Berat Jenis : 2400 kg/cm2
 Poisson Ratio : 0,2
 Modulus Elastisitas : 2,1409 x 105
 Massa per unit volume : 224,9

Halaman 10 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 11
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 11
SUBJECT 1.2. FrameReport
Calculation Section DATE 7/31/2018
DESIGN BY Syapril Type
Janizar Notasi CHECKED BY Section
Govinda/ Ragumani
Profil
Beam WF-300 WF 300X150X6X9
Column WF-300 WF-300X150X6X9
Gording CNP-150 CNP-150
Rafter WF-300 WF-300X100X6X9

1.3. Load Combination Beban Ultimate


Struktur, komponen-elemen struktur dan elemen-elemen pondasi harus
dirancang sedemikian hingga kuat rencananya sama atau melebihi pengaruh
beban-beban terfaktor dengan kombinasi-kombinasi sebagai berikut:
1. 1,4D
2. 1,2D + 1,6L + 0,5 (Lr atau R)
3. 1,2D + 1,6 (Lr atau R) + (L atau 0,5 W)
4. 1,2D + 1,0W + L+ 0,5 (Lr atau R)
5. 1,2D + 1,0E + L
6. 0,9D + 1,0W
7. 0,9D + 1,0E
PENGECUALIAN: Faktor beban untuk L pada kombinasi 3, 4, dan 5 boleh diambil
sama dengan 0,5 kecuali untuk ruangan garasi, ruangan pertemuan dan semua
ruangan yang nilai beban hidupnya lebih besar daripada 500 kg/m2.
Bila beban air F bekerja pada struktur, maka keberadaannya harus diperhitungkan
dengan nilai faktor beban yang sama dengan faktor beban untuk beban mati D pada
kombinasi 1 hingga 5 dan 7.
Bila beban tanah H bekerja pada struktur, maka keberadaannya harus
diperhitungkan sebagai berikut:
Bila adanya beban H memperkuat pengaruh variabel beban utama, maka
perhitungkan pengaruh H dengan faktor beban = 1,6.
Bila adanya beban H memberi perlawanan terhadap pengaruh variabel beban
utama, maka perhitungkan pengaruh H dengan faktor beban = 0,9 (jika bebannya
bersifat permanen) atau dengan faktor beban = 0 (untuk kondisi lainnya).
Pengaruh yang paling menentukan dari beban-beban angin dan gempa harus
Halaman 10 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 12
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT ditinjau,
New namun kedua
PE Warehouse beban tersebut
JOBtidak
NO. perlu - ditinjau secara simultan.
PAGE 12 Lihat

SUBJECT Pasal 7.4 untuk


Calculation Report definisi khusus mengenai
DATE pengaruh beban
7/31/2018gempa E.
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 10 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 11
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 11
SUBJECT Calculation Report DATE 7/31/2018
1.4. Pembebanan
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

L=5m L = 20 m L=5m

a. Beban Gravitasi
Berat sendiri atap = 5,00 x 6,00 = 30,00 kg/m
Berat sendiri gording = 96,00 x 0,248 = 23,81 kg/m
( ada 16 buah gording, bentang 6 m)
Beban air hujan = 20,00 x 6,00 = 120,00 kg/m
Berat sendiri Rafter = = 21,30 kg/m
= 195,11 kg/m

q (dalam arah vertikal) = 199,00 kg/m

b. Beban Angin

- Beban Angin Rencana = 30.00 kg/m2


- Kemiringan Atap Gable (tg a) = 30.00 degree
- Koef. Tekan = 0.02
- Koef. Hisap = -0.40
- Beban Angin Tekan (WT) = -7,5 kg/m'
- Beban Angin Tekan (WT) Terpasang = 36 kg/m'
- Beban Angin Hisap (WH) = -15 kg/m'
- Beban Angin Hisap (WH) Terpasang = 72 kg/m'
= 162 kg/m’
= 72 kg/m’

Halaman 11 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 12
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 12
SUBJECT Calculation Report DATE 7/31/2018
c. Beban Lateral
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
Beban Gempa ditentukan sesuai dengan yang disyaratkan oleh Tata Cara
Perencanaan Ketahanan Gempa Untuk Bangunan Gedung, SNI 03-1726-2019.
Beban gempa direncanakan berdasarkan SNI 1726-2019; dengan terletak pada Ss ~
1.2821 g ; S1 ~ 0.5528 g , adapun sesuai faktor peruntukannya yaitu Kafe, maka
termasuk kepada katagori resiko II dan faktor keutamaanya Ie = 1.
Maka didapat koefisien situs Fa = 0.97 dan Fv = 2.47 , dengan koefisien tersebut
maka didapatkan Spektral Respons Percepatan SDS = (2/3)x Fa x ss = 0.609 g; SD1
= (2/3)x Fv x s1 = 0.63 g.
Dari perhitungan dan fungsi bangunan diatas maka bangunan termasuk kedalam
Katagori Disain Seismik (KDS) “D”.
Bangunan ini akan dianalisa dinamik dengan Modal Statik Ekivalen dengan
parameter- parameter sebagai berikut :
- Wilayah gempa (Sukabumi)
- Koefisien gempa dasar C dihitung dari perioda bangunan hasil output komputer
- Faktor Keutamaan I = 1 (KRB = II)
- Faktor Reduksi Gempa R = 8

Beban horisontal akibat gaya gempa (analisis statik ekivalen 3 dimensi) yang
bekerja pada tiap lantai dihitung berdasarkan langkah langkah sebagai berikut :
1. Penentuan massa tiap lantai
Massa tiap lantai yang dapat diwakili oleh normal kolom pada masing-masing
kolom dan masing-masing lantai ditentukan dengan menggunakan rumus :

Beban Mati + Beban Hidup


Massa =
Percepatan Gravitasi

Besarnya percepatan gravitasi (g) adalah 9.81 meter/detik2.


2. Analisa respons spektrum dilakukan dengan menggunakan bantuan program
komputer SAP2000. Dari hasil analisa respons spektrum ini diperoleh :
- Waktu getar bangunan (T) untuk masing-masing arah bangunan

Halaman 12 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 13
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 13
SUBJECT Calculation Report DATE 7/31/2018
3. Dari link https://rsa.ciptakarya.pu.go.id/2021 didapat grafik respon spektra
DESIGN BY
untuk wilayah Sukabumi sebagai berikut ini :
Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 13 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 14
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 14
SUBJECT Calculation Report DATE 7/31/2018
d. Beban Lampu Strobo Crane
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
(P) = 1 Ton
L = 10 m
20
Koefisien Kejut (K)= 1 +
(50+𝐿)
K = 1+(20/(50+10) = 1.333

 Beban P bekerja sepanjang balok dengan Panjang, Li= 6 m


P1 = P + K
P1 = 1+1.333 = 2,333 t

1.5. Analysis Procedure


Analysis base on 3D Finite Element Analisis (SAP 2000).

Halaman 14 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 15
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 15
SUBJECT Calculation Report DATE 7/31/2018
2. STRUKTUR MODELING
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
Untuk struktur modeling konstruksi Gable Sapa Cafe menggunakan bantuan program SAP
2000, sebagai berikut:

Portal AS A

Portal AS 2

Halaman 15 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 16
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 16
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

3d Frame Section

3d Extrude

Halaman 16 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 17
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 17
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Gambar Input AGH

Halaman 17 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 18
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT JOB NO. - PAGE 18
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Gambar input Beban Lampu Strobo = 1 Ton

Gambar input Beban Angin

Halaman 18 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 20
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 20
SUBJECT Calculation Report DATE 7/31/2018
3. OUTPUT DESIGN
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
3.1. Ketahanan Struktur (Steel Stress Ratio)

Berdasarkan gambar output desain diatas, struktur kolom tidak ada yang berwarna
merah atau nilai stress steel rasio yang terjadi adalah < 1; maka desain struktur
cukup kuat menahan beban yang terjadi.

