Anda di halaman 1dari 157

PROGRESS PEKERJAAN PONDASI + SAMEP

PROYEK PEMBANGUNAN APARTEMEN "SOLTERRA PLACE"


PEJATEN, JAKARTA SELATAN
PAKET PEKERJAAN STRUKTUR
Progress Bulanan s/d Minggu ke-71
TOTAL PEKERJAAN STRUKTUR BAWAH 25 Februari 2019 s/d 31 Maret 2019
PROGRESS
No. URAIAN JUMLAH BOBOT Periode Lalu Periode Saat s/d Periode
Ini Saat Ini

REKAPITULASI

1.0 Pekerjaan Persiapan (Pondasi) #REF! #REF! 1.12% 0.00% 1.12%

1.1 Pekerjaan Bored Pile dan Soldier Pile #REF! #REF! 6.32% 0.01% 6.33%

Total Pekerjaan Pondasi #REF! #REF! 7.43% 0.01% 7.45%

1.0 Pekerjaan Persiapan (SAMEP) #REF! #REF! 0.59% 0.06% 0.65%

2.0 Pekerjaan Struktur Atas #REF! #REF! 0.27% 0.06% 0.33%

3.0 Pekerjaan Arsitektur #REF! #REF! 0.00% 0.00% 0.00%

4.0 Pekerjaan MEP (Provsum) #REF! #REF! 0.00% 0.00% 0.00%

5.0 Pekerjaan Infrastruktur (Provsum) #REF! #REF! 0.00% 0.00% 0.00%

6.0 Pekerjaan Special Lighting (Provsum) #REF! #REF! 0.00% 0.00% 0.00%

Total Pekerjaan SAMEP #REF! #REF! 0.86% 0.11% 0.97%

Grand Total #REF! #REF! 8.29% 0.13% 8.42%


PROGRESS PEKERJAAN PONDASI + SAMEP
PROYEK PEMBANGUNAN APARTEMEN "SOLTERRA PLACE"
PEJATEN, JAKARTA SELATAN
PAKET PEKERJAAN SAMEP
TOTAL PEKERJAAN SAMEP 03 Juli 2023 s/d 30 Juli 2023
PROGRESS
NILAI PROGRES
NO URAIAN JUMLAH BOBOT PEKERJAAN (Rp)*
Bulan Lalu Bulan Ini s/d Bulan Ini

REKAPITULASI

1.0 Pekerjaan Persiapan (Pondasi) 6,625,935,533 1.27% 1.27% 0.00% 1.27% 6,625,935,533

1.1 Pekerjaan Bored Pile dan Soldier Pile 34,330,068,026 6.60% 6.60% 0.00% 6.60% 34,330,068,026

Total Pekerjaan Pondasi 40,956,003,558 7.87% 7.87% 0.00% 7.87% 40,956,003,558

1.0 Pekerjaan Persiapan (SAMEP) 41,644,549,226 8.00% 8.00% 0.00% 8.00% 41,644,549,226

2.0 Pekerjaan Struktur Basement dan podium 87,456,941,169 16.81% 16.56% 0.00% 16.56% 86,151,486,663

3.0 Pekerjaan Struktur Mid 35,784,521,669 6.88% 6.88% 0.00% 6.88% 35,784,521,669

4.0 Pekerjaan Struktur Mid High 38,399,839,483 7.38% 7.38% 0.00% 7.38% 38,394,365,192

5.0 Pekerjaan Arsitektur basement dan podium 18,880,945,453 3.63% 2.77% 0.01% 2.78% 14,478,689,413

6.0 Pekerjaan Arsitektur mid 63,041,127,905 12.11% 11.50% 0.03% 11.52% 59,969,280,360

7.0 Pekerjaan Arsitektur mid high 70,901,434,235 13.62% 2.10% 0.00% 2.10% 10,925,419,624

8.0 Pekerjaan MEP basement dan podium 54,650,334,215 10.50% 8.40% 0.00% 8.40% 43,728,779,739

9.0 Pekerjaan MEP mid 26,434,107,085 5.08% 4.74% 0.00% 4.74% 24,649,828,289

10.0 Pekerjaan MEP mid high 29,815,558,700 5.73% 0.00% 0.00% 0.00% -

11.0 Pekerjaan Infrastruktur (Provsum) 3,600,000,000 0.69% 0.69% 0.00% 0.69% 3,600,000,000

12.0 Pekerjaan Special Lighting (Provsum) 1,270,640,859 0.24% 0.00% 0.00% 0.00% -

13.0 Provsum sekolah 5,238,541,311 1.01% 1.01% 0.00% 1.01% 5,238,541,311

14.0 Marketing Galery 2,305,455,134 0.44% 0.44% 0.00% 0.44% 2,305,455,134

Total Pekerjaan SAMEP 479,423,996,445 92.13% 70.46% 0.04% 70.50% 366,870,916,620

Grand Total 520,380,000,000 100.00% 78.335% 0.036% 78.371% 407,826,920,179

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Dowang Fernando Sekti Ali Zainal Abidin


Project Director Construction Manager Project Manager
PROGRESS PEKERJAAN PONDASI + SAMEP
PROYEK PEMBANGUNAN APARTEMEN "SOLTERRA PLACE"
PEJATEN, JAKARTA SELATAN
PAKET PEKERJAAN SAMEP
PROGRESS BULAN JULI 2023
TOTAL PEKERJAAN SAMEP 22 Februari 2021 s/d 28 Februari 2021
PROGRESS
NO URAIAN JUMLAH BOBOT s/d Periode
Periode Saat
Periode sd Lalu Ini Saat Ini

REKAPITULASI

1.0 Pekerjaan Persiapan (Pondasi) 6,625,935,533 1.27% 1.27% 0.00% 1.27%

1.1 Pekerjaan Bored Pile dan Soldier Pile 34,330,068,026 6.60% 6.60% 0.00% 6.60%

Total Pekerjaan Pondasi 40,956,003,558 7.87% 7.87% 0.00% 7.87%

1.0 Pekerjaan Persiapan (SAMEP) 41,644,549,226 8.00% 8.00% 0.00% 8.0027%

2.0 Pekerjaan Struktur Atas 161,641,302,322 31.06% 30.81% 0.00% 30.8102%

3.0 Pekerjaan Arsitektur 152,823,507,593 29.37% 16.37% 0.04% 16.4060%

4.0 Pekerjaan MEP (Provsum) 110,900,000,000 21.31% 13.14% 0.00% 13.1401%

5.0 Pekerjaan Infrastruktur (Provsum) 3,600,000,000 0.69% 0.69% 0.00% 0.6918%

6.0 Pekerjaan Special Lighting (Provsum) 1,270,640,859 0.24% 0.00% 0.00% 0.0000%

6.1 Provsum sekolah 5,238,541,311 1.01% 1.01% 0.00% 1.0067%

6.2 Marketing Galery 2,305,455,134 0.44% 0.44% 0.00% 0.4430%

Total Pekerjaan SAMEP 479,423,996,445 92.13% 70.46% 0.04% 70.5006%

Grand Total 520,380,000,000 100.00% 78.335% 0.036% 78.371%


RINCIAN PROGRESS PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN APARTEMEN SOLTERRA - PEJATEN - JAKARTA SELATAN PROGRESS BULAN JULI 2023

Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot

1.0 PEKERJAAN PERSIAPAN

I PEKERJAAN PERSIAPAN (TEST PILE)


1 Proyek Manajemen dan Biaya-Biaya Administrasi 1 ls 0.30% 100.00% 0.299% 0.00% 0.000% 100.00% 0.299%
Lapangan
3 Akomodasi Rapat Lapangan 1 ls 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 Gambar Kerja ( Shop Drawing ) 1 ls 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
11 Papan Nama 1 ls 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 Pemadam Kebakaran & P3K 1 ls 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
15 Penjagaan Proyek 1 ls 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
17 Pengadaan Tenaga Listrik 1 ls 0.02% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
20 Pengukuran dan Bouwplank 1 ls 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
21 Photo-Photo Kemajuan Pekerjaan 1 ls 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
22 Kebersihan dan Kerapihan 1 ls 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
29 Laporan 1 ls 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
32 Pekerjaan Clearing dan Perataan Level Tanah 1 ls 0.03% 100.00% 0.026% 0.00% 0.000% 100.00% 0.026%

II PEKERJAAN PERSIAPAN (BOR PILE - SOLDIER PILE)


1 Proyek Manajemen dan Biaya-Biaya Administrasi 1 ls 0.33% 100.00% 0.329% 0.00% 0.000% 100.00% 0.329%
Lapangan
2 Biaya Pembuatan Dokumen Kontrak 1 ls 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
3 Akomodasi Rapat Lapangan 1 ls 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 Gambar Kerja ( Shop Drawing ) 1 ls 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 Gambar Terlaksana (As Built Drawing) 1 ls 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 Kantor Pemborong di Lapangan 1 ls 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%
8 Gudang Bahan dan Los Kerja 1 ls 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
9 Pagar Sementara 1 ls 0.10% 100.00% 0.103% 0.00% 0.000% 100.00% 0.103%
13 Keselamatan dan Kesehatan Kerja (K3) 1 ls 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 Penjagaan Proyek 1 ls 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
17 Pengadaan Tenaga Listrik 1 ls 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%
18 Jalan Masuk Tempat Pekerjaan dan Jalan 1 ls 0.10% 100.00% 0.096% 0.00% 0.000% 100.00% 0.096%
19 Sementara
Sarana komunikasi 1 ls 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
20 Pengukuran dan Bouwplank 1 ls 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
21 Photo-Photo Kemajuan Pekerjaan 1 ls 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
22 Kebersihan dan Kerapihan 1 ls 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
26 Asuransi CAR, TPL & PA 1 ls 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
29 Laporan 1 ls 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
30 Asuransi Tenaga Kerja 1 ls 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
32 Persiapan Pondasi 1 ls 0.19% 100.00% 0.192% 0.00% 0.000% 100.00% 0.192%

Sub.Total 1 1.273% 1.273% 0.000% 1.273%

1.1 PEKERJAAN PONDASI TIANG BOR

1. Pengeboran Lubang bor dengan preliminary casing (max. 3 m)


Pengeboran tanah normal bukan pada tanah batuan / SPT maks 50
(Volume pengeboran dihitung dari muka tanah asli hingga toe level)
Bp dia. 100 cm ; Lbor = 33.5 m ; Lcor = 20 m ; 314 Tit 10,752 m' 0.60% 100.00% 0.595% 0.00% 0.000% 100.00% 0.595%
Bp dia. 80 cm ; Lbor = 33.5 m ; Lcor = 20 m ; 192 Tit 6,625 m' 0.35% 100.00% 0.352% 0.00% 0.000% 100.00% 0.352%
Soldier Pile
CP dia. 60 cm; Lbor = Lcor = 16 m (Penggerusan 889 m' 0.05% 100.00% 0.053% 0.00% 0.000% 100.00% 0.053%
dilakukan 24 jam setelah cor B0)
CP dia. 80 cm; Lbor = Lcor = 16 dan 20 m 2,245 m' 0.15% 100.00% 0.146% 0.00% 0.000% 100.00% 0.146%
(Penggerusan dilakukan 24 jam setelah cor B0)
CB0 dia. 50 cm ; Lbor = Lcor = 13 m ; 133 Titik 1,887 m' 0.09% 100.00% 0.094% 0.00% 0.000% 100.00% 0.094%
Pengeborang lapisan batu Gravel / Kobel 1.00 m' 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2. Untuk kondisi tanah pasir maka diperlukan 1.00 m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
pengadaan dan aplikasi Slurry Stabilizer (Polimer)
untuk membantu pekerjaan pengeboran
3. Pengecoran beton readymix dengan menggunakan pipa tremie
material dari pemberi tugas
(Volume beton dihitung dari toe level hingga Cut
off level + 1 m beton kotor + Overbreak 20%)
Bp dia. 100 cm ; Lbor = 33.5 m ; Lcor = 20 m ; 314 5,388 m3 0.09% 100.00% 0.091% 0.00% 0.000% 100.00% 0.091%
Titik
Bp dia. 80 cm ; Lbor = 33.5 m ; Lcor = 20 m ; 192 2,130 m3 0.04% 100.00% 0.036% 0.00% 0.000% 100.00% 0.036%
Titik
Soldier Pile
CP dia. 60 cm; Lbor = Lcor = 16 m 208 m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
CP dia. 80 cm; Lbor = Lcor = 16 dan 20 m 983 m3 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
CB0 dia. 50 cm ; Lbor = Lcor = 13 m ; 133 Titik 424 m3 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
Test Pile (Unused pile)
Bore Pile
Bp dia. 100 cm ; 1 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia. 80 cm ; 1 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Test Pile (Used pile )
Bore Pile
Bp dia. 100 cm ; 6 titik 187.02 m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
Bp dia. 80 cm ; 6 titik 114.56 m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4. Handling dan fabrikasi keranjang besi kedalam
lubang bor ( Asumsi 100 Kg/m3)
( Material oleh pemberi tugas)
Bore pile
Bp dia. 100 cm 487,878 kg 0.13% 100.00% 0.132% 0.00% 0.000% 100.00% 0.132%
Bp dia 80 cm 246,101 kg 0.07% 100.00% 0.067% 0.00% 0.000% 100.00% 0.067%
Soldier Pile
CP dia. 60 cm; Lbor = Lcor = 16 m 47,722 kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
CP dia. 80 cm; Lbor = Lcor = 16 dan 20 m 164,514 Kg 0.04% 100.00% 0.045% 0.00% 0.000% 100.00% 0.045%
Test Pile (Unused pile)
Bore Pile
Bp dia. 100 cm ; 1 titik kg 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia. 80 cm ; 1 titik kg 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Test Pile (Used pile )

4/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
Bore Pile
Bp dia. 100 cm ; 6 titik 18,399 kg 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
Bp dia. 80 cm ; 6 titik 14,416 kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

5. Pembuangan tanah bekas bor didalam lokasi


proyek
Bore pile
Bp dia. 100 cm m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia 80 cm m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Soldier Pile
CP dia. 60 cm; Lbor = Lcor = 16 m m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
CP dia. 80 cm; Lbor = Lcor = 16 dan 20 m m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
CB0 dia. 50 cm ; Lbor = Lcor = 13 m ; 133 Titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Test Pile (Unused pile)
Bore Pile
Bp dia. 100 cm ; 1 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia. 80 cm ; 1 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Test Pile (Used pile )
Bore Pile
Bp dia. 100 cm ; 6 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia. 80 cm ; 6 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembuangan tanah keluar lokasi proyek 13,667.29 m3 0.30% 100.00% 0.297% 0.00% 0.000% 100.00% 0.297%
6. PDA Test
Bp dia. 100 cm 4.00 Titik 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
Bp dia. 80 cm - Titik 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7. PIT Test 3.00 Titik 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8. Axial Loading Test dengan Sistem Kentledge
- Mob demob blok beton 800 ton 1.00 set 0.05% 100.00% 0.054% 0.00% 0.000% 100.00% 0.054%
- Bp dia. 100 cm ; Beban 200% x 400 Ton 5.00 Titik 0.10% 100.00% 0.098% 0.00% 0.000% 100.00% 0.098%
- Bp dia. 80 cm ; Beban 200% x 250 Ton 3.00 Titik 0.05% 100.00% 0.049% 0.00% 0.000% 100.00% 0.049%
Axial Loading Test dengan Sistem Kentledge
- Bp dia. 100 cm; beban 200%x 400 ton Titik 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
- Bp dia 80 cm ; beban 200%x250 ton Titik 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
* Tiang used pile di uji dengan kentledge sistem
dengan lose friction bor sekeliling
- Mob demob peralatan dengan sistem teaksi Set 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Tension Test dengan Sistem Kentledge
Bp dia 80 cm 3.00 Titik 0.04% 100.00% 0.037% 0.00% 0.000% 100.00% 0.037%
9. Lateral test dengan sistem Kentledge
- Bp dia. 100 cm ; Asumsi Beban 200% x 20 Ton 1.00 Titik 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
- Bp dia. 80 cm ; Asumsi Beban 200% x 12.5 Ton 1.00 Titik 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
10. Penggunaan Double layer Geo - Gundle atau
double casing termasuk accesories dan
perlengkapan lainnya untuk menghilangkan friksi
dari permukaan tanah hingga kepala tiang
(dengan asumsi panj 13,5 m)
Bore pile
Bp dia. 100 cm Titik 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia 80 cm Titik 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
*untuk Unused Pile
11. menhilangkan friksi (lose friction) dari Titik 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
permukaann tanah hingga ke kepala tiang dengan
menggunakan bor disekeliling tiang
12. Penggunaan Loadcell dengan beban Maksimal 12.00 Titik 0.04% 100.00% 0.039% 0.00% 0.000% 100.00% 0.039%
1000 Ton
13. Instrumental test pile utnuk Bp dia 100 cm; asumsi Titik 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
20 titik VWSG termasuk pembacaan
14. Instrumental test pile utnuk Bp dia 100 cm; asumsi 1.00 Titik 0.03% 100.00% 0.033% 0.00% 0.000% 100.00% 0.033%
12 titik VWSG termasuk pembacaan

Sub Total Pekerjaan Pengeboran

MATERIAL PONDASI TIANG BOR

Material Beton
Material Fc 25 / K 300 FA 15% ; Slump 18 +/-2
Bore pile
Bp dia. 100 cm 5,388.24 m3 1.27% 100.00% 1.274% 0.00% 0.000% 100.00% 1.274%
Bp dia 80 cm 2,130.18 m3 0.50% 100.00% 0.504% 0.00% 0.000% 100.00% 0.504%
Material Fc 20 / K 250 FA 15 % ; Slump 18 +/-2
Soldier Pile
CP dia. 60 cm; Lbor = Lcor = 16 m 208.13 m3 0.05% 100.00% 0.047% 0.00% 0.000% 100.00% 0.047%
CP dia. 80 cm; Lbor = Lcor = 16 dan 20 m 983.50 m3 0.22% 100.00% 0.224% 0.00% 0.000% 100.00% 0.224%
Material B0 FA 15 % ; Slump 16 +/-2
Soldier Pile
CB0 dia. 50 cm ; Lbor = Lcor = 13 m ; 133 Titik 424.49 m3 0.09% 100.00% 0.085% 0.00% 0.000% 100.00% 0.085%
Test Pile (Unused pile)
Bore Pile
Bp dia. 100 cm ; 1 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia. 80 cm ; 1 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Test Pile (Used pile )
Bore Pile
Bp dia. 100 cm ; 6 titik 187.02 m3 0.04% 100.00% 0.044% 0.00% 0.000% 100.00% 0.044%
Bp dia. 80 cm ; 6 titik 114.56 m3 0.03% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%

Material Besi
Bore pile
Bp dia. 100 cm 487,878 Kg 1.03% 100.00% 1.033% 0.00% 0.000% 100.00% 1.033%
Bp dia 80 cm 246,101 Kg 0.52% 100.00% 0.521% 0.00% 0.000% 100.00% 0.521%
Soldier Pile
CP dia. 60 cm; Lbor = Lcor = 16 m 47,722 Kg 0.11% 100.00% 0.107% 0.00% 0.000% 100.00% 0.107%
CP dia. 80 cm; Lbor = Lcor = 16 dan 20 m 164,514 Kg 0.37% 100.00% 0.368% 0.00% 0.000% 100.00% 0.368%
Test Pile (Unused pile)
Bore Pile
Bp dia. 100 cm ; 1 titik Kg 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia. 80 cm ; 1 titik Kg 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Test Pile (Used pile )
Bore Pile

5/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
Bp dia. 100 cm ; 6 titik 18,399 Kg 0.04% 100.00% 0.039% 0.00% 0.000% 100.00% 0.039%
Bp dia. 80 cm ; 6 titik 14,416 Kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

Sub.Total 2 6.60% 6.60% 0.00% 6.60%


Total Pondasi 7.87% 7.87% 0.00% 7.87%
Total SAMEP (Prov sum) 92.13% 0.00% 0.00% 0.00%

100.00% 7.87% 0.00% 7.87%

Lain - Lain
Bobok kepala tiang bor akibat overcast melebihi cut off level
dan pembuangan puing potongan kepala tiang
Pengeboran vertikal di darat dan kondisi tanah
normal - SPT max. 60 bukan tanah pasir atau
tanah batuan
Volume pembuangan tanah dihitung berdasarkan
volume dikali 20% swelling untuk buang keluar
lokasi proyek
Volume pembuangan tanah di dalam lokasi dihitung teoritis
Volume pengeboran dihitung dari muka tanah asli hingga toe level
Volume pengecoran dihitung dari toe level hingga cut off level + 1 m
beton kotor
Volume pembesian dihitung berdasarkan
barbending schedule yang disepakati kedua belah
pihak dengan acuan waste besi minumim
Volume bersifat remeasurement untuk pekerjaan
pondasi tiang bor (Volume akan dihitung kembali
berdasarkan kondisi aktual di lapangan)
Over Break beton 20%
Toleransi maksimal 7,5cm kembung untuk soldier
pile jika melewati hal tersebut maka itu kewajiban
pakubumi
Kawat bendrat dan beton deking termasuk
Waste besi akan dihitung berdasarkan barbending
skedulle yang paling ekonomis dan ditambah 3%
untuk faktor resiko dan ditambah 1% untuk kaki
kaki (berlaku untuk bor pile)

Pergeseran titik horizontal maksimal 10 cm


Slurry hanya untuk pekerjaan Bored pile tidak
termasuk pekerjaan Soldier pile
Jika Soldier Pile Bocor signifikan karna TEKNIS
PENGEBORAN maka akan di grouting
Blok Beton sampai selesai pekerjaan
Penyambungan tiang untuk keperluan test pile
dihitung sebagai Volume
Volume remeasurement Harga Satuan mengikat
kecuali harga material besi akan ditinjau ulang
pada saat kontrak.
Maksimum Overcast 1,5 Meter dari cut off

PEKERJAAN PERSIAPAN (SAMEP)


1 Biaya Manajemen dan Koordinasi Lapangan 1 ls 3.72% 100.00% 3.716% 0.00% 0.000% 100.00% 3.716%
2 Biaya Pembuatan Dokumen Kontrak 1 ls 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 Akomudasi Rapat Lapangan 1 ls 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
4 Gambar Kerja (Shop Drawing) 1 ls 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
5 Gambar Terlaksana (As Built Drawing) 1 ls 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
6 Kantor Direksi di Lapangan 1 ls
7 Kantor Pemborong di Lapangan 1 ls 0.04% 100.00% 0.042% 0.00% 0.000% 100.00% 0.042%
8 Gudang Bahan dan Los Kerja 1 ls 0.05% 100.00% 0.048% 0.00% 0.000% 100.00% 0.048%
9 Pagar Sementara Proyek 1 ls
10 Contoh - Contoh Bahan 1 ls 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
11 Papan Nama 1 ls
12 Pemeriksaan dan Pengujian Bahan 1 ls 0.05% 100.00% 0.053% 0.00% 0.000% 100.00% 0.053%
13 Pemadam Kebakaran,P3K,Peralatan Keselamatan 1 ls 0.31% 100.00% 0.309% 0.00% 0.000% 100.00% 0.309%
Kerja
14 Mobilisasi dan Demobilisasi 1 ls 0.04% 100.00% 0.040% 0.00% 0.000% 100.00% 0.040%
15 Penjagaan Proyek 1 ls 0.23% 100.00% 0.230% 0.00% 0.000% 100.00% 0.230%
16 Pengadaan Sumber Air 1 ls 0.07% 100.00% 0.067% 0.00% 0.000% 100.00% 0.067%
17 Pengadaan Tenaga Listrik 1 ls 1.05% 100.00% 1.052% 0.00% 0.000% 100.00% 1.052%
18 Jalan Masuk ke Tempat Pekerjaan dan Jalan 1 ls
Sementara
19 Asuransi 1 ls 0.11% 100.00% 0.107% 0.00% 0.000% 100.00% 0.107%
20 Sarana Komunikasi 1 ls 0.03% 100.00% 0.026% 0.00% 0.000% 100.00% 0.026%
21 Pengukuran dan Bouwplank 1 ls
22 Photo -Photo Kemajuan Pekerjaan 1 ls 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
23 Kebersihan dan Kerapian 1 ls 0.33% 100.00% 0.330% 0.00% 0.000% 100.00% 0.330%
24 Peralatan dan Perlengkapan kerja 1 ls 1.71% 100.00% 1.713% 0.00% 0.000% 100.00% 1.713%
25 Saluran Sementara 1 ls 0.03% 100.00% 0.030% 0.00% 0.000% 100.00% 0.030%
26 Asuransi Astek 1 ls 0.12% 100.00% 0.123% 0.00% 0.000% 100.00% 0.123%
27 Topi Pengaman (Helm) dan Sepatu Lapangan 1 ls 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
28 Testing dan Commissioning 1 ls 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
29 Jaring Pengaman 1 ls
31 Laporan 1 ls 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
32 Tambahan Pagar Proyek Sesuai SI 1 ls 0.02% 100.00% 0.023% 0.00% 0.000% 100.00% 0.023%
Total Pekerjaan Persiapan 8.00% 8.00% 0.000% 8.00%

6/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot

2 PEKERJAAN STRUKTUR ATAS


2.1 PEKERJAAN TANAH DAN LAIN-LAIN
1 Pekerjaan galian tanah berikut pembuangannya
keluar lokasi proyek
a. Pek. Galian Bassement & Sanctum 93,824 .m3 0.34% 100.00% 0.336% 0.00% 0.000% 100.00% 0.336%
b. Pek. Galian Raft, Tie Beam, Pile Cap 3,193 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 Pekerjaan Urugan Kembali tanah hasil galian
a. Pek. Urugan area Open Cut 16,190 .m3 0.06% 100.00% 0.064% 0.00% 0.000% 100.00% 0.064%
4 Pekerjaan Bobok Kepala Tiang
(berikut pembuangan hasil bobokan keluar lokasi
proyek)
a. Pondasi Tiang Bor Pile 546 titik 0.02% 100.00% 0.024% 0.00% 0.000% 100.00% 0.024%
b. Dinding Soldier Pile 160 titik 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 Pekerjaan Anti Rayap 11,408 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
6 Pekerjaan Dewatering 1 .ls 0.12% 100.00% 0.118% 0.00% 0.000% 100.00% 0.118%
7 Pekerjaan Struting Baja untuk galian
a. HB uk. 400x400x13x21 26,712 Kg 0.15% 100.00% 0.151% 0.00% 0.000% 100.00% 0.151%
b. IWF uk. 600x300x12x20 10,845 Kg 0.06% 100.00% 0.061% 0.00% 0.000% 100.00% 0.061%
b. Plat 16 MM 2,321 Kg 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
c. Angkur M25, L=850MM 330 bh 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
d. Baut HTB A325 dia 25 120 bh 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
d. Baut HTB A325 dia 25 30 ttk 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 Pondasi Tumpuan Struting Baja
a. Beton K400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Besi 432 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Bekisting 14 .m2 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
d. Pembongkaran setelah selesai 15 ttk 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Pekerjaan proteksi lereng galian (shotcrete) 3,318 m2 0.19% 100.00% 0.193% 0.00% 0.000% 100.00% 0.193%

Total Pek.Tanah 1.02% 1.02% 0.00% 1.02%

2.2 PEKERJAAN BETON


2.2.1 PEKERJAAN BETON LANTAI BASEMENT 3
1 PEKERJAAN PILE CAP
a. Pekerjaan beton K-400 2,956 .m3 0.56% 100.00% 0.556% 0.00% 0.000% 100.00% 0.556%
b. Pekerjaan bekisting 1,377 .m2 0.03% 100.00% 0.026% 0.00% 0.000% 100.00% 0.026%
c. Pekerjaan pembesian (BJTD-40) 711,286 .kg 1.56% 100.00% 1.560% 0.00% 0.000% 100.00% 1.560%
d. Pekerjaan lantai kerja tebal 5 cm 148 .m3 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%
e. Pekerjaan urug pasir tebal 10cm 296 .m3 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
f. Pekerjaan "integral" waterproofing 2,956 .m3 0.06% 100.00% 0.063% 0.00% 0.000% 100.00% 0.063%
2 PEKERJAAN SLOOF / TIE BEAM
a. Pekerjaan beton K-400 178 .m3 0.03% 100.00% 0.033% 0.00% 0.000% 100.00% 0.033%
b. Pekerjaan bekisting 777 .m2 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 80,938 .kg 0.18% 100.00% 0.178% 0.00% 0.000% 100.00% 0.178%
d. Pekerjaan lantai kerja tebal 5 cm 20 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
e. Pekerjaan urug pasir tebal 10cm 40 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
f. Pekerjaan "integral" waterproofing 178 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PEKERJAAN PELAT LANTAI
a. Pekerjaan beton K-400 3,233 .m3 0.61% 100.00% 0.608% 0.00% 0.000% 100.00% 0.608%
c. Pekerjaan pembesian (BJTD-40) 431,473 .kg 0.95% 100.00% 0.947% 0.00% 0.000% 100.00% 0.947%
d. Pekerjaan lantai kerja tebal 5 cm 305 .m3 0.06% 100.00% 0.059% 0.00% 0.000% 100.00% 0.059%
e. Pekerjaan urug pasir tebal 10cm 610 .m3 0.04% 100.00% 0.036% 0.00% 0.000% 100.00% 0.036%
d. Pekerjaan "integral" waterproofing 3,233 .m3 0.07% 100.00% 0.068% 0.00% 0.000% 100.00% 0.068%
4 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 244 .m3 0.05% 100.00% 0.048% 0.00% 0.000% 100.00% 0.048%
b. Pekerjaan bekisting 1,412 .m2 0.04% 100.00% 0.037% 0.00% 0.000% 100.00% 0.037%
c. Pekerjaan pembesian (BJTD-40) 138,891 .kg 0.30% 100.00% 0.305% 0.00% 0.000% 100.00% 0.305%
5 PEKERJAAN DINDING BETON STP
a. Pekerjaan beton K-400 180 .m3 0.03% 100.00% 0.033% 0.00% 0.000% 100.00% 0.033%
b. Pekerjaan bekisting 1,416 .m2 0.04% 100.00% 0.037% 0.00% 0.000% 100.00% 0.037%
c. Pekerjaan pembesian (BJTD-40) 27,452 .kg 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%
d. Pekerjaan "integral" waterproofing 180 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
6 PEKERJAAN DINDING BETON GWT
a. Pekerjaan beton K-400 48 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 175 .m2 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
c. Pekerjaan pembesian (BJTD-40) 12,957 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%
d. Pekerjaan "integral" waterproofing 48 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 PEKERJAAN TANGGA 1 & 2 MID
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 66 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,503 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 PEKERJAAN TANGGA 1 & 2 MID HIGH
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 66 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

7/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 1,503 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 PEKERJAAN TANGGA BUILDING MANAGEMENT
(PROV SUM)
a. Pekerjaan beton K-400 4 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 25 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 679 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 PEKERJAAN SHEAR WALL
a. Pekerjaan beton K-550 93 .m3 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
b. Pekerjaan bekisting 494 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 35,645 .kg 0.08% 100.00% 0.078% 0.00% 0.000% 100.00% 0.078%
10 PEKERJAAN RETAINING WALL
a. Pekerjaan beton K-400 1,143 .m3 0.21% 100.00% 0.208% 0.00% 0.000% 100.00% 0.208%
b. Pekerjaan bekisting 7,091 .m2 0.19% 100.00% 0.186% 0.00% 0.000% 100.00% 0.186%
c. Pekerjaan pembesian (BJTD-40) 376,964 .kg 0.83% 100.00% 0.827% 0.00% 0.000% 100.00% 0.827%
11 PEKERJAAN RAMP
a. Pekerjaan beton K-400 64 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 346 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 11,553 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PEKERJAAN PARAPET BETON RAMP
a. Pekerjaan beton K-400 11 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 109 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 1,004 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
11 PEKERJAAN SEPARATOR BEAM
a. Pekerjaan beton K-400 5 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 51 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 865 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

Total Pek.Beton Basement 3 6.17% 6.17% 0.00% 6.17%

2.2.2 PEKERJAAN BETON BASEMENT 2


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 406 .m3 0.08% 100.00% 0.076% 0.00% 0.000% 100.00% 0.076%
b. Pekerjaan bekisting 2,695 .m2 0.07% 100.00% 0.070% 0.00% 0.000% 100.00% 0.070%
c. Pekerjaan pembesian (BJTD-40) 224,695 .kg 0.49% 100.00% 0.493% 0.00% 0.000% 100.00% 0.493%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 244 .m3 0.05% 100.00% 0.048% 0.00% 0.000% 100.00% 0.048%
b. Pekerjaan bekisting 1,412 .m2 0.04% 100.00% 0.037% 0.00% 0.000% 100.00% 0.037%
c. Pekerjaan pembesian (BJTD-40) 94,284 .kg 0.21% 100.00% 0.207% 0.00% 0.000% 100.00% 0.207%
3 PEKERJAAN TANGGA 1 & 2 MID
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 66 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,503 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
4 PEKERJAAN TANGGA 1 & 2 MID HIGH
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 66 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,503 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN PELAT LANTAI (PROVSUM)
a. Pekerjaan beton K-400 813 .m3 0.15% 100.00% 0.153% 0.00% 0.000% 100.00% 0.153%
b. Pekerjaan bekisting 5,966 .m2 0.16% 100.00% 0.155% 0.00% 0.000% 100.00% 0.155%
c. Pekerjaan pembesian (BJTD-40) 81,826 .kg 0.18% 100.00% 0.180% 0.00% 0.000% 100.00% 0.180%
4 PEKERJAAN SHEAR WALL
a. Pekerjaan beton K-550 93 .m3 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
b. Pekerjaan bekisting 494 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 24,763 .kg 0.05% 100.00% 0.054% 0.00% 0.000% 100.00% 0.054%
5 PEKERJAAN RAMP
a. Pekerjaan beton K-400 64 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 346 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 11,553 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
6 PEKERJAAN PARAPET BETON PARKIR (PROV QTY)
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 29 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 260 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 PEKERJAAN PARAPET BETON RAMP
a. Pekerjaan beton K-400 11 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 109 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 1,004 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 PEKERJAAN SEPARATOR BEAM
a. Pekerjaan beton K-400 5 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 51 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 865 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN TANGGA #8 Building Management


a. Pekerjaan beton K-400 4 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 35 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 758 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

8/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot

Total Pek.Beton Basement 2 1.581% 1.581% 0.00% 1.581%

2.2.3 PEKERJAAN BETON BASEMENT 1


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 415 .m3 0.08% 100.00% 0.078% 0.00% 0.000% 100.00% 0.078%
b. Pekerjaan bekisting 2,702 .m2 0.07% 100.00% 0.070% 0.00% 0.000% 100.00% 0.070%
c. Pekerjaan pembesian (BJTD-40) 224,696 .kg 0.49% 100.00% 0.493% 0.00% 0.000% 100.00% 0.493%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 312 .m3 0.06% 100.00% 0.062% 0.00% 0.000% 100.00% 0.062%
b. Pekerjaan bekisting 1,670 .m2 0.04% 100.00% 0.044% 0.00% 0.000% 100.00% 0.044%
c. Pekerjaan pembesian (BJTD-40) 116,438 .kg 0.26% 100.00% 0.255% 0.00% 0.000% 100.00% 0.255%
3 PEKERJAAN TANGGA 1 & 2 MID
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 71 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
4 PEKERJAAN TANGGA 1 & 2 MID HIGH
a. Pekerjaan beton K-400 15 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 133 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,711 .kg 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
5 PEKERJAAN TANGGA SANCTUM 1
a. Pekerjaan Strouss Pile D.30 CM 42.00 .m1 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan Galian 11.36 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pekerjaan Pasir Urug 0.08 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
d. Pekerjaan Lantai Kerja 0.04 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
e. Pekerjaan beton K-400 11.36 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
f. Pekerjaan bekisting 107.28 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
g. Pekerjaan pembesian (BJTD-40) 1,684.33 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
6 PEKERJAAN TANGGA SANCTUM 2
a. Pekerjaan Strouss Pile D.30 CM 42.00 .m1 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan Galian 5.87 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pekerjaan Pasir Urug 0.44 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
d. Pekerjaan Lantai Kerja 0.22 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
e. Pekerjaan beton K-400 5.87 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
f. Pekerjaan bekisting 55.96 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
g. Pekerjaan pembesian (BJTD-40) 1,027.48 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PEKERJAAN PELAT LANTAI (PROVSUM)
a. Pekerjaan beton K-400 871 .m3 0.16% 100.00% 0.164% 0.00% 0.000% 100.00% 0.164%
b. Pekerjaan bekisting 6,223 .m2 0.16% 100.00% 0.162% 0.00% 0.000% 100.00% 0.162%
c. Pekerjaan pembesian (BJTD-40) 104,543 .kg 0.23% 100.00% 0.229% 0.00% 0.000% 100.00% 0.229%
5 PEKERJAAN SHEAR WALL
a. Pekerjaan beton K-550 138 .m3 0.03% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%
b. Pekerjaan bekisting 734 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 34,794 .kg 0.08% 100.00% 0.076% 0.00% 0.000% 100.00% 0.076%
6 PEKERJAAN RAMP
a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 587 .m2 0.02% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 32,848 .kg 0.07% 100.00% 0.072% 0.00% 0.000% 100.00% 0.072%
7 PEKERJAAN PARAPET BETON PARKIR
a. Pekerjaan beton K-400 14 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 191 .m2 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
c. Pekerjaan pembesian (BJTD-40) 1,715 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
8 PEKERJAAN PARAPET BETON RAMP
a. Pekerjaan beton K-400 14 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 145 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,017 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
9 PEKERJAAN SEPARATOR BEAM
a. Pekerjaan beton K-400 5 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 51 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 865 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
7 PEKERJAAN CAPPING BEAM
a. Pekerjaan beton K-400 80 .m3 0.02% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
b. Pekerjaan bekisting 164 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 11,378 .kg 0.02% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
d. Pekerjaan lantai kerja tebal 5 cm 1.67
e. Pekerjaan urug pasir tebal 10cm 0

PEKERJAAN TANGGA #5 Ke GF
a. Pekerjaan beton K-400 18 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 92 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 3,540 .kg 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%

Total Pek.Beton Basement 1 1.91% 1.91% 0.00% 1.91%

2.2.4 PEKERJAAN BETON GROUND FLOOR

9/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 406 .m3 0.08% 100.00% 0.076% 0.00% 0.000% 100.00% 0.076%
b. Pekerjaan bekisting 2,641 .m2 0.07% 100.00% 0.069% 0.00% 0.000% 100.00% 0.069%
c. Pekerjaan pembesian (BJTD-40) 216,465 .kg 0.47% 100.00% 0.475% 0.00% 0.000% 100.00% 0.475%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 507 .m3 0.10% 100.00% 0.100% 0.00% 0.000% 100.00% 0.100%
b. Pekerjaan bekisting 2,439 .m2 0.06% 100.00% 0.064% 0.00% 0.000% 100.00% 0.064%
c. Pekerjaan pembesian (BJTD-40) 153,092 .kg 0.34% 100.00% 0.336% 0.00% 0.000% 100.00% 0.336%
3 PEKERJAAN PELAT LANTAI (PROVSUM)
a. Pekerjaan beton K-400 884 .m3 0.17% 100.00% 0.166% 0.00% 0.000% 100.00% 0.166%
b. Pekerjaan bekisting 5,892 .m2 0.15% 100.00% 0.154% 0.00% 0.000% 100.00% 0.154%
c. Pekerjaan pembesian (BJTD-40) 106,052 .kg 0.23% 100.00% 0.233% 0.00% 0.000% 100.00% 0.233%
4 PEKERJAAN TANGGA 1 & 2 MID
a. Pekerjaan beton K-400 21 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 178 .m2 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
c. Pekerjaan pembesian (BJTD-40) 3,637 .kg 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
5 PEKERJAAN TANGGA 1 & 2 MID HIGH
a. Pekerjaan beton K-400 20 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 177 .m2 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
c. Pekerjaan pembesian (BJTD-40) 3,614 .kg 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
4 PEKERJAAN SHEAR WALL
a. Pekerjaan beton K-550 232 .m3 0.05% 100.00% 0.046% 0.00% 0.000% 100.00% 0.046%
b. Pekerjaan bekisting 1,240 .m2 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
c. Pekerjaan pembesian (BJTD-40) 54,311 .kg 0.12% 100.00% 0.119% 0.00% 0.000% 100.00% 0.119%
5 PEKERJAAN RAMP
a. Pekerjaan beton K-400 158 .m3 0.03% 100.00% 0.0289% 0.00% 0.000% 100.00% 0.029%
b. Pekerjaan bekisting 878 .m2 0.02% 100.00% 0.0229% 0.00% 0.000% 100.00% 0.023%
c. Pekerjaan pembesian (BJTD-40) 35,470 .kg 0.08% 100.00% 0.0778% 0.00% 0.000% 100.00% 0.078%
6 PEKERJAAN PARAPET BETON RAMP
a. Pekerjaan beton K-400 28 .m3 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
b. Pekerjaan bekisting 281 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 3,911 .kg 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
7 PEKERJAAN SEPARATOR BEAM
a. Pekerjaan beton K-400 5 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 51 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 865 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 PEKERJAAN KOLAM RENANG (INCL. GUTTER)
(PROV SUM)
a. Pekerjaan beton K-400 37 .m3 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
b. Pekerjaan bekisting 216 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 4,855 .kg 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
d. Pekerjaan "integral" waterproofing 37 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 PEKERJAAN TANGGA POOL DECK (PROV SUM)
a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 22 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 551 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
d. Pekerjaan "integral" waterproofing 3 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
10 PEKERJAAN TANGGA GF ke PARKIR (PROV SUM)
a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 22 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 551 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
d. Pekerjaan "integral" waterproofing 3 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 PEKERJAAN BOMB CHECK (PROV SUM)
a. Pekerjaan Strouss Pile D.30 CM 60 .m1 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
b. Pekerjaan Galian 9 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
c. Pekerjaan Pasir Urug 1 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
d. Pekerjaan Lantai Kerja 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Pekerjaan beton K-400 6 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
f. Pekerjaan bekisting 44 .m2 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
g. Pekerjaan pembesian (BJTD-40) 1,533 .kg 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
12 TANCTUM 18 UNIT (PROV SUM)
a. Pekerjaan Pasir Urug 6 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
b. Pekerjaan Lantai Kerja 3 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
c. Pekerjaan beton K-400 41 .m3 0.01% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
d. Pekerjaan bekisting 324 .m2 0.01% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Pekerjaan pembesian (BJTD-40) 8,735 .kg 0.02% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
13 TRASH ROOM (PROV SUM)
a. Pekerjaan Pasir Urug 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
b. Pekerjaan Lantai Kerja 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
c. Pekerjaan beton K-400 1 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
d. Pekerjaan bekisting 23 .m2 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Pekerjaan pembesian (BJTD-40) 148 .kg 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
14 PLN ROOM (PROV SUM)
a. Pekerjaan Pasir Urug 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
b. Pekerjaan Lantai Kerja 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

