REKAPITULASI BIAYA

RENCANA ANGGARAN BIAYA


PAKET PEKERJAAN ELEKTRONIK
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

NO URAIAN SAT VOLUME JUMLAH TOTAL

A PEKERJAAN TELEPHONE
1 PERALATAN UTAMA LS 1 591,496,600
2 PENGKABELAN LS 1 142,693,730
3 PEKERJAAN INSTALASI TELEPHONE LS 1 247,075,600

SUB TOTAL 981,265,930

B PEKERJAAN DATA / LAN


1 PERALATAN UTAMA LS 1 171,820,900
2 PENGKABELAN LS 1 23,169,780
3 PEKERJAAN INSTALASI DATA / LAN LS 1 93,014,850

SUB TOTAL 288,005,530

B PEKERJAAN CAMERA / CCTV


1 PERALATAN UTAMA LS 1 161,568,300
2 PEKERJAAN INSTALASI CAMERA / CCTV LS 1 247,022,345

SUB TOTAL 408,590,645

C PEKERJAAN FIRE ALARM


1 PERALATAN UTAMA LS 1 135,718,580
2 PENGKABELAN LS 1 11,887,620
3 PEKERJAAN INSTALASI FIRE ALARM LS 1 1,208,496,582

SUB TOTAL 1,356,102,782

D PEKERJAAN SOUND SYSTEM


1 PERALATAN UTAMA LS 1 241,648,524
2 PENGKABELAN LS 1 36,393,840
3 PEKERJAAN INSTALASI SOUND SYSTEM LS 1 131,303,790

SUB TOTAL 409,346,154

E PEKERJAAN M A T V
1 PERALATAN UTAMA LS 1 81,558,720
2 PENGKABELAN LS 1 3,562,110
3 PEKERJAAN INSTALASI M A T V LS 1 286,123,090

SUB TOTAL 371,243,920

JUMLAH PEKERJAAN ELEKTRONIK 3,814,554,961

Rekapitulasi Elektronik - 00
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )

PEKERJAAN TELEPHONE

I PERALATAN UTAMA
- PABX 8 CO . 530 EXT Panasonic Unit 1.00 515,978,600 515,978,600
- MDF 530 pairs Unit 1.00 12,649,500 12,649,500
- Billing system, PC, Printer, Software Unit 1.00 14,355,850 14,355,850
- Arrester Buah 1.00 987,200 987,200
- Grounding BC 16 mm² Unit 1.00 6,532,500 6,532,500
- Nicad bateray c/w charge Unit 1.00 9,784,550 9,784,550
- Penyambungan TELKOM PTT 8.00 875,000 7,000,000
- Pasang & Program Ls 1.00 12,500,000 12,500,000
- Material Bantu Ls 1.00 3,208,400 3,208,400
- Testing Comisioning Ls 1.00 8,500,000 8,500,000

Sub Total 591,496,600

II PENGKABELAN
MDF Telp. Ke :
- TB PABX ITC 5 (100 x 2 x 0,6 mm² )+3(10 x 2 x 0,6 mm² ) Supreme Meter 8.00 884,125 7,073,000
- TB TELKOM. OTC 10 x 2 x 0,6 mm² Supreme Meter 50.00 43,200 2,160,000
- TB. Telp. Lantai Dasar ITC 10 x 2 x 0,6 mm² Supreme Meter 23.00 33,345 766,935
- TB. Telp. Lantai 1, ITC 10 x 2 x 0,6 mm² Supreme Meter 53.00 33,345 1,767,285
- TB. Telp. Lantai 2, ITC 10 x 2 x 0,6 mm² Supreme Meter 58.00 33,345 1,934,010
- TB. Telp. Lantai 3, ITC 40 x 2 x 0,6 mm² Supreme Meter 63.00 87,750 5,528,250
- TB. Telp. Lantai 4, ITC 40 x 2 x 0,6 mm² Supreme Meter 68.00 87,750 5,967,000
- TB. Telp. Lantai 5, ITC 40 x 2 x 0,6 mm² Supreme Meter 73.00 87,750 6,405,750
- TB. Telp. Lantai 6, ITC 40 x 2 x 0,6 mm² Supreme Meter 78.00 87,750 6,844,500
- TB. Telp. Lantai 7, ITC 40 x 2 x 0,6 mm² Supreme Meter 83.00 87,750 7,283,250
- TB. Telp. Lantai 8, ITC 40 x 2 x 0,6 mm² Supreme Meter 88.00 87,750 7,722,000
- TB. Telp. Lantai 9, ITC 40 x 2 x 0,6 mm² Supreme Meter 93.00 87,750 8,160,750
- TB. Telp. Lantai 10, ITC 40 x 2 x 0,6 mm² Supreme Meter 98.00 87,750 8,599,500
- TB. Telp. Lantai 11, ITC 40 x 2 x 0,6 mm² Supreme Meter 103.00 87,750 9,038,250
- TB. Telp. Lantai 12, ITC 40 x 2 x 0,6 mm² Supreme Meter 108.00 87,750 9,477,000
- TB. Telp. Lantai 13, ITC 40 x 2 x 0,6 mm² Supreme Meter 113.00 87,750 9,915,750
- TB. Telp. Lantai 14, ITC 40 x 2 x 0,6 mm² Supreme Meter 118.00 87,750 10,354,500
- TB. Telp. Lantai 15, ITC 40 x 2 x 0,6 mm² Supreme Meter 123.00 87,750 10,793,250
- TB. Telp. Lantai 16, ITC 40 x 2 x 0,6 mm² Supreme Meter 128.00 87,750 11,232,000
- TB. Telp. Lantai 17, ITC 40 x 2 x 0,6 mm² Supreme Meter 133.00 87,750 11,670,750