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 22
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 22
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
3.2. Deflection Rafter
- Grafik Momen, Deflection pada Rafter akibat beban lampu Strobo

Deflection pada Rafter = 0,5879 mm


Cek Deflection (∆) :
∆ < L/360
0,5879 < 6000/360
0,5879 < 16.67 mm............. OK

Halaman 22 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 20
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 20

3.3. Calculation Report 7/31/2018


SUBJECT DATE
Perhitungan Sambungan Baja
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
A

B
C D

L=5m L = 20 m L=5m

A. Sambungan Kuda - Kuda ( Detail A )

D19

60

420 150

150
60
10mm
150

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 21
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 21
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Data Perencanaan
Syapril Janizar Sambungan CHECKED BY Govinda Ragumani
Dari hasil perhitungan SAP diperoleh:

Mu = 875,84 kgm = 87584 kgcm


Pu = 304,38 kg

Baut Tanpa Ulir ( Bor ) Diameter f = 19 mm


Tebal Plat = 10 mm

Kontrol Kekuatan Baut


a. Perhitungan Ruv yang Diterima Setiap Baut
Ruv = Pu = 304,38 = 50,73 kg
n 6

b. Perhitungan Kuat Geser Baut


f Rnv = 0,75 0,5 fu Ab n
= 0,75 0,5 4100 2,83385 1
= 4357,044 kg

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 22
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT c. Perhitungan
New Kuat Tumpu Baut
PE Warehouse JOB NO. - PAGE 22
f Rn = 2,4 d tp fu 0,75
SUBJECT Calculation Report
= 2,4 1,9
DATE
1 4100
7/31/2018
0,75
DESIGN BY Syapril Janizar = 14022 kg CHECKED BY Govinda Ragumani

d. Perhitungan Kuat tarik Baut


f Rnt = 0,75 0,75 fu Ab
= 0,75 0,75 4100 2,83385
= 6535,567 kg

e. Rumus Interaksi Geser dan Kuat Tarik Baut

Ruv 2 R
( )  ( ut ) 2  1
Rnv Rnt
50,73 + Rut < 1
4357,044 6535,567

Rut = T = 6459,472 kg

f. Kontrol Momen Sambungan

Letak Garis Netral a:

2T
60

150 2T
d3
150 2T d2
d1
60
a
150

a = ΣT = 6459,472 x 6
fy B 2500 x 15
= 1,033515 cm

d1 = 4,966485 cm
d2 = 19,96648 cm
d3 = 34,96648 cm
Sdi = 59,89945 cm

f Mn = 0,9 fy a2 B + S T di
2
= 0,9 2500 1,068154 15 + 773837,6
2
= 791862,7 kgcm > 87584 kgcm
OK
Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 23
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT B. Sambungan Kuda - Kuda dan Kolom ( Detail BJOB
New PE Warehouse ) NO. - PAGE 23
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
Pu

Mu 70

450 100
180

100
150

Data Perencanaan Sambungan


Dari hasil perhitungan SAP diperoleh:

Mu = 1824,02 kgm = 182402 kgcm


Pu = 1407,03 kg

Baut Tanpa Ulir ( Bor ) Diameter f = 19 mm


Tebal Plat = 10 mm

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 24
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT Kontrol
New Kekuatan Baut
PE Warehouse JOB NO. - PAGE 24
a. Perhitungan Ruv yang Diterima Setiap Baut
SUBJECT Ruv
Calculation =
Report Pu = 1407,03
DATE 234,505 kg
=7/31/2018
n 6
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
b. Perhitungan Kuat Geser Baut
f Rnv = 0,75 0,5 fu Ab n
= 0,75 0,5 4100 2,83385 1
= 4357,044 kg

c. Perhitungan Kuat Tumpu Baut


f Rn = 2,4 d tp fu 0,75
= 2,4 1,9 1 4100 0,75
= 14022 kg

d. Perhitungan Kuat tarik Baut


f Rnt = 0,75 0,75 fu Ab
= 0,75 0,75 4100 2,83385
= 6535,567 kg

e. Rumus Interaksi Geser dan Kuat Tarik Baut

Ruv 2 R
( )  ( ut ) 2  1
Rnv Rnt
234,505 + Rut < 1
4357,044 6535,567

Rut = T = 6183,809 kg

f. Kontrol Momen Sambungan

Letak Garis Netral a:

2T
60

80 2T
d3
180 2T d2
d1
100
a
200

a = ΣT = 6183,809 x 6
fy B 2500 x 20
= 0,742057 cm

d1 = 9,257943 cm
d2 = 27,25794 cm
d3 = 35,25794 cm
Sdi = 71,77383 cm

f Mn = 0,9 fy a2 B + S T di
2
= 0,9 2500 0,550649 20 + 887671,3
2
= 900060,9 kgcm > 182402 kgcm
OK

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 25
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT C. Sambungan Balok dan Kolom ( Detail C )
New PE Warehouse JOB NO. - PAGE 25
SUBJECT Calculation Report DATE 7/31/2018
Pu
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

60
Mu 80

400 120

80

60

100

Data Perencanaan Sambungan


Dari hasil perhitungan SAP diperoleh:

Mu = 4849,66 kgm = 484966 kgcm


Pu = 2670,12 kg

Baut Tanpa Ulir ( Bor ) Diameter f = 19 mm


Tebal Plat = 10 mm

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 26
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Kekuatan
Kontrol Baut
Warehouse JOB NO. - PAGE 26
a. Perhitungan Ruv yang Diterima Setiap Baut
SUBJECT Calculation
Ruv
Report
= Pu =
DATE
2670,12 =
7/31/2018
333,765 kg
DESIGN BY Syapril Janizar n 8
CHECKED BY Govinda Ragumani

b. Perhitungan Kuat Geser Baut


f Rnv = 0,75 0,5 fu Ab n
= 0,75 0,5 4100 2,83385 1
= 4357,044 kg

c. Perhitungan Kuat Tumpu Baut


f Rn = 2,4 d tp fu 0,75
= 2,4 1,9 1 4100 0,75
= 14022 kg

d. Perhitungan Kuat tarik Baut


f Rnt = 0,75 0,75 fu Ab
= 0,75 0,75 4100 2,83385
= 6535,567 kg

e. Rumus Interaksi Geser dan Kuat Tarik Baut

Ruv 2 R
( )  ( ut ) 2  1
Rnv Rnt
333,765 + Rut < 1
4357,044 6535,567

Rut = T = 6034,919 kg

f. Kontrol Momen Sambungan

a = ΣT = 6034,919 x 8
fy B 2500 x 10
= 1,931174 cm

d1 = 4,068826 cm
d2 = 12,06883 cm
d3 = 24,06883 cm
d4 = 32,06883 cm
Sdi = 72,2753

f Mn = 0,9 fy a2 B + S T di
2
= 0,9 2500 3,729433 10 + 872351,2
2
= 914307,3 kgcm > 484966 kgcm
OK
Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 27
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT D Sambungan Balok dan Kolom ( Detail D )
New PE Warehouse JOB NO. - PAGE 27
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
Pu Pu 60

80
Mu Mu 400

120

80
60

100

Data Perencanaan Sambungan


Dari hasil perhitungan SAP diperoleh:

Mu = 3648,9 kgm = 364890 kgcm


Pu = 842,46 kg

Baut Tanpa Ulir ( Bor ) Diameter f = 19 mm


Tebal Plat = 10 mm

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 28
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PEKekuatan
Kontrol Baut
Warehouse JOB NO. - PAGE 28
a. Perhitungan Ruv yang Diterima Setiap Baut
SUBJECT Calculation
Ruv
Report
= Pu =
DATE
842,46 =
7/31/2018
105,3075 kg
DESIGN BY Syapril Janizar n 8
CHECKED BY Govinda Ragumani

b. Perhitungan Kuat Geser Baut


f Rnv = 0,75 0,5 fu Ab n
= 0,75 0,5 4100 2,83385 1
= 4357,044 kg

c. Perhitungan Kuat Tumpu Baut


f Rn = 2,4 d tp fu 0,75
= 2,4 1,9 1 4100 0,75
= 14022 kg

d. Perhitungan Kuat tarik Baut


f Rnt = 0,75 0,75 fu Ab
= 0,75 0,75 4100 2,83385
= 6535,567 kg

e. Rumus Interaksi Geser dan Kuat Tarik Baut

Ruv 2 R
( )  ( ut ) 2  1
Rnv Rnt
105,3075 + Rut < 1
4357,044 6535,567

Rut = T = 6377,605 kg

f. Kontrol Momen Sambungan

a = ΣT = 6377,605 x 8
fy B 2500 x 10
= 2,040834 cm

d1 = 3,959166 cm
d2 = 11,95917 cm
d3 = 23,95917 cm
d4 = 31,95917 cm
Sdi = 71,83667

f Mn = 0,9 fy a2 B + S T di
2
= 0,9 2500 4,165002 10 + 916291,8
2
= 963148,1 kgcm > 364890 kgcm
OK