10/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan beton K-400 1 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
d. Pekerjaan bekisting 18 .m2 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Pekerjaan pembesian (BJTD-40) 118 .kg 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN TANGGA #5 (Primary School)


a. Pekerjaan beton K-400 7 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 42 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 1,615 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN TANGGA MENUJU PLAZA


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 12 .m2 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pekerjaan pembesian (BJTD-40) 480 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN TANGGA MENUJU RETAIL B


a. Pekerjaan beton K-550 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 8 .m2 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pekerjaan pembesian (BJTD-40) 300 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN TANGGA DROP OFF


a. Pekerjaan beton K-400 1 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 6 .m2 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pekerjaan pembesian (BJTD-40) 240 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

RAMP PEJALAN KAKI


a. Pekerjaan beton K-400 14 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 93 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 2,372 .kg 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

Total Pek.Beton Ground Floor 2.16% 2.11% 0.00% 2.11%

2.2.5 PEKERJAAN BETON PONDASI MEP


1 PEKERJAAN PONDASI GENSET (PROV QTY)
a. Pekerjaan beton K-400 22 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 110 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 2,295 .kg 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 PEKERJAAN PONDASI TANGKI HARIAN (PROV
QTY)
a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 328 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 16 .kg 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
3 PEKERJAAN PONDASI TRAFO (PROV QTY)
a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 450 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 5 .kg 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN PONDASI POMPA (PROV QTY)
a. Pekerjaan beton K-400 13 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 7 .m2 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pekerjaan pembesian (BJTD-40) 1,875 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 PEKERJAAN PONDASI POMPA PK (PROV QTY)
a. Pekerjaan beton K-400 17 .m3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 84 .m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,721 .kg 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
6 PEKERJAAN PONDASI POMPA PL (PROV QTY)
a. Pekerjaan beton K-400 6 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 32 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 669 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 PEKERJAAN SUMPIT
a. Pekerjaan beton K-400 7 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 83 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,485 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
d. Pekerjaan lantai kerja tebal 5 cm 1 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
e. Pekerjaan urug pasir tebal 10 cm 1 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
f. Pekerjaan "integral" waterproofing 7 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PEKERJAAN GREASETRAP
a. Pekerjaan beton K-400 14 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 170 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,880 .kg 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
d. Pekerjaan lantai kerja tebal 5 cm 1 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
e. Pekerjaan urug pasir tebal 10 cm 1 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
f. Pekerjaan "integral" waterproofing 14 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN DOG HOUSE (PROV QTY)
a. Pekerjaan beton K-400 11 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 77 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,320 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

11/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot

Total Pek.Beton Pondasi MEP 0.08% 0.08% 0.000% 0.08%

3.1 Pekerjaan Struktur Beton Bertulang Parkir


3.1.1 Pekerjaan Beton Lantai Parkir 2A (2 nd)
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 98 .m3 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
b. Pekerjaan bekisting 661 .m2 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
c. Pekerjaan pembesian (BJTD-40) 54,320 .kg 0.12% 100.00% 0.119% 0.00% 0.000% 100.00% 0.119%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 110 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 562 .m2 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 37,341 .kg 0.08% 100.00% 0.082% 0.00% 0.000% 100.00% 0.082%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 71 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,446 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

3 PEKERJAAN TANGGA AS T1.M-T1.N, T1.1-T1.2


(PROV SUM)
a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 22 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 577 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

3 PEKERJAAN TANGGA 2A KE 2B (PROV SUM)


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 11 .m2 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pekerjaan pembesian (BJTD-40) 288 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 159 .m3 0.03% 100.00% 0.030% 0.00% 0.000% 100.00% 0.030%
b. Pekerjaan bekisting 1,354 .m2 0.04% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%
c. Pekerjaan pembesian (BJTD-40) 16,204 .kg 0.04% 100.00% 0.036% 0.00% 0.000% 100.00% 0.036%

5 PEKERJAAN SHEAR WALL


a. Pekerjaan beton K-550 44 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 235 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,413 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

6 PEKERJAAN RAMP
a. Pekerjaan beton K-400 70 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 364 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 18,369 .kg 0.04% 100.00% 0.040% 0.00% 0.000% 100.00% 0.040%

7 PEKERJAAN PARAPET BETON PARKIR (PROV SUM)


a. Pekerjaan beton K-400 50 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 663 .m2 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
c. Pekerjaan pembesian (BJTD-40) 5,790 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

8 PEKERJAAN PARAPET BETON RAMP


a. Pekerjaan beton K-400 29 .m3 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
b. Pekerjaan bekisting 388 .m2 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
c. Pekerjaan pembesian (BJTD-40) 1,064 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

9 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Parkir 2A 0.55% 0.55% 0.00% 0.55%

3.1.2 Pekerjaan Beton Lantai Sekolah 2B-3A (3 rd)


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 115 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 790 .m2 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
c. Pekerjaan pembesian (BJTD-40) 63,592 .kg 0.14% 100.00% 0.140% 0.00% 0.000% 100.00% 0.140%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 110 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 562 .m2 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 37,341 .kg 0.08% 100.00% 0.082% 0.00% 0.000% 100.00% 0.082%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 7 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

12/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 52 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,462 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN TANGGA AS T1.M-T1.N, T1.1-T1.2


(PROV SUM)
a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 22 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 577 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

3 PEKERJAAN TANGGA 2B KE 3A (PROV SUM)


a. Pekerjaan beton K-400 5 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 34 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 865 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

3 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 204 .m3 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
b. Pekerjaan bekisting 1,548 .m2 0.04% 100.00% 0.040% 0.00% 0.000% 100.00% 0.040%
c. Pekerjaan pembesian (BJTD-40) 23,143 .kg 0.05% 100.00% 0.051% 0.00% 0.000% 100.00% 0.051%

4 PEKERJAAN SHEAR WALL


a. Pekerjaan beton K-550 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 252 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 11,705 .kg 0.03% 100.00% 0.026% 0.00% 0.000% 100.00% 0.026%

PEKERJAAN RAMP
a. Pekerjaan beton K-400 46 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 243 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 12,924 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%

PEKERJAAN PARAPET BETON PARKIR (PROV SUM)


a. Pekerjaan beton K-400 37 .m3 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
b. Pekerjaan bekisting 498 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 4,389 .kg 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%

PEKERJAAN PARAPET BETON RAMP


a. Pekerjaan beton K-400 17 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 168 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,356 .kg 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Parkir 3A 0.570% 0.570% 0.000% 0.570%

3.1.3 Pekerjaan Beton Lantai Sekolah 3B - 4A (4 rd)


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 118 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 825 .m2 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
c. Pekerjaan pembesian (BJTD-40) 65,536 .kg 0.14% 100.00% 0.144% 0.00% 0.000% 100.00% 0.144%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 111 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 562 .m2 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 37,341 .kg 0.08% 100.00% 0.082% 0.00% 0.000% 100.00% 0.082%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 71 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

3 PEKERJAAN TANGGA 3B KE 4A (PROV SUM)


a. Pekerjaan beton K-400 7 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 49 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 1,268 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 250 .m3 0.05% 100.00% 0.047% 0.00% 0.000% 100.00% 0.047%
b. Pekerjaan bekisting 1,874 .m2 0.05% 100.00% 0.049% 0.00% 0.000% 100.00% 0.049%
c. Pekerjaan pembesian (BJTD-40) 28,270 .kg 0.06% 100.00% 0.062% 0.00% 0.000% 100.00% 0.062%

5 PEKERJAAN SHEAR WALL


a. Pekerjaan beton K-550 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 252 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 11,705 .kg 0.03% 100.00% 0.026% 0.00% 0.000% 100.00% 0.026%

13/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot

6 PEKERJAAN RAMP
a. Pekerjaan beton K-400 46 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 243 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 12,924 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%

7 PEKERJAAN PARAPET BETON PARKIR (PROV SUM)


a. Pekerjaan beton K-400 36 .m3 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
b. Pekerjaan bekisting 478 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 4,201 .kg 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%

8 PEKERJAAN PARAPET BETON RAMP


a. Pekerjaan beton K-400 17 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 168 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,356 .kg 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

9 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Parkir 4A 0.603% 0.603% 0.000% 0.603%

3.1.4 Pekerjaan Beton Lantai Sekolah 4B - 5A (5 rd)


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 119 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 825 .m2 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
c. Pekerjaan pembesian (BJTD-40) 65,536 .kg 0.14% 100.00% 0.144% 0.00% 0.000% 100.00% 0.144%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 111 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 561 .m2 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 37,354 .kg 0.08% 100.00% 0.082% 0.00% 0.000% 100.00% 0.082%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 7 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 52 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,462 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN TANGGA 4B KE 5A (PROV SUM)


a. Pekerjaan beton K-400 6 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 40 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 1,038 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

3 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 238 .m3 0.04% 100.00% 0.045% 0.00% 0.000% 100.00% 0.045%
b. Pekerjaan bekisting 1,874 .m2 0.05% 100.00% 0.049% 0.00% 0.000% 100.00% 0.049%
c. Pekerjaan pembesian (BJTD-40) 27,017 .kg 0.06% 100.00% 0.059% 0.00% 0.000% 100.00% 0.059%

4 PEKERJAAN SHEAR WALL


a. Pekerjaan beton K-550 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 252 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 11,705 .kg 0.03% 100.00% 0.026% 0.00% 0.000% 100.00% 0.026%

PEKERJAAN RAMP
a. Pekerjaan beton K-400 46 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 243 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 12,924 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%

PEKERJAAN PARAPET BETON PARKIR (PROV SUM)


a. Pekerjaan beton K-400 75 .m3 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
b. Pekerjaan bekisting 1,006 .m2 0.03% 100.00% 0.026% 0.00% 0.000% 100.00% 0.026%
c. Pekerjaan pembesian (BJTD-40) 8,827 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%

PEKERJAAN PARAPET BETON RAMP


a. Pekerjaan beton K-400 17 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 168 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,356 .kg 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Parkir 5A 0.628% 0.628% 0.000% 0.628%

14/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
3.1.5 Pekerjaan Beton Lantai Parkir 5B-6A-6B (6-6B)
PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 170 .m3 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
b. Pekerjaan bekisting 1,185 .m2 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
c. Pekerjaan pembesian (BJTD-40) 92,501 .kg 0.20% 100.00% 0.203% 0.00% 0.000% 100.00% 0.203%

PEKERJAAN KOLOM
a. Pekerjaan beton K-550 146 .m3 0.03% 100.00% 0.029% 0.00% 0.000% 100.00% 0.029%
b. Pekerjaan bekisting 811 .m2 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
c. Pekerjaan pembesian (BJTD-40) 49,203 .kg 0.11% 100.00% 0.108% 0.00% 0.000% 100.00% 0.108%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 11 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 92 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 1,875 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN TANGGA 5B KE 6A (PROV SUM)


a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 19 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 469 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 317 .m3 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%
b. Pekerjaan bekisting 2,501 .m2 0.07% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%
c. Pekerjaan pembesian (BJTD-40) 35,920 .kg 0.08% 100.00% 0.079% 0.00% 0.000% 100.00% 0.079%

PEKERJAAN SHEAR WALL


a. Pekerjaan beton K-550 59 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 309 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 14,508 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

PEKERJAAN RAMP
a. Pekerjaan beton K-400 46 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 243 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 12,924 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%

PEKERJAAN PARAPET BETON PARKIR (PROV SUM)


a. Pekerjaan beton K-400 40 .m3 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
b. Pekerjaan bekisting 529 .m2 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
c. Pekerjaan pembesian (BJTD-40) 4,643 .kg 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%

PEKERJAAN PARAPET BETON RAMP


a. Pekerjaan beton K-400 17 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 168 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,356 .kg 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Parkir 6A 0.779% 0.779% 0.000% 0.779%

Total Pek.Struktur Beton Bertulang Parkir 3.1254% 3.125% 0.000% 3.125%

4.1 Pekerjaan Struktur Beton Bertulang Mid


Apartment
4.1.1 Pekerjaan Beton Lantai 7
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 118 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting ==> (termasuk alas balok) 1,141 .m2 0.03% 100.00% 0.030% 0.00% 0.000% 100.00% 0.030%
c. Pekerjaan pembesian (BJTD-40) 64,364 .kg 0.14% 100.00% 0.141% 0.00% 0.000% 100.00% 0.141%
d. Pekerjaan "integral" waterproofing 118 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 111 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 545 .m2 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
c. Pekerjaan pembesian (BJTD-40) 32,213 .kg 0.07% 100.00% 0.071% 0.00% 0.000% 100.00% 0.071%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 14 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 121 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,607 .kg 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%

3 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 351 .m3 0.07% 100.00% 0.066% 0.00% 0.000% 100.00% 0.066%

15/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 1,828 .m2 0.05% 100.00% 0.048% 0.00% 0.000% 100.00% 0.048%
c. Pekerjaan pembesian (BJTD-40) 30,579 .kg 0.07% 100.00% 0.067% 0.00% 0.000% 100.00% 0.067%
d. Pekerjaan "integral" waterproofing 351 .m3 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%

4 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 78 .m3 0.02% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
b. Pekerjaan bekisting 417 .m2 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
c. Pekerjaan pembesian (BJTD-40) 18,787 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

7 PEKERJAAN KOLAM RENANG (INCL. GUTTER)


a. Pekerjaan beton K-400 118 .m3 0.02% 100.00% 0.023% 0.00% 0.000% 100.00% 0.023%
b. Pekerjaan bekisting 927 .m2 0.02% 100.00% 0.024% 0.00% 0.000% 100.00% 0.024%
c. Pekerjaan pembesian (BJTD-40) 14,372 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
d. Pekerjaan "integral" waterproofing 118 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

8 PEKERJAAN PARAPET BETON PERIMETER LUAR


(PROV SUM)
a. Pekerjaan beton K-400 37 .m3 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
b. Pekerjaan bekisting 498 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 4,389 .kg 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
d. Pekerjaan "integral" waterproofing 37 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

9 PEKERJAAN DINDING PLANTER BOX


a. Pekerjaan beton K-400 6 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 116 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 1,106 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
d. Pekerjaan "integral" waterproofing 6 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

8 PEKERJAAN TANGGA POOL DECK (PROV SUM)


a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 22 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 551 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
d. Pekerjaan "integral" waterproofing 3 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

11 PEKERJAAN PONDASI GONDOLA (PROV SUM)


a. Pekerjaan beton K-400 4 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 31 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 331 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Lantai 7 0.695% 0.695% 0.000% 0.695%

4.1.2 Pekerjaan Beton Lantai 8


PEKERJAAN BETON LANTAI 8
1 PEKERJAAN BALOK KONVENSIONAL (PROV QTY)
a. Pekerjaan beton K-400 59 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 498 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 32,553 .kg 0.07% 100.00% 0.071% 0.00% 0.000% 100.00% 0.071%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 68 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 329 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 19,703 .kg 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 94 .m3 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
b. Pekerjaan bekisting 648 .m2 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
c. Pekerjaan pembesian (BJTD-40) 8,405 .kg 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 48 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 252 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 12,232 .kg 0.03% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

16/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Lantai 8 0.265% 0.265% 0.000% 0.265%

4.1.3 Pekerjaan Beton Lantai 9


PEKERJAAN BALOK KONVENSIONAL
1 a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 33,491 .kg 0.07% 100.00% 0.073% 0.00% 0.000% 100.00% 0.073%
-
2 PEKERJAAN KOLOM -
a. Pekerjaan beton K-550 68 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 328 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 19,746 .kg 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 71 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
3 PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 100 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 719 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,132 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
4 PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-550 48 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 252 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 12,232 .kg 0.03% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 9 0.272% 0.272% 0.000% 0.272%

4.1.3 Pekerjaan Beton Lantai 10


PEKERJAAN BALOK KONVENSIONAL
1 a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 33,491 .kg 0.07% 100.00% 0.073% 0.00% 0.000% 100.00% 0.073%
-
2 PEKERJAAN KOLOM -
a. Pekerjaan beton K-550 68 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 328 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 19,746 .kg 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 71 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
3 PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 100 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 719 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,132 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
4 PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-550 48 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 252 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 12,232 .kg 0.03% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Lantai 10 0.272% 0.272% 0.000% 0.272%

4.1.3 Pekerjaan Beton Lantai 11


PEKERJAAN BALOK KONVENSIONAL
1 a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 33,491 .kg 0.07% 100.00% 0.073% 0.00% 0.000% 100.00% 0.073%
-

17/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
2 PEKERJAAN KOLOM -
a. Pekerjaan beton K-550 68 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 328 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 19,746 .kg 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 71 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
3 PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 100 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 719 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,132 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
4 PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-550 48 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 252 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 12,232 .kg 0.03% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Lantai 11 0.272% 0.272% 0.000% 0.272%

4.1.4 Pekerjaan Beton Lantai 12


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 33,491 .kg 0.07% 100.00% 0.073% 0.00% 0.000% 100.00% 0.073%

PEKERJAAN KOLOM
a. Pekerjaan beton K-550 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,102 .kg 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 723 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 48 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 252 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 12,232 .kg 0.03% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 12 0.265% 0.265% 0.000% 0.265%

4.1.5 Pekerjaan Beton Lantai 13


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%
-
PEKERJAAN KOLOM -
a. Pekerjaan beton K-500 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,430 .kg 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

18/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
-
PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 13 0.249% 0.249% 0.000% 0.249%

Pekerjaan Beton Lantai 14


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%
-
PEKERJAAN KOLOM -
a. Pekerjaan beton K-500 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,430 .kg 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Lantai 14 0.249% 0.249% 0.000% 0.249%

Pekerjaan Beton Lantai 15


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%
-
PEKERJAAN KOLOM -
a. Pekerjaan beton K-500 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,430 .kg 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%

19/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 15 0.249% 0.249% 0.000% 0.249%

4.1.6 Pekerjaan Beton Lantai 16


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%

PEKERJAAN KOLOM
a. Pekerjaan beton K-500 67 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 351 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 19,444 .kg 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,266 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 53 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 282 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 9,598 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 16 0.260% 0.2601% 0.000% 0.2601%

4.1.7 Pekerjaan Beton Lantai Refugee Lt 17


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%

PEKERJAAN KOLOM
a. Pekerjaan beton K-500 71 .m3 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
b. Pekerjaan bekisting 370 .m2 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
c. Pekerjaan pembesian (BJTD-40) 20,348 .kg 0.04% 100.00% 0.045% 0.00% 0.000% 100.00% 0.045%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 10 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 88 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 1,896 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 10,240 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 55 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 297 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 10,037 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN DINDING PLANTER BOX

20/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-400 49 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 652 .m2 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
c. Pekerjaan pembesian (BJTD-40) 5,961 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
d. Pekerjaan "integral" waterproofing 49 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 17 0.310% 0.3102% 0.000% 0.310%

PEKERJAAN BETON LANTAI 18


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%

PEKERJAAN KOLOM
a. Pekerjaan beton K-500 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,636 .kg 0.04% 100.00% 0.039% 0.00% 0.000% 100.00% 0.039%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 71 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,084 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 18 0.250% 0.250% 0.000% 0.250%

Pekerjaan Beton Lantai 19


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%
-
PEKERJAAN KOLOM -
a. Pekerjaan beton K-500 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,430 .kg 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 19 0.249% 0.249% 0.000% 0.249%

Pekerjaan Beton Lantai 20

21/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%
-
PEKERJAAN KOLOM -
a. Pekerjaan beton K-500 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,430 .kg 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 20 0.249% 0.2494% 0.000% 0.249%

Pekerjaan Beton Lantai 21


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%
-
PEKERJAAN KOLOM -
a. Pekerjaan beton K-500 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,430 .kg 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 21 0.249% 0.2494% 0.000% 0.249%

4.1.9 Pekerjaan Beton Lantai 22


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%

PEKERJAAN KOLOM
a. Pekerjaan beton K-500 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%

22/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 22 0.241% 0.2409% 0.000% 0.241%

4.1.10 Pekerjaan Beton Lantai 23


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,270 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%

PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-450 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 250 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,003 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 23 0.228% 0.2278% 0.000% 0.228%

4.1.10 Pekerjaan Beton Lantai 24


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,270 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%

PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI

23/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-400 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-450 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 250 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,003 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 24 0.228% 0.2278% 0.000% 0.228%

4.1.10 Pekerjaan Beton Lantai 25


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,270 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%

PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-450 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 250 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,003 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 25 0.228% 0.2278% 0.000% 0.228%

4.1.10 Pekerjaan Beton Lantai 26


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,270 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%

PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-450 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 250 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,003 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

24/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 26 0.228% 0.2278% 0.000% 0.228%

4.1.10 Pekerjaan Beton Lantai 27


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,270 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%

PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-450 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 250 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,003 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 27 0.228% 0.2278% 0.000% 0.228%

4.1.10 Pekerjaan Beton Lantai 28


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,270 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%

PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-450 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 250 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,003 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 28 0.228% 0.2278% 0.000% 0.228%

25/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
4.1.10 Pekerjaan Beton Lantai 29
PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,270 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%

PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-450 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 250 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,003 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 29 0.228% 0.2278% 0.000% 0.228%

4.1.10 Pekerjaan Beton Lantai 30


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,270 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%

PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-450 46 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 250 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,003 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 30 0.228% 0.2278% 0.000% 0.228%

4.1.10 Pekerjaan Beton Lantai 31


PEKERJAAN BETON LANTAI 31
PEKERJAAN BALOK KONVENSIONAL 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
a. Pekerjaan beton K-400 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting ==> (termasuk alas balok) 26,338 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%
c. Pekerjaan pembesian (BJTD-40)

PEKERJAAN KOLOM 63 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%

26/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-500 340 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 15,344 .kg 0.03% 100.00% 0.034% 0.00% 0.000% 100.00% 0.034%
c. Pekerjaan pembesian (BJTD-40)

PEKERJAAN TANGGA 1 4 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
a. Pekerjaan beton K-400 35 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 758 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40)

PEKERJAAN PELAT LANTAI 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
a. Pekerjaan beton K-400 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
c. Pekerjaan pembesian (BJTD-40)

PEKERJAAN SHEAR WALL & CORE WALL 52 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
a. Pekerjaan beton K-500 281 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
b. Pekerjaan bekisting 6,576 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
c. Pekerjaan pembesian (BJTD-40)

PEKERJAAN SEPARATOR BEAM 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
a. Pekerjaan beton K-400 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40)
Total Pek.Beton Lantai 31 0.233% 0.2334% 0.000% 0.233%

4.1.12 Pekerjaan Beton Lantai Atap (R1) Lt 32


PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,069 .kg 0.06% 100.00% 0.057% 0.00% 0.000% 100.00% 0.057%

PEKERJAAN KOLOM (KR & KL)


a. Pekerjaan beton K-450 12 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 145 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,507 .kg 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

PEKERJAAN TANGGA (PROV SUM)


a. Pekerjaan beton K-400 4 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 28 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 798 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 108 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 723 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 10,012 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
d. Pekerjaan "integral" waterproofing 108 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PONDASI GONDOLA


a. Pekerjaan beton K-400 5 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 36 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 380 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN PONDASI ROOFTANK


a. Pekerjaan beton K-400 4 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 33 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 496 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN PONDASI POMPA (PROV SUM)


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 15 .m2 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pekerjaan pembesian (BJTD-40) 232 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN PARAPET ATAP


a. Pekerjaan beton K-400 52 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 363 .m2 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
c. Pekerjaan pembesian (BJTD-40) 2,873 .kg 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
Total Pek.Beton Lantai 32 (Atap) 0.194% 0.194% 0.000% 0.194%

27/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
4.1.13 PEKERJAAN BETON LANTAI ATAP LIFT (LMR)
PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 16 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting ==> (termasuk alas balok) 171 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,752 .kg 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%

PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 21 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 139 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,035 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
d. Pekerjaan "integral" waterproofing 21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

Total Pek.Beton LMR 0.026% 0.026% 0.000% 0.026%

Total Pek.Struktur Beton Bertulang Mid 6.877% 6.877% 0.000% 6.877%

5.1 Pekerjaan Struktur Beton Bertulang Mid High


Apartment
5.1.1 Pekerjaan Beton Lantai 2
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 53 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 450 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,395 .kg 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 54 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 264 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,924 .kg 0.04% 100.00% 0.042% 0.00% 0.000% 100.00% 0.042%

PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 71 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

2 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 696 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,722 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

4 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 55 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 383 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 2 0.259% 0.259% 0.000% 0.259%

5.1.2 Pekerjaan Beton Lantai 3


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,629.34 .kg 0.06% 100.00% 0.061% 0.00% 0.000% 100.00% 0.061%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL

28/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 3 0.260% 0.260% 0.000% 0.260%

5.1.3 Pekerjaan Beton Lantai 4


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,629.34 .kg 0.06% 100.00% 0.061% 0.00% 0.000% 100.00% 0.061%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 4 0.260% 0.260% 0.000% 0.260%

5.1.4 Pekerjaan Beton Lantai 5


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,629.34 .kg 0.06% 100.00% 0.061% 0.00% 0.000% 100.00% 0.061%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

29/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 5 0.260% 0.260% 0.000% 0.260%

Pekerjaan Beton Lantai 6


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,629.34 .kg 0.06% 100.00% 0.061% 0.00% 0.000% 100.00% 0.061%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 6 0.260% 0.260% 0.000% 0.260%

Pekerjaan Beton Lantai 7


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,629.34 .kg 0.06% 100.00% 0.061% 0.00% 0.000% 100.00% 0.061%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 7 0.260% 0.260% 0.000% 0.260%

5.1.3 Pekerjaan Beton Lantai 8

30/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,410.84 .kg 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.33 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,745.97 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 8 0.253% 0.253% 0.000% 0.253%

5.1.4 Pekerjaan Beton Lantai 9


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,537.88 .kg 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 54.20 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,745.97 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 9 0.253% 0.253% 0.000% 0.253%

Pekerjaan Beton Lantai 10


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,537.88 .kg 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 54.20 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%

31/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,745.97 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 10 0.253% 0.253% 0.000% 0.253%

Pekerjaan Beton Lantai 11


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,537.88 .kg 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 54.20 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,745.97 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 11 0.253% 0.253% 0.000% 0.253%

5.1.5 Pekerjaan Beton Lantai 12


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,537.88 .kg 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 49.54 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 255.18 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,863.69 .kg 0.03% 100.00% 0.033% 0.00% 0.000% 100.00% 0.033%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

32/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
4 PEKERJAAN PELAT LANTAI
a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 12 0.249% 0.249% 0.000% 0.249%

5.1.6 Pekerjaan Beton Lantai 13


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,250.70 .kg 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 55.48 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 286.47 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 17,055.34 .kg 0.04% 100.00% 0.037% 0.00% 0.000% 100.00% 0.037%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 9.72 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 83.94 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,801.04 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.22 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 700.34 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 60.09 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 303.48 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 11,114.05 .kg 0.02% 100.00% 0.024% 0.00% 0.000% 100.00% 0.024%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 13 0.251% 0.251% 0.000% 0.251%

5.1.7 Pekerjaan Beton Lantai Refugee Lt. 14


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 30,004.35 .kg 0.07% 100.00% 0.066% 0.00% 0.000% 100.00% 0.066%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 58.40 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 305.39 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 18,222.13 .kg 0.04% 100.00% 0.040% 0.00% 0.000% 100.00% 0.040%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 9.72 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 83.94 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,801.04 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.22 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 700.34 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 12,001.36 .kg 0.03% 100.00% 0.026% 0.00% 0.000% 100.00% 0.026%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 63.25 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 320.76 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%

33/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 11,608.09 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

7 PEKERJAAN DINDING PLANTER BOX (PROV SUM)


a. Pekerjaan beton K-400 49.67 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 662.21 .m2 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
c. Pekerjaan pembesian (BJTD-40) 6,056.53 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
d. Pekerjaan "integral" waterproofing 49.67 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

Total Pek.Beton Lantai Refugee Lt. 14 0.308% 0.307% 0.000% 0.307%

5.1.8 Pekerjaan Beton Lantai 15


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 44.20 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 377.23 .m2 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
c. Pekerjaan pembesian (BJTD-40) 21,210.11 .kg 0.05% 100.00% 0.047% 0.00% 0.000% 100.00% 0.047%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 49.64 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 258.47 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,901.89 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 73.83 .m3 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
b. Pekerjaan bekisting 508.53 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 6,771.66 .kg 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 53.77 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.89 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 10,084.61 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 15 0.207% 0.207% 0.000% 0.207%

5.1.9 Pekerjaan Beton Lantai 16


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 41.42 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 357.68 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 20,738.47 .kg 0.05% 100.00% 0.045% 0.00% 0.000% 100.00% 0.045%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 49.64 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 255.18 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,842.17 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 69.19 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 482.32 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 6,343.97 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-550 53.77 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.89 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 10,084.61 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

34/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
6 PEKERJAAN SEPARATOR BEAM
a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 16 0.202% 0.202% 0.000% 0.202%

5.1.10 Pekerjaan Beton Lantai 17


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 26,972.31 .kg 0.06% 100.00% 0.059% 0.00% 0.000% 100.00% 0.059%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 49.64 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 255.18 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,882.53 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.22 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 696.74 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,189.28 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 53.77 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 268.45 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 10,084.61 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 17 0.239% 0.239% 0.000% 0.239%

5.1.11 Pekerjaan Beton Lantai 18


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 26,972.31 .kg 0.06% 100.00% 0.059% 0.00% 0.000% 100.00% 0.059%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 47.91 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251.92 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,762.06 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.22 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 700.34 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,189.28 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 53.77 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.89 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 10,084.61 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 18 0.236% 0.236% 0.000% 0.236%

5.1.12 Pekerjaan Beton Lantai 19

35/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 26,981.74 .kg 0.06% 100.00% 0.059% 0.00% 0.000% 100.00% 0.059%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 47.91 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251.92 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,718.11 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.23 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 698.01 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,114.42 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 53.77 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.89 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 10,084.61 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 19 0.236% 0.236% 0.000% 0.236%

Pekerjaan Beton Lantai 20


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 26,981.74 .kg 0.06% 100.00% 0.059% 0.00% 0.000% 100.00% 0.059%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 47.91 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251.92 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,718.11 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.23 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 698.01 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,114.42 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 53.77 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.89 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 10,084.61 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 20 0.236% 0.236% 0.000% 0.236%

Pekerjaan Beton Lantai 21


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 26,981.74 .kg 0.06% 100.00% 0.059% 0.00% 0.000% 100.00% 0.059%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 47.91 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251.92 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%

36/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 14,718.11 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.23 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 698.01 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,114.42 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 53.77 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.89 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 10,084.61 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 21 0.236% 0.236% 0.000% 0.236%

5.1.13 Pekerjaan Beton Lantai 22


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 26,981.74 .kg 0.06% 100.00% 0.059% 0.00% 0.000% 100.00% 0.059%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,478.16 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.23 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 698.01 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,114.42 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 53.77 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.89 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 10,084.61 .kg 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 22 0.228% 0.228% 0.000% 0.228%

5.1.14 Pekerjaan Beton Lantai 23


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI

37/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-400 103.98 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 701.12 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 52.68 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 270.90 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,515.28 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 23 0.216% 0.216% 0.000% 0.216%

Pekerjaan Beton Lantai 24


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.98 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 701.12 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 52.68 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 270.90 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,515.28 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 24 0.216% 0.216% 0.000% 0.216%

Pekerjaan Beton Lantai 25


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.98 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 701.12 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 52.68 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 270.90 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,515.28 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%

38/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 25 0.216% 0.216% 0.000% 0.216%

Pekerjaan Beton Lantai 26


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.98 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 701.12 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 52.68 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 270.90 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,515.28 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 26 0.216% 0.216% 0.000% 0.216%

Pekerjaan Beton Lantai 27


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.98 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 701.12 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 52.68 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 270.90 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,515.28 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 27 0.216% 0.216% 0.000% 0.216%

39/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
Pekerjaan Beton Lantai 28
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.98 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 701.12 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 52.68 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 270.90 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,515.28 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 28 0.216% 0.216% 0.000% 0.216%

Pekerjaan Beton Lantai 29


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.98 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 701.12 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 52.68 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 270.90 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,515.28 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 29 0.216% 0.216% 0.000% 0.216%

Pekerjaan Beton Lantai 30


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%

40/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 8.19 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 70.69 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,516.66 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.98 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 701.12 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 52.68 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 270.90 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 6,515.28 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 30 0.216% 0.216% 0.000% 0.216%

5.1.15 Pekerjaan Beton Lantai 31


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 50.27 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 273.89 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 12,650.69 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%

3 PEKERJAAN TANGGA 1 & 2


a. Pekerjaan beton K-400 4.09 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 35.34 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 758.33 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 103.17 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 701.16 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%

5 PEKERJAAN SHEAR WALL & CORE WALL


a. Pekerjaan beton K-500 57.13 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 292.22 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 7,494.34 .kg 0.02% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%

6 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pek.Beton Lantai 31 0.221% 0.221% 0.000% 0.221%

5.1.16 Pekerjaan Beton Lantai Atap (R1) Lt 32


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 26,593.84 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%
d. Pekerjaan "integral" waterproofing 54.05 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 12.12 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 141.49 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,452.85 .kg 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

3 PEKERJAAN TANGGA ( PROV SUM )


a. Pekerjaan beton K-400 4.09 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 35.34 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 758.33 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

41/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot

4 PEKERJAAN PELAT LANTAI


a. Pekerjaan beton K-400 110.52 .m3 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
b. Pekerjaan bekisting 745.87 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 11,723.02 .kg 0.03% 100.00% 0.026% 0.00% 0.000% 100.00% 0.026%
d. Pekerjaan "integral" waterproofing 110.52 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

5 PEKERJAAN PONDASI GONDOLA


a. Pekerjaan beton K-400 5.08 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 36.96 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 394.26 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

6 PEKERJAAN PONDASI ROOFTANK


a. Pekerjaan beton K-400 10.20 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 42.32 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 741.59 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

7 PEKERJAAN PONDASI POMPA (PROV SUM)


a. Pekerjaan beton K-400 1.92 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 7.18 .m2 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pekerjaan pembesian (BJTD-40) 197.11 .kg 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

8 PEKERJAAN SEPARATOR BEAM


a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

9 PEKERJAAN PEDESTAL BAJA CROWN


a. Pekerjaan beton K-400 4.08 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 34.00 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 2,133.72 .kg 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

10 PEKERJAAN PARAPET ATAP


a. Pekerjaan beton K-400 51.22 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 357.96 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 2,828.47 .kg 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%

Total Pek.Beton Lantai 32 0.206% 0.206% 0.000% 0.206%

5.1.17 Pekerjaan Beton Lantai Atap Lift (Lmr)


1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 16.14 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 171.46 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,734.59 .kg 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%

2 PEKERJAAN PELAT LANTAI ATAP LIFT (LMR)


a. Pekerjaan beton K-400 20.42 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 144.54 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 1,939.75 .kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
d. Pekerjaan "integral" waterproofing 20.42 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

Total Pek.Beton Lantai Atap Lift (LMR) 0.026% 0.026% 0.000% 0.026%

Total Pek.Struktur Beton Bertulang MidHigh 7.379% 7.378% 0.000% 7.378%


6.1 Pekerjaan Baja
Pekerjaan Struktur Baja
Total Pek. Baja 0.761% 0.559% 0.000% 0.559%
7.1 Pekerjaan Add. Item
Pekerjaan Add. Item
Total Pek. Add.Item 0.000% 0.000% 0.000% 0.000%
Total Pekerjaan Struktur Atas 31.062% 30.810% 0.000% 30.810%

Total Pekerjaan Mekanikal, Elektrikal & Plumbing 21.31% 13.140% 0.000% 13.140%
(PROVSUM)
Total Pekerjaan Infrastruktur 0.69% 0.69% 0.00% 0.692%
(PROVSUM)
Total Pekerjaan Special Lighting 0.24% 0.00% 0.00% 0.00%
(PROVSUM)
Total SAMEP 61.31% 52.64% 0.00% 52.64%

Total Pondasi + SAMEP 69.18% 60.515% 0.000% 60.515%

42/157
RINCIAN PROGRESS PEKERJAAN MARKETING GALLERY
PROYEK PEMBANGUNAN APARTEMEN SOLTERRA - PEJATEN - JAKARTA SELATAN Progress Bulanan
1 September sd 30 September 2019
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot

II PEKERJAAN STRUKTUR
###
I PEKERJAAN PERSIAPAN

1 Biaya Manajemen dan Koordinasi Lapang 1.00 ls 15,084,726 15,084,726 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 Biaya Pembuatan Dokumen Kontrak 1.00 ls - -
3 Akomudasi Rapat Lapangan 1.00 ls - -
4 Gambar Kerja (Shop Drawing) 1.00 ls 1,500,000 1,500,000 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 Gambar Terlaksana (As Built Drawing) 1.00 ls 1,500,000 1,500,000 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
6 Kantor Direksi di Lapangan 1.00 ls - -
7 Kantor Pemborong di Lapangan 1.00 ls - -
8 Gudang Bahan dan Los Kerja 1.00 ls - -
9 Pagar Sementara Proyek 125.00 m² 214,192 26,774,000 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
10 Contoh - Contoh Bahan 1.00 ls - -
11 Papan Nama 1.00 ls - -
12 Pemeriksaan dan Pengujian Bahan 1.00 ls - -
13 Pemadam Kebakaran,P3K,Peralatan Kesel 1.00 ls 10,000,000 10,000,000 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
14 Mobilisasi dan Demobilisasi 1.00 ls - -
15 Penjagaan Proyek 1.00 ls - -
16 Pengadaan Sumber Air 1.00 ls 2,538,871 2,538,871 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
17 Pengadaan Tenaga Listrik 1.00 ls 13,250,091 13,250,091 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
18 Jalan Masuk ke Tempat Pekerjaan dan Ja 1.00 ls - -
19 Asuransi 1.00 ls - -
20 Sarana Komunikasi 1.00 ls - -
21 Pengukuran dan Bouwplank 1.00 ls 1,025,000 1,025,000 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
22 Photo -Photo Kemajuan Pekerjaan 1.00 ls 865,955 865,955 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
23 Kebersihan dan Kerapian 1.00 ls 16,560,000 16,560,000 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
24 Peralatan dan Perlengkapan kerja (sewa c 1.00 ls 49,585,000 49,585,000 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
25 Saluran Sementara 1.00 ls - -
26 Asuransi Astek 1.00 ls - -
27 Topi Pengaman (Helm) dan Sepatu Lapa 1.00 ls - -
28 Testing dan Commissioning 1.00 ls - -
29 Jaring Pengaman 1.00 ls - -
30 Laporan 1.00 ls 1,316,357 1,316,357 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
31 Persiapan & Pembersihan lokasi pekerjaa 1.00 ls 50,000,000 50,000,000 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
(relokasi gudang eksisting)

