Disusun oleh :
NOFEN BERLIANDY
NRP : 6108 030 001
PROGRAM STUDI
TEKNIK PERENCANAAN DAN KONSTRUKSI KAPAL
JURUSAN TEKNIK BANGUNAN KAPAL
POLITEKNIK PERKAPALAN NEGERI SURABAYA
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
SURABAYA
2010
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
Lembar Pengesahan
Laporan Tugas Gambar
KONSTRUKSI KAPAL (STEEL PLAN)
Menyetujui,
Dosen Pembimbing
Mahasiswa :
Nofen Berliandy
NRP. 6108.030.001
PROGRAM STUDI
TEKNIK PERENCANAAN DAN KONSTRUKSI KAPAL
JURUSAN TEKNIK BANGUNAN KAPAL
POLITEKNIK PERKAPALAN NEGERI SURABAYA
Design Construction A ‘08
Surabaya Shipbuilding State Of Polythecnic
2
10 Nopember Institute Of Technology
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
DAFTAR GAMBAR
Gambar 13. Tebal dan Lebar Plat Sheerstrike Pada Amidship .................27
Gambar 14. Tebal dan Lebar Plat Sheerstrike Pada AP ...........................27
Gambar 15. Tebal dan Lebar Plat Sheerstrike Pada FP ...........................28
Gambar 16. Tebal Plat Sisi Main Deck .................................................28
Gambar 17. Tebal Plat Sisi Poop Deck .................................................29
Gambar 18. Tebal Plat Sisi Boat, Bridge & Navigation Deck ..................30
Gambar 19. Tebal Plat Geladak Poop Deck ...........................................30
Gambar 20. Tebal Plat Geladak Boat Deck ............................................31
Gambar 21. Tebal Plat Geladak Bridge, Navigation & Top Deck .............31
Gambar 22. Tebal Plat Inner Bottom ....................................................32
Gambar 23. Tebal Plat Geladak Second Deck Kamar Mesin ....................32
Gambar 24. Tebal Plat Sisi Untuk Forecastle ........................................33
Gambar 25. Tinggi Dasar Ganda ..........................................................33
Gambar 26. Tebal Center Girder 0,7 L Tengah Kapal .............................34
Gambar 27. Tebal Side Girder .............................................................34
Gambar 28. Tebal Wrang Plat ..............................................................35
Gambar 29. Profile Pembujur Alas .......................................................36
Gambar 30. Profile Penegar Wrang Kedap ............................................37
Gambar 31. Tebal Center Girder Amidship ...........................................38
Gambar 32. Tebal Center Pada Ujung – Ujung Kapal .............................38
Gambar 33. Konstruksi Kedudukan Mesin .............................................40
Gambar 34. Gading Utama Di Ruang Muat ............................................41
Gambar 35. Gading Utama Main Deck ..................................................42
Gambar 36. Gading Utama Poop Deck ..................................................42
Gambar 37. Gading Utama Boat Deck ...................................................43
Gambar 38. Gading Utama Bridge Deck ................................................43
Gambar 39. Gading Utama Navigation Deck .........................................44
Gambar 40. Gading Utama Pada First Deck Kamar Mesin .......................45
Gambar 41. Gading Utama Pada Second Deck Kamar Mesin ...................46
Gambar 42. Gading Besar Pada First Deck Kamar Mesin ........................47
Gambar 43. Gading Besar Pada Second Deck Kamar Mesin ....................48
Gambar 44. Gading Besar Pada Ruang Muat ..........................................49
Gambar 45. Pembujur Geladak Amidship ..............................................52
Gambar 46. Balok Geladak Daerah A (Ceruk Buritan) ............................53
Gambar 47. Balok Geladak Untuk Main Deck ........................................54
Gambar 48. Balok Geladak Untuk Poop Deck ........................................54
Gambar 49. Balok Geladak Untuk Boat Deck ........................................55
Gambar 50. Balok Geladak Untuk Bridge Deck .....................................55
Gambar 51. Balok Geladak Untuk Navigation Deck ...............................56
Gambar 52. Side Comming Engine Chasing Kamar Mesin ......................57
Lpp : 68,00 m
Lwl : 71,40 m
B : 11,00 m
H : 5,50 m
T : 5,00 m
Cb : 0,72
Vs : 11,00 m
Lkonst : 69,26 m
Type Kapal : Oil Tanker
Nama Kapal : KM. Ngaliyan
Konstuksi : Campuran / Kombinasi
1. L KONSTRUKSI
Jarak pada garis musim panas dari depan linggi buritan (garis sumbu tongkat kemudi),
jika tidak ada linggi kemudi L tidak boleh kurang dari 96% LWL ≤ L ≤ 97% LWL
L Konstruksi (Lc) : 96% LwL = 68.54 m
L Konstruksi (Lc) : 97% LwL = 69.26 m
Lc diambil 69,26 m
Tabel 4.1.