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 29
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT 3.4. New
Perhitungan Sambungan Baseplate
PE Warehouse JOB NO. - PAGE 29
SUBJECT Calculation Report DATE 7/31/2018
ht
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
h
a 0.95 ht a
Pu
f f
Mu
B I
f f
Vu
L
J

1. DATA TUMPUAN

BEBAN KOLOM DATA BEBAN KOLOM


Gaya aksial akibat beban terfaktor, Pu = 10058,5 N
Momen akibat beban terfaktor, Mu = 137379,5 Nmm
Gaya geser akibat beban terfaktor, Vu = 2155,6 N
PLAT TUMPUAN (BASE PLATE) DATA PLAT TUMPUAN
Tegangan leleh baja, fy = 250 MPa
Tegangan tarik putus plat, f up = 410 MPa
Lebar plat tumpuan, B= 300 mm
Panjang plat tumpuan, L= 300 mm
Tebal plat tumpuan, t= 12 mm
KOLOM PEDESTRAL DATA KOLOM BETON
Kuat tekan beton, f c' = 24,9 MPa
Lebar penampang kolom, I= 300 mm
Panjang penampang kolom, J= 300 mm
DIMENSI KOLOM BAJA DATA KOLOM BAJA
Profil baja : WF 300.150.6,5.9
Tinggi total, ht = 300 mm
Lebar sayap, bf = 150 mm
Tebal badan, tw = 6,5 mm
Tebal sayap, tf = 9 mm

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 30
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PEBAUT
ANGKUR Warehouse JOB NO. DATA ANGKUR
- BAUT PAGE 30
SUBJECT Calculation
Jenis Report
angkur baut, DATE Tipe7/31/2018
: A-325
b
DESIGN BY Tegangan
Syapriltarik putus angkur baut,
Janizar CHECKED BY f u Govinda
= 825 MPa
Ragumani
Tegangan leleh angkur baut, fy = 400 MPa
Diameter angkur baut, d= 24 mm
Jumlah angkur baut pada sisi tarik, nt = 3 bh
Jumlah angkur baut pada sisi tekan, nc = 3 bh
Jarak baut terhadap pusat penampang kolom, f= 100 mm
Panjang angkur baut yang tertanam di beton, La = 500 mm

2. EKSENTRISITAS BEBAN
Eksentrisitas beban,
ht e = Mu / Pu = 13,66 mm
h
L/6= 50,00 mm
Pu
e<L/6
f e
ec h = ht - tf = 291 mm
et = f + h / 2 = 246 mm
ec = f - h / 2 = -45,5 mm
t

Jumlah angkur baut total,


f cu
n = nt + nc = 6 bh

et Y/3
Pu + Pt
Y
Pt
L

3. TAHANAN TUMPU BETON

Gaya tarik pada angkur baut, Pt = Pu * e c / e t = -1864 N


Gaya tekan total pada plat tumpuan, Puc = Pu + Pt = 8194 N
Panjang bidang tegangan tekan beton, Y=3*(L-h)/2= 13,50 mm
Luas plat tumpuan baja, A1 = B * L = 90000 mm2
2
Luas penampang kolom pedestral, A2 = I * J = 90000 mm
Tegangan tumpu nominal, f cn = 0.85 * f c' * √ ( A2 / A1 ) = 21,165 MPa
f cn = 1.70 * f c' = 42,330 MPa

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 31
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE
Tegangan Warehouse
tumpu nominal beton yg digunakan, JOB NO. f cn- = 21,165 MPaPAGE 31
SUBJECT Calculation
Faktor Report tekan beton,
reduksi kekuatan DATE 7/31/2018
= 0,65
DESIGN BY Syapriltumpu
Tegangan Janizarbeton yg diijinkan,  * f cn = 13,757
CHECKED BY Govinda RagumaniMPa

Tegangan tumpu maksimum yang terjadi pada beton,


f cu = 2 * Puc / ( Y * B ) = 4,047 MPa
Syarat yang harus dipenuhi :
f cu ≤  * f cn
4,047 < 13,757  AMAN (OK)

a 0.95 ht a

B I
f f

L
J

4. KONTROL DIMENSI PLAT TUMPUAN

Lebar minimum plat tumpuan yang diperlukan,


Bp min = Puc / ( 0.5 *  * f cn * Y ) = 88 mm
Lebar plat yang digunakan, B= 300 mm
Syarat yang harus dipenuhi :
Bp min  B
88 < 300  AMAN (OK)
Panjang bagian plat tumpuan jepit bebas,
a = ( L - 0.95 * ht ) / 2 = 7,5 mm
f cu1 = ( 1 - a / Y ) * f cu = 1,798 MPa
Modulus penampang plastis plat, Z = 1/4 * B * t2 = 10800 mm
3

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 32
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT Newyang
Momen PE Warehouse JOB NO.
terjadi pada plat akibat beban terfaktor, - PAGE 32
2 2
SUBJECT Mup = 1/2
Calculation * B * f cu1 * a
Report = 27820 Nmm
f cu - f cu1 ) * a 7/31/2018
+ 1/3 * B * (DATE
DESIGN BY Faktor reduksi
Syapril kekuatan lentur,
Janizar CHECKED BY  bGovinda
= 0,90
Ragumani
Tahanan momen nominal plat, Mn = f y * Z = 2700000 Nmm
Tahanan momen plat,  b * Mn = 2430000 Nmm
Syarat yang harus dipenuhi :
Mup   b * Mn
27820 < 2430000  AMAN (OK)

5. GAYA TARIK PADA ANGKUR BAUT

Gaya tarik pada angkur baut, Tu1 = Pt / nt = -621 N


Tegangan tarik putus angkur baut, f ub = 825 MPa
Luas penampang angkur baut, Ab = p / 4 * d2 = 452 mm2
Faktor reduksi kekuatan tarik, t = 0,90
Tahanan tarik nominal angkur baut, Tn = 0.75 * Ab * f ub = 279916 N
Tahanan tarik angkur baut,  t * Tn = 251924 N
Syarat yang harus dipenuhi :
Tu1   t * Tn
-621 < 251924  AMAN (OK)

6. GAYA GESER PADA ANGKUR BAUT

Gaya geser pada angkur baut, Vu1 = Vu / n = 359 N


Tegangan tarik putus baut, f ub = 825 MPa
Jumlah penampang geser, m= 1
Faktor pengaruh ulir pada bidang geser, r1 = 0,4
Luas penampang baut, Ab = p / 4 * d2 = 452 mm2
Faktor reduksi kekuatan geser, f = 0,75
Tahanan geser nominal, Vn = r1 * m * Ab * f ub = 149288 N
Tahanan geser angkur baut,  f * Vn = 111966 N
Syarat yang harus dipenuhi :
Vu1   f * Vn
359 < 111966  AMAN (OK)

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 33
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT 7. GAYA TUMPU PADA ANGKUR
New PE Warehouse JOB BAUT
NO. - PAGE 33
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril
Gaya tumpu Janizar
pada angkur baut, Ru1 =Govinda
CHECKED BY
Vu1 = Ragumani
359 N
Diameter baut, d= 24 mm
Tebal plat tumpu, t= 12 mm
p
Tegangan tarik putus plat, fu = 410 MPa
p
Tahanan tumpu nominal, Rn = 2.4 * d * t * f u = 283392 N
Tahanan tumpu,  f * Rn = 212544 N
Syarat yang harus dipenuhi :
Ru1   f * Rn
359 < 212544  AMAN (OK)