Total Persiapan Marketing Gallery 190,000,000 0.037% 0.037% 0.000% 0.037%


II PEKERJAAN STRUKTUR
A Pekerjaan Struktur Bawah

1 Pondasi Tiang Pancang System Hydraulic

2 Pekerjaan Galian Tanah

a. Galian tanah pondasi beton 132.83 m³ 18,629 2,474,527 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Galian tanah sloof 31.00 m³ 18,629 577,556 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Galian tanah pondasi batu kali - m³ 18,629 - 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

3 Pekerjaan Urugan Tanah

a. Urugan tanah kembali ex galian pondasi 84.00 m³ 20,638 1,733,592 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Urugan tanah dibawah lantai dasar & bordes tangga (±1m)381.30 m³ 36,589 13,951,386 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Urugan tanah area planter (lanskap) - m³ 36,589 - 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

4 Pekerjaan Pemadatan Tanah

a. Pemadatan tanah pondasi beton & Batu Kali 84.00 m² 12,364 1,038,576 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pemadatan tanah sloof 72.00 m² 12,364 890,208 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pemadatan tanah lantai dasar 381.30 m² 12,364 4,714,393 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

5 Pekerjaan Urugan Pasir t = 10 cm

a. Urugan pasir di bawah pondasi beton & Batu kali 8.40 m³ 304,668 2,559,211 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Urugan pasir di bawah sloof 7.20 m³ 304,668 2,193,610 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Urugan pasir di bawah lantai dasar 38.13 m³ 304,668 11,616,991 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

6 Pekerjaan Lantai kerja t = 5 cm

a. Lantai kerja di bawah pondasi setapak & Batu kjali 4.20 m3 1,001,082 4,204,544 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Lantai kerja di bawah sloof 3.60 m3 1,001,082 3,603,895 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Lantai kerja di bawah lantai dasar 19.07 m3 1,001,082 19,085,628 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

7 Pekerjaan Pondasi beton

a. Pondasi Beton bertulang


- Beton P1 (2000 x 2000 x 300) D13-125, D13-125
Beton K-300 7.20 m3 913,772 6,579,158 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Bekisting 14.40 m2 97,799 1,408,306 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 1,044.00 kg 11,416 11,918,304 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

- Beton P1a (2000 x 2000 x 300) D13-125, D13-125


Beton K-300 4.80 m3 913,772 4,386,106 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Bekisting 9.60 m2 97,799 938,870 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 696.00 kg 11,416 7,945,536 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

43/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Beton P2 (1600 x 1600 x 300) D13-125, D13-125
Beton K-300 6.14 m3 913,772 5,614,215 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Bekisting 15.36 m2 97,799 1,502,193 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 890.88 kg 11,416 10,170,286 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

- Beton P3 (800 x 800 x 250) D13-125, D13-125


Beton K-300 0.96 m3 913,772 877,221 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 4.80 m2 97,799 469,435 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 139.20 kg 11,416 1,589,107 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

- Beton P4 (1000 x 2050 x 300) D13-125, D13-125


Beton K-300 0.62 m3 913,772 561,970 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 1.83 m2 97,799 178,972 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 89.18 kg 11,416 1,018,022 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

8 Pekerjaan Kolom Pedestal

a. Pedestal beton bertulang


- Beton P1 (400 x 400 x 1700) 12D13, D8-100
Beton K-300 1.63 m3 913,772 1,491,276 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 16.32 m2 136,175 2,222,376 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 236.64 kg 11,416 2,701,482 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

- Beton P1a (400 x 400 x 1700) 12D13, D8-100


Beton K-300 1.09 m3 913,772 994,184 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 10.88 m2 136,175 1,481,584 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 157.76 kg 11,416 1,800,988 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

- Beton P2 (400 x 400 x 1700) 12D13, D8-100


Beton K-300 2.18 m3 913,772 1,988,368 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 21.76 m2 136,175 2,963,168 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Pembesian 315.52 kg 11,416 3,601,976 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

- Beton P3 (250 x 250 x 1795) 4D13, D8-100


Beton K-300 0.67 m3 913,772 615,083 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 10.20 m2 136,175 1,388,985 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 97.60 kg 11,416 1,114,237 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

- Beton P4 (300 x 2050 x 1600) 36D13, D10-150


Beton K-300 0.57 m3 913,772 518,586 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 6.46 m2 136,175 879,691 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 82.29 kg 11,416 939,431 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

9 Pekerjaan Sloof beton

a. Sloof Beton bertulang


- Beton Sloof (200/450) 7D16, D8-125
Beton K-250 13.50 m3 888,908 11,997,620 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
Bekisting 134.97 m2 97,799 13,200,312 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
Pembesian 2,159.58 kg 11,416 24,653,793 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

- Beton Sloof (150/300) 7D16, D8-125


Beton K-250 1.29 m3 888,908 1,147,785 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 17.81 m2 97,799 1,742,250 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 206.60 kg 11,416 2,358,509 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

- Beton Sloof (150/200) 4D10, D8-150 (Dinding Pagar)


Beton K-250 - m3 888,908 - 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting - m2 97,799 - 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian - kg 11,416 - 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

10 Pekerjaan pondasi rollag bata

a. Pondasi rollag bata (dibawah pasangan batako) 178.67 m¹ 157,842 28,200,841 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
Pasangan batako penahan tanah dibawah sloof 178.67 m² 160,577 28,689,490 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%

11 Pekerjaan pondasi batu kali

a. Pondasi batu kali untuk dinding pagar (lanskap) - m³ - 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

12 Pekerjaan Anti Rayap ex Terminix / Setara


(Pekerjaan anti rayap Soil Teratment tidak di tawarkan

- 8,468 - 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%


a. Anti rayap bawah bangunan lantai dasar m²

13 Pekerjaan Plat Lantai Dasar

a. Beton plat lantai t = 10 cm


Beton K-250 45.76 m3 888,908 40,672,874 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
Wiremesh M8 (2 lapis) 381.30 m2 155,072 59,128,954 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%

Total Pekerjaan Struktur Bawah 360,295,660 0.07% 0.07% 0.00% 0.07%

B Pekerjaan Struktur Atas & Atap

1 Pekerjaan Konstruksi Baja & Beton

a. Lantai satu

44/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Pemasangan angkur D16mm 72.00 bh 174,559 12,568,255 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Pemasangan angkur D12mm 28.00 bh 130,919 3,665,741 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Pemasangan baseplat 350 x 350 tebal 15 mm 259.64 kg 24,823 6,445,013 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Pemasangan baseplat 200 x 200 tebal 10 mm 18.84 kg 24,823 467,665 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
- Pemasangan plat tebal 15 mm 955.83 kg 24,823 23,726,568 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
- Pemasangan plat tebal 10 mm 269.84 kg 24,823 6,698,238 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Konstruksi Kolom Hbeam 300x300 7,718.80 kg 29,400 226,932,814 0.04% 100.00% 0.044% 0.00% 0.000% 100.00% 0.044%
- Konstruksi Kolom Baja Hbeam 150x150 815.79 kg 29,400 23,984,226 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
- Konstruksi Balok Baja WF 150.150.7.10 1,555.30 kg 29,400 45,725,881 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Konstruksi Balok Baja WF 250.125.6.9 1,043.43 kg 29,400 30,676,830 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Konstruksi Balok Baja WF 300.150.6.9 (baru) 2,936.72 kg 29,400 86,339,568 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
- Konstruksi Balok Baja WF 400.200.8.13 7,645.48 kg 29,400 224,777,112 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
- Konstruksi Balok Baja WF 150.75.5.7 207.70 kg 29,400 6,106,380 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Mur baut D 16 mm 954.00 bh 11,475 10,947,150 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Grouting Baja Kolom ex Sika 24.00 titik 168,145 4,035,480 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

- Plat lantai (Bondeck + Wiremesh + Shear con)


Beton K-250, tebal plat = 150 mm 37.24 m3 888,908 33,102,934 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
Wiremesh M10 248.28 m2 108,501 26,938,628 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
Bondek 0,75 mm 232.08 m2 217,503 50,478,096 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%

Kolom praktis 130x130 mm


- Beton (4D10, D8-150) - m³

Ringbalk ( 130x130 )
- Beton (4D10, D8-150) - m³ -

b. Lantai dua
- Pemasangan plat tebal 15 mm 493.98 kg 24,823 12,262,066 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Pemasangan plat tebal 10 mm 161.71 kg 24,823 4,014,127 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Konstruksi Kolom Hbeam 300x300 jadi 200x200 (b 3,485.91 kg 29,400 102,485,754 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
- Konstruksi Kolom Hbeam 150x150 444.61 kg 29,400 13,071,534 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Konstruksi Balok Baja WF 250.125.6.9 522.74 kg 29,400 15,368,556 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Konstruksi Balok Baja WF 300.150.6.9 3,600.29 kg 29,400 105,848,526 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
- Konstruksi Balok Baja WF 400.200.8.13 jadi 300.1 3,200.08 kg 29,400 94,082,234 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
- Konstruksi Balok Roll Hollow 75.150 162.49 kg 37,700 6,125,873 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Mur baut D 16 mm 544.00 bh 11,475 6,242,400 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

- Plat lantai (Bondeck + Wiremesh + Shear con)


Beton K-250, tebal plat = 120 mm (tanpa TC) 11.37 m3 1,027,439 11,681,981 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
Wiremesh M10 94.77 m2 108,501 10,282,640 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
Bondek 0,75 mm 94.77 m2 217,503 20,612,759 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

- Plat lantai konvensional (area basah)


Beton K-250, tebal plat = 120 mm (tanpa TC) 1.71 m3 1,027,439 1,756,921 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 14.29 m2 135,590 1,937,581 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Wiremesh M8 (2 lapis) 14.29 m2 155,072 2,215,979 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

Sloof praktis 130x200 mm (area basah)


- Beton (4D10, D8-150) - m³ -

Kolom praktis 130x130 mm


- Beton (4D10, D8-150) - m³ -

Ringbalk ( 130x130 )
- Beton (4D10, D8-150) - m³ -

c. Lantai tiga
- Pemasangan plat tebal 15 mm 659.87 kg 24,823 16,379,953 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Konstruksi Kolom Hbeam 300x300 jadi 150x150 (b 1,631.59 kg 29,400 47,968,681 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Konstruksi Balok Baja WF 300.150.6.9 5,561.10 kg 29,400 163,496,255 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
- Konstruksi Balok Baja WF 150.75.5.7 44.64 kg 29,400 1,312,294 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
- Konstruksi Balok Roll Hollow 75.150 98.91 kg 37,700 3,728,907 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Mur baut D 16 mm 604.00 bh 11,475 6,930,900 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

C1 Lantai Atap Level 2


- Pemasangan plat tebal 10 mm 54.02 kg 24,823 1,340,938 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
- Konstruksi Kolom Hbeam 150x150 806.97 kg 29,400 23,724,950 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
- Konstruksi Balok Baja WF 150.75.5.7 845.22 kg 29,400 24,849,565 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
- Mur baut D 16 mm 216.00 bh 11,475 2,478,600 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

- Plat lantai (Bondeck + Wiremesh)


Beton K-250 (tanpa TC) 10.71 m3 1,027,439 11,003,872 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
Wiremesh M10 89.24 m2 108,501 9,682,629 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
Bondek 0,75 mm 89.24 m2 217,503 19,409,968 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

- Plat lantai konvensional (area basah)


Beton K-250 (tanpa TC) 1.71 m3 1,027,439 1,756,921 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bekisting 14.29 m2 135,590 1,937,581 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Wiremesh M8 (2 lapis) 14.29 m2 155,072 2,215,979 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

Dinding bata ringan (dibawah atap spandek)


- Pasangan bata 90.54 m² 141,649 12,825,602 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Plasteran 181.09 m² 40,159 7,272,389 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Acian 181.09 m² 22,619 4,096,072 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Sloof praktis 130x200 mm (area basah)


- Beton (4D10, D8-150) - m³ - Tidak ditawarkan

Kolom praktis 130x130 mm


- Beton (4D10, D8-150) - m³ - Tidak ditawarkan

45/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot

Ringbalk ( 130x130 )
- Beton (4D10, D8-150) - m³ - Tidak ditawarkan

2 Tangga Beton

a. - Tangga beton (Tangga Utama)


Beton K-250 (tanpa TC) 4.10 m3 1,027,439 4,207,671 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Bekisting 31.70 m2 154,812 4,908,259 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Pembesian 655.25 kg 11,416 7,480,311 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

b. - Tangga Samping
- Pemasangan plat tebal 10 mm 15.70 kg 24,823 389,721 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
- Konstruksi UNP & Siku 1,292.74 kg 29,400 38,006,606 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
- Mur baut D 16 mm 4.00 bh 11,475 45,900 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

3 Rangka dan Penutup Atap

a. Atap spandek rangka baja ringan ex. Taso 164.69 m² 254,700 41,946,543 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Spanscrew D16 - bh 60,795 - 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Ikatan Angin - kg 29,400 - 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
d. Insulation aluminium foil 164.69 m² 202,730 33,387,604 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
e. Dak talang (konvensional) exclude waterproofing
Beton K-250 (tanpa TC) 5.50 m3 1,027,439 5,646,805 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Bondek 0,75 mm 45.80 m2 217,503 9,961,637 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
Wiremesh M8 45.80 m2 77,536 3,551,149 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

Total Pekerjaan Struktur Atas dan Atap 1,743,549,775 0.34% 0.34% 0.00% 0.34%

C Pekerjaan Mekanikal & Elektrikal

1 Pekerjaan Plumbing

a. Lantai Dasar
Instalasi Air Kotor & Bekas dibawah lantai dasar sd 1 m keluar dari bangunan
Instalasi Pipa PVC AW 3" 17.90 m' 82,491 1,476,589 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Instalasi Pipa PVC AW 4" 9.00 m' 121,499 1,093,491 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Instalasi Pipa PVC AW 6" 13.00 m' 269,507 3,503,591 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Fitting-fitting 1.00 ls 1,679,723 1,679,723 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

b. Lantai Dasar
Instalasi Drain AC dibawah lantai dasar sd 1 m keluar dari bangunan
Instalasi Pipa PVC AW 2" 16.00 m' 38,438 615,008 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pipa PVC AW 3/4" 20.00 m' 12,813 256,260 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Fitting-fitting 1.00 ls 550,734 550,734 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

c. Lantai Atap
Sparing Air hujan dak talang 18.00 ttk 49,137 884,466 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

2 Pekerjaan Elektrikal

a. Lantai Dasar
Instalasi Listrik dibawah lantai dasar sd 1 m keluar dari bangunan
Instalasi Conduit Ø 20mm 120.00 m' 7,008 840,960 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Instalasi Conduit Ø 25mm 16.00 m' 14,016 224,256 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
T-Dus dan Blockout 1.00 Ls 484,621 484,621 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

Total Pekerjaan MEP Magal 11,609,699 0.002% 0.002% 0.000% 0.002%


Total Pondasi + SAMEP 2,305,455,134 0.443% 0.443% 0.000% 0.443%

46/157
RINCIAN PROGRESS PEKERJAAN ARSITEK 0.0357%
PROYEK PEMBANGUNAN APARTEMEN SOLTERRA - PEJATEN - JAKARTA SELATAN PROGRESS BULAN JULI 2023
-
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN ARSITEK ###
ARSITEK LANTAI B3
I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 443.67 m2 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 348.02 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.25 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

II PEKERJAAN FINISHING DINDING


1 PLESTER 1,453 m2 0.011% 98.00% 0.011% 0.00% 0.000% 98.00% 0.011%
2 ACIAN 1,453 m2 0.006% 98.00% 0.006% 0.00% 0.000% 98.00% 0.006%
3 SKIMCOAT DINDING BETON 1,706 m2 0.008% 98.00% 0.008% 0.00% 0.000% 98.00% 0.008%
4 CAT DINDING (SECURITY, STORAGE DLL) 1,835 m2 0.005% 15.00% 0.001% 0.00% 0.000% 15.00% 0.001%
5 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 1,301 m2 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 KERAMIK (30x30) 326 m2 0.010% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 HT (60x120) JAMB. LIFT 116 m2 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
8 WATERPROOFING COATING (JAN, GWT, STP) 827 m2 0.009% 80.00% 0.007% 0.00% 0.000% 80.00% 0.007%

III PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 4 unit 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
2 PINTU TYPE SD1B 4 unit 0.008% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
3 PINTU TYPE SD2 10 unit 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
4 PINTU TYPE AD1 2 unit 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 PINTU TYPE AD2 1 unit 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 PINTU TYPE GD2 2 unit 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 9,272 m2 0.046% 100.00% 0.046% 0.00% 0.000% 100.00% 0.046%
2 PLAFOND GYPSUM BOARD (9MM) 115 m2 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 CAT PLAFOND GYPSUM BOARD 9,387 m2 0.028% 90.00% 0.025% 0.00% 0.000% 90.00% 0.025%
4 CORNICE PLAFOND 100 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

V PEKERJAAN LANTAI
1 HT (60x60) 115 m2 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED 78 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 KERAMIK (UK. 30x30) ROMAN 300 m2 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 SKIRTING KERAMIK (UK. 10x30) ROMAN 113 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 FLOOR HARDENER 3 KG (STP, FAN ROOM, MEP) 233 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 FLOOR HARDENER 5 KG (AREA PARKIR) 4,533 m2 0.036% 100.00% 0.036% 0.00% 0.000% 100.00% 0.036%
7 STEP NOSING KERAMIK (TANGGA 1-2 DAN 3-4) 95 m' 0.001% 60.00% 0.001% 0.00% 0.000% 60.00% 0.001%
8 WATERPROOFING COATING 468 m2 0.005% 90.00% 0.005% 0.00% 0.000% 90.00% 0.005%
9 PEKERJAAN PULAU PARKIR 947 m2 0.032% 98.00% 0.031% 0.00% 0.000% 98.00% 0.031%
10 PEKERJAAN LANTAI DUST PROOF (TANGGA DARURAT) 87 m2 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11 HT (UK. 60x60) POLISHED (TANGGA MANAGEMENT) 16 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
12 STEP NOSING HT (TANGGA BUILD. MANAGEMENT) 31 m' 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

VII PEKERJAAN SANITARY


1 FLOOR DRAIN 4 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 KRAN 2 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

VIII PEKERJAAN RAILLING


1 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 28 m' 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
2 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA BUILDING MANAGEMENT 14.45 m' 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 25 m' 0.002% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

IX PEKERJAAN LAIN - LAIN


1 PEKERJAAN FIRE STOPPER 11 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PEKERJAAN CAR STOPPER (AREA PARKIR) 284 unit 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
3 PEKERJAAN ARAH PANAH (AREA PARKIR) 28 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN GARIS PARKIR 960 m' 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 375 m' 0.033% 90.00% 0.029% 0.00% 0.000% 90.00% 0.029%
6 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 207.00 unit 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
7 PEKERJAAN SERSAN PARKIR 145.80 m 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
8 PEKERJAAN CANSTEEN 1,353.20 m' 0.056% 100.00% 0.056% 0.00% 0.000% 100.00% 0.056%
9 PEKERJAAN CAT CANSTEEN 1,353.20 m' 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK B3 0.449% 0.332% 0.000% 0.332%

ARSITEK LANTAI B2
I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 568 m2 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 346 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.25 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

II PEKERJAAN FINISHING DINDING


1 PLESTER 1,683 m2 0.013% 95.00% 0.012% 0.00% 0.000% 95.00% 0.012%
2 ACIAN 1,683 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
3 SKIMCOAT DINDING BETON 1,706 m2 0.008% 98.00% 0.008% 0.00% 0.000% 98.00% 0.008%
4 CAT DINDING (SECURITY, STORAGE DLL) 1,783 m2 0.005% 50.00% 0.003% 0.00% 0.000% 50.00% 0.003%
5 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 1,858 m2 0.010% 50.00% 0.005% 0.00% 0.000% 50.00% 0.005%
6 KERAMIK (30x30) 364 m2 0.011% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 HT (60x120) JAMB. LIFT 121 m2 0.010% 50.00% 0.005% 0.00% 0.000% 50.00% 0.005%
8 WATERPROOFING COATING (JAN, GWT, STP) 1,054 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%

III PEKERJAAN PINTU DAN JENDELA

47/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1 PINTU TYPE WD1 2.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PINTU TYPE WD3 2.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PINTU TYPE SD1 4.00 unit 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
4 PINTU TYPE SD1B 4.00 unit 0.008% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
5 PINTU TYPE SD2 11.00 unit 0.011% 95.00% 0.010% 0.00% 0.000% 95.00% 0.010%
6 PINTU TYPE AD1 1.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 PINTU TYPE GD2 2.00 unit 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 8,627 m2 0.043% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
2 PLAFOND GYPSUM BOARD (9MM) 116 m2 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PLAFOND GYPSUM BOARD WR (9MM) 13 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 CAT PLAFOND GYPSUM BOARD 8,742 m2 0.026% 90.00% 0.023% 0.00% 0.000% 90.00% 0.023%
5 CAT PLAFOND GYPSUM WR BOARD 13 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 CORNICE PLAFOND 122 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

V PEKERJAAN LANTAI
1 HT (60x60) POLISHED 116 m2 0.006% 30.00% 0.002% 0.00% 0.000% 30.00% 0.002%
2 SKIRTING HT (UK. 10x60CM) POLISHED 80 m' 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
3 HT (60x60) UNPOLISHED 13 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 KERAMIK (UK. 30x30) ROMAN POLISHED 61 m2 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 55.85 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 KERAMIK (UK. 30x30) ROMAN UNPOLISHED 29.63 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 55.58 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
8 FLOOR HARDENER 3 KG (STP, FAN ROOM, MEP) 126.10 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 FLOOR HARDENER 5 KG (AREA PARKIR) 4,627.97 m2 0.037% 100.00% 0.037% 0.00% 0.000% 100.00% 0.037%
10 STEP NOSING HT (TANGGA BUILD. MANAGEMENT) 94.50 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11 WATERPROOFING COATING 78.88 m2 0.001% 55.00% 0.000% 0.00% 0.000% 55.00% 0.000%
12 PULAU PARKIR 989.82 m2 0.033% 98.00% 0.033% 0.00% 0.000% 98.00% 0.033%
13 PEKERJAAN LANTAI DUST PROOF 86.69 m2 0.002% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

VII PEKERJAAN SANITARY


A TOILET
Closet Duduk 2.00 Unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Jet Washer 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Paper Holder 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 2.00 Set 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 3.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Urinoir 1.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

B JANITOR
Floor Drain 4.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Kran 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

VIII PEKERJAAN RAILLING


1 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 29.27 m' 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
2 HANDRAIL PIPA BESI Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 25.27 m' 0.002% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

IX PEKERJAAN LAIN - LAIN


1 MEJA BETON WASTAFLE 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PEKERJAAN FIRE STOPPER 11.38 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN CAR STOPPER (AREA PARKIR) 278.00 unit 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 PEKERJAAN ARAH PANAH (AREA PARKIR) 31.00 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 PEKERJAAN GARIS PARKIR 935.00 m' 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 374.88 m' 0.033% 90.00% 0.029% 0.00% 0.000% 90.00% 0.029%
7 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 209.00 unit 0.009% 98.00% 0.008% 0.00% 0.000% 98.00% 0.008%
8 PEKERJAAN SERSAN PARKIR 145.80 m2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
9 PEKERJAAN CANSTEEN 1,472.77 m' 0.061% 100.00% 0.061% 0.00% 0.000% 100.00% 0.061%
10 PEKERJAAN CAT CANSTEEN 1,472.77 m' 0.017% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK B2 0.450% 0.355% 0.000% 0.355%

ARSITEK LANTAI B1
I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 2,941.68 m2 0.080% 95.00% 0.076% 0.00% 0.000% 95.00% 0.076%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 750.81 m2 0.025% 95.00% 0.024% 0.00% 0.000% 95.00% 0.024%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.25 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
4 PEKERJAAN DINDING KACA 432.26 m' 0.126% 60.00% 0.075% 0.00% 0.000% 60.00% 0.075%
5 PEKERJAAN CUBICLE KACA 11.00 m' 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

II PEKERJAAN FINISHING DINDING


1 PLESTER 7,040.82 m2 0.054% 90.00% 0.049% 0.00% 0.000% 90.00% 0.049%
2 ACIAN 7,040.82 m2 0.031% 75.00% 0.023% 0.00% 0.000% 75.00% 0.023%
3 SKIMCOAT DINDING BETON 2,610.47 m2 0.013% 95.00% 0.012% 0.00% 0.000% 95.00% 0.012%
4 CAT DINDING (INTERIOR) 7,267.69 m2 0.021% 20.00% 0.004% 0.00% 0.000% 20.00% 0.004%
5 CAT DINDING (EXTERIOR) 1,057.33 m2 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 CAT MINYAK (AREA PARKIR, SERVIS) 1,369.39 m2 0.008% 50.00% 0.004% 0.00% 0.000% 50.00% 0.004%
7 KERAMIK (30x30) ROMAN 760.77 m2 0.022% 85.00% 0.019% 0.00% 0.000% 85.00% 0.019%
8 HT (60x120) JAMB. LIFT 261.79 m2 0.021% 90.00% 0.019% 0.00% 0.000% 90.00% 0.019%
9 WATERPROOFING COATING (JAN, GWT, R. POMPA) 760.77 m2 0.008% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
10 CAT TEKSTUR (GRAND STAIR) EXTERIOR 86.16 m2 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11 CAT PLINT DINDING 162.58 m' 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

III PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE WD1 (Uk. 900X2150) 3.00 unit 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PINTU TYPE WD1 (Uk. 800X2150) 4.00 unit 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PINTU TYPE WD1 (Uk. 1100X2150) 7.00 unit 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PINTU TYPE WD3 (Uk. 700x2150) 2.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

48/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
5 PINTU TYPE WD 4 (Uk. 1700X2150) 2.00 unit 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 PINTU TYPE SD1 (Uk. 1000X2150) 4.00 unit 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
7 PINTU TYPE SD1B (Uk. 1400X2150) 4.00 unit 0.008% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
8 PINTU TYPE SD2 (Uk. 900X2150) 9.00 unit 0.009% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
9 PINTU TYPE SD3 (Uk. 1800X2150) 1.00 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
10 PINTU TYPE SD4 (Uk. 2500X2450) 2.00 unit 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11 PINTU TYPE SD5 (Uk. 2500X2450) 1.00 unit 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
12 PINTU TYPE AD1 (Uk. 1000X2150) 1.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
13 PINTU TYPE AD2 (Uk. 1900X2150) 3.00 unit 0.007% 80.00% 0.006% 0.00% 0.000% 80.00% 0.006%
14 PINTU TYPE AD3 (Uk. 1900X2150) 2.00 unit 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
15 PINTU TYPE GD1 (Uk. 1800X2200) 7.00 unit 0.022% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
16 PINTU TYPE W12 (Uk. 1400X2750) 6.00 unit 0.005% 80.00% 0.004% 0.00% 0.000% 80.00% 0.004%
17 PINTU TYPE W13 (Uk. 2200X2750) 1.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
18 PINTU TYPE W14 (Uk. 3840X2750) 1.00 unit 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 3,701.11 m2 0.018% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
2 PLAFOND GYPSUM BOARD (9MM) 641.19 m2 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PLAFOND GYPSUM BOARD WR (9MM) 40.58 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 CAT PLAFOND GYPSUM BOARD 4,342.30 m2 0.013% 10.00% 0.001% 0.00% 0.000% 10.00% 0.001%
5 CAT PLAFOND GYPSUM WR BOARD 40.58 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 CORNICE PLAFOND 440.80 m' 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 MAN HOLE 10.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
8 WOOD PANEL COMPOSIT 574.88 m2 0.154% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

V PEKERJAAN LANTAI
1 HT (60x60) POLISHED 351.93 m2 0.018% 45.00% 0.008% 0.00% 0.000% 45.00% 0.008%
2 SKIRTING HT (UK. 10x60CM) POLISHED 227.70 m' 0.002% 35.00% 0.001% 0.00% 0.000% 35.00% 0.001%
3 HT (60x60) UNPOLISHED 549.84 m2 0.029% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 KERAMIK TILE (UK. 30x30) ROMAN POLISHED 75.25 m2 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 65.56 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 KERAMIK TILE (UK. 30x30) ROMAN UNPOLISHED 67.72 m2 0.003% 85.00% 0.003% 0.00% 0.000% 85.00% 0.003%
7 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 75.35 m' 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
8 FLOOR HARDENER 3 KG (STP, FAN ROOM, MEP) 332.35 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
9 FLOOR HARDENER 5 KG (AREA PARKIR) 1,433.63 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
10 STEP NOSING KERAMIK (TANGGA 1-2 DAN 3-4) 94.50 m' 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 WATERPROOFING COATING 780.38 m2 0.008% 90.00% 0.008% 0.00% 0.000% 90.00% 0.008%
12 PEKERJAAN PULAU PARKIR 321.97 m2 0.011% 90.00% 0.010% 0.00% 0.000% 90.00% 0.010%
13 PEKERJAAN LANTAI DUST PROOF (TANGGA DARURAT) 86.69 m2 0.002% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
14 BATU ANDHESIT UK. 30X60 724.44 m2 0.065% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

VII PEKERJAAN SANITARY


A TOILET
1 Closet Duduk 7.00 Unit 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 Jet Washer 7.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 Paper Holder 7.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 Wastafel 6.00 Set 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 Robe Hook 7.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 Floor Drain 8.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 Urinoir 3.00 Unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

B ABLUTION
1 Closet Duduk 2.00 Unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 Jet Washer 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 Paper Holder 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 Wastafel 2.00 Set 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 Robe Hook 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 Floor Drain 6.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 Kran 10.00 Unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

B JANITOR
Floor Drain 4.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Kran 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

VIII PEKERJAAN RAILLING


1 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 58.53 m' 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
2 HANDRAIL PIPA BESI Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 50.54 m' 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

IX PEKERJAAN LAIN - LAIN


1 MEJA BETON WASTAFLE
- uk. 60 x 1000 cm 2.00 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- uk. 40 x 2012 cm 2.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- uk. 40 x 1220 cm 1.00 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- uk. 40 x 1275 cm 1.00 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PEKERJAAN FIRE STOPPER 11.38 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN CAR STOPPER (AREA PARKIR) 24.00 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN ARAH PANAH (AREA PARKIR) 19.00 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 PEKERJAAN GARIS PARKIR 90.00 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 22.70 m' 0.002% 90.00% 0.002% 0.00% 0.000% 90.00% 0.002%
7 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 87.00 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
8 PEKERJAAN CANSTEEN 534.29 m' 0.022% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
9 PEKERJAAN CAT CANSTEEN 534.29 m' 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK B1 0.929% 0.451% 0.000% 0.451%

PARKIR
ARSITEK PARKIR LANTAI 2
I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 448.95 m2 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%

49/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 61.13 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

II PEKERJAAN FINISHING DINDING


1 PLESTER 960.49 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
2 ACIAN 960.49 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
3 SKIMCOAT DINDING BETON 1,840.14 m2 0.009% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
4 CAT DINDING (INTERIOR) 208.15 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
5 CAT DINDING (EXTERIOR) 142.34 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS) 1,812.19 m2 0.010% 95.00% 0.010% 0.00% 0.000% 95.00% 0.010%
7 KERAMIK (30x30) ROMAN 7.77 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
8 HT (60x120) JAMB. LIFT 51.89 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
9 WATERPROOFING COATING (JAN) 1.50 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
10 CAT PLINT DINDING 8.00 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

III PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 (Uk. 1000X2150) 2.00 Unit 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 PINTU TYPE SD1B (Uk. 1400X2150) 2.00 Unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
3 PINTU TYPE SD2 (Uk. 900X2150) 2.00 Unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PINTU TYPE AD1 (Uk. 1000X2150) 3.00 Unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 PINTU TYPE GD1 (Uk. 1800X2200) 1.00 Unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 2,336.21 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
2 PLAFOND GYPSUM BOARD (9MM) 14.77 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
3 CAT PLAFOND GYPSUM BOARD 2,350.98 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
4 SHAADOWLINE 19.58 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 165.69 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
2 FLOOR HARDENER 5 KG (AREA PARKIR) 1,260.20 m2 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
3 STEP NOSING KERAMIK (TANGGA 3-4) 83.70 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 WATERPROOFING COATING 2.19 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 KERAMIK TILE (UK. 30x30) ROMAN POLISHED 76.20 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
6 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 49.50 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
7 KERAMIK TILE (UK. 30x30) ROMAN UNPOLISHED 21.32 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
8 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 28.56 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
9 PEKERJAAN PULAU PARKIR 143.16 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%

VII PEKERJAAN SANITARY


A JANITOR
1 Floor Drain 1.00 .m3 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 Kran 1.00 .kg 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

VIII PEKERJAAN RAILLING


1 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 15 m' 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 RAILLING HOLOW STEEL GALVANIS 40X40 MM
TANGGA LOBBY, TANGGA PARKIR 25 m' 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
3 HANDRAIL PIPA BESI Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 12 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

IX PEKERJAAN LAIN - LAIN


1 PEKERJAAN FIRE STOPPER 7 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 PEKERJAAN CAR STOPPER (AREA PARKIR) 40 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 PEKERJAAN ARAH PANAH (AREA PARKIR) 7 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN GARIS PARKIR 135 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 93 m' 0.008% 90.00% 0.007% 0.00% 0.000% 90.00% 0.007%
6 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 48 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
7 PEKERJAAN SERSAN RAMP 343 m' 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 26 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
9 PEKERJAAN CANSTEEN 1,016 m' 0.042% 100.00% 0.042% 0.00% 0.000% 100.00% 0.042%
10 PEKERJAAN CAT CANSTEEN 1,016 m' 0.012% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK 2A 0.200% 0.182% 0.000% 0.182%

ARSITEK PARKIR LANTAI 3


I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 698 .m2 0.019% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 63 .m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1 .kg 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

II PEKERJAAN FINISHING DINDING


1 PLESTER 1,469 m2 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
2 ACIAN 1,469 m2 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
3 SKIMCOAT DINDING BETON 722 m2 0.004% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
4 CAT DINDING (INTERIOR) 1,044 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
5 CAT DINDING (EXTERIOR) 414 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT MINYAK (AREA PARKIR, SERVIS) 1,401 m2 0.008% 85.00% 0.007% 0.00% 0.000% 85.00% 0.007%
7 KERAMIK (30x30) ROMAN 8 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
8 HT (60x120) JAMB. LIFT 45 m2 0.004% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
9 WATERPROOFING COATING (JAN, GWT, R. POMPA) 2 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
10 CAT PLINT DINDING 8 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

III PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 (Uk. 1000X2150) 2 Unit 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 PINTU TYPE SD1B (Uk. 1400X2150) 2 Unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
3 PINTU TYPE SD2 (Uk. 900X2150) 6 Unit 0.006% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
4 PINTU TYPE AD1 (Uk. 1000X2150) 1 Unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 PINTU TYPE GD1 (Uk. 1800X2200) 1 Unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
6 PINTU TYPE WD4 (Uk. 1700X2150) 4 Unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

50/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
7 PINTU TYPE WD1 (Uk. 900X2150) 2 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 2,383 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
2 PLAFOND GYPSUM BOARD (9MM) 525 m2 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 CAT PLAFOND GYPSUM BOARD 2,908 m2 0.009% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
4 SHAADOWLINE 348 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%

V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 105 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 HT (Uk. 60x60) POLISHED 315 m2 0.017% 95.00% 0.016% 0.00% 0.000% 95.00% 0.016%
3 SKIRTING HT (Uk. 60x60) POLISHED 170 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 HT (Uk. 60x60) UNPOLISHED 177 m2 0.009% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
5 SKIRTING HT (Uk. 60x60) UNPOLISHED 122 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 FLOOR HARDENER 3 KG (JANITOR) 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 FLOOR HARDENER 5 KG (AREA PARKIR) 715 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
8 STEP NOSING KERAMIK (TANGGA 3-4) 84 m' 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
9 WATERPROOFING COATING 2 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
10 KERAMIK TILE (UK. 30x30) ROMAN POLISHED 6 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
11 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 12 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
12 KERAMIK TILE (UK. 30x30) ROMAN UNPOLISHED 7 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
13 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 18 m' 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
14 PEKERJAAN PULAU PARKIR 197 m2 0.007% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
15 SCREED LANTAI LOBBY LIFT 34 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

VII PEKERJAAN SANITARY


A JANITOR
1 Floor Drain 2 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 Kran 1 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

VIII PEKERJAAN RAILLING


1 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 15 m' 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 RAILLING HOLOW STEEL GALVANIS 40X40 MM
TANGGA LOBBY, TANGGA PARKIR 46 m' 0.013% 95.00% 0.012% 0.00% 0.000% 95.00% 0.012%
3 HANDRAIL PIPA BESI Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 12 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

IX PEKERJAAN LAIN - LAIN


1 PEKERJAAN FIRE STOPPER 7 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 PEKERJAAN CAR STOPPER (AREA PARKIR) 20 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
3 PEKERJAAN ARAH PANAH (AREA PARKIR) 14 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN GARIS PARKIR 70 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 m' 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
6 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 39 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
7 PEKERJAAN SERSAN RAMP 95 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 36 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 PEKERJAAN CANSTEEN 342 m' 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
10 PEKERJAAN CAT CANSTEEN 342 m' 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK 3A 0.216% 0.203% 0.000% 0.203%

ARSITEK PARKIR LANTAI 4


I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 981 m2 0.027% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 63 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN CUBICLE KACA 25 m' 0.013% 0.00% 0.000% 75.00% 0.010% 75.00% 0.010%

II PEKERJAAN FINISHING DINDING


1 PLESTER 1,886 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
2 ACIAN 1,886 0.008% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
3 SKIMCOAT DINDING BETON 719 0.004% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
4 CAT DINDING (INTERIOR) 1,452 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING (EXTERIOR) 414 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT MINYAK (AREA PARKIR, SERVIS) 1,185 0.007% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
7 KERAMIK (30x30) ROMAN 8 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
8 HT (40x40) TOILET 142 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
9 HT (60x120) JAMB. LIFT 52 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
10 WATERPROOFING COATING (JAN, GWT, R. POMPA) 19 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
11 CAT PLINT DINDING 8 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

III PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE WD1 (Uk. 900X2150) 9 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PINTU TYPE WD4 (Uk. 1700X2150) 6 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PINTU TYPE SD1 (Uk. 1000X2150) 2 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PINTU TYPE SD1B (Uk. 1400X2150) 2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 PINTU TYPE SD2 (Uk. 900X2150) 4 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
6 PINTU TYPE GD1 (Uk. 1600X2150) 1 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 PINTU TYPE AD1 (Uk. 1000X2150) 2 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 1,906 m2 0.009% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
2 PLAFOND GYPSUM BOARD (9MM) LOBBY + LOBBY 759 m2 0.016% 95.00% 0.015% 0.00% 0.000% 95.00% 0.015%
3 LIFT
PLAFOND GYPSUM BOARD (9MM) TOILET SISWA & 46 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
GURU
4 CAT PLAFOND GYPSUM BOARD 46 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 CAT PLAFOND & BETON EXPOSE 2,664 m2 0.008% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
6 SHAADOWLINE 538 m' 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
7 PEKERJAAN MAN HOLE 4 Unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

51/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 103 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 HT (Uk. 60x60) POLISHED 498 m2 0.026% 95.00% 0.025% 0.00% 0.000% 95.00% 0.025%
3 SKIRTING HT (Uk. 60x60) POLISHED 291 m' 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
4 HT (Uk. 60x60) UNPOLISHED 307 m2 0.016% 95.00% 0.015% 0.00% 0.000% 95.00% 0.015%
5 KERAMIK TILE (UK. 40x40) ROMAN POLISHED 12 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 15 m' 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 KERAMIK TILE (UK. 40x40) ROMAN UNPOLISHED 7 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
8 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 18 m' 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
9 FLOOR HARDENER 3 KG (JANITOR) 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
10 FLOOR HARDENER 5 KG (AREA PARKIR) 744 m2 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
11 STEP NOSING KERAMIK (TANGGA 3-4) 163 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
12 WATERPROOFING COATING 2 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
13 PEKERJAAN PULAU PARKIR 178 m2 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
14 SCREED LANTAI LOBBY LIFT 34 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

VII PEKERJAAN SANITARY


A Student Toilet
1 Closet Duduk 6 Unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
2 Jet Washer 6 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
3 Paper Holder 6 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 Wastafel 4 Set 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 Robe Hook 6 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 Floor Drain 6 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 Urinoir 6 Unit 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

B Teacher Toilet
1 Closet Duduk 5 Unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
2 Jet Washer 5 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
3 Paper Holder 5 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 Wastafel 4 Set 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 Robe Hook 5 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 Floor Drain 5 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 Urinoir 2 Unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

C JANITOR
1 Floor Drain 2 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 Kran 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

VIII PEKERJAAN RAILLING


1 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 15 m' 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 RAILLING HOLOW STEEL GALVANIS 40X40 MM
TANGGA LOBBY, TANGGA PARKIR 59 m' 0.016% 90.00% 0.015% 0.00% 0.000% 90.00% 0.015%
3 HANDRAIL PIPA BESI Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 12 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

