REKAPITULASI
1.1 Pekerjaan Bored Pile dan Soldier Pile #REF! #REF! 6.32% 0.01% 6.33%
6.0 Pekerjaan Special Lighting (Provsum) #REF! #REF! 0.00% 0.00% 0.00%
REKAPITULASI
1.0 Pekerjaan Persiapan (Pondasi) 6,625,935,533 1.27% 1.27% 0.00% 1.27% 6,625,935,533
1.1 Pekerjaan Bored Pile dan Soldier Pile 34,330,068,026 6.60% 6.60% 0.00% 6.60% 34,330,068,026
1.0 Pekerjaan Persiapan (SAMEP) 41,644,549,226 8.00% 8.00% 0.00% 8.00% 41,644,549,226
2.0 Pekerjaan Struktur Basement dan podium 87,456,941,169 16.81% 16.56% 0.00% 16.56% 86,151,486,663
3.0 Pekerjaan Struktur Mid 35,784,521,669 6.88% 6.88% 0.00% 6.88% 35,784,521,669
4.0 Pekerjaan Struktur Mid High 38,399,839,483 7.38% 7.38% 0.00% 7.38% 38,394,365,192
5.0 Pekerjaan Arsitektur basement dan podium 18,880,945,453 3.63% 2.77% 0.01% 2.78% 14,478,689,413
6.0 Pekerjaan Arsitektur mid 63,041,127,905 12.11% 11.50% 0.03% 11.52% 59,969,280,360
7.0 Pekerjaan Arsitektur mid high 70,901,434,235 13.62% 2.10% 0.00% 2.10% 10,925,419,624
8.0 Pekerjaan MEP basement dan podium 54,650,334,215 10.50% 8.40% 0.00% 8.40% 43,728,779,739
9.0 Pekerjaan MEP mid 26,434,107,085 5.08% 4.74% 0.00% 4.74% 24,649,828,289
10.0 Pekerjaan MEP mid high 29,815,558,700 5.73% 0.00% 0.00% 0.00% -
11.0 Pekerjaan Infrastruktur (Provsum) 3,600,000,000 0.69% 0.69% 0.00% 0.69% 3,600,000,000
12.0 Pekerjaan Special Lighting (Provsum) 1,270,640,859 0.24% 0.00% 0.00% 0.00% -
REKAPITULASI
1.1 Pekerjaan Bored Pile dan Soldier Pile 34,330,068,026 6.60% 6.60% 0.00% 6.60%
6.0 Pekerjaan Special Lighting (Provsum) 1,270,640,859 0.24% 0.00% 0.00% 0.0000%
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
4/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
Bore Pile
Bp dia. 100 cm ; 6 titik 18,399 kg 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
Bp dia. 80 cm ; 6 titik 14,416 kg 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
Material Beton
Material Fc 25 / K 300 FA 15% ; Slump 18 +/-2
Bore pile
Bp dia. 100 cm 5,388.24 m3 1.27% 100.00% 1.274% 0.00% 0.000% 100.00% 1.274%
Bp dia 80 cm 2,130.18 m3 0.50% 100.00% 0.504% 0.00% 0.000% 100.00% 0.504%
Material Fc 20 / K 250 FA 15 % ; Slump 18 +/-2
Soldier Pile
CP dia. 60 cm; Lbor = Lcor = 16 m 208.13 m3 0.05% 100.00% 0.047% 0.00% 0.000% 100.00% 0.047%
CP dia. 80 cm; Lbor = Lcor = 16 dan 20 m 983.50 m3 0.22% 100.00% 0.224% 0.00% 0.000% 100.00% 0.224%
Material B0 FA 15 % ; Slump 16 +/-2
Soldier Pile
CB0 dia. 50 cm ; Lbor = Lcor = 13 m ; 133 Titik 424.49 m3 0.09% 100.00% 0.085% 0.00% 0.000% 100.00% 0.085%
Test Pile (Unused pile)
Bore Pile
Bp dia. 100 cm ; 1 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia. 80 cm ; 1 titik m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Test Pile (Used pile )
Bore Pile
Bp dia. 100 cm ; 6 titik 187.02 m3 0.04% 100.00% 0.044% 0.00% 0.000% 100.00% 0.044%
Bp dia. 80 cm ; 6 titik 114.56 m3 0.03% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%
Material Besi
Bore pile
Bp dia. 100 cm 487,878 Kg 1.03% 100.00% 1.033% 0.00% 0.000% 100.00% 1.033%
Bp dia 80 cm 246,101 Kg 0.52% 100.00% 0.521% 0.00% 0.000% 100.00% 0.521%
Soldier Pile
CP dia. 60 cm; Lbor = Lcor = 16 m 47,722 Kg 0.11% 100.00% 0.107% 0.00% 0.000% 100.00% 0.107%
CP dia. 80 cm; Lbor = Lcor = 16 dan 20 m 164,514 Kg 0.37% 100.00% 0.368% 0.00% 0.000% 100.00% 0.368%
Test Pile (Unused pile)
Bore Pile
Bp dia. 100 cm ; 1 titik Kg 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Bp dia. 80 cm ; 1 titik Kg 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Test Pile (Used pile )
Bore Pile
5/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
Bp dia. 100 cm ; 6 titik 18,399 Kg 0.04% 100.00% 0.039% 0.00% 0.000% 100.00% 0.039%
Bp dia. 80 cm ; 6 titik 14,416 Kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
Lain - Lain
Bobok kepala tiang bor akibat overcast melebihi cut off level
dan pembuangan puing potongan kepala tiang
Pengeboran vertikal di darat dan kondisi tanah
normal - SPT max. 60 bukan tanah pasir atau
tanah batuan
Volume pembuangan tanah dihitung berdasarkan
volume dikali 20% swelling untuk buang keluar
lokasi proyek
Volume pembuangan tanah di dalam lokasi dihitung teoritis
Volume pengeboran dihitung dari muka tanah asli hingga toe level
Volume pengecoran dihitung dari toe level hingga cut off level + 1 m
beton kotor
Volume pembesian dihitung berdasarkan
barbending schedule yang disepakati kedua belah
pihak dengan acuan waste besi minumim
Volume bersifat remeasurement untuk pekerjaan
pondasi tiang bor (Volume akan dihitung kembali
berdasarkan kondisi aktual di lapangan)
Over Break beton 20%
Toleransi maksimal 7,5cm kembung untuk soldier
pile jika melewati hal tersebut maka itu kewajiban
pakubumi
Kawat bendrat dan beton deking termasuk
Waste besi akan dihitung berdasarkan barbending
skedulle yang paling ekonomis dan ditambah 3%
untuk faktor resiko dan ditambah 1% untuk kaki
kaki (berlaku untuk bor pile)
6/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
Pekerjaan proteksi lereng galian (shotcrete) 3,318 m2 0.19% 100.00% 0.193% 0.00% 0.000% 100.00% 0.193%
7/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 1,503 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 PEKERJAAN TANGGA BUILDING MANAGEMENT
(PROV SUM)
a. Pekerjaan beton K-400 4 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 25 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 679 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 PEKERJAAN SHEAR WALL
a. Pekerjaan beton K-550 93 .m3 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
b. Pekerjaan bekisting 494 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 35,645 .kg 0.08% 100.00% 0.078% 0.00% 0.000% 100.00% 0.078%
10 PEKERJAAN RETAINING WALL
a. Pekerjaan beton K-400 1,143 .m3 0.21% 100.00% 0.208% 0.00% 0.000% 100.00% 0.208%
b. Pekerjaan bekisting 7,091 .m2 0.19% 100.00% 0.186% 0.00% 0.000% 100.00% 0.186%
c. Pekerjaan pembesian (BJTD-40) 376,964 .kg 0.83% 100.00% 0.827% 0.00% 0.000% 100.00% 0.827%
11 PEKERJAAN RAMP
a. Pekerjaan beton K-400 64 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 346 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 11,553 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PEKERJAAN PARAPET BETON RAMP
a. Pekerjaan beton K-400 11 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 109 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 1,004 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
11 PEKERJAAN SEPARATOR BEAM
a. Pekerjaan beton K-400 5 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 51 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 865 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN TANGGA #5 Ke GF
a. Pekerjaan beton K-400 18 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting 92 .m2 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Pekerjaan pembesian (BJTD-40) 3,540 .kg 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 406 .m3 0.08% 100.00% 0.076% 0.00% 0.000% 100.00% 0.076%
b. Pekerjaan bekisting 2,641 .m2 0.07% 100.00% 0.069% 0.00% 0.000% 100.00% 0.069%
c. Pekerjaan pembesian (BJTD-40) 216,465 .kg 0.47% 100.00% 0.475% 0.00% 0.000% 100.00% 0.475%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 507 .m3 0.10% 100.00% 0.100% 0.00% 0.000% 100.00% 0.100%
b. Pekerjaan bekisting 2,439 .m2 0.06% 100.00% 0.064% 0.00% 0.000% 100.00% 0.064%
c. Pekerjaan pembesian (BJTD-40) 153,092 .kg 0.34% 100.00% 0.336% 0.00% 0.000% 100.00% 0.336%
3 PEKERJAAN PELAT LANTAI (PROVSUM)
a. Pekerjaan beton K-400 884 .m3 0.17% 100.00% 0.166% 0.00% 0.000% 100.00% 0.166%
b. Pekerjaan bekisting 5,892 .m2 0.15% 100.00% 0.154% 0.00% 0.000% 100.00% 0.154%
c. Pekerjaan pembesian (BJTD-40) 106,052 .kg 0.23% 100.00% 0.233% 0.00% 0.000% 100.00% 0.233%
4 PEKERJAAN TANGGA 1 & 2 MID
a. Pekerjaan beton K-400 21 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 178 .m2 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
c. Pekerjaan pembesian (BJTD-40) 3,637 .kg 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
5 PEKERJAAN TANGGA 1 & 2 MID HIGH
a. Pekerjaan beton K-400 20 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 177 .m2 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
c. Pekerjaan pembesian (BJTD-40) 3,614 .kg 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
4 PEKERJAAN SHEAR WALL
a. Pekerjaan beton K-550 232 .m3 0.05% 100.00% 0.046% 0.00% 0.000% 100.00% 0.046%
b. Pekerjaan bekisting 1,240 .m2 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
c. Pekerjaan pembesian (BJTD-40) 54,311 .kg 0.12% 100.00% 0.119% 0.00% 0.000% 100.00% 0.119%
5 PEKERJAAN RAMP
a. Pekerjaan beton K-400 158 .m3 0.03% 100.00% 0.0289% 0.00% 0.000% 100.00% 0.029%
b. Pekerjaan bekisting 878 .m2 0.02% 100.00% 0.0229% 0.00% 0.000% 100.00% 0.023%
c. Pekerjaan pembesian (BJTD-40) 35,470 .kg 0.08% 100.00% 0.0778% 0.00% 0.000% 100.00% 0.078%
6 PEKERJAAN PARAPET BETON RAMP
a. Pekerjaan beton K-400 28 .m3 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
b. Pekerjaan bekisting 281 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 3,911 .kg 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
7 PEKERJAAN SEPARATOR BEAM
a. Pekerjaan beton K-400 5 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 51 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 865 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 PEKERJAAN KOLAM RENANG (INCL. GUTTER)
(PROV SUM)
a. Pekerjaan beton K-400 37 .m3 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
b. Pekerjaan bekisting 216 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 4,855 .kg 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
d. Pekerjaan "integral" waterproofing 37 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 PEKERJAAN TANGGA POOL DECK (PROV SUM)
a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 22 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 551 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
d. Pekerjaan "integral" waterproofing 3 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
10 PEKERJAAN TANGGA GF ke PARKIR (PROV SUM)
a. Pekerjaan beton K-400 3 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 22 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 551 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
d. Pekerjaan "integral" waterproofing 3 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 PEKERJAAN BOMB CHECK (PROV SUM)
a. Pekerjaan Strouss Pile D.30 CM 60 .m1 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
b. Pekerjaan Galian 9 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
c. Pekerjaan Pasir Urug 1 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
d. Pekerjaan Lantai Kerja 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Pekerjaan beton K-400 6 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
f. Pekerjaan bekisting 44 .m2 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
g. Pekerjaan pembesian (BJTD-40) 1,533 .kg 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
12 TANCTUM 18 UNIT (PROV SUM)
a. Pekerjaan Pasir Urug 6 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
b. Pekerjaan Lantai Kerja 3 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
c. Pekerjaan beton K-400 41 .m3 0.01% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
d. Pekerjaan bekisting 324 .m2 0.01% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Pekerjaan pembesian (BJTD-40) 8,735 .kg 0.02% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
13 TRASH ROOM (PROV SUM)
a. Pekerjaan Pasir Urug 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
b. Pekerjaan Lantai Kerja 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
c. Pekerjaan beton K-400 1 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
d. Pekerjaan bekisting 23 .m2 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Pekerjaan pembesian (BJTD-40) 148 .kg 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
14 PLN ROOM (PROV SUM)
a. Pekerjaan Pasir Urug 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
b. Pekerjaan Lantai Kerja 0 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
10/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan beton K-400 1 .m3 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
d. Pekerjaan bekisting 18 .m2 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
e. Pekerjaan pembesian (BJTD-40) 118 .kg 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 110 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 562 .m2 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 37,341 .kg 0.08% 100.00% 0.082% 0.00% 0.000% 100.00% 0.082%
6 PEKERJAAN RAMP
a. Pekerjaan beton K-400 70 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 364 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 18,369 .kg 0.04% 100.00% 0.040% 0.00% 0.000% 100.00% 0.040%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 110 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 562 .m2 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 37,341 .kg 0.08% 100.00% 0.082% 0.00% 0.000% 100.00% 0.082%
12/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 52 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,462 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
PEKERJAAN RAMP
a. Pekerjaan beton K-400 46 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 243 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 12,924 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 111 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 562 .m2 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 37,341 .kg 0.08% 100.00% 0.082% 0.00% 0.000% 100.00% 0.082%
13/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
6 PEKERJAAN RAMP
a. Pekerjaan beton K-400 46 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 243 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 12,924 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 111 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 561 .m2 0.01% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
c. Pekerjaan pembesian (BJTD-40) 37,354 .kg 0.08% 100.00% 0.082% 0.00% 0.000% 100.00% 0.082%
PEKERJAAN RAMP
a. Pekerjaan beton K-400 46 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 243 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 12,924 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%
14/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
3.1.5 Pekerjaan Beton Lantai Parkir 5B-6A-6B (6-6B)
PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 170 .m3 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
b. Pekerjaan bekisting 1,185 .m2 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
c. Pekerjaan pembesian (BJTD-40) 92,501 .kg 0.20% 100.00% 0.203% 0.00% 0.000% 100.00% 0.203%
PEKERJAAN KOLOM
a. Pekerjaan beton K-550 146 .m3 0.03% 100.00% 0.029% 0.00% 0.000% 100.00% 0.029%
b. Pekerjaan bekisting 811 .m2 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
c. Pekerjaan pembesian (BJTD-40) 49,203 .kg 0.11% 100.00% 0.108% 0.00% 0.000% 100.00% 0.108%
PEKERJAAN RAMP
a. Pekerjaan beton K-400 46 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 243 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 12,924 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 111 .m3 0.02% 100.00% 0.022% 0.00% 0.000% 100.00% 0.022%
b. Pekerjaan bekisting 545 .m2 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
c. Pekerjaan pembesian (BJTD-40) 32,213 .kg 0.07% 100.00% 0.071% 0.00% 0.000% 100.00% 0.071%
15/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 1,828 .m2 0.05% 100.00% 0.048% 0.00% 0.000% 100.00% 0.048%
c. Pekerjaan pembesian (BJTD-40) 30,579 .kg 0.07% 100.00% 0.067% 0.00% 0.000% 100.00% 0.067%
d. Pekerjaan "integral" waterproofing 351 .m3 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 68 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 329 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 19,703 .kg 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
16/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Lantai 8 0.265% 0.265% 0.000% 0.265%
17/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
2 PEKERJAAN KOLOM -
a. Pekerjaan beton K-550 68 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 328 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 19,746 .kg 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 71 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
3 PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 100 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 719 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,132 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
4 PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-550 48 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 252 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 12,232 .kg 0.03% 100.00% 0.027% 0.00% 0.000% 100.00% 0.027%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pek.Beton Lantai 11 0.272% 0.272% 0.000% 0.272%
PEKERJAAN KOLOM
a. Pekerjaan beton K-550 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,102 .kg 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
18/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
-
PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
19/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN KOLOM
a. Pekerjaan beton K-500 67 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
b. Pekerjaan bekisting 351 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
c. Pekerjaan pembesian (BJTD-40) 19,444 .kg 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
PEKERJAAN KOLOM
a. Pekerjaan beton K-500 71 .m3 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
b. Pekerjaan bekisting 370 .m2 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
c. Pekerjaan pembesian (BJTD-40) 20,348 .kg 0.04% 100.00% 0.045% 0.00% 0.000% 100.00% 0.045%
20/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-400 49 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 652 .m2 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
c. Pekerjaan pembesian (BJTD-40) 5,961 .kg 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
d. Pekerjaan "integral" waterproofing 49 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN KOLOM
a. Pekerjaan beton K-500 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,636 .kg 0.04% 100.00% 0.039% 0.00% 0.000% 100.00% 0.039%
21/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 501 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 29,472 .kg 0.06% 100.00% 0.065% 0.00% 0.000% 100.00% 0.065%
-
PEKERJAAN KOLOM -
a. Pekerjaan beton K-500 60 .m3 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
b. Pekerjaan bekisting 313 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 17,430 .kg 0.04% 100.00% 0.038% 0.00% 0.000% 100.00% 0.038%
-
PEKERJAAN TANGGA 1 & 2 -
a. Pekerjaan beton K-400 8 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 59 .m2 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40) 1,517 .kg 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
-
PEKERJAAN PELAT LANTAI -
a. Pekerjaan beton K-400 104 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
-
PEKERJAAN SHEAR WALL & CORE WALL -
a. Pekerjaan beton K-500 47 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 8,720 .kg 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
-
PEKERJAAN SEPARATOR BEAM -