Range Factor CD Factor CF
0 < x/L < 0,2 1,2 – x/L 1,0 + 5/Cb * (0,2 – x/L)
x = 0,1 * Lkonst 1,100 1,694
A
= 6,9258
x/L = 0,100
A pada frame : 10 : 6m
M pada frame : 55 : 33 m
F pada frame : 110 : 66 m
Z1 = 1,600 m Z4 = 4,412 m
Z2 = 2,160 m Z5 = 5,537 m
Z3 = 3,280 m Z6 = 6,629 m
Z1 = 1,600 m Z4 = 4,412 m
Z2 = 2,160 m Z5 = 5,537 m
Z3 = 3,280 m Z6 = 6,629 m
Z1 = 1,600 m Z4 = 4,412 m
Z2 = 2,160 m Z5 = 5,504 m
Z3 = 3,280 m
= 84,082 kN/m²
Ps2F = 10 (T – Z2) + Po * CFF (1 + Z2/T)
= 10 ( 5 – 2,16 ) + 17,97 * 2,111 ( 1 + 2,16/5 )
= 82,732 kN/m²
Ps3F = 10 (T – Z3) + Po * CFF (1 + Z3/T)
= 10 ( 5 – 3,28 ) + 17,97 * 2,111 ( 1 + 3,28/5 )
= 80,030 kN/m²
= 64,857 kN/m²
Ps2 = Po * CFF * { 20 / (10 + Z2 – T) } = 17,97 * 2,111 { 20 / (10 + 17,5 – 5) }
= 58,823 kN/m²
n = 1 – {(21 – 9) / 10 } = - 0,200 m
PDA = PD * n { 0,7 * ( b’/B ) + 0,3 }
= 34,005*0,04 {0,7 * (7/11) + 0,3} = 15,206 kN/m²
3.1.2.2. Buritan ( A )
tBA = 1,21 * ao * √PBF * k + tk (mm)
dimana : PBA = 80,453 kN/m²
tBA = 1,9 * 0,6 * √80,453 * 0,91 + 1,5 = 8,926 mm ~ 9 mm
C
Gambar 4. Lebar dan Tebal Plat Bilga Daerah Fore (F)
CL CL
Gambar 6. Tebal Plat Lunas AP dan FP
3.4. TEBAL PLAT SISI
3.4.1. Daerah 0,5 L tengah kapal ( daerah M ), untuk kapal dengan L < 90 m
ts1 = 1,9 * nf * ao * √PSM1 * k + tk dimana : PSM1 = 57,723 kN/m²
= 1,9 * 1 * 0,6 * √57,723 * 0,91 * 1,5
= 9,382 mm ~ 10 mm
= 8,609 mm ~ 9 mm
CL
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
C
Gambar 9. Tebal Plat Sisi daerah AP
3.5. TEBAL PLAT GELADAK
3.5.1. TEBAL PLAT GELADAK PADA DAERAH 0,4 L AMIDSHIP
CL
Gambar 10. Tebal Plat Geladak daerah Amidship
C
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
CL
Design Construction A ‘08
Surabaya Shipbuilding State Of Polythecnic
29
10 Nopember Institute Of Technology
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
3.7.1. SUPERSTRUCTURES
Untuk non effective superstructures tebal plat sisinya diambil yang terbesar antara :
ta = 1,26 * a * √Ps * k + tk atau dengan L = Lmax = 12 * H = 12 * 5,5 = 66 m
tb = 0,8 * t2 dimana t2 = tmin = √L*k = √69,26 * 0,91 = 7,393 m