IX PEKERJAAN LAIN - LAIN


1 PEMBUATAN MEJA WASTAFLE
- uk. 40 x 2495 cm 1 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- uk. 40 x 1500 cm 2 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- uk. 40 x 1510 cm 1 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
1 PEKERJAAN FIRE STOPPER 7 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 PEKERJAAN CAR STOPPER (AREA PARKIR) 38 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 PEKERJAAN ARAH PANAH (AREA PARKIR) 14 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN GARIS PARKIR 135 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 m' 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
6 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 57 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
7 PEKERJAAN SERSAN RAMP 95 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 36 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 PEKERJAAN CANSTEEN 378 m' 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
10 PEKERJAAN CAT CANSTEEN 378 m' 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK 4A 0.293% 0.243% 0.010% 0.253%

ARSITEK PARKIR LANTAI 5


I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 592 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 63 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

II PEKERJAAN FINISHING DINDING


1 PLESTER 1,258 m2 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
2 ACIAN 1,258 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
3 SKIMCOAT DINDING BETON 763 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
4 CAT DINDING (INTERIOR) 769 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 CAT DINDING (EXTERIOR) 282 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS) 1,030 m2 0.006% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
7 KERAMIK (30x30) ROMAN 8 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
8 HT (60x120) JAMB. LIFT 45 m2 0.004% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
9 WATERPROOFING COATING (JANITOR) 2 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
10 CAT PLINT DINDING 8 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

III PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE WD1 (Uk. 900X2150) 1 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PINTU TYPE WD4 (Uk. 1700X2150) 4 unit 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PINTU TYPE SD1 (Uk. 1000X2150) 3 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
4 PINTU TYPE SD1B (Uk. 1400X2150) 1 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 PINTU TYPE SD2 (Uk. 900X2150) 3 unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
6 PINTU TYPE GD1 (Uk. 1600X2150) 3 unit 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 PINTU TYPE AD1 (Uk. 1000X2150) 1 unit 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

52/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 2,476 m2 0.012% 95.00% 0.012% 0.00% 0.000% 95.00% 0.012%
2 PLAFOND GYPSUM BOARD (9MM) 340 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
3 CAT PLAFOND GYPSUM BOARD 2,816 m2 0.008% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
4 SHAADOWLINE 222 m' 0.001% 80.00% 0.001% 0.00% 0.000% 80.00% 0.001%

V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 84 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 HT (Uk. 60x60) POLISHED 231 m2 0.013% 95.00% 0.012% 0.00% 0.000% 95.00% 0.012%
3 SKIRTING HT (Uk. 60x60) POLISHED 125 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 HT (Uk. 60x60) UNPOLISHED 95 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
5 SKIRTING HT (Uk. 60x60) UNPOLISHED 58 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 FLOOR HARDENER 3 KG (JANITOR) 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 FLOOR HARDENER 5 KG (AREA PARKIR) 1,302 m2 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
8 STEP NOSING KERAMIK (TANGGA) 103 m' 0.002% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
9 WATERPROOFING COATING 2 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
10 KERAMIK TILE (Uk. 30x30) ROMAN 7 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
11 SKIRTING HT (Uk. 30x30) 9 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
12 PEKERJAAN PULAU PARKIR 261 m2 0.009% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%

VII JANITOR
1 Floor Drain 2 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 Kran 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

VIII PEKERJAAN RAILLING


1 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA 1, 2 MH DAN 1, 2 MID 15 m' 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 RAILLING HOLOW STEEL GALVANIS 40X40 MM
TANGGA LOBBY, TANGGA PARKIR 52 m' 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
3 HANDRAIL PIPA BESI Ø38
TANGGA 1, 2 MID 12 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

IX PEKERJAAN LAIN - LAIN


1 PEKERJAAN FIRE STOPPER 7 .m3 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 PEKERJAAN CAR STOPPER (AREA PARKIR) 70 .m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 PEKERJAAN ARAH PANAH (AREA PARKIR) 11 .kg 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN GARIS PARKIR 255 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 .m3 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
6 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 100 .m2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
7 PEKERJAAN SERSAN RAMP 95 .kg 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 54 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
9 PEKERJAAN CANSTEEN 594 .m3 0.024% 100.00% 0.024% 0.00% 0.000% 100.00% 0.024%
10 PEKERJAAN CAT CANSTEEN 594 .m2 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK 5A 0.219% 0.195% 0.000% 0.195%

ARSITEK PARKIR LANTAI 6A


I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 186 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 63 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

II PEKERJAAN FINISHING DINDING


1 PLESTER 428 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
2 ACIAN 428 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
3 SKIMCOAT DINDING BETON 1,012 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
4 CAT DINDING (INTERIOR) 963 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
5 CAT DINDING (EXTERIOR) 1,116 m2 0.006% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
6 CAT MINYAK (AREA PARKIR, SERVIS) 586 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
7 KERAMIK (30x30) ROMAN 8 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
8 HT (60x120) JAMB. LIFT 62 m2 0.005% 0.000% 0.00% 0.000% 0.000%
9 WATERPROOFING COATING (JANITOR) 2 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
10 CAT PLINT DINDING 8 m' 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%

III PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 (Uk. 1000X2150) 2 unit 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 PINTU TYPE SD1B (Uk. 1400X2150) 2 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
3 PINTU TYPE SD2 (Uk. 900X2150) 2 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PINTU TYPE GD1 (Uk. 1600X2150) 1 unit 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 2,407 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
2 CAT PLAFOND BETON EXPOSE 2,407 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%

V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 65 m2 0.001% 0.000% 0.00% 0.000% 0.000%
2 FLOOR HARDENER 3 KG (JANITOR) 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
3 FLOOR HARDENER 5 KG (AREA PARKIR) 1,670 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
4 STEP NOSING KERAMIK (TANGGA) 49 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
5 WATERPROOFING COATING 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
6 KERAMIK TILE (Uk. 30x30) ROMAN 7 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 SKIRTING HT (Uk. 30x30) 9 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
8 PEKERJAAN PULAU PARKIR 205 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%

VII JANITOR
1 Floor Drain 2 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 Kran 1 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