a. Pekerjaan beton K-400 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN KOLOM
a. Pekerjaan beton K-500 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
22/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
23/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-400 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
c. Pekerjaan pembesian (BJTD-40) 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
24/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
25/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
4.1.10 Pekerjaan Beton Lantai 29
PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 60 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting ==> (termasuk alas balok) 505 .m2 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
c. Pekerjaan pembesian (BJTD-40) 26,270 .kg 0.06% 100.00% 0.058% 0.00% 0.000% 100.00% 0.058%
PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
PEKERJAAN KOLOM
a. Pekerjaan beton K-450 57 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 303 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 13,929 .kg 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
PEKERJAAN KOLOM 63 .m3 0.01% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
26/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-500 340 .m2 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 15,344 .kg 0.03% 100.00% 0.034% 0.00% 0.000% 100.00% 0.034%
c. Pekerjaan pembesian (BJTD-40)
PEKERJAAN TANGGA 1 4 .m3 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
a. Pekerjaan beton K-400 35 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 758 .kg 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
c. Pekerjaan pembesian (BJTD-40)
PEKERJAAN PELAT LANTAI 105 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
a. Pekerjaan beton K-400 725 .m2 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 9,270 .kg 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
c. Pekerjaan pembesian (BJTD-40)
PEKERJAAN SHEAR WALL & CORE WALL 52 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
a. Pekerjaan beton K-500 281 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
b. Pekerjaan bekisting 6,576 .kg 0.01% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
c. Pekerjaan pembesian (BJTD-40)
PEKERJAAN SEPARATOR BEAM 2 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
a. Pekerjaan beton K-400 21 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Pekerjaan bekisting 373 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40)
Total Pek.Beton Lantai 31 0.233% 0.2334% 0.000% 0.233%
27/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
4.1.13 PEKERJAAN BETON LANTAI ATAP LIFT (LMR)
PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 16 .m3 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
b. Pekerjaan bekisting ==> (termasuk alas balok) 171 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,752 .kg 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 54 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 264 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,924 .kg 0.04% 100.00% 0.042% 0.00% 0.000% 100.00% 0.042%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%
28/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-550 54.85 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 271.23 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,646.12 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%
29/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 18,901.41 .kg 0.04% 100.00% 0.041% 0.00% 0.000% 100.00% 0.041%
30/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 27,410.84 .kg 0.06% 100.00% 0.060% 0.00% 0.000% 100.00% 0.060%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 38.56 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
a. Pekerjaan beton K-600 15.64 .m3 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
b. Pekerjaan bekisting 264.33 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,745.97 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 54.20 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,745.97 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 54.20 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
31/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,745.97 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 54.20 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 264.35 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,745.97 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 49.54 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 255.18 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,863.69 .kg 0.03% 100.00% 0.033% 0.00% 0.000% 100.00% 0.033%
32/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
4 PEKERJAAN PELAT LANTAI
a. Pekerjaan beton K-400 103.08 .m3 0.02% 100.00% 0.019% 0.00% 0.000% 100.00% 0.019%
b. Pekerjaan bekisting 699.31 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,775.90 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 55.48 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 286.47 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 17,055.34 .kg 0.04% 100.00% 0.037% 0.00% 0.000% 100.00% 0.037%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 58.40 .m3 0.01% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
b. Pekerjaan bekisting 305.39 .m2 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
c. Pekerjaan pembesian (BJTD-40) 18,222.13 .kg 0.04% 100.00% 0.040% 0.00% 0.000% 100.00% 0.040%
33/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 11,608.09 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 49.64 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 258.47 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,901.89 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-550 49.64 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 255.18 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,842.17 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%
34/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
6 PEKERJAAN SEPARATOR BEAM
a. Pekerjaan beton K-400 2.21 .m3 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pekerjaan bekisting 22.08 .m2 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Pekerjaan pembesian (BJTD-40) 382.55 .kg 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 49.64 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 255.18 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 15,882.53 .kg 0.03% 100.00% 0.035% 0.00% 0.000% 100.00% 0.035%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 47.91 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251.92 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,762.06 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
35/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 26,981.74 .kg 0.06% 100.00% 0.059% 0.00% 0.000% 100.00% 0.059%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 47.91 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251.92 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,718.11 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 47.91 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251.92 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 14,718.11 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 47.91 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 251.92 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
36/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
c. Pekerjaan pembesian (BJTD-40) 14,718.11 .kg 0.03% 100.00% 0.032% 0.00% 0.000% 100.00% 0.032%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,478.16 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
37/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
a. Pekerjaan beton K-400 103.98 .m3 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
b. Pekerjaan bekisting 701.12 .m2 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
c. Pekerjaan pembesian (BJTD-40) 9,604.25 .kg 0.02% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
38/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
39/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
Pekerjaan Beton Lantai 28
1 PEKERJAAN BALOK KONVENSIONAL
a. Pekerjaan beton K-400 54.05 .m3 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
b. Pekerjaan bekisting 457.38 .m2 0.01% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
c. Pekerjaan pembesian (BJTD-40) 25,056.55 .kg 0.05% 100.00% 0.055% 0.00% 0.000% 100.00% 0.055%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 44.98 .m3 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
40/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
b. Pekerjaan bekisting 244.07 .m2 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
c. Pekerjaan pembesian (BJTD-40) 11,449.66 .kg 0.03% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 50.27 .m3 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
b. Pekerjaan bekisting 273.89 .m2 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
c. Pekerjaan pembesian (BJTD-40) 12,650.69 .kg 0.03% 100.00% 0.028% 0.00% 0.000% 100.00% 0.028%
2 PEKERJAAN KOLOM
a. Pekerjaan beton K-500 12.12 .m3 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
b. Pekerjaan bekisting 141.49 .m2 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
c. Pekerjaan pembesian (BJTD-40) 2,452.85 .kg 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
41/157
Progress
NO ITEM PEKERJAAN VOL SAT BOBOT Periode lalu Periode saat ini s/d Periode saat ini
(%) Progress Bobot Progress Bobot Progress Bobot
Total Pek.Beton Lantai Atap Lift (LMR) 0.026% 0.026% 0.000% 0.026%
Total Pekerjaan Mekanikal, Elektrikal & Plumbing 21.31% 13.140% 0.000% 13.140%
(PROVSUM)
Total Pekerjaan Infrastruktur 0.69% 0.69% 0.00% 0.692%
(PROVSUM)
Total Pekerjaan Special Lighting 0.24% 0.00% 0.00% 0.00%
(PROVSUM)
Total SAMEP 61.31% 52.64% 0.00% 52.64%
42/157
RINCIAN PROGRESS PEKERJAAN MARKETING GALLERY
PROYEK PEMBANGUNAN APARTEMEN SOLTERRA - PEJATEN - JAKARTA SELATAN Progress Bulanan
1 September sd 30 September 2019
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
II PEKERJAAN STRUKTUR
###
I PEKERJAAN PERSIAPAN
1 Biaya Manajemen dan Koordinasi Lapang 1.00 ls 15,084,726 15,084,726 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
2 Biaya Pembuatan Dokumen Kontrak 1.00 ls - -
3 Akomudasi Rapat Lapangan 1.00 ls - -
4 Gambar Kerja (Shop Drawing) 1.00 ls 1,500,000 1,500,000 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 Gambar Terlaksana (As Built Drawing) 1.00 ls 1,500,000 1,500,000 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
6 Kantor Direksi di Lapangan 1.00 ls - -
7 Kantor Pemborong di Lapangan 1.00 ls - -
8 Gudang Bahan dan Los Kerja 1.00 ls - -
9 Pagar Sementara Proyek 125.00 m² 214,192 26,774,000 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
10 Contoh - Contoh Bahan 1.00 ls - -
11 Papan Nama 1.00 ls - -
12 Pemeriksaan dan Pengujian Bahan 1.00 ls - -
13 Pemadam Kebakaran,P3K,Peralatan Kesel 1.00 ls 10,000,000 10,000,000 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
14 Mobilisasi dan Demobilisasi 1.00 ls - -
15 Penjagaan Proyek 1.00 ls - -
16 Pengadaan Sumber Air 1.00 ls 2,538,871 2,538,871 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
17 Pengadaan Tenaga Listrik 1.00 ls 13,250,091 13,250,091 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
18 Jalan Masuk ke Tempat Pekerjaan dan Ja 1.00 ls - -
19 Asuransi 1.00 ls - -
20 Sarana Komunikasi 1.00 ls - -
21 Pengukuran dan Bouwplank 1.00 ls 1,025,000 1,025,000 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
22 Photo -Photo Kemajuan Pekerjaan 1.00 ls 865,955 865,955 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
23 Kebersihan dan Kerapian 1.00 ls 16,560,000 16,560,000 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
24 Peralatan dan Perlengkapan kerja (sewa c 1.00 ls 49,585,000 49,585,000 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
25 Saluran Sementara 1.00 ls - -
26 Asuransi Astek 1.00 ls - -
27 Topi Pengaman (Helm) dan Sepatu Lapa 1.00 ls - -
28 Testing dan Commissioning 1.00 ls - -
29 Jaring Pengaman 1.00 ls - -
30 Laporan 1.00 ls 1,316,357 1,316,357 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
31 Persiapan & Pembersihan lokasi pekerjaa 1.00 ls 50,000,000 50,000,000 0.01% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
(relokasi gudang eksisting)
a. Galian tanah pondasi beton 132.83 m³ 18,629 2,474,527 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Galian tanah sloof 31.00 m³ 18,629 577,556 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Galian tanah pondasi batu kali - m³ 18,629 - 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
a. Urugan tanah kembali ex galian pondasi 84.00 m³ 20,638 1,733,592 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Urugan tanah dibawah lantai dasar & bordes tangga (±1m)381.30 m³ 36,589 13,951,386 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
c. Urugan tanah area planter (lanskap) - m³ 36,589 - 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
a. Pemadatan tanah pondasi beton & Batu Kali 84.00 m² 12,364 1,038,576 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Pemadatan tanah sloof 72.00 m² 12,364 890,208 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Pemadatan tanah lantai dasar 381.30 m² 12,364 4,714,393 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
a. Urugan pasir di bawah pondasi beton & Batu kali 8.40 m³ 304,668 2,559,211 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Urugan pasir di bawah sloof 7.20 m³ 304,668 2,193,610 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Urugan pasir di bawah lantai dasar 38.13 m³ 304,668 11,616,991 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
a. Lantai kerja di bawah pondasi setapak & Batu kjali 4.20 m3 1,001,082 4,204,544 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
b. Lantai kerja di bawah sloof 3.60 m3 1,001,082 3,603,895 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
c. Lantai kerja di bawah lantai dasar 19.07 m3 1,001,082 19,085,628 0.00% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
43/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Beton P2 (1600 x 1600 x 300) D13-125, D13-125
Beton K-300 6.14 m3 913,772 5,614,215 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Bekisting 15.36 m2 97,799 1,502,193 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pembesian 890.88 kg 11,416 10,170,286 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
a. Pondasi rollag bata (dibawah pasangan batako) 178.67 m¹ 157,842 28,200,841 0.01% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
Pasangan batako penahan tanah dibawah sloof 178.67 m² 160,577 28,689,490 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
a. Pondasi batu kali untuk dinding pagar (lanskap) - m³ - 0.00% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
a. Lantai satu
44/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Pemasangan angkur D16mm 72.00 bh 174,559 12,568,255 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Pemasangan angkur D12mm 28.00 bh 130,919 3,665,741 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Pemasangan baseplat 350 x 350 tebal 15 mm 259.64 kg 24,823 6,445,013 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Pemasangan baseplat 200 x 200 tebal 10 mm 18.84 kg 24,823 467,665 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
- Pemasangan plat tebal 15 mm 955.83 kg 24,823 23,726,568 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
- Pemasangan plat tebal 10 mm 269.84 kg 24,823 6,698,238 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Konstruksi Kolom Hbeam 300x300 7,718.80 kg 29,400 226,932,814 0.04% 100.00% 0.044% 0.00% 0.000% 100.00% 0.044%
- Konstruksi Kolom Baja Hbeam 150x150 815.79 kg 29,400 23,984,226 0.00% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
- Konstruksi Balok Baja WF 150.150.7.10 1,555.30 kg 29,400 45,725,881 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Konstruksi Balok Baja WF 250.125.6.9 1,043.43 kg 29,400 30,676,830 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Konstruksi Balok Baja WF 300.150.6.9 (baru) 2,936.72 kg 29,400 86,339,568 0.02% 100.00% 0.017% 0.00% 0.000% 100.00% 0.017%
- Konstruksi Balok Baja WF 400.200.8.13 7,645.48 kg 29,400 224,777,112 0.04% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
- Konstruksi Balok Baja WF 150.75.5.7 207.70 kg 29,400 6,106,380 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Mur baut D 16 mm 954.00 bh 11,475 10,947,150 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Grouting Baja Kolom ex Sika 24.00 titik 168,145 4,035,480 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Ringbalk ( 130x130 )
- Beton (4D10, D8-150) - m³ -
b. Lantai dua
- Pemasangan plat tebal 15 mm 493.98 kg 24,823 12,262,066 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Pemasangan plat tebal 10 mm 161.71 kg 24,823 4,014,127 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Konstruksi Kolom Hbeam 300x300 jadi 200x200 (b 3,485.91 kg 29,400 102,485,754 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
- Konstruksi Kolom Hbeam 150x150 444.61 kg 29,400 13,071,534 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Konstruksi Balok Baja WF 250.125.6.9 522.74 kg 29,400 15,368,556 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Konstruksi Balok Baja WF 300.150.6.9 3,600.29 kg 29,400 105,848,526 0.02% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
- Konstruksi Balok Baja WF 400.200.8.13 jadi 300.1 3,200.08 kg 29,400 94,082,234 0.02% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
- Konstruksi Balok Roll Hollow 75.150 162.49 kg 37,700 6,125,873 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Mur baut D 16 mm 544.00 bh 11,475 6,242,400 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Ringbalk ( 130x130 )
- Beton (4D10, D8-150) - m³ -
c. Lantai tiga
- Pemasangan plat tebal 15 mm 659.87 kg 24,823 16,379,953 0.00% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Konstruksi Kolom Hbeam 300x300 jadi 150x150 (b 1,631.59 kg 29,400 47,968,681 0.01% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Konstruksi Balok Baja WF 300.150.6.9 5,561.10 kg 29,400 163,496,255 0.03% 100.00% 0.031% 0.00% 0.000% 100.00% 0.031%
- Konstruksi Balok Baja WF 150.75.5.7 44.64 kg 29,400 1,312,294 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
- Konstruksi Balok Roll Hollow 75.150 98.91 kg 37,700 3,728,907 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Mur baut D 16 mm 604.00 bh 11,475 6,930,900 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
45/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
Ringbalk ( 130x130 )
- Beton (4D10, D8-150) - m³ - Tidak ditawarkan
2 Tangga Beton
b. - Tangga Samping
- Pemasangan plat tebal 10 mm 15.70 kg 24,823 389,721 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
- Konstruksi UNP & Siku 1,292.74 kg 29,400 38,006,606 0.01% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
- Mur baut D 16 mm 4.00 bh 11,475 45,900 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
a. Atap spandek rangka baja ringan ex. Taso 164.69 m² 254,700 41,946,543 0.01% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
b. Spanscrew D16 - bh 60,795 - 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Ikatan Angin - kg 29,400 - 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
