Anda di halaman 1dari 117

DAFTAR ISI LAPORAN MINGGUAN PELAKSANAAN PEKERJAAN

PEMBERI TUGAS DAFTAR ISI LAPORAN MINGGUAN PELAKSANAAN PEKERJAAN

PEKERJAAN :
#REF!

MANAJEMEN KONSTRUKSI #REF!

MINGGU KE : 45 (empat puluh lima)


PERIODE : ###
KONTRAKTOR WAKTU PELAKSANAAN : 330 Hari
WAKTU TERPAKAI : 118 Hari
WAKTU TERSISA : 212 Hari

DAFTAR ISI LAPORAN MINGGUAN PELAKSANAAN PEKERJAAN

1. REKAPITULASI PROGRES MINGGUAN

2. RINCIAN PROGRES PEKERJAAN

3. KURVA S

4. RENCANA KERJA DAN REALISASI KERJA MINGGUAN

5. LAPORAN KERJA MINGGUAN

6. PROGRES GAMBAR DETAIL PELAKSANAAN (SHOP DRAWING)

7. PROGRES PERSETUJUAN MATERIAL (APPROVAL MATERIAL)

8. LAPORAN CUACA MINGGUAN

9. FOTO DOKUMENTASI MINGGUAN


MINGGUAN PELAKSANAAN PEKERJAAN

R ISI LAPORAN MINGGUAN PELAKSANAAN PEKERJAAN

#REF!

#REF!
Bobot
No Jenis Pekerjaan
(%)

I BIAYA PEMBANGUNAN ( BUILD )


A PEKERJAAN BANGUNAN CHECK IN PENUMPANG

A2 PEMBANGUNAN (BUILD)
PEKERJAAN LANTAI 1

PEKERJAAN LANTAI 2
4 Pekerjaan Elektronika Bangunan 1.293

PEKERJAAN AREA DROP ZONE BARU


1 Pekerjaan Sipil & Arsitektur 1.170
2 Pekerjaan Jalan Akses 3.269
3 Pekerjaan Landscape 1.468

Total Persentase Pekerjaan A 40.550

B PEKERJAAN FASILITAS CHECK IN PENUMPANG

B2 PENGADAAN DAN PEMASANGAN X - RAY OOG


1 X-ray OOG Dual View Lengkap dengan Control Panel, UPS, Stabilizer 1.924
2 Acceptance, Commissioning test dan Familiarization 0.182

B3 PENGADAAN DAN PEMASANGAN BAGGAGE HANDLING SYSTEM

1 Pengadaan Check in Counter Lengkap beserta Baggage Handling System (BHS) 42.790

Total Prosentase Pekerjaan B 58.025


TOTAL A + B 98.575
Total Prosentase Item dikerjakan 87.143
Total Prosentase Item tidak dikerjakan 11.432
Rencana s/d Realisasi Deviasi
Minggu ini S/D Minggu Ini Keterangan
(%)
(%) Prestasi (%) Bobot (%)

1.293 87.038 1.126 -0.168 Tidak dikerjakan

1.170 0.000 0.000 -1.170 Tidak dikerjakan


3.269 0.000 0.000 -3.269 Tidak dikerjakan
1.468 0.000 0.000 -1.468 Tidak dikerjakan

40.550 32.728 -7.821

1.924 0.000 0.000 -1.924 Tidak dikerjakan


0.182 0.000 0.000 -0.182 Tidak dikerjakan

42.790 97.612 41.768 -1.022


Kurangnya Optimal pengerjaan section 3,
sedangkan material sudah onsite

58.025 53.922 -4.103


98.575 86.651 -11.924
87.143 83.581 -3.562
11.432 3.070 -8.362
FASILITAS
PEKERJAAN
WAKTU PELAKSANAAN
NOMOR KONTRAK
TANGGAL KONTRAK

NO URAIAN PEKERJAAN

I BIAYA PERENCANAAN
BIAYA LANGSUNG PERSONIL
BIAYA LANGSUNG NON PERSONIL

II PEMBANGUNAN
PEKERJAAN BANGUNAN AREA CHECK IN PENUMPANG
A.1. Persiapan
1 Pekerjaan Persiapan
A.2. Pembangunan (Build)
Pekerjaan Lantai 1
1 Pekerjaan Sipil & Arsitektur
2 Pekerjaan Landscape
Pekerjaan Lantai 2
1 Pekerjaan Sipil & Arsitektur
2 Pekerjaan Mekanikal & Plumbing
3 Pekerjaan Elektrikal Bangunan
2 Pekerjaan Elektronika Bangunan
Pekerjaan Area Dropzone Baru
Pembersihan Lahan
PEKERJAAN FASILITAS CHECK IN PENUMPANG
B.1. Pekerjaan dan Pemasangan Travelator
B.2. Pengadaan dan Pemasangan X-ray OOG
B.3. Pengadaan dan Pemasangan Baggage Handling Syst
B.4. Peralatan Airport Technology, Network Operation, &
B.5. Pekerjaan AC dan Listrik
Disetujui O
Pemberi Tu
PT. ANGKASA PURA

I GUSTI NGURAH AG
AIRPORT FACILITIES READIN
HEAD
AIRPORT FACILITIES READIN
HEAD
S : BANDAR U
AN : PERENCAN
ELAKSANAAN : 330 HARI K
KONTRAK : PBJDPS-18
L KONTRAK : 05 MARET

BOBOT
URAIAN PEKERJAAN
(%)

RENCANAAN
UNG PERSONIL 0.926
UNG NON PERSONIL 0.499

GUNAN
ANGUNAN AREA CHECK IN PENUMPANG

Persiapan 0.185
gunan (Build)
Lantai 1
Sipil & Arsitektur 15.335
Landscape
Lantai 2
Sipil & Arsitektur 14.134
Mekanikal & Plumbing 2.310
Elektrikal Bangunan 1.316
Elektronika Bangunan 1.293
Area Dropzone Baru 5.907
an Lahan 0.068
ASILITAS CHECK IN PENUMPANG
n dan Pemasangan Travelator 2.905
an dan Pemasangan X-ray OOG 2.106
an dan Pemasangan Baggage Handling System 43.028
n Airport Technology, Network Operation, & Supp 7.712
n AC dan Listrik 2.274
TOTAL 100.000
RENCANA BOBOT %
KOMULATIF RENCANA %
REALISASI BOBOT %
KOMULATIF REALISASI %
DEVIASI (%) +/-

Disetujui Oleh,
Pemberi Tugas
PT. ANGKASA PURA I (PERSERO)

I GUSTI NGURAH AGUNG WIRAMA


AIRPORT FACILITIES READINESS DEPARTEMEN
HEAD
AIRPORT FACILITIES READINESS DEPARTEMEN
HEAD
ANDAR UDARA INTERNASIONAL I GUSTI NGU
ERENCANAAN DAN PEMBUATAN PERLUASAN
30 HARI KALENDER
BJDPS-18002825
5 MARET 2018

MARET APRIL
M-1 M-2 M-3 M-4 M-5 M-6 M-7
05/03 12/03 19/03 26/03 02/04 09/04 16/04
11/03 18/03 25/03 01/04 08/04 15/04 22/04
6 Hari
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari
0.071 0.071 0.071 0.071 0.071 0.071 0.071

0.067 0.067 0.071 0.071 0.025 0.025 0.025

0.062 0.062 0.062

0.528 0.528 0.528 0.528


0.138 0.138 0.203 0.732 0.686 0.625 0.625
0.138 0.276 0.479 1.211 1.897 2.522 3.147
0.172 0.042 0.084 0.067 0.161 0.161 0.129
0.172 0.214 0.298 0.365 0.436 0.597 0.726
0.034 (0.062) (0.182) (0.846) (1.461) (1.925) (2.421)

Di
Pe
SERO)
PT. ANGKAS

IRAMA
EPARTEMENT AIRPORT EQUIPMENT R
EPARTEMENT AIRPORT EQUIPMENT R
USTI NGURAH RAI BALI
RLUASAN LANTAI 2 COUNTER CHECK IN PENU

L MEI JUNI
M-8 M-9 M-10 M-11 M-12 M-13 M-14
23/04 30/04 07/05 14/05 21/05 28/05 04/06
29/04 06/05 13/05 20/05 27/05 03/06 10/06
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari
0.071 0.071 0.071 0.071 0.071 0.071

0.025 0.025 0.025 0.025 0.025 0.025

0.858 1.565 0.050 0.050 0.050 0.050 0.050

0.050 0.100 0.100 0.100

0.050 0.050 0.050 0.050

0.004 0.004 0.004


0.955 1.661 0.146 0.246 0.300 0.300 0.204
4.101 5.762 5.909 6.155 6.455 6.755 6.959
0.140 0.212 0.162 0.461 0.414 0.236 0.251
0.866 1.078 1.240 1.702 2.115 2.352 2.603
(3.235) (4.685) (4.668) (4.453) (4.339) (4.404) (4.356)

Disetujui Oleh,
Pemberi Tugas
T. ANGKASA PURA I (PERSERO)

NOVEL
QUIPMENT READINESS DEPARTEMENT HEAD
NOVEL
QUIPMENT READINESS DEPARTEMENT HEAD
MASTER SCHEDU

K IN PENUMPANG DI TERMINAL INTERNASION

JUNI JULI
M-15 M-16 M-17 M-18 M-19 M-20 M-21
11/06 18/06 25/06 02/07 09/07 16/07 23/07
17/06 24/06 01/07 08/07 15/07 22/07 29/07
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari
LIBUR LEBARAN

0.050 0.050 0.050 1.182 1.182

0.100 0.100 0.100 0.866 0.766

0.050 0.050 0.050 0.280 0.280

0.050 0.181 0.181

0.050 0.178 0.178

0.004 0.004

0.339 0.339 1.392 1.437


- - 0.204 0.643 0.539 4.078 4.023
6.959 6.959 7.163 7.806 8.345 12.423 16.446
- - 0.366 0.656 0.550 3.422 2.900
2.603 2.603 2.968 3.624 4.174 7.596 10.496
(4.356) (4.356) (4.195) (4.182) (4.170) (4.826) (5.950)

Dise
Pem
PT. ANGKASA

RIKA K.N.
EAD INFORMATION COMMUNICATION
RIKA K.N.
EAD INFORMATION COMMUNICATION
R SCHEDULLE ( KURVA "S")

RNASIONAL

TAHUN 2018
AGUSTUS
M-22 M-23 M-24 M-25 M-26
30/07 06/08 13/08 20/08 27/08
05/08 12/08 19/08 26/08 02/09
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari
1.182 1.182 1.890 1.890 1.890

1.889 1.889 2.692 2.692 2.692

0.280 0.280 0.280 0.280 0.280

0.181 0.181 0.181 0.181 0.181

0.178 0.178 0.178 0.178 0.178

1.969 1.969 1.969

0.017 0.017 0.017 0.017

0.034 0.927 0.927 0.962 0.034

0.061 0.641 0.641 0.702 0.061

8.558 8.558 8.677 8.558 8.677

1.824 2.187 0.068 0.068 0.059

0.117 0.719 0.719 0.719


14.186 16.156 18.239 18.216 16.756
30.632 46.788 65.028 83.244 100.00
7.923 17.153 14.417 7.489 1.340
18.419 35.573 49.990 57.479 58.819
(12.213) (11.215) (15.038) (25.765) (41.181)

Disetujui Oleh,
Pemberi Tugas
NGKASA PURA I (PERSERO)

RIKA K.N. DANAKUSUMA


UNICATION TECHNOLOGY DEPARTEMENT HEAD
RIKA K.N. DANAKUSUMA
UNICATION TECHNOLOGY DEPARTEMENT HEAD
SEPTEMBER
M-27 M-28 M-29 M-30 M-31
03/08 10/09 17/09 24/09 01/10
09/09 16/09 23/09 30/09 07/10
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari
- - - - -
100.00 100.00 100.00 100.00 100.00
10.630 4.578 4.166 1.877 4.715
69.449 74.027 78.192 80.069 84.783
(30.551) (25.973) (21.808) (19.931) (15.217)

Kons
KSO. PT. YODY

EMENT HEAD
EMENT HEAD
OKTOBER NOVEMBE
M-32 M-33 M-34 M-35 M-36
08/10 15/10 22/10 29/10 05/11
14/10 21/10 28/10 04/11 11/11
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari
IMF
- - - - -
100.00 100.00 100.00 100.00 100.00
0.799 0.026 0.326 0.088 0.040
85.583 85.608 85.935 86.023 86.063
(14.417) (14.392) (14.065) (13.977) (13.937)

Diperiksa Oleh,
Konsultan Manajemen Konstruksi
O. PT. YODYA KARYA (PERSERO) - PT. JAYA CM

SRIYONO
KOORDINATOR PROYEK
SRIYONO
KOORDINATOR PROYEK

-
NOVEMBER DESEMBER
M-37 M-38 M-39 M-40 M-41 M-42
12/11 19/11 26/11 03/12 10/12 17/12
18/11 25/11 02/12 09/12 16/12 23/12
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari
- - - - - -
100.00 100.00 100.00 100.00 100.00 100.00
0.040 0.040 #REF! #REF! #REF!
86.103 86.143 86.186 #REF! #REF!
(13.897) (13.857) (13.814) #REF! #REF!

ruksi
- PT. JAYA CM PT. A
TAHUN 2019
EMBER JANUARI
M-43 M-44 M-45 M-46 M-47 M-48
24/12 31/12 07/01 14/01 21/01 28/01
30/12 06/01 13/01 20/01 27/01
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 1 Hari
- - - - - -
100.00 100.00 100.00 100.00 100.00 100.00

#REF!

