Anda di halaman 1dari 109

PERHITUNGAN V

NO KETERANGAN
1 PONDASI
0.30
1.35 1.35
0.30

3.10

2 KEPALA JEMBATAN

0.25
0.50
0.75
0.50

0.50
3 ABUTMENT

0.25
1.75

0.25
5.00

5.00
4.25
0.50

0.40 1.25
4 PLAT JEMBATAN

7.02
0.46

5 PEKERJAAN ASPAL AC.WC tebal 4 cm (berat jenis aspal 2,3 ton/m3)


6 PEKERJAAN LAPIS PEREKAT ASPAL CAIR
7 PEKERJAAN BAHAN ANTI PENGELUPASAN
8 BOK
PERHITUNGAN VOLUME JEMBATAN

PERHITUNGAN P L T TEBAL
V.persegi panjang 1 9 3.1 0.3
V.persegi panjang 2 9 0.4 0.5

V.Persegi 1 9 0.25 0.25


V.Persegi 2 9 0.25 0.25
V.Persegi panjang 1 9 0.5 0.25
V.Persegi panjang 2 9 1 0.5

V.total = ( V.trapesium - V. persegi 2)+(V.persegi panjang-V.persegi 1)


V. Trapesium (J.sisi sejajar)X (t)/2
V. persegi 2 9 0.5 0.4
V. Persegi panjang 9 2.45 1.25
V. Persegi 1 9 0.25 0.25
V.Persegi panjang 9 7.02 0.46

V.ASPAL AC.WC 13.28 6 0.04


V.PEREKAT(KOEF.LAPIS 0,35 L/m2) 13.28 6
V.ANTI PENGELUPASAN (Koef.addictive 0,162 kg/ton),(BJ:2,3 ton/m3) 13.28 6 0.04
V1=2,46 x 0,69 x 0,17
V2=2,32 x 0,49 x 0,11
V3=2,26 x 0,49 x 0,68
VOLUME BAGIAN VOLUME SEMENTARA VOLUME SATUAN
8.37 10.17 10.17 m3
1.8

0.5625 6.75 6.75 m3


0.5625
1.125
4.5

anjang-V.persegi 1)
5 3.2 30.2 m3
1.8
27.5625 27
0.5625
29.0628 29.0628 m3

7.33056 7.33056 ton


27.888 27.888 liter
1.18755072 1.18755072 kg
0.288558
0,140,36
0.753032
FORMULIR REKAMAN
ANALISA HARGA SATUAN PEKERJAAN

Paket : Jembatan Pelunas Hutang


Tanah Anggaran : 2019
No. Mata Pembayaran :
Jenis Pekerjaan : Galian Biasa
Satuan pengukuran : m³

No Uraian Satuan Koefisien Biaya Satuan (Rp)


A Tempat Kerja
1 Pekerja Jam 0.213 85,000
2 Mandor Jam 0.053 12,100

Jumlah Harga Tenaga Kerja

B Bahan-bahan

Jumlah Harga Bahan-bahan

C Peralatan
1 Escavator Jam 0.053 274,755.00
2 Dump Truck 4 m³ Jam 0.132 338,080.00
3 Alat Bantu Ls 1,000

Jumlah Harga Peralatan

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (10% x D)
F Harga Satuan (D+E)
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat unt
2 Kuantitas adalah bobot setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Harga satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
AAN

Perkiraan Kuantitas :
Total Harga (Rp) :
% Harga Jml Seluru :

Jumlah

18105
641.3

18746.3

14562.015
44626.56
0.00

59188.575

77934.875
7793.4875
85728.3625

ume dan/atau ukuran berat untuk bahan-bahan.


aan dari nomor mata pembayaran.
an operator.
tapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR REKAMAN
ANALISA HARGA SATUAN PEKERJAAN

Paket : Jembatan Pelunas Hutang


Tanah Anggaran : 2019
No. Mata Pembayaran :
Jenis Pekerjaan : Timbunan Biasa Dari Sumber Galian
Satuan pengukuran : m³

No Uraian Satuan Koefisien Biaya Satuan (Rp)


A Tempat Kerja
1 Pekerja Jam 0.347 10,000
2 Mandor Jam 0.087 85,000

Jumlah Harga Tenaga Kerja

B Bahan-bahan
1 Air m³ 0.346 42,000

Jumlah Harga Bahan-bahan

C Peralatan
1 Escavator Jam 0.053 442,057.00
2 Dump Truck 4 m³ Jam 0.129 252,559.00
3 Bulldozer Jam 0.005 720,845.00
4 Vibratory Roller, 10 ton Jam 0.013 309,313.00
5 Water Tank Truck 4000 Jam 0.087 195,243.00
6 Alat Bantu Ls 1,000

Jumlah Harga Peralatan

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (10% x D)
F Harga Satuan (D+E)
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat unt
2 Kuantitas adalah bobot setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Harga satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
AAN

Perkiraan Kuantitas :
Total Harga (Rp) :
% Harga Jml Seluru :

Jumlah

3470
7395

10865

14532

14532

23429.021
32580.111
3604.225
4021.069
16986.141
0.00

80620.567

106017.567
10601.7567
116619.3237

ume dan/atau ukuran berat untuk bahan-bahan.