d. Insulation aluminium foil 164.69 m² 202,730 33,387,604 0.01% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
e. Dak talang (konvensional) exclude waterproofing
Beton K-250 (tanpa TC) 5.50 m3 1,027,439 5,646,805 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Bondek 0,75 mm 45.80 m2 217,503 9,961,637 0.00% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
Wiremesh M8 45.80 m2 77,536 3,551,149 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Total Pekerjaan Struktur Atas dan Atap 1,743,549,775 0.34% 0.34% 0.00% 0.34%
1 Pekerjaan Plumbing
a. Lantai Dasar
Instalasi Air Kotor & Bekas dibawah lantai dasar sd 1 m keluar dari bangunan
Instalasi Pipa PVC AW 3" 17.90 m' 82,491 1,476,589 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Instalasi Pipa PVC AW 4" 9.00 m' 121,499 1,093,491 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Instalasi Pipa PVC AW 6" 13.00 m' 269,507 3,503,591 0.00% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Fitting-fitting 1.00 ls 1,679,723 1,679,723 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
b. Lantai Dasar
Instalasi Drain AC dibawah lantai dasar sd 1 m keluar dari bangunan
Instalasi Pipa PVC AW 2" 16.00 m' 38,438 615,008 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Pipa PVC AW 3/4" 20.00 m' 12,813 256,260 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Fitting-fitting 1.00 ls 550,734 550,734 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
c. Lantai Atap
Sparing Air hujan dak talang 18.00 ttk 49,137 884,466 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 Pekerjaan Elektrikal
a. Lantai Dasar
Instalasi Listrik dibawah lantai dasar sd 1 m keluar dari bangunan
Instalasi Conduit Ø 20mm 120.00 m' 7,008 840,960 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Instalasi Conduit Ø 25mm 16.00 m' 14,016 224,256 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
T-Dus dan Blockout 1.00 Ls 484,621 484,621 0.00% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
46/157
RINCIAN PROGRESS PEKERJAAN ARSITEK 0.0357%
PROYEK PEMBANGUNAN APARTEMEN SOLTERRA - PEJATEN - JAKARTA SELATAN PROGRESS BULAN JULI 2023
-
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN ARSITEK ###
ARSITEK LANTAI B3
I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 443.67 m2 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 348.02 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.25 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 9,272 m2 0.046% 100.00% 0.046% 0.00% 0.000% 100.00% 0.046%
2 PLAFOND GYPSUM BOARD (9MM) 115 m2 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 CAT PLAFOND GYPSUM BOARD 9,387 m2 0.028% 90.00% 0.025% 0.00% 0.000% 90.00% 0.025%
4 CORNICE PLAFOND 100 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
V PEKERJAAN LANTAI
1 HT (60x60) 115 m2 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED 78 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 KERAMIK (UK. 30x30) ROMAN 300 m2 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 SKIRTING KERAMIK (UK. 10x30) ROMAN 113 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 FLOOR HARDENER 3 KG (STP, FAN ROOM, MEP) 233 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 FLOOR HARDENER 5 KG (AREA PARKIR) 4,533 m2 0.036% 100.00% 0.036% 0.00% 0.000% 100.00% 0.036%
7 STEP NOSING KERAMIK (TANGGA 1-2 DAN 3-4) 95 m' 0.001% 60.00% 0.001% 0.00% 0.000% 60.00% 0.001%
8 WATERPROOFING COATING 468 m2 0.005% 90.00% 0.005% 0.00% 0.000% 90.00% 0.005%
9 PEKERJAAN PULAU PARKIR 947 m2 0.032% 98.00% 0.031% 0.00% 0.000% 98.00% 0.031%
10 PEKERJAAN LANTAI DUST PROOF (TANGGA DARURAT) 87 m2 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11 HT (UK. 60x60) POLISHED (TANGGA MANAGEMENT) 16 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
12 STEP NOSING HT (TANGGA BUILD. MANAGEMENT) 31 m' 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
ARSITEK LANTAI B2
I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 568 m2 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 346 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.25 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
47/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1 PINTU TYPE WD1 2.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PINTU TYPE WD3 2.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PINTU TYPE SD1 4.00 unit 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
4 PINTU TYPE SD1B 4.00 unit 0.008% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
5 PINTU TYPE SD2 11.00 unit 0.011% 95.00% 0.010% 0.00% 0.000% 95.00% 0.010%
6 PINTU TYPE AD1 1.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 PINTU TYPE GD2 2.00 unit 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 8,627 m2 0.043% 100.00% 0.043% 0.00% 0.000% 100.00% 0.043%
2 PLAFOND GYPSUM BOARD (9MM) 116 m2 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PLAFOND GYPSUM BOARD WR (9MM) 13 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 CAT PLAFOND GYPSUM BOARD 8,742 m2 0.026% 90.00% 0.023% 0.00% 0.000% 90.00% 0.023%
5 CAT PLAFOND GYPSUM WR BOARD 13 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 CORNICE PLAFOND 122 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
V PEKERJAAN LANTAI
1 HT (60x60) POLISHED 116 m2 0.006% 30.00% 0.002% 0.00% 0.000% 30.00% 0.002%
2 SKIRTING HT (UK. 10x60CM) POLISHED 80 m' 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
3 HT (60x60) UNPOLISHED 13 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 KERAMIK (UK. 30x30) ROMAN POLISHED 61 m2 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 55.85 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 KERAMIK (UK. 30x30) ROMAN UNPOLISHED 29.63 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 55.58 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
8 FLOOR HARDENER 3 KG (STP, FAN ROOM, MEP) 126.10 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 FLOOR HARDENER 5 KG (AREA PARKIR) 4,627.97 m2 0.037% 100.00% 0.037% 0.00% 0.000% 100.00% 0.037%
10 STEP NOSING HT (TANGGA BUILD. MANAGEMENT) 94.50 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11 WATERPROOFING COATING 78.88 m2 0.001% 55.00% 0.000% 0.00% 0.000% 55.00% 0.000%
12 PULAU PARKIR 989.82 m2 0.033% 98.00% 0.033% 0.00% 0.000% 98.00% 0.033%
13 PEKERJAAN LANTAI DUST PROOF 86.69 m2 0.002% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
B JANITOR
Floor Drain 4.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Kran 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
ARSITEK LANTAI B1
I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 2,941.68 m2 0.080% 95.00% 0.076% 0.00% 0.000% 95.00% 0.076%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 750.81 m2 0.025% 95.00% 0.024% 0.00% 0.000% 95.00% 0.024%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.25 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
4 PEKERJAAN DINDING KACA 432.26 m' 0.126% 60.00% 0.075% 0.00% 0.000% 60.00% 0.075%
5 PEKERJAAN CUBICLE KACA 11.00 m' 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
48/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
5 PINTU TYPE WD 4 (Uk. 1700X2150) 2.00 unit 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 PINTU TYPE SD1 (Uk. 1000X2150) 4.00 unit 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
7 PINTU TYPE SD1B (Uk. 1400X2150) 4.00 unit 0.008% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
8 PINTU TYPE SD2 (Uk. 900X2150) 9.00 unit 0.009% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
9 PINTU TYPE SD3 (Uk. 1800X2150) 1.00 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
10 PINTU TYPE SD4 (Uk. 2500X2450) 2.00 unit 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
11 PINTU TYPE SD5 (Uk. 2500X2450) 1.00 unit 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
12 PINTU TYPE AD1 (Uk. 1000X2150) 1.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
13 PINTU TYPE AD2 (Uk. 1900X2150) 3.00 unit 0.007% 80.00% 0.006% 0.00% 0.000% 80.00% 0.006%
14 PINTU TYPE AD3 (Uk. 1900X2150) 2.00 unit 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
15 PINTU TYPE GD1 (Uk. 1800X2200) 7.00 unit 0.022% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
16 PINTU TYPE W12 (Uk. 1400X2750) 6.00 unit 0.005% 80.00% 0.004% 0.00% 0.000% 80.00% 0.004%
17 PINTU TYPE W13 (Uk. 2200X2750) 1.00 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
18 PINTU TYPE W14 (Uk. 3840X2750) 1.00 unit 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 3,701.11 m2 0.018% 100.00% 0.018% 0.00% 0.000% 100.00% 0.018%
2 PLAFOND GYPSUM BOARD (9MM) 641.19 m2 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PLAFOND GYPSUM BOARD WR (9MM) 40.58 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 CAT PLAFOND GYPSUM BOARD 4,342.30 m2 0.013% 10.00% 0.001% 0.00% 0.000% 10.00% 0.001%
5 CAT PLAFOND GYPSUM WR BOARD 40.58 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 CORNICE PLAFOND 440.80 m' 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 MAN HOLE 10.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
8 WOOD PANEL COMPOSIT 574.88 m2 0.154% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
V PEKERJAAN LANTAI
1 HT (60x60) POLISHED 351.93 m2 0.018% 45.00% 0.008% 0.00% 0.000% 45.00% 0.008%
2 SKIRTING HT (UK. 10x60CM) POLISHED 227.70 m' 0.002% 35.00% 0.001% 0.00% 0.000% 35.00% 0.001%
3 HT (60x60) UNPOLISHED 549.84 m2 0.029% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 KERAMIK TILE (UK. 30x30) ROMAN POLISHED 75.25 m2 0.004% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 65.56 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 KERAMIK TILE (UK. 30x30) ROMAN UNPOLISHED 67.72 m2 0.003% 85.00% 0.003% 0.00% 0.000% 85.00% 0.003%
7 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 75.35 m' 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
8 FLOOR HARDENER 3 KG (STP, FAN ROOM, MEP) 332.35 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
9 FLOOR HARDENER 5 KG (AREA PARKIR) 1,433.63 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
10 STEP NOSING KERAMIK (TANGGA 1-2 DAN 3-4) 94.50 m' 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
11 WATERPROOFING COATING 780.38 m2 0.008% 90.00% 0.008% 0.00% 0.000% 90.00% 0.008%
12 PEKERJAAN PULAU PARKIR 321.97 m2 0.011% 90.00% 0.010% 0.00% 0.000% 90.00% 0.010%
13 PEKERJAAN LANTAI DUST PROOF (TANGGA DARURAT) 86.69 m2 0.002% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
14 BATU ANDHESIT UK. 30X60 724.44 m2 0.065% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
B ABLUTION
1 Closet Duduk 2.00 Unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 Jet Washer 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 Paper Holder 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 Wastafel 2.00 Set 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 Robe Hook 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 Floor Drain 6.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 Kran 10.00 Unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
B JANITOR
Floor Drain 4.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Kran 2.00 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PARKIR
ARSITEK PARKIR LANTAI 2
I PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 448.95 m2 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
49/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 61.13 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 2,336.21 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
2 PLAFOND GYPSUM BOARD (9MM) 14.77 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
3 CAT PLAFOND GYPSUM BOARD 2,350.98 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
4 SHAADOWLINE 19.58 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 165.69 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
2 FLOOR HARDENER 5 KG (AREA PARKIR) 1,260.20 m2 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
3 STEP NOSING KERAMIK (TANGGA 3-4) 83.70 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 WATERPROOFING COATING 2.19 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 KERAMIK TILE (UK. 30x30) ROMAN POLISHED 76.20 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
6 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 49.50 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
7 KERAMIK TILE (UK. 30x30) ROMAN UNPOLISHED 21.32 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
8 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 28.56 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
9 PEKERJAAN PULAU PARKIR 143.16 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
50/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
7 PINTU TYPE WD1 (Uk. 900X2150) 2 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 2,383 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
2 PLAFOND GYPSUM BOARD (9MM) 525 m2 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 CAT PLAFOND GYPSUM BOARD 2,908 m2 0.009% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
4 SHAADOWLINE 348 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 105 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 HT (Uk. 60x60) POLISHED 315 m2 0.017% 95.00% 0.016% 0.00% 0.000% 95.00% 0.016%
3 SKIRTING HT (Uk. 60x60) POLISHED 170 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 HT (Uk. 60x60) UNPOLISHED 177 m2 0.009% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
5 SKIRTING HT (Uk. 60x60) UNPOLISHED 122 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 FLOOR HARDENER 3 KG (JANITOR) 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 FLOOR HARDENER 5 KG (AREA PARKIR) 715 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
8 STEP NOSING KERAMIK (TANGGA 3-4) 84 m' 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
9 WATERPROOFING COATING 2 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
10 KERAMIK TILE (UK. 30x30) ROMAN POLISHED 6 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
11 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 12 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
12 KERAMIK TILE (UK. 30x30) ROMAN UNPOLISHED 7 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
13 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 18 m' 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
14 PEKERJAAN PULAU PARKIR 197 m2 0.007% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
15 SCREED LANTAI LOBBY LIFT 34 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 1,906 m2 0.009% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
2 PLAFOND GYPSUM BOARD (9MM) LOBBY + LOBBY 759 m2 0.016% 95.00% 0.015% 0.00% 0.000% 95.00% 0.015%
3 LIFT
PLAFOND GYPSUM BOARD (9MM) TOILET SISWA & 46 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
GURU
4 CAT PLAFOND GYPSUM BOARD 46 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 CAT PLAFOND & BETON EXPOSE 2,664 m2 0.008% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
6 SHAADOWLINE 538 m' 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
7 PEKERJAAN MAN HOLE 4 Unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
51/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 103 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 HT (Uk. 60x60) POLISHED 498 m2 0.026% 95.00% 0.025% 0.00% 0.000% 95.00% 0.025%
3 SKIRTING HT (Uk. 60x60) POLISHED 291 m' 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
4 HT (Uk. 60x60) UNPOLISHED 307 m2 0.016% 95.00% 0.015% 0.00% 0.000% 95.00% 0.015%
5 KERAMIK TILE (UK. 40x40) ROMAN POLISHED 12 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 SKIRTING KERAMIK (UK. 10x30) ROMAN POLISHED 15 m' 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 KERAMIK TILE (UK. 40x40) ROMAN UNPOLISHED 7 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
8 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 18 m' 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
9 FLOOR HARDENER 3 KG (JANITOR) 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
10 FLOOR HARDENER 5 KG (AREA PARKIR) 744 m2 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
11 STEP NOSING KERAMIK (TANGGA 3-4) 163 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
12 WATERPROOFING COATING 2 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
13 PEKERJAAN PULAU PARKIR 178 m2 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
14 SCREED LANTAI LOBBY LIFT 34 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
B Teacher Toilet
1 Closet Duduk 5 Unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
2 Jet Washer 5 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
3 Paper Holder 5 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 Wastafel 4 Set 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 Robe Hook 5 Unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 Floor Drain 5 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 Urinoir 2 Unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
C JANITOR
1 Floor Drain 2 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 Kran 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
52/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 2,476 m2 0.012% 95.00% 0.012% 0.00% 0.000% 95.00% 0.012%
2 PLAFOND GYPSUM BOARD (9MM) 340 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
3 CAT PLAFOND GYPSUM BOARD 2,816 m2 0.008% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
4 SHAADOWLINE 222 m' 0.001% 80.00% 0.001% 0.00% 0.000% 80.00% 0.001%
V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 84 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 HT (Uk. 60x60) POLISHED 231 m2 0.013% 95.00% 0.012% 0.00% 0.000% 95.00% 0.012%
3 SKIRTING HT (Uk. 60x60) POLISHED 125 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 HT (Uk. 60x60) UNPOLISHED 95 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
5 SKIRTING HT (Uk. 60x60) UNPOLISHED 58 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 FLOOR HARDENER 3 KG (JANITOR) 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 FLOOR HARDENER 5 KG (AREA PARKIR) 1,302 m2 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
8 STEP NOSING KERAMIK (TANGGA) 103 m' 0.002% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
9 WATERPROOFING COATING 2 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
10 KERAMIK TILE (Uk. 30x30) ROMAN 7 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
11 SKIRTING HT (Uk. 30x30) 9 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
12 PEKERJAAN PULAU PARKIR 261 m2 0.009% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
VII JANITOR
1 Floor Drain 2 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 Kran 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 2,407 m2 0.012% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
2 CAT PLAFOND BETON EXPOSE 2,407 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
V PEKERJAAN LANTAI
1 LANTAI DUST PROOF / SETARA 65 m2 0.001% 0.000% 0.00% 0.000% 0.000%
2 FLOOR HARDENER 3 KG (JANITOR) 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
3 FLOOR HARDENER 5 KG (AREA PARKIR) 1,670 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
4 STEP NOSING KERAMIK (TANGGA) 49 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
5 WATERPROOFING COATING 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
