Anda di halaman 1dari 3

Dimensi blok penambangan r = 10 x 10 m2

Besar daerah yang ditambang R = 50 x 100 m2


Ketebalan bijih rata-rata t = 10 m
Variogram Model:
a1 = 150 m; C1 = 8.5 m2
a2 = 1400 m; C2 = 12.7 m2

Hitung:
1. Variasi volume penambangan blok dengan asumsi variogram model seperti di atas.
2. Sama dengan no. 1 tapi ukuran blok penambangan r = 2.5 x 2.5 m2.
3. Variasi volume penambangan blok dengan asumsi variogram model ketebalan yang
Isotrop, dengan variogram untuk model MATHERON:
a = 200 m, C = 5 m2, dan C0 = 2 m2.

Penyelesaian:
10 L = 100
2
1. Dimensi blok penambangan r = 10 x 10 m 10 r
Besar daerah yang ditambang R = 50 x 100 m2
Ketebalan bijih rata-rata t = 10 m h = 50
Variogram Model: R
a1 = 150 m; C1 = 8.5 m2
a2 = 1400 m; C2 = 12.7 m2

Blok R;
 ℎ⁄𝑎1 = 50⁄150 = 0.333  ℎ⁄ = 50⁄
𝑎2 1400 = 0.036
 𝐿⁄𝑎1 = 100⁄150 = 0.667  𝐿⁄𝑎2 = 100⁄1400 = 0.071
 F (0.333⁄0.667) = 0.375  F (0.036⁄0.071) = 0.044
(Table F) (Table F)
 𝛾̅1 (𝑅, 𝑅) = 0.375  𝛾̅2 (𝑅, 𝑅) = 0.044
Maka; 𝐶1 = 0.375 𝑥 8.5 = 3.19 𝑚2 Maka; 𝐶2 = 0.044 𝑥 12.7 = 0.56 𝑚2

Blok r;
 ℎ⁄𝑎1 = 𝐿⁄𝑎1 = 10⁄150 = 0.067  ℎ⁄ = 𝐿⁄ = 10⁄
𝑎2 𝑎2 1400 = 0.007
 F (0.067⁄0.067) = 0.055  F (0.007⁄0.007) = 0
(Table F) (Table F)
 𝛾̅1 (𝑟, 𝑟) = 0.055  𝛾̅1 (𝑟, 𝑟) = 0
Maka; 𝐶1 = 0.055 𝑥 8.5 = 0.47 𝑚2 Maka; 𝐶2 = 0 𝑥 12.7 = 0 𝑚2

Sehingga; 𝜎𝐷2 (𝑟⁄𝑅 ) = 𝛾̅1 (𝑅, 𝑅) + 𝛾̅2 (𝑅, 𝑅) − 𝛾̅1 (𝑟, 𝑟) − 𝛾̅2 (𝑟, 𝑟)
𝜎𝐷2 (𝑟⁄𝑅 ) = 𝐶1 (𝑅, 𝑅) + 𝐶2 (𝑅, 𝑅) − 𝐶1 (𝑟, 𝑟) − 𝐶2 (𝑟, 𝑟)
𝜎𝐷2 (𝑟⁄𝑅 ) = 3.19 + 0.56 − 0.47 − 0 = 3.28 𝑚2
Untuk deviasi ketebalan adalah;
𝜎 = √3.28 = 1.81 𝑚

1
Maka deviasi volumenya adalah;
𝜎 = 𝑝 𝑥 𝑙 𝑥 𝑡 = 10 𝑥 10 𝑥 1.81 = 181 𝑚3
Dimana volume seharusnya V = 10 x 10 x 10 = 1000 m3. Karena ada deviasi volume
sebesar 181 m3, jadi volume yang terambil adalah sebesar (819 ≤ V ≤ 1181) m3.

2.5 L = 100
2. Dimensi blok penambangan r = 2.5 x 2.5 m2
Besar daerah yang ditambang R = 50 x 100 m2 2.5 r
Ketebalan bijih rata-rata t = 10 m
h = 50
Variogram Model: R
a1 = 150 m; C1 = 8.5 m2
a2 = 1400 m; C2 = 12.7 m2