8. KOMBINASI GESER DAN TARIK

Konstanta tegangan untuk baut mutu tinggi, f1 = 807 MPa


f2 = 621 MPa
Faktor pengaruh ulir pada bidang geser, r2 = 1,9
Tegangan geser akibat beban terfaktor, f uv = Vu / ( n * Ab ) = 0,79 MPa
Kuat geser angkur baut,  f * r1 * m * f ub = 247,50 MPa

Syarat yang harus dipenuhi :


f uv = Vu / ( n * Ab )   f * r1 * m * f ub
0,79 < 247,50  AMAN (OK)
Gaya tarik akibat beban terfaktor, Tu1 = -621 N
Tahanan tarik angkur baut,  f * Tn =  f * f 1 * Ab = 273809 N
Syarat yang harus dipenuhi :
Tu1   f * f 1 * Ab
-621 < 273809  AMAN (OK)

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 34
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT KuatNew
tarikPE Warehouse
angkur baut, f t NO.
JOB = 0.75 * f u- b = 618,75 MPa PAGE 34
DATE f - r * f 7/31/2018
Calculation
teganganReport uv =
SUBJECT Batas kombinasi, 805,49 MPa
1 2
DESIGN BY Syapril Janizar CHECKED BY f 2 = 621,00
Govinda Ragumani MPa

Syarat yang harus dipenuhi :


ft  f 1 - r2 * f uv
618,75 < 805,49  AMAN (OK)
Syarat yang harus dipenuhi :
ft  f2
618,75 < 621,00  AMAN (OK)

9. KONTROL PANJANG ANGKUR BAUT

Panjang angkur tanam yang digunakan, La = 500 mm


Kuat tekan beton, f c' = 25
Tegangan leleh baja, fy = 400
Diameter angkur baut, d= 24
Panjang angkur tanam minimum yang diperlukan,
Lmin = f y / ( 4 *  f c' ) * d = 481 mm
Syarat yang harus dipenuhi :
Lmin  La
481 < 500  AMAN (OK)

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 35
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT 3.5. New
Perhitungan Tie beam
PE Warehouse JOB NO. - PAGE 35
SUBJECT a.Calculation
ModelingReport
Tie beam DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Berdasarkan gambar output desain diatas menunjukan luas tulangan yang


diperlukan pada penampang tie beam.

Halaman 20 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 24
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 24
SUBJECT Calculation Report DATE 7/31/2018
Syapril Janizar
Desain Tulangan Lentur Sloof
DESIGN BY CHECKED BY Govinda Ragumani

f'c = 30,0 Mpa


fy = 420 Mpa
fys = 280 Mpa
TABLE: Concrete Design - Beam Summary Data - SNI 2847-2019
As
Ukuran Letak Ø Luas
Nama Daerah Asperlu Asmin n aktual Cek Dipasang
Balok
Tulangan (mm²) (mm²) (mm) (mm²) (mm²)
Atas 56
151 163 16 201,14 2 402 Aman 2 Ø 16
Tump.
bawah 28
51 163 16 201,14 2 402 Aman 2 Ø 16
TB 200 x 300
Atas 14
28 163 16 201,14 2 402 Aman 2 Ø 16
Lap.
bawah 49
28 163 16 201,14 2 402 Aman 2 Ø 16

Desain Tulangan Geser Sloof

TABLE: Concrete Design - Beam Summary Data - SNI 2847-2019


Ukuran Av/SPerlu Ø Luas Sperlu Smax Sterpakai
Nama Daerah Dipasang
Balok mm²/mm mm mm² mm mm mm
Tump. 0,246 8 100,57 408,83 61 61,00 P 8 - 60
TB 200 x 300
Lap. 0,246 8 100,57 408,83 122 122,00 P 8 - 120

Halaman 24 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 25
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT Sapa Cafe JOB NO. - PAGE 25
SUBJECT Calculation Report DATE 7/07/2023
3.6. Perhitungan Pedestal
DESIGN BY Sandy Lesmana CHECKED BY -
a. Desain Tulangan Pedestal
PROJECT New PE Warehouse JOB NO. - PAGE 25
SUBJECT
UntukReport
Calculation Perhitungan Tulangan, Pedestal
DATE
di diasumsikan sebagai kolom kotak dan
7/31/2018
di analisis menggunakan bantuanCHECKED
program SAP Govinda
2000. Adapun untuk analisanya
DESIGN BY Syapril Janizar BY Ragumani
sebagai berikut :
 Jadi untuk Reaksi Pondasi Dalam diambil yang terbesar, Sebagai berikut:
TABLE: Joint Reactions
Joint OutputCase CaseType F1 F2 F3 M1 M2 M3
Text Text Text Tonf Tonf Tonf Tonf-m Tonf-m Tonf-m
1 COMB1 Combination -0,5109 0,0002028 1,559 0,51843 -1,01839 -0,00002254
3 COMB1 Combination -0,6768 -0,0111 3,2424 0,55701 -1,30365 0,0000219
5 COMB1 Combination -0,2874 -0,0002106 3,095 0,00101 -0,48831 6,065E-06
9 COMB1 Combination -0,2846 -8,768E-05 2,6228 0,00053 -0,52162 -3,595E-06
11 COMB1 Combination -0,4281 -0,0007759 3,0064 0,53129 -0,57464 -7,658E-06
13 COMB1 Combination -0,5804 0,0003921 1,6507 0,51786 -0,52292 0,00000823
30 COMB1 Combination -0,3184 -0,0003738 2,1813 0,0011 -0,62213 -0,0000329
31 COMB1 Combination -0,3706 -0,000164 2,1666 0,00049 -0,74313 -0,00002893
32 COMB1 Combination -0,1247 -0,0001338 2,2971 0,0004 -0,23361 -0,00002834
33 COMB1 Combination -0,2317 -0,00095 2,2439 0,00281 -0,45838 -0,00004261
34 COMB1 Combination -0,4852 -0,0007797 1,5742 -0,5167 -0,96784 -0,00003939
35 COMB1 Combination 0,5301 -0,1945 7,3683 -0,21665 -0,21205 0,00006492
36 COMB1 Combination 0,3023 -0,1167 10,1885 0,20173 0,50299 -8,133E-06
37 COMB1 Combination -0,5674 -0,1329 9,0026 0,21789 -0,03539 0,00002966
38 COMB1 Combination 2,0402 -0,1378 11,922 0,22159 1,80968 -0,00004202
39 COMB1 Combination -0,4597 -0,0448 6,0457 0,10308 -0,15509 9,519E-06
40 COMB1 Combination -0,8224 -8,448E-05 2,3084 0,00025 -1,0137 0,00001676
41 COMB1 Combination -0,7181 0,0189 5,9492 -0,00231 -1,81459 -0,00002117
42 COMB1 Combination -3,0274 -0,0737 11,4365 0,11692 -3,65938 0,0000568
43 COMB1 Combination -0,6381 -0,0773 8,9803 0,12619 -1,91551 -0,00005877
44 COMB1 Combination -1,15 -0,0652 9,8102 0,11785 -2,05008 0,00000137
45 COMB1 Combination -1,3359 -0,1655 7,1909 -0,27028 -1,06033 -0,00012
46 COMB1 Combination -0,4533 -0,0009635 1,5913 -0,51616 -0,252 0,00003176
47 COMB1 Combination -0,8652 -0,0009921 2,3533 0,00293 -1,08199 0,00003249
48 COMB1 Combination -0,9954 -4,706E-05 2,4137 0,00014 -1,35897 0,00001587
49 COMB1 Combination -0,8004 -2,452E-05 2,3107 8,005E-05 -0,95444 0,00001546
52 COMB1 Combination 0,1029 -0,0158 6,909 0,02389 -0,29201 9,761E-06
56 COMB1 Combination -0,7041 -0,0107 6,5524 0,01467 -0,91545 0,00002496
213 COMB1 Combination -0,7095 1,0365 2,9274 -1,32301 -1,22471 0,00005003
214 COMB1 Combination -0,1864 1,0578 3,4186 -1,33725 -0,32798 -0,000034
220 COMB1 Combination -0,3381 -0,3029 5,8057 0,41689 -0,51494 0,00002689
222 COMB1 Combination -0,1164 -0,231 5,7903 0,30473 -0,27515 0,00004152
229 COMB1 Combination 1,3404 -0,0013 2,8981 0,00391 1,13031 8,207E-06
231 COMB1 Combination -1,8019 0,000431 2,8002 0,00012 -1,92617 0,00001703
236 COMB1 Combination -0,0974 -0,291 6,9763 0,40564 -0,13122 -0,00002103
238 COMB1 Combination -0,8379 -0,2366 6,3503 0,31924 -1,44006 0,00002486