6 KERAMIK TILE (Uk. 30x30) ROMAN 7 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 SKIRTING HT (Uk. 30x30) 9 m' 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
8 PEKERJAAN PULAU PARKIR 205 m2 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
VII JANITOR
1 Floor Drain 2 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 Kran 1 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
53/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
TANGGA 1, 2 MID 15 m' 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 RAILLING HOLOW STEEL GALVANIS 40X40 MM
TANGGA LOBBY, TANGGA PARKIR 15 m' 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
3 HANDRAIL PIPA BESI Ø38
TANGGA 1, 2 MID 12 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
```
IX PEKERJAAN LAIN - LAIN
1 PEKERJAAN FIRE STOPPER 7 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
2 PEKERJAAN CAR STOPPER (AREA PARKIR) 98 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
3 PEKERJAAN ARAH PANAH (AREA PARKIR) 14 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
4 PEKERJAAN GARIS PARKIR 255 m' 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 128 m' 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
6 PEKERJAAN KOLOM PROTEKTOR (AREA PARKIR) 134 unit 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
7 PEKERJAAN SERSAN RAMP 47 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 91 m' 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
9 PEKERJAAN CANSTEEN 710 m' 0.029% 100.00% 0.029% 0.00% 0.000% 100.00% 0.029%
10 PEKERJAAN CAT CANSTEEN 710 m' 0.008% 0.000% 0.00% 0.000% 0.000%
II PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 1,025 m2 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
2 CAT PLAFOND BETON EXPOSE 1,025 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
III PEKERJAAN LANTAI
1 PEKERJAAN PULAU PARKIR 590 m2 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
2 FLOOR HARDENER 5 KG (AREA PARKIR) 137 m2 0.005% 98.00% 0.005% 0.00% 0.000% 98.00% 0.005%
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 582.35 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
2 PLAFOND GYPSUM BOARD (9MM) MAIL BOX 236.23 m2 0.006% 0.000% 0.00% 0.000% 0.000%
3 CAT PLAFOND & BETON EXPOSE 582.35 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
4 CAT PLAFOND GYPSUM 236.23 m2 0.001% 0.000% 0.00% 0.000% 0.000%
5 PEKERJAAN PLAFOND ALUMUNIUM 375.31 m2 0.060% 95.00% 0.057% 0.00% 0.000% 95.00% 0.057%
6 PEKERJAAN PLAFOND WOOD PANEL 153.16 m2 0.041% 0.000% 0.00% 0.000% 0.000%
V PEKERJAAN LANTAI
54/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1 BATU ANDHESIT UK. 30x60 cm T : 4cm 84.83 m2 0.008% 90.00% 0.007% 5.00% 0.000% 95.00% 0.007%
2 BATU ANDHESIT UK. 30x60 cm T : 2cm 1,101.59 m2 0.099% 90.00% 0.089% 5.00% 0.005% 95.00% 0.094%
3 KERAMIK TILE (UK. 40x40) ROMAN UNPOLISHED 16.46 m2 0.001% 0.000% 0.00% 0.000% 0.000%
4 SKIRTING KERAMIK (UK. 10x30) ROMAN UNPOLISHED 24.83 m' 0.000% 0.000% 0.00% 0.000% 0.000%
5 PEMBUATAN DUST PROOF EX. FOSROC 116.22 m2 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
6 STEP NOSING KERAMIK 301.40 m' 0.005% 75.00% 0.003% 0.00% 0.000% 75.00% 0.003%
7 WATERPROOFING COATING 1,103.44 m2 0.012% 0.000% 0.00% 0.000% 0.000%
8 HT UK. 60x60 173.50 m2 0.009% 35.00% 0.003% 0.00% 0.000% 35.00% 0.003%
9 PEKERJAAN PULAU PARKIR 17.12 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
10 FLOOR HARDENER 5 KG (AREA PARKIR) 3.05 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
B JANITOR
1 Floor Drain 1.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
2 Kran 1.00 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
IV PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 46.93 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 91.36 m2 0.002% 40.00% 0.001% 0.00% 0.000% 40.00% 0.001%
3 PLAFOND GYPSUM BOARD (9MM) WR 1.85 m2 0.000% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
4 CAT PLAFOND GYPSUM BOARD 91.36 m2 0.000% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
5 CAT PLAFOND GYPSUM BOARD WR 1.85 m2 0.000% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
6 CAT PLAFOND BETON EXPOSE 46.93 m2 0.000% 80.00% 0.000% 0.00% 0.000% 80.00% 0.000%
7 SHADOWLINE PADA PLAFOND 106.61 m2 0.001% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
8 PLAFOND ALUMINIUM 210.21 m2 0.034% 85.00% 0.029% 10.00% 0.003% 95.00% 0.032%
V PEKERJAAN LANTAI
1 HT (60x60) 144 m2 0.008% 50.00% 0.004% 0.00% 0.000% 50.00% 0.004%
55/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
2 SKIRTING HT (UK. 10x60CM) POLISHED 71 m' 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 KERAMIK (UK. 30x30) ROMAN 85 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 WATERPROOFING COATING 1,015 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
5 WATERPROOFING MEMBRAN 219 m2 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
6 FIBER CEMENT 178 m2 0.062% 95.00% 0.059% 0.00% 0.000% 95.00% 0.059%
7 KERAMIK (UK. 30x30) UNPOLISHED 104 m2 0.005% 90.00% 0.005% 0.00% 0.000% 90.00% 0.005%
8 SKIRTING KERAMIK UK. 30X30 106 m' 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
9 FLOOR HARDENER 3 KG 4 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
10 PEMBUATAN DUST PROOF 52 m2 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
11 BATU ANDHESIT (AREA OUTDOOR + OUTDOOR AC) 534 m2 0.048% 100.00% 0.048% 0.00% 0.000% 100.00% 0.048%
12 BATU ANDHESIT (OVERFLOW) 173 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
JANITOR
1 Floor Drain 2 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
2 Kran 1 Unit 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
LANTAI 8
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 445 m2 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 9 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING SHEARWALL T = 5 C 27 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 9 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 DINDING KACA 45 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
8 PASANGAN DINDING BATA RINGAN Tebal 75 mm 491 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
56/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PINTU TYPE D-9 2 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
PINTU TYPE D-6 4 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
PINTU TYPE D-8 13 unit 0.012% 100.00% 0.012% 0.00% 0.000% 100.00% 0.012%
PINTU TYPE G1 2 unit 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 234 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
2 PLAFOND GYPSUM BOARD (9MM) 367 m2 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
3 PLAFOND GYPSUM BOARD (9MM) WR 50 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
4 PLAFOND CALCIUM CILICATE 37 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 367 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD (BALKON) 37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 50 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN LANTAI
HT (60x60) KORIDOR 55 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
SKIRTING HT (UK. 10x60CM) 50 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
HT (60x60)KORIDOR LUAR 46 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
SKIRTING HT (UK. 10x60CM) POLISHED 20 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
HT (60x60) 266 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
SKIRTING HT (UK. 10x60CM) POLISHED 277 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
HT (60x60) CLOSED 34 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
HT (60x60) SHOWER 15 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
HT (60x60) BALKON 31 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
SKIRTING KERAMIK UK. 30X30 32 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEMBUATAN DUST PROOF 39 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
STEP NOSSING 50 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
WATERPROOFING COATING 141 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
FLOOR HARDENER 4 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN
KITCHEN ZINK 15 Unit 0.003% 98.00% 0.003% 0.00% 0.000% 98.00% 0.003%
KRAN 15 Unit 0.001% 98.00% 0.001% 0.00% 0.000% 98.00% 0.001%
TOILET
Closet Duduk 17 Unit 0.006% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
Jet Washer 17 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 17 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Wastafel 17 Set 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
Head Shower 17 Set 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
Hand soap 17 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Towel Bar 17 Unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
Robe Hook 17 Unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Floor Drain 34 Unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
JANITOR
Floor Drain 2 Unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 Unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 15 Unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 31 m' 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
LANTAI 9
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
57/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE (BALKON) 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD (BALKON) 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM 436 0.021% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
4 SKIRTING HT (UK. 10x60CM) POLISHED 446 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
5 HT (60x60) CLOSED UNPOLISHED 53 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
6 HT (60x60) SHOWER UNPOLISHED 25 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HT (60x60) BALKON UNPOLISHED 55 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 90.00% 0.004% 0.00% 0.000% 90.00% 0.004%
KRAN 23 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Towel Bar 27 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
Robe Hook 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
58/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 10
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
59/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
10 DROP CEILLING 85 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99.1 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89.0 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM 435.8 0.021% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
4 SKIRTING HT (UK. 10x60CM) POLISHED 446.1 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
5 HT (60x60) CLOSED UNPOLISHED 53.3 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
6 HT (60x60) SHOWER UNPOLISHED 24.8 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HT (60x60) BALKON UNPOLISHED 55.5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 11.9 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 41.7 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 42.9 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50.4 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135.5 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4.0 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
TOILET
Closet Duduk 27 0.010% 90.00% 0.009% 0.00% 0.000% 90.00% 0.009%
Jet Washer 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Paper Holder 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Wastafel 27 0.005% 90.00% 0.005% 0.00% 0.000% 90.00% 0.005%
Head Shower 27 0.007% 90.00% 0.006% 0.00% 0.000% 90.00% 0.006%
Hand soap 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Towel Bar 27 0.003% 90.00% 0.003% 0.00% 0.000% 90.00% 0.003%
Robe Hook 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 11
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
60/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
2 PINTU TYPE SD-1B 2 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
3 PINTU TYPE SD-2 2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PINTU TYPE SD-6 5 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
5 PINTU TYPE SD-7 11 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD (BALKON) 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM 436 0.021% 100.00% 0.021% 0.00% 0.000% 100.00% 0.021%
4 SKIRTING HT (UK. 10x60CM) POLISHED 446 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
5 HT (60x60) CLOSED UNPOLISHED 53 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
6 HT (60x60) SHOWER UNPOLISHED 25 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HT (60x60) BALKON UNPOLISHED 55 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 50.00% 0.001% 0.00% 0.000% 50.00% 0.001%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 40.00% 0.000% 0.00% 0.000% 40.00% 0.000%
Towel Bar 27 0.003% 50.00% 0.002% 0.00% 0.000% 50.00% 0.002%
Robe Hook 27 0.001% 40.00% 0.000% 0.00% 0.000% 40.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 90.00% 0.002% 0.00% 0.000% 90.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
61/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
LANTAI 12
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
62/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK
- Material 23 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
- Upah 23 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
KRAN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
TOILET
Closet Duduk
- Material 27 unit 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 27 unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Jet Washer
- Material 27 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 27 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Paper Holder
- Material 27 unit 0.001% 40.00% 0.001% 0.00% 0.000% 40.00% 0.001%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel
- Material 27 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
- Upah 27 unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Head Shower
- Material 27 unit 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
- Upah 27 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Hand soap
- Material 27 unit 0.001% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar
- Material 27 unit 0.003% 40.00% 0.001% 0.00% 0.000% 40.00% 0.001%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook
- Material 27 unit 0.001% 45.50% 0.000% 0.00% 0.000% 45.50% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 54 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 90.00% 0.002% 0.00% 0.000% 90.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 13
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
63/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK
- Material 23 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
64/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
KRAN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
TOILET
Closet Duduk
- Material 27 unit 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 27 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Jet Washer
- Material 27 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 27 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Paper Holder
- Material 27 unit 0.001% 35.00% 0.000% 0.00% 0.000% 35.00% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel
- Material 27 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
- Upah 27 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Head Shower
- Material 27 unit 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
- Upah 27 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Hand soap
- Material 27 unit 0.001% 45.00% 0.000% 0.00% 0.000% 45.00% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar
- Material 27 unit 0.003% 35.00% 0.001% 0.00% 0.000% 35.00% 0.001%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook
- Material 27 unit 0.001% 40.00% 0.000% 0.00% 0.000% 40.00% 0.000%
- Upah 27 unit 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 54 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 14
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
65/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK
- Material 23 unit 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
KRAN
- Material 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 23 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
TOILET
Closet Duduk 27 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
Jet Washer 27 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
Head Shower 27 0.007% 100.00% 0.007% 0.00% 0.000% 100.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
66/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Upah 54 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 15
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
67/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 90.00% 0.002% 0.00% 0.000% 90.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 16
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 508 m2 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 94.38 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
68/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m' 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN PENEBALAN DINDING SHEARWALL T = 5 C 42 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 15 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 999.90 m2 0.023% 100.00% 0.023% 0.00% 0.000% 100.00% 0.023%
PEKERJAAN PLAFOND
PLAFOND BETON EXPOSE 51 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PLAFOND GYPSUM BOARD (9MM) 535 m2 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
PLAFOND GYPSUM BOARD (9MM) WR 80 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
PLAFOND CALCIUM CILICATE 65 m2 0.002% 90.00% 0.001% 5.00% 0.000% 95.00% 0.002%
CAT PLAFOND GYPSUM BOARD INTERIOR 535 m2 0.002% 90.00% 0.001% 5.00% 0.000% 95.00% 0.002%
CAT PLAFOND GYPSUM BOARD 65 m2 0.000% 90.00% 0.000% 5.00% 0.000% 95.00% 0.000%
CAT PLAFOND GYPSUM BOARD WR 80 m2 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
SKIRTING KERAMIK UK. 30X30 42 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEMBUATAN DUST PROOF 43 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
STEP NOSSING 58 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
WATERPROOFING COATING 135 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FLOOR HARDENER 4 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
69/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
KITCHEN
Kitchen Zink 23 Unit 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
Kran 23 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
TOILET
Closet Duduk 27 Unit 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 Unit 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 Unit 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 Set 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 Set 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 Unit 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 Unit 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 Unit 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
- Upah 54 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
JANITOR
Floor Drain 2 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 Unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
Floor Drain 23 Unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 m' 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 m' 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 17