Dibuat Oleh,
Kontraktor
PT. ANGKASA PURA PROPERTI

RIZA CANDRA
PROJECT MANAGER
RIZA CANDRA
PROJECT MANAGER
(%) KETERANGAN

100
0
50
MASA PEMELIHARAAN 365 HARI KALENDER
RTI
REKAPITULASI LAPO
PEKERJAAN PERENCANAAN DAN PEMBUATAN PERLUASAN LANTAI 2 COUNTER CHEC

TOTAL KONTRAK PEKERJAAN BANGUNAN CHECK IN PENUMPANG

NO. URAIAN PEKERJAAN VOLUME SATUAN

1 Persiapan 1.00
a. Pekerjaan Pemagaran Lokasi M
b. Pekerjaan Pemindahan atau Perapihan Pohon Existing LS
c. Pekerjaan Pemindahan Parkir Existing LS
d. Pekerjaan Pengukurun Bowplank dan Kelengkapannya M
e. Pekerjaan Penunjang lainnya LS
f. Direksi Ket M2
TOTAL

2 Pekerjaan Sipil & Arsitektur Lantai 1 1,800.00 M2


Zone 1
Cutting Beton m'
Galian m3
Urugan Tanah Kembali dan Pemadatan m3
Pembuangan tanah m3
-Pekerjaan Pondasi Jalur
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Bekisting Batako m2
Pekerjaan Pembesian Kg
Pekerjaan Beton fc' 29.05 Mpa m3
-Pekerjaan Tiebeam
Pekerjaan Bekisting Batako m2
Pekerjaan Pembesian Kg
Pekerjaan Beton fc' 29.05 Mpa m3
-Pekerjaan Pedestal Kolom
Pekerjaan Bekisting plywood m2
Pekerjaan Pembesian Kg
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Grouting titik
-Pekerjaan Slab R. AHU
Pekerjaan Galian Pondasi m3
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Bekisting Batako m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Pembesian kg
-R. AHU & SELASAR
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Bekisting plywood m2
Pekerjaan Wiremesh M8 (2 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
-Pekerjaan Cor Kembali Bekas Galian
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Wiremesh M8 (2 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan R. Tangga Darurat
Pondasi
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Bekisting Batako m2
Pekerjaan Pembesian Kg
Pekerjaan Beton fc' 29.05 Mpa m3
Tangga
Pekerjaan Bekisting Plywood m2
Pekerjaan Pembesian Kg
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Area Lift OSL (El. +9.00)
Pekerjaan Galian Pondasi m3
Urugan Tanah Kembali dan Pemadatan m3
Pembuangan tanah m3
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Bekisting Batako m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Pembesian Kg
Grouting titik
-Pekerjaan Struktur Baja EL. +3.17
Pekerjaan Kolom Baja Kg
Base Plat 25 mm thk Kg
Angkur D25, L=0.7 m Pcs
Chemical Anchor M24 Pcs
Pekerjaan Balok Baja Kg
Pekerjaan Zincromate Fin Ex. Nippon m2
MB HTB Ø M24 ASTM A-325 Pcs
MB HTB Ø M22x55 Pcs
MB HTB Ø M22x50 Pcs
MB HTB Ø M16x40 Pcs
Zone 2
Cutting Beton m'
Galian m3
UruganTanah Kembali dan Pemadatan m3
Pembuangan tanah m3
-Pekerjaan Pondasi Jalur
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Bekisting Batako m2
Pekerjaan Pembesian kg
Pekerjaan Beton fc' 29.05 Mpa m3
-Pekerjaan Tiebeam
Pekerjaan Bekisting Batako m2
Pekerjaan Pembesian Kg
Pekerjaan Beton fc' 29.05 Mpa m3
-Pekerjaan Pedestal Kolom
Pekerjaan Bekisting Plywood m2
Pekerjaan Pembesian Kg
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Grouting titik
-Pekerjaan Slab R. AHU & Selasar
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Bekisting plywood m2
Pekerjaan Wiremesh M8 (2 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
-Pekerjaan Cor Kembali Bekas Galian
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Wiremesh M8 (2 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
-Pekerjaan Struktur Baja
Pekerjaan Kolom Baja kg
Base Plat 25 mm thk kg
Angkur D25, L=0.7 m pcs
Chemical Anchor M20 pcs
Chemical Anchor M24 pcs
Pekerjaan Zincromate Fin Ex. Nippon m2
Pekerjaan Struktur Baja (El. +3.17)
Pekerjaan Balok Baja kg
Pekerjaan Zincromate Fin Ex. Nippon m2
MB HTB Ø M24 ASTM A-325 bh
MB HTB Ø M22x55 bh
MB HTB Ø M16x40 bh
Zone 3
Cutting Beton m'
Galian m3
UruganTanah Kembali dan Pemadatan m3
Pembuangan tanah m3
Urugan Peninggian Lantai m3
Pekerjaan Bekisting Batako Saluran terbuka m2
-Pekerjaan Pondasi Jalur
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Bekisting Batako m2
Pekerjaan Pembesian kg
Pekerjaan Beton fc' 29.05 Mpa m3
-Pekerjaan Tiebeam
Pekerjaan Bekisting Batako m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Pembesian kg
Pekerjaan Beton fc' 29.05 Mpa m3
-Pekerjaan Pedestal Kolom
Pekerjaan Bekisting Plywood m2
Pekerjaan Pembesian kg
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Grouting pcs
-Pekerjaan Slab Lantai
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Bekisting Plat Bondex m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (2 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Rabat Beton m3
-Pekerjaan Struktur Baja
Pekerjaan Kolom Baja kg
Base Plat 25 mm thk kg
Angkur D25, L=0.7 m bh
Chemical Anchor M24 bh
Pekerjaan Zincromate Fin Ex. Nippon m2
-Pekerjaan Struktur Baja (El. +3.17 dan +8.92)
Pekerjaan Balok Baja Kg
Pekerjaan Zincromate m2
MB HTB Ø M24 ASTM A-325 Pcs
MB HTB Ø M22x55 Pcs
MB HTB Ø M22x50 Pcs
MB HTB Ø M16x40 Pcs
Pekerjaan Perkuatan Kalsi Clad
CNP 200x75x20x3,2 kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pembongkaran
-Lantai 2 - Zona 3
Pembongkaran Jembatan Penghubung Koridor m2
Pembongkaran Railing Jembatan m1
Pembongkaran Tapak Dara Koridor m2
Pembongkaran Kaca Koridor m2
Pembongkaran Tanggulan Koridor m1
Pembongkaran Janggutan Koridor m2
Pembongkaran Railing Koridor m'
Lantai 1 - Zona 2
Pembongkaran Tangga Beton (2 unt) m2
Pembongkaran Railing Tangga (2 unt) m1
Pembongkaran Dinding Ruang Tangga m2
Bobok Saluran Beton m3
Lantai 1 - Zona 3
Pembongkaran Pura (2 unit) m'
Pembongkaran Tangga Baja m2
Pembongkaran Kanopi Beton unit
Bobok Saluran Beton m2
Bobok Beton untuk Tanam Pipa D10 m'
Bongkar Saluran Pas. Batu kali m3
Bongkar Pagar BRC m'
Lantai 3 - Zona 1
Pembongkaran Lantai Re-Packing m2
Pembongkaran Plafond + Lampu + Instalasi bawah repacking m2
Pembongkaran Kaca + Rangka m2
Pembongkaran Tapak Dara Re-Packing m2
Pembongkaran Kaca Re-Packing m2
Pembongkaran Railing Re-Packing m1
Pembongkaran Kaca Check In Hall m2
Pembongkaran Railing Check In Hall m1
Pembongkaran Tanggulan Check In Hall m1
Pembongkaran Plat Area Rencana Lift OSL m2
Pembongkaran Tangga Beton Area Rencana Lift OSL m3
Pembongkaran Railing+Kaca Tangga Area Rencana Lift OSL m2
Lantai 2 - Zona 2
Pembongkaran Pot & Kolom Promenade Elv.+6.35 m1
Pembongkaran Keramik dan Screed m2

TOTAL

3 Pekerjaan Landscape 1,800.00 m2


-Saluran Batu Kali
Galian untuk Selokan Drainase dan Saluran Air m3
Pekerjaan Lantai Kerja fc' 10 Mpa, t = 5 cm m3
Pekerjaan Pas. Batu Kali m3
Rabatan m3
Pembuangan Tanah m3
Pekerjaan Pas. Batako m2
Pekerjaan Plesteran m2
Pekerjaan Acian m2
Pekerjaan Bekisting Plat Bondex m2
Pekerjaan Wiremesh M8 (2 lapis) m2
Pekerjaan Beton fc'29.05 Mpa m3
Pekerjaan Bekisting Batako m2
-Loading Dock
Pembersihan Lahan m2
Lantai Kerja m3
Rabatan Beton 15 cm m3
Pekerjaan Wiremesh m2
Pekerjaan Bekisting Batako m2
Jalan Akses Buggy Transit Domestik-Internasional
Pembersihan Lahan m2
Lantai Kerja m3
Rabatan Beton 15 cm m3
Pekerjaan Wiremesh m2
Pekerjaan Bekisting Batako m2
-Pondasi Dudukan Pagar Promade
Pekerjaan Pas. Batako m2
Pekerjaan Wiremesh M8 (2 lapis) m2
Pekerjaan Beton fc'29.05 Mpa m3
Pekerjaan Plesteran m2
Pekerjaan Acian m2

Pekerjaan Dinding
Pek. Pasangan dinding bata ringan m2
Pek. Plasteran dinding m2
Pek. Acian m2
Kolom praktis m'
Ring Balok m'
Pek. Cat Interior m2
Pek. Cat Exterior m2
Pekerjaan Lantai
Pek. Lantai Floor hardener m2
Pek. Step Nosing Tangga unpolised m'
Pek. Lantai Tangga Darurat m2
Pek. Urugan Pasir Bawah Paving t=7 cm m3
Pek. Paving Blok K=300 m2
Lantai Kerja m3
Pekerjaan Wiremesh M8 (1 lapis) m2
Rabatan Beton t.10cm m3
Pekerjaan Kansteen m'
Pek. Pengecatan Kansteen m2
Pekerjaan Kusen Pintu dan Jendela
Pintu type PB1, uk. 1100x2100 mm, unit
Pintu type PB2, uk. 1700x2150 mm unit
Hand Railling Tangga + Pipa BSP Ø 2" finishing Cat duco m'

Pekerjaan Dinding
Pek. Pasangan dinding bata ringan m2
Pek. Plasteran dinding m2
Pek. Acian m2
Kolom praktis m'
Ring Balok m'
Pek. Cat Interior m2
Pek. Cat Exterior m2
Pek. Cover kolom kotak bahan Kalsiclad 10 mm m2
Pekerjaan Lantai
Pek. Lantai Floor hardener m2
Pek. Step Nosing Tangga unpolised m'
Pek. Lantai Tangga Darurat m2
Pekerjaan Kansteen m'
Pek. Pengecatan Kansteen m2
Pekerjaan Kusen Pintu dan Jendela
Pintu type PB1, uk. 1100x2100 mm, unit
Hand Railling Tangga + Pipa BSP Ø 2" finishing Cat duco m'
Pintu type PB2, uk. 1700x2150 mm unit

Pekerjaan Dinding
Pek. Pasangan dinding bata ringan m2
Pek. Pasangan dinding kalsicald (2 sisi) m2
Pek. Plasteran dinding m2
Pek. Acian m2
Kolom praktis m'
Ring Balok m'
Pek. Cover kolom kotak bahan Kalsiclad 10 mm m2
Pek. Cat Interior m'
Pek. Cat Exterior m'
Pek. Dinding Gypsum 9 mm (Temporary IMF) m2
Pek. Pemasangan Banner (Temporary IMF) m2
Pekerjaan Lantai
Pek. Lantai Floor hardener 5kg/m2 m2
Pekerjaan Kusen Pintu dan Jendela
Pintu type PB2, uk. 1700x2150 mm unit
Pintu type PA-1, uk. 900x2100 mm unit
Pintu type PA-3, uk. 1700x2100 mm unit