VIII PEKERJAAN RAILLING


1 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38

53/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
TANGGA 1, 2 MID 15 m' 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 RAILLING HOLOW STEEL GALVANIS 40X40 MM
TANGGA LOBBY, TANGGA PARKIR 15 m' 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
3 HANDRAIL PIPA BESI Ø38
TANGGA 1, 2 MID 12 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
```
IX PEKERJAAN LAIN - LAIN
1 PEKERJAAN FIRE STOPPER 7 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 PEKERJAAN CAR STOPPER (AREA PARKIR) 98 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 PEKERJAAN ARAH PANAH (AREA PARKIR) 14 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN GARIS PARKIR 255 m' 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 m' 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
6 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 134 unit 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
7 PEKERJAAN SERSAN RAMP 47 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 91 m' 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
9 PEKERJAAN CANSTEEN 710 m' 0.029% 100.00% 0.029% 0.00% 0.000% 100.00% 0.029%
10 PEKERJAAN CAT CANSTEEN 710 m' 0.008% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK 6A 0.165% 0.144% 0.000% 0.144%

ARSITEK PARKIR LANTAI 6B


I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 SKIMCOAT DINDING BETON 413 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 CAT DINDING (EXTERIOR) 1,025 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%

II PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 1,025 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
2 CAT PLAFOND BETON EXPOSE 1,025 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
III PEKERJAAN LANTAI
1 PEKERJAAN PULAU PARKIR 590 m2 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
2 FLOOR HARDENER 5 KG (AREA PARKIR) 137 m2 0.005% 98.00% 0.005% 0.00% 0.000% 98.00% 0.005%

IV PEKERJAAN LAIN - LAIN


1 PEKERJAAN FIRE STOPPER 7 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 PEKERJAAN CAR STOPPER (AREA PARKIR) 32 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 PEKERJAAN ARAH PANAH (AREA PARKIR) 4 unit 0.000% 10.00% 0.000% 0.00% 0.000% 10.00% 0.000%
4 PEKERJAAN GARIS PARKIR 115 m' 0.002% 10.00% 0.000% 0.00% 0.000% 10.00% 0.000%
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 m' 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
6 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 49 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
7 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 53 m' 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
8 PEKERJAAN CANSTEEN 281 m' 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
9 PEKERJAAN CAT CANSTEEN 281 m' 0.003% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK 6B 0.060% 0.054% 0.000% 0.054%

ARSITEK PARKIR LANTAI GF (MID)


I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 1,070.94 m2 0.029% 95.00% 0.028% 0.00% 0.000% 95.00% 0.028%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 191.75 m2 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.25 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
4 PEKERJAAN CUBICLE KACA 413.65 m2 0.120% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 PEKERJAAN TANGGULAN BETON T= 300 mm 26.30 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

II PEKERJAAN FINISHING DINDING


1 PLESTER 881.62 m2 0.007% 80.00% 0.005% 15.00% 0.001% 95.00% 0.006%
2 ACIAN 881.62 m2 0.004% 65.00% 0.002% 20.00% 0.001% 85.00% 0.003%
3 SKIMCOAT DINDING BETON 767.20 m2 0.004% 80.00% 0.003% 15.00% 0.001% 95.00% 0.004%
4 CAT DINDING (EXTERIOR) 825.03 m2 0.004% 50.00% 0.002% 25.00% 0.001% 75.00% 0.003%
5 CAT MINYAK (AREA PARKIR, SERVIS) 601.85 m2 0.003% 0.000% 0.00% 0.000% 0.000%
6 KERAMIK (30x30) ROMAN 1.58 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 WATERPROOFING COATING (JANITOR) 1.58 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
8 PEKERJAAN FINISHING KOLOM LOKAL
- Material 605.42 m2 0.153% 100.00% 0.153% 0.00% 0.000% 100.00% 0.153%
- Upah 605.42 m2 0.050% 100.00% 0.050% 0.00% 0.000% 100.00% 0.050%
9 PEKERJAAN FINISHING KOLOM TERA KITA 142.98 m2 0.028% 0.00% 0.000% 0.00% 0.000% 0.000%
10 PEKERJAAN WOOD PANEL PADA DINDING (ZIGZAG 75.53 m2 0.021% 95.00% 0.020% 0.00% 0.000% 95.00% 0.020%
TYPE1)
11 PEKERJAAN WOOD PANEL PADA DINDING (DATAR 150.32 m2 0.042% 60.00% 0.025% 0.00% 0.000% 60.00% 0.025%
TYPE2)
12 FINISHING DINDING RAMP ORANG ADHESIT 185.50 m2 0.018% 60.00% 0.011% 0.00% 0.000% 60.00% 0.011%

III PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE WD1 (Uk. 900X2150) 5.00 unit 0.003% 0.000% 0.00% 0.000% 0.000%
2 PINTU TYPE WD2 (Uk. 900X2150) 1.00 unit 0.001% 0.000% 0.00% 0.000% 0.000%
3 PINTU TYPE SD1A (Uk. 1200X2150) 4.00 unit 0.006% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
4 PINTU TYPE SD2 (Uk. 900X2150) 2.00 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 PINTU TYPE SD1B (Uk. 900X2150) 2.00 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
6 PINTU TYPE AD1 (Uk. 1000X2150) 1.00 unit 0.001% 0.000% 0.00% 0.000% 0.000%
7 PINTU TYPE GD1 (Uk. 1600X2150) 7.00 unit 0.022% 95.00% 0.021% 0.00% 0.000% 95.00% 0.021%
8 PINTU TYPE G-1 (Uk. 400X600) 2.00 unit 0.000% 0.000% 0.00% 0.000% 0.000%

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 582.35 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
2 PLAFOND GYPSUM BOARD (9MM) MAIL BOX 236.23 m2 0.006% 0.000% 0.00% 0.000% 0.000%
3 CAT PLAFOND & BETON EXPOSE 582.35 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
4 CAT PLAFOND GYPSUM 236.23 m2 0.001% 0.000% 0.00% 0.000% 0.000%
5 PEKERJAAN PLAFOND ALUMUNIUM 375.31 m2 0.060% 95.00% 0.057% 0.00% 0.000% 95.00% 0.057%
6 PEKERJAAN PLAFOND WOOD PANEL 153.16 m2 0.041% 0.000% 0.00% 0.000% 0.000%

V PEKERJAAN LANTAI

54/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1 BATU ANDHESIT UK. 30x60 cm T : 4cm 84.83 m2 0.008% 90.00% 0.007% 5.00% 0.000% 95.00% 0.007%
2 BATU ANDHESIT UK. 30x60 cm T : 2cm 1,101.59 m2 0.099% 90.00% 0.089% 5.00% 0.005% 95.00% 0.094%
3 KERAMIK TILE (UK. 40x40) ROMAN UNPOLISHED 16.46 m2 0.001% 0.000% 0.00% 0.000% 0.000%
4 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 24.83 m' 0.000% 0.000% 0.00% 0.000% 0.000%
5 PEMBUATAN DUST PROOF EX. FOSROC 116.22 m2 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
6 STEP NOSING KERAMIK 301.40 m' 0.005% 75.00% 0.003% 0.00% 0.000% 75.00% 0.003%
7 WATERPROOFING COATING 1,103.44 m2 0.012% 0.000% 0.00% 0.000% 0.000%
8 HT UK. 60x60 173.50 m2 0.009% 35.00% 0.003% 0.00% 0.000% 35.00% 0.003%
9 PEKERJAAN PULAU PARKIR 17.12 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
10 FLOOR HARDENER 5 KG (AREA PARKIR) 3.05 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

VII PEKERJAAN SANITARY


A TOILET
1 Closet Duduk 2.00 Unit 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
2 Jet Washer 2.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
3 Paper Holder 2.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
4 Wastafel 2.00 Set 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
5 Head Shower 2.00 Set 0.001% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
6 Hand soap 2.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
7 Towel Bar 2.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
8 Robe Hook 2.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
9 Floor Drain 2.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
10 Grab bar 2.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

B JANITOR
1 Floor Drain 1.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
2 Kran 1.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

VIII PEKERJAAN RAILLING


1 HANDRAIL kayu 22.74 m' 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 HANDRAIL PIPA BESI Ø38 28.88 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
3 RAILLING VERTIKAL Ø38 22.03 m' 0.004% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
4 RAILLING STEEL GALVANIS 19.08 m' 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
5 RAILLING STEEL VERTIKAL STEEL PLATE STRIP 50x9 mm 10.61 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%

IX PEKERJAAN LAIN - LAIN


1 PEKERJAAN ARAH PANAH 4.00 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PEKERJAAN FIRE STOPPER 6.53 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
3 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 24.10 m' 0.002% 50.00% 0.001% 0.00% 0.000% 50.00% 0.001%
4 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 5.10 m' 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
5 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 73.00 unit 0.003% 90.00% 0.003% 0.00% 0.000% 90.00% 0.003%

TOTAL PEKERJAAN ARSITEK LANTAI GF 0.801% 0.523% 0.009% 0.532%

ARSITEK TOWER MID


ARSITEK LANTAI 7
I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 754.34 m2 0.021% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 143.59 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN DINDING KACA 36.31 m2 0.011% 90.00% 0.009% 0.00% 0.000% 90.00% 0.009%

II PEKERJAAN FINISHING DINDING


1 PLESTER 685.40 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
2 ACIAN 685.40 m2 0.003% 80.00% 0.002% 0.00% 0.000% 80.00% 0.002%
3 SKIMCOAT DINDING BETON 278.17 m2 0.001% 80.00% 0.001% 15.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 238.19 m2 0.001% 55.00% 0.000% 0.00% 0.000% 55.00% 0.000%
5 CAT DINDING EXTERIOR 638.29 m2 0.003% 35.00% 0.001% 0.00% 0.000% 35.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 358.82 m2 0.002% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
7 KERAMIK (30x30) JANITOR 1.58 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
8 PEMASANGAN MOZAIK EX. KUDA LAUT 473.58 m2 0.048% 100.00% 0.048% 0.00% 0.000% 100.00% 0.048%
9 DINDING ANDHESIT 82.96 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
10 WATERPROOFING COATING 475.43 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
11 FINISHING MARBLE LOKAL PADA KOLOM 538.96 m2 0.180% 95.00% 0.171% 0.00% 0.000% 95.00% 0.171%

III PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE GD1 1.00 unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
2 PINTU TYPE FD-1 3.00 unit 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
3 PINTU TYPE FD-2 2.00 unit 0.014% 95.00% 0.013% 0.00% 0.000% 95.00% 0.013%
4 PINTU TYPE FD-3 1.00 unit 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
5 PINTU TYPE FD-4 2.00 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
6 PINTU TYPE SD1 2.00 unit 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
7 PINTU TYPE SD1B 1.00 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
8 PINTU TYPE SD2 4.00 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
9 PINTU TYPE WD1 3.00 unit 0.002% 0.000% 0.00% 0.000% 0.000%
10 PINTU TYPE WD11 1.00 unit 0.002% 80.00% 0.001% 0.00% 0.000% 80.00% 0.001%
11 PINTU TYPE G-1 2.00 unit 0.000% 0.000% 0.00% 0.000% 0.000%

IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 46.93 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 91.36 m2 0.002% 40.00% 0.001% 0.00% 0.000% 40.00% 0.001%
3 PLAFOND GYPSUM BOARD (9MM) WR 1.85 m2 0.000% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
4 CAT PLAFOND GYPSUM BOARD 91.36 m2 0.000% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
5 CAT PLAFOND GYPSUM BOARD WR 1.85 m2 0.000% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
6 CAT PLAFOND BETON EXPOSE 46.93 m2 0.000% 80.00% 0.000% 0.00% 0.000% 80.00% 0.000%
7 SHADOWLINE PADA PLAFOND 106.61 m2 0.001% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
8 PLAFOND ALUMINIUM 210.21 m2 0.034% 85.00% 0.029% 10.00% 0.003% 95.00% 0.032%

V PEKERJAAN LANTAI
1 HT (60x60) 144 m2 0.008% 50.00% 0.004% 0.00% 0.000% 50.00% 0.004%

55/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
2 SKIRTING HT (UK. 10x60CM) POLISHED 71 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 KERAMIK (UK. 30x30) ROMAN 85 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 WATERPROOFING COATING 1,015 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
5 WATERPROOFING MEMBRAN 219 m2 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
6 FIBER CEMENT 178 m2 0.062% 95.00% 0.059% 0.00% 0.000% 95.00% 0.059%
7 KERAMIK (UK. 30x30) UNPOLISHED 104 m2 0.005% 90.00% 0.005% 0.00% 0.000% 90.00% 0.005%
8 SKIRTING KERAMIK UK. 30X30 106 m' 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
9 FLOOR HARDENER 3 KG 4 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
10 PEMBUATAN DUST PROOF 52 m2 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
11 BATU ANDHESIT (AREA OUTDOOR + OUTDOOR AC) 534 m2 0.048% 100.00% 0.048% 0.00% 0.000% 100.00% 0.048%
12 BATU ANDHESIT (OVERFLOW) 173 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%

VII PEKERJAAN SANITARY


TOILET
1 Closet Duduk 2 Unit 0.001% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
2 Jet Washer 2 Unit 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
3 Paper Holder 2 Unit 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
4 Wastafel 2 Set 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
5 Head Shower 4 Set 0.001% 50.00% 0.001% 0.00% 0.000% 50.00% 0.001%
6 Hand soap 4 Unit 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
7 Towel Bar 4 Unit 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
8 Robe Hook 4 Unit 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
9 Floor Drain 6 Unit 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
10 Urinal 1 Unit 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%

JANITOR
1 Floor Drain 2 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
2 Kran 1 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

VIII PEKERJAAN RAILLING


1 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38
TANGGA #3 & #4 18 m' 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
2 RAILLING PIPA BESI Ø 25 DAN HANDRAIL Ø38 22.35 m' 0.004% 90.00% 0.003% 0.00% 0.000% 90.00% 0.003%
3 RAILLING PIPA BESI PLAT STRIP 50 x 9 30 m' 0.006% 90.00% 0.005% 0.00% 0.000% 90.00% 0.005%
4 HANDRAIL KAYU POOL DECK 19 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%

IX PEKERJAAN LAIN - LAIN


1 PEKERJAAN FIRE STOPPER 2 m2 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
2 PEMBUATAN GUTTER 44 m' 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PEMBUATAN GRILL AREA POOL 51 m' 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 PEMBUATAN GRILL AREA POOL DECK 16 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

TOTAL PEKERJAAN ARSITEK LANTAI 7 0.575% 0.537% 0.004% 0.541%

LANTAI 8
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 445 m2 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 9 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING SHEARWALL T = 5 C 27 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 9 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 DINDING KACA 45 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
8 PASANGAN DINDING BATA RINGAN Tebal 75 mm 491 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,323 m2 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
2 ACIAN 1,323 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
3 SKIMCOAT DINDING BETON 166 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 936 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 CAT DINDING EXTERIOR 150 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 203 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER) 104 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
8 HOMOGENOUS TILE (CLOSED) 165 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 HOMOGENOUS TILE (MEJA PANTRY) 34 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 MARMER LOKAL PADA KOLOM 25 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
12 WATERPROOFING COATING 87 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE AD1 1 unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 PINTU TYPE GD-1 2 unit 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
3 PINTU TYPE GD-2 1 unit 0.002% 50.00% 0.001% 0.00% 0.000% 50.00% 0.001%
4 PINTU TYPE SD-1 2 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-1B 1 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 PINTU TYPE SD-2 3 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
7 PINTU TYPE SD-6 3 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 PINTU TYPE SD-7 7 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 PINTU TYPE WD1 1 unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


JENDELA TYPE W-1 2 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
JENDELA TYPE W-2 7 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
JENDELA TYPE W-4 2 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
JENDELA TYPE W-5 4 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
JENDELA TYPE W-9 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
JENDELA TYPE W-11 1 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
JENDELA CURTAIN WALL 3 unit 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
PINTU TYPE D-1 15 unit 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
PINTU TYPE D-2 6 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
PINTU TYPE D-3 15 unit 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%

56/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PINTU TYPE D-9 2 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
PINTU TYPE D-6 4 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
PINTU TYPE D-8 13 unit 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
PINTU TYPE G1 2 unit 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 234 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
2 PLAFOND GYPSUM BOARD (9MM) 367 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 PLAFOND GYPSUM BOARD (9MM) WR 50 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 PLAFOND CALCIUM CILICATE 37 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 367 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD (BALKON) 37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 50 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


CAT PLAFOND BETON EXPOSE 234 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN SHADOW LINE 643 m' 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
DROP CEILLING 54 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
MANHOLE 17 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PLAFON ALUMINIUM 60 m2 0.010% 85.00% 0.008% 0.00% 0.000% 85.00% 0.008%

PEKERJAAN LANTAI
HT (60x60) KORIDOR 55 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
SKIRTING HT (UK. 10x60CM) 50 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
HT (60x60)KORIDOR LUAR 46 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
SKIRTING HT (UK. 10x60CM) POLISHED 20 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
HT (60x60) 266 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
SKIRTING HT (UK. 10x60CM) POLISHED 277 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
HT (60x60) CLOSED 34 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
HT (60x60) SHOWER 15 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
HT (60x60) BALKON 31 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
SKIRTING KERAMIK UK. 30X30 32 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEMBUATAN DUST PROOF 39 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
STEP NOSSING 50 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
WATERPROOFING COATING 141 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
FLOOR HARDENER 4 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN
KITCHEN ZINK 15 Unit 0.003% 98.00% 0.003% 0.00% 0.000% 98.00% 0.003%
KRAN 15 Unit 0.001% 98.00% 0.001% 0.00% 0.000% 98.00% 0.001%

TOILET
Closet Duduk 17 Unit 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
Jet Washer 17 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 17 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Wastafel 17 Set 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
Head Shower 17 Set 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
Hand soap 17 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Towel Bar 17 Unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
Robe Hook 17 Unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Floor Drain 34 Unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%

JANITOR
Floor Drain 2 Unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 Unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 15 Unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 31 m' 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 4 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
MEJA PANTRY
1 1680 x 600 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 1700 x 600 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
3 1430 x 600 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 1580 x 549 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 1430 x 600 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
6 1300 x 700 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 1263 x 700 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
8 1275 x 600 2 Unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 1112 x 820 2 Unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 1430 x 600 2 Unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 1330 x 660 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
12 1400 x 650 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
CERMIN WASTAFLE
1 FIRE STOPPER 2 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
2 WOOD PANEL 122 m2 0.032% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 8 0.299% 0.262% 0.000% 0.262%

LANTAI 9
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

57/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER) 164 m2 0.008% 99.50% 0.008% 0.00% 0.000% 99.50% 0.008%
8 HOMOGENOUS TILE (CLOSED) 262 m2 0.012% 99.50% 0.012% 0.00% 0.000% 99.50% 0.012%
9 HOMOGENOUS TILE (MEJA PANTRY) 52 m2 0.002% 99.50% 0.002% 0.00% 0.000% 99.50% 0.002%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE (BALKON) 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD (BALKON) 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
10 DROP CEILLING 85 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 MANHOLE 27 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM 436 0.021% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
4 SKIRTING HT (UK. 10x60CM) POLISHED 446 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
5 HT (60x60) CLOSED UNPOLISHED 53 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
6 HT (60x60) SHOWER UNPOLISHED 25 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HT (60x60) BALKON UNPOLISHED 55 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 90.00% 0.004% 0.00% 0.000% 90.00% 0.004%
KRAN 23 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Towel Bar 27 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
Robe Hook 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

58/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 9 0.347% 0.344% 0.000% 0.344%

LANTAI 10
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER) 164 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
8 HOMOGENOUS TILE (CLOSED) 262 m2 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
9 HOMOGENOUS TILE (MEJA PANTRY) 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%

59/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
10 DROP CEILLING 85 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99.1 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89.0 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM 435.8 0.021% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
4 SKIRTING HT (UK. 10x60CM) POLISHED 446.1 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
5 HT (60x60) CLOSED UNPOLISHED 53.3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
6 HT (60x60) SHOWER UNPOLISHED 24.8 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HT (60x60) BALKON UNPOLISHED 55.5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 11.9 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 41.7 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 42.9 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50.4 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135.5 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4.0 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

TOILET
Closet Duduk 27 0.010% 90.00% 0.009% 0.00% 0.000% 90.00% 0.009%
Jet Washer 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Paper Holder 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Wastafel 27 0.005% 90.00% 0.005% 0.00% 0.000% 90.00% 0.005%
Head Shower 27 0.007% 90.00% 0.006% 0.00% 0.000% 90.00% 0.006%
Hand soap 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Towel Bar 27 0.003% 90.00% 0.003% 0.00% 0.000% 90.00% 0.003%
Robe Hook 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 10 0.347% 0.343% 0.000% 0.343%

LANTAI 11
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER) 164 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
8 HOMOGENOUS TILE (CLOSED) 262 m2 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
9 HOMOGENOUS TILE (MEJA PANTRY) 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

60/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD (BALKON) 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
10 DROP CEILLING 85 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 MANHOLE 27 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM 436 0.021% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
4 SKIRTING HT (UK. 10x60CM) POLISHED 446 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
5 HT (60x60) CLOSED UNPOLISHED 53 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
6 HT (60x60) SHOWER UNPOLISHED 25 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HT (60x60) BALKON UNPOLISHED 55 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 50.00% 0.001% 0.00% 0.000% 50.00% 0.001%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 40.00% 0.000% 0.00% 0.000% 40.00% 0.000%
Towel Bar 27 0.003% 50.00% 0.002% 0.00% 0.000% 50.00% 0.002%
Robe Hook 27 0.001% 40.00% 0.000% 0.00% 0.000% 40.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 90.00% 0.002% 0.00% 0.000% 90.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

61/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 11 0.347% 0.341% 0.000% 0.341%

LANTAI 12
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
10 DROP CEILLING 85 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 MANHOLE 27 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

62/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK
- Material 23 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
- Upah 23 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
KRAN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

TOILET
Closet Duduk
- Material 27 unit 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 27 unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Jet Washer
- Material 27 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 27 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Paper Holder
- Material 27 unit 0.001% 40.00% 0.001% 0.00% 0.000% 40.00% 0.001%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel
- Material 27 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
- Upah 27 unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Head Shower
- Material 27 unit 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
- Upah 27 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Hand soap
- Material 27 unit 0.001% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar
- Material 27 unit 0.003% 40.00% 0.001% 0.00% 0.000% 40.00% 0.001%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook
- Material 27 unit 0.001% 45.50% 0.000% 0.00% 0.000% 45.50% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 54 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 90.00% 0.002% 0.00% 0.000% 90.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 12 0.347% 0.342% 0.000% 0.342%

LANTAI 13
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

63/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
10 DROP CEILLING 85 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK
- Material 23 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

64/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
KRAN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOILET
Closet Duduk
- Material 27 unit 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 27 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Jet Washer
- Material 27 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 27 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Paper Holder
- Material 27 unit 0.001% 35.00% 0.000% 0.00% 0.000% 35.00% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel
- Material 27 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
- Upah 27 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Head Shower
- Material 27 unit 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
- Upah 27 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Hand soap
- Material 27 unit 0.001% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar
- Material 27 unit 0.003% 35.00% 0.001% 0.00% 0.000% 35.00% 0.001%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook
- Material 27 unit 0.001% 40.00% 0.000% 0.00% 0.000% 40.00% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 54 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 13 0.347% 0.342% 0.000% 0.342%

LANTAI 14
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%

65/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
10 DROP CEILLING 85 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK
- Material 23 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
KRAN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOILET
Closet Duduk 27 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
Jet Washer 27 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
Head Shower 27 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

66/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Upah 54 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 14 0.347% 0.341% 0.000% 0.341%

LANTAI 15
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

67/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
10 DROP CEILLING 85 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 90.00% 0.002% 0.00% 0.000% 90.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 15 0.347% 0.340% 0.000% 0.340%

LANTAI 16
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 508 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 94.38 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%

68/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN PENEBALAN DINDING SHEARWALL T = 5 C 42 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 15 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 999.90 m2 0.023% 100.00% 0.023% 0.00% 0.000% 100.00% 0.023%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,861 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,861 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 256 m2 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


PINTU TYPE SD1 2 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
PINTU TYPE SD-1B 2 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
PINTU TYPE SD-2 2 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
PINTU TYPE SD-6 5 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
PINTU TYPE SD-7 11 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
JENDELA TYPE W-1 4 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
JENDELA TYPE W-2 11 unit 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
JENDELA TYPE W-3 1 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
JENDELA TYPE W-4 3 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
JENDELA TYPE W-5 4 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
JENDELA TYPE W-9 2 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
JENDELA TYPE W-11 1 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
JENDELA CURTAIN WALL 4 unit 0.009% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


PINTU TYPE D-1 23 unit 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
PINTU TYPE D-2 12 unit 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
PINTU TYPE D-3 23 unit 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
PINTU TYPE D-9 4 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
PINTU TYPE D-7 4 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
PINTU TYPE D-6 8 unit 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
PINTU TYPE D-8 15 unit 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
PINTU TYPE G1 2 unit 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
PLAFOND BETON EXPOSE 51 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PLAFOND GYPSUM BOARD (9MM) 535 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
PLAFOND GYPSUM BOARD (9MM) WR 80 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
PLAFOND CALCIUM CILICATE 65 m2 0.002% 90.00% 0.001% 5.00% 0.000% 95.00% 0.002%
CAT PLAFOND GYPSUM BOARD INTERIOR 535 m2 0.002% 90.00% 0.001% 5.00% 0.000% 95.00% 0.002%
CAT PLAFOND GYPSUM BOARD 65 m2 0.000% 90.00% 0.000% 5.00% 0.000% 95.00% 0.000%
CAT PLAFOND GYPSUM BOARD WR 80 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


CAT PLAFOND BETON EXPOSE 51 m2 0.000% 90.00% 0.000% 5.00% 0.000% 95.00% 0.000%
PEKERJAAN SHADOW LINE 1,021 m' 0.006% 90.00% 0.005% 5.00% 0.000% 95.00% 0.005%
DROP CEILLING 85 m2 0.001% 90.00% 0.001% 5.00% 0.000% 95.00% 0.001%
MANHOLE 27 unit 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
SKIRTING KERAMIK UK. 30X30 42 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEMBUATAN DUST PROOF 43 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
STEP NOSSING 58 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
WATERPROOFING COATING 135 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FLOOR HARDENER 4 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

69/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot

KITCHEN
Kitchen Zink 23 Unit 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
Kran 23 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

TOILET
Closet Duduk 27 Unit 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 Unit 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 Set 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 Set 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 Unit 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 Unit 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 Unit 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
- Upah 54 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

JANITOR
Floor Drain 2 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
Floor Drain 23 Unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 m' 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 m' 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE
750 x 400 mm 7 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
900 x 400 mm 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 549 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 16 0.353% 0.335% 0.001% 0.336%

LANTAI 17
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 249 m2 0.007% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 94 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 23 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

PEKERJAAN FINISHING DINDING


1 PLESTER 483 m2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 ACIAN 483 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 SKIMCOAT DINDING BETON 592 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
4 CAT DINDING INTERIOR 18 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
5 CAT DINDING EXTERIOR 929 m2 0.005% 90.00% 0.004% 0.00% 0.000% 90.00% 0.004%
6 CAT MINYAK 316 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
7 Pekerjaan Keramik uk. 30x30 cm Matte ex. ROMAN, 2 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
8 Pekerjaan waterprofing coating ex. Fosroc/Sika 9 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
9 Pekerjaan Homogenous Tile uk. 30x60 cm Unpolished 24 m2 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%

PEKERJAAN PINTU DAN JENDELA


SD1 A 4 unit 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
SD1 B 1 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
SD2 3 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
WD3 1 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
G-1 (provsum) 2 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PLAFOND
PLAFOND BETON EXPOSE 742 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
PLAFOND GYPSUM BOARD (9MM) WR 5 m2 0.000% 80.00% 0.000% 0.00% 0.000% 80.00% 0.000%
Pekerjaan pengecatan plafond pada Beton Expose de 742 m2 0.004% 80.00% 0.003% 0.00% 0.000% 80.00% 0.003%
CAT PLAFOND GYPSUM BOARD INTERIOR 5 m2 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
Pekerjaan plafond gypsum WR 593 m2 0.018% 50.00% 0.009% 0.00% 0.000% 50.00% 0.009%
Pekerjaan plafond gypsum WR 95 m2 0.003% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN LANTAI
Keramik Tile uk. 30x30 cm Unpolished ex. ROMAN 12 m2 0.001% 65.00% 0.000% 0.00% 0.000% 65.00% 0.000%
Skirting, Keramik uk. 10x30 cm ex. ROMAN 9 m' 0.000% 65.00% 0.000% 0.00% 0.000% 65.00% 0.000%
Pekerjaan pembuatan dust proof ex. Fosroc/sika 41 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

70/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
Pekerjaan step nossing Keramik Tile 7,5x30cm ex. R 59 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Pekerjaan waterproofing coating ex. Fosroc/sika/EQ 5 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
Pekerjaan Lantai dengan Beton Expose Finished Floor H 516 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
Skirting, Homogenous Tile uk. 10x60 cm Polished ex. 204 m' 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
Homogenous Tile uk. 60x60 cm Unpolished ex. …./seta 3 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
Pekerjaan Floor Hardener 4 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Waterproofing coating berikut mortar, grouting nat 800 m2 0.009% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%

JANITOR
Floor Drain 2 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOILET
Closet Duduk 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Jet Washer 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Paper Holder 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Wastafel 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Robe Hook 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Floor Drain 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN RAILING
Railing vertikal Ø38 mm dengan Handrail Pipa Besi Ø3 13 m' 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
Railing vertikal Ø38 mm dengan Handrail Pipa Besi Ø3 15 m' 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%

PEKERJAAN LAIN - LAIN


Pekerjaan pembuatan meja beton washtafel, finish Natu 1 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Pekerjaan Fire Stopper menggunakan beton cor pada ke 2 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Caping aluminium pada parapet yang dilaksanakan sesua 109 m2 0.025% 95.00% 0.024% 0.00% 0.000% 95.00% 0.024%
Pekerjaan Gutter 150 mm yang dilaksanakan sesuai gamb 157 m' 0.016% 95.00% 0.016% 0.00% 0.000% 95.00% 0.016%

TOTAL PEKERJAAN ARSITEK LANTAI 17 0.129% 0.110% 0.000% 0.110%

LANTAI 18
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 98.00% 0.001% 0.00% 0.000% 98.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 0.000% 0.00% 0.000% 0.000%

71/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
10 DROP CEILLING 85 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 MANHOLE 27 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
- Upah 54 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 18 0.347% 0.338% 0.000% 0.338%

LANTAI 19
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

72/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 98.00% 0.001% 0.00% 0.000% 98.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
10 DROP CEILLING 85 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 MANHOLE 27 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

73/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 19 0.347% 0.339% 0.000% 0.339%

LANTAI 20
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 90.00% 0.004% 0.00% 0.000% 90.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%

74/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
10 DROP CEILLING 85 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 MANHOLE 27 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

75/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 20 0.347% 0.339% 0.000% 0.339%

LANTAI 21
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 85.00% 0.003% 10.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 90.00% 0.010% 0.00% 0.000% 90.00% 0.010%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 85.00% 0.005% 0.00% 0.000% 85.00% 0.005%
10 DROP CEILLING 85 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 MANHOLE 27 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

76/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 21 0.347% 0.336% 0.000% 0.337%

LANTAI 22
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 85.00% 0.003% 0.00% 0.000% 85.00% 0.003%
5 CAT DINDING EXTERIOR 254 m2 0.001% 70.00% 0.001% 15.00% 0.000% 85.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

77/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 90.00% 0.010% 5.00% 0.001% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 10.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 85.00% 0.005% 0.00% 0.000% 85.00% 0.005%
10 DROP CEILLING 85 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 MANHOLE 27 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

78/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 22 0.347% 0.336% 0.001% 0.337%

LANTAI 23
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 90.00% 0.010% 0.00% 0.000% 90.00% 0.010%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 90.00% 0.002% 0.00% 0.000% 90.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 90.00% 0.005% 0.00% 0.000% 90.00% 0.005%
10 DROP CEILLING 85 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
11 MANHOLE 27 0.000% 70.00% 0.000% 0.00% 0.000% 70.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%

79/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 80.00% 0.001% 0.00% 0.000% 80.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 23 0.347% 0.337% 0.000% 0.337%

LANTAI 24
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)

80/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
10 DROP CEILLING 85 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 70.00% 0.000% 15.00% 0.000% 85.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

81/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 24 0.347% 0.337% 0.000% 0.337%

LANTAI 25
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 70.00% 0.000% 25.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 50.00% 0.000% 25.00% 0.000% 75.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)

82/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
8 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
10 DROP CEILLING 85 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 25 0.347% 0.336% 0.000% 0.336%

LANTAI 26
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%

83/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
3 SKIMCOAT DINDING BETON 222 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 65.00% 0.000% 30.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 65.00% 0.000% 20.00% 0.000% 85.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 0.000% 90.00% 0.000% 5.00% 0.000% 95.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 90.00% 0.005% 5.00% 0.000% 95.00% 0.005%
10 DROP CEILLING 85 0.001% 90.00% 0.001% 5.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 50.00% 0.000% 25.00% 0.000% 75.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 85.00% 0.004% 0.00% 0.000% 85.00% 0.004%
KRAN 23 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%

84/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 26 0.347% 0.334% 0.001% 0.335%

LANTAI 27
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

85/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 10.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 50.00% 0.000% 25.00% 0.000% 75.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 90.00% 0.000% 5.00% 0.000% 95.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 85.00% 0.005% 0.00% 0.000% 85.00% 0.005%
10 DROP CEILLING 85 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 MANHOLE 27 0.000% 50.00% 0.000% 25.00% 0.000% 75.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 STEP NOSSING 50 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
13 FLOOR HARDENER 4 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 27 0.347% 0.334% 0.001% 0.335%

LANTAI 28
PEKERJAAN PASANGAN DINDING DAN PARTISI

86/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 85.00% 0.010% 10.00% 0.001% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 10.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 85.00% 0.005% 0.00% 0.000% 85.00% 0.005%
10 DROP CEILLING 85 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 MANHOLE 27 0.000% 70.00% 0.000% 0.00% 0.000% 70.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

87/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 28 0.347% 0.334% 0.002% 0.335%

LANTAI 29
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 90.00% 0.001% 5.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 90.00% 0.004% 5.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 90.00% 0.001% 5.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

88/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 85.00% 0.010% 10.00% 0.001% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 10.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 50.00% 0.000% 20.00% 0.000% 70.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 85.00% 0.005% 0.00% 0.000% 85.00% 0.005%
10 DROP CEILLING 85 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 MANHOLE 27 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

89/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 29 0.347% 0.333% 0.002% 0.335%

LANTAI 30
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 95.00% 0.019% 0.00% 0.000% 95.00% 0.019%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