tb = 0,8 * 7,393 = 5,914 ~ 6 mm
3.7.1.1. UNTUK MAIN DECK
Plat 1
ta = 1,26 * a * √Ps1 * k + tk = 1,26 * 0,6 * √52,056 * 0,91 + 1,5 = 6,703 ~ 7 mm
maka, diambil t1 = 7 mm
Plat 2
ta = 1,26 * a * √Ps2 * k + tk = 1,26 * 0,6 * √43,195 * 0,91 + 1,5 = 6,240 ~ 7 mm
maka, diambil t2 = 7 mm
POOP DECK
CHIEF COOK
ROOM
MAIN DECK
Gambar 16. Tebal Plat Sisi Main Deck
3.7.1.2. UNTUK POOP DECK
Plat 1
ta = 1,26 * a * √Ps1 * k + tk = 1,26 * 0,6 * √43,195 * 0,91 + 1,5 = 6,240 ~ 7 mm
maka, diambil t1 = 7 mm
Plat 2
ta = 1,26 * a * √Ps2 * k + tk = 1,26 * 0,6 * √39,807 * 0,91 + 1,5 = 6,050 ~ 7 mm
maka, diambil t2 = 7 mm
BOAT DECK
ELECTRICIAN
ROOM
POOP DECK
NAV. DECK
CAPTAIN
GANG WAY
ROOM
BOAT DECK
CL
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
Gambar 18. Tebal Plat Sisi Boat, Bridge dan Navogation Deck
ELECTRICIAN
GANG WAY
ROOM
POOP
DECK
CL Gambar 19. Tebal Plat Geladak Poop Deck
t2
=
BOAT
DOCTER
GANG WAY ROOM
DECK
CL
(5,5 + 0,02 L) √k = (5,5 + 0,02 * 69,26) √0,91 = 5,980 ~ 6 mm
tD = 6 mm
3.8.3. UNTUK BRIDGE, NAVIGATION DAN TOP DECK
Akibat beban pada geladak bridge, navigation dan top deck (Pda) lebih kecil dari poop
danboat deck maka dengan sendirinya tebal plat geladaknya (t1) juga makin mengecil
(t1<t2) sehingga plat geladaknya yangdiambil t2 = 6 mm. tD = 6 mm
NAV. DECK
CAPTAIN
GANG WAY
ROOM
BRIDGE DECK
C
Gambar 21. Tebal Plat Geladak Bridge, Navigation dan Top Deck
Tebal plat pada propeller bracke dan boss propeller sama dengan tebalplat sisi terbesar
pada 0,4 L tengah kapal. Jadi t = 10 mm.
CL
Gambar 22. Tebal Plat Inner Bottom
3.12. TEBAL PLAT GELADAK SECOND DECK KAMAR MESIN
Tmin = (5,5 + 0,02 L) √k = (5,5 + 0,02 * 69,26) √0,91 = 6,544 ~ 7 mm
atau
t = 1,1 * a * √PL * k + tk = 1,1 * 0,6 * √38,455 * 0,91 + 1,5 = 5,404 ~ 6 mm
maka dipilih t = 7 mm
C
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
CL
Gambar 26. Tebal Center Girder 0,7 L Tengah kapal
- Diketahui jarak antara center girder dan sisi kapal = B/2 = 11/2 = 5,50 m jadi
direncanakan dipasang satu side girder disetiap sisi dari double bottom.