 L = 0,75 m
 Pedestal = 300 x 300 mm

Halaman 25 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 26
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT Sapa Cafe JOB NO. - PAGE 26
SUBJECT Calculation Report DATE 7/07/2023
11,43 T
DESIGN BY Sandy Lesmana CHECKED BY -
3,65 Tm
PROJECT New PE Warehouse JOB NO. - PAGE 26
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

0,75 m

Gambar input beban

Halaman 25 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 27
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT Sapa Cafe JOB NO. - PAGE 27
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY b. Sandy
Output
Lesmana CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 27
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Halaman 25 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 28
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT NewAnalisis dan Desain Struktur Kolom
PE Warehouse JOB NO. - PAGE 28
SUBJECT Dimensi kolom
Calculation harus disesuaikan dengan tinggi kolom,DATE
Report sehingga memenuhi 7/31/2018
syarat kelangsingan.
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
Diketahui :
Tinggi kolom : 0,75 m
Pnmpng sb.2 : 300 mm
(h) : 0,3 m 0,75 m
Pnmpng sb.3 : 300 mm
(b) : 0,3 m
K : 0,5 (jepit-jepit)
f'c : 30 MPa
fy : 340 MPa
d' : 46 mm
d : 254 mm
Y : 150 mm
Ag : 90000 mm2 300 mm
Asst : 900 mm2 (1%.Ag) (sb.2)
As = As' : 450 mm2 (0,50.Asst)
300 mm
Penampang
Cek Kelangsingan kolom :
Iy (sb.2) = 1/12 . b3 . h
= 0,08 x 0,30 x 0,027
= 0,00 m4
A = b.h
= 0,3 x 0,3
= 0,09 m2
r = Iy
A
= 0,09 m
k.l / r = 4,33
< 22 (Dimensi OK!!)

a. Kondisi beban sentris


Pn = (0,85.fc’.(Ag – Asst) + fy..Asst))
= ( 0,85 x 30 x 89100 ) + ( 340 x 900 )
= 2578,05 kN
Mn = 0 kNm

b. Kondisi Balance
xb = 600 x 254
600 + 340
= 162,1277
ab = 0,85 x 162
= 137,8085
fs' = ( 162,1277 - 46 ) x 600
162,1
= 429,76 MPa
> 340 MPa (dipakai fs'!!)
fs' = 340 MPa

Cc = 0,85 . fc’ . ab . b . 10-3


= 0,85 x 30 x 137,809 x 300 x 0,001
= 1054,235 kN

Cs = As' . (f's - 0,85 . f'c) . 10-3


= 450 x 0,31
= 141,525

Ts = As . fy . 10-3

Halaman 27 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 29
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT =
New PE Warehouse 153 kN JOB NO. - PAGE 29
SUBJECT Pnb' Report =
Calculation Cc + Cs - Ts DATE 7/31/2018
= 1042,76 kN
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
Mnb = Cc . (Y - a/2) + Cs . (Y - d') + Ts . (d - Y)
= 116,1246 kNm

c. Kondisi Patah Desak


x = 170% x 162
= 275,617 mm
ab = 0,85 x 276
= 234,2745 mm
fs' = ( 275,617 - 46 ) x 600
275,6
= 499,86 MPa
> 340 MPa (dipakai fs'!!)
fs' = 340 MPa

fs = ( 254 - 276 ) x 600


275,6
= -47,06 MPa
< 340,00 MPa
fs pakai = -47,06 MPa

Cc = 0,85 . fc’ . ab . b . 10-3


= 0,85 x 30 x 234,274 x 300 x 0,001
= 1792,2 kN

Cs = As' . (f's - 0,85 . f'c) . 10-3


= 450 x 0,31
= 141,525

Ts = As . fs . 10-3
= -21,17647 kN

Pnb' = Cc + Cs - Ts
= 1954,901 kN

Mnb = Cc . (Y - a/2) + Cs . (Y - d') + Ts . (d - Y)


= 71,41289 kNm

d. Kondisi Patah Desak


x = 140% x 162
= 226,9787 mm
ab = 0,85 x 227
= 192,9319 mm
fs' = ( 226,9787 - 46 ) x 600
227
= 478,40 MPa
> 340 MPa (dipakai fs'!!)
fs' = 340 MPa

fs = ( 254 - 227 ) x 600


227
= 71,43 MPa
< 340,00 MPa
fs pakai = 71,43 MPa

Halaman 27 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 30
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 30
Cc = 0,85 . fc’ . ab . b . 10-3
SUBJECT Calculation Report = 0,85 x 30 DATE
x 192,932 x 300 x
7/31/2018 0,001
= 1475,929 kN
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
-3
Cs = As' . (f's - 0,85 . f'c) . 10
= 450 x 0,31
= 141,525

Ts = As . fs . 10-3
= 32,14286 kN

Pnb' = Cc + Cs - Ts
= 1585,311 kN

Mnb = Cc . (Y - a/2) + Cs . (Y - d') + Ts . (d - Y)


= 97,07391 kNm

e. Kondisi Patah Tarik


x = 60% x 162
= 97,2766 mm
ab = 0,85 x 97,3
= 82,68511 mm
fs' = ( 97,2766 - 46 ) x 600
97,28
= 316,27 MPa
> 340 MPa (Dipakai fy!!)
fs' = 316,273 MPa

fs = ( 254 - 97,3 ) x 600


97,28
= 966,67 MPa
< 340,00 MPa
fs pakai = 340,00 MPa

Cc = 0,85 . fc’ . ab . b . 10-3


= 0,85 x 30 x 82,6851 x 300 x 0,001
= 632,5411 kN

Cs = As' . (f's - 0,85 . f'c) . 10-3


= 450 x 0,29
= 130,8478

Ts = As . fs . 10-3
= 153 kN

Pnb' = Cc + Cs - Ts
= 610,3889 kN

Mnb = Cc . (Y - a/2) + Cs . (Y - d') + Ts . (d - Y)


= 98,25047 kNm

f. Kondisi Patah Tarik


x = 30% x 162
= 48,6383 mm
ab = 0,85 x 48,6
= 41,34255 mm
fs' = ( 48,6383 - 46 ) x 600
48,64
= 32,55 MPa
> 340 MPa (Dipakai fy!!)
fs' = 32,54593 MPa

Halaman 27 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 31
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 31
fs = ( 254 - 48,6 DATE ) x 600
SUBJECT Calculation Report 7/31/2018
48,64
DESIGN BY Syapril Janizar= 2533,33 MPa CHECKED BY Govinda Ragumani
< 340,00 MPa
fs pakai = 340,00 MPa

Cc = 0,85 . fc’ . ab . b . 10-3


= 0,85 x 30 x 41,3426 x 300 x 0,001
= 316,2705 kN

Cs = As' . (f's - 0,85 . f'c) . 10-3


= 450 x 0,01
= 3,170669

Ts = As . fs . 10-3
= 153 kN

Pnb' = Cc + Cs - Ts
= 166,4412 kN

Mnb = Cc . (Y - a/2) + Cs . (Y - d') + Ts . (d - Y)


= 57,14461 kNm

g. Kondisi momen murni


a = 450 x 340
0,85 x 30 x 300
= 20,00 mm

Mn = As . fy . (d - a/2) . 10-6
= 37,332 kNm

Pn = 0 kN

Halaman 27 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 32
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 32
SUBJECT Calculation Report Tabel hasil perhitungan
DATEMn dan Pn 7/31/2018
:
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Asst = 1% Ag Asst = 2% Ag Asst = 3% Ag Asst = 4% Ag