Sub Total 142,693,730

III PERALATAN INSTALASI TELEPHONE


1 Denah Lantai Dasar
- TB. Telp.10 Pairs Saka, Krone Unit 1.00 324,700 324,700
- Out let telephone Hager, Clipsal Buah 2.00 72,860 145,720
- Inst. Telp. ITC 2 x 2 x 0,6 mm2 + PVC Cond. 20 mm² Supreme+PVC Westpex Titik 2.00 378,540 757,080

2 Denah Lantai 1
- TB. Telp.10 Pairs Saka, Krone Unit 1.00 324,700 324,700
- Out let telephone Hager, Clipsal Buah 3.00 72,860 218,580
- Inst. Telp. ITC 2 x 2 x 0,6 mm2 + PVC Cond. 20 mm² Supreme+PVC Westpex Titik 3.00 378,540 1,135,620

3 Denah Lantai 2
- TB. Telp.10 Pairs Saka, Krone Unit 1.00 324,700 324,700
- Out let telephone Hager, Clipsal Buah 3.00 72,860 218,580
- Inst. Telp. ITC 2 x 2 x 0,6 mm2 + PVC Cond. 20 mm² Supreme+PVC Westpex Titik 3.00 378,540 1,135,620

4 Denah Lantai 3

Telephone - 0 2
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )
- TB. Telp.40 Pairs Saka, Krone Unit 1.00 457,300 457,300
- Out let telephone Hager, Clipsal Buah 32.00 72,860 2,331,520
- Inst. Telp. ITC 2 x 2 x 0,6 mm2 + PVC Cond. 20 mm² Supreme+PVC Westpex Titik 32.00 378,540 12,113,280

Telephone - 0 3
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )
5 Denah Lantai 4 - 17 ( typikal 14 lantai )
- TB. Telp.40 Pairs Saka, Krone Unit 14.00 457,300 6,402,200
- Out let telephone Hager, Clipsal Buah 490.00 72,860 35,701,400
- Inst. Telp. ITC 2 x 2 x 0,6 mm2 + PVC Cond. 20 mm² Supreme+PVC Westpex Titik 490.00 378,540 185,484,600

Sub Total 247,075,600

TOTAL PEKERJAAN TELEPHONE 981,265,930

Telephone - 0 4
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )

PEKERJAAN DATA / LAN

I PERALATAN UTAMA
- Billing / server system, PC, Printer, Software HP, Dell, Epson Unit 1.00 53,422,850 53,422,850
- Router Mikrotik Buah 1.00 17,555,050 17,555,050
- Arrester Buah 1.00 987,200 987,200
- Rack Kabinet (include Core Switch) Fortuna, Cisco Unit 1.00 74,502,400 74,502,400
- Grounding BC 16 mm² Unit 1.00 6,532,500 6,532,500
- UPS 1 KVA Laplace, ICA Unit 1.00 2,362,500 2,362,500
- Pasang & Program Ls 1.00 8,750,000 8,750,000
- Material Bantu Ls 1.00 3,208,400 3,208,400
- Testing Comisioning Ls 1.00 4,500,000 4,500,000

Sub Total 171,820,900

II PENGKABELAN
MDF Telp. Ke :
- Switch hub 8 port Lantai Dasar UTP Cat 5e + kond. 20 mm Belden Meter 23.00 14,445 332,235
- Switch hub 8 port Lantai 1 UTP Cat 5e + kond. 20 mm Belden Meter 53.00 14,445 765,585
- Switch hub 8 port Lantai 2 UTP Cat 5e + kond. 20 mm Belden Meter 58.00 14,445 837,810
- Switch hub 8 port Lantai 3 UTP Cat 5e + kond. 20 mm Belden Meter 63.00 14,445 910,035
- Switch hub 8 port Lantai 4 UTP Cat 5e + kond. 20 mm Belden Meter 68.00 14,445 982,260
- Switch hub 8 port Lantai 5 UTP Cat 5e + kond. 20 mm Belden Meter 73.00 14,445 1,054,485
- Switch hub 8 port Lantai 6 UTP Cat 5e + kond. 20 mm Belden Meter 78.00 14,445 1,126,710
- Switch hub 8 port Lantai 7 UTP Cat 5e + kond. 20 mm Belden Meter 83.00 14,445 1,198,935
- Switch hub 8 port Lantai 8 UTP Cat 5e + kond. 20 mm Belden Meter 88.00 14,445 1,271,160
- Switch hub 8 port Lantai 9 UTP Cat 5e + kond. 20 mm Belden Meter 93.00 14,445 1,343,385
- Switch hub 8 port Lantai 10 UTP Cat 5e + kond. 20 mm Belden Meter 98.00 14,445 1,415,610
- Switch hub 8 port Lantai 11 UTP Cat 5e + kond. 20 mm Belden Meter 103.00 14,445 1,487,835
- Switch hub 8 port Lantai 12 UTP Cat 5e + kond. 20 mm Belden Meter 108.00 14,445 1,560,060
- Switch hub 8 port Lantai 13 UTP Cat 5e + kond. 20 mm Belden Meter 113.00 14,445 1,632,285
- Switch hub 8 port Lantai 14 UTP Cat 5e + kond. 20 mm Belden Meter 118.00 14,445 1,704,510
- Switch hub 8 port Lantai 15 UTP Cat 5e + kond. 20 mm Belden Meter 123.00 14,445 1,776,735
- Switch hub 8 port Lantai 16 UTP Cat 5e + kond. 20 mm Belden Meter 128.00 14,445 1,848,960
- Switch hub 8 port Lantai 17 UTP Cat 5e + kond. 20 mm Belden Meter 133.00 14,445 1,921,185