4 Pekerjaan Sipil & Arsitektur Lantai 2 1,800.00 M2


Zona 1
Pekerjaan Struktur Baja (El. +7.30)
Pekerjaan Balok Baja H200*100*5.5*8 Kg
Pekerjaan Balok Baja H400*200*8*13 Kg
Pekerjaan Balok Baja H600*200*11*17 Kg
Pekerjaan Balok Baja H500*200*10*16 Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
MB HTB Ø M24 ASTM A-325 Pcs
MB HTB Ø M22x55 Pcs
MB HTB Ø M22x50 Pcs
MB HTB Ø M16x40 Pcs
-Pekerjaan Struktur Baja (El. +8.07 dan +8.665)
Pekerjaan Balok Baja H400*200*8*13 Kg
Pekerjaan Balok Baja H200*100*5.5*8 Kg
Pekerjaan Balok Baja H600*200*11*17 Kg
Pekerjaan Balok Baja H500*200*10*16 Kg
Pekerjaan Plat Sambung Baja Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
MB HTB Ø M22x50 Pcs
MB HTB Ø M16x40 Pcs
-Pekerjaan Struktur Baja (EL. +9.77 dan +11.67)
Pekerjaan Balok Baja H400*200*8*13 Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Struktur Baja (EL. +13.37)
Pekerjaan Balok Baja H400*200*8*13 Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Struktur Baja (El. +9.00)
-Pekerjaan Baja Area Lift OSL
Profil Baja HB 300x30010x15 Kg
Profil Baja HB 200x200X8X12 Kg
Profil Baja IWF 500x200x10x16 Kg
Profil Baja IWF 250x125x6x9 Kg
Profil Baja IWF 200x100x5.5x8 Kg
Base Plat 16 mm thk Kg
Plat Sambung Baja Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Angkur D22 Pcs
Chemical Anchor M24 Pcs
MB HTB Ø M24 ASTM A-325 Pcs
MB HTB Ø M16x40 Pcs
-Pekerjaan Baja Area Re-Packing
Profil Baja IWF 500x200x10x16 Kg
Profil Baja IWF 200x100x5.5x8 Kg
Pekerjaan Tangga Penumpang
Profil Baja IWF 250x125x6x9 kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
MB HTB Ø M24 ASTM A-325 Pcs
MB HTB Ø M22x50 Pcs
Pekerjaan Perkuatan Kaca Mati
Hollow 100x100x4 kg
Profil Baja IWF 300x150x6.6x9 kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Baja Intermediate Travelator
HB 200x200x8x12 kg
Plat Sambung kg
MB HTB Ø M16x40 Pcs
Siku 50x50x5 kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Door Jamb (Lift OSL)
CNP 100*50*20*3.2 kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Re-packing Area (El. +8.90)
Pekerjaan Plat Bondex, t= 1 mm m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Area Lift OSL (El. +1.71)
Pekerjaan Plat Bondex, t= 1 mm m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Area Lift OSL (El. +3.30)
Pekerjaan Kalsifloor m2
CNP 100*50*20*3.2 Kg
Siku 50x50x5 Kg
UNP 150 Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Area Lift OSL (El. +9.00)
Pekerjaan Kalsifloor m2
CNP 100*50*20*3.2 Kg
Siku 50x50x5 Kg
UNP 150 Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Slab Lantai (El. +3.30)
Pekerjaan Plat Bondex, t= 1 mm m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Lantai Beton Flat Floor m2
Pekerjaan Dak Floor (El. +7.43)
Pekerjaan Plat Bondex, t= 1 mm m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjan Waterprofing m2
Pekerjaan Slab LT. Jembatan (El. +8.90)
Pekerjaan Plat Bondex, t= 1 mm m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Arsitektur Lantai 2 - Zona 1
Pekerjaan Rangka Atap
CNP 150x50x20x3.2 Kg
Pekerjaan Sambungan Baja Kg
CNP 200x75x20x3.2 Kg
Pekerjaan Balok Baja H250*125*6*9 Kg
Pekerjaan Kolom Baja H350*175*7*11 Kg
Pekerjaan Sambungan Baja H450*200*9*14 Kg
Kait Angin (dia. 16 mm) Kg
Trekstang (dia. 12 mm) Kg
Jarum keras Pcs
MB HTB Ø M22x55 Pcs
MB HTB Ø M16x40 Pcs
Plat Strip Gording Kg
Talang Datar Zincalume m'
Pekerjaan Rangka Talang Siku Baja Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Dinding
Pek. Pasangan dinding bata ringan m2
Pek. Plasteran dinding Transram m2
Pek. Plasteran dinding m2
Pek. Acian m2
Kolom praktis m'
Ring Balok m'
Pek. Dinding Toilet Fin. Homogenous Tile m2
Pek. Cat Interior m2
Pek. Cat Exterior m2
Pek. Pasangan Wallpaper m2
Cor Beton untuk tanggulan dudukan curtainwall 10x10 m'
Pek. ACP Penutup balok tampak luar dan listplank m2
Pek. Dinding Gypsum 9 mm (Temporary IMF) m2
Pek. Pemasangan Banner (Temporary IMF) m2
Pekerjaan Lantai
Pek. Waterproofing m2
Pek. Lantai Homogenous Tile uk. 600x600 mm Polished m2
Pek. Lantai Homogenous Tile uk. 600x600 mm Unpolished m2
Pek. Step Nosing Tangga 100x600 mm unpolised m'
Pek. Self Leveling Compound 3mm m2
Pek. Lantai Vinyl m2
Pek. Kalsi Floor area counter desk (2 lapis) m2
Pek. Dilatasi m'
Pek. Lantai Parket Kayu m2
Pekerjaan Plafond
Pek. Plafond Gypsum tebal 9 mm m2
Pek. Cover Balok Gypsum tebal 9 mm m2
Pek. Plafond Gypsum WR t= 9 mm m2
Pek. Kalsiclad bawah tangga publik (satu sisi) m2
Pek. Pengecatan Plafond m2
Pek. Metal Linear Ceiling + penggantung & acc m2
Rangka Baja Ringan untuk penutup plafond nursery m2
Shadowline m'
Pekerjaan Kusen Pintu dan Jendela
Pintu type PA-1, uk. 900x2100 mm unit
Pintu type PA-2, uk. 1100x2100 mm unit
Pintu type PA-3, uk. 1700x2100 mm unit
Pintu type PA-4, uk. 900x2100 mm unit
Pekerjaan Pintu Besi
Pintu type PB1, uk. 1100x2100 mm, unit
Reilling Stainless steel untuk tangga penumpang m'
Reilling Stainless steel untuk tangga OSL m'
Reilling Stainless steel untuk Ramp m'
Pekerjaan Jendela dengan Curtain Wall Muliion 4" Powder Coating Putih
dan Kaca Laminated T= 5mm Dark Blue + PVB = 0,38 mm + Kaca 5 mm Clear
Mulion 4 " Powder Coating Putih m'
Transome Powder Coating Putih m'
Kaca Laminated T= 5mm Dark Blue + PVB = 0,38 mm + Kaca 5 mm Clear m2
Kusen Frame Alumunium 4" u/ kaca mati m'
Atap genteng keramik
- Rangka Kaso & Reng Baja Ringan m2
- Insulasi alumunium foil single side m2
- Genteng keramik (Karang Pilang) m2
- Bubungan genteng m'
- Pek. Murda Besar (Fiber glass finishing Cat tembaga) bh
- Pek. Ikat Celedu (Fiber glass finishing Cat tembaga) bh
- Listplank Kayu m'
- Pengecatan Lisplank m2
Atap genteng tepian
- Rangka Kaso & Reng Baja Ringan m2
- Genteng keramik (Karang Pilang) m2
- Bubungan genteng m'
- Pek. Ikut Celedu (Paras) bh
- Listplank Kayu m'
- Plafond Kalsiboard 6 mm m2
- Pengecatan Lisplank dan plafond m2
- Pek. Kalsiclad (Dudukan Bubungan) m2
Atap zincaluminium tebal 0.5 mm finishing color ( type U-672 ) m2
- Insulasi Bubble m2
Pekerjaan Sanitair
Closet Duduk CW 705 ENJ Unit
Closet Duduk CW 421J (Difable) Unit
Closet Jongkok CE 9 Unit
Shower Spray TB 19CS MCR Unit
Floor Drain TX1BN Unit
Paper Holder Closet YH116 Unit
Urinal U57 M Unit
Wastafel L 546 Unit
Wastafel LW 103JT 1 (Difable) Unit
Kran Wastafel TX 101LB Unit
Paper Holder Wastafel TX 8 Unit
Double Rube Hook TS 118 WSB Unit
Urinal Partisi A 100 Unit
Hand Ralling T113 BP3 ( Difable) Unit
Kaca Cermin 60 x 90 cm Unit
Partisi Kubikal Toilet kaca printing 10 mm + Accessories m2
Eco Washer TCW07S (Difable) Unit
Luggage Rack uk.1800x800 Unit
Cor Meja Wastafel m3
Pekerjaan Wiremesh M8 (1 lapis) m2
Bekisting Kayu m2
Meja Granite Wastafel m2
Acian Expose Beton Bawah Wastafel m2
Zona 2
LT. Dak UNIT 1 (El. +3.17)
Pekerjaan Bekisting Plat Bondex m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Lantai Beton Flat Floor m2
LT. Dak UNIT 2 (El. +3.17)
Pekerjaan Bekisting Plat Bondex m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Lantai Beton Flat Floor m2
Lt. Dak Massa 3 (El. +3.30)
Pekerjaan Plat Bondex, t= 1 mm m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Lantai Beton Flat Floor m2
LT. Dak UNIT 4 (El. +3.17)
Pekerjaan Bekisting Plat Bondex m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Lantai Beton Flat Floor m2
-Slab
Dilatasi m'
Self Leveling m2
Pekerjaan Baja Penutup Tangga Existing
Profil Baja IWF 250x125x6x9 Kg
Plat 10 mm Kg
Profil Baja IWF 200x100x5.5x8 Kg
Profil Baja IWF 500x200x10x16 Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Chemical Anchor M16 Pcs
Pekerjaan Rangka Atap
CNP 150x50x20x3.2 Kg
Pekerjaan Kolom Baja H350*175*7*11 Kg
Pekerjaan Balok Baja H450*200*9*14 Kg
Kait Angin (dia. 16 mm) Kg
Trekstang (dia. 12 mm) Kg
Jarum Keras Pcs
MB HTB Ø M22x55 Pcs
MB HTB Ø M16x40 Pcs
Plat Strip Gording Kg
Talang Datar Zincalume m'
Pekerjaan Rangka Talang Siku Baja Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Dinding
Pek. Pasangan dinding bata ringan m2
Pek. Plasteran dinding Transram m2
Pek. Plasteran dinding m2
Pek. Acian m2
Pek. Kolom praktis m'
Pek. Ring Balok m'
Pek. Dinding Toilet Fin. Homogenous Tile m2
Pek. Cat Interior m2
Pek. Cat Exterior m2
Pek. Dinding Gypsum 9 mm (Temporary IMF) m2
Pek. Pemasangan Banner (Temporary IMF) m2
Pek Pasang Kembali Pot & Kolom Promanade m'
Cor Beton untuk tanggulan dudukan curtainwall 10x10 m'
Pekerjaan Lantai
Pek. Waterproofing m2
Pek. Lantai Homogenous Tile uk. 600x600 mm Unpolished m2
Pek. Self Leveling Compound 3mm m2
Pek. Lantai Vinyl m2
Pek. Dilatasi m'
Pekerjaan Plafond
Pek. Cover Balok Gypsum tebal 9 mm m2
Pek. Plafond Gypsum WR t= 9 mm m2
Pek. Pengecatan Plafond m2
Pek. Metal Linear Ceiling + penggantung & acc m2
Shadowline m'
Pekerjaan Kusen Pintu dan Jendela
Pintu type PA-4, uk. 900x2100 mm unit
Pintu type PB1, uk. 1100x2100 mm, unit
Pintu type PB2, uk. 1700x2150 mm unit
Pekerjaan Jendela dengan Curtain Wall Muliion 4" Powder Coating Putih
dan Kaca Laminated T= 5mm Dark Blue + PVB = 0,38 mm + Kaca 5 mm Clear
Mulion 4 " Powder Coating Putih m'
Transome Powder Coating Putih m'
Kaca Laminated T= 5mm Dark Blue + PVB = 0,38 mm + Kaca 5 mm Clear m2
Kusen Frame Alumunium 4" u/ kaca mati m'
Pekerjaan Atap
Atap genteng keramik ( Karang Pilang )
- Rangka Kaso + Reng Baja Ringan m2
- Insulasi alumunium foil single side m2
- Genteng keramik (Karang Pilang) m2
- Bubungan genteng m'
- Pek. Murda Besar (Fiber glass finishing Cat tembaga) bh
- Pek. Ikat Celedu (Fiber glass finishing Cat tembaga) bh
- Listplank Kayu m
- Pengecatan Lisplank m2
Pekerjaan Atap Tambahan
Pek. Pasangan dinding bata ringan m2
Pek. Plasteran dinding m2
Pek. Acian m2
Pek. Ring Balok m'
Profil Baja Gording C 150x50x20x3,2 kg
Kait Angin (dia.16 mm) kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Atap zincaluminium tebal 0.5 mm finishing color ( type U-672 ) m2
- Insulasi Bubble m2
Pekerjaan Sanitair
Closet Duduk CW 705 ENJ Unit
Shower Spray TB 19CS MCR Unit
Floor Drain TX1BN Unit
Paper Holder Closet YH116 Unit
Urinal U57 M Unit
Wastafel L 546 Unit
Kran Wastafel TX 101LB Unit
Paper Holder Wastafel TX 8 Unit
Double Rube Hook TS 118 WSB Unit
Urinal Partisi A 100 Unit
Kaca Cermin 60 x 90 cm Unit
Partisi Kubikal Toilet kaca printing 10 mm + Accessories m2
Luggage Rack uk.1200x800 Unit
Cor Meja Wastafel m3
Pekerjaan Wiremesh M8 (1 lapis) m2
Bekisting Kayu m2
Meja Granite Wastafel m2
Acian Expose Beton Bawah Wastafel m2
Zona 3
-Pekerjaan Struktur Baja (El. +3.30)
Pekerjaan Balok Baja WF600X200X11X17 Kg
Pekerjaan Balok Baja WF300X150X6.5X9 Kg
Pekerjaan Balok Baja WF500X200X10X16 Kg
Pekerjaan Balok Baja WF400X200X8X13 Kg
Pekerjaan Balok Baja WF200X100X5.5X8 Kg
Pekerjaan Balok Baja H350*175*7*11 Kg
Pekerjaan Sambungan Baja Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
MB HTB Ø M24 ASTM A-325 Pcs
MB HTB Ø M22x55 Pcs
MB HTB Ø M22x50 Pcs
MB HTB Ø M16x40 Pcs
Pekerjaan Tangga Penumpang
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Profil Baja IWF 200x100x5.5x8 Kg
Pekerjaan Plat Siku Baja Kg
Pekerjaan Plat Sambung Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
MB HTB Ø M20x50 Pcs
MB HTB Ø M20x55 Pcs
MB HTB Ø M16x40 Pcs
MB HTB Ø M12x40 Pcs
Pekerjaan Rangka Atap
Profil Baja Gording C 150x50x20x3.2 Kg
Kait Angin (dia. 16 mm) Kg
Trekstang (dia. 12 mm) Kg
Jarum Keras Pcs
MB HTB Ø M22x55 Pcs
MB HTB Ø M16x40 Pcs
Plat Strip Gording Kg
Talang Datar Zincalume m'
Pekerjaan Rangka Talang Siku Baja Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Slab (El. +3.30)
Pekerjaan Plat Bondex, t= 1 mm m2
Pekerjaan Bekisting Plywood m2
Pekerjaan Wiremesh M8 (1 lapis) m2
Pekerjaan Beton fc' 29.05 Mpa m3
Pekerjaan Lantai Beton Flat Floor m2
Pekerjaan LT. 3 (El. +8.92)
Pekerjaan Plat KalsiFloor m2
Profil Baja Gording C 150x50x20x3.2 Kg
Pekerjaan Zincromate m2
Pekerjaan Finishing Cat Baja m2
Pekerjaan Dinding
Pek. Pasangan dinding Bata Ringan m2
Pek. Pasangan dinding kalsiclad (2 sisi) m2
Pek. Cover kolom & Balok (Kalsiclad 1 sisi) m2
Pek. Plasteran dinding m2
Pek. Acian m2
Pek. Kolom praktis m'
Pek. Ring Balok m'
Pek. Cat Interior m2
Pek. Cat Exterior m2
Pek. ACP Penutup balok tampak luar dan listplank m2
Pek. Dinding Gypsum 9 mm (Temporary IMF) m2
Pek. Pemasangan Banner (Temporary IMF) m2
Cor Beton untuk tanggulan dudukan curtainwall 10x10 m'
Pekerjaan Lantai
Pek. Lantai Homogenous Tile Tangga Polished m2
Pek. Self Leveling Compound 3mm m2
Pek. Lantai Vinyl m2
Pek. Step Nosing Tangga m'
Pek. Beton Screed Bangunan Existing m3
Pek. Dilatasi m'
Pekerjaan Plafond
Pek. Plafond Gypsum tebal 9mm m2
Pek. Plafond Gypsum tebal 9mm bawah tangga publik m2
Pek. Plafond Gypsum tebal 9mm Drop Ceiling m2
Pek. Pengecatan Plafond m2
Pek. Plafond metal Linear Ceiling m2
Pekerjaan Reilling
Reilling Stainless steel untuk tangga penumpang m'
Mulion 4 " Powder Coating Putih m'
Transome Powder Coating Putih m'
Kaca Laminated T= 5mm Dark Blue + PVB = 0,38 mm + Kaca 5 mm Clear m2
Kusen Frame Alumunium 4" u/ kaca mati m'
Atap zincaluminium tebal 0.5 mm finishing color ( type U-672 )
- Insulasi Bubble
Pekerjaan Atap
Atap zincaluminium tebal 0.5 mm finishing color ( type U-672 ) m2
- Insulasi Bubble m2

5 Pemmbongkaran 1.00 LS
Lantai 1 - Zona 1
Pembongkaran Rumah Pompa m2
Pembongkaran Kanopi Beton m2
PembongkaranTapak Dara Elv.-0.15 m2
Bobok lantai untuk dudukan travelator m3
Bobok lantai untuk pondasi lift OSL m3

Bongkar Saluran Batu Kali m3


Bongkar Saluran U-dith m3
Bongkar Saluran Beton Lama m3
Lantai 3 - Zona 1
Pembongkaran Railing Re-Packing m'
Pembongkaran Railing Check In Hall m'
Pembongkaran Plat Area Rencana Lift OSL m2
Pembongkaran Tangga Beton Area Rencana Lift OSL m3
Pembongkaran Railing+Kaca Tangga Area Rencana Lift OSL m2
Lantai 3 - Zona 3
Pembongkaran Tapak Dara m2
Pembongkaran Kaca Re-Packing m2
Pembongkaran Railing Re-Packing m'