Kondisi
Mn (kNm) Pn (kN) Mn (kNm) Pn (kN) Mn (kNm) Pn (kN) Mn (kNm) Pn (kN)
Beban sentris - 2.578,05 - 2.861,10 - 3.144,15 - 3.427,20
Patah Desak 1 71,41 1.954,90 83,93 2.117,60 96,45 2.280,30 108,96 2.443,01
Patah Desak 2 97,07 1.585,31 115,14 1.694,69 133,20 1.804,08 151,26 1.913,46
Balance 116,12 1.042,76 146,76 1.031,29 177,39 1.019,81 208,02 1.008,34
Patah Tarik 1 98,25 610,39 127,77 588,24 157,29 566,08 186,81 543,93
Patah Tarik 2 57,14 166,44 73,39 16,61 89,63 (133,22) 105,87 (283,05)
Momen Murni 37,33 - 71,60 - 102,82 - 130,97 -

Diagram Interaksi Kolom


4.000

3.500

3.000

2.500
Pn (kN)

2.000 1%
2%
1.500 3%
4%
1.000

500

0
0 50 100 150 200 250
-500

Mn (kNm)

Halaman 27 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 33
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT NewPenulangan Kolom Biaxial
PE Warehouse JOB NO. - PAGE 33
SUBJECT Calculation
· Diketahui : Report DATE 7/31/2018
data output SAP2000
DESIGN BY Syapril Janizar
Pu : 97,17 kN CHECKED BY Govinda Ragumani
Mu.x : 32,35 kNm
Mu.y : 32,35 kNm Diagram Interaksi Kolom
4.000
Data Kolom : 3.500
f'c : 30 MPa
fy : 340 MPa 3.000

h : 300 mm 2.500
b : 300 mm 1%

Pn (kN)
Ag : 90000 mm2 2.000 2%
3%
1.500
· Penyelesaian : 4%

Mn.x = 32,35 1.000 Kolom

0,65 500
= 49,77 kNm
0
0 100 200 300
Mn.y = 32,35 -500
0,65
= 49,77 kNm Mn (kNm)

Pn = 97,17
0,65
= 149,49 kNm

Momen uniaksial ekuivalen yang diperlukan berdasarkan momen terhadap sumbu x (Mo.x) karena momen yang
terbesar adalah Mn.x sehingga digunakan Mo.x sehingga digunakan Mo.x untuk perencanaan.

Mo.x = Mn.x + Mn.y (b/h) . ((1-b)/b)


= 76,57 kNm

Data Mo.x dan Pn selanjutnya dimasukkan ke dalam grafik dan diperhatikan posisinya
Karena posisinya dibawah 2%, maka digunakan As total = 2% . Ag

As.tot. = r x Ag
= 1800 mm2

Diameter tul. = 16 mm

Jumlah (n) = 9 bh.

Cek r ada = 1808,64


90000
= 0,02

· Penyelesaian :
xb = 600 x 254
600 + 340
= 162,12766
ab = 0,85 x 162,128
= 137,80851
fs' = ( 162,12766 - 46 ) x 600
162
= 429,76 MPa
> 340 MPa (dipakai fs'!!)
fs' dipakai = 340 MPa

Cc = 0,85 . fc’ . ab . b . 10-3


= 0,85 x 30 x 137,81 x 300 x 0,001
= 1054,2351 kN

Cs = As' . (f's - 0,85 . f'c) . 10-3


= 450 x 0,3145
= 141,525

Ts = As . fy . 10-3
= 153 kN

Halaman 27 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 34
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
Pnb'
PROJECT New= PE Warehouse
Cc + Cs - Ts JOB NO. - PAGE 34
= 1042,7601 kN
SUBJECT Calculation Report DATE 7/31/2018
Mnb
DESIGN BY = Janizar
Syapril Cc . (Y - a/2) + Cs . (Y - d') + Ts . (d - Y) CHECKED BY Govinda Ragumani
= 116,12458 kNm

Cek : Pn < Pnb (Keruntuhan Tarik!!)


149,49 1042,76

· Penulangan Geser · Gambar Penulangan :

Nu = 166,10 kN
Vu = 29,68 kN
Vu / f = 49,47 kN f 10 - 125

Vc = 78,73 kN
1/2 Vc = 39,37 kN
< 49,47 kN (Tul.geser min.!!)

Diamtr.sgkg. = 10 mm 9 D 16

Av = 157 mm2

S1 = 533 mm (dicari yang terkecil.)


S2 = 127 mm

S dipakai = 125 mm

*****

Halaman 27 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 28
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 28

3.7.Calculation Report 7/31/2018


SUBJECT DATE
Perhitungan Pondasi Telapak
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
a. Gambar Rencana

Halaman 28 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 29
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 29
SUBJECT Calculation Report DATE 7/31/2018
b. Poin Reaksi Pondasi
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Gambar Poin Pondasi

Halaman 29 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 30
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT Sapa Cafe JOB NO. - PAGE 30
SUBJECT Calculation Report DATE 7/07/2023
Kombinasi untuk pondasi, POND : DL+LL+W+Q
DESIGN BY Sandy Lesmana CHECKED BY -
TABLE:
PROJECT Joint
NewReactions
PE Warehouse JOB NO. - PAGE 30
Joint OutputCase CaseType F1 F2 F3 M1 M2 M3
SUBJECT Calculation Report DATE 7/31/2018
Text Text Text KN KN KN KN-m KN-m KN-m
DESIGN BY
1 Syapril
COMB1 Janizar
Combination -5,01
CHECKED BY
0,001989 15,288 Govinda Ragumani
5,0841 -9,987 -0,000221
3 COMB1 Combination -6,637 -0,109 31,797 5,4624 -12,7844 0,0002148
5 COMB1 Combination -2,819 -0,002065 30,352 0,0099 -4,7887 5,948E-05
9 COMB1 Combination -2,791 -0,00086 25,721 0,0052 -5,1153 -3,525E-05
11 COMB1 Combination -4,198 -0,007609 29,482 5,2102 -5,6353 -0,0000751
13 COMB1 Combination -5,692 0,003845 16,188 5,0785 -5,1281 8,071E-05
30 COMB1 Combination -3,122 -0,003666 21,391 0,0108 -6,101 -0,0003227
31 COMB1 Combination -3,634 -0,001608 21,247 0,0048 -7,2876 -0,0002837
32 COMB1 Combination -1,223 -0,001312 22,527 0,0039 -2,291 -0,0002779
33 COMB1 Combination -2,272 -0,009316 22,005 0,0275 -4,4952 -0,0004179
34 COMB1 Combination -4,758 -0,007646 15,438 -5,0671 -9,4913 -0,0003863
35 COMB1 Combination 5,199 -1,908 72,258 -2,1246 -2,0795 0,0006367
36 COMB1 Combination 2,965 -1,144 99,915 1,9783 4,9326 -7,976E-05
37 COMB1 Combination -5,564 -1,303 88,285 2,1368 -0,347 0,0002908
38 COMB1 Combination 20,007 -1,351 116,915 2,173 17,7469 -0,000412
39 COMB1 Combination -4,508 -0,439 59,288 1,0109 -1,5209 9,335E-05
40 COMB1 Combination -8,065 -0,000828 22,637 0,0024 -9,941 0,0001644
41 COMB1 Combination -7,042 0,185 58,342 -0,0227 -17,795 -0,0002076
42 COMB1 Combination -29,689 -0,723 112,154 1,1466 -35,8862 0,000557
43 COMB1 Combination -6,258 -0,758 88,066 1,2375 -18,7847 -0,0005764
44 COMB1 Combination -11,278 -0,639 96,205 1,1557 -20,1044 1,343E-05
45 COMB1 Combination -13,1 -1,623 70,519 -2,6505 -10,3983 -0,0012
46 COMB1 Combination -4,446 -0,009449 15,605 -5,0618 -2,4712 0,0003114
47 COMB1 Combination -8,485 -0,009729 23,078 0,0287 -10,6107 0,0003186
48 COMB1 Combination -9,761 -0,000462 23,67 0,0014 -13,3269 0,0001557
49 COMB1 Combination -7,849 -0,000241 22,661 0,00079 -9,3598 0,0001516
52 COMB1 Combination 1,009 -0,155 67,754 0,2343 -2,8636 9,572E-05
56 COMB1 Combination -6,905 -0,104 64,257 0,1439 -8,9775 0,0002448
213 COMB1 Combination -6,958 10,164 28,708 -12,9743 -12,0103 0,0004906
214 COMB1 Combination -1,828 10,374 33,525 -13,114 -3,2164 -0,0003334
220 COMB1 Combination -3,315 -2,97 56,935 4,0883 -5,0498 0,0002637
222 COMB1 Combination -1,142 -2,265 56,784 2,9884 -2,6983 0,0004072
229 COMB1 Combination 13,145 -0,013 28,42 0,0383 11,0846 8,048E-05
231 COMB1 Combination -17,671 0,004226 27,46 0,0012 -18,8893 0,000167
236 COMB1 Combination -0,956 -2,853 68,414 3,978 -1,2868 -0,0002062
238 COMB1 Combination -8,217 -2,32 62,275 3,1306 -14,1222 0,0002438