Sub Total 23,169,780

III PERALATAN INSTALASI DATA / LAN


1 Denah Lantai Dasar
- Switch hub 8 port Cisco Unit 1.00 876,150 876,150
- Out let data Hager, Clipsal Buah 2.00 96,250 192,500
- Perangkat komputer dan monitor HP, Dell Buah 1.00 7,392,500 7,392,500
- Inst. Data UTP Cat 5e + kond. 20 mm Belden + PVC Westpex Titik 2.00 443,340 886,680

2 Denah Lantai 1
- Switch hub 8 port Cisco Unit 1.00 876,150 876,150
- Out let data Hager, Clipsal Buah 3.00 96,250 288,750
- Perangkat komputer dan monitor HP, Dell Buah 1.00 7,392,500 7,392,500
- Inst. Data UTP Cat 5e + kond. 20 mm Belden + PVC Westpex Titik 3.00 443,340 1,330,020
- Wireless acces point ( WAP ) Ubiquity Buah 1.00 2,541,950 2,541,950
- Inst. WAP. UTP Cat 5e + kond. 20 mm Belden + PVC Westpex Titik 1.00 443,340 443,340

3 Denah Lantai 2
- Switch hub 8 port Cisco Unit 1.00 876,150 876,150
- Out let data Hager, Clipsal Buah 3.00 96,250 288,750
- Perangkat komputer dan monitor HP, Dell Buah 1.00 7,392,500 7,392,500
- Inst. Data UTP Cat 5e + kond. 20 mm Belden + PVC Westpex Titik 3.00 443,340 1,330,020
- Wireless acces point ( WAP ) Ubiquity Buah 1.00 2,541,950 2,541,950
- Inst. WAP. UTP Cat 5e + kond. 20 mm Belden + PVC Westpex Titik 1.00 443,340 443,340

4 Denah Lantai 3
- Switch hub 8 port Cisco Unit 1.00 876,150 876,150
- Wireless acces point ( WAP ) Ubiquity Buah 1.00 2,541,950 2,541,950
- Inst. WAP. UTP Cat 5e + kond. 20 mm Belden + PVC Westpex Titik 1.00 443,340 443,340

Data, Lan - 0 5
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )
5 Denah Lantai 4 - 17 ( typikal 14 lantai )
- Switch hub 8 port Cisco Unit 14.00 876,150 12,266,100
- Wireless acces point ( WAP ) Ubiquity Buah 14.00 2,541,950 35,587,300
- Inst. WAP. UTP Cat 5e + kond. 20 mm Belden + PVC Westpex Titik 14.00 443,340 6,206,760

Sub Total 93,014,850

TOTAL PEKERJAAN DATA 288,005,530

Data, Lan - 0 6
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )

PEKERJAAN CAMERA / CCTV

I PERALATAN UTAMA
- Digital Video Recorder ( DVR ) 16 chanel Bosch Unit 4.00 27,222,400 108,889,600
- LCD Monitor 21" Bosch Unit 2.00 2,517,750 5,035,500
- Join - Stick Bosch Unit 1.00 17,362,800 17,362,800
- UPS 2 KVA Laplace, ICA Unit 1.00 5,089,500 5,089,500
- Rack Kabinet Unit 1.00 1,450,000 1,450,000
- Ground BC 16 mm² Unit 1.00 6,532,500 6,532,500
- Pasang + Program Ls 1.00 9,500,000 9,500,000
- Material Bantu Ls 1.00 3,208,400 3,208,400
- Testing Comisioning Ls 1.00 4,500,000 4,500,000

Sub Total 161,568,300

II PERALATAN INSTALASI CAMERA

1 Denah Lantai Dasar


- Dome Camera Colour Fixed Bosch Buah 2.00 2,427,100 4,854,200
- Camera Colour Fixed C/W housing Outdoor Type Bosch Buah 3.00 3,951,600 11,854,800
- Adaptor Buah 5.00 128,400 642,000
- Stop Kontak Uticon Buah 5.00 37,125 185,625
- Inst. CCTV Coaxial Cable RG - 6 + PVC Cond. 20 mm² Belden + PVC Westpex Titik 5.00 998,460 4,992,300
- Inst. Power CCTV NYM 3 x 2,5 mm² + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 5.00 409,370 2,046,850

2 Denah Lantai 1
- Dome Camera Colour Fixed Bosch Buah 2.00 2,427,100 4,854,200
- Camera Colour Fixed C/W housing Outdoor Type Bosch Buah 2.00 3,951,600 7,903,200
- Adaptor Buah 4.00 128,400 513,600
- Stop Kontak Uticon Buah 4.00 43,125 172,500
- Inst. CCTV Coaxial Cable RG - 6 + PVC Cond. 20 mm² Belden + PVC Westpex Titik 4.00 998,460 3,993,840
- Inst. Power CCTV NYM 3 x 2,5 mm² + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 4.00 409,370 1,637,480