2 ACIAN 1,858 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 85.00% 0.003% 0.00% 0.000% 85.00% 0.003%
5 CAT DINDING EXTERIOR 254 m2 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 85.00% 0.010% 10.00% 0.001% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 50.00% 0.000% 35.00% 0.000% 85.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 50.00% 0.000% 20.00% 0.000% 70.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 0.000% 85.00% 0.000% 10.00% 0.000% 95.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 85.00% 0.005% 10.00% 0.001% 95.00% 0.005%
10 DROP CEILLING 85 0.001% 85.00% 0.001% 10.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 50.00% 0.000% 45.00% 0.000% 95.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED

90/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 85.00% 0.001% 10.00% 0.000% 95.00% 0.001%

TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 85.00% 0.001% 10.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
MEJA PANTRY
1680 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 30 0.347% 0.325% 0.003% 0.328%

LANTAI 31
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 508.34 m2 0.014% 95.00% 0.013% 0.00% 0.000% 95.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 94.38 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 15.11 m2 0.000% 0.000% 0.00% 0.000% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 999.90 m2 0.023% 95.00% 0.022% 0.00% 0.000% 95.00% 0.022%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,861 m2 0.014% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
2 ACIAN 1,861 m2 0.008% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
3 SKIMCOAT DINDING BETON 222 m2 0.001% 80.00% 0.001% 15.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 85.00% 0.003% 0.00% 0.000% 85.00% 0.003%
5 CAT DINDING EXTERIOR 256 m2 0.001% 70.00% 0.001% 15.00% 0.000% 85.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 85.00% 0.003% 10.00% 0.000% 95.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
- Upah 52 m2 0.001% 85.00% 0.001% 10.00% 0.000% 95.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%

PEKERJAAN PINTU DAN JENDELA

91/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1 PINTU TYPE SD1 2 unit 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 PINTU TYPE SD-1B 2 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
3 PINTU TYPE SD-2 2 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PINTU TYPE SD-6 5 unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
5 PINTU TYPE SD-7 11 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
2 JENDELA TYPE W-2 11 unit 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
3 JENDELA TYPE W-3 1 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 JENDELA TYPE W-4 3 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 JENDELA TYPE W-5 4 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 JENDELA TYPE W-9 2 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 unit 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
9 PINTU TYPE D-1 23 unit 0.025% 95.00% 0.024% 0.00% 0.000% 95.00% 0.024%
10 PINTU TYPE D-2 12 unit 0.008% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
11 PINTU TYPE D-3 23 unit 0.010% 95.00% 0.010% 0.00% 0.000% 95.00% 0.010%
12 PINTU TYPE D-9 4 unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
13 PINTU TYPE D-7 4 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
14 PINTU TYPE D-6 8 unit 0.008% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
15 PINTU TYPE D-8 15 unit 0.014% 95.00% 0.013% 0.00% 0.000% 95.00% 0.013%
16 PINTU TYPE G1 2 unit 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 0.011% 80.00% 0.009% 5.00% 0.001% 85.00% 0.010%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 m2 0.002% 40.00% 0.001% 35.00% 0.001% 75.00% 0.001%
4 PLAFOND CALCIUM CILICATE 65 m2 0.002% 40.00% 0.001% 20.00% 0.000% 60.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 m2 0.002% 50.00% 0.001% 35.00% 0.001% 85.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 m2 0.000% 70.00% 0.000% 0.00% 0.000% 70.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 m2 0.000% 40.00% 0.000% 20.00% 0.000% 60.00% 0.000%
8 Insulasi di bawah atap dak beton dengan menggunaka 686 m2 0.027% 95.00% 0.025% 0.00% 0.000% 95.00% 0.025%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 m' 0.006% 60.00% 0.003% 0.00% 0.000% 60.00% 0.003%
10 DROP CEILLING 85 m2 0.001% 40.00% 0.000% 0.00% 0.000% 40.00% 0.000%
11 MANHOLE 27 unit 0.000% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 58 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%

PEKERJAAN SANITARY
KITCHEN ZINK 23 unit 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 unit 0.001% 80.00% 0.001% 0.00% 0.000% 80.00% 0.001%

TOILET
Closet Duduk 27 unit 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 unit 0.001% 80.00% 0.001% 0.00% 0.000% 80.00% 0.001%
Paper Holder 27 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 unit 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 unit 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Hand soap 27 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 unit 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%

JANITOR
Floor Drain 2 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

BALKON
FLOOR DRAIN 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%

92/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 m' 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE
750 x 400 mm 7 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
900 x 400 mm 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
MEJA PANTRY
1680 x 600 2 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1700 x 600 2 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1430 x 600 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 31 0.379% 0.343% 0.003% 0.346%

LMR
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 379.16 m2 0.010% 95.00% 0.010% 0.00% 0.000% 95.00% 0.010%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 10.04 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN FINISHING DINDING


PLESTER 761.80 m2 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
ACIAN 761.80 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
SKIMCOAT DINDING BETON 83.06 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
CAT DINDING EXTERIOR 469.25 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
CAT MINYAK (SERVIS DAN FAN ) 342.04 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
KERAMIK (30x30) JANITOR 16.59 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
WATERPROOFING COATING 16.59 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


SD1 2.00 unit 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
SD2 1.00 unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%

PEKERJAAN PLAFOND
Plafond Beton Expose ex. MU/DRYMIX/EQ 90.77 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
pengecatan plafond pada Beton Expose dengan Cat M 90.77 m2 0.001% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN LANTAI
Keramik Tile uk. 30x30 cm Unpolished ex. ROMAN 3.23 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Skirting, Keramik uk. 10x30 cm ex. ROMAN 7.31 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Pekerjaan Lantai dengan Beton Expose Finished Floor H 732.60 m2 0.013% 95.00% 0.012% 0.00% 0.000% 95.00% 0.012%
Pekerjaan screed + waterproofing membran 732.60 m2 0.033% 95.00% 0.031% 0.00% 0.000% 95.00% 0.031%
Pekerjaan pembuatan dust proof ex. Fosroc/sika 66.45 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

JANITOR
Floor Drain 1.00 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1.00 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

PEKERJAAN LAIN - LAIN


Fire Stopper menggunakan beton cor pada keseluruhan 1.99 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI LMR 0.078% 0.072% 0.000% 0.072%

LANTAI ATAP
Waterproofing Membrane ex. Fosroc/sika Finish scree 135.16 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
Pekerjaan tanggulan 10cm keliling dak atap 73.31 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Lt 7 Plafond bawah balkon menggunakan Gypsum WR + 106.37 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
Screed+Aci slooping kanopi 106.37 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
Grouting celah lantai dengan precast 1,228.21 m2 0.024% 100.00% 0.024% 0.00% 0.000% 100.00% 0.024%

TOTAL PEKERJAAN ARSITEK LANTAI ATAP 0.038% 0.038% 0.000% 0.038%

ARSITEK FACADE PARKIR


1 Pekerjaan pemasangan planter box 117 m2 0.053% 100.00% 0.053% 0.00% 0.000% 100.00% 0.053%
2 Pekerjaan waterproofing coating dan screed tebal 30 241 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
mm pada planter box
3 Pemasangan GRC pada finch vertikal dan horizontal 1,199 m2 0.153% 95.00% 0.145% 0.00% 0.000% 95.00% 0.145%
berikut rangka.
4 Pemasangan Sling + Tanaman Rambat 1,280 m2 0.037% 100.00% 0.037% 0.00% 0.000% 100.00% 0.037%
5 Pemasangan Precast + cat weathershield 2,407 m2 0.376% 95.00% 0.357% 0.00% 0.000% 95.00% 0.357%
6 Louvre (prov sum) 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- G-1 (400X600mm) shaft pressurize 22 unit 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- G-2 (800x2100mm) Fan room 9 unit 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
- G-3 (800x4200mm) Genset & trafo 2 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- G-4 (900x900mm) Dog house (sanctum stair) 2 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- G-5 Motorcycle parking 1 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- G-6 Dog house (GF) 2 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 Aluminium (prov sum) 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
W15 1 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
W16 1 unit 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

93/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot

ARSITEK FACADE MID


1 PASANGAN DINDING BETON PRECAST Tebal 100 mm 9,164 m2 1.385% 100.00% 1.385% 0.00% 0.000% 100.00% 1.385%
Pekerjaan pengecatan dengan Cat Weathershield ex. 9,337 m2 0.047% 100.00% 0.047% 0.00% 0.000% 100.00% 0.047%
Jotun/Dulux/EQ
Pekerjaan skimcoat pada balok eskpose 173 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Pekerjaan GRC + Rangka + Cat Weathershield 5,065 m2 0.645% 100.00% 0.645% 0.00% 0.000% 100.00% 0.645%
Planter Box pada Refugee 217 m2 0.108% 100.00% 0.108% 0.00% 0.000% 100.00% 0.108%
Kanopi kaca lt. 8 (kolam renang)
- Pemasangan ACP pada kanopi kaca + List ACP lt 8 472 m2 0.090% 100.00% 0.090% 0.00% 0.000% 100.00% 0.090%
- Pemasangan kaca 68 m2 0.038% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
Kanopi kaca tangga 6 (ground)
- Pemasangan Kaca tempered 12 mm + rangka spider 105 m2 0.058% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%
fitting
- Pemasangan ACP 18 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
LIST ACP 0.000% 0.00% 0.000% 0.000%
-Pemasangan List ACP Ref DWG-A4504 det 2 Lantai 9 109 m2 0.021% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
- Pemasangan List ACP Ref DWG-A4504 det 2 Lantai 264 m2 0.051% 100.00% 0.051% 0.00% 0.000% 100.00% 0.051%
18
Pemasangan Curtain Wall lantai 8 193 m2 0.079% 100.00% 0.079% 0.00% 0.000% 100.00% 0.079%

ARSITEK FACADE MID HIGH


1 PASANGAN DINDING BETON PRECAST Tebal 100 mm 8,705.68 m2 1.316% 100.00% 1.316% 0.00% 0.000% 100.00% 1.316%
Pekerjaan pengecatan dengan Cat Weathershield ex. 8,928.88 m2 0.045% 0.000% 0.00% 0.000% 0.00% 0.000%
Jotun/Dulux/EQ
Pekerjaan skimcoat pada balok eskpose 223.20 m2 0.001% 0.000% 0.00% 0.000% 0.00% 0.000%
Pekerjaan GRC + Rangka + Cat Weathershield 4,723.91 m2 0.601% 20.00% 0.120% 0.00% 0.000% 20.00% 0.120%
Planter Box pada Refugee 172.50 m2 0.086% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Pintu Sky Lounge
- CW-1 SKYLOUNGE 1.00 Unit 0.057% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- CW-2 SKYLOUNGE 1.00 Unit 0.012% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Pekerjaan Dog House
- Pekerjaan Dog House 2.00 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Pemasangan Kanopi Aluminium
-Pekerjaan Aluminium + Rangka Mulion 677.46 m2 0.333% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Kaca Tempered 12 mm 99.28 m2 0.055% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN FACADE PARKIR MID 0.647% 0.614% 0.000% 0.614%


TOTAL PEKERJAAN FACADE PARKIR TOWER MID 2.525% 2.525% 0.000% 2.525%
TOTAL PEKERJAAN FACADE TOWER MID HIGH 2.506% 1.436% 0.000% 1.436%
TOTAL PEKERJAAN ARSITEK PODIUM & PARKIR 2.981% 2.159% 0.010% 2.168%
TOTAL PEKERJAAN ARSITEK TOWER 1 (MID) 9.589% 8.973% 0.026% 8.999%
TOTAL PEKERJAAN ARSITEK TOWER 2 (MID HIGH) 11.119% 0.664% 0.000% 0.664%

TOTAL PEKERJAAN ARSITEK 29.368% 16.370% 0.036% 16.406%

94/157
RINCIAN PROGRESS PEKERJAAN ARSITEK
PROYEK PEMBANGUNAN APARTEMEN SOLTERRA - PEJATEN - JAKARTA SELATAN PROGRESS BULAN JULI 2023
22 Februari 2021 s/d 28 Februari 2021
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot

PEKERJAAN ARSITEK ###


ARSITEK LANTAI B3
IX PEKERJAAN LAIN - LAIN
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 375 m' 453,628 170,056,065 0.033% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK B3 2,337,936,732 0.449% 0.000% 0.000% 0.000%

ARSITEK LANTAI B2
IX PEKERJAAN LAIN - LAIN
6 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 374.88 m' 453,628 170,056,065 0.033% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK B2 64,507,737 2,339,619,850 0.45% 0.000% 0.000% 0.0000%

ARSITEK LANTAI B1
IX PEKERJAAN LAIN - LAIN
6 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 22.70 m' 453,628 10,297,356 0.002% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK B1 4,833,728,483 0.929% 0.000% 0.000% 0.0000%

PARKIR
ARSITEK PARKIR LANTAI 2
IX PEKERJAAN LAIN - LAIN
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 93 m' 453,628 42,391,537 0.008% 0.000% 0.00% 0.000% 0.000%
7 PEKERJAAN SERSAN RAMP 343 m' 151,209 51,839,405 0.010% 0.000% 0.00% 0.000% 0.000%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 26 m' 417,338 11,046,937 0.002% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK 2A 1,041,845,378 0.200% 0.000% 0.000% 0.0000%

ARSITEK PARKIR LANTAI 3


IV PEKERJAAN PLAFOND
3 CAT PLAFOND GYPSUM BOARD + BETON EKSPOSE 2,908 m2 15,362 44,677,458 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

IX PEKERJAAN LAIN - LAIN


5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 m' 453,628 58,064,384 0.011% 0.000% 0.00% 0.000% 0.000%
7 PEKERJAAN SERSAN RAMP 95 m2 151,209 14,293,484 0.003% 0.000% 0.00% 0.000% 0.000%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 36 m' 417,338 14,836,366 0.003% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK 3A 1,122,760,989 0.216% 0.000% 0.000% 0.000%

ARSITEK PARKIR LANTAI 4


IX PEKERJAAN LAIN - LAIN
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 m' 453,628 58,064,384 0.011% 0.000% 0.00% 0.000% 0.000%
7 PEKERJAAN SERSAN RAMP 95 m' 151,209 14,293,484 0.003% 0.000% 0.00% 0.000% 0.000%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 36 m' 417,338 14,836,366 0.003% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK 4A 1,525,645,597 0.293% 0.000% 0.000% 0.000%

ARSITEK PARKIR LANTAI 5


IX PEKERJAAN LAIN - LAIN
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 .m3 453,628 58,064,384 0.011% 0.000% 0.00% 0.000% 0.000%
7 PEKERJAAN SERSAN RAMP 95 .kg 151,209 14,293,484 0.003% 0.000% 0.00% 0.000% 0.000%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 54 417,338 22,486,171 0.004% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK 5A 1,141,427,279 0.219% 0.000% 0.000% 0.000%

ARSITEK PARKIR LANTAI 6A


IX PEKERJAAN LAIN - LAIN
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 m' 453,628 58,064,384 0.011% 0.000% 0.00% 0.000% 0.000%
7 PEKERJAAN SERSAN RAMP 47 m2 151,209 7,146,742 0.001% 0.000% 0.00% 0.000% 0.000%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 91 m' 417,338 38,140,520 0.007% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK 6A 857,456,326 0.165% 0.000% 0.000% 0.000%

ARSITEK PARKIR LANTAI 6B


II PEKERJAAN PLAFOND
2 CAT PLAFOND BETON EXPOSE 1,025 m2 15,362 15,741,134 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

IV PEKERJAAN LAIN - LAIN


5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 m' 453,628 58,064,384 0.011% 0.000% 0.00% 0.000% 0.000%
7 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 53 m' 417,338 21,926,939 0.004% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK 6B - 311,543,291 0.060% 0.000% 0.000% 0.000%

ARSITEK PARKIR LANTAI GF (MID)


IV PEKERJAAN PLAFOND

95/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1 PLAFOND BETON EXPOSE 582.35 m2 25,851 15,054,330 0.003% 0.000% 0.00% 0.000% 0.000%
3 CAT PLAFOND & BETON EXPOSE 582.35 m2 28,985 16,879,415 0.003% 0.000% 0.00% 0.000% 0.000%

IX PEKERJAAN LAIN - LAIN


3 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 24.10 m' 453,628 10,932,435 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 5.10 m' 417,338 2,128,424 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI GF - 4,170,317,902 0.801% 0.000% 0.000% 0.000%

ARSITEK TOWER MID


ARSITEK LANTAI 7
III PEKERJAAN PINTU DAN JENDELA
6 PINTU TYPE SD1 2.00 unit 6,817,617 13,635,234 0.003% 0.000% 0.00% 0.000% 0.000%
7 PINTU TYPE SD1B 1.00 unit 10,209,486 10,209,486 0.002% 0.000% 0.00% 0.000% 0.000%
8 PINTU TYPE SD2 4.00 unit 4,988,048 19,952,192 0.004% 0.000% 0.00% 0.000% 0.000%

IX PEKERJAAN LAIN - LAIN


3 PEMBUATAN GRILL AREA POOL 51 m' 544,354 27,990,683 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEMBUATAN GRILL AREA POOL DECK 16 m' 544,354 8,764,099 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 7 2,993,587,313 2,993,587,313 0.575% 0.000% 0.000% 0.000%

LANTAI 8
PEKERJAAN FINISHING DINDING
1 PLESTER 1,323 m2 40,159 53,124,121 0.010% 0.000% 0.00% 0.000% 0.000%
2 ACIAN 1,323 m2 22,619 29,921,425 0.006% 0.000% 0.00% 0.000% 0.000%
3 SKIMCOAT DINDING BETON 166 m2 25,851 4,291,266 0.001% 0.000% 0.00% 0.000% 0.000%
4 CAT DINDING INTERIOR 936 m2 15,362 14,372,595 0.003% 0.000% 0.00% 0.000% 0.000%
5 CAT DINDING EXTERIOR 150 m2 26,086 3,925,492 0.001% 0.000% 0.00% 0.000% 0.000%
6 CAT MINYAK (AREA SERVIS DAN FAN ) 203 m2 28,985 5,883,491 0.001% 0.000% 0.00% 0.000% 0.000%
7 HOMOGENOUS TILE (SHOWER) 104 m2 246,807 25,584,631 0.005% 0.000% 0.00% 0.000% 0.000%
8 HOMOGENOUS TILE (CLOSED) 165 m2 246,807 40,794,112 0.008% 0.000% 0.00% 0.000% 0.000%
9 HOMOGENOUS TILE (MEJA PANTRY) 34 m2 246,807 8,301,600 0.002% 0.000% 0.00% 0.000% 0.000%
10 KERAMIK (30x30) JANITOR 2 m2 251,712 397,705 0.000% 0.000% 0.00% 0.000% 0.000%
11 MARMER LOKAL PADA KOLOM 25 m2 1,742,214 42,806,198 0.008% 0.000% 0.00% 0.000% 0.000%
12 WATERPROOFING COATING 87 m2 55,692 4,872,805 0.001% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE AD1 1 unit 7,082,551 7,082,551 0.001% 0.000% 0.00% 0.000% 0.000%
2 PINTU TYPE GD-1 2 unit 16,405,708 32,811,416 0.006% 0.000% 0.00% 0.000% 0.000%
3 PINTU TYPE GD-2 1 unit 11,266,028 11,266,028 0.002% 0.000% 0.00% 0.000% 0.000%
4 PINTU TYPE SD-1 2 unit 6,817,617 13,635,234 0.003% 0.000% 0.00% 0.000% 0.000%
5 PINTU TYPE SD-1B 1 unit 10,209,486 10,209,486 0.002% 0.000% 0.00% 0.000% 0.000%
6 PINTU TYPE SD-2 3 unit 4,988,048 14,964,144 0.003% 0.000% 0.00% 0.000% 0.000%
7 PINTU TYPE SD-6 3 unit 3,370,827 10,112,481 0.002% 0.000% 0.00% 0.000% 0.000%
8 PINTU TYPE SD-7 7 unit 1,999,547 13,996,829 0.003% 0.000% 0.00% 0.000% 0.000%
9 PINTU TYPE WD1 1 unit 2,965,205 2,965,205 0.001% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


JENDELA TYPE W-1 2 unit 5,410,956 10,821,912 0.002% 0.000% 0.00% 0.000% 0.000%
JENDELA TYPE W-2 7 unit 3,245,603 22,719,221 0.004% 0.000% 0.00% 0.000% 0.000%
JENDELA TYPE W-4 2 unit 4,693,622 9,387,244 0.002% 0.000% 0.00% 0.000% 0.000%
JENDELA TYPE W-5 4 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
JENDELA TYPE W-9 1 unit 2,209,049 2,209,049 0.000% 0.000% 0.00% 0.000% 0.000%
JENDELA TYPE W-11 1 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%
JENDELA CURTAIN WALL 3 unit 10,487,887 31,463,661 0.006% 0.000% 0.00% 0.000% 0.000%
PINTU TYPE D-1 15 unit 5,710,455 85,656,825 0.016% 0.000% 0.00% 0.000% 0.000%
PINTU TYPE D-2 6 unit 3,364,434 20,186,604 0.004% 0.000% 0.00% 0.000% 0.000%
PINTU TYPE D-3 15 unit 2,268,051 34,020,765 0.007% 0.000% 0.00% 0.000% 0.000%
PINTU TYPE D-9 2 unit 3,956,300 7,912,600 0.002% 0.000% 0.00% 0.000% 0.000%
PINTU TYPE D-6 4 unit 5,170,631 20,682,524 0.004% 0.000% 0.00% 0.000% 0.000%
PINTU TYPE D-8 13 unit 4,901,175 63,715,275 0.012% 0.000% 0.00% 0.000% 0.000%
PINTU TYPE G1 2 unit 725,805 1,451,610 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
PLAFOND BETON EXPOSE 234 m2 25,851 6,051,719 0.001% 0.000% 0.00% 0.000% 0.000%
PLAFOND GYPSUM BOARD (9MM) 367 m2 110,054 40,420,633 0.008% 0.000% 0.00% 0.000% 0.000%
PLAFOND GYPSUM BOARD (9MM) WR 50 m2 129,748 6,544,489 0.001% 0.000% 0.00% 0.000% 0.000%
PLAFOND CALCIUM CILICATE 37 m2 129,748 4,840,898 0.001% 0.000% 0.00% 0.000% 0.000%
CAT PLAFOND GYPSUM BOARD INTERIOR 367 m2 15,362 5,642,155 0.001% 0.000% 0.00% 0.000% 0.000%
CAT PLAFOND GYPSUM BOARD 37 m2 26,086 973,269 0.000% 0.000% 0.00% 0.000% 0.000%
CAT PLAFOND GYPSUM BOARD WR 50 m2 26,086 1,315,778 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


CAT PLAFOND BETON EXPOSE 234 m2 28,985 6,785,389 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN SHADOW LINE 643 m' 28,961 18,621,923 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
DROP CEILLING 54 m2 52,131 2,826,543 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

96/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN LANTAI
HT (60x60) 266 m2 253,210 67,326,007 0.013% 0.000% 0.00% 0.000% 0.000%
SKIRTING HT (UK. 10x60CM) POLISHED 277 m' 52,763 14,599,522 0.003% 0.000% 0.00% 0.000% 0.000%
HT (60x60) CLOSED 34 m2 272,787 9,280,214 0.002% 0.000% 0.00% 0.000% 0.000%
HT (60x60) SHOWER 15 m2 272,787 3,974,507 0.001% 0.000% 0.00% 0.000% 0.000%
HT (60x60) BALKON 31 m2 272,787 8,394,202 0.002% 0.000% 0.00% 0.000% 0.000%
STEP NOSSING 50 m' 78,153 3,935,004 0.001% 0.000% 0.00% 0.000% 0.000%
WATERPROOFING COATING 141 m2 55,692 7,841,991 0.002% 0.000% 0.00% 0.000% 0.000%
FLOOR HARDENER 4 m2 32,661 131,950 0.000% 0.000% 0.00% 0.000% 0.000%

BALKON
FLOOR DRAIN 15 Unit 277,622 4,164,330 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 4 1,800,027 7,200,108 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 1 Unit 2,355,205 2,355,205 0.000% 0.000% 0.00% 0.000% 0.000%
1700 x 600 1 Unit 2,383,243 2,383,243 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 Unit 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 549 1 Unit 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 Unit 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 Unit 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 Unit 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1275 x 600 2 Unit 1,787,432 3,574,864 0.001% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 Unit 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 Unit 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 Unit 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1400 x 650 1 Unit 2,215,266 2,215,266 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 8 1,556,695,169 1,556,695,169 0.299% 0.000% 0.000% 0.000%

LANTAI 9
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTER 1,858 m2 40,159 74,620,341 0.014% 0.000% 0.00% 0.000% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.000% 0.00% 0.000% 0.000%
3 SKIMCOAT DINDING BETON 222 m2 25,851 5,732,764 0.001% 0.000% 0.00% 0.000% 0.000%
4 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.000% 0.00% 0.000% 0.000%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 181,169 29,727,659 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 164 m2 65,638 10,770,408 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 181,169 47,459,031 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 262 m2 65,638 17,194,530 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 181,169 9,354,842 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 52 m2 65,638 3,389,284 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 KERAMIK (30x30) JANITOR 2 m2 251,712 397,705 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11 WATERPROOFING COATING 143 m2 55,692 7,941,657 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


1 PINTU TYPE SD1 2 unit 6,817,617 13,635,234 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PINTU TYPE SD-1B 2 unit 10,209,486 20,418,972 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PINTU TYPE SD-2 2 unit 4,988,048 9,976,096 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


1 JENDELA TYPE W-1 4 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
2 JENDELA TYPE W-2 11 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
3 JENDELA TYPE W-3 1 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
4 JENDELA TYPE W-4 3 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
5 JENDELA TYPE W-5 4 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
7 JENDELA TYPE W-11 1 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%
13 PINTU TYPE D-7 4 unit 5,415,811 21,663,244 0.004% 0.000% 0.00% 0.000% 0.000%
14 PINTU TYPE D-6 8 unit 5,170,631 41,365,048 0.008% 0.000% 0.00% 0.000% 0.000%
15 PINTU TYPE D-8 15 unit 4,901,175 73,517,625 0.014% 0.000% 0.00% 0.000% 0.000%

97/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 129,748 10,383,732 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 m2 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 m' 28,961 29,561,941 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
3 HT (60x60)BEDROOM 436 m2 253,210 110,351,957 0.021% 0.000% 0.00% 0.000% 0.000%
4 SKIRTING HT (UK. 10x60CM) POLISHED 446 m' 52,763 23,537,258 0.005% 0.000% 0.00% 0.000% 0.000%
5 HT (60x60) CLOSED UNPOLISHED 53 m2 272,787 14,550,459 0.003% 0.000% 0.00% 0.000% 0.000%
6 HT (60x60) SHOWER UNPOLISHED 25 m2 272,787 6,776,029 0.001% 0.000% 0.00% 0.000% 0.000%
7 HT (60x60) BALKON UNPOLISHED 55 m2 272,787 15,126,039 0.003% 0.000% 0.00% 0.000% 0.000%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 m2 253,787 3,027,679 0.001% 0.000% 0.00% 0.000% 0.000%
9 SKIRTING KERAMIK UK. 30X30 42 m' 66,183 2,761,419 0.001% 0.000% 0.00% 0.000% 0.000%
10 PEMBUATAN DUST PROOF 43 m2 90,726 3,889,424 0.001% 0.000% 0.00% 0.000% 0.000%
11 STEP NOSSING 50 m' 78,153 3,935,004 0.001% 0.000% 0.00% 0.000% 0.000%
12 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 unit 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 unit 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 unit 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 unit 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 unit 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 unit 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 unit 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 unit 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 unit 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 unit 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 unit 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 unit 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 unit 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 unit 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 unit 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 unit 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 9 1,804,728,073 1,804,728,073 0.347% 0.0000% 0.000% 0.000%

LANTAI 10 1 ls 1,804,728,073 279,565,035 0.054% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 181,169 29,727,659 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 164 m2 65,638 10,770,408 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 181,169 47,459,031 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 262 m2 65,638 17,194,530 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 181,169 9,354,842 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 52 m2 65,638 3,389,284 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 WATERPROOFING COATING 143 m2 55,692 7,941,657 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


1 Pintu SD1 2.00 unit 6,817,617 13,635,234 0.003% 0.000% 0.00% 0.000% 0.000%
2 Pintu SD1 B 2.00 unit 10,209,486 20,418,972 0.004% 0.000% 0.00% 0.000% 0.000%
3 Pintu SD2 2.00 unit 4,988,048 9,976,096 0.002% 0.000% 0.00% 0.000% 0.000%
6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%

98/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%
Pintu D7 4.00 unit 5,415,811 21,663,244 0.004% 0.000% 0.00% 0.000% 0.000%
Pintu D6 8.00 unit 5,170,631 41,365,048 0.008% 0.000% 0.00% 0.000% 0.000%
Pintu D8 15.00 unit 4,901,175 73,517,625 0.014% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 m' 28,961 29,561,941 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM 436 m2 253,210 110,351,957 0.021% 0.000% 0.00% 0.000% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED 446 m' 52,763 23,537,258 0.005% 0.000% 0.00% 0.000% 0.000%
3 HT (60x60) CLOSED UNPOLISHED 53 m2 272,787 14,550,459 0.003% 0.000% 0.00% 0.000% 0.000%
4 HT (60x60) BALKON UNPOLISHED 55 m2 272,787 15,126,039 0.003% 0.000% 0.00% 0.000% 0.000%
9 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 10 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 11 1 ls 1,804,728,073 308,304,600 0.059% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 181,169 29,727,659 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 164 m2 65,638 10,770,408 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 181,169 47,459,031 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 262 m2 65,638 17,194,530 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 181,169 9,354,842 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 52 m2 65,638 3,389,284 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 WATERPROOFING COATING 143 m2 55,692 7,941,657 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

99/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


1 Pintu SD1 2.00 unit 6,817,617 13,635,234 0.003% 0.000% 0.00% 0.000% 0.000%
2 Pintu SD1 B 2.00 unit 10,209,486 20,418,972 0.004% 0.000% 0.00% 0.000% 0.000%
3 Pintu SD2 2.00 unit 4,988,048 9,976,096 0.002% 0.000% 0.00% 0.000% 0.000%
6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%
Pintu D7 4.00 unit 5,415,811 21,663,244 0.004% 0.000% 0.00% 0.000% 0.000%
Pintu D6 8.00 unit 5,170,631 41,365,048 0.008% 0.000% 0.00% 0.000% 0.000%
Pintu D8 15.00 unit 4,901,175 73,517,625 0.014% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 CAT PLAFOND BETON EXPOSE 51 m2 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 11 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 12 1 ls 1,804,728,073 308,304,600 0.059% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 HOMOGENOUS TILE (SHOWER)

100/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Material 164 m2 181,169 29,727,659 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 164 m2 65,638 10,770,408 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 181,169 47,459,031 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 262 m2 65,638 17,194,530 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 181,169 9,354,842 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 52 m2 65,638 3,389,284 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 WATERPROOFING COATING 143 m2 55,692 7,941,657 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


1 Pintu SD1 2.00 unit 6,817,617 13,635,234 0.003% 0.000% 0.00% 0.000% 0.000%
2 Pintu SD1 B 2.00 unit 10,209,486 20,418,972 0.004% 0.000% 0.00% 0.000% 0.000%
3 Pintu SD2 2.00 unit 4,988,048 9,976,096 0.002% 0.000% 0.00% 0.000% 0.000%
6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 12 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 13 1 ls 1,804,728,073 308,304,600 0.059% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

101/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 181,169 29,727,659 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 164 m2 65,638 10,770,408 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 181,169 47,459,031 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 262 m2 65,638 17,194,530 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 181,169 9,354,842 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 52 m2 65,638 3,389,284 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 WATERPROOFING COATING 143 m2 55,692 7,941,657 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


1 Pintu SD1 2.00 unit 6,817,617 13,635,234 0.003% 0.000% 0.00% 0.000% 0.000%
2 Pintu SD1 B 2.00 unit 10,209,486 20,418,972 0.004% 0.000% 0.00% 0.000% 0.000%
3 Pintu SD2 2.00 unit 4,988,048 9,976,096 0.002% 0.000% 0.00% 0.000% 0.000%
6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA (Lanjutan)


Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 m2 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 13 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

102/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
LANTAI 14 1 ls 1,804,728,073 732,085,497 0.141% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 181,169 29,727,659 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 164 m2 65,638 10,770,408 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 181,169 47,459,031 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 262 m2 65,638 17,194,530 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 181,169 9,354,842 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 52 m2 65,638 3,389,284 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 WATERPROOFING COATING 143 m2 55,692 7,941,657 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


1 Pintu SD1 2.00 unit 6,817,617 13,635,234 0.003% 0.000% 0.00% 0.000% 0.000%
2 Pintu SD1 B 2.00 unit 10,209,486 20,418,972 0.004% 0.000% 0.00% 0.000% 0.000%
3 Pintu SD2 2.00 unit 4,988,048 9,976,096 0.002% 0.000% 0.00% 0.000% 0.000%
6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8.00 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2.00 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2.00 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1.00 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1.00 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2.00 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1.00 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1.00 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1.00 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2.00 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1.00 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1.00 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4.00 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%

103/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1400 x 650 2.00 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2.00 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 1.99 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 14 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 15 1 ls 1,804,728,073 691,587,430 0.133% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.000% 0.00% 0.000% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.000% 0.00% 0.000% 0.000%
3 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.000% 0.00% 0.000% 0.000%
4 HOMOGENOUS TILE (SHOWER) 164 m2 246,807 40,498,067 0.008% 0.000% 0.00% 0.000% 0.000%
- Material 164 m2 181,169 29,727,659 0.006% 0.000% 0.00% 0.000% 0.000%
- Upah 164 m2 65,638 10,770,408 0.002% 0.000% 0.00% 0.000% 0.000%
5 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 181,169 47,459,031 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 262 m2 65,638 17,194,530 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 181,169 9,354,842 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 52 m2 65,638 3,389,284 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 WATERPROOFING COATING 143 m2 55,692 7,941,657 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%

104/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 15 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 16 1 ls 1,835,251,285 757,123,020 0.145% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 508 m2 141,649 72,005,828 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 999.90 m2 120,938 120,926,085 0.023% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,861 m2 40,159 74,716,735 0.014% 0.000% 0.00% 0.000% 0.000%
2 ACIAN 1,861 m2 22,619 42,083,165 0.008% 0.000% 0.00% 0.000% 0.000%
3 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.000% 0.00% 0.000% 0.000%
4 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 181,169 29,727,659 0.006% 0.000% 0.00% 0.000% 0.000%
- Upah 164 m2 65,638 10,770,408 0.002% 0.000% 0.00% 0.000% 0.000%
5 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 181,169 47,459,031 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 262 m2 65,638 17,194,530 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 181,169 9,354,842 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 52 m2 65,638 3,389,284 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 m2 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 m2 129,748 10,383,732 0.002% 0.000% 0.00% 0.000% 0.000%
4 PLAFOND CALCIUM CILICATE 65 m2 129,748 8,441,405 0.002% 0.000% 0.00% 0.000% 0.000%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 m2 15,362 8,217,011 0.002% 0.000% 0.00% 0.000% 0.000%
6 CAT PLAFOND GYPSUM BOARD 65 m2 26,086 1,697,155 0.000% 0.000% 0.00% 0.000% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 m2 26,086 2,087,663 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 m2 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 m' 28,961 29,561,941 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11 MANHOLE 27 67,191 1,814,157 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


1 Pintu SD1 2.00 unit 6,817,617 13,635,234 0.003% 0.000% 0.00% 0.000% 0.000%
2 Pintu SD1 B 2.00 unit 10,209,486 20,418,972 0.004% 0.000% 0.00% 0.000% 0.000%
3 Pintu SD2 2.00 unit 4,988,048 9,976,096 0.002% 0.000% 0.00% 0.000% 0.000%
4 Pintu SD6 5.00 unit 3,370,827 16,854,135 0.003% 0.000% 0.00% 0.000% 0.000%
5 Pintu SD7 11.00 unit 1,999,547 21,995,017 0.004% 0.000% 0.00% 0.000% 0.000%
6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

105/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 16 1,835,251,285 1,835,251,285 0.353% 0.0000% 0.000% 0.000%

LANTAI 17 1 ls 672,419,087 287,475,564 0.055% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 249 m2 141,649 35,321,595 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 93.94 m2 172,843 16,236,699 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 329,847 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PASANGAN DINDING BATA RINGAN Tebal 75 mm 23 m2 120,938 2,786,412 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 483 m2 40,159 19,385,151 0.004% 0.000% 0.00% 0.000% 0.000%
2 ACIAN 483 m2 22,619 10,918,417 0.002% 0.000% 0.00% 0.000% 0.000%
3 SCIMCOAT DINDING BETON 592 m2 25,851 15,311,547 0.003% 0.000% 0.00% 0.000% 0.000%
4 CAT INTERIOR 18 m2 15,362 275,748 0.000% 0.000% 0.00% 0.000% 0.000%
5 CAT EXTERIOR 929 m2 26,086 24,241,146 0.005% 0.000% 0.00% 0.000% 0.000%
6 CAT MINYAK 316 m2 28,985 9,145,675 0.002% 0.000% 0.00% 0.000% 0.000%
7 KERAMIK JANITOR 2 m2 251,712 397,705 0.000% 0.000% 0.00% 0.000% 0.000%
8 WATERPROOFING JANITOR 9 m2 55,692 495,659 0.000% 0.000% 0.00% 0.000% 0.000%
9 HT (CLOSED) 24 m2 246,807 5,913,002 0.001% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
Plafond Beton Expose ex. MU/DRYMIX/EQ, yang dilaksanaka 742 m2 25,851 19,184,027 0.004% 0.000% 0.00% 0.000% 0.000%
Plafond Gypsum Board WR T : 9 mm secara full system de 5 m2 129,748 617,600 0.000% 0.000% 0.00% 0.000% 0.000%
Pekerjaan pengecatan plafond pada Beton Expose denga 742 m2 28,985 21,509,769 0.004% 0.000% 0.00% 0.000% 0.000%
Pekerjaan pengecatan pada plafond Gypsum Board WR 9 5 m2 26,086 124,169 0.000% 0.000% 0.00% 0.000% 0.000%
Pekerjaan plafond gypsum WR + pengecatan yang dilaksana 593 m2 155,834 92,356,578 0.018% 0.000% 0.00% 0.000% 0.000%
Pekerjaan plafond gypsum WR + pengecatan yang dilaksana 95 m2 155,834 14,788,647 0.003% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 17 672,419,087 672,419,087 0.129% 0.000% 0.000% 0.000%

LANTAI 18 1 ls 1,804,728,073 760,316,432 0.146% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 HOMOGENOUS TILE (SHOWER) 164 m2 246,807 40,498,067 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 HOMOGENOUS TILE (CLOSED) 262 m2 246,807 64,653,562 0.012% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED

106/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 18 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 19 1 ls 1,804,728,073 760,316,432 0.146% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 CAT DINDING INTERIOR 1,350 m2 15,362 20,733,631 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

107/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 19 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 20 1 ls 1,804,728,073 886,201,692 0.170% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.0000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.0000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.0000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 129,748 10,383,732 0.002% 0.000% 0.00% 0.000% 0.000%
4 PLAFOND CALCIUM CILICATE 65 129,748 8,441,405 0.002% 0.000% 0.00% 0.000% 0.000%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 15,362 8,217,011 0.002% 0.000% 0.00% 0.000% 0.000%
6 CAT PLAFOND GYPSUM BOARD 65 26,086 1,697,155 0.000% 0.000% 0.00% 0.000% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 26,086 2,087,663 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

108/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 20 1,804,728,073 1,804,728,073 0.347% 0.0000% 0.000% 0.000%

LANTAI 21 1 ls 1,804,728,073 886,201,692 0.170% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


6 Jendela W1 4.00 unit 5,410,956 21,643,824 0.004% 0.000% 0.00% 0.000% 0.000%
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN LAIN - LAIN


MEJA BETON WASTAFLE 8 1,800,027 14,400,216 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%

109/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 21 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 22 1 ls 1,804,728,073 1,098,616,195 0.211% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


2 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 m2 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 22 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 23 1 ls 1,804,728,073 1,098,616,195 0.211% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


2 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 23 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 24 1 ls 1,804,728,073 1,098,616,195 0.211% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

110/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot

PEKERJAAN FINISHING DINDING


2 PLESTERAN DINDING BATA 1,858 m2 40,159 74,620,341 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 ACIAN 1,858 m2 22,619 42,028,873 0.008% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 24 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 25 1 ls 1,804,728,073 1,215,265,409 0.234% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 25 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 26 1 ls 1,804,728,073 1,215,265,409 0.234% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN PINTU DAN JENDELA


11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 26 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 27 1 ls 1,804,728,073 1,198,812,624 0.230% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 872 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA

111/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 27 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 28 1 ls 1,804,728,073 1,198,812,624 0.230% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 872 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA


11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 28 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 29 1 ls 1,804,728,073 1,198,812,624 0.230% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 872 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PINTU DAN JENDELA


11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 29 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 30 1 ls 1,804,728,073 1,377,638,842 0.265% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 872 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND

112/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%

PEKERJAAN PLAFOND (lanjutan)


8 CAT PLAFOND BETON EXPOSE 51 28,985 1,468,808 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 30 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%

LANTAI 31 1 1,974,352,447 1,748,103,370 0.336%


1 PEKERJAAN PASANGAN DINDING DAN PARTISI
2 PASANGAN DINDING BATA RINGAN Tebal 100 mm 508 m2 141,649 72,005,828 0.014% 0.000% 0.00% 0.000% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 125 mm 94 m2 172,843 16,312,577 0.003% 0.000% 0.00% 0.000% 0.000%
4 PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
5 PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
6 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
7 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 15 m2 133,064 2,011,036 0.000% 0.000% 0.00% 0.000% 0.000%
8 PASANGAN DINDING BATA RINGAN Tebal 75 mm 1,000 m2 120,938 120,926,085 0.023% 0.000% 0.00% 0.000% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI 31 1,974,352,447 0.379% 0.000% 0.000% 0.000%

LANTAI ATAP
Pekerjaan tanggulan 10cm keliling dak atap 73 m' 39,445 2,891,739 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Screed+Aci slooping kanopi 106 m2 234,105 24,901,749 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Grouting celah lantai dengan precast 1,228 m2 100,403 123,315,969 0.024% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI ATAP 199,327,774 199,327,774 0.038% 0.000% 0.000% 0.000%

LT. LMR 1 ls 403,591,572 299,995,591 0.058% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 379.16 m2 141,649 53,707,259 0.010% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 10.04 m2 172,843 1,734,739 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 329,847 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

PEKERJAAN FINISHING DINDING


1 PLESTERAN DINDING BATA 761.80 m2 40,159 30,593,034 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 ACIAN 761.80 m2 22,619 17,231,102 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN ARSITEK LANTAI LMR 403,591,572 403,591,572 0.078% 0.000% 0.000% 0.000%

ARSITEK FACADE PARKIR