TOTAL

6 Mekanikal dan Plumbing 1,800.00 M2


Pipa Hydrant BSCH 40 d150 m'
Pipa Hydrant BSCH 40 d100 m'
Pipa PPR d150 m'
Galian tanah m3
Boring m'
-Relokasi
PIPA PPR 80 mm m'
PIPA PPR 65 mm m'
-FF SPRINKLER
Pipa Black Steel Sch 40 dia. 150mm m'
Pipa Black Steel Sch 40 dia. 100mm m'
Pipa Black Steel Sch 40 dia. 80mm m'
Pipa Black Steel Sch 40 dia. 65mm m'
Pipa Black Steel Sch 40 dia. 50mm m'
BSCH 40 D40 m'
BSCH 40 D32 m'
BSCH 40 D25 m'
Head Splinkler unit
Fire Extingusher 3 kg unit
-Plumbing
Pipa PPR PN 10 DN 75 mm / 2.5" m'
Pipa PPR PN 10 DN 63 mm / 2" m'
Pipa PPR PN 10 DN 40 mm / 1 1/4" m'
Pipa PPR PN 10 DN 32 mm / 1" m'
Pipa PPR PN 10 DN 20 mm / 1/2" m'
Globe Valve Dia. 50 mm 2.00 buah
Globe Valve Dia. 65 mm 3.00 buah
-SWP
PVC D100 m'
PVC D65 m'
PVC D50 m'
-WW
PVC D100 m'
PVC D80 m'
PVC D65 m'
PVC D50 m'
PVC D40 m'
Venting - Pipa PVC AW dia. 100mm m'
Venting - Pipa PVC AW dia. 80mm m'
Venting - Pipa PVC AW dia. 65mm m'
Venting - Pipa PVC AW dia. 50mm m'
Venting - Pipa PVC AW dia. 40mm m'
Venting - Pipa PVC AW dia. 32mm m'
-FF HYDRANT
BSCH 40 D150 m'
BSCH 40 D100 m'
BSCH 40 D65 m'
BSCH 40 D40 m'
Gate Valve Klass 16K Dia. 150 mm unit
Gate Valve Klass 16K Dia.50 mm unit
Gate Valve Klass 16 K BCV Dia 150 mm unit
Sight Glass unit
Pekerjaan Pengadaan Box Hydrant
Box Hydran c/w, Landing Valve, Nozle, Hose Rack buah
Pekerjaan Pemasangan Box Hydrant
Box Hydran c/w, Landing Valve, Nozle, Hose Rack buah
-Pekerjaan Pemipaan Air Hujan
Rain Wtr - Pipa PVC AW dia. 150mm m
Rain Wtr - Pipa PVC AW dia. 100mm m
Roof Drain RD dia. 150mm m
Rain Wtr - Pipa Riser PVC AW dia. 150mm m
Roof Drain RD dia. 100mm m
Rain Wtr - Pipa Riser PVC AW dia. 150mm m
Pekerjaan Peralatan Air Bekas
P-Trap dia. 50mm unit

TOTAL

7 Elektrikal Bangunan 1,800.00 M2


-Pekerjaan Pengadaan Kabel Feeder
Dari Panel LV (CRB III Trafo 1250 KVA ) ke SDP CIC - NYY 4 x 300 mm2 m'
Dari Panel LV (SSC Trafo 800 KVA) ke SDP CIC - NYY 4 x 300 mm2 m'
Dari SDP CIC ke UPS 100 KVA - NYY 4 x 50 mm2 m'
Dari SDP CIC ke Panel ATS UPS - NYY 4 x 50 mm2 m'
Dari Panel ATS UPS ke PP Counter Check In - NYY 4 x 50 mm2 + NYA 2 m'
Dari SDP CIC ke LP Lt. Dasar - NYY 4 x 6 mm2 + NYA 6 mm2 m'
Dari SDP CIC ke AHU.1 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari PP. AHU.1 ke Unit AHU 1 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari SDP CIC ke AHU.2 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari PP AHU.2 ke Unit AHU 2 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari SDP CIC ke AHU.3 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari PP AHU.3 ke Unit AHU 3 - NYY 4 x 4 mm2 + NYA 4 mm2 m'
Dari SDP CIC ke PP-TRAVELATOR NYY 4 x 16 mm2 + NYA 16 mm2 m'
Dari PP-TRAVELATOR ke Travelator NYY 4 x 16mm2 m'
Dari SDP CIC ke PP-ESCALATOR-1 NYY 4 x 10 mm2 + NYA10 mm2 m'
Dari SDP CIC ke PP-ESCALATOR-2 NYY 4 x 10 mm2 m'
Dari SDP CIC ke Unit Eskalator-2 NYY 4 x 16 mm2 m'
Dari SDP CIC ke LP-2 NYY 4 x 10 mm2 + NYA 6 m'
Dari SDP CIC ke PP Lift (OSL) 4 x 10 mm2 + NYA 10 mm2 m'
Dari PP Counter Check In ke PP Signage NYY 4 x 10 mm2 m'
Dari PP Counter Check In ke LP Emergency NYY 4 x 6 mm2 m'
Dari Panel LV (Panel 1 BHS Eksisting Trafo 1250 KVA ) ke PP BHS m'
- NYY 4 x 300 mm2
Dari Panel LV (Panel 2 BHS Eksisting Trafo 1250 KVA ) ke PP BHS m'
- NYY 4 x 300 mm2
Dari PP. Counter Check In ke Smart Rack Elband - NYY 3 x 6 mm2 m'
-Pekerjaan Pemasangan kabel Feeder
Dari Panel LV (CRB III Trafo 1250 KVA ) ke SDP CIC - NYY 4 x 300 mm2 m'
Dari Panel LV (SSC Trafo 800 KVA) ke SDP CIC - NYY 4 x 300 mm2 m'
Dari SDP CIC ke UPS 100 KVA - NYY 4 x 50 mm2 m'
Dari SDP CIC ke Panel ATS UPS - NYY 4 x 50 mm2 m'
Dari Panel ATS UPS ke PP Counter Check In - NYY 4 x 50 mm2 + NYA 2 m'
Dari SDP CIC ke LP Lt. Dasar - NYY 4 x 6 mm2 + NYA 6 mm2 m'
Dari SDP CIC ke PP AHU.1 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari PP. AHU.1 ke Unit AHU 1 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari SDP CIC ke PP AHU.2 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari PP AHU.2 ke Unit AHU 2 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari SDP CIC ke PP AHU.3 - NYY 4 x 10 mm2 + NYA 10 mm2 m'
Dari PP AHU.3 ke Unit AHU 3 - NYY 4 x 4 mm2 + NYA 4 mm2 m'
Dari SDP CIC ke PP-TRAVELATOR NYY 4 x 16 mm2 + NYA 16 mm2 m'
Dari PP-TRAVELATOR ke Travelator NYY 4 x 16mm2 m'
Dari SDP CIC ke PP-ESCALATOR-1 NYY 4 x 10 mm2 + NYA10 mm2 m'
Dari SDP CIC ke PP-ESCALATOR-2 NYY 4 x 10 mm2 m'
Dari SDP CIC ke Unit Eskalator-2 NYY 4 x 16 mm2 m'
Dari SDP CIC ke LP-2 NYY 4 x 10 mm2 + NYA 6 m'
Dari SDP CIC ke PP Lift (OSL) 4 x 10 mm2 + NYA 10 mm2 m'
Dari PP Counter Check In ke PP Signage NYY 4 x 10 mm2 m'
Dari PP Counter Check In ke LP Emergency NYY 4 x 6 mm2 m'
Dari Panel LV (Panel 1 BHS Eksisting Trafo 1250 KVA ) ke PP BHS m'
- NYY 4 x 300 mm2
Dari Panel LV (Panel 2 BHS Eksisting Trafo 1250 KVA ) ke PP BHS m'
- NYY 4 x 300 mm2
Dari PP. Counter Check In ke Smart Rack Elband - NYY 3 x 6 mm2 m'

SDP - CIC Form 3B unit


PP - Counter Check In unit
LP - Dasar unit
PP - AHU 1 unit
PP - AHU 2 unit
PP - AHU 3 unit
PP - Travelator unit
P - BHS unit
LP - 2 unit
PP - Lift unit
PP - Signage unit
LP - Emergency unit

Pekerjaan Instalasi Panel - Panel


SDP - CIC Form 3B unit
PP - Counter Check In unit
LP - Dasar unit
PP - AHU 1 unit
PP - AHU 2 unit
PP - AHU 3 unit
PP - Travelator unit
P - BHS unit
LP - 2 unit
PP - Lift unit
PP - Signage unit
LP - Emergency unit
Relokasi UPS - 100 KVA unit
MCCB 630 A-800 A 4P unit
MCB 63 A 1P unit

Pekerjaan Pengadaan Grounnding Box


Ground Rod (ukuran 3/4" x 4 meter) unit
Terminal - Busbar (Tembaga) unit
Bak Kontrol Grounding PVC unit
BC 70 mm2 m
Kabel NYA 50 mm m
Kabel NYA 35 mm m
Kabel NYA 6 mm m
Material Bantu lot
Pekerjaan Instalasi Pembumian
Pembumian Body Panel + bak kontrol dan elektode pembumian lot
Pembumian penangkal petir + bak kontrol dan elektrode pembumian lot
Material Bantu lot

Pekerjaan Pengadaan Material Penangkal Petir


Splitzen Head ( Tombak ) unit
Tiang Support ( 1 " ) m'
Base Plate ( Terminal - Busbar ) lot
Kabel NYY 70 mm2 m'
Pekerjaan Pemasangan Material Penangkal Petir
Splitzen Head ( Tombak ) unit
Tiang Support ( 1 " ) m'
Base Plate ( Terminal - Busbar ) lot
Kabel NYY 70 mm2 m'

Pekerjaan Pengadaan Material Elektrikal


Lampu Downlight LED 12W D175 buah
Lampu Downlight LED 20W D200 buah
Lampu TL-D Reccessed 2x36W buah
Lampu TL TKO 1x36W buah
Lampu Sorot LED 50 Watt buah
Lampu T5 90 cm WW (Area Kaca Toilet) buah
Exit Slimline TL LED 1 x 3 Watt + Battery buah
Saklar Tunggal 10 A, 250 VAC buah
Saklar Ganda 10 A, 250 VAC buah
Stop Kontak 1 Gang - 1 x 200 watt buah
Stop Kontak 2 Gang 2 x 200 watt buah
Pekerjaan Instalasi Elektrikal
Instalasi Penerangan (NYM 3 x 2,5mm + PVC Conduit H.I 20mm) titik
Instalasi Stop Kontak (NYM 3 x 2,5mm + PVC Conduit H.I 20mm) titik
Instalasi Power Signage (NYM 3 x 2,5mm + PVC Conduit H.I 20mm) titik

TOTAL

Pekerjaan Elektronika Bangunan 1,800.00 M2


- Pekerjaan Pemasangan Serve FIDS
Instalasi monitor LED 43" unit
Instalasi monitor LED 55" unit
Instalasi, Setting dan Konfigurasi Module Controller Display unit
Site Acceptance Test & Comissioning lot

-Pekerjaan Pemasangan PAS


Instalasi Amplifier (lengkap dgn rak dan alat pendukung) titik
Instalasi Junction Box Sound System titik
(Kabel NYY3x1,5mm)
Instalasi Junction Box Sound System titik
(Kabel NYMHY2x2,5mm ke MDF SS, PVC counduit 20mm)
Instalasi 2 way Ceiling Speaker 6watt titik
Instalasi dari Kulkul 6 ke Kulkul 8 m
(Kabel NYMHY 2x1,5mm, PVC counduit 20mm)
Instalasi dari Kulkul 6 ke Kulkul 8 m
(Kabel NYY 3x1,5mm, PVC counduit 20mm)

-Pekerjaan Pemasangan Fire Alarm


Setting dan Intalasi Smoke Detector titik
Instalasi Titik detektor addressable dengan kabel FRC titik
AWG 18 dalam PVC Conduit 20 mm berserta detector
Instalasi Titik Manual Push Button addressable dengan titik
kabel FRC AWG 18 dalam PVC Conduit 20 mm berserta detector
Instalasi Titik Manual Call Point addressable dengan titik
kabel FRC AWG 18 dalam PVC Conduit 20 mm
berserta detector
Instalasi Titik alarm bell addressable dengan titik
kabel FRC AWG 18 dalam PVC Conduit 20 mm
berserta detector
Instalasi Titik breakglass addressable dengan titik
kabel FRC AWG 18 dalam PVC Conduit 20 mm
berserta detector
Instalasi Titik Strobe lamp addressable dengan titik
kabel FRC AWG 18 dalam PVC Conduit 20 mm
berserta detector
Instalasi Kabel Feeder dari MCFA ke TBFA-1 dengan m'
STP AWG 18 dalam PVC Conduit 20 mm
Instalasi Kabel Feeder dari MCFA ke TBFA-1 dengan m'
FRC 3x1,5 mm (PVC Conduit 20 mm)

-Pekerjaan pemasangan Jaringan Data


Instalasi UTP Cable cat 6 dari access switch titik

TOTAL
8 Pengadaan Travelator Lengkap dengan Control Panel 2.00 LS
Pengadaan Travelator Lengkap dengan Control Panel LS

TOTAL

Pengadaan Baggage Handling System 1.00 LS


Pengadaan Baggage Handling System 0.001 LS

TOTAL

9 Pengadaan Server FIDS 1.00 LS


a Server FIDS Include Software unit
(Intel¨ Xeon¨ E5_2609 v3, 16GB RAM, 2 x 1TB , 7.2K RPM
SATA 3.5" Hotplug driv, 16x SATA DVD +/- RW
, duel redundant PS 550W)

TOTAL

Pemasangan Server FIDS 1.00 LS


Instalasi, Setting dan Konfigurasi Server unit

TOTAL

10 Pengadaan FIDS 30 Titik 1.00 LS


Fixture
Module Controller Display (Easy & small unit
from Linux Configuration) (Intel-based I7, Fanless
& Solid State, inlcude FIDS client License
Monitor LED 43", include bracket unit
HDMI Cable unit

TOTAL

11 Pengadaan FIDS Desk Summary 1.00 LS


Fixture
Module Controller Display (Easy & small unit
from Linux Configuration) (Intel-based I7, Fanless
& Solid State, inlcude FIDS client License
Monitor LED 55", include bracket unit
HDMI Cable unit

TOTAL

12 Pengadaan ETD 1.00 LS


Explosive Trace Detector (ETD) unit

TOTAL

13 Pengadaan IP Phone 35.00 unit


Low end IP Telepon set PoE (satu merk/brand unit
dengan IP PABX)
Patch cord UTP cat.6,3m length (For connected IP phone unit
to face plate RJ 45 outlet)

TOTAL

Pemasangan IP Phone 1.00 LS


Instalasi, Setting, dan Konfigurasi IP Phone unit

TOTAL

14 Pengadaan CCTV 1.00 LS


- Surface mount bracket
P-T-Z IP Dome Camera 5MP unit
- 10 BASE-T/100 BASE-TX, RJ 45 outlet PoE support
- Surface mount bracket

IP Camera - Indoor Colour Bullet Fixed IP Camera unit


- 5 Megapixel, CMOS sensor
- 3 mm s/d 10 mm variable focal lens
- 10 BASE-T/100 BASE-TX, RJ 45 outlet PoE support