3 Denah Lantai 2
- Dome Camera Colour Fixed Bosch Buah 2.00 2,427,100 4,854,200
- Camera Colour Fixed C/W housing Outdoor Type Bosch Buah 2.00 3,951,600 7,903,200
- Adaptor Buah 4.00 128,400 513,600
- Stop Kontak Uticon Buah 4.00 43,125 172,500
- Inst. CCTV Coaxial Cable RG - 6 + PVC Cond. 20 mm² Belden + PVC Westpex Titik 4.00 998,460 3,993,840
- Inst. Power CCTV NYM 3 x 2,5 mm² + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 4.00 409,370 1,637,480

4 Denah Lantai 3
- Dome Camera Colour Fixed Bosch Buah 4.00 2,427,100 9,708,400
- Adaptor Buah 4.00 128,400 513,600
- Stop Kontak Uticon Buah 4.00 43,125 172,500
- Inst. CCTV Coaxial Cable RG - 6 + PVC Cond. 20 mm² Belden + PVC Westpex Titik 4.00 998,460 3,993,840
- Inst. Power CCTV NYM 3 x 2,5 mm² + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 4.00 409,370 1,637,480

5 Denah Lantai 4 - 17 ( typikal 14 lantai )


- Dome Camera Colour Fixed Bosch Buah 42.00 2,427,100 101,938,200
- Adaptor Buah 42.00 128,400 5,392,800
- Stop Kontak Uticon Buah 42.00 43,125 1,811,250
- Inst. CCTV Coaxial Cable RG - 6 + PVC Cond. 20 mm² Belden + PVC Westpex Titik 42.00 998,460 41,935,320
- Inst. Power CCTV NYM 3 x 2,5 mm² + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 42.00 409,370 17,193,540

Sub Total 247,022,345

TOTAL PEKERJAAN CCTV 408,590,645

Camera - 0 7
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )

PEKERJAAN FIRE ALARM


I PERALATAN UTAMA DAN PENGKABELAN
Peralatan utama
- M C P F A 2 Loop 318 address type semi addressable Notifier unit 1.00 82,187,250 82,187,250
- Announciator Notifier unit 1.00 14,594,580 14,594,580
- Rectifier unit 1.00 3,691,400 3,691,400
- Line surge arester unit 1.00 987,200 987,200
- Nicad bateray c/w charge unit 1.00 8,517,250 8,517,250
- Grounding BC 16 mm2 unit 1.00 6,532,500 6,532,500
- Biaya program unit 1.00 7,500,000 7,500,000
- Material bantu ls 1.00 3,208,400 3,208,400
- Test commissioning ls 1.00 8,500,000 8,500,000

Sub Total 135,718,580

II PENGKABELAN
1 Pengkabelan MCP FA ke Anounciator
- Announciator, twisted 1 pair AWG 18 + kond. dia 20 mm Belden + PVC Westpex mtr 12.00 27,270 327,240
- Central sound system, NYY 2 x 1,5 mm² + kond. 20mm² Supreme + PVC Westpex mtr 12.00 19,845 238,140
- Terminal Box FA Bs - Termianl Box 4 menggunakan :
kabel twisted 2 pair AWG 18 + PVC dia 20 mm Belden + PVC Westpex mtr 128.00 35,670 4,565,760
kabel NYY 2 x 1,5 mm² + kond. 20mm² Supreme + PVC Westpex mtr 128.00 19,845 2,540,160
kabel ITC 2x2x0.6 mm² + PVC Conduit 20mm² Supreme + PVC Westpex mtr 128.00 11,745 1,503,360
kabel BC dia 4 mm2+ PVC Conduit 20mm² Supreme + PVC Westpex mtr 128.00 21,195 2,712,960

Sub Total 11,887,620

III PEKERJAAN INSTALASIFIRE ALARM


1 Denah Lantai Dasar
- TB.FA Basement Notifier Unit 1.00 4,951,732 4,951,732
- Smoke Detector c/w alarm response lamp Notifier Unit 3.00 777,600 2,332,800
- ROR Heat detector Notifier Unit 35.00 228,096 7,983,360
- Fixed Heat Temperatur Detector Notifier Unit 4.00 228,096 912,384
- Manual Push Button ( Break glass alarm ) Notifier Unit 2.00 311,040 622,080
- Lampu indikator Notifier Unit 2.00 207,360 414,720
- Alarm Bel Notifier Unit 2.00 414,720 829,440
- Jack Intercom Notifier Unit 2.00 include MPB
- Zone address module Notifier Unit 4.00 933,120 3,732,480
- Individual address module Notifier Unit 4.00 673,920 2,695,680
- Control zone module Notifier Unit 1.00 1,036,800 1,036,800
- Short circuit isolation Notifier Unit 1.00 673,920 673,920
- Signal zone address module Notifier Unit 4.00 673,920 2,695,680
- Inst. Fire alarm Detector FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 42.00 551,880 23,178,960
- Inst. Manual Push Button FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst. Lampu Indikator FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst.Alarm Bel FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst.Jack Intercom ITC 2x2x0,6 mm² + PVC Conduit 20mm² Supreme+PVC Westpex Titik 2.00 514,620 1,029,240
- Inst. Panel kontrol hydrant FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 1.00 716,310 716,310

2 Denah Lantai 1
- TB.FA - 1 Notifier Unit 1.00 4,951,732 4,951,732
- Smoke Detector c/w alarm response lamp Notifier Unit 5.00 777,600 3,888,000
- ROR Heat detector Notifier Unit 31.00 228,096 7,070,976
- Manual Push Button ( Break glass alarm ) Notifier Unit 2.00 311,040 622,080