aan dari nomor mata pembayaran.
an operator.
tapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR REKAMAN
ANALISA HARGA SATUAN PEKERJAAN

Paket : Jembatan Pelunas Hutang


Tanah Anggaran : 2019
No. Mata Pembayaran :
Jenis Pekerjaan : Lapis Perekat - Aspal Cair
Satuan pengukuran : Liter

No Uraian Satuan Koefisien Biaya Satuan (Rp)


A Tempat Kerja
1 Pekerja Jam 0.013 10,000
2 Mandor Jam 0.003 85,000

Jumlah Harga Tenaga Kerja

B Bahan-bahan
1 Aspal Kg 0.889 17,000.00
2 Kerosen/Minyak Tanah L 0.253 3800

Jumlah Harga Bahan-bahan

C Peralatan
1 Asphalt Sprayer Jam 0.003 73,865.00
2 Air Compressor Jam 0.002 162,074.00
3 Dump Truck Jam 0.003 252,559.00

Jumlah Harga Peralatan

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (10% x D)
F Harga Satuan (D+E)
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat unt
2 Kuantitas adalah bobot setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Harga satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
AAN

Perkiraan Kuantitas :
Total Harga (Rp) :
% Harga Jml Seluru :

Jumlah

130
255

385

15113
961.4

16074.4

221.595
324.148
757.677

1303.42

17762.82
1776.282
19539.102

ume dan/atau ukuran berat untuk bahan-bahan.


aan dari nomor mata pembayaran.
an operator.
tapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR REKAMAN
ANALISA HARGA SATUAN PEKERJAAN

Paket : Jembatan Pelunas Hutang


Tanah Anggaran : 2019
No. Mata Pembayaran :
Jenis Pekerjaan : Laston Lapis Aus (AC-WC)
Satuan pengukuran : Ton

No Uraian Satuan Koefisien Biaya Satuan (Rp)


A Tempat Kerja
1 Pekerja Jam 0.361 10,000
2 Mandor Jam 0.024 85,000

Jumlah Harga Tenaga Kerja

B Bahan-bahan
1 Agregat Kasar m³ 0.59 359000
2 Agregat Halus m³ 0.331 385000

Jumlah Harga Bahan-bahan

C Peralatan
1 Wheel Loader Jam 0.029 477,307.00
2 Asphalt Mixing Plant Jam 0.026 6,179,612.00
3 Generator Set Jam 0.026 401,567.00
4 Dump Truck, 10 m3 Jam 0.136 338,080.00
5 Asphalt Finisher Jam 0.022 404,000.00
6 Tandem Roller Jam 0.019 264,857.00
7 Pneumatic Tyre Roller, 10 Jam 0.038 287,333.00
8 Alat bantu ls 1,000

Jumlah Harga Peralatan

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (10% x D)
F Harga Satuan (D+E)
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat unt
2 Kuantitas adalah bobot setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Harga satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
AAN

Perkiraan Kuantitas :
Total Harga (Rp) :
% Harga Jml Seluru :

Jumlah

3610
2040

5650

211810
127435

339245

13841.903
160669.912
10440.742
45978.88
8888
5032.283
10918.654
0

255770.374

600665.374
60066.5374
660731.9114

ume dan/atau ukuran berat untuk bahan-bahan.


aan dari nomor mata pembayaran.
an operator.
tapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR REKAMAN
ANALISA HARGA SATUAN PEKERJAAN

Paket : Jembatan Pelunas Hutang


Tanah Anggaran : 2019
No. Mata Pembayaran :
Jenis Pekerjaan : Bahan Anti Pengelupasan
Satuan pengukuran : Kg

No Uraian Satuan Koefisien Biaya Satuan (Rp)


A Tempat Kerja
1 Pekerja Jam 0.007 10,000
2 Tukang Jam 0.004 11,400

Jumlah Harga Tenaga Kerja

B Bahan-bahan
1 Aditif anti pengelupasan Kg 1.071 108000

Jumlah Harga Bahan-bahan

C Peralatan
1 Alat Bantu Ls 1.000

Jumlah Harga Peralatan

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (10% x D)
F Harga Satuan (D+E)
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat unt
2 Kuantitas adalah bobot setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Harga satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
AAN

Perkiraan Kuantitas :
Total Harga (Rp) :
% Harga Jml Seluru :

Jumlah

70
45.6

115.6

115668

115668

0.00

0.00

115783.6
11578.36
127361.96

ume dan/atau ukuran berat untuk bahan-bahan.


aan dari nomor mata pembayaran.
an operator.
tapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR REKAMAN
ANALISA HARGA SATUAN PEKERJAAN

Paket : Jembatan Pelunas Hutang


Tanah Anggaran : 2019
No. Mata Pembayaran :
Jenis Pekerjaan : Beton Mutu Sedang, fc'30 Mpa
Satuan pengukuran : m³

No Uraian Satuan Koefisien Biaya Satuan (Rp)


A Tempat Kerja
1 Pekerja Jam 2.410 10,000
2 Mandor Jam 0.402 85,000
3 Tukang Jam 0.803 11,400