Patch Cord UTP Cat.6,2m length


- For connected camera to face plate RJ 45 outlet unit

TOTAL

Pemasangan CCTV 1.00 LS


Instalasi dan setting Fixed camera titik
Instalasi dan setting PTZ camera titik

TOTAL

15 Pengadaan PAS 1.00 LS


Junction Box (JB-SS) unit
Network Cable LBB4416/05 unit
Network Cable LBB4416/02 unit
Rack Power Amplifier unit
Power Amplifier 2x250W unit
Fixture
Ceiling Speaker, 6 watt titik
Box Speaker, 10 watt titik

TOTAL

Pemasangan PAS 1.00 LS


Instalasi Universal Speaker 10watt titik
(Kabel NYMHY 2x1,5mm, PVC counduit 20mm)

TOTAL

16 Pengadaan Fire Alarm 1.00 LS


Addressable Photoelectric Smoke Detector c/w base unit
Manual Push Button unit
Manual Call Point unit
Sounder dan Alarm Bell unit
Strobe Lamp unit
Break Glass unit
Loop Card Module 1 Loop unit
Terminal Box Fire Alarm set

TOTAL

-Pemasangan Fire Alarm 1.00 LS


Instalasi Kabel Feeder dari TBFA-1 ke TBFA-2 dengan m'
STP AWG 18 dalam PVC Conduit 20 mm

TOTAL

17 Pengadaan Jaringan Data & Distribution Switch 1.00 LS


Distribution Switches, rackmount 1U, IP Services unit
- 24-port SFP+ 10G port
- Mempunyai minimal 2-port 10GB SFP+
- Redundant PS 715 Watt
Access Swiches PoE, rackmount 1u, LANbase unit
- 24-port Gigabit RJ-45 PoE
- Dapat distack dengan kabel khusus tanpa
mengurangi RJ-45 port
- Mempunyai minimal 2-port 10GB SFP+
- Redundant PS 715 Watt
Network Module SFP 4 x 10GB unit
di ruang server existing ke access switch baru
diarea perluasan checkin.
Smart Rack 38U unit
10G SFP+ Transceiver Module, Single mode unit
Single mode fiber optic 12 core indoor dari core switch m'
Fiber Rackmount Enclouser 12 Core (lengkap dengan unit
FO Patch cable LC - LC OS2, 2M length unit
UTP Patch panel 24 port CAT 6A unit
Horizontal cable management unit
Face Plate outlet data RJ 45, 2 hole, unloaded unit
Face Plate outlet data RJ 45, 1 hole, unloaded unit
RJ 45 Modular Jack CAT 6 unit
RJ45 UTP patch cable CAT 6 , 2M length unit
RJ45 UTP patch cable CAT 6 , 1M length unit
Smart Rack 38U unit

TOTAL

- Pemasangan Jaringan Data 1.00 LS


Instalasi kabel fiber optic backbone single mode 12 core m'
dari perangkat distribution switch ke ruang access switch
area perluasan dalam conduit 20 mm
Instalasi kabel fiber optic backbone single mode 12 core m'
dari kulkul 8 ke core switch ruang elband existing
Instalasi Face Plate outlet data RJ 45 titik
Terminasi Fiber Optic Cable titik
Terminasi UTP Cable dan Labelling titik
Instalasi Smart rack unit
Instalasi switch beserta kelengkapannya unit
Setting Jaringan lot
TOTAL

18 PEKERJAAN PEMASANGAN AC 1.00 LS


Air Handling Unit (AHU) - 1 & 2 unit
Kapasitas : 75.9 TR, 25900 CFM / 11650 LPS, 4R
AC Split Wall 2 PK unit
Pealatan Utama (Pemasangan)
Air Handling Unit (AHU) - 1 & 2 unit
Kapasitas : 75.9 TR, 25900 CFM / 11650 LPS, 4R
Air Handling Unit (AHU) - 3 Existing (Bongkar dan Pasang) unit
Kapasitas : 14 TR, 6300 CFM / 2961 LPS, 4R
AC Split Wall 2 PK unit
Pekerjaan Pemipaan
Pipa Black Steel Sch. 40 dia.200mm + isolasi m
Pipa Black Steel Sch. 40 dia.150mm + isolasi m
Pipa Black Steel Sch. 40 dia.100mm + isolasi m
Pipa Black Steel Sch. 40 dia.65mm + isolasi m
Pipa Black Steel Sch. 40 dia.50mm + isolasi m
Supply - Return & Fresh ducting dgn PU Polyurethane m2
non insulation

TOTAL

19 PEKERJAAN LISTRIK DAN KELENGKAPANNYA 1.00 LOT


Grill and Damper
EAG 150x150 mm buah
VD 150x150 mm buah
VD 325x300 mm buah

Ducting
(Fabrikasi dan pemasangan lengkap dengan alat bantu dan accessories lainnnya sesuai dgn gambar dan spesifikasi)
Isolasi Dalam BJLS 60 m2

(Pengadaan dan pemasangan lengkap dengan alat bantu dan accessories lainnnya sesuai dgn gambar dan spesifika
Exhaust Fans - toilet1 unit
Tipe : Axial fan , Kapasitas : 600 CFM /282 LPS, SP 11 PA
Exhaust Fans - toilet unit
Tipe : Axial fan, Kapasitas : 1380 CFM /649 LPS, SP 34 PA

Grill and Damper


Supply Linier Bar Grille 300 x 300 mm buah
Supply Linier Bar Grille 400 x 400 mm buah
Supply Linier Bar Grille 150 x 150 mm buah
Supply Linier Bar Grille 1500 x 150 mm buah
Return Linier Bar Grille 1500 x 150 mm buah
Return Linier Bar Grille 150 x 150 mm buah
Fresh Air Grille 600 x 350 mm buah
VD 1300x500 mm buah
VD 800x500 mm buah
VD 600x500 mm buah
VD 500x500 mm buah
VD 400x400 mm buah
VD 400x300 mm buah
VD 150x150 mm buah

Baterfly Valve dia. 200 mm buah


Baterfly Valve dia. 100 mm buah
Flexible Joint dia.100 mmm buah
Flexible Joint dia.50 mmm buah
Strainer dia.100 mm buah
Strainer dia.50 mm buah
2 Way Motorized Valve dia.100 mm buah
2 Way Motorized Valve dia.50 mm buah
Thermometer 0-100 ⁰C buah
Pressure Gauge 0-10 buah
Material bantu lot

Isolasi Luar dan Dalam Plenum Box 1200x1500x1800 mm unit


Isolasi Luar dan Dalam Plenum Box 1700x1700x1700 mm unit
Isolasi Luar dan Dalam Plenum Box 2300x1500x800 mm unit
Isolasi Luar dan Dalam Plenum Box 3300x1800x1800 mm unit

TOTAL
REKAPITULASI LAPORAN MINGGUAN
PERLUASAN LANTAI 2 COUNTER CHECK IN PENUMPANG DITERMINAL INTERNATIONAL I GUSTI NGURAH RAI - BALI 2018

107,163,485,000.00

MINGGU KE - 39
BOBOT
HARGA SATUAN TOTAL PRESTASI BOBOT
(%) VOLUME
(%) (%)

198,000,000.00 0.185
120,731.71 -
19,800,000.00 -
9,900,000.00 -
151,793.93 -
9,900,000.00 -
594,000.00 -
- - -

7,865,000.00 14,157,000,000.00 13.211

31,840.00 - - - -
85,387.50 - 0.00 0.00 0.000
26,467.32 - - - -
95,216.00 - - - -

898,362.00 - 0.00 0.00 0.000


117,193.00 - 0.00 0.00 0.000
16,600.00 - 0.00 0.00 0.000
1,185,000.00 - 0.00 0.00 0.000

117,193.00 - - - -
16,600.00 - - - -
1,185,000.00 - - - -

271,330.50 - - - -
16,600.00 - - - -
1,185,000.00 - - - -
120,000.00 - - - -

85,387.50 - - - -
898,362.00 - - - -
117,193.00 - - - -
1,185,000.00 - - - -
16,600.00 - - - -

898,362.00 - - - -
271,330.50 - - - -
71,918.47 - - - -
1,185,000.00 - - - -

898,362.00 - - - -
71,918.47 - - - -
1,185,000.00 - - - -

898,362.00 - - - -
117,193.00 - - - -
16,600.00 - - - -
1,185,000.00 - - - -
- - - -
271,330.50 - - - -
16,600.00 - - - -
1,185,000.00 - - - -
- - - -
85,387.50 - - - -
26,467.32 - - - -
95,216.00 - - - -
898,362.00 - - - -
117,193.00 - - - -
271,330.50 - - - -
1,185,000.00 - - - -
16,600.00 - - - -
120,000.00 - - - -

31,840.00 - - - -
31,840.00 - - - -
286,035.37 - - - -
286,035.37 - - - -
31,840.00 - - - -
30,840.00 - - - -
77,600.00 - - - -
64,700.00 - - - -
64,700.00 - - - -
24,600.00 - - - -

31,840.00 - - - -
85,387.50 - - - -
26,467.32 - - - -
95,216.00 - - - -

898,362.00 - - - -
117,193.00 - - - -
16,600.00 - - - -
1,185,000.00 - - - -

117,193.00 - - - -
16,600.00 - - - -
1,185,000.00 - - - -

271,330.50 - 0.00 0.00 0.000


16,600.00 - 0.00 0.00 0.000
1,185,000.00 - 0.00 0.00 0.000
120,000.00 - - - -

898,362.00 - - - -
271,330.50 - - - -
71,918.47 - - - -
1,185,000.00 - - - -

898,362.00 - - - -
71,918.47 - - - -
1,185,000.00 - - - -
31,268.89 - - - -
31,268.89 - - - -
286,035.37 - - - -
286,035.37 - - - -
286,035.37 - - - -
30,840.00 - - - -

31,268.89 - - - -
30,840.00 - - - -
286,035.37 - - - -
286,035.37 - - - -
286,035.37 - - - -

31,840.00 - - - -
85,387.50 - 0.00 0.00 0.000
26,467.32 - - - -
95,216.00 - - - -
39,700.98 - - - -
117,193.00 - - - -

898,362.00 - 0.00 0.00 0.000


117,193.00 - 0.00 0.00 0.000
16,600.00 - 0.00 0.00 0.000
1,185,000.00 - 0.00 0.00 0.000

117,193.00 - - - -
271,330.50 - - - -
16,600.00 - - - -
1,185,000.00 - - - -

271,330.50 - - - -
16,600.00 - - - -
1,185,000.00 - - - -
120,000.00 - - - -

898,362.00 - - - -
286,035.37 - - - -
271,330.50 - - - -
71,918.47 - - - -
1,185,000.00 - - - -
1,185,000.00 - - - -

31,268.89 - - - -
31,268.89 - - - -
286,035.37 - - - -
286,035.37 - - - -
30,840.00 - - - -

31,268.89 - - - -
- - -
- - -
- - -
- - -
- - -

31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -

144,420.00 - - - -
45,000.00 - - - -
227,500.00 - - - -
44,650.00 - - - -
88,880.00 - - - -
106,660.00 - - - -
158,450.00 - - - -

850,000.00 - - - -
145,000.00 - - - -
290,000.00 - - - -
290,000.00 - - - -

290,000.00 - - - -
1,020,408.16 - - - -
1,500,000.00 - - - -
290,000.00 - - - -
290,000.00 - - - -
290,000.00 - - - -
100,000.00 - - - -

- - - -
- - - -
290,000.00 - - - -
290,000.00 - - - -
180,000.00 - - - -
- - - -
180,000.00 - - - -
- - - -
148,500.00 - - - -
- - - -
- - - -
- - - -

201,500.00 - - - -
178,400.00 - - - -

0.00 0.000 0.000

1,265,000.00 2.12

85,387.50 - - - -
898,362.00 - - - -
1,059,460.50 - - - -
1,185,000.00 - - - -
95,216.00 - - - -
117,193.00 - - - -
61,544.43 - - - -
37,416.50 - - - -
286,035.37 - - - -
71,918.47 - - - -
1,185,000.00 - - - -
117,193.00 - - - -
15,000.00 - - - -
898,362.00 - - - -
1,185,000.00 - - - -
71,918.47 - - - -
117,193.00 - - - -

15,000.00 - - - -
898,362.00 - - - -
1,185,000.00 - - - -
71,918.47 - - - -
117,193.00 - - - -

117,193.00 - - - -
71,918.47 - - - -
1,185,000.00 - - - -
61,544.43 - - - -
37,416.50 - - - -

234,050.00 - - - -
88,400.00 - - - -
45,090.00 - - - -
117,160.00 - - - -
149,630.00 - - - -
46,120.00 - - - -
61,150.00 - - - -
- - - -
65,350.00 - - - -
211,250.00 - - - -
445,250.00 - - - -
254,890.00 - - - -
256,100.00 - - - -
1,328,980.00 - - - -
111,330.00 - - - -
1,328,980.00 - - - -
149,870.00 - - - -
61,150.00 - - - -
- - - -
14,338,880.00 - - - -
19,123,380.00 - - - -
880,900.00 - - - -

- - -
234,050.00 - - - -
88,400.00 - - - -
45,090.00 - - - -
117,160.00 - - - -
149,630.00 - - - -
46,120.00 - - - -
61,150.00 - - - -
302,790.00 - - - -
- - - -
65,350.00 - - - -
211,250.00 - - - -
445,250.00 - - - -
149,870.00 - - - -
61,150.00 - - - -
- - - -
14,338,880.00 - - - -
880,900.00 - - - -
19,123,380.00 - - - -

234,050.00 - - - -
435,910.00 - - - -
88,400.00 - - - -
45,090.00 - - - -
117,160.00 - - - -
149,630.00 - - - -
302,790.00 - - - -
46,120.00 - - - -
61,150.00 - - - -
196,640.00 - - - -
116,060.00 - - - -
- - - -
65,350.00 - - - -
- - - -
19,123,380.00 - - - -
5,842,000.00 - - - -
10,103,900.00 - - - -

- - -

8,415,000.00 15,147,000,000.00 14.134

31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
77,600.00 - - - -
64,700.00 - - - -
64,700.00 - - - -
24,600.00 - - - -

31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
64,700.00 - - - -
24,600.00 - - - -

31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -

31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -

31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
286,035.37 - - - -
286,035.37 - - - -
77,600.00 - - - -
24,600.00 - - - -
-
31,268.89 - - - -
31,268.89 - - - -

31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
77,600.00 - - - -
64,700.00 - - - -
-
31,268.89 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
-
31,268.89 - - - -
31,268.89 - - - -
24,600.00 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
-
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -

286,035.37 - - - -
271,330.50 - - - -
71,918.47 - - - -
1,185,000.00 - - - -
- - - -
286,035.37 - - - -
271,330.50 - - - -
71,918.47 - - - -
1,185,000.00 - - - -
- - - -
527,040.00 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
- - - -
527,040.00 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -

286,035.37 - - - -
271,330.50 - - - -
71,918.47 - - - -
1,185,000.00 - - - -
59,350.00 - - - -
- - - -
286,035.37 - - - -
271,330.50 - - - -
71,918.47 - - - -
1,185,000.00 - - - -
154,290.00 - - - -

286,035.37 - - - -
271,330.50 - - - -
71,918.47 - - - -
1,185,000.00 - - - -

31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
46,950.00 - - - -
64,700.00 - - - -
24,600.00 - - - -
31,268.89 - - - -
247,790.00 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -

234,050.00 - - - -
73,096.00 - - - -
70,720.00 - - - -
45,090.00 - - - -
117,160.00 - - - -
149,630.00 - - - -
679,930.00 - - - -
46,120.00 - - - -
61,150.00 - - - -
368,060.00 - - - -
117,160.00 - - - -
827,568.00 - - - -
196,640.00 - - - -
116,060.00 - - - -
- - -
154,290.00 - - - -
495,960.00 - - - -
577,970.00 - - - -
238,050.00 - - - -
104,830.00 - - - -
608,480.00 - - - -
740,420.00 - - - -
160,420.00 - - - -
402,630.00 - - - -

196,640.00 - - - -
196,640.00 - - - -
219,370.00 - - - -
302,790.00 - - - -
46,120.00 - - - -
822,740.00 - - - -
163,680.00 - - - -
27,000.00 - - - -
- - - -
5,842,000.00 - - - -
7,225,300.00 - - - -
10,103,900.00 - - - -
5,842,000.00 - - - -
- - - -
14,338,880.00 - - - -
1,475,000.00 - - - -
1,475,000.00 - - - -
1,475,000.00 - - - -
- - - -
- - - -
438,330.00 - - - -
305,980.00 - - - -
1,141,330.00 - - - -
235,660.00 - - - -

163,680.00 - - - -
52,440.00 - - - -
194,410.00 - - - -
200,800.00 - - - -
4,888,300.00 - - - -
2,388,300.00 - - - -
164,610.00 - - - -
61,150.00 - - - -
- - - -
163,680.00 - - - -
194,410.00 - - - -
200,800.00 - - - -
738,300.00 - - - -
164,610.00 - - - -
224,000.00 - - - -
61,150.00 - - - -
302,790.00 - - - -
356,520.00 - - - -
134,170.00 - - - -
6,462,450.00 - - - -
3,823,050.00 - - - -
4,220,930.00 - - - -
1,063,600.00 - - - -
472,950.00 - - - -
684,650.00 - - - -
4,301,560.00 - - - -
1,642,260.00 - - - -
2,571,860.00 - - - -
1,446,190.00 - - - -
701,650.00 - - - -
251,650.00 - - - -
1,732,400.00 - - - -
3,169,640.00 - - - -
235,030.00 - - - -
3,437,390.00 - - - -
1,968,050.00 - - - -
11,800,000.00 - - - -
1,328,980.00 - - - -
111,330.00 - - - -
390,470.00 - - - -
2,070,000.00 - - - -
45,090.00 - - - -

286,035.37 -
271,330.50 -
71,918.47 -
1,185,000.00 -
59,350.00 -

286,035.37 -
271,330.50 -
71,918.47 -
1,185,000.00 -
59,350.00 -

286,035.37 -
271,330.50 -
71,918.47 -
1,185,000.00 - - - -
59,350.00 - - - -

286,035.37 -
271,330.50 -
71,918.47 -
1,185,000.00 -
59,350.00 -

43,750.00 - - - -
84,990.00 - - - -

31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
24,600.00 - - - -

31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
16,600.00 - - - -
16,600.00 - - - -
46,950.00 - - - -
64,700.00 - - - -
24,600.00 - - - -
31,268.89 - - - -
247,790.00 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -

234,050.00 - - - -
91,370.00 - - - -
88,400.00 - - - -
45,090.00 - - - -
117,160.00 - - - -
149,630.00 - - - -
679,930.00 - - - -
46,120.00 - - - -
61,150.00 - - - -
196,640.00 - - - -
116,060.00 - - - -
437,000.00 - - - -
117,160.00 - - - -

154,290.00 - - - -
577,970.00 - - - -
104,830.00 - - - -
760,600.00 - - - -
160,420.00 - - - -
- - - -
196,640.00 - - - -
219,370.00 - - - -
46,120.00 - - - -
822,740.00 - - - -
27,000.00 - - - -
- - - -
5,842,000.00 - - - -
13,920,000.00 - - - -
18,704,500.00 - - - -
- - - -
- - - -
438,330.00 - - - -
305,980.00 - - - -
1,141,330.00 - - - -
235,660.00 - - - -

163,680.00 - - - -
52,440.00 - - - -
194,410.00 - - - -
200,800.00 - - - -
4,888,300.00 - - - -
2,388,300.00 - - - -
164,610.00 - - - -
61,150.00 - - - -
- - - -
234,050.00 - - - -
88,400.00 - - - -
45,090.00 - - - -
149,630.00 - - - -
46,950.00 - - - -
46,950.00 - - - -
40,510.00 - - - -
63,780.00 - - - -
356,520.00 - - - -
134,170.00 - - - -

6,462,450.00 - - - -
1,063,600.00 - - - -
472,950.00 - - - -
684,650.00 - - - -
4,301,560.00 - - - -
1,642,260.00 - - - -
1,446,190.00 - - - -
701,650.00 - - - -
251,650.00 - - - -
1,732,400.00 - - - -
235,030.00 - - - -
3,437,390.00 - - - -
8,500,000.00 - - - -
1,328,980.00 - - - -
111,330.00 - - - -
390,470.00 - - - -
2,070,000.00 - - - -
45,090.00 - - - -

31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
77,600.00 - - - -
64,700.00 - - - -
64,700.00 - - - -
24,600.00 - - - -

71,918.47 - - - -
1,185,000.00 - - - -
31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
43,700.00 - - - -
45,600.00 - - - -
24,600.00 - - - -
16,150.00 - - - -

31,268.89 - - - -
31,268.89 - - - -
31,268.89 - - - -
46,950.00 - - - -
64,700.00 - - - -
24,600.00 - - - -
31,268.89 - - - -
247,790.00 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -
-
286,035.37 - - - -
271,330.50 - - - -
71,918.47 - - - -
1,185,000.00 - - - -
59,350.00 - - - -
- - - -
527,040.00 - - - -
31,268.89 - - - -
30,840.00 - - - -
40,510.00 - - - -

234,050.00 - - - -
435,910.00 - - - -
302,790.00 - - - -
88,400.00 - - - -
45,090.00 - - - -
117,160.00 - - - -
149,630.00 - - - -
46,120.00 - - - -
61,150.00 - - - -
1,034,460.00 - - - -
196,640.00 - - - -
116,060.00 - - - -
117,160.00 - - - -
- - - -
495,960.00 - - - -
104,830.00 - - - -
760,600.00 - - - -
211,250.00 - - - -
1,328,980.00 - - - -
160,420.00 - - - -

196,640.00 - - - -
196,640.00 - - - -
196,640.00 - - - -
46,120.00 - - - -
822,740.00 - - - -
1,475,000.00 - - - -
438,330.00 - - - -
305,980.00 - - - -
1,141,330.00 - - - -
235,660.00 - - - -

356,520.00 - - - -
134,170.00 - - - -

- - -

73,150,000.00 0.068

960,960.00 - - - -
421,660.00 - - - -
250,250.00 - - - -
1,050,260.00 - - - -
1,050,260.00 - - - -

600,600.00 - - - -
440,150.00 - - - -
440,150.00 - - - -

48,080.00 - - - -
146,660.00 - - - -
665,940.00 - - - -
798,920.00 - - - -
176,000.00 - - - -

250,250.00 - - - -
98,240.00 - - - -
48,080.00 - - - -

- - -

1,375,000.00 2,475,000,000.00 2.31


645,400.00 -
386,300.00 -
2,804,458.00 -
40,600.00 -
515,000.00 -

661,476.00 -
410,346.00 -

410,346.00 - - - -
410,346.00 - - - -
410,346.00 - - - -
410,346.00 - - - -
410,346.00 - - - -
122,300.00 - - - -
94,500.00 - - - -
73,200.00 - - - -
99,000.00 - - - -
779,000.00 - - - -

425,150.00 - - - -
278,200.00 -
181,700.00 -
122,740.00 - - - -
82,120.00 - - - -
1,695,980.00 3,391,960.00 - - -
4,843,080.00 14,529,240.00 - - -

140,770.00 - - - -
76,200.00 -
51,800.00 -

140,770.00 - - - -
97,100.00 -
76,200.00 - - - -
51,800.00 -
44,330.00 - - - -
140,770.00 - - - -
95,790.00 - - - -
75,950.00 - - - -
51,610.00 - - - -
44,330.00 - - - -
40,970.00 - - - -

1,160,820.00 - - - -
386,300.00 -
218,100.00 -
122,300.00 -
42,777,900.00 - - - -
8,418,000.00 - - - -
30,475,000.00 - - - -
2,012,500.00 - - - -

5,370,385.00 - - - -

947,710.00 - - - -

319,720.00 - - - -
140,770.00 - - - -
1,675,000.00 - - - -
319,720.00 - - - -
1,380,000.00 - - - -
319,720.00 - - - -

62,740.00 - - - -

- - -

783,750.00 1,410,750,000.00 1.32

2,064,320.00 - - - -
2,064,320.00 - - - -
294,600.00 - - - -
294,600.00 - - - -
332,000.00 - - - -
63,200.00 - - - -
101,670.00 - - - -
101,670.00 - - - -
101,670.00 - - - -
101,670.00 - - - -
101,670.00 - - - -
47,500.00 - - - -
159,480.00 - - - -
159,480.00 - - - -
101,670.00 - - - -
83,860.00 - - - -
159,480.00 - - - -
94,490.00 - - - -
101,670.00 - - - -
83,860.00 - - - -
52,570.00 - - - -
2,064,320.00 - - - -

2,064,320.00 - - - -

52,570.00 - - - -

624,650.00 - - - -
624,650.00 - - - -
624,650.00 - - - -
624,650.00 - - - -
624,650.00 - - - -
28,860.00 - - - -
42,250.00 - - - -
42,250.00 - - - -
42,250.00 - - - -
42,250.00 - - - -
42,250.00 - - - -
14,450.00 - - - -
68,150.00 - - - -
68,150.00 - - - -
42,250.00 - - - -
22,970.00 - - - -
68,150.00 - - - -
36,580.00 - - - -
42,250.00 - - - -
22,970.00 - - - -
14,450.00 - - - -
624,650.00 - - - -

624,650.00 - - - -

14,450.00 - - - -

465,745,800.00 - - - -
69,368,000.00 - - - -
65,748,800.00 - - - -
42,827,200.00 - - - -
42,827,200.00 - - - -
42,827,200.00 - - - -
66,163,500.00 - - - -
515,472,100.00 - - - -
119,395,900.00 - - - -
51,234,300.00 - - - -
178,735,700.00 - - - -
83,203,900.00 - - - -

2,320,000.00 - - - -
2,320,000.00 - - - -
1,740,000.00 - - - -
2,320,000.00 - - - -
2,320,000.00 - - - -
2,320,000.00 - - - -
2,320,000.00 - - - -
2,320,000.00 - - - -
2,320,000.00 - - - -
2,320,000.00 - - - -
1,740,000.00 - - - -
2,320,000.00 - - - -
2,320,000.00 - - - -
2,320,000.00 - - - -
2,320,000.00 - - - -

313,087.50 - - - -
939,262.50 - - - -
4,625,584.05 - - - -
62,617.50 - - - -
62,617.50 - - - -
62,617.50 - - - -
62,617.50 - - - -
5,500,000.00 - - - -

10,018,800.00 - - - -
10,018,800.00 - - - -
4,400,000.00 - - - -

17,855,161.00 - - - -
7,096,650.00 - - - -
2,661,243.00 - - - -
177,416.00 - - - -

1,474,404.65 - - - -
2,128,995.00 - - - -
798,373.70 - - - -
53,225.45 - - - -

300,000.00 - - - -
325,000.00 - - - -
913,000.00 - - - -
412,000.00 - - - -
945,000.00 - - - -
300,000.00 - - - -
1,500,000.00 - - - -
52,555.00 - - - -
64,526.50 - - - -
60,950.00 - - - -
60,950.00 - - - -

540,500.00 - - - -
805,000.00 - - - -
805,000.00 - - - -

- - -

770,000.00 1.29

184,020.00 - - - -
184,020.00 - - - -
3,504,670.00 - - - -
17,350,000.00 -

25,100,000.00 - - - -
7,869,400.00 - - - -

2,757,900.00 - - - -

1,147,920.00 - - - -
60,980.00 - - - -

75,170.00 - - - -

285,230.00 - - - -
1,302,250.00 - - - -

4,340,850.00 - - - -

4,340,850.00 - - - -

4,340,850.00 - - - -

4,340,850.00 - - - -

4,340,850.00 - - - -

143,400.00 - - - -

91,860.00 - - - -

4,790,140.00 - - - -

- - -
1,490,500,000.00 2.78
1,490,500,000.00 - 0 - -

- - -

41,686,790,836.00 42.79
41,686,790,836.00 41,686,790.84 0.001 0.10 0.043

0.00 0.100 0.043

344,868,336.45 344,868,336.45 0.32


172,434,168.23 - - -

- - -

59,890,050.00 0.06
51,780,710.00 - - - -

- - -

797,251,950.00 797,251,950.00 0.74

23,367,070.00 - - - -

13,616,290.00 - - - -
734,000.00 - - - -

- - -

119,010,870.00 119,010,870.00 0.11

23,367,070.00 - - - -

51,015,480.00 - - - -
734,000.00 - - - -

- - -

1,092,661,900.00 1.02
1,316,091,800.00 - - - -

- - -

6,644,498.85 232,557,459.75 0.22


6,988,450.00 - - - -

208,070.00 - - - -

- - -

9,615,375.00 0.01
262,850.00 - - - -

- - -

749,449,800.00 749,449,800.00 0.70

99,153,370.00 - - - -

24,441,120.00 - - - -

208,070.00 - - - -

- - -

11,375,812.80 0.01
453,500.00 - - - -
453,500.00 - - - -

- - -

319,120,560.00 319,120,560.00 0.30


2,531,740.00 - - - -
3,080,120.00 - - - -
2,070,500.00 - - - -
23,765,650.00 - - - -
101,238,220.00 - - - -

1,221,800.00 - - - -
2,109,450.00 - - - -

- - -

40,659,300.00 0.04
1,736,340.00 - - - -

- - -

139,700,000.00 139,700,000.00 0.13


3,716,650.00 130,082,750.00 - - -
1,230,000.00 1,230,000.00 - - -
1,230,000.00 1,230,000.00 - - -
1,095,720.00 1,230,000.00 - - -
1,605,150.00 1,230,000.00 - - -
1,095,720.00 1,230,000.00 - - -
16,213,240.00 1,230,000.00 - - -
7,435,350.00 1,230,000.00 - - -