Fire Alarm - 0 8
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )
- Lampu indikator Notifier Unit 2.00 207,360 414,720
- Alarm Bel Notifier Unit 2.00 414,720 829,440
- Jack Intercom Notifier Unit 2.00 include MPB
- Zone address module Notifier Unit 3.00 933,120 2,799,360
- Individual address module Notifier Unit 4.00 673,920 2,695,680
- Short circuit isolation Notifier Unit 1.00 673,920 673,920
- Signal zone address module Notifier Unit 4.00 673,920 2,695,680
- Inst. Fire alarm Detector FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 36.00 551,880 19,867,680
- Inst. Manual Push Button FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst. Lampu Indikator FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst.Alarm Bel FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst.Jack Intercom ITC 2x2x0,6 mm² + PVC Conduit 20mm² Supreme+PVC Westpex Titik 2.00 514,620 1,029,240

3 Denah Lantai 2
- TB.FA - 1 Notifier Unit 1.00 4,951,732 4,951,732
- Smoke Detector c/w alarm response lamp Notifier Unit 5.00 777,600 3,888,000
- ROR Heat detector Notifier Unit 31.00 228,096 7,070,976
- Manual Push Button ( Break glass alarm ) Notifier Unit 2.00 311,040 622,080
- Lampu indikator Notifier Unit 2.00 207,360 414,720
- Alarm Bel Notifier Unit 2.00 414,720 829,440
- Jack Intercom Notifier Unit 2.00 include MPB
- Zone address module Notifier Unit 3.00 933,120 2,799,360
- Individual address module Notifier Unit 4.00 673,920 2,695,680
- Short circuit isolation Notifier Unit 1.00 673,920 673,920
- Signal zone address module Notifier Unit 4.00 673,920 2,695,680
- Inst. Fire alarm Detector FRC 2x1,5 mm² + PVC Conduit 20mm² Notifier Titik 36.00 551,880 19,867,680
- Inst. Manual Push Button FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst. Lampu Indikator FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst.Alarm Bel FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst.Jack Intercom ITC 2x2x0,6 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 514,620 1,029,240

4 Denah Lantai 3
- TB.FA - 2 Notifier Unit 1.00 4,951,732 4,951,732
- ROR Heat detector Notifier Unit 52.00 228,096 11,860,992
- Manual Push Button ( Break glass alarm ) Notifier Unit 2.00 311,040 622,080
- Lampu indikator Notifier Unit 2.00 207,360 414,720
- Alarm Bel Notifier Unit 2.00 414,720 829,440
- Jack Intercom Notifier Unit 2.00 include MPB
- Zone address module Notifier Unit 4.00 933,120 3,732,480
- Individual address module Notifier Unit 4.00 673,920 2,695,680
- Short circuit isolation Notifier Unit 1.00 673,920 673,920
- Signal zone address module Notifier Unit 4.00 673,920 2,695,680
- Inst. Fire alarm Detector FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 52.00 551,880 28,697,760
- Inst. Manual Push Button FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst. Lampu Indikator FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst.Alarm Bel FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 716,310 1,432,620
- Inst.Jack Intercom ITC 2x2x0,6 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 2.00 514,620 1,029,240

5 Denah Lantai 4 - 17 ( typikal 14 lantai )


- TB.FA - 3 Notifier Unit 14.00 4,951,732 69,324,248
- ROR Heat detector Notifier Unit 868.00 228,096 197,987,328
- Manual Push Button ( Break glass alarm ) Notifier Unit 28.00 311,040 8,709,120
- Lampu indikator Notifier Unit 28.00 207,360 5,806,080
- Alarm Bel Notifier Unit 28.00 414,720 11,612,160
- Jack Intercom Notifier Unit 28.00 include MPB
- Zone address module Notifier Unit 56.00 933,120 52,254,720
- Individual address module Notifier Unit 56.00 673,920 37,739,520
- Short circuit isolation Notifier Unit 14.00 673,920 9,434,880
- Signal zone address module Notifier Unit 56.00 673,920 37,739,520
- Inst. Fire alarm Detector FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 868.00 551,880 479,031,840
- Inst. Manual Push Button FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 28.00 716,310 20,056,680
- Inst. Lampu Indikator FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 28.00 716,310 20,056,680
- Inst.Alarm Bel FRC 2x1,5 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 28.00 716,310 20,056,680
- Inst.Jack Intercom ITC 2x2x0,6 mm² + PVC Conduit 20mm² Yunitomo + PVC Westpex Titik 28.00 514,620 14,409,360

Fire Alarm - 0 9
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )
Sub Total 1,208,496,582

TOTAL PEKERJAAN FIRE ALARM 1,356,102,782

Fire Alarm - 0 10
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )

PEKERJAAN SOUND SYSTEM


I PERALATAN UTAMA
- Mic Emergency TOA unit 1.00 3,770,624 3,770,624
- Paging mic TOA unit 1.00 5,453,184 5,453,184
- Remote Mic C/W key pad TOA unit 1.00 19,616,256 19,616,256
- Mixer PRE - Amp TOA unit 2.00 40,789,760 81,579,520
- DVD / VCD / CD / MP3 Player Radio tunner AM / FM c/w antene TOA unit 1.00 3,850,000 3,850,000
- Equalizer TOA unit 1.00 4,840,000 4,840,000
- Speaker Selektor TOA unit 1.00 3,740,000 3,740,000
- Emergency Power Amp. 120 W TOA unit 1.00 2,624,600 2,624,600
- Power Amp. 120 W TOA unit 1.00 2,624,600 2,624,600
- Power Amp. 240 W TOA unit 6.00 3,726,800 22,360,800
- MDF SS TOA unit 1.00 3,892,600 3,892,600
- Evacuation Sound Repeater TOA unit 1.00 11,308,000 11,308,000
- Mic Car Call TOA unit 1.00 1,345,300 1,345,300
- UPS 3 KVA Laplace, ICA unit 1.00 8,437,500 8,437,500
- Surge Arrester unit 1.00 987,200 987,200
- Rack Kabinet Laplace, ICA unit 1.00 27,241,600 27,241,600
- Inst. Paging Mic Titik 1.00 1,308,960 1,308,960
- Inst. Interconnection Titik 1.00 5,926,880 5,926,880
- Ground BC 16 mm² Unit 1.00 6,532,500 6,532,500
- Material Bantu Ls 1.00 3,208,400 3,208,400
- Biaya program unit 1.00 12,500,000 12,500,000
- Testing + Program Ls 1.00 8,500,000 8,500,000