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 249 m2 0.007% 95.00% 0.006% 0.00% 0.000% 95.00% 0.006%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 94 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 23 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
PEKERJAAN PLAFOND
PLAFOND BETON EXPOSE 742 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
PLAFOND GYPSUM BOARD (9MM) WR 5 m2 0.000% 80.00% 0.000% 0.00% 0.000% 80.00% 0.000%
Pekerjaan pengecatan plafond pada Beton Expose de 742 m2 0.004% 80.00% 0.003% 0.00% 0.000% 80.00% 0.003%
CAT PLAFOND GYPSUM BOARD INTERIOR 5 m2 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
Pekerjaan plafond gypsum WR 593 m2 0.018% 50.00% 0.009% 0.00% 0.000% 50.00% 0.009%
Pekerjaan plafond gypsum WR 95 m2 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN LANTAI
Keramik Tile uk. 30x30 cm Unpolished ex. ROMAN 12 m2 0.001% 65.00% 0.000% 0.00% 0.000% 65.00% 0.000%
Skirting, Keramik uk. 10x30 cm ex. ROMAN 9 m' 0.000% 65.00% 0.000% 0.00% 0.000% 65.00% 0.000%
Pekerjaan pembuatan dust proof ex. Fosroc/sika 41 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
70/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
Pekerjaan step nossing Keramik Tile 7,5x30cm ex. R 59 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Pekerjaan waterproofing coating ex. Fosroc/sika/EQ 5 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
Pekerjaan Lantai dengan Beton Expose Finished Floor H 516 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
Skirting, Homogenous Tile uk. 10x60 cm Polished ex. 204 m' 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
Homogenous Tile uk. 60x60 cm Unpolished ex. …./seta 3 m2 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
Pekerjaan Floor Hardener 4 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Waterproofing coating berikut mortar, grouting nat 800 m2 0.009% 95.00% 0.008% 0.00% 0.000% 95.00% 0.008%
JANITOR
Floor Drain 2 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
TOILET
Closet Duduk 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Jet Washer 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Paper Holder 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Wastafel 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Robe Hook 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Floor Drain 1 unit 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN RAILING
Railing vertikal Ø38 mm dengan Handrail Pipa Besi Ø3 13 m' 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
Railing vertikal Ø38 mm dengan Handrail Pipa Besi Ø3 15 m' 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
LANTAI 18
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 98.00% 0.001% 0.00% 0.000% 98.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 0.000% 0.00% 0.000% 0.000%
71/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain
- Material 54 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
- Upah 54 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 19
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
72/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 98.00% 0.001% 0.00% 0.000% 98.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
73/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 20
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
74/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 100.00% 0.011% 0.00% 0.000% 100.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 90.00% 0.000% 0.00% 0.000% 90.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
75/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
LANTAI 21
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 90.00% 0.010% 0.00% 0.000% 90.00% 0.010%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
76/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 22
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
77/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 90.00% 0.010% 5.00% 0.001% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 10.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
78/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1430 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1580 x 550 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 600 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1263 x 700 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1311 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1112 x 820 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
LANTAI 23
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 90.00% 0.010% 0.00% 0.000% 90.00% 0.010%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 90.00% 0.002% 0.00% 0.000% 90.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
79/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Towel Bar 27 0.003% 30.00% 0.001% 0.00% 0.000% 30.00% 0.001%
Robe Hook 27 0.001% 30.00% 0.000% 0.00% 0.000% 30.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 80.00% 0.001% 0.00% 0.000% 80.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 24
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
80/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
81/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 100.00% 0.015% 0.00% 0.000% 100.00% 0.015%
LANTAI 25
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 70.00% 0.000% 25.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 50.00% 0.000% 25.00% 0.000% 75.00% 0.000%
82/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
8 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
9 PEKERJAAN SHADOW LINE 1,021 0.006% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
10 DROP CEILLING 85 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 MANHOLE 27 0.000% 50.00% 0.000% 0.00% 0.000% 50.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
LANTAI 26
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
83/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
3 SKIMCOAT DINDING BETON 222 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
4 CAT DINDING INTERIOR 1,350 m2 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
5 CAT DINDING EXTERIOR 254 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 CAT MINYAK (AREA PARKIR, SERVIS DAN FAN ) 220 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 HOMOGENOUS TILE (SHOWER)
- Material 164 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
- Upah 164 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 0.009% 100.00% 0.009% 0.00% 0.000% 100.00% 0.009%
- Upah 262 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
9 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 52 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 KERAMIK (30x30) JANITOR 2 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
11 WATERPROOFING COATING 143 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 65.00% 0.000% 30.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 65.00% 0.000% 20.00% 0.000% 85.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 85.00% 0.004% 0.00% 0.000% 85.00% 0.004%
KRAN 23 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
84/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
LANTAI 27
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
85/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 95.00% 0.011% 0.00% 0.000% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 10.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 50.00% 0.000% 25.00% 0.000% 75.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
11 STEP NOSSING 50 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
13 FLOOR HARDENER 4 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 85.00% 0.001% 0.00% 0.000% 85.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 85.00% 0.002% 0.00% 0.000% 85.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
LANTAI 28
PEKERJAAN PASANGAN DINDING DAN PARTISI
86/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 85.00% 0.010% 10.00% 0.001% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 10.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 85.00% 0.000% 0.00% 0.000% 85.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
87/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
LANTAI 29
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 100.00% 0.020% 0.00% 0.000% 100.00% 0.020%
88/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
6 JENDELA TYPE W-9 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
7 JENDELA TYPE W-11 1 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
8 JENDELA CURTAIN WALL 4 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
9 PINTU TYPE D-1 23 0.025% 100.00% 0.025% 0.00% 0.000% 100.00% 0.025%
10 PINTU TYPE D-2 12 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
11 PINTU TYPE D-3 23 0.010% 100.00% 0.010% 0.00% 0.000% 100.00% 0.010%
12 PINTU TYPE D-9 4 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
13 PINTU TYPE D-7 4 0.004% 100.00% 0.004% 0.00% 0.000% 100.00% 0.004%
14 PINTU TYPE D-6 8 0.008% 100.00% 0.008% 0.00% 0.000% 100.00% 0.008%
15 PINTU TYPE D-8 15 0.014% 100.00% 0.014% 0.00% 0.000% 100.00% 0.014%
16 PINTU TYPE G1 2 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 85.00% 0.010% 10.00% 0.001% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 85.00% 0.000% 10.00% 0.000% 95.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 50.00% 0.000% 20.00% 0.000% 70.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
KRAN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 90.00% 0.001% 0.00% 0.000% 90.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 95.00% 0.007% 0.00% 0.000% 95.00% 0.007%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
89/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1275 x 600 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1330 x 660 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
1430 x 650 4 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
1400 x 650 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
1300 x 700 2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
FIRE STOPPER 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
LANTAI 30
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 0.013% 100.00% 0.013% 0.00% 0.000% 100.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 0.020% 95.00% 0.019% 0.00% 0.000% 95.00% 0.019%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 0.011% 85.00% 0.010% 10.00% 0.001% 95.00% 0.011%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 0.002% 85.00% 0.002% 10.00% 0.000% 95.00% 0.002%
4 PLAFOND CALCIUM CILICATE 65 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 0.002% 85.00% 0.001% 10.00% 0.000% 95.00% 0.002%
6 CAT PLAFOND GYPSUM BOARD 65 0.000% 50.00% 0.000% 35.00% 0.000% 85.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 0.000% 50.00% 0.000% 20.00% 0.000% 70.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
90/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 50 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 0.001% 85.00% 0.001% 10.00% 0.000% 95.00% 0.001%
TOILET
Closet Duduk 27 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 0.001% 85.00% 0.001% 10.00% 0.000% 95.00% 0.001%
Paper Holder 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Hand soap 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
Kran 1 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
BALKON
FLOOR DRAIN 23 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 12 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
LANTAI 31
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 508.34 m2 0.014% 95.00% 0.013% 0.00% 0.000% 95.00% 0.013%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 94.38 m2 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 15.11 m2 0.000% 0.000% 0.00% 0.000% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 999.90 m2 0.023% 95.00% 0.022% 0.00% 0.000% 95.00% 0.022%
91/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
1 PINTU TYPE SD1 2 unit 0.003% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
2 PINTU TYPE SD-1B 2 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
3 PINTU TYPE SD-2 2 unit 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
4 PINTU TYPE SD-6 5 unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
5 PINTU TYPE SD-7 11 unit 0.004% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 0.011% 80.00% 0.009% 5.00% 0.001% 85.00% 0.010%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 m2 0.002% 40.00% 0.001% 35.00% 0.001% 75.00% 0.001%
4 PLAFOND CALCIUM CILICATE 65 m2 0.002% 40.00% 0.001% 20.00% 0.000% 60.00% 0.001%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 m2 0.002% 50.00% 0.001% 35.00% 0.001% 85.00% 0.001%
6 CAT PLAFOND GYPSUM BOARD 65 m2 0.000% 70.00% 0.000% 0.00% 0.000% 70.00% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 m2 0.000% 40.00% 0.000% 20.00% 0.000% 60.00% 0.000%
8 Insulasi di bawah atap dak beton dengan menggunaka 686 m2 0.027% 95.00% 0.025% 0.00% 0.000% 95.00% 0.025%
PEKERJAAN LANTAI
1 HT (60x60) KORIDOR 99 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
2 SKIRTING HT (UK. 10x60CM) 89 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
3 HT (60x60)BEDROOM
- Material 436 m2 0.016% 100.00% 0.016% 0.00% 0.000% 100.00% 0.016%
- Upah 436 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
4 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
- Upah 446 m' 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
5 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 53 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
6 HT (60x60) SHOWER UNPOLISHED
- Material 25 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
- Upah 25 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
7 HT (60x60) BALKON UNPOLISHED
- Material 55 m2 0.002% 100.00% 0.002% 0.00% 0.000% 100.00% 0.002%
- Upah 55 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
9 SKIRTING KERAMIK UK. 30X30 42 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
10 PEMBUATAN DUST PROOF 43 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
11 STEP NOSSING 58 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
12 WATERPROOFING COATING 135 m2 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
13 FLOOR HARDENER 4 m2 0.000% 100.00% 0.000% 0.00% 0.000% 100.00% 0.000%
PEKERJAAN SANITARY
KITCHEN ZINK 23 unit 0.005% 95.00% 0.004% 0.00% 0.000% 95.00% 0.004%
KRAN 23 unit 0.001% 80.00% 0.001% 0.00% 0.000% 80.00% 0.001%
TOILET
Closet Duduk 27 unit 0.010% 95.00% 0.009% 0.00% 0.000% 95.00% 0.009%
Jet Washer 27 unit 0.001% 80.00% 0.001% 0.00% 0.000% 80.00% 0.001%
Paper Holder 27 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Wastafel 27 unit 0.005% 95.00% 0.005% 0.00% 0.000% 95.00% 0.005%
Head Shower 27 unit 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Hand soap 27 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Towel Bar 27 unit 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Robe Hook 27 unit 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Floor Drain 54 unit 0.003% 95.00% 0.003% 0.00% 0.000% 95.00% 0.003%
JANITOR
Floor Drain 2 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
BALKON
FLOOR DRAIN 23 unit 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 0.001% 95.00% 0.001% 0.00% 0.000% 95.00% 0.001%
RAILLING VERTIKAL Ø38 13 m' 0.002% 95.00% 0.002% 0.00% 0.000% 95.00% 0.002%
92/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x5 55 m' 0.015% 95.00% 0.014% 0.00% 0.000% 95.00% 0.014%
LMR
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 379.16 m2 0.010% 95.00% 0.010% 0.00% 0.000% 95.00% 0.010%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 10.04 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
PEKERJAAN PLAFOND
Plafond Beton Expose ex. MU/DRYMIX/EQ 90.77 m2 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
pengecatan plafond pada Beton Expose dengan Cat M 90.77 m2 0.001% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
PEKERJAAN LANTAI
Keramik Tile uk. 30x30 cm Unpolished ex. ROMAN 3.23 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Skirting, Keramik uk. 10x30 cm ex. ROMAN 7.31 m2 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Pekerjaan Lantai dengan Beton Expose Finished Floor H 732.60 m2 0.013% 95.00% 0.012% 0.00% 0.000% 95.00% 0.012%
Pekerjaan screed + waterproofing membran 732.60 m2 0.033% 95.00% 0.031% 0.00% 0.000% 95.00% 0.031%
Pekerjaan pembuatan dust proof ex. Fosroc/sika 66.45 m2 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
JANITOR
Floor Drain 1.00 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
Kran 1.00 unit 0.000% 95.00% 0.000% 0.00% 0.000% 95.00% 0.000%
LANTAI ATAP
Waterproofing Membrane ex. Fosroc/sika Finish scree 135.16 m2 0.006% 100.00% 0.006% 0.00% 0.000% 100.00% 0.006%
Pekerjaan tanggulan 10cm keliling dak atap 73.31 m' 0.001% 100.00% 0.001% 0.00% 0.000% 100.00% 0.001%
Lt 7 Plafond bawah balkon menggunakan Gypsum WR + 106.37 m2 0.003% 100.00% 0.003% 0.00% 0.000% 100.00% 0.003%
Screed+Aci slooping kanopi 106.37 m2 0.005% 100.00% 0.005% 0.00% 0.000% 100.00% 0.005%
Grouting celah lantai dengan precast 1,228.21 m2 0.024% 100.00% 0.024% 0.00% 0.000% 100.00% 0.024%
93/157
BOBOT Progress
NO ITEM PEKERJAAN VOL SAT
(%) Periode lalu Periode saat ini s/d Periode saat ini
1 2 3 4 Progress Bobot Progress Bobot Progress Bobot
94/157
RINCIAN PROGRESS PEKERJAAN ARSITEK
PROYEK PEMBANGUNAN APARTEMEN SOLTERRA - PEJATEN - JAKARTA SELATAN PROGRESS BULAN JULI 2023
22 Februari 2021 s/d 28 Februari 2021
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
ARSITEK LANTAI B2
IX PEKERJAAN LAIN - LAIN
6 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 374.88 m' 453,628 170,056,065 0.033% 0.000% 0.00% 0.000% 0.000%
ARSITEK LANTAI B1
IX PEKERJAAN LAIN - LAIN
6 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 22.70 m' 453,628 10,297,356 0.002% 0.000% 0.00% 0.000% 0.000%
PARKIR
ARSITEK PARKIR LANTAI 2
IX PEKERJAAN LAIN - LAIN
5 PEMBUATAN GUTTER DAN GRILL (LEBAR 20CM) 93 m' 453,628 42,391,537 0.008% 0.000% 0.00% 0.000% 0.000%
7 PEKERJAAN SERSAN RAMP 343 m' 151,209 51,839,405 0.010% 0.000% 0.00% 0.000% 0.000%
8 PEMBUATAN GUTTER DAN GRILL (LEBAR 15CM) 26 m' 417,338 11,046,937 0.002% 0.000% 0.00% 0.000% 0.000%
95/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1 PLAFOND BETON EXPOSE 582.35 m2 25,851 15,054,330 0.003% 0.000% 0.00% 0.000% 0.000%
3 CAT PLAFOND & BETON EXPOSE 582.35 m2 28,985 16,879,415 0.003% 0.000% 0.00% 0.000% 0.000%
LANTAI 8
PEKERJAAN FINISHING DINDING
1 PLESTER 1,323 m2 40,159 53,124,121 0.010% 0.000% 0.00% 0.000% 0.000%
2 ACIAN 1,323 m2 22,619 29,921,425 0.006% 0.000% 0.00% 0.000% 0.000%
3 SKIMCOAT DINDING BETON 166 m2 25,851 4,291,266 0.001% 0.000% 0.00% 0.000% 0.000%
4 CAT DINDING INTERIOR 936 m2 15,362 14,372,595 0.003% 0.000% 0.00% 0.000% 0.000%
5 CAT DINDING EXTERIOR 150 m2 26,086 3,925,492 0.001% 0.000% 0.00% 0.000% 0.000%
6 CAT MINYAK (AREA SERVIS DAN FAN ) 203 m2 28,985 5,883,491 0.001% 0.000% 0.00% 0.000% 0.000%
7 HOMOGENOUS TILE (SHOWER) 104 m2 246,807 25,584,631 0.005% 0.000% 0.00% 0.000% 0.000%
8 HOMOGENOUS TILE (CLOSED) 165 m2 246,807 40,794,112 0.008% 0.000% 0.00% 0.000% 0.000%
9 HOMOGENOUS TILE (MEJA PANTRY) 34 m2 246,807 8,301,600 0.002% 0.000% 0.00% 0.000% 0.000%
10 KERAMIK (30x30) JANITOR 2 m2 251,712 397,705 0.000% 0.000% 0.00% 0.000% 0.000%