- - -

14,357,128.50 0.01
143,400.00 - - - -

- - -

4,056,940,998.00 4,056,940,998.00 3.79


429,276,150.00 - - - -

144,757,670.00 - - - -

56,388,320.00 - - - -

353,625,000.00 - - - -
81,291,720.00 - - - -
32,800.00 - - - -
7,484,550.00 - - - -
384,370.00 - - - -
6,618,420.00 - - - -
274,700.00 - - - -
83,020.00 - - - -
76,870.00 - - - -
193,720.00 - - - -
196,800.00 - - - -
208,070.00 - - - -
353,625,000.00 -

- - -

277,370,052.30 0.26
19,950.00 -

19,950.00 -

41,510.00 -
350,550.00 -
87,630.00 -
5,842,500.00 -
11,685,000.00 -
196,599,580.00 - - - -
- - -

1,936,000,000.00 1,936,000,000.00 1.81


287,500,000.00 - - -

9,943,000.00 - - - -

11,500,000.00 - - - -

20,125,000.00 - - - -

1,200,000.00 - - - -

1,768,800.00 - - - -
1,415,200.00 - - - -
856,660.00 - - - -
541,140.00 - - - -
381,524.00 - - - -
421,600.00 - - - -

- - -

500,500,000.00 0.47

174,000.00 - - - -
320,160.00 - - - -
747,040.00 - - - -

nnnya sesuai dgn gambar dan spesifikasi)


273,100.00 - - - -

lainnnya sesuai dgn gambar dan spesifikasi)


6,459,750.00 - - - -

15,387,400.00 - - - -

317,400.00 - - - -
423,200.00 - - - -
158,700.00 - - - -
1,176,450.00 - - - -
1,176,450.00 - - - -
158,700.00 - - - -
1,005,100.00 - - - -
1,725,000.00 - - - -
1,380,000.00 - - - -
1,163,800.00 - - - -
1,092,500.00 - - - -
846,400.00 - - - -
740,600.00 - - - -
320,160.00 - - - -

5,220,000.00 - - - -
2,900,000.00 - - - -
5,452,000.00 - - - -
870,000.00 - - - -
5,220,000.00 - - - -
2,030,000.00 - - - -
14,500,000.00 - - - -
5,800,000.00 - - - -
638,000.00 - - - -
406,000.00 - - - -
8,700,000.00 - - - -

7,195,360.00 - - - -
9,902,680.00 - - - -
7,412,400.00 - - - -
16,857,930.00 - - - -

- - -
STI NGURAH RAI - BALI 2018

MINGGU KE - 40
TOTAL
PRESTASI BOBOT TOTAL VOLUME
VOLUME BOBOT
(%) (%)

0.035 307.50
0.018 1.00
0.009 1.00
0.024 130.44
0.011 1.00
0.087 150.00
- - - 0.185

- - - 0.003 113.52
0.00 0.00 0.000 0.164 2,057.15
- - - 0.035 1,402.58
- - - 0.058 654.57

- - - 0.031 37.32
- - - 0.056 509.13
- - - 0.598 38,623.83
- - - 0.255 230.47

- - - 0.117 1,074.00
- - - 0.719 46,444.65
- - - 0.238 214.80

- - - 0.052 205.80
- - - 0.157 10,104.10
- - - 0.033 29.51
- - - 0.004 39.00

- - - 0.003 41.65
- - - 0.002 2.94
- - - 0.003 29.40
- - - 0.013 11.76
- - - 0.029 1,872.60

- - - 0.006 6.78
- - - 0.005 21.66
- - - 0.018 271.35
- - - 0.027 24.08

- - - 0.003 3.87
- - - 0.010 154.91
- - - 0.017 15.49

- - - 0.001 1.30
- - - 0.004 32.80
- - - 0.022 1,420.92
- - - 0.011 9.68
- - - - -
- - - 0.007 26.04
- - - 0.008 486.93
- - - 0.004 3.27
- - - - -
- - - 0.002 31.36
- - - 0.001 22.81
- - - 0.001 8.54
- - - 0.001 1.01
- - - 0.002 16.80
- - - 0.015 59.07
- - - 0.031 27.65
- - - 0.031 1,996.15
- - - 0.001 7.00

- - - 2.081 70,040.06
- - - 0.067 2,251.27
- - - 0.056 210.00
- - - 0.006 24.00
- - - 2.462 82,877.94
- - - 0.069 2,398.37
- - - 0.111 1,536.00
- - - 0.009 150.00
- - - 0.036 600.00
- - - 0.006 242.00

- - - 0.017 563.70
- - - 0.046 574.95
- - - 0.009 369.82
- - - 0.018 205.13

- - - 0.009 10.87
- - - 0.024 216.82
- - - 0.247 15,958.36
- - - 0.100 90.34

- - - 0.027 247.22
- - - 0.210 13,544.87
- - - 0.055 49.44

- - - 0.021 84.48
- - - 0.071 4,584.05
- - - 0.014 12.72
- - - 0.007 60.00

- - - 0.007 8.84
- - - 0.006 23.85
- - - 0.024 353.68
- - - 0.035 32.00

- - - 0.013 15.51
- - - 0.042 620.42
- - - 0.069 62.04
- - - 1.206 41,346.99
- - - 0.083 2,843.71
- - - 0.026 96.00
- - - 0.021 80.00
- - - 0.038 144.00
- - - 0.014 476.85

- - - 2.436 83,493.21
- - - 0.054 1,866.60
- - - 0.452 1,692.00
- - - 0.158 592.00
- - - 0.141 530.00

- - - 0.006 191.40
0.00 0.00 0.000 0.077 963.84
- - - 0.017 670.62
- - - 0.026 293.22
- - - 0.006 152.92
- - - 0.001 10.00

0.00 0.00 0.000 0.017 20.70


0.00 0.00 0.000 0.035 319.78
0.00 0.00 0.000 0.359 23,156.94
0.00 0.00 0.000 0.140 126.62

0.00 0.00 0.000 0.043 389.71


0.00 0.00 0.000 0.027 106.47
0.00 0.00 0.000 0.372 24,041.18
- - - 0.093 84.22

- - - 0.036 143.65
- - - 0.128 8,262.64
- - - 0.020 17.96
- - - 0.006 50.00

- - - 0.043 50.97
- - - 0.021 78.04
- - - 0.011 42.77
- - - 0.137 2,038.98
- - - 0.207 187.46
- - - 0.011 10.28

- - - 1.709 58,565.04
- - - 0.079 2,696.83
- - - 0.068 254.00
- - - 0.005 18.00
- - - 0.022 780.13

- - - 0.876 30,021.33
- - - -
- - - -
- - - -
- - - -
- - - -

- - - 0.029 983.75
- - - 0.002 64.60
- - - 0.002 64.60

- - - 0.009 64.00
- - - 0.001 16.00
- - - 0.065 303.88
- - - 0.006 134.00
- - - 0.007 86.00
- - - 0.007 68.80
- - - 0.002 11.04

- - - 0.026 33.39
- - - 0.006 42.32
- - - 0.067 249.40
- - - 0.001 3.52

- - - 0.007 24.50
- - - 0.001 1.00
- - - 0.020 14.03
- - - 0.003 10.00
- - - 0.002 5.70
- - - 0.004 12.93
- - - 0.001 12.00

- - - -
- - - -
- - - 0.025 93.40
- - - 0.011 40.60
- - - 0.004 26.39
- - - -
- - - 0.004 21.60
- - - -
- - - 0.001 10.80
- - - -
- - - -
- - - -

- - - 0.023 122.52
- - - 0.043 258.66

0.00 0.000 0.000 18.374

- - - 0.034 429.24
- - - 0.015 17.96
- - - 0.147 148.32
- - - 0.024 21.55
- - - 0.038 429.24
- - - 0.006 53.88
- - - 0.009 161.64
- - - 0.006 161.64
- - - 0.011 245.60
- - - 0.005 491.20
- - - 0.009 49.12
- - - 0.001 49.12
-
- - - 0.002 116.60
- - - 0.005 5.83
- - - 0.019 17.49
- - - 0.008 116.60
- - - 0.001 11.37
-
- - - 0.002 135.72
- - - 0.006 6.79
- - - 0.023 20.36
- - - 0.009 135.72
- - - 0.001 12.39
-
- - - 0.001 40.16
- - - 0.000 40.16
- - - 0.001 4.02
- - - 0.000 40.16
- - - 0.000 40.16
-
-
- - - 0.036 162.83
- - - 0.033 397.97
- - - 0.017 415.15
- - - 0.008 75.90
- - - 0.000 3.20
- - - 0.010 238.91
- - - 0.007 124.23
- - - - -
- - - 0.005 77.76
- - - 0.006 29.40
- - - 0.015 36.92
- - - 0.012 51.72
- - - 0.177 738.88
- - - 0.011 8.70
- - - 0.018 173.91
- - - 0.022 17.39
- - - 0.022 155.45
- - - 0.004 69.95
- - - - -
- - - 0.013 1.00
- - - 0.018 1.00
- - - 0.007 8.54
- -
- - - - -
- - - 0.041 185.89
- - - 0.035 419.16
- - - 0.018 436.99
- - - 0.013 115.50
- - - 0.001 5.30
- - - 0.011 259.77
- - - 0.047 818.57
- - - 0.185 656.33
- - - - -
- - - 0.007 111.29
- - - 0.008 38.37
- - - 0.012 29.40
- - - 0.015 104.45
- - - 0.003 47.00
- - - - -
- - - 0.013 1.00
- - - 0.007 8.54
- - - 0.036 2.00
- -
- -
- - - 0.064 293.48
- - - 0.233 573.78
- - - 0.054 648.65
- - - 0.027 648.65
- - - 0.014 132.00
- - - 0.001 7.40
- - - 0.021 76.08
- - - 0.043 1,004.60
- - - 0.047 828.48
- - - 0.015 83.83
- - - 0.009 83.83
- - - - -
- - - 0.056 916.79
- - - - -
- - - 0.054 3.00
- - - 0.022 4.00
- - - 0.009 1.00

- - - 1.944

- - - 0.113 3,876.97
- - - 0.571 19,560.26
- - - 0.063 2,143.87
- - - 0.857 29,371.94
- - - 0.028 975.86
- - - 0.037 975.86
- - - 0.069 948.00
- - - 0.008 125.00
- - - 0.040 660.00
- - - 0.003 121.00

- - - 0.092 3,159.79
- - - 0.029 984.47
- - - 0.299 10,256.88
- - - 0.102 3,479.40
- - - 0.007 231.08
- - - 0.009 302.33
- - - 0.011 302.33
- - - 0.037 612.00
- - - 0.002 88.00

- - - 0.286 9,803.19
- - - 0.006 193.20
- - - 0.007 193.20

- - - 0.431 14,762.69
- - - 0.009 307.64
- - - 0.012 307.64

- - - 0.082 2,815.70
- - - 0.010 355.00
- - - 0.085 2,908.15
- - - 0.039 1,336.53
- - - 0.197 6,756.38
- - - 0.003 101.39
- - - 0.119 4,089.24
- - - 0.013 437.54
- - - 0.017 437.54
- - - 0.011 42.00
- - - 0.070 264.00
- - - 0.012 160.00
- - - 0.004 160.00

- - - 0.083 2,828.15
- - - 0.021 720.00
-
- - - 0.102 3,480.48
- - - 0.003 90.50
- - - 0.003 90.50
- - - 0.003 48.00
- - - 0.017 280.00

- - - 0.111 3,802.50
- - - 0.023 785.40
- - - 0.004 130.52
- - - 0.005 130.52

- - - 0.034 1,177.89
- - - 0.006 198.51
- - - 0.001 60.00
- - - 0.004 124.76
- - - 0.001 38.59
- - - 0.001 38.59

- - - 0.004 153.14
- - - 0.000 13.12
- - - 0.000 13.12

- - - 0.028 103.87
- - - 0.002 6.14
- - - 0.007 103.87
- - - 0.018 16.10
- - - - -
- - - 0.004 14.45
- - - 0.001 2.33
- - - 0.001 14.45
- - - 0.002 2.24
- - - - -
- - - 0.034 68.95
- - - 0.057 1,957.47
- - - 0.012 419.49
- - - 0.004 135.24
- - - 0.005 190.50
- - - 0.007 190.50
- - - - -
- - - 0.023 47.05
- - - 0.036 1,241.94
- - - 0.011 384.71
- - - 0.004 135.24
- - - 0.004 127.70
- - - 0.005 127.70

- - - 0.418 1,565.96
- - - 0.011 43.25
- - - 0.105 1,565.96
- - - 0.268 242.72
- - - 0.087 1,565.96
- - - - -
- - - 0.210 788.60
- - - 0.011 42.56
- - - 0.053 788.60
- - - 0.135 122.23
- - - 0.114 788.60

- - - 0.051 191.27
- - - 0.004 15.33
- - - 0.013 191.27
- - - 0.033 29.65

- - - 0.310 10,632.29
- - - 0.061 2,076.08
- - - 0.053 1,803.82
- - - 0.129 4,405.41
- - - 0.290 9,922.07
- - - 0.022 768.34
- - - 0.006 213.21
- - - 0.023 775.64
- - - 0.001 32.00
- - - 0.020 336.00
- - - 0.038 1,644.00
- - - 0.019 664.06
- - - 0.025 107.50
- - - 0.046 1,560.69
- - - 0.063 2,195.41
- - - 0.083 2,195.41

- - - 0.158 723.64
- - - 0.029 424.15
- - - 0.057 868.95
- - - 0.046 1,095.74
- - - 0.038 351.88
- - - 0.006 40.16
- - - 0.132 208.53
- - - 0.039 906.60
- - - 0.011 200.12
- - - 0.024 70.36
- - - 0.004 39.63
- - - 1.014 1,313.40
- - - 0.021 113.25
- - - 0.012 113.25
- - - - -
- - - 0.019 128.80
- - - 0.100 216.52
- - - 0.095 175.59
- - - 0.024 108.90
- - - 0.137 1,399.74
- - - 0.795 1,399.74
- - - 0.162 235.13
- - - 0.017 112.17
- - - 0.005 12.41

- - - 0.034 185.86
- - - 0.149 813.00
- - - 0.022 106.68
- - - 0.029 102.03
- - - 0.052 1,207.56
- - - 1.040 1,354.46
- - - 0.006 36.97
- - - 0.004 153.12
- - - - -
- - - 0.016 3.00
- - - 0.013 2.00
- - - 0.009 1.00
- - - 0.005 1.00
- - - - -
- - - 0.013 1.00
- - - 0.054 39.55
- - - 0.002 1.30
- - - 0.017 12.03
- - - - -
- - - - -
- - - 0.173 422.88
- - - 0.155 544.60
- - - 0.467 438.22
- - - 0.029 134.00
-
- - - 0.087 570.30
- - - 0.028 570.30
- - - 0.103 570.30
- - - 0.011 59.45
- - - 0.009 2.00
- - - 0.009 4.00
- - - 0.012 79.60
- - - 0.002 31.84
- - - - -
- - - 0.056 369.42
- - - 0.067 369.42
- - - 0.021 110.72
- - - 0.003 5.00
- - - 0.019 126.47
- - - 0.077 369.42
- - - 0.028 487.70
- - - 0.016 55.04
- - - 0.167 503.42
- - - 0.063 503.42
- - - 0.060 10.00
- - - 0.004 1.00
- - - 0.008 2.00
- - - 0.013 13.00
- - - 0.008 17.00
- - - 0.008 13.00
- - - 0.032 8.00
- - - 0.020 13.00
- - - 0.002 1.00
- - - 0.020 15.00
- - - 0.008 12.00
- - - 0.003 13.00
- - - 0.011 7.00
- - - 0.012 4.00
- - - 0.003 14.00
- - - 0.199 62.13
- - - 0.002 1.00
- - - 0.022 2.00
- - - 0.002 1.25
- - - 0.001 12.47
- - - 0.005 14.12
- - - 0.026 13.51
- - - 0.001 12.19