Sub Total 241,648,524

II PENGKABELAN
Pengkabelan MDF SS ke :
- TB SS Lantai Dasar NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 23.00 31,320 720,360
- TB SS Lantai 1 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 27.00 31,320 845,640
- TB SS Lantai 2 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 32.00 31,320 1,002,240
- TB SS Lantai 3 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 37.00 31,320 1,158,840
- TB SS Lantai 4 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 42.00 31,320 1,315,440
- TB SS Lantai 5 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 47.00 31,320 1,472,040
- TB SS Lantai 6 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 52.00 31,320 1,628,640
- TB SS Lantai 7 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 57.00 31,320 1,785,240
- TB SS Lantai 8 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 62.00 31,320 1,941,840
- TB SS Lantai 9 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 67.00 31,320 2,098,440
- TB SS Lantai 10 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 72.00 31,320 2,255,040
- TB SS Lantai 11 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 77.00 31,320 2,411,640
- TB SS Lantai 12 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 82.00 31,320 2,568,240
- TB SS Lantai 13 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 87.00 31,320 2,724,840
- TB SS Lantai 14 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 92.00 31,320 2,881,440
- TB SS Lantai 15 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 97.00 31,320 3,038,040
- TB SS Lantai 16 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 102.00 31,320 3,194,640
- TB SS Lantai 17 NYMHY 3x2,5 mm² + PVC Conduit 20 mm² Supreme + PVC Westpex m 107.00 31,320 3,351,240

Sub Total 36,393,840

III PERALATAN INSTALASI SOUND SYSTEM


1 Denah Lantai Dasar
- Ceilling speaker 6 Watt TOA Buah 8.00 108,350 866,800
- Wall Speaker 6 Watt TOA Buah 3.00 184,800 554,400
- Horn Speaker 15 Watt TOA Buah 6.00 376,200 2,257,200
- Volume control 30 Watt TOA Buah 5.00 161,040 805,200
- TB Sound System Unit 1.00 317,250 317,250

Sound System - 0 11
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )
- Inst. Ceilling Speaker 6 W, NYMHY 2 x 1,5 mm + PVC Cond. 20 mm² Supreme + PVC Westpex
2
Titik 8.00 279,180 2,233,440
- Inst. Box Speaker 6 W, NYMHY 2 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 3.00 450,630 1,351,890
- Inst. Volume control 30 W, NYMHY 3 x 1,5 mm 2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 5.00 345,330 1,726,650
- Inst.Horn Speaker NYMHY 3 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 6.00 583,160 3,498,960

2 Denah Lantai 1
- Ceilling speaker 6 Watt TOA Buah 6.00 108,350 650,100
- Wall Speaker 6 Watt TOA Buah 2.00 184,800 369,600
- Horn Speaker 15 Watt TOA Buah 3.00 376,200 1,128,600
- Volume control 30 Watt TOA Buah 2.00 161,040 322,080
- TB Sound System Unit 1.00 317,250 317,250
- Inst. Ceilling Speaker 6 W, NYMHY 2 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 6.00 279,180 1,675,080
- Inst. Box Speaker 6 W, NYMHY 2 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 2.00 450,630 901,260
- Inst. Volume control 30 W, NYMHY 3 x 1,5 mm 2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 2.00 345,330 690,660
- Inst.Horn Speaker NYMHY 3 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 3.00 583,160 1,749,480

3 Denah Lantai 2
- Ceilling speaker 6 Watt TOA Buah 6.00 108,350 650,100
- Wall Speaker 6 Watt TOA Buah 2.00 184,800 369,600
- Horn Speaker 15 Watt TOA Buah 3.00 376,200 1,128,600
- Volume control 30 Watt TOA Buah 2.00 161,040 322,080
- TB Sound System Unit 1.00 317,250 317,250
- Inst. Ceilling Speaker 6 W, NYMHY 2 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 6.00 279,180 1,675,080
- Inst. Box Speaker 6 W, NYMHY 2 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 2.00 450,630 901,260
- Inst. Volume control 30 W, NYMHY 3 x 1,5 mm 2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 2.00 345,330 690,660
- Inst.Horn Speaker NYMHY 3 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 3.00 583,160 1,749,480

4 Denah Lantai 3
- Ceilling speaker 6 Watt TOA Buah 15.00 108,350 1,625,250
- Wall Speaker 6 Watt TOA Buah 2.00 184,800 369,600
- Horn Speaker 15 Watt TOA Buah 2.00 376,200 752,400
- TB Sound System Unit 1.00 317,250 317,250
- Inst. Ceilling Speaker 6 W, NYMHY 2 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 15.00 279,180 4,187,700
- Inst. Box Speaker 6 W, NYMHY 2 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 2.00 450,630 901,260
- Inst.Horn Speaker NYMHY 3 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 2.00 583,160 1,166,320