11 MARMER LOKAL PADA KOLOM 25 m2 1,742,214 42,806,198 0.008% 0.000% 0.00% 0.000% 0.000%
12 WATERPROOFING COATING 87 m2 55,692 4,872,805 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PLAFOND
PLAFOND BETON EXPOSE 234 m2 25,851 6,051,719 0.001% 0.000% 0.00% 0.000% 0.000%
PLAFOND GYPSUM BOARD (9MM) 367 m2 110,054 40,420,633 0.008% 0.000% 0.00% 0.000% 0.000%
PLAFOND GYPSUM BOARD (9MM) WR 50 m2 129,748 6,544,489 0.001% 0.000% 0.00% 0.000% 0.000%
PLAFOND CALCIUM CILICATE 37 m2 129,748 4,840,898 0.001% 0.000% 0.00% 0.000% 0.000%
CAT PLAFOND GYPSUM BOARD INTERIOR 367 m2 15,362 5,642,155 0.001% 0.000% 0.00% 0.000% 0.000%
CAT PLAFOND GYPSUM BOARD 37 m2 26,086 973,269 0.000% 0.000% 0.00% 0.000% 0.000%
CAT PLAFOND GYPSUM BOARD WR 50 m2 26,086 1,315,778 0.000% 0.000% 0.00% 0.000% 0.000%
96/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN LANTAI
HT (60x60) 266 m2 253,210 67,326,007 0.013% 0.000% 0.00% 0.000% 0.000%
SKIRTING HT (UK. 10x60CM) POLISHED 277 m' 52,763 14,599,522 0.003% 0.000% 0.00% 0.000% 0.000%
HT (60x60) CLOSED 34 m2 272,787 9,280,214 0.002% 0.000% 0.00% 0.000% 0.000%
HT (60x60) SHOWER 15 m2 272,787 3,974,507 0.001% 0.000% 0.00% 0.000% 0.000%
HT (60x60) BALKON 31 m2 272,787 8,394,202 0.002% 0.000% 0.00% 0.000% 0.000%
STEP NOSSING 50 m' 78,153 3,935,004 0.001% 0.000% 0.00% 0.000% 0.000%
WATERPROOFING COATING 141 m2 55,692 7,841,991 0.002% 0.000% 0.00% 0.000% 0.000%
FLOOR HARDENER 4 m2 32,661 131,950 0.000% 0.000% 0.00% 0.000% 0.000%
BALKON
FLOOR DRAIN 15 Unit 277,622 4,164,330 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 8 1,556,695,169 1,556,695,169 0.299% 0.000% 0.000% 0.000%
LANTAI 9
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 470.80 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
3 PEKERJAAN DINDING KACA SHOWER SCREEN 18.40 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
5 PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42.48 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
6 PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13.45 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
7 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%
97/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 129,748 10,383,732 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN LANTAI
3 HT (60x60)BEDROOM 436 m2 253,210 110,351,957 0.021% 0.000% 0.00% 0.000% 0.000%
4 SKIRTING HT (UK. 10x60CM) POLISHED 446 m' 52,763 23,537,258 0.005% 0.000% 0.00% 0.000% 0.000%
5 HT (60x60) CLOSED UNPOLISHED 53 m2 272,787 14,550,459 0.003% 0.000% 0.00% 0.000% 0.000%
6 HT (60x60) SHOWER UNPOLISHED 25 m2 272,787 6,776,029 0.001% 0.000% 0.00% 0.000% 0.000%
7 HT (60x60) BALKON UNPOLISHED 55 m2 272,787 15,126,039 0.003% 0.000% 0.00% 0.000% 0.000%
8 KERAMIK (UK. 30x30) UNPOLISHED ROMAN 12 m2 253,787 3,027,679 0.001% 0.000% 0.00% 0.000% 0.000%
9 SKIRTING KERAMIK UK. 30X30 42 m' 66,183 2,761,419 0.001% 0.000% 0.00% 0.000% 0.000%
10 PEMBUATAN DUST PROOF 43 m2 90,726 3,889,424 0.001% 0.000% 0.00% 0.000% 0.000%
11 STEP NOSSING 50 m' 78,153 3,935,004 0.001% 0.000% 0.00% 0.000% 0.000%
12 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 9 1,804,728,073 1,804,728,073 0.347% 0.0000% 0.000% 0.000%
LANTAI 10 1 ls 1,804,728,073 279,565,035 0.054% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
98/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
7 Jendela W2 11.00 unit 3,245,603 35,701,633 0.007% 0.000% 0.00% 0.000% 0.000%
8 Jendela W3 1.00 unit 4,693,622 4,693,622 0.001% 0.000% 0.00% 0.000% 0.000%
9 Jendela W4 3.00 unit 4,693,622 14,080,866 0.003% 0.000% 0.00% 0.000% 0.000%
10 Jendela W5 4.00 unit 2,709,119 10,836,476 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM 436 m2 253,210 110,351,957 0.021% 0.000% 0.00% 0.000% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED 446 m' 52,763 23,537,258 0.005% 0.000% 0.00% 0.000% 0.000%
3 HT (60x60) CLOSED UNPOLISHED 53 m2 272,787 14,550,459 0.003% 0.000% 0.00% 0.000% 0.000%
4 HT (60x60) BALKON UNPOLISHED 55 m2 272,787 15,126,039 0.003% 0.000% 0.00% 0.000% 0.000%
9 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 10 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 11 1 ls 1,804,728,073 308,304,600 0.059% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
99/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 CAT PLAFOND BETON EXPOSE 51 m2 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 11 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 12 1 ls 1,804,728,073 308,304,600 0.059% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
100/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Material 164 m2 181,169 29,727,659 0.006% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 164 m2 65,638 10,770,408 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
5 HOMOGENOUS TILE (CLOSED)
- Material 262 m2 181,169 47,459,031 0.009% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 262 m2 65,638 17,194,530 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
6 HOMOGENOUS TILE (MEJA PANTRY)
- Material 52 m2 181,169 9,354,842 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 52 m2 65,638 3,389,284 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
7 WATERPROOFING COATING 143 m2 55,692 7,941,657 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 12 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 13 1 ls 1,804,728,073 308,304,600 0.059% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
101/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 m2 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 13 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
102/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
LANTAI 14 1 ls 1,804,728,073 732,085,497 0.141% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
103/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1400 x 650 2.00 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2.00 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 1.99 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 14 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 15 1 ls 1,804,728,073 691,587,430 0.133% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 WATERPROOFING COATING 135 m2 55,692 7,545,152 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
104/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 15 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 16 1 ls 1,835,251,285 757,123,020 0.145% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 508 m2 141,649 72,005,828 0.014% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 999.90 m2 120,938 120,926,085 0.023% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 m2 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 m2 129,748 10,383,732 0.002% 0.000% 0.00% 0.000% 0.000%
4 PLAFOND CALCIUM CILICATE 65 m2 129,748 8,441,405 0.002% 0.000% 0.00% 0.000% 0.000%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 m2 15,362 8,217,011 0.002% 0.000% 0.00% 0.000% 0.000%
6 CAT PLAFOND GYPSUM BOARD 65 m2 26,086 1,697,155 0.000% 0.000% 0.00% 0.000% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 m2 26,086 2,087,663 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
105/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
MEJA PANTRY
1680 x 600 2 2,355,205 4,710,410 0.001% 0.000% 0.00% 0.000% 0.000%
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 16 1,835,251,285 1,835,251,285 0.353% 0.0000% 0.000% 0.000%
LANTAI 17 1 ls 672,419,087 287,475,564 0.055% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 249 m2 141,649 35,321,595 0.007% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 93.94 m2 172,843 16,236,699 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 329,847 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PASANGAN DINDING BATA RINGAN Tebal 75 mm 23 m2 120,938 2,786,412 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
Plafond Beton Expose ex. MU/DRYMIX/EQ, yang dilaksanaka 742 m2 25,851 19,184,027 0.004% 0.000% 0.00% 0.000% 0.000%
Plafond Gypsum Board WR T : 9 mm secara full system de 5 m2 129,748 617,600 0.000% 0.000% 0.00% 0.000% 0.000%
Pekerjaan pengecatan plafond pada Beton Expose denga 742 m2 28,985 21,509,769 0.004% 0.000% 0.00% 0.000% 0.000%
Pekerjaan pengecatan pada plafond Gypsum Board WR 9 5 m2 26,086 124,169 0.000% 0.000% 0.00% 0.000% 0.000%
Pekerjaan plafond gypsum WR + pengecatan yang dilaksana 593 m2 155,834 92,356,578 0.018% 0.000% 0.00% 0.000% 0.000%
Pekerjaan plafond gypsum WR + pengecatan yang dilaksana 95 m2 155,834 14,788,647 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 17 672,419,087 672,419,087 0.129% 0.000% 0.000% 0.000%
LANTAI 18 1 ls 1,804,728,073 760,316,432 0.146% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
106/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 18 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 19 1 ls 1,804,728,073 760,316,432 0.146% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
107/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
10 DROP CEILLING 85 m2 52,131 4,431,135 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 19 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 20 1 ls 1,804,728,073 886,201,692 0.170% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.0000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.0000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.0000% 0.00% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
2 PLAFOND GYPSUM BOARD (9MM) 535 m2 110,054 58,867,004 0.011% 0.000% 0.00% 0.000% 0.000%
3 PLAFOND GYPSUM BOARD (9MM) WR 80 129,748 10,383,732 0.002% 0.000% 0.00% 0.000% 0.000%
4 PLAFOND CALCIUM CILICATE 65 129,748 8,441,405 0.002% 0.000% 0.00% 0.000% 0.000%
5 CAT PLAFOND GYPSUM BOARD INTERIOR 535 15,362 8,217,011 0.002% 0.000% 0.00% 0.000% 0.000%
6 CAT PLAFOND GYPSUM BOARD 65 26,086 1,697,155 0.000% 0.000% 0.00% 0.000% 0.000%
7 CAT PLAFOND GYPSUM BOARD WR 80 26,086 2,087,663 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
108/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 20 1,804,728,073 1,804,728,073 0.347% 0.0000% 0.000% 0.000%
LANTAI 21 1 ls 1,804,728,073 886,201,692 0.170% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN LANTAI
1 HT (60x60)BEDROOM
- Material 436 m2 195,117 85,034,330 0.016% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 436 m2 58,093 25,317,627 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 SKIRTING HT (UK. 10x60CM) POLISHED
- Material 446 m' 30,249 13,493,897 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 446 m' 22,514 10,043,360 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 HT (60x60) CLOSED UNPOLISHED
- Material 53 m2 214,694 11,451,778 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
- Upah 53 m2 58,093 3,098,681 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
109/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1700 x 600 2 2,383,243 4,766,486 0.001% 0.000% 0.00% 0.000% 0.000%
1430 x 600 1 2,004,728 2,004,728 0.000% 0.000% 0.00% 0.000% 0.000%
1580 x 550 1 2,215,014 2,215,014 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 600 2 2,004,728 4,009,456 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 1 2,057,033 2,057,033 0.000% 0.000% 0.00% 0.000% 0.000%
1263 x 700 1 1,998,487 1,998,487 0.000% 0.000% 0.00% 0.000% 0.000%
1311 x 600 1 1,837,901 1,837,901 0.000% 0.000% 0.00% 0.000% 0.000%
1112 x 820 2 1,960,187 3,920,374 0.001% 0.000% 0.00% 0.000% 0.000%
1275 x 600 1 1,787,432 1,787,432 0.000% 0.000% 0.00% 0.000% 0.000%
1330 x 660 1 2,104,503 2,104,503 0.000% 0.000% 0.00% 0.000% 0.000%
1430 x 650 4 2,133,732 8,534,928 0.002% 0.000% 0.00% 0.000% 0.000%
1400 x 650 2 2,215,266 4,430,532 0.001% 0.000% 0.00% 0.000% 0.000%
1300 x 700 2 2,057,033 4,114,066 0.001% 0.000% 0.00% 0.000% 0.000%
FIRE STOPPER 2 544,354 1,083,264 0.000% 0.000% 0.00% 0.000% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 21 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 22 1 ls 1,804,728,073 1,098,616,195 0.211% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 m2 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 22 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 23 1 ls 1,804,728,073 1,098,616,195 0.211% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 23 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 24 1 ls 1,804,728,073 1,098,616,195 0.211% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
110/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 24 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 25 1 ls 1,804,728,073 1,215,265,409 0.234% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING HOLLOW GALVANIS 40x40 + HANDRAIL 50x50 55 m' 1,447,714 79,255,103 0.015% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 25 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 26 1 ls 1,804,728,073 1,215,265,409 0.234% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 75 mm 871.70 m2 120,938 105,421,495 0.020% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 330,810 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
4 PASANGAN DINDING BATA RINGAN Tebal 125 mm 82.80 m2 172,843 14,311,400 0.003% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 26 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 27 1 ls 1,804,728,073 1,198,812,624 0.230% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 872 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%
111/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
11 Jendela W11 1.00 unit 8,990,343 8,990,343 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 27 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 28 1 ls 1,804,728,073 1,198,812,624 0.230% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 872 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 28 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 29 1 ls 1,804,728,073 1,198,812,624 0.230% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 872 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PLAFOND
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
HANDRAIL Ø38 16 m' 318,497 5,048,177 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 29 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI 30 1 ls 1,804,728,073 1,377,638,842 0.265% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
PASANGAN DINDING BATA RINGAN Tebal 100 mm 471 m2 141,649 66,688,607 0.013% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 125 mm 83 m2 172,843 14,311,400 0.003% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN DINDING KACA SHOWER SCREEN 18 m2 643,299 11,836,702 0.002% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN TANGGULAN BETON T= 300 mm 1 m2 240,764 330,810 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PENEBALAN DINDING STRUKTUR T = 5 CM 42 m2 66,532 2,826,040 0.001% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN CALSIBOARD PENUTUP PIPA AIR HUJAN 13 m2 133,064 1,790,043 0.000% 0.000% 0.00% 0.000% 0.000%
PASANGAN DINDING BATA RINGAN Tebal 75 mm 872 m2 120,938 105,421,495 0.020% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN PLAFOND
112/157
HARGA JUMLAH Progress
NO ITEM PEKERJAAN VOL SAT SATUAN HARGA BOBOT Periode lalu Periode saat ini s/d Periode saat ini
( Rp,- ) ( Rp,- ) (%) Progress Bobot Progress Bobot Progress Bobot
1 PLAFOND BETON EXPOSE 51 25,851 1,309,993 0.000% 0.000% 0.00% 0.000% 0.000%
PEKERJAAN RAILLING
RAILLING VERTIKAL Ø38 13 m' 868,628 11,300,850 0.002% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI 30 1,804,728,073 1,804,728,073 0.347% 0.000% 0.000% 0.000%
LANTAI ATAP
Pekerjaan tanggulan 10cm keliling dak atap 73 m' 39,445 2,891,739 0.001% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Screed+Aci slooping kanopi 106 m2 234,105 24,901,749 0.005% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
Grouting celah lantai dengan precast 1,228 m2 100,403 123,315,969 0.024% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI ATAP 199,327,774 199,327,774 0.038% 0.000% 0.000% 0.000%
LT. LMR 1 ls 403,591,572 299,995,591 0.058% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
PEKERJAAN PASANGAN DINDING DAN PARTISI
1 PASANGAN DINDING BATA RINGAN Tebal 100 mm 379.16 m2 141,649 53,707,259 0.010% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
2 PASANGAN DINDING BATA RINGAN Tebal 125 mm 10.04 m2 172,843 1,734,739 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
3 PEKERJAAN TANGGULAN BETON T= 300 mm 1.37 m2 240,764 329,847 0.000% 0.00% 0.000% 0.00% 0.000% 0.00% 0.000%
TOTAL PEKERJAAN ARSITEK LANTAI LMR 403,591,572 403,591,572 0.078% 0.000% 0.000% 0.000%
TOTAL PEKERJAAN FACADE PARKIR MID - 3,368,981,528 0.65% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN FACADE PARKIR TOWER MID - 13,141,023,888 2.53% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN ARSITEK PODIUM & PARKIR 15,511,963,925 2.98% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN ARSITEK TOWER 1 (MID) 53,269,085,545 10.24% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN ARSITEK TOWER 2 (MID HIGH) 70,901,434,235 13.62% 0.00% 0.00% 0.00%
TOTAL PEKERJAAN ARSITEK 152,823,507,593 29.368% 0.000% 0.000% 0.000%
113/157
BILL OF QUANTITY
PROYEK PEMBANGUNAN "SOLTERRA PLACE" ###
PEJATEN, JAKARTA SELATAN
PAKET PEKERJAAN STRUKTUR BAJA
114/157
PAKET PEKERJAAN MEP
PROYEK PEMBANGUNAN SOLTERRA PLEACE 520380000000
PEJATEN - JAKARTA
PEMADAM KEBAKARAN PROGRESS BULAN JULI 2023
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI
PLUMBING
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI
ELECTRONIC
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI
ELEKTRIKAL
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI
LIFT / ELEVATOR
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI
PROGRESS MOS
1 Lift 6 & 7 (MOS) 1,926,911,200 0.3703% 0.3703% 0.0000% 0.3703%
2 Lift 8 (MOS) 963,455,600 0.1851% 0.1851% 0.0000% 0.1851%
3 Lift 9 (MOS) + Pekerjaan 1,214,415,700 0.2334% 0.2334% 0.0000% 0.2334%
4 Lift 10 407,152,000 0.0782% 0.0782% 0.0000% 0.0782%
5 Lift 1 PODIUM MH (MOS) 407,152,000 0.0782% 0.0587% 0.0000% 0.0587%
6 Lift 2 & 3 MH (MOS) 1,935,596,600 0.3720% 0.2790% 0.0000% 0.2790%
7 Lift 4 MH (MOS) 967,798,300 0.1860% 0.1488% 0.0000% 0.1488%
8 Lift 5 MH (MOS) 1,214,415,700 0.2334% 0.2100% 0.0000% 0.2100%
9 Supervisory Panel + Instalasi "Computerize PC
Monitor 24" 23,473,600 0.0045% 0.0041% 0.0000% 0.0041%
10 Grounding Lift & Dumb Waiter 41,900,548 0.0081% 0.0072% 0.0000% 0.0072%
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI
SD SAAT
NO. URAIAN TOTAL (Rp) BOBOT SAAT LALU SAAT INI
INI
NO ITEM PEKERJAAN URAIAN M83 M84 M85 M86 M87 M88 M89 M90 M91 M92 M93 M94 M95 M96
A PEKERJAAN STRUKTUR
1 PEKERJAAN GALIAN
2. PEKERJAAN BOBOKAN
TOWER MID
I PEKERJAAN BALOK KONVESIONAL
IV PEKERJAAN SW DAN CW
V PEKERJAAN RW
B PEKERJAAN ARSITEKTUR
SCIMCOAT
Lt. B3 9,272.1 m² Progress 6.92% 6.92% 15.00%
Lt. B2 8,626.5 m² Progress 5.00%
IV PEKERJAAN CW & SW
32.37% 32.37% 38.70% 38.70% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84%
5.04% 5.04% 26.64% 36.56% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75%
5.00% 5.00% 5.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00%
27.64% 27.64% 27.64% 27.64% 52.94% 52.94% 52.94% 52.94% 52.94% 52.94% 52.94%
29.01% 29.01% 29.01% 29.01% 85.00% 85.00% 85.00% 85.00% 85.00% 85.00% 85.00%