CL
Gambar 28. Tebal Wrang Plat
CL
Gambar 29. Profile Pembujur Alas
CL
Gambar 31. Tebal Center Girder Amidship
4.8.2. Tebal center girder pada ujung – ujung kapal, boleh dikurangi 10 %
t = 11 – [10/100 * 11] = 9,9 ~ 10 mm
t = 10 mm
CL
Gambar 32. Tebal Center Girder Pada Ujung – Ujung Kapal
= 600,5/100 + 4 = 10,005 ~ 11 mm
t = 11 mm
4.13.4. CENTER GIRDER PADA RUANGAN MESIN INDUK
Diambil tebal plat center girder pada ruangan mesin = t = 8 mm
QUARTER
GANG
MASTER
WAY
ROOM
C
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
OFFICE GANG
ROOM WAY
RADIO
GANG
OPERATOR
WAY
ROOM
Design Construction A ‘08
Surabaya Shipbuilding State Of Polythecnic
46
10 Nopember Institute Of Technology
C
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
WHEEL
ESEP ROOM
HOUSE
Ps = 64,857 kN/m²
f = 0,75
k=1
a = 0,6
W2 = 0,55 * 0,6 * (4,31)² * 64,857 * 0,75 * 1 = 950,9578 cm³
Maka diperoleh ukuran profil L 320 x 16 dan ukuran bracket 420 x 10,5
C
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
MAIN DECK
C
STEEL PLAN “ KM. NGALIYAN”
NOFEN BERLIANDY
tebal plat di fs = 3 cm
tebal plat di f = 2,5 cm
fs = 70 x 3 = 210 cm² # fs/F = 120/214,65 = 0,97
f = 50 x 2,5 = 125 cm² # f/F = 125/214,65 = 0,58
dari grafik diperoleh harga w = 0,78
sehingga W = w * F * h
W = 0,78 * 214,65 * 70 = 11719,89 cm³ (memenuhi)
Jadi, dipakai profil T dengan ukuran 700 x 30
500 x 25
Modulus pada section N – N
ZQN = (1 + gn / ln) * {1 – (1,4 * an) / (an + cn)} * ZNN
Dimana : an = 0,8 ; cn = H – hDB – an = 6,5 m
ZQN = (1 + 0,8 / 5,396) * {1 – (1,4 * 0,8) / (0,8 + 6,5)} * 11406,89 = 1249,66 cm³
Perhitungan Profil T
l/e = 6,19/3 = 1,38
dengan interpolasi didapat em1 = 0,53 x 4,5 = 2,385 m = 238,5 cm
plat ikut = plat geladak dgn tebal maksimun = 8 mm = 0,8 cm
F = 238,5 x 0,9 = 214,65 cm²
Direncanakan :
h = 70 cm
tebal plat di fs = 3 cm
tebal plat di f = 2,5 cm
fs = 70 x 3 = 210 cm² # fs/F = 120/214,65 = 0,98
f = 50 x 2,5 = 125 cm² # f/F = 125/214,65 = 0,58
dari grafik diperoleh harga w = 0,75
sehingga W = w * F * h
W = 0,75 * 214,65 * 70 = 1269,125 cm³ (memenuhi)
Jadi, dipakai profil T dengan ukuran 700 x 30
500 x 25
C
Gambar 46. Balok Geladak Daerah A
C
Gambar 47. Balok Geladak Untuk Main Deck
QUARTER
MASTER GANG WAY
ROOM
OFFICE
GANG WAY
ROOM
RADIO
OPERATOR GANG WAY
ROOM
WHEEL
ESEP ROOM
HOUSE
C
Gambar 52. Side Comming Engine Casing Kamar Mesin
e = 3,6
l = 6,6 m
P = PDM = 30,905 kN/m²
W = 0,75 * 3,6 * (6,6)² * 30,905 * 0,91 = 3639,4 cm³
Perhitungan Profil T
l/e = 6,6/3,6 = 1,83
dengan interpolasi didapat em1 = 0,36 x 6,6 = 1,296 m = 237,6 cm
plat ikut = plat geladak dgn tebal maksimun = 8 mm = 0,8 cm
F = 237,6 x 0,8 = 190,08 cm²
Direncanakan :
h = 30 cm
tebal plat di fs = 0,8 cm
tebal plat di f = 0,7 cm
fs = 30 x 0,8 = 24 cm² # fs/F = 24/69,12 = 0,35
f = 23 x 0,7 = 16,1 cm² # f/F = 16,1/69,12 = 0,23
dari grafik diperoleh harga w = 0,315
sehingga W = w * F * h
W = 0,315 * 190,08 * 30 = 3596,26 cm³ (memenuhi)
Jadi, dipakai profil T dengan ukuran 300 x 8
230 x 7