4 Denah Lantai 4 - 17 ( typikal 14 lantai )


- Ceilling speaker 6 Watt TOA Buah 182.00 108,350 19,719,700
- Wall Speaker 6 Watt TOA Buah 28.00 184,800 5,174,400
- TB Sound System Unit 14.00 317,250 4,441,500
- Inst. Ceilling Speaker 6 W, NYMHY 2 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 182.00 279,180 50,810,760
- Inst. Box Speaker 6 W, NYMHY 2 x 1,5 mm2 + PVC Cond. 20 mm² Supreme + PVC Westpex Titik 28.00 450,630 12,617,640

Sub Total 131,303,790

TOTAL PEKERJAAN SOUND SYSTEM 409,346,154

Sound System - 0 12
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )

PEKERJAAN MATV

I PERALATAN UTAMA
- MASIV TYPE C/W Accessories Venus Unit 1.00 6,477,350 6,477,350
- UHF antena Ikusi Unit 1.00 1,582,500 1,582,500
- VHF antena Ikusi Unit 1.00 1,582,500 1,582,500
- Masterhead amplifier Ikusi Unit 1.00 5,467,500 5,467,500
- Combiner Ikusi Unit 1.00 11,333,250 11,333,250
- Active spliter Ikusi Unit 1.00 3,046,900 3,046,900
- Signal Channel amplifier 10 CH Ikusi Unit 1.00 19,747,820 19,747,820
- UPS 3 KVA Laplace, ICA Unit 1.00 8,437,500 8,437,500
- Arrester Unit 1.00 987,200 987,200
- Stop kontak 3 gang Uticon Unit 1.00 155,300 155,300
- Grounding BC 16 mm² Unit 1.00 6,532,500 6,532,500
- Material Bantu Ls 1.00 3,208,400 3,208,400
- Biaya program unit 1.00 8,500,000 8,500,000
- Testing Comisioning Ls 1.00 4,500,000 4,500,000

Sub Total 81,558,720

II PENGKABELAN
Signal Channel amplifier 10 CH ke :
- Masterhead amp. Coaxial Cable RG - 11 + PVC cond. 20 mm² Belden + PVC Westpex Meter 52.00 22,545 1,172,340
- Active spliter ke MASIV TYPE Coaxial Cable RG - 11 + Belden + PVC Westpex Meter 56.00 22,545 1,262,520
PVC cond. 20 mm²

Combiner ke :
- TBTV Basement Coaxial Cable RG - 11 + PVC cond. 20 mm² Belden + PVC Westpex Meter 6.00 22,545 135,270
- TBTV 2nd floor Coaxial Cable RG - 11 + PVC cond. 20 mm² Belden + PVC Westpex Meter 44.00 22,545 991,980

sub total 3,562,110

III PERALATAN INSTALASI MATV

1 Denah Lantai Dasar


- Terminal Box TV Saka Buah 1.00 306,950 306,950
- Booster Ikusi Buah 1.00 3,735,800 3,735,800
- Directional coupler 4 TAP Ikusi Buah 1.00 328,050 328,050
- Outlet TV Hager, Clipsal Buah 2.00 78,350 156,700
- Inst. DC 6 TAP Coaxial Cable RG - 11 + PVC cond. 20 mm² Belden + PVC Westpex Titik 1.00 489,240 489,240
- Inst. Booster Coaxial Cable RG - 11 + PVC cond. 20 mm² Belden + PVC Westpex Titik 1.00 489,240 489,240
- Inst.outlet TV Coaxial Cable RG - 6 + PVC cond. 20 mm² Belden + PVC Westpex Titik 2.00 311,040 622,080

2 Denah Lantai 1
- Directional coupler 4 TAP Panasonik Buah 1.00 328,050 328,050
- Outlet TV Hager, Clipsal Buah 2.00 78,350 156,700
- Inst. DC 6 TAP Coaxial Cable RG - 11 + PVC cond. 20 mm² Belden + PVC Westpex Titik 1.00 489,240 489,240
- Inst.outlet TV Coaxial Cable RG - 6 + PVC cond. 20 mm² Belden + PVC Westpex Titik 2.00 311,040 622,080

3 Denah Lantai 2
- Directional coupler 4 TAP 0 Buah 1.00 328,050 328,050
- Outlet TV Panasonik Buah 2.00 78,350 156,700
- Inst. DC 6 TAP Coaxial Cable RG - 11 + PVC cond. 20 mm² Hager, Clipsal Titik 1.00 489,240 489,240
- Inst.outlet TV Coaxial Cable RG - 6 + PVC cond. 20 mm² Belden + PVC Westpex Titik 2.00 311,040 622,080

4 Denah Lantai 3
- Directional coupler 4 TAP Panasonik Buah 8.00 328,050 2,624,400
- Spliter 2 way Panasonik Buah 1.00 236,250 236,250
- Outlet TV Hager, Clipsal Buah 32.00 78,350 2,507,200

MATV - 0 13
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )
- Inst. DC 6 TAP Coaxial Cable RG - 11 + PVC cond. 20 mm² Belden + PVC Westpex Titik 8.00 489,240 3,913,920
- Inst.outlet TV Coaxial Cable RG - 6 + PVC cond. 20 mm² Belden + PVC Westpex Titik 32.00 311,040 9,953,280

MATV - 0 14
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRONIKA
PROYEK APARTEMENT PAVILION PERMATA TOWER 2
SURABAYA - JAWA TIMUR