35.00% 35.00% 35.00% 35.00% 65.00% 65.00% 65.00% 65.00% 65.00% 65.00% 65.00%
26.54% 26.54% 26.54% 26.54% 50.45% 50.45% 50.45% 50.45% 50.45% 50.45% 50.45%
29.65% 29.65% 29.65% 29.65% 85.00% 85.00% 85.00% 85.00% 85.00% 85.00% 85.00%
36.45% 36.45% 36.45% 36.45% 65.00% 65.00% 65.00% 65.00% 65.00% 65.00% 65.00%
0.00% 0.00% 21.23% 21.23% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36%
0.00% 0.00% 24.64% 24.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64%
35.00% 50.00% 55.00% 55.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00%
35.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%
M119 M120 M121 M122 M123 M124 M125 M126 M127 M128 M129 M130 M131 M132 M133 M134 M135 M136 M137 M138 M139 M140
45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84%
41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75%
30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00%
52.94% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
65.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.45% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
65.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36%
45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64%
60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00%
50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%
M141 M142 M143 M144 M145 M146 M147 M148 M149 M150 M151 M152 M153 M154 M155 M156 M157 M158 M158 M159 M161 M162
45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84% 45.84%
41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75% 41.75%
30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00% 28.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 40.36%
45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 45.64%
60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00%
50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%
M163 M164 M165 M166 M167 M168 M169 M170 M171 M172 M173 M174 M175 M176 M177 M178 M179 M180 M181 M182 M183 M184
35.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
75.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
60.00% 85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 65.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
40.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
75.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
60.00% 60.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 45.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
40.36% 40.36% 40.36% 40.36% 40.36% 40.36% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.64% 45.64% 45.64% 45.64% 45.64% 45.64% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
60.00% 60.00% 60.00% 60.00% 60.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
80.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 95.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 50.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 50.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
75.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 95.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
30.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
45.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
35.00% 65.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
35.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Ega Kosasih P
& Site contract Administration
Risk Manager
M185 M186 M187 M188 M189 M190 KETERANGAN
KURVA-S R1
19 Struktur Lantai 20 0.23560 0.05890 0.17670
20 Struktur Lantai 21 0.23560 0.23560
21 Struktur Lantai 22 0.22773 0.22773
22 Struktur Lantai 23 0.21639 0.21639
23 Struktur Lantai 24 0.21639 0.21639
24 Struktur Lantai 25 0.21639 0.21639
25 Struktur Lantai 26 0.21639 0.21639
Topping Off
26 Struktur Lantai 27 0.21639 0.21639
Tower Mid
27 Struktur Lantai 28 0.21639 0.21639 High
28 Struktur Lantai 29 0.21639 0.21639 Oktober 2021
29 Struktur Lantai 30 0.21639
KURVA-S R2
0.21639
30 Struktur Lantai 31 0.22077 0.22077
31 Struktur Lantai Atap (R1) Lt 32 0.20610 0.20610
32 Struktur Lantai Atap Lift (Lmr) 0.02579 0.02579
C PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN ARSITEKTUR PODIUM
C.1.1 PEKERJAAN ARSITEKTUR BASEMENT
1 ARSITEKTUR LANTAI BASEMENT 3 0.44927 0.17993 0.04992 0.02438 0.02438 0.00488 0.01829 0.01829 0.01829 0.01829 0.00366 0.00366 0.00366 0.00366 0.00366 0.05608 0.01829
2 ARSITEKTUR LANTAI BASEMENT 2 0.44960 0.04996 0.03996 0.03996 0.00400 0.02798 0.02798 0.02798 0.02798 0.00560 0.00560 0.00560 0.00560 0.00560 0.02798 0.05595 0.02798 0.06394
3 ARSITEKTUR LANTAI BASEMENT 1 0.92888 0.03547 0.08934 0.00893 0.02798 0.05956 0.05956 0.08934 0.02204 0.02204 0.02204 0.02204 0.02204 0.11019 0.11019 0.05956 0.05956 0.08429 0.02473
D.1 PEKERJAAN ME BASEMENT 9.69211 0.04567 0.04567 0.02284 0.01522 0.01522 0.00304 0.01454 0.20910 0.20910 0.20910 0.06468 0.06468 0.06468 0.06468 0.06468 0.32339 0.35376 0.64808 0.64808 0.64808 0.41661 0.41661 0.41661 0.39938 0.51846 0.51846 0.51846 0.51846 0.51846 0.26822 0.26822 0.26822 0.26822 0.11895 0.13586 0.26895 0.11968
D.2 PEKERJAAN MEP PODIUM 0.80990 0.02284 0.01522 0.01522 0.00304 0.01620 0.01620 0.04454 0.04454 0.00891 0.00891 0.00891 0.00891 0.00891 0.04454 0.04454 0.11422 0.11422 0.04454 0.04454 0.04454 0.06146 0.07492
D.3 PEKERJAAN MEP (MID) 5.07977 0.01522 0.01522 0.00304 0.00508 0.17673 0.30375 0.30375 0.11155 0.11155 0.11155 0.11155 0.11155 0.55774 0.73175 0.41223 0.41223 0.41223 0.21207 0.17673 0.17673 0.30375 0.30375
D.4 PEKERJAAN MEP (MID HIGH) 5.72957 0.06351 0.08203 0.03755 0.03755 0.03755 0.38462 0.03755 0.38462 0.38462 0.38462 0.38462 0.38462 0.21743 0.34014 0.34014 0.34014 0.28126 0.28126 0.68690 0.63882
E INFRASTRUKTUR (POVSUM) 0.69180 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459
F SPECIAL LIGHTING (PROVSUM) 0.24418 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526
G PROVSUM SEKOLAH 1.00668 0.05033 0.05033 0.10067 0.15100 0.20134 0.20134 0.15100 0.05033 0.05033
Progres Rencana Bulanan (R0) 100.000 2.680 1.850 1.587 1.453 0.828 0.798 0.724 3.053 3.999 4.510 4.840 4.833 4.778 4.777 4.770 4.754 4.750 1.490 4.627 4.771 4.706 4.603 0.890 0.890 0.890 0.890 0.890 4.243 3.985 3.684 3.176 2.458 1.543 0.718 0.563
Kumulatif Progres Rencana Bulanan (R0) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.974 16.973 21.483 26.323 31.156 35.933 40.711 45.481 50.236 54.986 56.476 61.103 65.874 70.579 75.182 76.071 76.961 77.851 78.740 79.630 83.873 87.858 91.542 94.718 97.176 98.719 99.437 100.00
Progres Realisasi Bulanan (R0) 2.680 1.850 1.587 1.970 0.417 2.509 0.354 2.591
Progres Rencana Bulanan (R1) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 3.264 2.850 2.798 3.333 2.475 4.372 4.605 4.475 4.506 0.775 0.775 0.775 0.775 0.775 4.022 2.836 3.496 3.021 2.784 2.562 2.291 2.088 2.133 2.137 1.922 1.749 1.558 1.412 1.376
Kumulatif Progres Rencana Bulanan (R1) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 31.325 34.175 36.974 40.306 42.782 47.154 51.759 56.235 60.741 61.515 62.290 63.065 63.840 64.614 68.636 71.472 74.968 77.989 80.773 83.336 85.626 87.714 89.847 91.984 93.906 95.654 97.212 98.624 100.00
Kumulatif Progres Realisasi Bulanan (R1) 0 2.680 4.529 6.117 8.087 8.504 11.013 11.366 13.957 16.426 18.426 21.084 25.495 28.296
Progres Rencana Bulanan (R2) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.142 2.638 2.819 2.693 3.737 3.768 3.856 4.054 0.836 0.836 0.836 0.836 0.836 4.047 3.948 3.844 3.499 3.273 2.922 2.738 2.573 2.631 2.685 2.046 1.872 1.612 1.385 0.974
Kumulatif Progres Rencana Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.210 34.848 37.667 40.360 44.096 47.864 51.720 55.773 56.609 57.444 58.280 59.115 59.951 63.998 67.946 71.790 75.289 78.562 81.484 84.222 86.795 89.426 92.111 94.157 96.029 97.641 99.026 100.00
Kumulatif Progres Realisasi Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 32.210 34.848 33.163 33.411
Progres Rencana Bulanan (R3) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.046 0.740 0.310 0.248 1.081 2.808 3.060 3.227 0.646 0.646 0.646 0.646 0.646 3.271 3.365 3.366 3.006 3.048 2.728 2.293 2.984 3.168 2.961 2.819 2.519 2.269 2.172 1.900 1.841 1.743 1.617 1.382 1.252 1.118 0.682 0.913 0.764
Kumulatif Progres Rencana Bulanan (R3) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.113 32.854 33.163 33.411 34.492 37.300 40.359 43.587 44.233 44.880 45.526 46.172 46.819 50.090 53.455 56.821 59.828 62.875 65.603 67.896 70.880 74.048 77.009 79.828 82.347 84.616 86.788 88.688 90.529 92.272 93.889 95.271 96.523 97.641 98.323 99.24 100.00
Kumulatif Progres Realisasi Bulanan (R3) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 31.548 32.854 32.854 32.854 33.887 36.435 38.685 40.028 40.548 40.865 53.146 53.283 42.178
Deviasi 0 1.378 0.948 0.076 0.917 0.234 -0.029 -0.565 0.000 -0.310 -0.558 -0.605 -0.865 -1.674 -3.559 -3.685 -4.014 7.620 7.111 -4.641
LAPORAN PRESTASI
BULANAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
PROGRESS BULANAN : JULI 2023
TANGGAL : 30 JULI 2023
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 95,901%
Progress Aktual : 78,371%
Deviasi : -17,53%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
A PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan Pondasi 1.27329 0.9431 0.0512 0.0512 0.0192 0.0695 0.0695 0.0695
2 Pekerjaan Persiapan SAMEP 8.00272 0.0512 0.0512 0.2858 0.2163 0.1520 0.0856 0.1329 0.21400 0.21400 0.21400 0.21400 0.21400 0.23831 0.23831 0.23831 0.30993 0.24795 0.24795 0.30993 0.24795 0.24795 0.30993 0.24795 0.30993 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561 0.12561
KURVA-S R1
19 Struktur Lantai 20 0.23560 0.05890 0.17670
20 Struktur Lantai 21 0.23560 0.23560
21 Struktur Lantai 22 0.22773 0.22773
22 Struktur Lantai 23 0.21639 0.21639
23 Struktur Lantai 24 0.21639 0.21639
24 Struktur Lantai 25 0.21639 0.21639
25 Struktur Lantai 26 0.21639 0.21639
26 Struktur Lantai 27 0.21639 0.21639
Topping Off Tower
27 Struktur Lantai 28 0.21639 0.21639
Mid High
28 Struktur Lantai 29 0.21639 0.21639
Oktober 2021
29
30
Struktur Lantai 30
Struktur Lantai 31
0.21639
0.22077 KURVA-S R2 0.21639
0.22077
31 Struktur Lantai Atap (R1) Lt 32 0.20610 0.20610
32 Struktur Lantai Atap Lift (Lmr) 0.02579 0.02579
C PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN ARSITEKTUR PODIUM
KURVA-S R3
C.1.1 PEKERJAAN ARSITEKTUR BASEMENT
1 ARSITEKTUR LANTAI BASEMENT 3 0.44927 0.17993 0.04992 0.02438 0.02438 0.00488 0.01829 0.01829 0.01829 0.01829 0.01829 0.05608 0.01829
2 ARSITEKTUR LANTAI BASEMENT 2 0.44960 0.04996 0.03996 0.03996 0.00400 0.02798 0.02798 0.02798 0.02798 0.02798 0.02798 0.05595 0.02798 0.06394
3 ARSITEKTUR LANTAI BASEMENT 1 0.92888 0.03547 0.08934 0.00893 0.02798 0.05956 0.05956 0.08934 0.11019 0.11019 0.11019 0.05956 0.05956 0.08429 0.02473
D.1 PEKERJAAN ME BASEMENT 9.69211 0.04567 0.04567 0.02284 0.01522 0.01522 0.00304 0.01454 0.20910 0.20910 0.20910 0.32339 0.32339 0.35376 0.64808 0.64808 0.64808 0.41661 0.41661 0.41661 0.39938 0.51846 0.51846 0.51846 0.51846 0.51846 0.26822 0.26822 0.26822 0.26822 0.11895 0.13586 0.26895 0.11968
D.2 PEKERJAAN MEP PODIUM 0.80990 0.02284 0.01522 0.01522 0.00304 0.01620 0.01620 0.04454 0.04454 0.04454 0.04454 0.04454 0.11422 0.11422 0.04454 0.04454 0.04454 0.06146 0.07492
D.3 PEKERJAAN MEP (MID) 5.07977 0.01522 0.01522 0.00304 0.00508 0.17673 0.30375 0.30375 0.55774 0.55774 0.73175 0.41223 0.41223 0.41223 0.21207 0.17673 0.17673 0.30375 0.30375
D.4 PEKERJAAN MEP (MID HIGH) 5.72957 0.06351 0.08203 0.03755 0.03755 0.03755 0.38462 0.03755 0.38462 0.38462 0.38462 0.38462 0.38462 0.21743 0.34014 0.34014 0.34014 0.28126 0.28126 0.68690 0.63882
E INFRASTRUKTUR (POVSUM) 0.69180 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459 0.03459
F SPECIAL LIGHTING (PROVSUM) 0.24418 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526 0.01526
G PROVSUM SEKOLAH 1.00668 0.05033 0.05033 0.10067 0.15100 0.20134 0.20134 0.15100 0.05033 0.05033
Progres Rencana Bulanan (R0) 100.000 2.680 1.850 1.587 1.453 0.828 0.798 0.724 3.053 3.999 4.510 4.840 4.833 4.778 4.777 4.770 4.754 4.750 1.490 4.627 4.771 4.706 4.603 4.448 4.243 3.985 3.684 3.176 2.458 1.543 0.718 0.563
Kumulatif Progres Rencana Bulanan (R0) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.974 16.973 21.483 26.323 31.156 35.933 40.711 45.481 50.236 54.986 56.476 61.103 65.874 70.579 75.182 79.630 83.873 87.858 91.542 94.718 97.176 98.719 99.437 100.00
Progres Realisasi Bulanan (R0) 2.680 1.850 1.587 1.970 0.417 2.509 0.354 2.591
Progres Rencana Bulanan (R1) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 3.264 2.850 2.798 3.333 2.475 4.372 4.605 4.475 4.506 3.874 4.022 2.836 3.496 3.021 2.784 2.562 2.291 2.088 2.133 2.137 1.922 1.749 1.558 1.412 1.376
Kumulatif Progres Rencana Bulanan (R1) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 31.325 34.175 36.974 40.306 42.782 47.154 51.759 56.235 60.741 64.614 68.636 71.472 74.968 77.989 80.773 83.336 85.626 87.714 89.847 91.984 93.906 95.654 97.212 98.624 100.00
Kumulatif Progres Realisasi Bulanan (R1) 0 2.680 4.529 6.117 8.087 8.504 11.013 11.366 13.957 16.426 18.426 21.084 25.495 28.296
Progres Rencana Bulanan (R2) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.142 2.638 2.819 2.693 3.737 3.768 3.856 4.054 4.178 4.047 3.948 3.844 3.499 3.273 2.922 2.738 2.573 2.631 2.685 2.046 1.872 1.612 1.385 0.974
Kumulatif Progres Rencana Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.210 34.848 37.667 40.360 44.096 47.864 51.720 55.773 59.951 63.998 67.946 71.790 75.289 78.562 81.484 84.222 86.795 89.426 92.111 94.157 96.029 97.641 99.026 100.00
Kumulatif Progres Realisasi Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 32.210 34.848 33.163 33.411
Progres Rencana Bulanan (R3) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.046 0.740 0.310 0.248 1.081 2.808 3.060 3.227 3.232 3.271 2.692 4.039 3.006 3.048 2.728 2.293 2.984 3.168 2.961 2.819 2.519 2.269 2.172 1.900 1.841 1.743 1.617 1.382 1.252 1.118 0.682 0.913 0.764
Kumulatif Progres Rencana Bulanan (R3) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.113 32.854 33.163 33.411 34.492 37.300 40.359 43.587 46.819 50.090 52.782 56.821 59.828 62.875 65.603 67.896 70.880 74.048 77.009 79.828 82.347 84.616 86.788 88.688 90.529 92.272 93.889 95.271 96.523 97.641 98.323 99.24 100.00
Kumulatif Progres Realisasi Bulanan (R3) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 31.548 32.854 32.854 32.854 33.887 36.435 38.290 39.931 42.178 43.360 44.822 46.865 48.543 50.357 51.178 51.640 52.898 54.763 56.494 58.917 60.396 62.943 63.808 65.221 67.641 68.852 69.848 70.659 71.261 71.886 72.695 73.417 78.371
Deviasi 0 1.378 0.948 0.076 0.917 0.234 -0.029 -0.565 0.000 -0.310 -0.558 -0.605 -0.865 -2.069 -3.656 -4.641 -6.729 -7.960 -9.956 -11.285 -12.519 -14.425 -16.256 -17.982 -19.284 -20.515 -20.911 -21.951 -21.674 -22.979 -23.466 -22.888 -23.420 -24.040 -24.612 -25.262 -25.755 -25.627 -25.819 -21.629
A PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan Pondasi 1.27329 0.9431 0.0512 0.0512 0.0192 0.0695 0.0695 0.0695
2 Pekerjaan Persiapan SAMEP 8.00272 0.0512 0.0512 0.2858 0.2163 0.1520 0.0856 0.1329 0.2140 0.2140 0.2140 0.2140 0.2140 0.2383 0.2383 0.2383 - - 0.2479 0.5021 0.2479 0.1117 0.1117 0.1117 0.1117 0.1117 0.1117 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.1153 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906 0.0906
1 Pekerjaan Bored Pile dan Soldier Pile 6.59712 1.7367 1.7472 1.4849 1.0974 0.3382 0.0643 0.0643 0.0643
1 Pekerjaan Tanah dan Lain-Lain 1.01849 0.0509 0.2037 0.2037 0.0509 0.2037 0.2037 0.1018
1 Struktur Lantai - Bassement 3 6.17282 0.3086 0.2422 1.1460 1.4819 1.1427 0.8332 0.4855 0.5327
2 Struktur Lantai - Bassement 2 1.58058 0.0790 0.2371 0.2497 0.3161 0.2371 0.1185 0.0790 0.0880 0.0880 0.0880
3 Struktur Lantai - Bassement 1 1.91000 0.3820 0.2865 0.2865 0.2865 0.3343 0.0414 0.0414 0.1058 0.0096 0.0681 0.0681
4 Struktur Lantai - Ground Floor 2.15722 0.2157 0.2157 0.4993 0.3955 0.4612 0.0798 0.0798 0.0426 0.0558 0.0558 0.0558
1 Struktur Lantai Parkir 2A (2 nd) 0.54541 0.0614 0.1636 0.1636 0.0273 0.0648 0.0648
2 Struktur Lantai Sekolah 2B-3A (3 rd) 0.57015 0.0676 0.2707 0.1821 0.0285 0.0106 0.0106
3 Struktur Lantai Sekolah 3B - 4A (4 rd) 0.60329 0.1508 0.1810 0.1810 0.0302 0.0302 0.0302
4 Struktur Lantai Sekolah 4B - 5A (5 rd) 0.62797 0.1570 0.1884 0.1884 0.0314 0.0314 0.0314
5 Struktur Lantai Parkir 5B-6A-6B (6-6B) 0.77859 0.1946 0.2336 0.1669 0.0612 0.0612 0.0612
20 Struktur Lantai 21
KURVA-S R2
0.23560 0.1356 0.1000
C PEKERJAAN ARSITEKTUR
1 ARSITEKTUR LANTAI BASEMENT 3 0.44927 0.1799 0.0499 0.0244 0.0244 0.0049 0.0183 0.0183 0.0183 0.0183 0.0183 0.0516 0.0003 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
2 ARSITEKTUR LANTAI BASEMENT 2 0.44960 0.0500 0.0400 0.0400 0.0040 0.0280 0.0280 0.0280 0.0280 0.0280 0.0280 0.0560 0.0280 0.0415 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
3 ARSITEKTUR LANTAI BASEMENT 1 0.92888 0.0355 0.0893 0.0089 0.0280 0.0596 0.0596 0.0893 0.0893 0.1102 0.1285 0.0596 0.1024 0.0473 0.0064 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
1 ARSITEKTUR LANTAI 2 0.20021 0.0161 0.0598 0.0161 0.0135 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047
2 ARSITEKTUR LANTAI 3 0.21576 0.0475 0.0324 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068
4 ARSITEKTUR LANTAI 5 0.21934 0.0010 0.0019 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0098 0.0298 0.0198
5 ARSITEKTUR LANTAI 6 0.16478 0.0082 0.0082 0.0124 0.0124 0.0124 0.0124 0.0110 0.0110 0.0110 0.0110 0.0110 0.0110 0.0062 0.0062 0.0062 0.0062 0.0021 0.0021 0.0021 0.0021
6 ARSITEKTUR LANTAI 6B 0.05987 0.0130 0.0130 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
7 ARSITEKTUR FAÇADE 0.64741 0.0719 0.0719 0.0080 0.0065 0.0432 0.0798 0.0647 0.0647 0.0877 0.0763 0.0179 0.0179 0.0179 0.0088 0.0100
1 ARSITEKTUR LANTAI GROUND FLOOR 0.80140 0.0688 0.1202 0.1603 0.1107 0.0751 0.0057 0.0147 0.0762 0.0147 0.0222 0.0565 0.0661 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
2 ARSITEKTUR LANTAI 7 0.57527 0.0288 0.1162 0.0661 0.0811 0.0072 0.0197 0.1044 0.0197 0.0441 0.0441 0.0353 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
3 ARSITEKTUR LANTAI 8 0.29915 0.0868 0.0354 0.0354 0.0059 0.0254 0.0749 0.0354
4 ARSITEKTUR LANTAI 9 0.34681 0.0173 0.0029 0.0254 0.0913 0.0198 0.0063 0.0063 0.0063 0.0570 0.0570 0.0570
5 ARSITEKTUR LANTAI 10 0.34681 0.0173 0.0029 0.0035 0.0694 0.0354 0.0073 0.0073 0.0073 0.0655 0.0655 0.0655
6 ARSITEKTUR LANTAI 11 0.34681 0.0173 0.0029 0.0035 0.0694 0.0354 0.0073 0.0073 0.0073 0.0655 0.0655 0.0655
7 ARSITEKTUR LANTAI 12 0.34681 0.0694 0.0354 0.0081 0.0081 0.0081 0.0545 0.0545 0.0087 0.0263 0.0039 0.0050 0.0350 0.0300
8 ARSITEKTUR LANTAI 13 0.34681 0.0694 0.0354 0.0081 0.0081 0.0081 0.0545 0.0545 0.0087 0.0251 0.0052 0.0050 0.0350 0.0300
9 ARSITEKTUR LANTAI 14 0.34681 0.0513 0.0354 0.0087 0.0087 0.0087 0.0585 0.0585 0.0087 0.0271 0.0013 0.0050 0.0400 0.0350
10 ARSITEKTUR LANTAI 15 0.34681 0.0173 0.0110 0.0110 0.0110 0.0329 0.0173 0.0087 0.0238 0.0050 0.0038 0.0050 0.0900 0.0900 0.0200
11 ARSITEKTUR LANTAI 16 0.35268 0.0176 0.0112 0.0112 0.0112 0.0335 0.0176 0.0088 0.0242 0.0066 0.0042 0.0066 0.0900 0.0900 0.0200
12 ARSITEKTUR LANTAI 17. REFUGEE 0.12922 0.0065 0.0041 0.0041 0.0041 0.0123 0.0065 0.0032 0.0089 0.0054 0.0089 0.0054 0.0300 0.0300