Halaman 30 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 31
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 31
SUBJECT PERHITUNGAN
Calculation Report FONDASI FOOTPLAT
DATE 7/31/2018
DESIGN BY Syapril Janizar BENTUK EMPAT PERSEGI PANJANG
CHECKED BY Govinda Ragumani
[C]2010 : M. Noer Ilham

A. DATA FONDASI FOOT PLAT

DATA TANAH
Kedalaman fondasi, Df = 1,00 m
Berat volume tanah, g= 17,60 kN/m
3

Sudut gesek dalam, = 34,00 


Kohesi, c= 20,00 kPa
2
Tahanan konus rata-rata (hasil pengujian sondir), qc = 20,00 kg/cm
DIMENSI FONDASI
Lebar fondasi arah x, Bx = 1,50 m
Lebar fondasi arah y, By = 1,50 m
Tebal fondasi, h= 0,25 m
Lebar kolom arah x, bx = 0,30 m
Lebar kolom arah y, by = 0,30 m
Posisi kolom (dalam = 40, tepi = 30, sudut = 20) as = 40
BAHAN KONSTRUKSI
Kuat tekan beton, fc' = 20,7 MPa
Kuat leleh baja tulangan, fy = 420 MPa
gc =
3
Berat beton bertulang, 24 kN/m
BEBAN RENCANA FONDASI
Gaya aksial akibat beban terfaktor, Pu = 116,915 kN
Momen arah x akibat beban terfaktor, Mux = 17,740 kNm
Momen arah y akibat beban terfaktor, Muy = 1,200 kNm

Halaman 52 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 32
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 32
SUBJECT B. Calculation
KAPASITAS DUKUNG TANAH
Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani
1. MENURUT TERZAGHI DAN PECK (1943)

Kapasitas dukung ultimit tanah menurut Terzaghi dan Peck (1943) :


qu = c * Nc * (1 + 0.3 * B / L) + D f * g * Nq + 0.5 * B * Ng * (1 - 0.2 * B / L)

c = kohesi tanah (kN/m2) c= 20,00 


Df = Kedalaman fondasi (m) Df = 1,00 m
g = berat volume tanah (kN/m3) g= 17,60 kN/m3
B = lebar fondasi (m) B = By = 1,50 m
L = panjang fondasi (m) L = By = 1,50 m
Sudut gesek dalam, = 34,00 
 =  / 180 * p = 0,5934119 rad
a = e(3*p / 4 - /2)*tan  = 4,011409
Kpg = 3 * tan [ 45 + 1/2*(  + 33) ] = 72,476306
2

Faktor kapasitas dukung tanah menurut Terzaghi :


Nc = 1/ tan  * [ a2 / (2 * cos 2 (45 + /2) - 1 ] = 52,637
Nq = a2 / [ (2 * cos 2 (45 + /2) ] = Nc * tan  + 1 = 36,504
Ng = 1/2 * tan  * [ Kpg / cos2  - 1 ] = 35,226
Kapasitas dukung ultimit tanah menurut Terzaghi :
qu = c*Nc*(1+0.3*B/L) + D f*g*Nq + 0.5*B*Ng*(1-0.2*B/L) = 2032,19 kN/m2
Kapasitas dukung tanah, qa = qu / 3 = 677,40 kN/m2

2. MENURUT MEYERHOF (1956)

Kapasitas dukung tanah menurut Meyerhof (1956) :


qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd ( dalam kg/cm2)
dengan, Kd = 1 + 0.33 * Df / B harus  1.33

2
qc = tahanan konus rata-rata hasil sondir pada dasar fondasi ( kg/cm )
B = lebar fondasi (m) B = By = 1,50 m
Df = Kedalaman fondasi (m) Df = 1,00 m
Kd = 1 + 0.33 * D f / B = 1,22 < 1.33
 diambil, Kd = 1,22
2
Tahanan konus rata-rata hasil sondir pada dasar fondasi, qc = 20,00 kg/cm
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd = 1,065 kg/cm2
Kapasitas dukung ijin tanah, qa = 106,47 kN/m2

3. KAPASITAS DUKUNG TANAH YANG DIPAKAI

2
Kapasitas dukung tanah menurut Terzaghi dan Peck : qa = 677,40 kN/m
Kapasitas dukung tanah tanah menurut Meyerhof : qa = 106,47 kN/m2
2
Kapasitas dukung tanah yang dipakai : qa = 106,47 kN/m
Halaman 52 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 33
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE Warehouse JOB NO. - PAGE 33
SUBJECT C. KONTROL
Calculation TEGANGAN
Report TANAH DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Luas dasar foot plat, A = Bx * By = 2,2500 m2


Tahanan momen arah x, W x = 1/6 * By * Bx2 = 0,5625 m3
Tahanan momen arah y, W y = 1/6 * Bx * By2 = 0,5625 m3
Tinggi tanah di atas foot plat, z = Df - h = 0,75 m
Tekanan akibat berat foot plat dan tanah, q = h * gc + z * g = 19,200 kN/m2
Eksentrisitas pada fondasi :
ex = Mux / Pu = 0,1517 m < Bx / 6 = 0,2500 m (OK)
ey = Muy / Pu = 0,0103 m < By / 6 = 0,2500 m (OK)
Tegangan tanah maksimum yang terjadi pada dasar fondasi :
qmax = Pu / A + Mux / W x + Muy / W y + q = 104,833 kN/m2
qmax < qa  AMAN (OK)
Tegangan tanah minimum yang terjadi pada dasar fondasi :
2
qmin = Pu / A - Mux / W x - Muy / W y + q = 37,491 kN/m
qmin > 0  tak terjadi teg.tarik (OK)

D. GAYA GESER PADA FOOT PLAT

1. TINJAUAN GESER ARAH X

Halaman 52 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 34
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New
Jarak PE
pusat Warehouse
tulangan terhadap sisi luar beton, JOB NO. d' = 0,075
- m PAGE 34
Tebal efektif foot plat, d = h - d' = 0,175 m
SUBJECT Calculation Report DATE 7/31/2018
Jarak bid. kritis terhadap sisi luar foot plat, ax = ( Bx - bx - d ) / 2 = 0,513 m
DESIGN BY Syapril Janizar
Tegangan tanah pada bidang kritis geser arah x,
CHECKED BY Govinda Ragumani
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 81,825 kN/m2
Gaya geser arah x, Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 56,987 kN
Lebar bidang geser untuk tinjauan arah x, b = By = 1500 mm
Tebal efektif footplat, d= 175 mm
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 1,0000
Kuat geser foot plat arah x, diambil nilai terkecil dari Vc yang diperoleh dari pers.sbb. :
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3 = 597,151 kN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3 = 663,502 kN
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 398,101 kN
Diambil, kuat geser foot plat,  Vc = 398,101 kN
Faktor reduksi kekuatan geser,  = 0,75
Kuat geser foot plat,  * Vc = 298,576 kN
Syarat yang harus dipenuhi,
 * Vc ≥ Vux
298,576 > 56,987  AMAN (OK)