1 Pekerjaan pemasangan planter box 117 m2 2,365,218 276,730,506 0.053% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 Pemasangan Precast + cat weathershield 2,407 m2 812,571 1,956,069,665 0.376% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

ARSITEK FACADE MID


1 PASANGAN DINDING BETON PRECAST Tebal 100 mm 9,164 m2 786,485 7,207,348,540 1.385% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Pekerjaan GRC + Rangka + Cat Weathershield 5,065 m2 662,297 3,354,287,599 0.645% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

TOTAL PEKERJAAN FACADE PARKIR MID - 3,368,981,528 0.65% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN FACADE PARKIR TOWER MID - 13,141,023,888 2.53% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN ARSITEK PODIUM & PARKIR 15,511,963,925 2.98% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN ARSITEK TOWER 1 (MID) 53,269,085,545 10.24% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN ARSITEK TOWER 2 (MID HIGH) 70,901,434,235 13.62% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN ARSITEK 152,823,507,593 29.368% 0.000% 0.000% 0.000%

113/157
BILL OF QUANTITY
PROYEK PEMBANGUNAN "SOLTERRA PLACE" ###
PEJATEN, JAKARTA SELATAN
PAKET PEKERJAAN STRUKTUR BAJA

6. PEKERJAAN STRUKTUR BAJA PROGRESS BULAN JULI 2023


Progress
No. URAIAN SAT QTY BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
6 PEKERJAAN BAJA STRUKTUR
Catatan :
Kecuali ditentukan lain harga satuan sudah termasuk
penyediaan plat sambung, las, baut, angkur, kop angin-
angin, baut angin-angin kop sling, pengecatan zincromate,
pengecatan duco ( bila ada ) dan accesoris lainnya apabila
belum disebutkan dalam item pekerjaan ini.

Kontraktor sudah harus memasukan di dalamnya adanya


biaya alat-alat bantu, bending, welded, fabrikasi, erection,
persiapan, transportasi bahan dan alat sampai site proyek,
security untuk mengatur lalu lintas, perapihan sambungan,
serta upah lainnya menurut tingkat kesulitan pekerjaan baja
yang akan dikerjakan sehingga tidak ada "change-order"
dengan alasan kontraktor belum memasukannya dalam
harga satuan pekerjaan. sehingga pekerjaan baja dapat
terlaksanakan sesuai gambar dan spesifikasi yang telah
ditentukan.

1 PEKERJAAN TANGGA SANCTUM 1 (PROV SUM)


a. Anchor Bolt d.22 L=60 CM .unit 14.00 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Base Plat T=12 MM .kg 15.31 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. KOLOM HB 100x100x6x8 .kg 721.00 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%

2 PEKERJAAN TANGGA SANCTUM 2 (PROV SUM)


a. Anchor Bolt d.22 L=60 CM .unit 14.00 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Base Plat T=12 MM .kg 15.31 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. KOLOM HB 100x100x6x8 .kg 427.42 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%

3 PEKERJAAN BAJA CROWN TOWER MID


a. Kolom WF uk. 400x200x8x13 .kg 10,604.09 0.059% 60.00% 0.035% 0.00% 0.000% 60.00% 0.035%
b. Balok G1 WF Uk. 250x125x6x9 .kg 19,433.41 0.108% 15.00% 0.016% 0.00% 0.000% 15.00% 0.016%
c. Plat Stiffner 8 MM .kg 838.58 0.004% 60.00% 0.002% 0.00% 0.000% 60.00% 0.002%
d. Plat 10 MM .kg 371.34 0.002% 25.00% 0.000% 0.00% 0.000% 25.00% 0.000%
d. Plat 12 MM .kg 673.75 0.003% 25.00% 0.001% 0.00% 0.000% 25.00% 0.001%
e. Baut A-325 .bh 864.00 0.005% 30.00% 0.002% 0.00% 0.000% 30.00% 0.002%
f. Angkur M24, L=850MM .bh 648.00 0.029% 70.00% 0.020% 0.00% 0.000% 70.00% 0.020%
g. Grouting Uk. 400x400 MM .bh 36.00 0.001% 62.35% 0.000% 0.00% 0.000% 62.35% 0.000%

4 PEKERJAAN BAJA CROWN MID HIGH


a. Kolom WF uk. 400x200x8x13 .kg 10,014.97 0.056% 100.00% 0.056% 0.00% 0.000% 100.00% 0.056%
b. Balok G1 WF Uk. 250x125x6x9 .kg 16,938.30 0.094% 100.00% 0.094% 0.00% 0.000% 100.00% 0.094%
c. Plat Stiffner 8 MM .kg 791.99 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
d. Plat 10 MM .kg 350.71 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
d. Plat 12 MM .kg 636.32 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
e. Baut A-325 .bh 816.00 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
f. Angkur M24, L=850MM .bh 612.00 0.027% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%
g. Grouting Uk. 400x400 MM .bh 34.00 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

5 PEKERJAAN BAJA CANOPY KOLAM RENANG MID HIGH (PROV SUM)


a. Baja Profile .kg 44,800.00 0.266% 100.00% 0.266% 0.00% 0.000% 100.00% 0.266%
b. Plat Stiffner 8 MM .ls 1.00 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Plat 12 MM .kg 874.98 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
d. Baut A-325 .ls 1.00 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
e. Anchor Bolt d.22 L=60 CM .bh 216.00 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
f. Grouting Uk. 400x400 MM .bh 36.00 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%

6 PEKERJAAN BAJA BOMB CHECK


a. WF uk. 450x200x9x14 (KC) .kg 4,241.56 0.025% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
b. WF uk. 450x200x9x14 (W1) .kg 5,856.56 0.034% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
c. CNP uk. 150X50X20X3.2 (a) .kg 339.76 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
d. WF uk. 200x100x5.5x8 (RB) .kg 306.32 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Plat 6 MM .kg 3.89 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Plat 8 MM .kg 175.99 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
f. Plat 10 MM .kg 195.26 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Plat 12 MM .kg 177.53 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
f. Plat 16 MM .kg 235.71 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
g. Baut HTB A-325 Ø16 .bh 176.00 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
h. Baut HTB A-325 Ø19 .bh 60.00 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
i. Baut HTB A-325 Ø22 .bh 180.00 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
j. Grouting Uk. 300x550 MM T = 25 MM .bh 10.00 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%

Carried to Summary 0.7605% 0.5588% 0.0000% 0.5588%

114/157
PAKET PEKERJAAN MEP
PROYEK PEMBANGUNAN SOLTERRA PLEACE 520380000000
PEJATEN - JAKARTA
PEMADAM KEBAKARAN PROGRESS BULAN JULI 2023
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

I PODIUM 6,152,642,985 1.1823% 1.0755% 0.0000% 1.0755%


II PARKIR (LT. 2-6B T. MID) 728,287,180 0.1400% 0.1338% 0.0000% 0.1338%
III MID 2,677,183,742 0.5145% 0.4885% 0.0000% 0.4885%
IV MID HIGH 3,405,886,950 0.6545% 0.0000% 0.0000% 0.0000%

TOTAL PEMADAM KEBAKARAN 12,964,000,858 2.4913% 1.6978% 0.0000% 1.6978%

PLUMBING
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

I PODIUM Rp 1,149,221,050.00 0.2208% 0.1869% 0.0000% 0.1869%


II Equipment Rp 3,463,913,400.00 0.6657% 0.3555% 0.0000% 0.3555%
III PARKIR (LT. 2-6B T. MID) Rp 343,385,350.00 0.0660% 0.0627% 0.0000% 0.0627%
IV MID Rp 5,453,478,827.17 1.0480% 0.9953% 0.0000% 0.9953%
V MID HIGH Rp 5,769,795,094.34 1.1088% 0.0000% 0.0000% 0.0000%

TOTAL PLUMBING 16,179,793,722 3.1092% 1.6004% 0.0000% 1.600%

ELECTRONIC
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

I FIRE ALARM (POD) Rp 891,666,700.00 0.1713% 0.1192% 0.0000% 0.1192%


II FIRE ALARM (PARKIR) Rp 276,210,300.00 0.0531% 0.0472% 0.0000% 0.0472%
III FIRE ALARM (TOWER MID) Rp 2,056,999,200.00 0.3953% 0.3648% 0.0000% 0.3648%
IV FIRE ALARM (TOWER MID HIGH) Rp 2,289,036,800.00 0.4399% 0.0000% 0.0000% 0.0000%
V SOUND SISTEM (POD) Rp 478,375,400.00 0.0919% 0.0475% 0.0000% 0.0475%
VI SOUND SISTEM (PARKIR) Rp 91,935,300.00 0.0177% 0.0168% 0.0000% 0.0168%
VII SOUND SISTEM (TOWER MID) Rp 351,442,000.00 0.0675% 0.0641% 0.0000% 0.0641%
VIII SOUND SISTEM (TOWER MID HIGH) Rp 292,919,700.00 0.0563% 0.0000% 0.0000% 0.0000%
IX KABEL TRAY POD Rp 211,338,600.00 0.0406% 0.0386% 0.0000% 0.0386%
X KABEL TRAY PARKIR Rp 122,058,400.00 0.0235% 0.0235% 0.0000% 0.0235%
XI KABEL TRAY MID Rp 503,092,000.00 0.0967% 0.0967% 0.0000% 0.0967%
XII KABEL TRAY MID HIGH Rp 576,443,400.00 0.1108% 0.0000% 0.0000% 0.0000%
XIII BAS POD Rp 507,389,000.00 0.0975% 0.0814% 0.0000% 0.0814%
XIV BAS PARKIR Rp 135,509,500.00 0.0260% 0.0247% 0.0000% 0.0247%
XV BAS MID Rp 783,359,500.00 0.1505% 0.1430% 0.0000% 0.1430%
XVI BAS MID HIGH Rp 1,186,332,000.00 0.2280% 0.0000% 0.0000% 0.0000%

TOTAL TATA ELECTRONIC 10,754,107,800 2.0666% 1.0675% 0.0000% 1.0675%

ELEKTRIKAL
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

I PERALATAN UTAMA POD+PAR Rp 5,951,227,011.12 1.1436% 1.0262% 0.00000% 1.0262%


II KABEL FEDEER POD+PAR Rp 4,453,637,200.00 0.8558% 0.6611% 0.00000% 0.6611%
III LAMPU PENERANGAN & ACC POD+PAR Rp 1,817,893,600.00 0.3493% 0.1833% 0.00000% 0.1833%
IV RACK KABEL POD+PAR Rp 315,365,400.00 0.0606% 0.0541% 0.00000% 0.0541%
V PERALATAN UTAMA MD Rp 2,247,003,000.00 0.4318% 0.4063% 0.00000% 0.4063%
VI KABEL FEDEER MID Rp 1,919,911,550.00 0.3689% 0.3505% 0.00000% 0.3505%
V LAMPU PENERANGAN & ACC MID Rp 4,251,453,000.00 0.8170% 0.7634% 0.00000% 0.7634%
VI PENANGKAL PETIR MID Rp 244,666,800.00 0.0470% 0.0423% 0.00000% 0.0423%
VII RACK KABEL MID Rp 419,719,200.00 0.0807% 0.0805% 0.00000% 0.0805%
VIII PERALATAN UTAMA MH Rp 2,478,880,000.00 0.4764% 0.0000% 0.00000% 0.0000%
IX KABEL FEDEER MH Rp 2,003,173,700.00 0.3849% 0.0000% 0.00000% 0.0000%
X LAMPU PENERANGAN & ACC MH Rp 4,644,118,400.00 0.8924% 0.0000% 0.00000% 0.0000%
XI PENANGKAL PETIR MH Rp 311,642,400.00 0.0599% 0.0000% 0.00000% 0.0000%
XII RACK KABEL MH Rp 445,615,850.00 0.0856% 0.0000% 0.00000% 0.0000%

TOTAL ELEKTRIKAL 31,504,307,111 6.0541% 3.5677% 0.00000% 3.5677%


VAC
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

I UNIT AC POD+PAR Rp 1,555,437,500.00 0.2989% 0.0086% 0.0000% 0.0086%


II FAN POD+PAR Rp 1,674,913,300.00 0.3219% 0.2314% 0.0000% 0.2314%
III DIFFUSER, GRILLE & ACC POD+PAR Rp 212,279,600.00 0.0408% 0.0035% 0.0000% 0.0035%
IV INSTALASI DUCTING POD+PAR Rp 571,505,300.00 0.1098% 0.0694% 0.0000% 0.0694%
V INSTALASI PEMIPAAN AC POD+PAR Rp 570,821,986.00 0.1097% 0.0507% 0.0000% 0.0507%
VI UNIT AC MID Rp 487,126,500.00 0.0936% 0.0619% 0.0000% 0.0619%
VII FAN MID Rp 877,205,200.00 0.1686% 0.1425% 0.0000% 0.1425%
VIII DIFFUSER, GRILLE & ACC MID Rp 75,354,600.00 0.0145% 0.0142% 0.0000% 0.0142%
IX INSTALASI DUCTING MID Rp 745,177,300.00 0.1432% 0.1350% 0.0000% 0.1350%
X INSTALASI PEMIPAAN AC MID Rp 1,073,663,176.00 0.2063% 0.1938% 0.0000% 0.1938%
XI UNIT AC MID HIGH Rp 25,240,600.00 0.0049% 0.0000% 0.0000% 0.0000%
XII FAN MID HIGH Rp 869,099,000.00 0.1670% 0.0000% 0.0000% 0.0000%
XIII DIFFUSER, GRILLE & ACC MID HIGH Rp 72,883,200.00 0.0140% 0.0000% 0.0000% 0.0000%
XIV INSTALASI DUCTING MID HIGH Rp 949,015,200.00 0.1824% 0.0000% 0.0000% 0.0000%
XV INSTALASI PEMIPAAN AC MID HIGH Rp 1,157,033,900.00 0.2223% 0.0000% 0.0000% 0.0000%

TOTAL TATA UDARA 10,916,756,362 2.0978% 0.9110% 0.0000% 0.9110%

LIFT / ELEVATOR

SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

PROGRESS MOS
1 Lift 6 & 7 (MOS) 1,926,911,200 0.3703% 0.3703% 0.0000% 0.3703%
2 Lift 8 (MOS) 963,455,600 0.1851% 0.1851% 0.0000% 0.1851%
3 Lift 9 (MOS) + Pekerjaan 1,214,415,700 0.2334% 0.2334% 0.0000% 0.2334%
4 Lift 10 407,152,000 0.0782% 0.0782% 0.0000% 0.0782%
5 Lift 1 PODIUM MH (MOS) 407,152,000 0.0782% 0.0587% 0.0000% 0.0587%
6 Lift 2 & 3 MH (MOS) 1,935,596,600 0.3720% 0.2790% 0.0000% 0.2790%
7 Lift 4 MH (MOS) 967,798,300 0.1860% 0.1488% 0.0000% 0.1488%
8 Lift 5 MH (MOS) 1,214,415,700 0.2334% 0.2100% 0.0000% 0.2100%
9 Supervisory Panel + Instalasi "Computerize PC
Monitor 24" 23,473,600 0.0045% 0.0041% 0.0000% 0.0041%
10 Grounding Lift & Dumb Waiter 41,900,548 0.0081% 0.0072% 0.0000% 0.0072%

TOTAL LIFT / ELEVATOR 9,102,271,248 1.7492% 1.5748% 0.0000% 1.5748%


GONDOLA
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

I GONDOLA Rp 2,963,302,400.00 0.5694% 0.4475% 0.0000% 0.4475%

TOTAL GONDOLA 2,963,302,400 0.5694% 0.4475% 0.0000% 0.4475%


G-PON
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

I G-PON POD Rp 4,151,031,949.77 0.7977% 0.7266% 0.0000% 0.7266%


II G-PON PAR Rp 187,254,054.10 0.0360% 0.0342% 0.0000% 0.0342%
III G-PON MID Rp 2,267,271,490.51 0.4357% 0.3941% 0.0000% 0.3941%
IV G-PON MID HIGH Rp 3,338,442,505.62 0.6415% 0.0000% 0.0000% 0.0000%

TOTAL G-PON 9,944,000,000 1.9109% 1.1548% 0.0000% 1.1548%


GENSET

SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

I GENSET (MOS) + Pekerjaan Rp 5,746,190,700.00 1.1042% 1.0477% 0.0000% 1.0477%

TOTAL G-PON 5,746,190,700 1.1042% 1.0477% 0.0000% 1.0477%


KOLAM RENANG

SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI

I PERSIAPAN Rp 10,563,000.00 0.0020% 0.0000% 0.0000% 0.0000%


II KOLAM RENANG 7 Rp 437,803,400.00 0.0841% 0.0654% 0.0000% 0.0654%
III KOLAM RENANG GF Rp 376,903,400.00 0.0724% 0.0056% 0.0000% 0.0056%

TOTAL G-PON 825,269,800 0.1586% 0.0710% 0.0000% 0.0710%

GRAND TOTAL PEKERJAAN MEP 110,900,000,000.00 21.311% 13.140% 0.0000% 13.140%


PAKET PEKERJAAN INFRASTRUKTUR
PROYEK PEMBANGUNAN SOLTERRA PLEACE
PEJATEN - JAKARTA

INFRASTRUKTUR PROGRESS BULAN MEI 2023


SD SAAT
NO. URAIAN BOBOT SAAT LALU SAAT INI
INI

I PEKERJAAN SALURAN 0.3252% 0.2783% 0.0000% 0.2783%


II PEKERJAAN PERKERASAN 0.2431% 0.1396% 0.0000% 0.1396%
III PEKERJAAN PAGAR 0.2572% 0.2495% 0.0000% 0.2495%
IV BANGUNAN PENUNJANG 0.0331% 0.0244% 0.0000% 0.0244%

TOTAL INFRASTRUKTUR 0.8587% 0.6918% 0.0000% 0.6918%


GRAND TOTAL PEKERJAAN INFRA 0.8587% 0.6918% 0.0000% 0.6918%
Proyek : Solterra Place
Tanggal : PROGRESS BULAN JULI 2023
Perhitungan : Pekerjaan Persiapan dan Struktur
Area :

NO ITEM PEKERJAAN URAIAN M83 M84 M85 M86 M87 M88 M89 M90 M91 M92 M93 M94 M95 M96

A PEKERJAAN STRUKTUR
1 PEKERJAAN GALIAN

2. PEKERJAAN BOBOKAN

3. Proteksi Lereng Galian

4. PEKERJAAN PILE CAP

5. PEKERJAAN TIE BEAM

TOWER MID
I PEKERJAAN BALOK KONVESIONAL

II PEKERJAAN PLAT LANTAI

III PEKERJAAN KOLOM Total Area 100%

IV PEKERJAAN SW DAN CW

V PEKERJAAN RW

B PEKERJAAN ARSITEKTUR

SCIMCOAT
Lt. B3 9,272.1 m² Progress 6.92% 6.92% 15.00%
Lt. B2 8,626.5 m² Progress 5.00%

Lt. B3 443.7 m² Progress 5.00%


Lt. B2 568.5 m² Progress

TOWER MID HIGH


I PEKERJAAN BALOK KONVESIONAL
Total Area 100%
Lt. 2 'a. Beton 53 .m3 Progress
b. Bekisting 450 .m2 Progress
c. Besi 27,395 .kg Progress

Lt. 3 'a. Beton 54 .m3 Progress


b. Bekisting 457 .m2 Progress
c. Besi 27,629 .kg Progress

Lt. 4 'a. Beton 54 .m3 Progress


b. Bekisting 457 .m2 Progress
c. Besi 27,629 .kg Progress

II PEKERJAAN PELAT LANTAI

Lt. 2 'a. Beton 103 .m3 Progress


b. Bekisting 696 .m2 Progress
c. Besi 9,722 .kg Progress

Lt. 3 'a. Beton 103 .m3 Progress


b. Bekisting 699 .m2 Progress
c. Besi 9,776 .kg Progress

Lt. 4 'a. Beton 103 .m3 Progress


b. Bekisting 699 .m2 Progress
c. Besi 9,776 .kg Progress

III PEKERJAAN KOLOM

Lt. 2 'a. Beton 54 .m3 Progress


b. Bekisting 264 .m2 Progress
c. Besi 18,924 .kg Progress

Lt. 3 'a. Beton 39 .m3 Progress


b. Beton 16 .m3 Progress
c. Bekisting 264 .m2 Progress
d. Besi 18,901 .kg Progress

Lt. 4 'a. Beton 39 .m3 Progress


b. Beton 16 .m3 Progress
c. Bekisting 264 .m2 Progress
d. Besi 18,901 .kg Progress

Lt. 4 'a. Beton 39 .m3 Progress


b. Beton 16 .m3 Progress
c. Bekisting 264 .m2 Progress
d. Besi 18,901 .kg Progress

IV PEKERJAAN CW & SW

Lt. 2 'a. Beton 55 .m3 Progress


b. Bekisting 271 .m2 Progress
c. Besi 14,646 .kg Progress

Lt. 3 'a. Beton 55 .m3 Progress


b. Bekisting 271 .m2 Progress
c. Besi 14,646 .kg Progress

Lt. 4 'a. Beton 55 .m3 Progress


b. Bekisting 271 .m2 Progress
c. Besi 14,646 .kg Progress

Lt. 5 'a. Beton 55 .m3 Progress


b. Bekisting 271 .m2 Progress
c. Besi 14,646 .kg Progress
M97 M98 M99 M100 M101 M102 M103 M104 M105 M106 M107 M108 M109 M110 M111 M112 M113 M114 M115 M116 M117 M118

32.37% 32.37% 38.70% 38.70% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84%
5.04% 5.04% 26.64% 36.56% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75%

5.00% 5.00% 5.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00%

27.64% 27.64% 27.64% 27.64% 52.94% 52.94% 52.94% 52.94% 52.94% 52.94% 52.94%
29.01% 29.01% 29.01% 29.01% 85.00% 85.00% 85.00% 85.00% 85.00% 85.00% 85.00%
35.00% 35.00% 35.00% 35.00% 65.00% 65.00% 65.00% 65.00% 65.00% 65.00% 65.00%

26.54% 26.54% 26.54% 26.54% 50.45% 50.45% 50.45% 50.45% 50.45% 50.45% 50.45%
29.65% 29.65% 29.65% 29.65% 85.00% 85.00% 85.00% 85.00% 85.00% 85.00% 85.00%
36.45% 36.45% 36.45% 36.45% 65.00% 65.00% 65.00% 65.00% 65.00% 65.00% 65.00%

0.00% 0.00% 21.23% 21.23% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36%
0.00% 0.00% 24.64% 24.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64%
35.00% 50.00% 55.00% 55.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00%

35.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%
M119 M120 M121 M122 M123 M124 M125 M126 M127 M128 M129 M130 M131 M132 M133 M134 M135 M136 M137 M138 M139 M140

45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84%
41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75%

30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00%

52.94% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
65.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

50.45% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
65.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36%
45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64%
60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00%

50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%
M141 M142 M143 M144 M145 M146 M147 M148 M149 M150 M151 M152 M153 M154 M155 M156 M157 M158 M158 M159 M161 M162

45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84%
41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75%

30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36%
45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64%
60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00%

50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%
M163 M164 M165 M166 M167 M168 M169 M170 M171 M172 M173 M174 M175 M176 M177 M178 M179 M180 M181 M182 M183 M184

45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84%


41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75%

30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%


28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

35.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
75.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
60.00% 85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 65.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

40.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
75.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
60.00% 60.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 45.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
60.00% 60.00% 60.00% 60.00% 60.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
80.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 95.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 50.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 50.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
75.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 95.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

30.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 65.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%

35.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Jakarta, 28 Maret 2021


M163 M164 M165 M166 M167 M168 M169 M170 M171 M172 M173 M174 M175 M176 M177 M178 M179 M180 M181 M182 M183 M184
Jakarta, 28 Maret 2021

Ega Kosasih P
& Site contract Administration
Risk Manager
M185 M186 M187 M188 M189 M190 KETERANGAN

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
98.00% 98.00% 98.00% 98.00%

100.00% 100.00% 100.00% 100.00%


100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
JADWAL PELAKSANAAN DAN KURVA S (R3)
PROYEK APARTEMEN SOLTERRA PLACE, PEJATEN
1.081 3.271 3.365 3.366 3.006 3.048 2.728 2.293 2.984 3.168 2.961 2.819 2.519 2.269 2.172 1.900 1.841 1.743 1.617 1.382 1.252 1.118 0.682 0.913
WAKTU PELAKSANAAN
NO URAIAN BOBOT OKTOBER 2020
Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22
M150 M151 M152 M153 M154
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
A PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan Pondasi 1.27329 0.9431 0.0512 0.0512 0.0192 0.0695 0.0695 0.0695
2 Pekerjaan Persiapan SAMEP 8.00272 0.0512 0.0512 0.2858 0.2163 0.1520 0.0856 0.1329 0.2140 0.2140 0.2140 0.2140 0.2140 0.2383 0.2383 0.2383 0.3099 0.2479 0.2479 0.3099 0.2479 0.2479 0.0620 0.0620 0.0620 0.0620 0.06199 0.24795 0.30993 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561

B.1 PEKERJAAN PONDASI


1 Pekerjaan Bored Pile dan Soldier Pile 6.59712 1.7367 1.7472 1.4849 1.0974 0.3382 0.0643 0.0643 0.0643

B.2 PEKERJAAN STRUKTUR ATAS


B.2.1 Pekerjaan Tanah dan Lain-Lain
1 Pekerjaan Tanah dan Lain-Lain 1.01849 0.0509 0.2037 0.2037 0.0509 0.2037 0.2037 0.1018

B.2.2 Pekerjaan Struktur Beton Bertulang Bassement


1 Struktur Lantai - Bassement 3 6.17282 0.30864 0.24219 1.14596 1.48187 1.14271 0.83317 0.48554 0.53275
2 Struktur Lantai - Bassement 2 1.58058 0.07903 0.23709 0.24966 0.31612 0.23709 0.11854 0.07903 0.08801 0.08801 0.08801
3 Struktur Lantai - Bassement 1 1.91000 0.38200 0.28650 0.28650 0.28650 0.33425 0.04137 0.04137 0.10575 0.00955 0.06810 0.06810
4 Struktur Lantai - Ground Floor 2.15722 0.21572 0.21572 0.49926 0.39554 0.46118 0.07982 0.07982 0.04260 0.05585 0.05585 0.05585
5 Struktur Lantai - Pondasi ME 0.08130 0.02439 0.02439 0.03252

B.2.3 Pekerjaan Struktur Beton Bertulang Parkir


1 Struktur Lantai Parkir 2A (2 nd) 0.54541 0.06138 0.16362 0.16362 0.02727 0.06476 0.06476
2 Struktur Lantai Sekolah 2B-3A (3 rd) 0.57015 0.06757 0.27073 0.18212 0.02851 0.01061 0.01061
3 Struktur Lantai Sekolah 3B - 4A (4 rd) 0.60329 0.15082 0.18099 0.18099 0.03016 0.03016 0.03016
4 Struktur Lantai Sekolah 4B - 5A (5 rd) 0.62797 0.15699 0.18839 0.18839 0.03140 0.03140 0.03140
5 Struktur Lantai Parkir 5B-6A-6B (6-6B) 0.77859 0.19465 0.23358 0.16691 0.06115 0.06115 0.06115

B.2.4 Pekerjaan Struktur Beton Bertulang Mid Apartment


1 Struktur Lantai 7 0.69526 0.27811 0.20858 0.13905 0.06953
2 Struktur Lantai 8 0.26490 0.10596 0.07947 0.05298 0.02649
3 Struktur Lantai 9 0.27242 0.10897 0.08173 0.05448 0.02724
4 Struktur Lantai 10 0.27242 0.10897 0.08173 0.05448 0.02724
5 Struktur Lantai 11 0.27242 0.08173 0.13621 0.02724 0.02724
6 Struktur Lantai 12 0.26544 0.07963 0.13272 0.02654 0.02654
7 Struktur Lantai 13 0.24943 0.07483 0.07483 0.06236 0.03741
8 Struktur Lantai 14 0.24943 0.07483 0.07483 0.06236 0.03741
9 Struktur Lantai 15 0.24943 0.09977 0.09977 0.02494 0.02494
10 Struktur Lantai 16 0.26006 0.10402 0.10402 0.02601 0.02601
11 Struktur Lantai 17 Refugee 0.31022 0.09307 0.06204 0.01034 0.14477
12 Struktur Lantai 18 0.24983 0.07495 0.09993 0.01249 0.06246
13 Struktur Lantai 19 0.24943 0.07483 0.09977 0.00998 0.06485
14 Struktur Lantai 20 0.24943 0.09977 0.00416 0.14550
15 Struktur Lantai 21 0.24943 0.09977 0.00416 0.01455 0.13095
16 Struktur Lantai 22 0.24094 0.24094
17 Struktur Lantai 23 0.22784 0.22784
18 Struktur Lantai 24 0.22784 0.22784
19 Struktur Lantai 25 0.22784 0.05696 0.17088
20 Struktur Lantai 26 0.22784 0.22784
21 Struktur Lantai 27 0.22784 0.22784
22 Struktur Lantai 28 0.22784 0.22784
23 Struktur Lantai 29 0.22784 0.05696 0.17088
24 Struktur Lantai 30 0.22784 0.22784
25 Struktur Lantai 31 0.23341 0.23341
26 Struktur Lantai Atap (R1) Lt 32 0.19391 0.04848 0.02909 0.02909 0.02909 0.02909 0.02909
27 Struktur Lantai Atap Lift (Lmr) 0.02614 0.00523 0.00523 0.00523 0.00523 0.00523

B.2.5 Pekerjaan Struktur Beton Bertulang Mid High Apartment


1 Struktur Lantai 2 0.25860 0.25860
2 Struktur Lantai 3 0.26012 0.26012
3 Struktur Lantai 4 0.26012 0.26012
4 Struktur Lantai 5 0.26012 0.26012
5 Struktur Lantai 6 0.26012 0.06503 0.19509
6 Struktur Lantai 7 0.26012 0.26012
7 Struktur Lantai 8 0.25272 0.25272
8 Struktur Lantai 9 0.25256 0.06314 0.18942
9 Struktur Lantai 10 0.25256 0.25256
10 Struktur Lantai 11
11 Struktur Lantai 12
0.25256
0.24946 KURVA-S R0 0.25256
0.12473 0.12473
12 Struktur Lantai 13 0.25083 0.25083
13 Struktur Lantai 14 Refugee 0.30823 0.30823
14 Struktur Lantai 15 0.20650 0.04130 0.16520
15 Struktur Lantai 16 0.20172 0.20172
16 Struktur Lantai 17 0.23860 0.23860
17 Struktur Lantai 18 0.23590 0.23590
18 Struktur Lantai 19 0.23560 0.23560

KURVA-S R1
19 Struktur Lantai 20 0.23560 0.05890 0.17670
20 Struktur Lantai 21 0.23560 0.23560
21 Struktur Lantai 22 0.22773 0.22773
22 Struktur Lantai 23 0.21639 0.21639
23 Struktur Lantai 24 0.21639 0.21639
24 Struktur Lantai 25 0.21639 0.21639
25 Struktur Lantai 26 0.21639 0.21639
Topping Off
26 Struktur Lantai 27 0.21639 0.21639
Tower Mid
27 Struktur Lantai 28 0.21639 0.21639 High
28 Struktur Lantai 29 0.21639 0.21639 Oktober 2021
29 Struktur Lantai 30 0.21639
KURVA-S R2
0.21639
30 Struktur Lantai 31 0.22077 0.22077
31 Struktur Lantai Atap (R1) Lt 32 0.20610 0.20610
32 Struktur Lantai Atap Lift (Lmr) 0.02579 0.02579

B.2.6 Pekerjaan Struktur Baja


1 Pekerjaan Struktur Baja 0.76053 KURVA-S R3 0.15211 0.15211 0.15211 0.15211 0.15211

C PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN ARSITEKTUR PODIUM
C.1.1 PEKERJAAN ARSITEKTUR BASEMENT
1 ARSITEKTUR LANTAI BASEMENT 3 0.44927 0.17993 0.04992 0.02438 0.02438 0.00488 0.01829 0.01829 0.01829 0.01829 0.00366 0.00366 0.00366 0.00366 0.00366 0.05608 0.01829
2 ARSITEKTUR LANTAI BASEMENT 2 0.44960 0.04996 0.03996 0.03996 0.00400 0.02798 0.02798 0.02798 0.02798 0.00560 0.00560 0.00560 0.00560 0.00560 0.02798 0.05595 0.02798 0.06394
3 ARSITEKTUR LANTAI BASEMENT 1 0.92888 0.03547 0.08934 0.00893 0.02798 0.05956 0.05956 0.08934 0.02204 0.02204 0.02204 0.02204 0.02204 0.11019 0.11019 0.05956 0.05956 0.08429 0.02473

C.1.2 PEKERJAAN ARSITEKTUR PARKIR (TW 1)


1 ARSITEKTUR LANTAI 2 0.20021 0.01614 0.05975 0.01614 0.01614 0.01195 0.01195 0.01195 0.01195 0.01195 0.01614 0.01614
2 ARSITEKTUR LANTAI 3 0.21576 0.04749 0.04749 0.00950 0.00950 0.00950 0.00950 0.00950 0.02415 0.03040 0.01873
3 ARSITEKTUR LANTAI 4 0.29318 0.05576 0.01115 0.01115 0.01115 0.01115 0.01115 0.03633 0.04844 0.04844 0.04844
4 ARSITEKTUR LANTAI 5 0.21934 0.01104 0.01104 0.01104 0.01104 0.01104 0.05519 0.02724 0.02724 0.02724 0.02724
5 ARSITEKTUR LANTAI 6 0.16478 0.04407 0.04407 0.01916 0.01916 0.01916 0.01916
6 ARSITEKTUR LANTAI 6B 0.05987 0.01301 0.01301 0.00846 0.00846 0.00846 0.00846
7 ARSITEKTUR FAÇADE 0.64741 0.07193 0.07193 0.00799 0.00647 0.04316 0.07985 0.07985 0.01597 0.01597 0.01597 0.01597 0.01597 0.07627 0.07627 0.01794 0.01794 0.01794

C.2 PEKERJAAN ARSITEKTUR TOWER 1 (MID)


1 ARSITEKTUR LANTAI GROUND FLOOR 0.80140 0.06883 0.12021 0.16028 0.11069 0.07507 0.00572 0.01472 0.07620 0.06874 0.02219 0.01131 0.01131 0.01131 0.01131 0.01131 0.02219
2 ARSITEKTUR LANTAI 7 0.57527 0.02876 0.11621 0.06606 0.08106 0.00719 0.05606 0.10439 0.11554
3 ARSITEKTUR LANTAI 8 0.29915 0.08677 0.03540 0.03540 0.00590 0.02540 0.07489 0.03540
4 ARSITEKTUR LANTAI 9 0.34681 0.01734 0.00289 0.02540 0.09135 0.08268 0.12716
5 ARSITEKTUR LANTAI 10 0.34681 0.01734 0.00289 0.00347 0.06936 0.08670 0.16705
6 ARSITEKTUR LANTAI 11 0.34681 0.01734 0.00289 0.00347 0.06936 0.08670 0.16705
7 ARSITEKTUR LANTAI 12 0.34681 0.00347 0.06936 0.06936 0.05896 0.01387 0.01387 0.01387 0.01387 0.01387 0.05549 0.02081
8 ARSITEKTUR LANTAI 13 0.34681 0.00347 0.06936 0.05202 0.05202 0.01261 0.01261 0.01261 0.01261 0.01261 0.08952 0.01734
9
10
ARSITEKTUR LANTAI 14
ARSITEKTUR LANTAI 15
0.34681
0.34681
0.00347 0.05202
0.01734
0.05202
0.05202
0.10404
0.01734
0.01179
0.02081
0.01179
0.02081
0.01179
0.02081
0.01179
0.02081
0.01179
0.02081 REALISASI
0.05896
0.08670
0.01734
0.05202 0.01734
11 ARSITEKTUR LANTAI 16 0.35268 0.01763 0.01763 0.05290 0.02116 0.02116 0.02116 0.02116 0.02116 0.10580 0.03527 0.01763
12 ARSITEKTUR LANTAI 17. REFUGEE 0.12922 0.00646 0.00646 0.00775 0.00775 0.00775 0.00775 0.00775 0.03877 0.03230 0.00646
13 ARSITEKTUR LANTAI 18 0.34681 0.01734 0.03468 0.01734 0.01734 0.01734 0.01734 0.01734 0.08670 0.08670 0.01734 0.01734
14 ARSITEKTUR LANTAI 19 0.34681 0.01734 0.05202 0.01387 0.01387 0.01387 0.01387 0.01387 0.06936 0.06936 0.05202 0.01734
15 ARSITEKTUR LANTAI 20 0.34681 0.05202 0.01040 0.01040 0.01040 0.01040 0.01040 0.10404 0.10404 0.01734 0.01734
16 ARSITEKTUR LANTAI 21 0.34681 0.05202 0.01040 0.01040 0.01040 0.01040 0.01040 0.10404 0.10404 0.01734 0.01734
17 ARSITEKTUR LANTAI 22 0.34681 0.01734 0.01734 0.01734 0.01734 0.01734 0.10404 0.10404 0.01734 0.01734 0.01734
18 ARSITEKTUR LANTAI 23 0.34681 0.01734 0.01734 0.01734 0.01734 0.01734 0.10404 0.10404 0.01734 0.01734 0.01734
19 ARSITEKTUR LANTAI 24 0.34681 0.08670 0.08670 0.07514 0.04046 0.03578 0.02202
20 ARSITEKTUR LANTAI 25 0.34681 0.08670 0.08670 0.06358 0.04046 0.04734 0.02202
21 ARSITEKTUR LANTAI 26 0.34681 0.01734 0.08670 0.10404 0.05202 0.06936 0.01734
22 ARSITEKTUR LANTAI 27 0.34681 0.01734 0.08670 0.10404 0.05202 0.06936 0.01734
23 ARSITEKTUR LANTAI 28 0.34681 0.01734 0.05202 0.08670 0.10404 0.06936 0.01734
24 ARSITEKTUR LANTAI 29 0.34681 0.01734 0.05202 0.08670 0.10404 0.06936 0.01734
25 ARSITEKTUR LANTAI 30 0.34681 0.01734 0.05202 0.08670 0.10404 0.06936 0.01734
26 ARSITEKTUR LANTAI 31 0.37941 0.01897 0.05691 0.09485 0.11382 0.03794 0.05691
27 ARSITEKTUR LANTAI ATAP 0.07756 0.03878 0.03878
28 ARSITEKTUR LANTAI LMR 0.03830 0.03830
29 ARSITEKTUR FAÇADE 2.52527 0.07576 0.07576 0.07576 0.00963 0.00505 0.16714 0.27778 0.44066 0.08813 0.08813 0.08813 0.08813 0.08813 0.44066 0.44066 0.07576

C.3 PEKERJAAN ARSITEKTUR TOWER 2 (MID HIGH)


1 ARSITEKTUR LANTAI GROUND FLOOR 1.02215 0.05111 0.10221 0.10221 0.10221 0.05111 0.15332 0.20443 0.15332 0.05111 0.05111
2 ARSITEKTUR LANTAI 2 0.34723 0.01736 0.05208 0.06945 0.06945 0.06945 0.06945
3 ARSITEKTUR LANTAI 3 0.34723 0.01736 0.05208 0.06945 0.06945 0.06945 0.06945
4 ARSITEKTUR LANTAI 4 0.34723 0.05208 0.06945 0.06945 0.06945 0.08681
5 ARSITEKTUR LANTAI 5 0.34723 0.03472 0.05208 0.06945 0.08681 0.08681 0.01736
6 ARSITEKTUR LANTAI 6 0.34723 0.03472 0.05208 0.06945 0.08681 0.06945 0.01736 0.01736
7 ARSITEKTUR LANTAI 7 0.34723 0.01736 0.05208 0.06945 0.08681 0.01736 0.10417
8 ARSITEKTUR LANTAI 8 0.34723 0.01736 0.05208 0.06945 0.06945 0.03472 0.08681 0.01736
9 ARSITEKTUR LANTAI 9 0.34723 0.01736 0.05208 0.08681 0.01736 0.08681 0.08681
10 ARSITEKTUR LANTAI 10 0.34723 0.01736 0.05208 0.08681 0.01736 0.08681 0.08681
11 ARSITEKTUR LANTAI 11 0.34723 0.01736 0.05208 0.01736 0.08681 0.08681 0.08681
12 ARSITEKTUR LANTAI 12 0.34723 0.01736 0.05208 0.01736 0.08681 0.08681 0.08681
13 ARSITEKTUR LANTAI 13 0.36120 0.01806 0.05418 0.01806 0.09030 0.09030 0.07224 0.01806
14 ARSITEKTUR LANTAI 14 REFUGEE 0.09124 0.00456 0.00456 0.02281 0.02281 0.02281 0.01369
15 ARSITEKTUR LANTAI 15 0.22581 0.01129 0.01129 0.05645 0.05645 0.05645 0.02258 0.01129
16 ARSITEKTUR LANTAI 16 0.25293 0.01265 0.03794 0.06323 0.06323 0.06323 0.01265
17 ARSITEKTUR LANTAI 17 0.34723 0.01736 0.06945 0.08681 0.08681 0.08681
18 ARSITEKTUR LANTAI 18 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
19 ARSITEKTUR LANTAI 19 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
20 ARSITEKTUR LANTAI 20 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
21 ARSITEKTUR LANTAI 21 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
22 ARSITEKTUR LANTAI 22 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
23 ARSITEKTUR LANTAI 23 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
24 ARSITEKTUR LANTAI 24 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
25 ARSITEKTUR LANTAI 25 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
26 ARSITEKTUR LANTAI 26 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
27 ARSITEKTUR LANTAI 27 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
28 ARSITEKTUR LANTAI 28 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
29 ARSITEKTUR LANTAI 29 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
30 ARSITEKTUR LANTAI 30 0.34723 0.01736 0.05208 0.06945 0.06945 0.06945 0.05208 0.01736
31 ARSITEKTUR LANTAI 31 0.37983 0.01899 0.05697 0.09496 0.09496 0.07597 0.03798
32 ARSITEKTUR LANTAI ATAP 0.06570 0.02628 0.03942
33 ARSITEKTUR LANTAI LMR 0.03927 0.03927
34 ARSITEKTUR FAÇADE 2.50614 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061

D.1 PEKERJAAN ME BASEMENT 9.69211 0.04567 0.04567 0.02284 0.01522 0.01522 0.00304 0.01454 0.20910 0.20910 0.20910 0.06468 0.06468 0.06468 0.06468 0.06468 0.32339 0.35376 0.64808 0.64808 0.64808 0.41661 0.41661 0.41661 0.39938 0.51846 0.51846 0.51846 0.51846 0.51846 0.26822 0.26822 0.26822 0.26822 0.11895 0.13586 0.26895 0.11968

D.2 PEKERJAAN MEP PODIUM 0.80990 0.02284 0.01522 0.01522 0.00304 0.01620 0.01620 0.04454 0.04454 0.00891 0.00891 0.00891 0.00891 0.00891 0.04454 0.04454 0.11422 0.11422 0.04454 0.04454 0.04454 0.06146 0.07492

D.3 PEKERJAAN MEP (MID) 5.07977 0.01522 0.01522 0.00304 0.00508 0.17673 0.30375 0.30375 0.11155 0.11155 0.11155 0.11155 0.11155 0.55774 0.73175 0.41223 0.41223 0.41223 0.21207 0.17673 0.17673 0.30375 0.30375

D.4 PEKERJAAN MEP (MID HIGH) 5.72957 0.06351 0.08203 0.03755 0.03755 0.03755 0.38462 0.03755 0.38462 0.38462 0.38462 0.38462 0.38462 0.21743 0.34014 0.34014 0.34014 0.28126 0.28126 0.68690 0.63882

E INFRASTRUKTUR (POVSUM) 0.69180 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459

F SPECIAL LIGHTING (PROVSUM) 0.24418 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526

G PROVSUM SEKOLAH 1.00668 0.05033 0.05033 0.10067 0.15100 0.20134 0.20134 0.15100 0.05033 0.05033

H MARKETING GALERY 0.44303 0.13291 0.17721 0.13291

Progres Rencana Bulanan (R0) 100.000 2.680 1.850 1.587 1.453 0.828 0.798 0.724 3.053 3.999 4.510 4.840 4.833 4.778 4.777 4.770 4.754 4.750 1.490 4.627 4.771 4.706 4.603 0.890 0.890 0.890 0.890 0.890 4.243 3.985 3.684 3.176 2.458 1.543 0.718 0.563

Kumulatif Progres Rencana Bulanan (R0) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.974 16.973 21.483 26.323 31.156 35.933 40.711 45.481 50.236 54.986 56.476 61.103 65.874 70.579 75.182 76.071 76.961 77.851 78.740 79.630 83.873 87.858 91.542 94.718 97.176 98.719 99.437 100.00
Progres Realisasi Bulanan (R0) 2.680 1.850 1.587 1.970 0.417 2.509 0.354 2.591
Progres Rencana Bulanan (R1) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 3.264 2.850 2.798 3.333 2.475 4.372 4.605 4.475 4.506 0.775 0.775 0.775 0.775 0.775 4.022 2.836 3.496 3.021 2.784 2.562 2.291 2.088 2.133 2.137 1.922 1.749 1.558 1.412 1.376
Kumulatif Progres Rencana Bulanan (R1) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 31.325 34.175 36.974 40.306 42.782 47.154 51.759 56.235 60.741 61.515 62.290 63.065 63.840 64.614 68.636 71.472 74.968 77.989 80.773 83.336 85.626 87.714 89.847 91.984 93.906 95.654 97.212 98.624 100.00
Kumulatif Progres Realisasi Bulanan (R1) 0 2.680 4.529 6.117 8.087 8.504 11.013 11.366 13.957 16.426 18.426 21.084 25.495 28.296
Progres Rencana Bulanan (R2) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.142 2.638 2.819 2.693 3.737 3.768 3.856 4.054 0.836 0.836 0.836 0.836 0.836 4.047 3.948 3.844 3.499 3.273 2.922 2.738 2.573 2.631 2.685 2.046 1.872 1.612 1.385 0.974
Kumulatif Progres Rencana Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.210 34.848 37.667 40.360 44.096 47.864 51.720 55.773 56.609 57.444 58.280 59.115 59.951 63.998 67.946 71.790 75.289 78.562 81.484 84.222 86.795 89.426 92.111 94.157 96.029 97.641 99.026 100.00
Kumulatif Progres Realisasi Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 32.210 34.848 33.163 33.411
Progres Rencana Bulanan (R3) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.046 0.740 0.310 0.248 1.081 2.808 3.060 3.227 0.646 0.646 0.646 0.646 0.646 3.271 3.365 3.366 3.006 3.048 2.728 2.293 2.984 3.168 2.961 2.819 2.519 2.269 2.172 1.900 1.841 1.743 1.617 1.382 1.252 1.118 0.682 0.913 0.764
Kumulatif Progres Rencana Bulanan (R3) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.113 32.854 33.163 33.411 34.492 37.300 40.359 43.587 44.233 44.880 45.526 46.172 46.819 50.090 53.455 56.821 59.828 62.875 65.603 67.896 70.880 74.048 77.009 79.828 82.347 84.616 86.788 88.688 90.529 92.272 93.889 95.271 96.523 97.641 98.323 99.24 100.00
Kumulatif Progres Realisasi Bulanan (R3) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 31.548 32.854 32.854 32.854 33.887 36.435 38.685 40.028 40.548 40.865 53.146 53.283 42.178
Deviasi 0 1.378 0.948 0.076 0.917 0.234 -0.029 -0.565 0.000 -0.310 -0.558 -0.605 -0.865 -1.674 -3.559 -3.685 -4.014 7.620 7.111 -4.641

Jakarta, 01 November 2020


Disetujui oleh, Diperiksa oleh, Dibuat oleh,
Pemilik Proyek Konsultan MK Kontraktor
PT. Waskita FIM Perkasa Realty PT. Ciria Expertindo Consultant PT. Waskita Karya (Persero) Tbk.

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Manager Proyek Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
BULANAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
PROGRESS BULANAN : JULI 2023
TANGGAL : 30 JULI 2023

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 8.003% 0.000% 8.003% 8.003%

2.0 Pekerjaan Struktur Atas 31.062% 30.810% 0.000% 30.810% 30.810%

3.0 Pekerjaan Arsitektur 29.368% 16.370% 0.036% 16.406% 16.406%

4.0 Pekerjaan MEP (Provsum) 21.311% 13.140% 0.000% 13.140% 13.140%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.692% 0.000% 0.692% 0.692%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 1.007% 0.000% 1.007% 1.007%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 70.465% 0.036% 70.501% 70.501%

Grand Total 100.000% 78.335% 0.036% 78.371% 78.371%

Keterangan :
Progress Rencana : 95,901%
Progress Aktual : 78,371%
Deviasi : -17,53%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Dowang Fernando Sekti Ali Zainal Abidin


Project Director Management Construction Project Manager
JADWAL PELAKSANAAN DAN KURVA S (R3)
PROYEK APARTEMEN SOLTERRA PLACE, PEJATEN
1.081 3.232 3.006 3.048 2.728 2.293 2.984 3.168 2.961 2.819 2.519 2.269 2.172 1.900 1.841 1.743 1.617 1.382 1.252 1.118 0.682 0.913
WAKTU PELAKSANAAN
NO URAIAN BOBOT
Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
A PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan Pondasi 1.27329 0.9431 0.0512 0.0512 0.0192 0.0695 0.0695 0.0695
2 Pekerjaan Persiapan SAMEP 8.00272 0.0512 0.0512 0.2858 0.2163 0.1520 0.0856 0.1329 0.21400 0.21400 0.21400 0.21400 0.21400 0.23831 0.23831 0.23831 0.30993 0.24795 0.24795 0.30993 0.24795 0.24795 0.30993 0.24795 0.30993 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561

B.1 PEKERJAAN PONDASI


1 Pekerjaan Bored Pile dan Soldier Pile 6.59712 1.7367 1.7472 1.4849 1.0974 0.3382 0.0643 0.0643 0.0643

B.2 PEKERJAAN STRUKTUR ATAS


B.2.1 Pekerjaan Tanah dan Lain-Lain
1 Pekerjaan Tanah dan Lain-Lain 1.01849 0.05092 0.20370 0.20370 0.05092 0.20370 0.20370 0.10185

B.2.2 Pekerjaan Struktur Beton Bertulang Bassement


1 Struktur Lantai - Bassement 3 6.17282 0.30864 0.24219 1.14596 1.48187 1.14271 0.83317 0.48554 0.53275
2 Struktur Lantai - Bassement 2 1.58058 0.07903 0.23709 0.24966 0.31612 0.23709 0.11854 0.07903 0.08801 0.08801 0.08801
3 Struktur Lantai - Bassement 1 1.91000 0.38200 0.28650 0.28650 0.28650 0.33425 0.04137 0.04137 0.10575 0.00955 0.06810 0.06810
4 Struktur Lantai - Ground Floor 2.15722 0.21572 0.21572 0.49926 0.39554 0.46118 0.07982 0.07982 0.04260 0.05585 0.05585 0.05585
5 Struktur Lantai - Pondasi ME 0.08130 0.02439 0.02439 0.03252

B.2.3 Pekerjaan Struktur Beton Bertulang Parkir


1 Struktur Lantai Parkir 2A (2 nd) 0.54541 0.06138 0.16362 0.16362 0.02727 0.06476 0.06476
2 Struktur Lantai Sekolah 2B-3A (3 rd) 0.57015 0.06757 0.27073 0.18212 0.02851 0.01061 0.01061
3 Struktur Lantai Sekolah 3B - 4A (4 rd) 0.60329 0.15082 0.18099 0.18099 0.03016 0.03016 0.03016
4 Struktur Lantai Sekolah 4B - 5A (5 rd) 0.62797 0.15699 0.18839 0.18839 0.03140 0.03140 0.03140
5 Struktur Lantai Parkir 5B-6A-6B (6-6B) 0.77859 0.19465 0.23358 0.16691 0.06115 0.06115 0.06115

B.2.4 Pekerjaan Struktur Beton Bertulang Mid Apartment


1 Struktur Lantai 7 0.69526 0.27811 0.20858 0.13905 0.06953
2 Struktur Lantai 8 0.26490 0.10596 0.07947 0.05298 0.02649
3 Struktur Lantai 9 0.27242 0.10897 0.08173 0.05448 0.02724
4 Struktur Lantai 10 0.27242 0.10897 0.08173 0.05448 0.02724
5 Struktur Lantai 11 0.27242 0.08173 0.13621 0.02724 0.02724
6 Struktur Lantai 12 0.26544 0.07963 0.13272 0.02654 0.02654
7 Struktur Lantai 13 0.24943 0.07483 0.07483 0.06236 0.03741
8 Struktur Lantai 14 0.24943 0.07483 0.07483 0.06236 0.03741
9 Struktur Lantai 15 0.24943 0.09977 0.09977 0.02494 0.02494
10 Struktur Lantai 16 0.26006 0.10402 0.10402 0.02601 0.02601
11 Struktur Lantai 17 Refugee 0.31022 0.09307 0.06204 0.01034 0.14477
12 Struktur Lantai 18 0.24983 0.07495 0.09993 0.01249 0.06246
13 Struktur Lantai 19 0.24943 0.07483 0.09977 0.00998 0.06485
14 Struktur Lantai 20 0.24943 0.09977 0.00416 0.14550
15 Struktur Lantai 21
16 Struktur Lantai 22
0.24943
0.24094
0.09977 0.00416 0.01455 0.13095
0.24094
REALISASI
17 Struktur Lantai 23 0.22784 0.22784
18 Struktur Lantai 24 0.22784 0.22784
19 Struktur Lantai 25 0.22784 0.05696 0.17088
20 Struktur Lantai 26 0.22784 0.22784
21 Struktur Lantai 27 0.22784 0.22784
22 Struktur Lantai 28 0.22784 0.22784
Topping Off Tower Mid
23 Struktur Lantai 29 0.22784 0.05696 0.17088
September 2020
24 Struktur Lantai 30 0.22784 0.22784
25 Struktur Lantai 31 0.23341 0.23341
26 Struktur Lantai Atap (R1) Lt 32 0.19391 0.0485 0.14543
27 Struktur Lantai Atap Lift (Lmr) 0.02614 0.02614

B.2.5 Pekerjaan Struktur Beton Bertulang Mid High Apartment


1 Struktur Lantai 2 0.25860 0.25860
2 Struktur Lantai 3 0.26012 0.26012
3 Struktur Lantai 4 0.26012 0.26012
4 Struktur Lantai 5 0.26012 0.26012
5 Struktur Lantai 6 0.26012 0.06503 0.19509
6 Struktur Lantai 7 0.26012 0.26012
7 Struktur Lantai 8 0.25272 0.25272
8 Struktur Lantai 9 0.25256 0.06314 0.18942
9
10
Struktur Lantai 10
Struktur Lantai 11
0.25256
0.25256
KURVA-S R0 0.25256
0.25256
11 Struktur Lantai 12 0.24946 0.12473 0.12473
12 Struktur Lantai 13 0.25083 0.25083
13 Struktur Lantai 14 Refugee 0.30823 0.30823
14 Struktur Lantai 15 0.20650 0.04130 0.16520
15 Struktur Lantai 16 0.20172 0.20172
16 Struktur Lantai 17 0.23860 0.23860
17 Struktur Lantai 18 0.23590 0.23590
18 Struktur Lantai 19 0.23560 0.23560

KURVA-S R1
19 Struktur Lantai 20 0.23560 0.05890 0.17670
20 Struktur Lantai 21 0.23560 0.23560
21 Struktur Lantai 22 0.22773 0.22773
22 Struktur Lantai 23 0.21639 0.21639
23 Struktur Lantai 24 0.21639 0.21639
24 Struktur Lantai 25 0.21639 0.21639
25 Struktur Lantai 26 0.21639 0.21639
26 Struktur Lantai 27 0.21639 0.21639
Topping Off Tower
27 Struktur Lantai 28 0.21639 0.21639
Mid High
28 Struktur Lantai 29 0.21639 0.21639
Oktober 2021
29
30
Struktur Lantai 30
Struktur Lantai 31
0.21639
0.22077 KURVA-S R2 0.21639
0.22077
31 Struktur Lantai Atap (R1) Lt 32 0.20610 0.20610
32 Struktur Lantai Atap Lift (Lmr) 0.02579 0.02579

B.2.6 Pekerjaan Struktur Baja


1 Pekerjaan Struktur Baja 0.76053 0.15211 0.15211 0.15211 0.15211 0.15211

C PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN ARSITEKTUR PODIUM

KURVA-S R3
C.1.1 PEKERJAAN ARSITEKTUR BASEMENT
1 ARSITEKTUR LANTAI BASEMENT 3 0.44927 0.17993 0.04992 0.02438 0.02438 0.00488 0.01829 0.01829 0.01829 0.01829 0.01829 0.05608 0.01829
2 ARSITEKTUR LANTAI BASEMENT 2 0.44960 0.04996 0.03996 0.03996 0.00400 0.02798 0.02798 0.02798 0.02798 0.02798 0.02798 0.05595 0.02798 0.06394
3 ARSITEKTUR LANTAI BASEMENT 1 0.92888 0.03547 0.08934 0.00893 0.02798 0.05956 0.05956 0.08934 0.11019 0.11019 0.11019 0.05956 0.05956 0.08429 0.02473

C.1.2 PEKERJAAN ARSITEKTUR PARKIR (TW 1)


1 ARSITEKTUR LANTAI 2 0.20021 0.01614 0.05975 0.01614 0.01614 0.05975 0.01614 0.01614
2 ARSITEKTUR LANTAI 3 0.21576 0.04749 0.04749 0.04749 0.02415 0.03040 0.01873
3 ARSITEKTUR LANTAI 4 0.29318 0.05576 0.05576 0.03633 0.04844 0.04844 0.04844
4 ARSITEKTUR LANTAI 5 0.21934 0.05519 0.05519 0.02724 0.02724 0.02724 0.02724
5 ARSITEKTUR LANTAI 6 0.16478 0.04407 0.04407 0.01916 0.01916 0.01916 0.01916
6 ARSITEKTUR LANTAI 6B 0.05987 0.01301 0.01301 0.00846 0.00846 0.00846 0.00846
7 ARSITEKTUR FAÇADE 0.64741 0.07193 0.07193 0.00799 0.00647 0.04316 0.07985 0.07985 0.07985 0.07627 0.07627 0.01794 0.01794 0.01794

C.2 PEKERJAAN ARSITEKTUR TOWER 1 (MID)


1 ARSITEKTUR LANTAI GROUND FLOOR 0.80140 0.06883 0.12021 0.16028 0.11069 0.07507 0.00572 0.01472 0.07620 0.06874 0.02219 0.05654 0.02219
2 ARSITEKTUR LANTAI 7 0.57527 0.02876 0.11621 0.06606 0.08106 0.00719 0.05606 0.10439 0.11554
3 ARSITEKTUR LANTAI 8 0.29915 0.08677 0.03540 0.03540 0.00590 0.02540 0.07489 0.03540
4 ARSITEKTUR LANTAI 9 0.34681 0.01734 0.00289 0.02540 0.09135 0.08268 0.12716
5 ARSITEKTUR LANTAI 10 0.34681 0.01734 0.00289 0.00347 0.06936 0.08670 0.16705
6 ARSITEKTUR LANTAI 11 0.34681 0.01734 0.00289 0.00347 0.06936 0.08670 0.16705
7 ARSITEKTUR LANTAI 12 0.34681 0.00347 0.06936 0.06936 0.05896 0.06936 0.05549 0.02081
8 ARSITEKTUR LANTAI 13 0.34681 0.00347 0.06936 0.05202 0.05202 0.06307 0.08952 0.01734
9 ARSITEKTUR LANTAI 14 0.34681 0.00347 0.05202 0.05202 0.10404 0.05896 0.05896 0.01734
10 ARSITEKTUR LANTAI 15 0.34681 0.01734 0.05202 0.01734 0.10404 0.08670 0.05202 0.01734
11 ARSITEKTUR LANTAI 16 0.35268 0.01763 0.01763 0.05290 0.10580 0.10580 0.03527 0.01763
12 ARSITEKTUR LANTAI 17. REFUGEE 0.12922 0.00646 0.00646 0.03877 0.03877 0.03230 0.00646
13 ARSITEKTUR LANTAI 18 0.34681 0.01734 0.03468 0.08670 0.08670 0.08670 0.01734 0.01734
14 ARSITEKTUR LANTAI 19 0.34681 0.01734 0.05202 0.06936 0.06936 0.06936 0.05202 0.01734
15 ARSITEKTUR LANTAI 20 0.34681 0.05202 0.05202 0.10404 0.10404 0.01734 0.01734
16 ARSITEKTUR LANTAI 21 0.34681 0.05202 0.05202 0.10404 0.10404 0.01734 0.01734
17 ARSITEKTUR LANTAI 22 0.34681 0.08670 0.10404 0.10404 0.01734 0.01734 0.01734
18 ARSITEKTUR LANTAI 23 0.34681 0.08670 0.10404 0.10404 0.01734 0.01734 0.01734
19 ARSITEKTUR LANTAI 24 0.34681 0.08670 0.08670 0.07514 0.04046 0.03578 0.02202
20 ARSITEKTUR LANTAI 25 0.34681 0.08670 0.08670 0.06358 0.04046 0.04734 0.02202
21 ARSITEKTUR LANTAI 26 0.34681 0.01734 0.08670 0.10404 0.05202 0.06936 0.01734
22 ARSITEKTUR LANTAI 27 0.34681 0.01734 0.08670 0.10404 0.05202 0.06936 0.01734
23 ARSITEKTUR LANTAI 28 0.34681 0.01734 0.05202 0.08670 0.10404 0.06936 0.01734
24 ARSITEKTUR LANTAI 29 0.34681 0.01734 0.05202 0.08670 0.10404 0.06936 0.01734
25 ARSITEKTUR LANTAI 30 0.34681 0.01734 0.05202 0.08670 0.10404 0.06936 0.01734
26 ARSITEKTUR LANTAI 31 0.37941 0.01897 0.05691 0.09485 0.11382 0.03794 0.05691
27 ARSITEKTUR LANTAI ATAP 0.07756 0.03878 0.03878
28 ARSITEKTUR LANTAI LMR 0.03830 0.03830
29 ARSITEKTUR FAÇADE 2.52527 0.07576 0.07576 0.07576 0.00963 0.00505 0.16714 0.27778 0.44066 0.44066 0.44066 0.44066 0.07576

C.3 PEKERJAAN ARSITEKTUR TOWER 2 (MID HIGH)


1 ARSITEKTUR LANTAI GROUND FLOOR 1.02215 0.05111 0.10221 0.10221 0.10221 0.05111 0.15332 0.20443 0.15332 0.05111 0.05111
2 ARSITEKTUR LANTAI 2 0.34723 0.01736 0.05208 0.06945 0.06945 0.06945 0.06945
3 ARSITEKTUR LANTAI 3 0.34723 0.01736 0.05208 0.06945 0.06945 0.06945 0.06945
4 ARSITEKTUR LANTAI 4 0.34723 0.05208 0.06945 0.06945 0.06945 0.08681