13 ARSITEKTUR LANTAI 18 0.34681 0.0116 0.0116 0.0116 0.0231 0.0173 0.0087 0.0263 0.0048 0.0048 0.0148 0.0148 0.0148 0.0348 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0348
14 ARSITEKTUR LANTAI 19 0.34681 0.0116 0.0116 0.0116 0.0231 0.0173 0.0087 0.0263 0.0048 0.0048 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0348
15 ARSITEKTUR LANTAI 20 0.34681 0.0116 0.0116 0.0116 0.0231 0.0173 0.0087 0.0263 0.0048 0.0048 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0148 0.0348
16 ARSITEKTUR LANTAI 21 0.34681 0.0116 0.0116 0.0116 0.0173 0.0087 0.0286 0.0086 0.0043 0.1073 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0383
17 ARSITEKTUR LANTAI 22 0.34681 0.0116 0.0116 0.0116 0.0173 0.0087 0.0286 0.0086 0.0043 0.1073 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0383
18 ARSITEKTUR LANTAI 23 0.34681 0.0116 0.0116 0.0116 0.0173 0.0087 0.0286 0.0036 0.0036 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0236 0.0236
19 ARSITEKTUR LANTAI 24 0.34681 0.0116 0.0116 0.0173 0.0087 0.0286 0.0035 0.0035 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0235 0.0235
20 ARSITEKTUR LANTAI 25 0.34681 0.0116 0.0116 0.0173 0.0087 0.0286 0.0035 0.0035 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0235 0.0235
21 ARSITEKTUR LANTAI 26 0.34681 0.0087 0.0087 0.0173 0.0087 0.0286 0.0037 0.0037 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0237 0.0237
22 ARSITEKTUR LANTAI 27 0.34681 0.0520 0.0173 0.0087 0.0286 0.0014 0.0014 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0214 0.0214
23 ARSITEKTUR LANTAI 28 0.34681 0.0520 0.0173 0.0087 0.0286 0.0014 0.0014 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0214 0.0214
24 ARSITEKTUR LANTAI 29 0.34681 0.0520 0.0590 0.0087 0.0286 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095
25 ARSITEKTUR LANTAI 30 0.34681 0.0173 0.0087 0.0286 0.0033 0.0033 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0233 0.0233
26 ARSITEKTUR LANTAI 31 0.37941 0.0190 0.0095 0.0286 0.0047 0.0047 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0047 0.0247
29 ARSITEKTUR FAÇADE 2.52527 0.0758 0.0758 0.0758 0.0096 0.0051 0.1171 0.1263 0.1530 0.7548 0.3538 0.6009 0.0296 0.0296 0.0018 0.0073 0.0018 0.1073
2 ARSITEKTUR LANTAI 2 0.34723 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0174 0.0174 0.0174 0.0174 0.0509 0.0509 0.0509 0.0304 0.0304 0.0304 0.0304
3 ARSITEKTUR LANTAI 3 0.34723 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0174 0.0174 0.0174 0.0174 0.0509 0.0509 0.0509 0.0304 0.0304 0.0304 0.0304
4 ARSITEKTUR LANTAI 4 0.34723 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0174 0.0174 0.0174 0.0174 0.0382 0.0382 0.0382 0.0382 0.0304 0.0304 0.0304 0.0304
5 ARSITEKTUR LANTAI 5 0.34723 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0174 0.0174 0.0174 0.0174 0.0382 0.0382 0.0382 0.0382 0.0304 0.0304 0.0304 0.0304
6 ARSITEKTUR LANTAI 6 0.34723 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0174 0.0174 0.0174 0.0174 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304
7 ARSITEKTUR LANTAI 7 0.34723 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0174 0.0174 0.0174 0.0174 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304
8 ARSITEKTUR LANTAI 8 0.34723 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0139 0.0139 0.0139 0.0139 0.0139 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304
9 ARSITEKTUR LANTAI 9 0.34723 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0139 0.0139 0.0139 0.0139 0.0139 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304
10 ARSITEKTUR LANTAI 10 0.34723 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0139 0.0139 0.0139 0.0139 0.0139 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304
11 ARSITEKTUR LANTAI 11 0.34723 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0174 0.0174 0.0174 0.0174 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304
12 ARSITEKTUR LANTAI 12 0.34723 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0139 0.0139 0.0139 0.0139 0.0139 0.0347 0.0347 0.0347 0.0347 0.0304 0.0304 0.0304 0.0304
13 ARSITEKTUR LANTAI 13 0.36120 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0181 0.0181 0.0181 0.0181 0.0361 0.0361 0.0361 0.0361 0.0316 0.0316 0.0316 0.0316
14 ARSITEKTUR LANTAI 14 REFUGEE 0.09124 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0046 0.0046 0.0046 0.0046 0.0091 0.0091 0.0091 0.0091 0.0080 0.0080 0.0080 0.0080
15 ARSITEKTUR LANTAI 15 0.22581 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0151 0.0151 0.0151 0.0226 0.0226 0.0226 0.0226 0.0198 0.0198 0.0198 0.0198
16 ARSITEKTUR LANTAI 16 0.25293 0.0032 0.0032 0.0032 0.0032 0.0253 0.0253 0.0253 0.0253 0.0443 0.0443 0.0253 0.0253
17 ARSITEKTUR LANTAI 17 0.34723 0.0043 0.0043 0.0043 0.0043 0.0174 0.0174 0.0174 0.0174 0.0694 0.0694 0.0608 0.0608
18 ARSITEKTUR LANTAI 18 0.34723 0.0043 0.0043 0.0043 0.0043 0.0174 0.0174 0.0174 0.0174 0.0694 0.0694 0.0608 0.0608
19 ARSITEKTUR LANTAI 19 0.34723 0.0116 0.0116 0.0116 0.0174 0.0174 0.0174 0.0174 0.0694 0.0694 0.0521 0.0521
20 ARSITEKTUR LANTAI 20 0.34723 0.0116 0.0116 0.0116 0.0174 0.0174 0.0174 0.0174 0.0694 0.0694 0.0521 0.0521
21 ARSITEKTUR LANTAI 21 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
22 ARSITEKTUR LANTAI 22 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
23 ARSITEKTUR LANTAI 23 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
24 ARSITEKTUR LANTAI 24 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
25 ARSITEKTUR LANTAI 25 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
26 ARSITEKTUR LANTAI 26 0.34723 0.0116 0.0116 0.0116 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
27 ARSITEKTUR LANTAI 27 0.34723 0.0116 0.0116 0.0116 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
28 ARSITEKTUR LANTAI 28 0.34723 0.0116 0.0116 0.0116 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
29 ARSITEKTUR LANTAI 29 0.34723 0.0174 0.0174 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
30 ARSITEKTUR LANTAI 30 0.34723 0.0116 0.0116 0.0116 0.0347 0.0347 0.0694 0.0694 0.0521 0.0521
31 ARSITEKTUR LANTAI 31 0.37983 0.0190 0.0190 0.0380 0.0380 0.0760 0.0760 0.0570 0.0570
34 ARSITEKTUR FAÇADE 2.50614 0.0042 0.0042 0.0042 0.0042 0.0042 0.4345 0.0019 0.1479 0.1479 0.1479 0.1479 0.3611 0.1479 0.1479 0.0222 - 0.2420 0.2261 0.2005 0.1701 0.4230 0.0005
D.1 PEKERJAAN MEP BASEMENT 9.69211 0.0457 0.0457 0.0228 0.0152 0.0152 0.0030 0.0145 0.0145 0.0145 0.0792 0.0792 0.0792 0.3088 0.0895 0.0467 0.0882 0.0082 0.0082 0.0100 0.0100 0.0100 0.0100 0.0100 1.1169 0.4579 0.6993 0.4649 1.5100 0.4034 0.1059 0.0100 0.0100 0.0100 1.7608 0.9288 0.8309 0.2520 0.1032
D.2 PEKERJAAN MEP PODIUM 0.80990 0.0228 0.0152 0.0152 0.0030 0.0162 0.0162 0.0445 0.0271 0.0071 0.0035 0.0135 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0065 0.0065 0.0265 0.0065 0.0065 0.0065 0.0165
D.3 PEKERJAAN MEP (MID) 5.07977 0.0152 0.0152 0.0030 0.0051 0.0051 0.0051 0.0839 0.6876 0.0852 0.3795 0.0839 0.0195 0.0369 0.0069 0.0085 0.0100 0.0100 0.0100 0.0100 0.0100 0.6100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.7198 0.6898 0.6898 0.6898 0.0998
D.4 PEKERJAAN MEP (MID HIGH) 5.72957 0.0635 0.0820 0.0375 0.0375 0.0375 0.2031 0.2183 0.3846 0.3846 0.3846 0.3846 0.3846 0.2174 0.3401 0.3401 0.3401 0.2813 0.2821 0.3314 0.3314 0.3314 0.3314
E INFRASTRUKTUR (POVSUM) 0.69180 0.0031 0.0073 0.0231 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0370 0.0285 0.0262 0.0062 0.0062
F SPECIAL LIGHTING (PROVSUM) 0.24418 0.0305 0.0305 0.0305 0.0305 0.0153 0.0153 0.0153 0.0153 0.0153 0.0153 0.0153 0.0153
G PEKERJAAN TAMBAH KURANG 1.00668 0.0503 0.0503 0.1007 0.1510 0.2013 0.2013 0.1510 0.0503 0.0503
Progres Rencana Bulanan (R0) 100.000 2.680 1.850 1.587 1.453 0.828 0.798 0.724 3.053 3.999 4.510 4.840 4.833 4.778 4.777 4.770 4.754 4.750 1.490 4.627 4.771 4.706 4.603 4.448 4.243 3.985 3.684 3.176 2.458 1.543 0.718 0.563
Kumulatif Progres Rencana Bulanan (R0) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.974 16.973 21.483 26.323 31.156 35.933 40.711 45.481 50.236 54.986 56.476 61.103 65.874 70.579 75.182 79.630 83.873 87.858 91.542 94.718 97.176 98.719 99.437 100.0
Progres Realisasi Bulanan (R0) 2.680 1.850 1.587 1.970 0.417 2.509 0.354 2.591
Progres Rencana Bulanan (R1) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 3.264 2.850 2.798 3.333 2.475 4.372 4.605 4.475 4.506 3.874 4.022 2.836 3.496 3.021 2.784 2.562 2.291 2.088 2.133 2.137 1.922 1.749 1.558 1.412 1.376
Kumulatif Progres Rencana Bulanan (R1) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 31.325 34.175 36.974 40.306 42.782 47.154 51.759 56.235 60.741 64.614 68.636 71.472 74.968 77.989 80.773 83.336 85.626 87.714 89.847 91.984 93.906 95.654 97.212 98.624 100.0
Kumulatif Progres Realisasi Bulanan (R1) 0 2.680 4.529 6.117 8.087 8.504 11.013 11.366 13.957 16.426 18.426 21.084 25.495 28.296
Progres Rencana Bulanan (R2) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.142 2.638 2.819 2.693 3.737 3.768 3.856 4.054 4.178 4.047 3.948 3.844 3.499 3.273 2.922 2.738 2.573 2.631 2.685 2.046 1.872 1.612 1.385 0.974
Kumulatif Progres Rencana Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.210 34.848 37.667 40.360 44.096 47.864 51.720 55.773 59.951 63.998 67.946 71.790 75.289 78.562 81.484 84.222 86.795 89.426 92.111 94.157 96.029 97.641 99.026 100.00
Kumulatif Progres Realisasi Bulanan (R2) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 32.210 34.848 33.163 33.411
Progres Rencana Bulanan (R3) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.046 0.740 0.310 0.248 1.081 2.808 3.060 3.227 3.232 3.271 3.365 3.366 3.006 3.048 2.728 2.293 2.984 3.168 2.961 2.819 2.519 2.269 2.172 1.900 1.841 1.743 1.617 1.382 1.252 1.118 0.682 0.913 0.764
Kumulatif Progres Rencana Bulanan (R3) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.113 32.854 33.163 33.411 34.492 37.300 40.359 43.587 46.819 50.090 53.455 56.821 59.828 62.875 65.603 67.896 70.880 74.048 77.009 79.828 82.347 84.616 86.788 88.688 90.529 92.272 93.889 95.271 96.523 97.641 98.323 99.24 100.00
Kumulatif Progres Realisasi Bulanan (R3) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 31.548 32.854 33.163 33.411 33.842 36.435 38.375 39.931 42.178 43.360 45.748 46.865 48.543 50.357 51.178 51.640 52.936 54.866 56.592 58.917 60.396 62.943 64.002 65.303 66.369 68.759 69.848 70.595 71.317 71.881 72.695 73.147 76.828
Progres Rencana Bulanan (R4) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 2.784 2.430 3.530 3.571 3.483 2.006 2.046 0.740 0.000 0.000 1.034 2.548 1.940 1.556 2.247 1.182 2.388 1.116 1.678 1.804 0.831 0.462 1.296 1.931 1.726 2.325 1.479 2.546 1.059 1.301 1.067 2.390 1.089 0.747 0.721 0.565 0.814 3.491 3.224 3.234 2.638 2.250 1.469 1.111 1.277 1.566 1.519 1.426 1.297 1.051 0.755 0.553 0.443
Kumulatif Progres Rencana Bulanan (R4) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 15.048 17.478 21.008 24.579 28.062 30.068 32.113 32.854 32.854 32.854 33.887 36.435 38.375 39.931 42.178 43.360 45.748 46.865 48.543 50.347 51.178 51.640 52.936 54.866 56.592 58.917 60.396 62.943 64.002 65.303 66.369 68.759 69.848 70.595 71.317 71.881 72.695 76.186 79.411 82.645 85.283 87.532 89.002 90.112 91.390 92.956 94.475 95.901 97.198 98.249 99.004 99.557 100.00
Kumulatif Progres Realisasi Bulanan (R4) 0 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 28.296 30.039 31.548 32.854 32.854 32.854 33.842 36.435 38.375 39.931 42.178 43.360 45.748 46.865 48.543 50.357 51.178 51.640 52.936 54.866 56.592 58.917 60.396 62.943 64.002 65.303 66.369 68.759 69.848 70.595 71.317 71.881 72.695 73.147 76.828 77.399 77.743 77.896 78.013 78.232 78.232 78.283 78.335 78.371
Deviasi 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.378 0.948 0.076 0.917 0.234 -0.029 -0.565 0.000 0.000 0.000 -0.045 -0.001 0.000 -0.000 -0.000 0.000 0.000 0.000 0.000 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -3.039 -2.583 -5.246 -7.540 -9.636 -10.988 -11.881 -13.158 -14.672 -16.140 -17.530
Progres Rencana Gabungan Bulanan (R4) 2.680 1.850 1.587 1.453 0.828 0.798 0.724 2.343 4.163 2.000 2.658 4.411 27.525 0.180 0.164 0.283 - - 0.355 0.646 0.502 0.690 0.631 0.531 0.428 0.482 1.640 0.268 0.668 15.256 - - 0.138 0.046 0.559 0.304 0.300 0.279 0.190 0.220 0.385 - 0.488 0.300 0.287 0.300 0.300 0.300 1.500 2.000 2.500 2.000 1.500 2.000 2.000 1.300 1.300 1.000 0.920 0.920 0.920
Kumulatif Progres Rencana Bulanan (R4) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 53.020 53.200 53.364 53.647 53.647 53.647 54.002 54.648 55.150 55.840 56.471 57.002 57.430 57.912 59.552 59.820 60.488 75.744 75.744 75.744 75.882 75.928 76.487 76.791 77.091 77.370 77.560 77.780 78.165 78.165 78.653 78.953 79.240 79.540 79.840 80.140 81.640 83.640 86.140 88.140 89.640 91.640 93.640 94.940 96.240 97.240 98.160 99.080 100.00
Kumulatif Progres Realisasi Bulanan (R4) 2.680 4.529 6.117 7.570 8.398 9.196 9.920 12.263 16.426 18.426 21.084 25.495 53.020 53.200 53.364 53.647 53.647 53.647 54.002 54.648 55.150 55.840 56.471 57.002 57.430 57.912 59.552 59.820 60.488 75.744 75.744 75.744 75.882 75.928 76.487 76.791 77.091 77.370 77.560 77.780 78.165 78.165 78.653 78.953 79.240 79.540
CATATAN :
UNTUK PEKERJAAN PRIORITAS TOWER.2 DIBUTUHKAN PERSETUJUAN ESKALASI DAN SURAT PENRNYATAAN KESIAPAN Jakarta, 30 Juli 2023
PENDANAAN DARI WFPR UNTUK DISAMPAIKAN KE DIVISI DAN SCM PUSAT AGAR KONTRAK VENDOR DAPAT DIJALANKAN.
Disetujui oleh, Diperiksa oleh, Dibuat oleh,
Pemilik Proyek Konsultan MK Kontraktor
PT. Waskita FIM Perkasa Realty PT. Ciria Expertindo Consultant PT. Waskita Karya (Persero) Tbk.
0.000
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 117/LPM/ASP-WK/SAMEP/II/2021
TANGGAL : 21 Februari 2021
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 48,08%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 116/LPM/ASP-WK/SAMEP/II/2021
TANGGAL : 14 Februari 2021
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 47,749%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 115/LPM/ASP-WK/SAMEP/II/2021
TANGGAL : 07 Februari 2021
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 47,212%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 114/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 31 Januari 2021
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 46,865%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 113/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 24 Januari 2021
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 46,566%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 112/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 17 Januari 2021
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 46,346%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 111/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 10 Januari 2021
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 46,074%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 110/LPM/ASP-WK/SAMEP/I/2021
TANGGAL : 03 Januari 2021
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 45,748%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 109/LPM/ASP-WK/SAMEP/XII/2020
TANGGAL : 27 DESEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 44,822%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 108/LPM/ASP-WK/SAMEP/XII/2020
TANGGAL : 20 DESEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 44,433%
Deviasi Err:509
NO. URAIAN BOBOT SEPTEMBER OKTOBER NOVEMBER DESEMBER TOTAL MOS KETERANGAN
A MOS LIFT
1 Lift 6 & 7 (MOS) 0.370% 0.0000% 0.2407% 0.0000% 0.0000% 0.2407%
2 Lift 8 (MOS) 0.185% 0.0000% 0.1203% 0.0000% 0.0000% 0.1203%
3 Lift 9 (MOS) 0.233% 0.0000% 0.1517% 0.0000% 0.0000% 0.1517%
B HT DINDING
1 HT (SHOWER)
- Material 0.006% 0.0086% 0.0086% 0.0000% 0.0086% 0.0257% SD LANTAI 20
- Upah 0.002%
2 HT (CLOSED)
- Material 0.009% 0.0137% 0.0137% 0.0000% 0.0137% 0.0410% SD LANTAI 20
- Upah 0.003%
3 HT (MEJA PANTRY)
- Material 0.002% 0.0027% 0.0027% 0.0000% 0.0027% 0.0081% SD LANTAI 20
- Upah 0.001%
C PINTU KAYU
1 PINTU TYPE D-1 0.016% 0.0198% 0.0198% LT. 09 - LT. 11
2 PINTU TYPE D-2 0.004% 0.0047% 0.0047% LT. 09 - LT. 11
3 PINTU TYPE D-3 0.007% 0.0078% 0.0078% LT. 09 - LT. 11
4 PINTU TYPE D-9 0.002% 0.0018% 0.0018% LT. 09 - LT. 11
JUMLAH MOS PINTU KAYU 0.0284% 0.0000% 0.0000% 0.0000% 0.0341% 0.0341%
0.6705%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 107/LPM/ASP-WK/SAMEP/XII/2020
TANGGAL : 13 DESEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 44,191%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 106/LPM/ASP-WK/SAMEP/XII/2020
TANGGAL : 06 DESEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 43,79%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 105/LPM/ASP-WK/SAMEP/XI/2020
TANGGAL : 23 NOVEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 43,36%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 103/LPM/ASP-WK/SAMEP/XI/2020
TANGGAL : 15 NOVEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 49,272%
Progress Aktual : 43,076%
Deviasi : -6,196%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 103/LPM/ASP-WK/SAMEP/XI/2020
TANGGAL : 15 NOVEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 48,454%
Progress Aktual : 42,76%
Deviasi : -5,695%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : PROGRESS BULAN OKTOBER 2020
TANGGAL : 08 NOVEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 47,637%
Progress Aktual : 42,332%
Deviasi : -5,305%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 102/LPM/ASP-WK/SAMEP/XI/2020
TANGGAL : 08 NOVEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 46,819%
Progress Aktual : 42,178%
Deviasi : -4,641%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 100/LPM/ASP-WK/SAMEP/X/2020
TANGGAL : 25 OKTOBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 46,172%
Progress Aktual : 53,283%
Deviasi : 7,111%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 099/LPM/ASP-WK/SAMEP/X/2020
TANGGAL : 18 OKTOBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 45,526%
Progress Aktual : 53,146%
Deviasi : 7,62%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 098/LPM/ASP-WK/SAMEP/X/2020
TANGGAL : 11 OKTOBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 44,88%
Progress Aktual : 40,865%
Deviasi : -4,014%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 097/LPM/ASP-WK/SAMEP/X/2020
TANGGAL : 04 OKTOBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 44,233%
Progress Aktual : 52,582%
Deviasi : 8,349%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 096/LPM/ASP-WK/SAMEP/IX/2020
TANGGAL : 27 SEPTEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana : 43,587%
Progress Aktual : 40,021%
Deviasi : -3,566%
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 095/LPM/ASP-WK/SAMEP/IX/2020
TANGGAL : 20 SEPTEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 52,056%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 094/LPM/ASP-WK/SAMEP/IX/2020
TANGGAL : 06 SEPTEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 51,72%
Deviasi Err:509
LAPORAN PRESTASI
MINGGUAN PELAKSANAAN
PROYEK : APARTEMEN SOLTERRA PLACE
PAKET / PEKERJAAN : STRUKTUR, ARSITEKTUR, MEP
NO : 093/LPM/ASP-WK/SAMEP/IX/2020
TANGGAL : 06 SEPTEMBER 2020
1.1 Pekerjaan Bored Pile dan Soldier Pile 6.597% 6.597% 0.000% 6.597% 6.597%
6.0 Pekerjaan Special Lighting (Provsum) 0.244% 0.000% 0.000% 0.000% 0.000%
Keterangan :
Progress Rencana Err:509
Progress Aktual : 51,417%
Deviasi Err:509