0.052 195.73
0.004 16.88
0.013 195.73
0.034 30.34
0.011 195.73

0.070 261.10
0.006 22.88
0.018 261.10
0.045 40.47
0.014 261.10

0.152 571.23
0.005 19.13
0.038 571.23
- - - 0.098 88.54
- - - 0.032 571.23

0.059 219.95
0.003 13.43
0.015 219.95
0.038 34.09
0.012 219.95

- - - 0.005 122.00
- - - 0.016 195.73

- - - 0.026 902.80
- - - 0.005 162.01
- - - 0.012 409.39
- - - 0.017 591.25
- - - 0.000 9.45
- - - 0.000 9.45
- - - 0.003 120.00

- - - 0.180 6,155.97
- - - 0.025 840.00
- - - 0.018 631.90
- - - 0.000 32.00
- - - 0.001 89.10
- - - 0.001 32.00
- - - 0.051 840.00
- - - 0.021 928.00
- - - 0.017 578.59
- - - 0.021 89.10
- - - 0.038 1,291.95
- - - 0.024 841.28
- - - 0.032 841.28

- - - 0.057 261.58
- - - 0.022 256.79
- - - 0.023 282.24
- - - 0.016 374.16
- - - 0.018 168.30
- - - 0.004 30.44
- - - 0.105 164.87
- - - 0.013 292.44
- - - 0.006 102.80
- - - 0.017 92.27
- - - 0.010 92.27
- - - 0.041 100.37
- - - 0.005 47.99

- - - 0.011 77.35
- - - 0.049 90.62
- - - 0.152 1,553.52
- - - 1.103 1,553.52
- - - 0.026 170.43
- - - - -
- - - 0.100 546.62
- - - 0.016 77.35
- - - 0.027 623.97
- - - 0.956 1,245.45
- - - 0.002 85.00
- - - - -
- - - 0.005 1.00
- - - 0.013 1.00
- - - 0.017 1.00
- - - - -
- - - - -
- - - 0.117 285.96
- - - 0.102 358.80
- - - 0.339 318.25
- - - 0.029 134.00
-
-
- - - 0.116 758.14
- - - 0.037 758.14
- - - 0.138 758.14
- - - 0.011 60.98
- - - 0.009 2.00
- - - 0.009 4.00
- - - 0.015 98.49
- - - 0.002 39.40
- - - - -
- - - 0.015 66.61
- - - 0.011 133.22
- - - 0.006 133.22
- - - 0.003 18.68
- - - 0.009 206.70
- - - 0.001 28.39
- - - 0.001 15.98
- - - 0.001 15.98
- - - 0.010 28.93
- - - 0.004 28.93

- - - 0.036 6.00
- - - 0.006 6.00
- - - 0.004 9.00
- - - 0.004 6.00
- - - 0.012 3.00
- - - 0.009 6.00
- - - 0.009 7.00
- - - 0.004 6.00
- - - 0.001 6.00
- - - 0.005 3.00
- - - 0.001 6.00
- - - 0.096 30.02
- - - 0.016 2.00
- - - 0.001 0.50
- - - 0.001 5.04
- - - 0.002 5.76
- - - 0.011 5.76
- - - 0.000 4.32

- - - 0.057 1,952.86
- - - 0.324 11,087.69
- - - 0.409 14,007.40
- - - 0.552 18,916.99
- - - 0.403 13,818.18
- - - 0.017 591.81
- - - 0.018 602.51
- - - 0.061 2,125.66
- - - 0.080 2,125.66
- - - 0.117 1,616.00
- - - 0.003 55.00
- - - 0.022 368.00
- - - 0.005 204.00

- - - 0.001 12.48
- - - 0.001 1.25
- - - 0.023 802.10
- - - 0.098 3,355.11
- - - 0.009 314.87
- - - 0.002 75.31
- - - 0.003 75.31
- - - 0.001 36.00
- - - 0.001 16.00
- - - 0.001 26.00
- - - 0.001 56.00

- - - 0.246 8,435.61
- - - 0.028 969.88
- - - 0.026 892.96
- - - 0.011 240.00
- - - 0.034 564.00
- - - 0.028 1,224.00
- - - 0.020 670.63
- - - 0.079 343.70
- - - 0.145 4,983.65
- - - 0.019 668.13
- - - 0.025 668.13

- - - 0.132 493.73
- - - 0.006 23.26
- - - 0.033 493.73
- - - 0.085 76.53
- - - 0.027 493.73
- - - - -
- - - 0.052 106.07
- - - 0.079 2,692.93
- - - 0.007 230.33
- - - 0.009 230.33

- - - 0.002 9.59
- - - 0.382 937.94
- - - 0.041 143.93
- - - 0.008 93.87
- - - 0.004 93.87
- - - 0.003 28.00
- - - 0.000 2.10
- - - 0.066 1,529.67
- - - 0.038 672.53
- - - 0.424 439.00
- - - 0.008 45.63
- - - 0.005 45.63
- - - 0.022 198.16
- - - - -
- - - 0.010 20.78
- - - 0.026 261.30
- - - 0.185 261.30
- - - 0.006 31.20
- - - 0.009 6.97
- - - 0.002 16.00

- - - 0.027 149.65
- - - 0.010 55.35
- - - 0.005 28.27
- - - 0.009 205.00
- - - 0.099 128.80
- - - 0.051 36.74
- - - 0.114 278.41
- - - 0.105 366.61
- - - 0.292 274.12
- - - 0.029 134.00

- - - 0.342 1,028.62
- - - 0.129 1,028.62

- - - 24.667

- - - 0.006 6.25
- - - 0.005 11.44
- - - 0.029 123.63
- - - 0.001 0.80
- - - 0.007 7.00

- - - 0.008 13.92
- - - 0.014 33.00
- - - 0.002 5.76

- - - 0.001 12.18
- - - 0.001 10.80
- - - 0.017 27.68
- - - 0.011 15.04
- - - 0.006 34.91

- - - 0.030 128.00
- - - 0.003 33.28
- - - 0.001 15.36

- - - 0.140

0.04 72.00
0.02 62.00
0.14 54.00
0.00 35.00
0.01 15.00

0.03 50.00
0.02 40.00

- - - 0.02 64.00
- - - 0.03 102.00
- - - 0.01 34.00
- - - 0.01 18.00
- - - 0.04 103.00
- - - 0.02 253.00
- - - 0.01 109.00
- - - 0.02 454.00
- - - 0.03 279.00
- - - 0.01 20.00

- - - 0.03 64.00
0.01 33.00
0.00 18.00
- - - 0.01 72.00
- - - 0.01 190.00
- - - 0.00 2.00
- - - 0.01 3.00

- - - 0.02 168.00
0.00 3.00
0.00 27.00

- - - 0.01 97.00
0.00 8.00
- - - 0.01 76.00
0.00 24.00
- - - 0.00 23.00
- - - 0.00 26.00
- - - 0.00 15.00
- - - 0.00 12.00
- - - 0.00 9.00
- - - 0.00 15.00
- - - 0.01 175.00

- - - 0.09 96.00
0.02 54.00
0.01 47.00
0.00 11.00
- - - 0.04 3.00
- - - 0.02 2.00
- - - 0.03 1.00
- - - 0.00 2.00

- - - 0.02 4.00

- - - 0.00 4.00

- - - 0.07 242.00
- - - 0.01 75.00
- - - 0.07 47.00
- - - 0.18 594.00
- - - 0.03 21.00
- - - 0.05 181.00

- - - 0.00 26.00

- - - 1.238

- - - 0.35 182.00
- - - 0.50 262.00
- - - 0.00 15.00
- - - 0.00 15.00
- - - 0.00 15.00
- - - 0.00 16.00
- - - 0.00 15.00
- - - 0.00 20.00
- - - 0.01 85.00
- - - 0.00 20.00
- - - 0.01 130.00
- - - 0.00 20.00
- - - 0.00 17.00
- - - 0.05 307.00
- - - 0.01 126.00
- - - 0.01 128.00
- - - 0.02 110.00
- - - 0.00 51.00
- - - 0.01 150.00
- - - 0.00 15.00
- - - 0.00 15.00
- - - 0.21 110.00

- - - 0.21 110.00

- - - 0.00 70.00

- - - 0.11 182.00
- - - 0.15 262.00
- - - 0.01 15.00
- - - 0.01 15.00
- - - 0.01 14.00
- - - 0.00 16.00
- - - 0.00 15.00
- - - 0.00 20.00
- - - 0.00 85.00
- - - 0.00 20.00
- - - 0.01 130.00
- - - 0.00 20.00
- - - 0.00 17.00
- - - 0.02 307.00
- - - 0.00 126.00
- - - 0.00 128.00
- - - 0.01 110.00
- - - 0.00 51.00
- - - 0.01 150.00
- - - 0.00 15.00
- - - 0.00 15.00
- - - 0.06 110.00

- - - 0.06 110.00
-
- - - 0.00 70.00

- - - 0.43 1.00
- - - 0.06 1.00
- - - 0.06 1.00
- - - 0.04 1.00
- - - 0.04 1.00
- - - 0.04 1.00
- - - 0.06 1.00
- - - 0.48 1.00
- - - 0.11 1.00
- - - 0.05 1.00
- - - 0.17 1.00
- - - 0.08 1.00

- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.01 4.00
- - - 0.00 1.00

- - - 0.00 6.00
- - - 0.01 6.00
- - - 0.01 3.00
- - - 0.00 60.00
- - - 0.01 190.00
- - - 0.00 20.00
- - - 0.03 460.00
- - - 0.01 1.00

- - - 0.01 1.00
- - - 0.01 1.00
- - - 0.00 1.00

- - - 0.07 4.00
- - - 0.08 12.00
- - - 0.01 4.00
- - - 0.05 286.00

- - - 0.01 4.00
- - - 0.02 12.00
- - - 0.00 4.00
- - - 0.01 286.00

- - - 0.02 58.00
- - - 0.09 306.00
- - - 0.16 192.00
- - - 0.02 48.00
- - - 0.02 24.00
- - - 0.01 40.00
- - - 0.01 6.00
- - - 0.00 10.00
- - - 0.00 17.00
- - - 0.00 60.00
- - - 0.01 94.00

- - - 0.34 674.00
- - - 0.12 154.00
- - - 0.01 19.00

- - - 4.716

- - - 0.01 36.00
- - - 0.00 2.00
- - - 0.13 39.00

- - - 0.02 1.00
- - - 0.01 1.00

- - - 0.00 1.00

- - - 0.01 10.00
- - - 0.02 300.00

- - - 0.01 125.00

- - - 0.01 25.00
- - - 0.03 25.00

- - - 0.01 2.00

- - - 0.01 2.00

- - - 0.01 2.00

- - - 0.01 2.00

- - - 0.01 2.00

- - - 0.03 200.00

- - - 0.01 150.00

- - - 0.36 180.00

- - - 0.679
0 - - 2.64 1.90

- - - 2.64

0.001 0.10 0.043 40.03 0.94

0.00 0.100 0.043 40.03

- - - 0.32 2.00

- - - 0.322

- - - 0.05 1.00

- - - 0.048

- - - 0.78 36.00

- - - 0.46 36.00
- - - 0.02 36.00

- - - 1.267

- - - 0.04 2.00

- - - 0.10 2.00
- - - 0.00 2.00

- - - 0.140

- - - 1.23 1.00

- - - 1.228
- - - 0.25 38.00

- - - 0.01 38.00

- - - 0.255

- - - 0.00 19.00

- - - 0.005

- - - 0.19 2.00

- - - 0.50 22.00

- - - 0.00 24.00

- - - 0.691

- - - 0.01 20.00
- - - 0.00 2.00

- - - 0.009

- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.00 1.00
- - - 0.02 1.00
- - - 0.19 2.00

- - - 0.02 20.00
- - - 0.04 21.00

- - - 0.282

- - - 0.03 21.00

- - - 0.034

- - - 0.12 35.00
- - - 0.00 2.00
- - - 0.00 2.00
- - - 0.00 2.00
- - - 0.00 2.00
- - - 0.00 2.00
- - - 0.00 1.00
- - - 0.00 3.00

- - - 0.129

- - - 0.01 80.00

- - - 0.007

- - - 0.80 2.00

- - - 1.08 8.00

- - - 0.05 1.00

- - - 0.33 1.00
- - - 0.91 12.00
- - - 0.01 350.00
- - - 0.01 2.00
- - - 0.00 12.00
- - - 0.05 8.00
- - - 0.00 8.00
- - - 0.00 36.00
- - - 0.01 108.00
- - - 0.03 180.00
- - - 0.01 72.00
- - - 0.03 180.00
-

- - - 3.346

0.01 350.00

0.00 150.00

0.01 147.00
0.02 48.00
0.03 360.00
0.01 1.00
0.01 1.00
- - - 0.13 0.70
- - - 0.205

- - - 0.54 2.00

- - - 0.02 2.00

- - - 0.02 2.00

- - - 0.02 1.00

- - - 0.00 2.00

- - - 0.01 6.00
- - - 0.13 98.00
- - - 0.21 261.00
- - - 0.06 112.00
- - - 0.01 24.00
- - - 0.84 2,122.50

- - - 1.846

- - - 0.00 19.00
- - - 0.00 14.00
- - - 0.00 1.00

- - - 0.02 62.00

- - - 0.01 1.00

- - - 0.01 1.00

- - - 0.00 11.00
- - - 0.01 20.00
- - - 0.00 2.00
- - - 0.01 8.00
- - - 0.03 30.00
- - - 0.00 2.00
- - - 0.00 2.00
- - - 0.00 1.00
- - - 0.00 2.00
- - - 0.01 7.00
- - - 0.00 2.00
- - - 0.01 10.00
- - - 0.01 8.00
- - - 0.00 1.00
-
- - - 0.01 2.00
- - - 0.03 12.00
- - - 0.02 4.00
- - - 0.00 2.00
- - - 0.01 2.00
- - - 0.00 1.00
- - - 0.03 2.00
- - - 0.01 1.00
- - - 0.00 6.00
- - - 0.00 6.00
- - - 0.01 1.00
-
- - - 0.01 1.00
- - - 0.01 1.00
- - - 0.01 2.00
- - - 0.03 2.00

- - - 0.311