2. TINJAUAN GESER ARAH Y

Jarak pusat tulangan terhadap sisi luar beton, d' = 0,085 m


Tebal efektif foot plat, d = h - d' = 0,165 m
Jarak bid. kritis terhadap sisi luar foot plat, ay = ( By - by - d ) / 2 = 0,518 m
Tegangan tanah pada bidang kritis geser arah y,
qy = qmin + (By - ay) / By * (qmax - qmin) = 81,600 kN/m2
Gaya geser arah y, Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 57,456 kN
Lebar bidang geser untuk tinjauan arah y, b = Bx = 1500 mm
Tebal efektif footplat, d= 165 mm
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 1,0000
Kuat geser foot plat arah y, diambil nilai terkecil dari Vc yang diperoleh dari pers.sbb. :
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3 = 563,029 kN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3 = 600,564 kN
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 375,352 kN
Diambil, kuat geser foot plat,  Vc = 375,352 kN

Halaman 52 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 35
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New kekuatan
Faktor reduksi PE Warehouse
geser, JOB NO.  = - 0,75 PAGE 35
Kuat geser
SUBJECT foot plat,
Calculation Report DATE  * Vc = 7/31/2018
281,514 kN

DESIGNSyarat
BY yang harusJanizar
Syapril dipenuhi, CHECKED BY Govinda Ragumani
 * Vc ≥ Vux
281,514 > 57,456  AMAN (OK)

3. TINJAUAN GESER DUA ARAH (PONS)

Jarak pusat tulangan terhadap sisi luar beton, d' = 0,085 m


Tebal efektif foot plat, d = h - d' = 0,17 m
Lebar bidang geser pons arah x, cx = bx + 2 * d = 0,465 m
Lebar bidang geser pons arah y, cy = by + 2 * d = 0,465 m
Gaya geser pons yang terjadi,
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 105,679 kN
Luas bidang geser pons, Ap = 2 * ( cx + cy ) * d = 0,307 m2
Lebar bidang geser pons, bp = 2 * ( cx + cy ) = 1,860 m
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 1,0000
Tegangan geser pons, diambil nilai terkecil dari fp yang diperoleh dari pers.sbb. :
f p = [ 1 + 2 / bc ] * √ f c ' / 6 = 2,275 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 2,104 MPa
fp = 1 / 3 * √ fc' = 1,517 MPa
Tegangan geser pons yang disyaratkan, fp = 1,517 MPa
Faktor reduksi kekuatan geser pons,  = 0,75
Kuat geser pons,  * Vnp =  * Ap * fp * 103 = 349,08 kN
Syarat :  * Vnp ≥ Vup
349,078 > 105,679  AMAN (OK)
 * Vnp ≥ Pu
349,078 > 116,915  AMAN (OK)

Halaman 52 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 36
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT PEMBESIAN
E. New FOOTPLAT
PE Warehouse JOB NO. - PAGE 36
SUBJECT Calculation Report DATE 7/31/2018
1. TULANGAN LENTUR ARAH X
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Jarak tepi kolom terhadap sisi luar foot plat, ax = ( Bx - bx ) / 2 = 0,600 m


Tegangan tanah pada tepi kolom,
2
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 77,896 kN/m
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 20,697 kNm
Lebar plat fondasi yang ditinjau, b = By = 1500 mm
Tebal plat fondasi, h= 250 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 75 mm
Tebal efektif plat, d = h - d' = 175 mm
Kuat tekan beton, fc' = 21 MPa
Kuat leleh baja tulangan, fy = 420 MPa
Modulus elastis baja, Es = 2,00E+05 MPa
Faktor distribusi teg. beton, b1 = 0,85
rb = b1* 0.85 * f c’/ fy * 600 / ( 600 + f y ) = 0,0209464
Faktor reduksi kekuatan lentur,  = 0,80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * f c’ ) ] = 5,361
Mn = Mux /  = 25,871 kNm
Rn = Mn * 106 / ( b * d2 ) = 0,56317
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * f c’ / fy * [ 1 -  {1 – 2 * Rn / ( 0.85 * f c’ ) } ] = 0,0014
Rasio tulangan minimum, rmin = 0,0025
Rasio tulangan yang digunakan,  r= 0,0025
As = r * b * d =
2
Luas tulangan yang diperlukan, 656,25 mm
Diameter tulangan yang digunakan, D 16 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 460 mm
Jarak tulangan maksimum, smax = 200 mm
Jarak tulangan yang digunakan,  s= 200 mm
Digunakan tulangan, D 16 - 200
As = p / 4 * D2 * b / s = 1507,96
2
Luas tulangan terpakai, mm

Halaman 52 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 37
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
PROJECT New PE
2. TULANGAN Warehouse
LENTUR ARAH Y JOB NO. - PAGE 37
SUBJECT Calculation Report DATE 7/31/2018
DESIGN BY Syapril Janizar CHECKED BY Govinda Ragumani

Jarak tepi kolom terhadap sisi luar foot plat, ay = ( By - by ) / 2 = 0,600 m


Tegangan tanah pada tepi kolom,
2
qy = qmin + (By - ay) / By * (qmax - qmin) = 77,896 kN/m
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 20,697 kNm
Lebar plat fondasi yang ditinjau, b = Bx = 1500 mm
Tebal plat fondasi, h= 250 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 85 mm
Tebal efektif plat, d = h - d' = 165 mm
Kuat tekan beton, fc' = 21 MPa
Kuat leleh baja tulangan, fy = 420 MPa
Modulus elastis baja, Es = 2,00E+05 MPa
Faktor distribusi teg. beton, b1 = 0,85
rb = b1* 0.85 * f c’/ fy * 600 / ( 600 + f y ) = 0,0209464
Faktor reduksi kekuatan lentur,  = 0,80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * f c’ ) ] = 5,361
Mn = Muy /  = 25,871 kNm
Rn = Mn * 106 / ( b * d2 ) = 0,63351
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * f c’ / fy * [ 1 -  {1 – 2 * Rn / ( 0.85 * f c’ ) } ] = 0,0015
Rasio tulangan minimum, rmin = 0,0025
Rasio tulangan yang digunakan,  r= 0,0025
As = r * b * d =
2
Luas tulangan yang diperlukan, 618,75 mm
Diameter tulangan yang digunakan, D 16 mm

Halaman 52 dari 52
PROJECT Sapa Cafe JOB NO. - PAGE 38
SUBJECT Calculation Report DATE 7/07/2023
DESIGN BY CHECKED BY -
New
Jarak tulangan
PROJECT PEdiperlukan,
yang Warehouse s = p / 4JOB 2
* DNO.
* b / As = - 487 mm PAGE 38
Jarak tulangan
SUBJECT maksimum,
Calculation Report DATE smax = 7/31/2018
200 mm
JarakBYtulangan
DESIGN yang Janizar
Syapril digunakan, CHECKED BY s = Govinda200 Ragumani
mm
Digunakan tulangan, D 16 - 200
As = p / 4 * D * b / s = 1507,96
2 2
Luas tulangan terpakai, mm

3. TULANGAN SUSUT

Rasio tulangan susut minimum, rsmin = 0,0014


Asx = rsmin* d * Bx =
2
Luas tulangan susut arah x, 367,500 mm
Luas tulangan susut arah y, Asy = rsmin* d * By = 346,500 mm2
Diameter tulangan yang digunakan,  12 mm

Jarak tulangan susut arah x, sx = p / 4 * 2 * By / Asx = 462 mm


Jarak tulangan susut maksimum arah x, sx,max = 200 mm
Jarak tulangan susut arah x yang digunakan,  sx = 200 mm
Jarak tulangan susut arah y, sy = p / 4 *  * Bx / Asy =
2
490 mm
Jarak tulangan susut maksimum arah y, sy,max = 200 mm
Jarak tulangan susut arah y yang digunakan,  sy = 200 mm
Digunakan tulangan susut arah x,  12 - 200
Digunakan tulangan susut arah y,  12 - 200