SPEKSIFIKASI HARGA JUMLAH TOTAL


NO URAIAN PEKERJAAN SAT JUMLAH
MATERIAL ( RP ) ( Rp ) ( Rp )

4 Denah Lantai 4 & 10 & 14 ( typikal 3 lantai )


- Terminal Box TV Panasonik Buah 3.00 306,950 920,850
- Booster Panasonik Buah 3.00 3,735,800 11,207,400
- Spliter 2 way Panasonik Buah 3.00 236,250 708,750
- Directional coupler 4 TAP Panasonik Buah 30.00 328,050 9,841,500
- Outlet TV Hager, Clipsal Buah 114.00 78,350 8,931,900
- Inst. DC 6 TAP Coaxial Cable RG - 11 + PVC cond. 20 mm² Belden + PVC Westpex Titik 30.00 489,240 14,677,200
- Inst. Booster Coaxial Cable RG - 11 + PVC cond. 20 mm² Belden + PVC Westpex Titik 3.00 489,240 1,467,720
- Inst.outlet TV Coaxial Cable RG - 6 + PVC cond. 20 mm² Belden + PVC Westpex Titik 114.00 311,040 35,458,560

5 Denah Lantai 5-9 & 11-13 & 15-17 ( typikal 11 lantai )


- Directional coupler 4 TAP Panasonik Buah 11.00 328,050 3,608,550
- Spliter 2 way Panasonik Buah 11.00 236,250 2,598,750
- Outlet TV Panasonik Buah 418.00 78,350 32,750,300
- Inst. DC 6 TAP Coaxial Cable RG - 11 + PVC cond. 20 mm² Hager, Clipsal Titik 11.00 489,240 5,381,640
- Inst.outlet TV Coaxial Cable RG - 6 + PVC cond. 20 mm² Belden + PVC Westpex Titik 418.00 311,040 130,014,720

sub total 286,123,090

Total Pekerjaan MATV 371,243,920

MATV - 0 15
LIST OF MATERIAL SPECIFICATION
Apartement Permata Tower 2
Surabaya
NO. SPESIFIKASI MATERIAL MERK YANG DITAWARKAN KETERANGAN

I PEKERJAAN TELEPON
A. Main Unit
1 Sentral Analog PABX Panasonic
2 Operator Console Panasonic
3 Handset Telepon Analog Panasonic
4 Facsimile Panasonic
5 Billing System Lokal
6 Komputer Dell
B. Material Instalasi
1 Outlet Telepon Clipsal
2 Kabel instalasi titik ITC 2 x 2 x 0,6 mm Supreme, Kabelindo
3 Kabel Feeder ITC Multipair Supreme, Kabelindo
4 Pipa conduit Westpex
5 Terminal Box dan Accessories Lokal
6 Material bantu Lokal

II PEKERJAAN DATA
A. Main Unit
1 Server HP, Dell
2 Printer Epson
3 Core Switch Cisco
4 Switch Hub Cisco
5 Access Point Ubiquity Unifi
7 UPS ICA
B. Material Instalasi
1 Outlet Data Schneider
2 Kabel instalasi UTP cat 6 Belden
3 Kabel Power Supreme, Kabelindo
4 Pipa conduit Clipsal
5 Material bantu Lokal

III PEKERJAAN CCTV


A. Main Unit
1 16-Channel Digital Video Recorder (DVR Bosch
2 Fixed Dome Color Camera Bosch
4 Fixed Color Camera c/w Outdoor Housin Bosch
5 LCD Monitor Bosch
6 Komputer HP, Dell
B. Material Instalasi
1 Kabel instalasi titik UTP RG-6 Belden
2 Pipa conduit Westpex
3 Material bantu Lokal

IV PEKERJAAN FIRE ALARM


A. Main Unit
1 Semi Addressable MCFA 2 Loop 318 Add Notifier
2 Annunciator Notifier
3 All Detectors Notifier
4 Manual Call Point c/w Jack Intercom Notifier
5 Alarm Bell Notifier
6 Remote Lamp Notifier
B. Material Instalasi
1 Kabel instalasi titik NYA Supreme, Kabelindo
2 Kabel instalasi feeder FRC Fuji, Kabel Metal
3 Kabel instalasi feeder FRC STP Belden
4 Pipa conduit Westpex
5 Terminal Box dan Accessories Lokal
6 Material bantu Lokal

V PEKERJAAN SOUND SYSTEM


A. Main Unit
1 Power Amplifier 240 W TOA
2 Microphone TOA
3 Mixer Pre Amplifier TOA
4 Speaker Selector TOA
5 Ceiling/Box/Column/Horn Speaker TOA
6 Volume Control TOA
7 UPS ICA
B. Material Instalasi
1 Kabel instalasi titik NYMHY Supreme, Kabelindo
2 Kabel instalasi feeder FRC Fuji, Kabel Metal
3 Pipa conduit Westpex
4 Terminal Box dan Accessories Lokal
5 Material bantu Lokal

VI PEKERJAAN MATV
A. Main Unit
1 Antenna Parabola Venus
2 Receiver & Modulator Ikusi
3 Channel Amplifier & Active Combiner Ikusi
4 Booster Amplifier Ikusi
6 Splitter Ikusi
7 Tap Off / Coupler Ikusi
8 Rack Peralatan Lokal
B. Material Instalasi
1 Outlet TV Clipsal
2 Kabel instalasi titik Coaxial RG-6 Belden
3 Kabel instalasi feeder Coaxial RG-11 Belden
4 Pipa conduit Westpex
5 Material bantu Lokal