5 ARSITEKTUR LANTAI 5 0.34723 0.03472 0.05208 0.06945 0.08681 0.08681 0.01736
6 ARSITEKTUR LANTAI 6 0.34723 0.03472 0.05208 0.06945 0.08681 0.06945 0.01736 0.01736
7 ARSITEKTUR LANTAI 7 0.34723 0.01736 0.05208 0.06945 0.08681 0.01736 0.10417
8 ARSITEKTUR LANTAI 8 0.34723 0.01736 0.05208 0.06945 0.06945 0.03472 0.08681 0.01736
9 ARSITEKTUR LANTAI 9 0.34723 0.01736 0.05208 0.08681 0.01736 0.08681 0.08681
10 ARSITEKTUR LANTAI 10 0.34723 0.01736 0.05208 0.08681 0.01736 0.08681 0.08681
11 ARSITEKTUR LANTAI 11 0.34723 0.01736 0.05208 0.01736 0.08681 0.08681 0.08681
12 ARSITEKTUR LANTAI 12 0.34723 0.01736 0.05208 0.01736 0.08681 0.08681 0.08681
13 ARSITEKTUR LANTAI 13 0.36120 0.01806 0.05418 0.01806 0.09030 0.09030 0.07224 0.01806
14 ARSITEKTUR LANTAI 14 REFUGEE 0.09124 0.00456 0.00456 0.02281 0.02281 0.02281 0.01369
15 ARSITEKTUR LANTAI 15 0.22581 0.01129 0.01129 0.05645 0.05645 0.05645 0.02258 0.01129
16 ARSITEKTUR LANTAI 16 0.25293 0.01265 0.03794 0.06323 0.06323 0.06323 0.01265
17 ARSITEKTUR LANTAI 17 0.34723 0.01736 0.06945 0.08681 0.08681 0.08681
18 ARSITEKTUR LANTAI 18 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
19 ARSITEKTUR LANTAI 19 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
20 ARSITEKTUR LANTAI 20 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
21 ARSITEKTUR LANTAI 21 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
22 ARSITEKTUR LANTAI 22 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
23 ARSITEKTUR LANTAI 23 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
24 ARSITEKTUR LANTAI 24 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
25 ARSITEKTUR LANTAI 25 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
26 ARSITEKTUR LANTAI 26 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
27 ARSITEKTUR LANTAI 27 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
28 ARSITEKTUR LANTAI 28 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
29 ARSITEKTUR LANTAI 29 0.34723 0.01736 0.05208 0.08681 0.08681 0.08681 0.01736
30 ARSITEKTUR LANTAI 30 0.34723 0.01736 0.05208 0.06945 0.06945 0.06945 0.05208 0.01736
31 ARSITEKTUR LANTAI 31 0.37983 0.01899 0.05697 0.09496 0.09496 0.07597 0.03798
32 ARSITEKTUR LANTAI ATAP 0.06570 0.02628 0.03942
33 ARSITEKTUR LANTAI LMR 0.03927 0.03927
34 ARSITEKTUR FAÇADE 2.50614 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061 0.25061

D.1 PEKERJAAN ME BASEMENT 9.69211 0.04567 0.04567 0.02284 0.01522 0.01522 0.00304 0.01454 0.20910 0.20910 0.20910 0.32339 0.32339 0.35376 0.64808 0.64808 0.64808 0.41661 0.41661 0.41661 0.39938 0.51846 0.51846 0.51846 0.51846 0.51846 0.26822 0.26822 0.26822 0.26822 0.11895 0.13586 0.26895 0.11968

D.2 PEKERJAAN MEP PODIUM 0.80990 0.02284 0.01522 0.01522 0.00304 0.01620 0.01620 0.04454 0.04454 0.04454 0.04454 0.04454 0.11422 0.11422 0.04454 0.04454 0.04454 0.06146 0.07492

D.3 PEKERJAAN MEP (MID) 5.07977 0.01522 0.01522 0.00304 0.00508 0.17673 0.30375 0.30375 0.55774 0.55774 0.73175 0.41223 0.41223 0.41223 0.21207 0.17673 0.17673 0.30375 0.30375

D.4 PEKERJAAN MEP (MID HIGH) 5.72957 0.06351 0.08203 0.03755 0.03755 0.03755 0.38462 0.03755 0.38462 0.38462 0.38462 0.38462 0.38462 0.21743 0.34014 0.34014 0.34014 0.28126 0.28126 0.68690 0.63882

E INFRASTRUKTUR (POVSUM) 0.69180 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459

F SPECIAL LIGHTING (PROVSUM) 0.24418 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526

G PROVSUM SEKOLAH 1.00668 0.05033 0.05033 0.10067 0.15100 0.20134 0.20134 0.15100 0.05033 0.05033

H MARKETING GALERY 0.44303 0.13291 0.17721 0.13291

Progres Rencana Bulanan (R0) 100.000 2.680 1.850 1.587 1.453 0.828 0.798 0.724 3.053 3.999 4.510 4.840 4.833 4.778 4.777 4.770 4.754 4.750 1.490 4.627 4.771 4.706 4.603 4.448 4.243 3.985 3.684 3.176 2.458 1.543 0.718 0.563

Kumulatif Progres Rencana Bulanan (R0) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.974 16.973 21.483 26.323 31.156 35.933 40.711 45.481 50.236 54.986 56.476 61.103 65.874 70.579 75.182 79.630 83.873 87.858 91.542 94.718 97.176 98.719 99.437 100.00
Progres Realisasi Bulanan (R0) 2.680 1.850 1.587 1.970 0.417 2.509 0.354 2.591
Progres Rencana Bulanan (R1) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 3.264 2.850 2.798 3.333 2.475 4.372 4.605 4.475 4.506 3.874 4.022 2.836 3.496 3.021 2.784 2.562 2.291 2.088 2.133 2.137 1.922 1.749 1.558 1.412 1.376
Kumulatif Progres Rencana Bulanan (R1) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 31.325 34.175 36.974 40.306 42.782 47.154 51.759 56.235 60.741 64.614 68.636 71.472 74.968 77.989 80.773 83.336 85.626 87.714 89.847 91.984 93.906 95.654 97.212 98.624 100.00
Kumulatif Progres Realisasi Bulanan (R1) 0 2.680 4.529 6.117 8.087 8.504 11.013 11.366 13.957 16.426 18.426 21.084 25.495 28.296
Progres Rencana Bulanan (R2) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.142 2.638 2.819 2.693 3.737 3.768 3.856 4.054 4.178 4.047 3.948 3.844 3.499 3.273 2.922 2.738 2.573 2.631 2.685 2.046 1.872 1.612 1.385 0.974
Kumulatif Progres Rencana Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.210 34.848 37.667 40.360 44.096 47.864 51.720 55.773 59.951 63.998 67.946 71.790 75.289 78.562 81.484 84.222 86.795 89.426 92.111 94.157 96.029 97.641 99.026 100.00
Kumulatif Progres Realisasi Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 32.210 34.848 33.163 33.411
Progres Rencana Bulanan (R3) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.046 0.740 0.310 0.248 1.081 2.808 3.060 3.227 3.232 3.271 2.692 4.039 3.006 3.048 2.728 2.293 2.984 3.168 2.961 2.819 2.519 2.269 2.172 1.900 1.841 1.743 1.617 1.382 1.252 1.118 0.682 0.913 0.764
Kumulatif Progres Rencana Bulanan (R3) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.113 32.854 33.163 33.411 34.492 37.300 40.359 43.587 46.819 50.090 52.782 56.821 59.828 62.875 65.603 67.896 70.880 74.048 77.009 79.828 82.347 84.616 86.788 88.688 90.529 92.272 93.889 95.271 96.523 97.641 98.323 99.24 100.00
Kumulatif Progres Realisasi Bulanan (R3) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 31.548 32.854 32.854 32.854 33.887 36.435 38.290 39.931 42.178 43.360 44.822 46.865 48.543 50.357 51.178 51.640 52.898 54.763 56.494 58.917 60.396 62.943 63.808 65.221 67.641 68.852 69.848 70.659 71.261 71.886 72.695 73.417 78.371
Deviasi 0 1.378 0.948 0.076 0.917 0.234 -0.029 -0.565 0.000 -0.310 -0.558 -0.605 -0.865 -2.069 -3.656 -4.641 -6.729 -7.960 -9.956 -11.285 -12.519 -14.425 -16.256 -17.982 -19.284 -20.515 -20.911 -21.951 -21.674 -22.979 -23.466 -22.888 -23.420 -24.040 -24.612 -25.262 -25.755 -25.627 -25.819 -21.629

Jakarta, 30 Oktober 2022


Disetujui oleh, Diperiksa oleh, Dibuat oleh,
Pemilik Proyek Konsultan MK Kontraktor
PT. Waskita FIM Perkasa Realty PT. Ciria Expertindo Consultant PT. Waskita Karya (Persero) Tbk.

Iwan Sitohang Sekti Ali Zainal Abidin


Project Director Management Construction Project Manager
JADWAL PELAKSANAAN DAN KURVA S (REVISI.4)
PROYEK PEMBANGUNAN APARTEMEN SOLTERRA PLACE - JAKARTA SELATAN

2018 2019 2020 2021 2022 2023


NO URAIAN BOBOT
Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

A PEKERJAAN PERSIAPAN

1 Pekerjaan Persiapan Pondasi 1.27329 0.9431 0.0512 0.0512 0.0192 0.0695 0.0695 0.0695

2 Pekerjaan Persiapan SAMEP 8.00272 0.0512 0.0512 0.2858 0.2163 0.1520 0.0856 0.1329 0.2140 0.2140 0.2140 0.2140 0.2140 0.2383 0.2383 0.2383 - - 0.2479 0.5021 0.2479 0.1117 0.1117 0.1117 0.1117 0.1117 0.1117 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906

B.1 PEKERJAAN PONDASI

1 Pekerjaan Bored Pile dan Soldier Pile 6.59712 1.7367 1.7472 1.4849 1.0974 0.3382 0.0643 0.0643 0.0643

B.2 PEKERJAAN STRUKTUR ATAS

B.2.1 Pekerjaan Tanah dan Lain-Lain

1 Pekerjaan Tanah dan Lain-Lain 1.01849 0.0509 0.2037 0.2037 0.0509 0.2037 0.2037 0.1018

B.2.2 Pekerjaan Struktur Beton Bertulang Bassement

1 Struktur Lantai - Bassement 3 6.17282 0.3086 0.2422 1.1460 1.4819 1.1427 0.8332 0.4855 0.5327

2 Struktur Lantai - Bassement 2 1.58058 0.0790 0.2371 0.2497 0.3161 0.2371 0.1185 0.0790 0.0880 0.0880 0.0880

3 Struktur Lantai - Bassement 1 1.91000 0.3820 0.2865 0.2865 0.2865 0.3343 0.0414 0.0414 0.1058 0.0096 0.0681 0.0681

4 Struktur Lantai - Ground Floor 2.15722 0.2157 0.2157 0.4993 0.3955 0.4612 0.0798 0.0798 0.0426 0.0558 0.0558 0.0558

5 Struktur Lantai - Pondasi ME 0.08130 0.0244 0.0244 0.0325

B.2.3 Pekerjaan Struktur Beton Bertulang Parkir

1 Struktur Lantai Parkir 2A (2 nd) 0.54541 0.0614 0.1636 0.1636 0.0273 0.0648 0.0648

2 Struktur Lantai Sekolah 2B-3A (3 rd) 0.57015 0.0676 0.2707 0.1821 0.0285 0.0106 0.0106

3 Struktur Lantai Sekolah 3B - 4A (4 rd) 0.60329 0.1508 0.1810 0.1810 0.0302 0.0302 0.0302

4 Struktur Lantai Sekolah 4B - 5A (5 rd) 0.62797 0.1570 0.1884 0.1884 0.0314 0.0314 0.0314

5 Struktur Lantai Parkir 5B-6A-6B (6-6B) 0.77859 0.1946 0.2336 0.1669 0.0612 0.0612 0.0612

B.2.4 Pekerjaan Struktur Beton Bertulang Mid Apartment

1 Struktur Lantai 7 0.69526 0.2781 0.2086 0.1391 0.0695

2 Struktur Lantai 8 0.26490 0.1060 0.0795 0.0530 0.0265

3 Struktur Lantai 9 0.27242 0.1090 0.0817 0.0545 0.0272

4 Struktur Lantai 10 0.27242 0.1090 0.0817 0.0545 0.0272

5 Struktur Lantai 11 0.27242 0.0817 0.1362 0.0272 0.0272

6 Struktur Lantai 12 0.26544 0.0796 0.1327 0.0265 0.0265

7 Struktur Lantai 13 0.24943 0.0748 0.0748 0.0624 0.0374

8 Struktur Lantai 14 0.24943 0.0748 0.0748 0.0624 0.0374

9 Struktur Lantai 15 0.24943 0.0998 0.0998 0.0249 0.0249

10 Struktur Lantai 16 0.26006 0.1040 0.1040 0.0260 0.0260

11 Struktur Lantai 17 Refugee 0.31022 0.0931 0.0620 0.0103 0.1448

12 Struktur Lantai 18 0.24983 0.0749 0.0999 0.0125 0.0625

13 Struktur Lantai 19 0.24943 0.0748 0.0998 0.0100 0.0649

14 Struktur Lantai 20 0.24943 0.0998 0.0042 0.1455 REALISASI


15 Struktur Lantai 21 0.24943 0.0998 0.0042 0.0145 0.1309

16 Struktur Lantai 22 0.24094 0.2409

17 Struktur Lantai 23 0.22784 0.2278

18 Struktur Lantai 24 0.22784 0.2278

19 Struktur Lantai 25 0.22784 0.0570 0.1709

20 Struktur Lantai 26 0.22784 0.2278

21 Struktur Lantai 27 0.22784 0.2278


KURVA-S R4
22 Struktur Lantai 28 0.22784 0.2278

23 Struktur Lantai 29 0.22784 0.0342 0.1937

24 Struktur Lantai 30 0.22784 0.2278

25 Struktur Lantai 31 0.23341 0.2334

26 Struktur Lantai Atap (R1) Lt 32 0.19391 0.0485 0.1454

27 Struktur Lantai Atap Lift (Lmr) 0.02614 0.0261

B.2.5 Pekerjaan Struktur Beton Bertulang Mid High Apartmen

1 Struktur Lantai 2 0.25860 0.2586

2 Struktur Lantai 3 0.26012 0.2601

3 Struktur Lantai 4 0.26012 0.2601

4 Struktur Lantai 5 0.26012 0.0951 0.1650

5 Struktur Lantai 6 0.26012 0.0650 0.1951

6 Struktur Lantai 7 0.26012 0.2601

7 Struktur Lantai 8 0.25272 0.2527

8 Struktur Lantai 9 0.25256 0.0631 0.1894

9 Struktur Lantai 10 0.25256 0.1263 0.0263 0.0500 0.0500

10 Struktur Lantai 11 0.25256 0.1263 0.0263 0.0500 0.0500

11 Struktur Lantai 12 0.24946 0.1022 0.0473 0.0500 0.0500

12 Struktur Lantai 13 0.25083 0.0254 0.0754 0.1500

13 Struktur Lantai 14 Refugee 0.30823


KURVA-S R0 0.0541 0.1039 0.1502

14 Struktur Lantai 15 0.20650 0.0066 0.0652 0.1347

15 Struktur Lantai 16 0.20172 0.0317 0.0700 0.1000

16 Struktur Lantai 17 0.23860 0.1386 0.1000


KURVA-S R1
17 Struktur Lantai 18 0.23590 0.1359 0.1000

18 Struktur Lantai 19 0.23560 0.1356 0.1000

19 Struktur Lantai 20 0.23560


KURVA-S R3 0.0384 0.1472 0.0500

20 Struktur Lantai 21
KURVA-S R2
0.23560 0.1356 0.1000

21 Struktur Lantai 22 0.22773 0.1277 0.1000

22 Struktur Lantai 23 0.21639 0.1031 0.1133

23 Struktur Lantai 24 0.21639 0.2164

24 Struktur Lantai 25 0.21639 0.2164

25 Struktur Lantai 26 0.21639 0.2164

26 Struktur Lantai 27 0.21639 0.2164

27 Struktur Lantai 28 0.21639 0.2164

28 Struktur Lantai 29 0.21639 0.2164

29 Struktur Lantai 30 0.21639 0.2164

30 Struktur Lantai 31 0.22077 0.2208

31 Struktur Lantai Atap (R1) Lt 32 0.20610 0.2061

32 Struktur Lantai Atap Lift (Lmr) 0.02579 0.0258

B.2.6 Pekerjaan Struktur Baja

1 Pekerjaan Struktur Baja 0.76053 0.1521 0.1521 0.1521 0.1521 0.1521

C PEKERJAAN ARSITEKTUR

C.1 PEKERJAAN ARSITEKTUR PODIUM

C.1.1 PEKERJAAN ARSITEKTUR BASEMENT

1 ARSITEKTUR LANTAI BASEMENT 3 0.44927 0.1799 0.0499 0.0244 0.0244 0.0049 0.0183 0.0183 0.0183 0.0183 0.0183 0.0516 0.0003 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011

2 ARSITEKTUR LANTAI BASEMENT 2 0.44960 0.0500 0.0400 0.0400 0.0040 0.0280 0.0280 0.0280 0.0280 0.0280 0.0280 0.0560 0.0280 0.0415 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011

3 ARSITEKTUR LANTAI BASEMENT 1 0.92888 0.0355 0.0893 0.0089 0.0280 0.0596 0.0596 0.0893 0.0893 0.1102 0.1285 0.0596 0.1024 0.0473 0.0064 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008

C.1.2 PEKERJAAN ARSITEKTUR PARKIR (TW 1)

1 ARSITEKTUR LANTAI 2 0.20021 0.0161 0.0598 0.0161 0.0135 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047

2 ARSITEKTUR LANTAI 3 0.21576 0.0475 0.0324 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068

HOLD MENUNGGU IMB PERUBAHAN


3 ARSITEKTUR LANTAI 4 0.29318 0.0059 0.0093 0.0093 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0320 0.0320

4 ARSITEKTUR LANTAI 5 0.21934 0.0010 0.0019 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0298 0.0198

5 ARSITEKTUR LANTAI 6 0.16478 0.0082 0.0082 0.0124 0.0124 0.0124 0.0124 0.0110 0.0110 0.0110 0.0110 0.0110 0.0110 0.0062 0.0062 0.0062 0.0062 0.0021 0.0021 0.0021 0.0021

6 ARSITEKTUR LANTAI 6B 0.05987 0.0130 0.0130 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015

7 ARSITEKTUR FAÇADE 0.64741 0.0719 0.0719 0.0080 0.0065 0.0432 0.0798 0.0647 0.0647 0.0877 0.0763 0.0179 0.0179 0.0179 0.0088 0.0100

C.2 PEKERJAAN ARSITEKTUR TOWER 1 (MID)

1 ARSITEKTUR LANTAI GROUND FLOOR 0.80140 0.0688 0.1202 0.1603 0.1107 0.0751 0.0057 0.0147 0.0762 0.0147 0.0222 0.0565 0.0661 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004

2 ARSITEKTUR LANTAI 7 0.57527 0.0288 0.1162 0.0661 0.0811 0.0072 0.0197 0.1044 0.0197 0.0441 0.0441 0.0353 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004

3 ARSITEKTUR LANTAI 8 0.29915 0.0868 0.0354 0.0354 0.0059 0.0254 0.0749 0.0354

4 ARSITEKTUR LANTAI 9 0.34681 0.0173 0.0029 0.0254 0.0913 0.0198 0.0063 0.0063 0.0063 0.0570 0.0570 0.0570

5 ARSITEKTUR LANTAI 10 0.34681 0.0173 0.0029 0.0035 0.0694 0.0354 0.0073 0.0073 0.0073 0.0655 0.0655 0.0655

6 ARSITEKTUR LANTAI 11 0.34681 0.0173 0.0029 0.0035 0.0694 0.0354 0.0073 0.0073 0.0073 0.0655 0.0655 0.0655

7 ARSITEKTUR LANTAI 12 0.34681 0.0694 0.0354 0.0081 0.0081 0.0081 0.0545 0.0545 0.0087 0.0263 0.0039 0.0050 0.0350 0.0300

8 ARSITEKTUR LANTAI 13 0.34681 0.0694 0.0354 0.0081 0.0081 0.0081 0.0545 0.0545 0.0087 0.0251 0.0052 0.0050 0.0350 0.0300

9 ARSITEKTUR LANTAI 14 0.34681 0.0513 0.0354 0.0087 0.0087 0.0087 0.0585 0.0585 0.0087 0.0271 0.0013 0.0050 0.0400 0.0350

10 ARSITEKTUR LANTAI 15 0.34681 0.0173 0.0110 0.0110 0.0110 0.0329 0.0173 0.0087 0.0238 0.0050 0.0038 0.0050 0.0900 0.0900 0.0200

11 ARSITEKTUR LANTAI 16 0.35268 0.0176 0.0112 0.0112 0.0112 0.0335 0.0176 0.0088 0.0242 0.0066 0.0042 0.0066 0.0900 0.0900 0.0200

12 ARSITEKTUR LANTAI 17. REFUGEE 0.12922 0.0065 0.0041 0.0041 0.0041 0.0123 0.0065 0.0032 0.0089 0.0054 0.0089 0.0054 0.0300 0.0300

13 ARSITEKTUR LANTAI 18 0.34681 0.0116 0.0116 0.0116 0.0231 0.0173 0.0087 0.0263 0.0048 0.0048 0.0148 0.0148 0.0148 0.0348 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0348

14 ARSITEKTUR LANTAI 19 0.34681 0.0116 0.0116 0.0116 0.0231 0.0173 0.0087 0.0263 0.0048 0.0048 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0348

15 ARSITEKTUR LANTAI 20 0.34681 0.0116 0.0116 0.0116 0.0231 0.0173 0.0087 0.0263 0.0048 0.0048 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0348

16 ARSITEKTUR LANTAI 21 0.34681 0.0116 0.0116 0.0116 0.0173 0.0087 0.0286 0.0086 0.0043 0.1073 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0383

17 ARSITEKTUR LANTAI 22 0.34681 0.0116 0.0116 0.0116 0.0173 0.0087 0.0286 0.0086 0.0043 0.1073 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0383

18 ARSITEKTUR LANTAI 23 0.34681 0.0116 0.0116 0.0116 0.0173 0.0087 0.0286 0.0036 0.0036 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0236 0.0236

19 ARSITEKTUR LANTAI 24 0.34681 0.0116 0.0116 0.0173 0.0087 0.0286 0.0035 0.0035 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0235 0.0235

20 ARSITEKTUR LANTAI 25 0.34681 0.0116 0.0116 0.0173 0.0087 0.0286 0.0035 0.0035 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0235 0.0235

21 ARSITEKTUR LANTAI 26 0.34681 0.0087 0.0087 0.0173 0.0087 0.0286 0.0037 0.0037 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0237 0.0237

22 ARSITEKTUR LANTAI 27 0.34681 0.0520 0.0173 0.0087 0.0286 0.0014 0.0014 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0214 0.0214

23 ARSITEKTUR LANTAI 28 0.34681 0.0520 0.0173 0.0087 0.0286 0.0014 0.0014 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0214 0.0214

24 ARSITEKTUR LANTAI 29 0.34681 0.0520 0.0590 0.0087 0.0286 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095

25 ARSITEKTUR LANTAI 30 0.34681 0.0173 0.0087 0.0286 0.0033 0.0033 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0233 0.0233

26 ARSITEKTUR LANTAI 31 0.37941 0.0190 0.0095 0.0286 0.0047 0.0047 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0047 0.0247

27 ARSITEKTUR LANTAI ATAP 0.07756 0.0388 0.0388

28 ARSITEKTUR LANTAI LMR 0.03830 0.0383

29 ARSITEKTUR FAÇADE 2.52527 0.0758 0.0758 0.0758 0.0096 0.0051 0.1171 0.1263 0.1530 0.7548 0.3538 0.6009 0.0296 0.0296 0.0018 0.0073 0.0018 0.1073

C.3 PEKERJAAN ARSITEKTUR TOWER 2 (MID HI


1 ARSITEKTUR LANTAI GROUND FLOOR 1.02215 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0681 0.0681 0.0681 0.1670 0.1670 0.1670 0.1533 0.1533

2 ARSITEKTUR LANTAI 2 0.34723 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0174 0.0174 0.0174 0.0174 0.0509 0.0509 0.0509 0.0304 0.0304 0.0304 0.0304

3 ARSITEKTUR LANTAI 3 0.34723 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0174 0.0174 0.0174 0.0174 0.0509 0.0509 0.0509 0.0304 0.0304 0.0304 0.0304

4 ARSITEKTUR LANTAI 4 0.34723 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0174 0.0174 0.0174 0.0174 0.0382 0.0382 0.0382 0.0382 0.0304 0.0304 0.0304 0.0304

5 ARSITEKTUR LANTAI 5 0.34723 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0174 0.0174 0.0174 0.0174 0.0382 0.0382 0.0382 0.0382 0.0304 0.0304 0.0304 0.0304

6 ARSITEKTUR LANTAI 6 0.34723 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0174 0.0174 0.0174 0.0174 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304

7 ARSITEKTUR LANTAI 7 0.34723 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0174 0.0174 0.0174 0.0174 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304

8 ARSITEKTUR LANTAI 8 0.34723 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0139 0.0139 0.0139 0.0139 0.0139 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304

9 ARSITEKTUR LANTAI 9 0.34723 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0139 0.0139 0.0139 0.0139 0.0139 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304

10 ARSITEKTUR LANTAI 10 0.34723 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0139 0.0139 0.0139 0.0139 0.0139 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304

11 ARSITEKTUR LANTAI 11 0.34723 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0174 0.0174 0.0174 0.0174 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304

12 ARSITEKTUR LANTAI 12 0.34723 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0139 0.0139 0.0139 0.0139 0.0139 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304

13 ARSITEKTUR LANTAI 13 0.36120 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0181 0.0181 0.0181 0.0181 0.0361 0.0361 0.0361 0.0361 0.0316 0.0316 0.0316 0.0316

14 ARSITEKTUR LANTAI 14 REFUGEE 0.09124 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0046 0.0046 0.0046 0.0046 0.0091 0.0091 0.0091 0.0091 0.0080 0.0080 0.0080 0.0080

15 ARSITEKTUR LANTAI 15 0.22581 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0151 0.0151 0.0151 0.0226 0.0226 0.0226 0.0226 0.0198 0.0198 0.0198 0.0198

16 ARSITEKTUR LANTAI 16 0.25293 0.0032 0.0032 0.0032 0.0032 0.0253 0.0253 0.0253 0.0253 0.0443 0.0443 0.0253 0.0253

17 ARSITEKTUR LANTAI 17 0.34723 0.0043 0.0043 0.0043 0.0043 0.0174 0.0174 0.0174 0.0174 0.0694 0.0694 0.0608 0.0608

18 ARSITEKTUR LANTAI 18 0.34723 0.0043 0.0043 0.0043 0.0043 0.0174 0.0174 0.0174 0.0174 0.0694 0.0694 0.0608 0.0608

19 ARSITEKTUR LANTAI 19 0.34723 0.0116 0.0116 0.0116 0.0174 0.0174 0.0174 0.0174 0.0694 0.0694 0.0521 0.0521

20 ARSITEKTUR LANTAI 20 0.34723 0.0116 0.0116 0.0116 0.0174 0.0174 0.0174 0.0174 0.0694 0.0694 0.0521 0.0521

21 ARSITEKTUR LANTAI 21 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

22 ARSITEKTUR LANTAI 22 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

23 ARSITEKTUR LANTAI 23 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

24 ARSITEKTUR LANTAI 24 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

25 ARSITEKTUR LANTAI 25 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

26 ARSITEKTUR LANTAI 26 0.34723 0.0116 0.0116 0.0116 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

27 ARSITEKTUR LANTAI 27 0.34723 0.0116 0.0116 0.0116 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

28 ARSITEKTUR LANTAI 28 0.34723 0.0116 0.0116 0.0116 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

29 ARSITEKTUR LANTAI 29 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

30 ARSITEKTUR LANTAI 30 0.34723 0.0116 0.0116 0.0116 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521

31 ARSITEKTUR LANTAI 31 0.37983 0.0190 0.0190 0.0380 0.0380 0.0760 0.0760 0.0570 0.0570

32 ARSITEKTUR LANTAI ATAP 0.06570 0.0328 0.0328

33 ARSITEKTUR LANTAI LMR 0.03927 0.0393

34 ARSITEKTUR FAÇADE 2.50614 0.0042 0.0042 0.0042 0.0042 0.0042 0.4345 0.0019 0.1479 0.1479 0.1479 0.1479 0.3611 0.1479 0.1479 0.0222 - 0.2420 0.2261 0.2005 0.1701 0.4230 0.0005

D.1 PEKERJAAN MEP BASEMENT 9.69211 0.0457 0.0457 0.0228 0.0152 0.0152 0.0030 0.0145 0.0145 0.0145 0.0792 0.0792 0.0792 0.3088 0.0895 0.0467 0.0882 0.0082 0.0082 0.0100 0.0100 0.0100 0.0100 0.0100 1.1169 0.4579 0.6993 0.4649 1.5100 0.4034 0.1059 0.0100 0.0100 0.0100 1.7608 0.9288 0.8309 0.2520 0.1032

D.2 PEKERJAAN MEP PODIUM 0.80990 0.0228 0.0152 0.0152 0.0030 0.0162 0.0162 0.0445 0.0271 0.0071 0.0035 0.0135 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0065 0.0065 0.0265 0.0065 0.0065 0.0065 0.0165

D.3 PEKERJAAN MEP (MID) 5.07977 0.0152 0.0152 0.0030 0.0051 0.0051 0.0051 0.0839 0.6876 0.0852 0.3795 0.0839 0.0195 0.0369 0.0069 0.0085 0.0100 0.0100 0.0100 0.0100 0.0100 0.6100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.7198 0.6898 0.6898 0.6898 0.0998

D.4 PEKERJAAN MEP (MID HIGH) 5.72957 0.0635 0.0820 0.0375 0.0375 0.0375 0.2031 0.2183 0.3846 0.3846 0.3846 0.3846 0.3846 0.2174 0.3401 0.3401 0.3401 0.2813 0.2821 0.3314 0.3314 0.3314 0.3314

E INFRASTRUKTUR (POVSUM) 0.69180 0.0031 0.0073 0.0231 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0285 0.0262 0.0062 0.0062

F SPECIAL LIGHTING (PROVSUM) 0.24418 0.0305 0.0305 0.0305 0.0305 0.0153 0.0153 0.0153 0.0153 0.0153 0.0153 0.0153 0.0153

G PEKERJAAN TAMBAH KURANG 1.00668 0.0503 0.0503 0.1007 0.1510 0.2013 0.2013 0.1510 0.0503 0.0503

H MARKETING GALERY 0.44303 0.1329 0.1772 0.1329

Progres Rencana Bulanan (R0) 100.000 2.680 1.850 1.587 1.453 0.828 0.798 0.724 3.053 3.999 4.510 4.840 4.833 4.778 4.777 4.770 4.754 4.750 1.490 4.627 4.771 4.706 4.603 4.448 4.243 3.985 3.684 3.176 2.458 1.543 0.718 0.563

Kumulatif Progres Rencana Bulanan (R0) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.974 16.973 21.483 26.323 31.156 35.933 40.711 45.481 50.236 54.986 56.476 61.103 65.874 70.579 75.182 79.630 83.873 87.858 91.542 94.718 97.176 98.719 99.437 100.0

Progres Realisasi Bulanan (R0) 2.680 1.850 1.587 1.970 0.417 2.509 0.354 2.591

Progres Rencana Bulanan (R1) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 3.264 2.850 2.798 3.333 2.475 4.372 4.605 4.475 4.506 3.874 4.022 2.836 3.496 3.021 2.784 2.562 2.291 2.088 2.133 2.137 1.922 1.749 1.558 1.412 1.376

Kumulatif Progres Rencana Bulanan (R1) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 31.325 34.175 36.974 40.306 42.782 47.154 51.759 56.235 60.741 64.614 68.636 71.472 74.968 77.989 80.773 83.336 85.626 87.714 89.847 91.984 93.906 95.654 97.212 98.624 100.0

Kumulatif Progres Realisasi Bulanan (R1) 0 2.680 4.529 6.117 8.087 8.504 11.013 11.366 13.957 16.426 18.426 21.084 25.495 28.296

Progres Rencana Bulanan (R2) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.142 2.638 2.819 2.693 3.737 3.768 3.856 4.054 4.178 4.047 3.948 3.844 3.499 3.273 2.922 2.738 2.573 2.631 2.685 2.046 1.872 1.612 1.385 0.974

Kumulatif Progres Rencana Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.210 34.848 37.667 40.360 44.096 47.864 51.720 55.773 59.951 63.998 67.946 71.790 75.289 78.562 81.484 84.222 86.795 89.426 92.111 94.157 96.029 97.641 99.026 100.00

Kumulatif Progres Realisasi Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 32.210 34.848 33.163 33.411

Progres Rencana Bulanan (R3) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.046 0.740 0.310 0.248 1.081 2.808 3.060 3.227 3.232 3.271 3.365 3.366 3.006 3.048 2.728 2.293 2.984 3.168 2.961 2.819 2.519 2.269 2.172 1.900 1.841 1.743 1.617 1.382 1.252 1.118 0.682 0.913 0.764

Kumulatif Progres Rencana Bulanan (R3) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.113 32.854 33.163 33.411 34.492 37.300 40.359 43.587 46.819 50.090 53.455 56.821 59.828 62.875 65.603 67.896 70.880 74.048 77.009 79.828 82.347 84.616 86.788 88.688 90.529 92.272 93.889 95.271 96.523 97.641 98.323 99.24 100.00

Kumulatif Progres Realisasi Bulanan (R3) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 31.548 32.854 33.163 33.411 33.842 36.435 38.375 39.931 42.178 43.360 45.748 46.865 48.543 50.357 51.178 51.640 52.936 54.866 56.592 58.917 60.396 62.943 64.002 65.303 66.369 68.759 69.848 70.595 71.317 71.881 72.695 73.147 76.828

Progres Rencana Bulanan (R4) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.046 0.740 0.000 0.000 1.034 2.548 1.940 1.556 2.247 1.182 2.388 1.116 1.678 1.804 0.831 0.462 1.296 1.931 1.726 2.325 1.479 2.546 1.059 1.301 1.067 2.390 1.089 0.747 0.721 0.565 0.814 3.491 3.224 3.234 2.638 2.250 1.469 1.111 1.277 1.566 1.519 1.426 1.297 1.051 0.755 0.553 0.443

Kumulatif Progres Rencana Bulanan (R4) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.113 32.854 32.854 32.854 33.887 36.435 38.375 39.931 42.178 43.360 45.748 46.865 48.543 50.347 51.178 51.640 52.936 54.866 56.592 58.917 60.396 62.943 64.002 65.303 66.369 68.759 69.848 70.595 71.317 71.881 72.695 76.186 79.411 82.645 85.283 87.532 89.002 90.112 91.390 92.956 94.475 95.901 97.198 98.249 99.004 99.557 100.00

Kumulatif Progres Realisasi Bulanan (R4) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 31.548 32.854 32.854 32.854 33.842 36.435 38.375 39.931 42.178 43.360 45.748 46.865 48.543 50.357 51.178 51.640 52.936 54.866 56.592 58.917 60.396 62.943 64.002 65.303 66.369 68.759 69.848 70.595 71.317 71.881 72.695 73.147 76.828 77.399 77.743 77.896 78.013 78.232 78.232 78.283 78.335 78.371

Deviasi 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.378 0.948 0.076 0.917 0.234 -0.029 -0.565 0.000 0.000 0.000 -0.045 -0.001 0.000 -0.000 -0.000 0.000 0.000 0.000 0.000 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -3.039 -2.583 -5.246 -7.540 -9.636 -10.988 -11.881 -13.158 -14.672 -16.140 -17.530
Progres Rencana Gabungan Bulanan (R4) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 4.163 2.000 2.658 4.411 27.525 0.180 0.164 0.283 - - 0.355 0.646 0.502 0.690 0.631 0.531 0.428 0.482 1.640 0.268 0.668 15.256 - - 0.138 0.046 0.559 0.304 0.300 0.279 0.190 0.220 0.385 - 0.488 0.300 0.287 0.300 0.300 0.300 1.500 2.000 2.500 2.000 1.500 2.000 2.000 1.300 1.300 1.000 0.920 0.920 0.920

Kumulatif Progres Rencana Bulanan (R4) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 53.020 53.200 53.364 53.647 53.647 53.647 54.002 54.648 55.150 55.840 56.471 57.002 57.430 57.912 59.552 59.820 60.488 75.744 75.744 75.744 75.882 75.928 76.487 76.791 77.091 77.370 77.560 77.780 78.165 78.165 78.653 78.953 79.240 79.540 79.840 80.140 81.640 83.640 86.140 88.140 89.640 91.640 93.640 94.940 96.240 97.240 98.160 99.080 100.00

Kumulatif Progres Realisasi Bulanan (R4) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 53.020 53.200 53.364 53.647 53.647 53.647 54.002 54.648 55.150 55.840 56.471 57.002 57.430 57.912 59.552 59.820 60.488 75.744 75.744 75.744 75.882 75.928 76.487 76.791 77.091 77.370 77.560 77.780 78.165 78.165 78.653 78.953 79.240 79.540

CATATAN :
UNTUK PEKERJAAN PRIORITAS TOWER.2 DIBUTUHKAN PERSETUJUAN ESKALASI DAN SURAT PENRNYATAAN KESIAPAN Jakarta, 30 Juli 2023
PENDANAAN DARI WFPR UNTUK DISAMPAIKAN KE DIVISI DAN SCM PUSAT AGAR KONTRAK VENDOR DAPAT DIJALANKAN.
Disetujui oleh, Diperiksa oleh, Dibuat oleh,
Pemilik Proyek Konsultan MK Kontraktor
PT. Waskita FIM Perkasa Realty PT. Ciria Expertindo Consultant PT. Waskita Karya (Persero) Tbk.

0.000

Dowang Fernando Sekti Ali P Zainal Abidin


Project Director Construction Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 117/LPM/ASP-WK/SAMEP/II/2021
TANGGAL : 21 Februari 2021

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 6.309% 0.062% 6.371% 6.371%

2.0 Pekerjaan Struktur Atas 31.062% 23.440% 0.088% 23.527% 23.527%

3.0 Pekerjaan Arsitektur 29.368% 6.577% 0.122% 6.699% 6.699%

4.0 Pekerjaan MEP (Provsum) 21.311% 3.109% 0.060% 3.169% 3.169%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 39.879% 0.332% 40.210% 40.210%

Grand Total 100.000% 47.749% 0.332% 48.080% 48.080%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 48,08%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 116/LPM/ASP-WK/SAMEP/II/2021
TANGGAL : 14 Februari 2021

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 6.247% 0.062% 6.309% 6.309%

2.0 Pekerjaan Struktur Atas 31.062% 23.207% 0.233% 23.440% 23.440%

3.0 Pekerjaan Arsitektur 29.368% 6.395% 0.182% 6.577% 6.577%

4.0 Pekerjaan MEP (Provsum) 21.311% 3.049% 0.060% 3.109% 3.109%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 39.342% 0.537% 39.879% 39.879%

Grand Total 100.000% 47.212% 0.537% 47.749% 47.749%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 47,749%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 115/LPM/ASP-WK/SAMEP/II/2021
TANGGAL : 07 Februari 2021

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 6.185% 0.062% 6.247% 6.247%

2.0 Pekerjaan Struktur Atas 31.062% 23.077% 0.130% 23.207% 23.207%

3.0 Pekerjaan Arsitektur 29.368% 6.250% 0.145% 6.395% 6.395%

4.0 Pekerjaan MEP (Provsum) 21.311% 3.038% 0.011% 3.049% 3.049%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 38.994% 0.348% 39.342% 39.342%

Grand Total 100.000% 46.865% 0.348% 47.212% 47.212%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 47,212%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 114/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 31 Januari 2021

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 6.123% 0.062% 6.185% 6.185%

2.0 Pekerjaan Struktur Atas 31.062% 23.077% 0.000% 23.077% 23.077%

3.0 Pekerjaan Arsitektur 29.368% 6.190% 0.060% 6.250% 6.250%

4.0 Pekerjaan MEP (Provsum) 21.311% 2.831% 0.207% 3.038% 3.038%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 38.665% 0.329% 38.994% 38.994%

Grand Total 100.000% 46.535% 0.329% 46.865% 46.865%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 46,865%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 113/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 24 Januari 2021

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 6.061% 0.062% 6.123% 6.123%

2.0 Pekerjaan Struktur Atas 31.062% 23.077% 0.000% 23.077% 23.077%

3.0 Pekerjaan Arsitektur 29.368% 6.093% 0.127% 6.221% 6.221%

4.0 Pekerjaan MEP (Provsum) 21.311% 2.800% 0.031% 2.831% 2.831%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 38.475% 0.220% 38.695% 38.695%

Grand Total 100.000% 46.346% 0.220% 46.566% 46.566%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 46,566%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 112/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 17 Januari 2021

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.999% 0.062% 6.061% 6.061%

2.0 Pekerjaan Struktur Atas 31.062% 23.077% 0.000% 23.077% 23.077%

3.0 Pekerjaan Arsitektur 29.368% 5.903% 0.190% 6.093% 6.093%

4.0 Pekerjaan MEP (Provsum) 21.311% 2.781% 0.020% 2.800% 2.800%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 38.203% 0.272% 38.475% 38.475%

Grand Total 100.000% 46.074% 0.272% 46.346% 46.346%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 46,346%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 111/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 10 Januari 2021

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.937% 0.062% 5.999% 5.999%

2.0 Pekerjaan Struktur Atas 31.062% 23.076% 0.001% 23.077% 23.077%

3.0 Pekerjaan Arsitektur 29.368% 5.659% 0.244% 5.903% 5.903%

4.0 Pekerjaan MEP (Provsum) 21.311% 2.754% 0.027% 2.781% 2.781%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 37.870% 0.334% 38.203% 38.203%

Grand Total 100.000% 45.740% 0.334% 46.074% 46.074%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 46,074%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 110/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 03 Januari 2021

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.875% 0.062% 5.937% 5.937%

2.0 Pekerjaan Struktur Atas 31.062% 23.075% 0.001% 23.076% 23.076%

3.0 Pekerjaan Arsitektur 29.368% 5.495% 0.164% 5.659% 5.659%

4.0 Pekerjaan MEP (Provsum) 21.311% 2.063% 0.700% 2.762% 2.762%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 36.952% 0.926% 37.878% 37.878%

Grand Total 100.000% 44.822% 0.926% 45.748% 45.748%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 45,748%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 109/LPM/ASP-WK/SAMEP/XII/2020
TANGGAL : 27 DESEMBER 2020

BOBOT PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN
KONTRAK MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.813% 0.062% 5.875% 5.875%

2.0 Pekerjaan Struktur Atas 31.062% 23.074% 0.001% 23.075% 23.075%

3.0 Pekerjaan Arsitektur 29.368% 5.185% 0.310% 5.495% 5.495%

4.0 Pekerjaan MEP (Provsum) 21.311% 2.047% 0.016% 2.063% 2.063%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 36.562% 0.390% 36.952% 36.952%

Grand Total 100.000% 44.433% 0.390% 44.822% 44.822%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 44,822%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 108/LPM/ASP-WK/SAMEP/XII/2020
TANGGAL : 20 DESEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.751% 0.062% 5.813% 5.813%

2.0 Pekerjaan Struktur Atas 31.062% 23.074% 0.000% 23.074% 23.074%

3.0 Pekerjaan Arsitektur 29.368% 5.056% 0.129% 5.185% 5.185%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.996% 0.051% 2.047% 2.047%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 36.320% 0.242% 36.562% 36.562%

Grand Total 100.000% 44.191% 0.242% 44.433% 44.433%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 44,433%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PROGRESS MOS (MATERIAL ON SITE)
UPDATE : DESEMBER 2020

NO. URAIAN BOBOT SEPTEMBER OKTOBER NOVEMBER DESEMBER TOTAL MOS KETERANGAN

A MOS LIFT
1 Lift 6 & 7 (MOS) 0.370% 0.0000% 0.2407% 0.0000% 0.0000% 0.2407%
2 Lift 8 (MOS) 0.185% 0.0000% 0.1203% 0.0000% 0.0000% 0.1203%
3 Lift 9 (MOS) 0.233% 0.0000% 0.1517% 0.0000% 0.0000% 0.1517%

JUMLAH MOS LIFT 0.7888% 0.0000% 0.5127% 0.0000% 0.0000% 0.5127%


MOS HT
A HT LANTAI
1 HT (60x60)
BEDROOM
- Material 0.015% 0.0228% 0.0228% 0.0000% 0.0228% 0.0759% SD LANTAI 22
- Upah 0.005%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 0.016% 0.0233% 0.0233% 0.0000% 0.0233% 0.0777% SD LANTAI 22
- Upah 0.006%
3 HT (60x60) CLOSED UNPOLISHED
- Material 0.002% 0.0028% 0.0028% 0.0000% 0.0028% 0.0093% SD LANTAI 22
- Upah 0.001%
4 HT (60x60) SHOWER UNPOLISHED
- Material 0.001% 0.0000% 0.0000% 0.0000% 0.0015% 0.0020% SD LANTAI 22
- Upah 0.000%
JUMLAH MOS HT LANTAI 0.0444% 0.0488% 0.0488% 0.0000% 0.0504% 0.1628%

B HT DINDING
1 HT (SHOWER)
- Material 0.006% 0.0086% 0.0086% 0.0000% 0.0086% 0.0257% SD LANTAI 20
- Upah 0.002%
2 HT (CLOSED)
- Material 0.009% 0.0137% 0.0137% 0.0000% 0.0137% 0.0410% SD LANTAI 20
- Upah 0.003%
3 HT (MEJA PANTRY)
- Material 0.002% 0.0027% 0.0027% 0.0000% 0.0027% 0.0081% SD LANTAI 20
- Upah 0.001%

JUMLAH MOS HT DINDING 0.0227% 0.0249% 0.0249% 0.0000% 0.0249% 0.0748%

C PINTU KAYU
1 PINTU TYPE D-1 0.016% 0.0198% 0.0198% LT. 09 - LT. 11
2 PINTU TYPE D-2 0.004% 0.0047% 0.0047% LT. 09 - LT. 11
3 PINTU TYPE D-3 0.007% 0.0078% 0.0078% LT. 09 - LT. 11
4 PINTU TYPE D-9 0.002% 0.0018% 0.0018% LT. 09 - LT. 11

JUMLAH MOS PINTU KAYU 0.0284% 0.0000% 0.0000% 0.0000% 0.0341% 0.0341%

D GONDOLA (MOS) 0.569% 0.0888% 0.0888%

E GENSET (B/L) 1.104% 0.5817% 0.5817%

0.6705%

TOTAL MOS SD DESEMBER 0.0738% 0.5865% 0.0000% 0.1094% 1.4550%


PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 107/LPM/ASP-WK/SAMEP/XII/2020
TANGGAL : 13 DESEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.689% 0.062% 5.751% 5.751%

2.0 Pekerjaan Struktur Atas 31.062% 23.074% 0.000% 23.074% 23.074%

3.0 Pekerjaan Arsitektur 29.368% 4.782% 0.274% 5.056% 5.056%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.931% 0.065% 1.996% 1.996%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 35.919% 0.401% 36.320% 36.320%

Grand Total 100.000% 43.790% 0.401% 44.191% 44.191%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 44,191%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 106/LPM/ASP-WK/SAMEP/XII/2020
TANGGAL : 06 DESEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.627% 0.062% 5.689% 5.689%

2.0 Pekerjaan Struktur Atas 31.062% 23.071% 0.003% 23.074% 23.074%

3.0 Pekerjaan Arsitektur 29.368% 4.485% 0.297% 4.782% 4.782%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.864% 0.067% 1.931% 1.931%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 35.490% 0.429% 35.919% 35.919%

Grand Total 100.000% 43.360% 0.429% 43.790% 43.790%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 43,79%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 105/LPM/ASP-WK/SAMEP/XI/2020
TANGGAL : 23 NOVEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.565% 0.062% 5.627% 5.627%

2.0 Pekerjaan Struktur Atas 31.062% 23.044% 0.027% 23.071% 23.071%

3.0 Pekerjaan Arsitektur 29.368% 4.243% 0.242% 4.485% 4.485%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.826% 0.038% 1.864% 1.864%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 35.121% 0.369% 35.490% 35.490%

Grand Total 100.000% 42.992% 0.369% 43.360% 43.360%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 43,36%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 103/LPM/ASP-WK/SAMEP/XI/2020
TANGGAL : 15 NOVEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.503% 0.062% 5.565% 5.565%

2.0 Pekerjaan Struktur Atas 31.062% 23.078% 0.034% 23.112% 23.112%

3.0 Pekerjaan Arsitektur 29.368% 4.078% 0.178% 4.256% 4.256%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.786% 0.043% 1.829% 1.829%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 34.889% 0.316% 35.205% 35.205%

Grand Total 100.000% 42.760% 0.316% 43.076% 43.076%

Keterangan :
Progress Rencana : 49,272%
Progress Aktual : 43,076%
Deviasi : -6,196%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 103/LPM/ASP-WK/SAMEP/XI/2020
TANGGAL : 15 NOVEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.441% 0.062% 5.503% 5.503%

2.0 Pekerjaan Struktur Atas 31.062% 23.021% 0.057% 23.078% 23.078%

3.0 Pekerjaan Arsitektur 29.368% 3.872% 0.206% 4.078% 4.078%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.726% 0.060% 1.786% 1.786%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 34.504% 0.385% 34.889% 34.889%

Grand Total 100.000% 42.375% 0.385% 42.760% 42.760%

Keterangan :
Progress Rencana : 48,454%
Progress Aktual : 42,76%
Deviasi : -5,695%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : PROGRESS BULAN OKTOBER 2020
TANGGAL : 08 NOVEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.379% 0.062% 5.441% 5.441%

2.0 Pekerjaan Struktur Atas 31.062% 23.009% 0.000% 23.009% 23.009%

3.0 Pekerjaan Arsitektur 29.368% 3.749% 0.092% 3.842% 3.842%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.727% 0.000% 1.727% 1.727%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 34.308% 0.154% 34.462% 34.462%

Grand Total 100.000% 42.178% 0.154% 42.332% 42.332%

Keterangan :
Progress Rencana : 47,637%
Progress Aktual : 42,332%
Deviasi : -5,305%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 102/LPM/ASP-WK/SAMEP/XI/2020
TANGGAL : 08 NOVEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.070% 0.310% 5.379% 5.379%

2.0 Pekerjaan Struktur Atas 31.062% 22.762% 0.247% 23.009% 23.009%

3.0 Pekerjaan Arsitektur 29.368% 2.932% 0.818% 3.749% 3.749%

4.0 Pekerjaan MEP (Provsum) 21.311% 0.854% 0.873% 1.727% 1.727%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 32.061% 2.247% 34.308% 34.308%

Grand Total 100.000% 39.931% 2.247% 42.178% 42.178%

Keterangan :
Progress Rencana : 46,819%
Progress Aktual : 42,178%
Deviasi : -4,641%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 100/LPM/ASP-WK/SAMEP/X/2020
TANGGAL : 25 OKTOBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.256% 0.062% 5.318% 5.318%

2.0 Pekerjaan Struktur Atas 31.062% 22.908% 0.025% 22.933% 22.933%

3.0 Pekerjaan Arsitektur 29.368% 3.528% 0.051% 3.579% 3.579%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.636% 0.070% 13.140% 13.140%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 33.771% 0.208% 45.413% 45.413%

Grand Total 100.000% 41.641% 0.208% 53.283% 53.283%

Keterangan :
Progress Rencana : 46,172%
Progress Aktual : 53,283%
Deviasi : 7,111%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 099/LPM/ASP-WK/SAMEP/X/2020
TANGGAL : 18 OKTOBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.194% 0.062% 5.256% 5.256%

2.0 Pekerjaan Struktur Atas 31.062% 22.896% 0.012% 22.908% 22.908%

3.0 Pekerjaan Arsitektur 29.368% 3.356% 0.172% 3.528% 3.528%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.106% 0.529% 13.140% 13.140%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 32.995% 0.776% 45.275% 45.275%

Grand Total 100.000% 40.865% 0.776% 53.146% 53.146%

Keterangan :
Progress Rencana : 45,526%
Progress Aktual : 53,146%
Deviasi : 7,62%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 098/LPM/ASP-WK/SAMEP/X/2020
TANGGAL : 11 OKTOBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.132% 0.062% 5.194% 5.194%

2.0 Pekerjaan Struktur Atas 31.062% 22.846% 0.050% 22.896% 22.896%

3.0 Pekerjaan Arsitektur 29.368% 3.135% 0.221% 3.356% 3.356%

4.0 Pekerjaan MEP (Provsum) 21.311% 1.002% 0.104% 1.106% 1.106%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 32.558% 0.437% 32.995% 32.995%

Grand Total 100.000% 40.428% 0.437% 40.865% 40.865%

Keterangan :
Progress Rencana : 44,88%
Progress Aktual : 40,865%
Deviasi : -4,014%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 097/LPM/ASP-WK/SAMEP/X/2020
TANGGAL : 04 OKTOBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.070% 0.062% 5.132% 5.132%

2.0 Pekerjaan Struktur Atas 31.062% 22.768% 0.084% 22.852% 22.852%

3.0 Pekerjaan Arsitektur 29.368% 3.007% 0.137% 3.144% 3.144%

4.0 Pekerjaan MEP (Provsum) 21.311% 0.863% 0.146% 13.140% 13.140%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 32.151% 0.430% 44.711% 44.711%

Grand Total 100.000% 40.021% 0.430% 52.582% 52.582%

Keterangan :
Progress Rencana : 44,233%
Progress Aktual : 52,582%
Deviasi : 8,349%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 096/LPM/ASP-WK/SAMEP/IX/2020
TANGGAL : 27 SEPTEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 5.008% 0.062% 5.070% 5.070%

2.0 Pekerjaan Struktur Atas 31.062% 22.717% 0.051% 22.768% 22.768%

3.0 Pekerjaan Arsitektur 29.368% 2.878% 0.129% 3.007% 3.007%

4.0 Pekerjaan MEP (Provsum) 21.311% 0.724% 0.139% 0.863% 0.863%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 31.770% 0.381% 32.151% 32.151%

Grand Total 100.000% 39.640% 0.381% 40.021% 40.021%

Keterangan :
Progress Rencana : 43,587%
Progress Aktual : 40,021%
Deviasi : -3,566%

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 095/LPM/ASP-WK/SAMEP/IX/2020
TANGGAL : 20 SEPTEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 4.946% 0.062% 5.008% 5.008%

2.0 Pekerjaan Struktur Atas 31.062% 22.695% 0.022% 22.717% 22.717%

3.0 Pekerjaan Arsitektur 29.368% 2.626% 0.252% 2.878% 2.878%

4.0 Pekerjaan MEP (Provsum) 21.311% 0.583% 0.142% 13.140% 13.140%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 31.292% 0.478% 44.185% 44.185%

Grand Total 100.000% 39.162% 0.478% 52.056% 52.056%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 52,056%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 094/LPM/ASP-WK/SAMEP/IX/2020
TANGGAL : 06 SEPTEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 4.884% 0.062% 4.946% 4.946%

2.0 Pekerjaan Struktur Atas 31.062% 22.495% 0.199% 22.695% 22.695%

3.0 Pekerjaan Arsitektur 29.368% 2.584% 0.042% 2.626% 2.626%

4.0 Pekerjaan MEP (Provsum) 21.311% 0.491% 0.092% 13.140% 13.140%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 30.897% 0.395% 43.849% 43.849%

Grand Total 100.000% 38.767% 0.395% 51.720% 51.720%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 51,72%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager
PT. WASKITA FIM PERKASA REALTI

LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 093/LPM/ASP-WK/SAMEP/IX/2020
TANGGAL : 06 SEPTEMBER 2020

PRESTASI S/D PRESTASI PRESTAI S/D BOBOT PROGRESS


NO URAIAN PEKERJAAN BOBOT KONTRAK
MINGGU LALU KENAIKAN MINGGU INI (%)

1.0 Pekerjaan Persiapan (Pondasi) 1.273% 1.273% 0.000% 1.273% 1.273%

1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%

Total Pekerjaan Pondasi 7.870% 7.870% 0.000% 7.870% 7.870%

1.0 Pekerjaan Persiapan (SAMEP) 8.003% 4.822% 0.062% 4.884% 4.884%

2.0 Pekerjaan Struktur Atas 31.062% 22.266% 0.229% 22.495% 22.495%

3.0 Pekerjaan Arsitektur 29.368% 2.451% 0.133% 2.584% 2.584%

4.0 Pekerjaan MEP (Provsum) 21.311% 0.468% 0.023% 13.140% 13.140%

5.0 Pekerjaan Infrastruktur (Provsum) 0.692% 0.000% 0.000% 0.000% 0.000%

6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%

7.0 Provsum sekolah 1.007% 0.000% 0.000% 0.000% 0.000%

8.0 Marketing Galery 0.443% 0.443% 0.000% 0.443% 0.443%

Total Pekerjaan SAMEP 92.130% 30.450% 0.447% 43.546% 43.546%

Grand Total 100.000% 38.320% 0.447% 51.417% 51.417%

Keterangan :
Progress Rencana Err:509
Progress Aktual : 51,417%
Deviasi Err:509

,Diketahui Pemberi Tugas ,Diperiksa MK Diajukan oleh Kontraktor


PT. WASKITA FIM PERKASA REALTI PT. CIRIA EXPERTINDO CONSULTANT PT. WASKITA KARYA (Persero), Tbk

Iwan Sitohang Andi Rosika Zainal Abidin


VP Construction Project Manager Project Manager