Blok R;
 ℎ⁄𝑎1 = 50⁄150 = 0.333  ℎ⁄ = 50⁄
𝑎2 1400 = 0.036
 𝐿⁄𝑎1 = 100⁄150 = 0.667  𝐿⁄𝑎2 = 100⁄1400 = 0.071
 F (0.333⁄0.667) = 0.375  F (0.036⁄0.071) = 0.044
(Table F) (Table F)
 𝛾̅1 (𝑅, 𝑅) = 0.375  𝛾̅2 (𝑅, 𝑅) = 0.044
Maka; 𝐶1 = 0.375 𝑥 8.5 = 3.19 𝑚2 Maka; 𝐶2 = 0.044 𝑥 12.7 = 0.56 𝑚2

Blok r;
 ℎ⁄𝑎1 = 𝐿⁄𝑎1 = 2.5⁄150 = 0.017  ℎ⁄ = 𝐿⁄ = 2.5⁄
𝑎2 𝑎2 1400 = 0.0018
 F (0.017⁄0.017) = 0.017  F( 0.0018 ⁄0.0018 ) = 0
(Table F) (Table F)
 𝛾̅1 (𝑟, 𝑟) = 0.017  𝛾̅1 (𝑟, 𝑟) = 0
Maka; 𝐶1 = 0.017𝑥 8.5 = 0.15 𝑚2 Maka; 𝐶2 = 0 𝑥 12.7 = 0 𝑚2

Sehingga; 𝜎𝐷2 (𝑟⁄𝑅 ) = 𝛾̅1 (𝑅, 𝑅) + 𝛾̅2 (𝑅, 𝑅) − 𝛾̅1 (𝑟, 𝑟) − 𝛾̅2 (𝑟, 𝑟)
𝜎𝐷2 (𝑟⁄𝑅 ) = 𝐶1 (𝑅, 𝑅) + 𝐶2 (𝑅, 𝑅) − 𝐶1 (𝑟, 𝑟) − 𝐶2 (𝑟, 𝑟)
𝜎𝐷2 (𝑟⁄𝑅 ) = 3.19 + 0.56 − 0.15 − 0 = 3.6 𝑚2
Untuk deviasi ketebalan adalah;
𝜎 = √3.6 = 1.9 𝑚
Maka deviasi volumenya adalah;
𝜎 = 𝑝 𝑥 𝑙 𝑥 𝑡 = 2.5 𝑥 2.5 𝑥 1.9 = 11.88 𝑚3
Dimana volume seharusnya V = 2.5 x 2.5 x 10 = 62.5 m3. Karena ada deviasi volume
sebesar 11.88 m3, jadi volume yang terambil adalah sebesar (50.62 ≤ V ≤ 74.38) m3.

2
3. Dimensi blok penambangan r = 2.5 x 2.5 m2
10 L = 100
Besar daerah yang ditambang R = 50 x 100 m2
Ketebalan bijih rata-rata t = 10 m 10 r
Variogram Model:
h = 50
a = 200 m; C = 5 m2; C0 = 2 m2 R

Blok R; Blok r;
 ℎ⁄𝑎 = 50⁄200 = 0.25  ℎ⁄𝑎 = 𝐿⁄𝑎 = 10⁄200 = 0.05
 𝐿⁄𝑎 = 100⁄200 = 0.5  F (0.05⁄0.05) = 0.040
 F (0.25⁄0.5) = 0.3 (Table F)
(Table F)  𝛾̅ (𝑟, 𝑟) = 0.040
 𝛾̅ (𝑅, 𝑅) = 0.3 Maka; 𝐶 = (0.040 𝑥 5) + 2 = 2.2 𝑚2
Maka; 𝐶 = (0.3 𝑥 5) + 2 = 3.5 𝑚2

Sehingga; 𝜎𝐷2 (𝑟⁄𝑅 ) = 𝛾̅ (𝑅, 𝑅) − 𝛾̅ (𝑟, 𝑟)


𝜎𝐷2 (𝑟⁄𝑅 ) = 𝐶(𝑅, 𝑅) − 𝐶(𝑟, 𝑟)
𝜎𝐷2 (𝑟⁄𝑅 ) = 3.5 − 2.2 = 1.3 𝑚2
Untuk deviasi ketebalan adalah;
𝜎 = √1.3 = 1.14 𝑚
Maka deviasi volumenya adalah;
𝜎 = 𝑝 𝑥 𝑙 𝑥 𝑡 = 10 𝑥 10 𝑥 1.14 = 114 𝑚3
Dimana volume seharusnya V = 10 x 10 x 10 = 1000 m3. Karena ada deviasi volume
sebesar 114 m3, jadi volume yang terambil adalah sebesar (886 ≤ V ≤ 1114) m3.

Anda mungkin juga menyukai