Jumlah Harga Tenaga Kerja

B Bahan-bahan
1 Semen Kg 383.670 2000
2 Pasir Beton m³ 0.859 320000
3 Agregat Kasar m³ 0.441 359000
4 Kayu Dolken m³ 0.062 17000
5 Paku Kecil Kg 0.089 1000
6 Air m³ 0.197 42,000

Jumlah Harga Bahan-bahan

C Peralatan
1 Concrete Mixer 500 liter Jam 0.402 50,000.00
2 Water Tank Truck 4000 L Jam 0.050 195,243.00
3 Concrete Vibrator Jam 0.402 47,630.00
4 Alat bantu Ls 1.000

Jumlah Harga Peralatan

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (10% x D)
F Harga Satuan (D+E)
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat unt
2 Kuantitas adalah bobot setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Harga satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
AAN

Perkiraan Kuantitas :
Total Harga (Rp) :
% Harga Jml Seluru :

Jumlah

24100
34170
9154.2

67424.2

767340
274880
158319
1054
89
8274

1209956

20100
9762.15
19147.26
0

49009.41

1326389.61
132638.961
1459028.571

ume dan/atau ukuran berat untuk bahan-bahan.


aan dari nomor mata pembayaran.
an operator.
tapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR REKAMAN
ANALISA HARGA SATUAN PEKERJAAN

Paket : Jembatan Pelunas Hutang


Tanah Anggaran : 2019
No. Mata Pembayaran :
Jenis Pekerjaan : Baja Tulangan Ulir D25
Satuan pengukuran : Kg

No Uraian Satuan Koefisien Biaya Satuan (Rp)


A Tempat Kerja
1 Pekerja Jam 0.070 10,000
2 Mandor Jam 0.035 85,000
3 Tukang Jam 0.035 11,400

Jumlah Harga Tenaga Kerja

B Bahan-bahan
1 Besi beton ulir Kg 1.500 19000
2 Kawat Beton Kg 0.020 19000

Jumlah Harga Bahan-bahan

C Peralatan
1 Alat Bantu Ls 1.000

Jumlah Harga Peralatan

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (10% x D)
F Harga Satuan (D+E)
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat unt
2 Kuantitas adalah bobot setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Harga satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
AAN

Perkiraan Kuantitas :
Total Harga (Rp) :
% Harga Jml Seluru :

Jumlah

700
2975
399

4074

28500
380

28880

0.00

32954
3295.4
36249.4

ume dan/atau ukuran berat untuk bahan-bahan.


aan dari nomor mata pembayaran.
an operator.
tapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR REKAMAN
ANALISA HARGA SATUAN PEKERJAAN

Paket : Jembatan Pelunas Hutang


Tanah Anggaran : 2019
No. Mata Pembayaran :
Jenis Pekerjaan : Pasangan Batu
Satuan pengukuran : m³

No Uraian Satuan Koefisien Biaya Satuan (Rp)


A Tempat Kerja
1 Pekerja Jam 2.410 10,000
2 Tukang Jam 0.803 85,000
3 Mandor Jam 0.402 11,400

Jumlah Harga Tenaga Kerja

B Bahan-bahan
1 Batu Belah 0.905 264000
2 Semen 93.667 2000
3 Pasir Pasang 0.187 371000
4 Air 1.077 42,000

Jumlah Harga Bahan-bahan

C Peralatan
Concrete Mixer 500 liter Jam 0.402 50,000.00
Water Tank Truck 4000 L Jam 0.052 195,243.00
Alat Bantu Ls 1.000

Jumlah Harga Peralatan

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (10% x D)
F Harga Satuan (D+E)
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat unt
2 Kuantitas adalah bobot setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Harga satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
AAN

Perkiraan Kuantitas :
Total Harga (Rp) :
% Harga Jml Seluru :

Jumlah

24100
68255
4582.8

96937.8

238920
187334
69377
45234

540865

20100
10152.636
0

30252.636

668055.436
66805.5436
734860.9796

ume dan/atau ukuran berat untuk bahan-bahan.


aan dari nomor mata pembayaran.
an operator.
tapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
REKAPITULASI
RENCANA ANGGARAN BIAYA

NAMA PAKET :
LOKASI :
TAHUN ANGGARAN :

NO. DIVISI URAIAN

(A) JUMLAH HARGA PEKERJAAN (Termasuk Harga Umum dan Keuntungan)


(B) PAJAK PERTAMBAHAN NILAI (PPN) = 10% x (A)
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)
(D) DIBULATKAN

TERBILANG
JUMLAH HARGA PEKERJAAN (Rp)

Dipersiapkan Oleh :
DAFTAR HARGA DAN KUANTIT

SATKER :
PAKET :
TAHUN ANGGARAN :

Mata
Pembayaran

a
DIV. 1
Jumlah Harga Pekerjaan Div. 1 (Dipindahkan ke Rekapitulasi B
DIV. 2
Jumlah Harga Pekerjaan Div. 2 (Dipindahkan ke Rekapitulasi B
DIV. 3
Jumlah Harga Pekerjaan Div. 3 (Dipindahkan ke Rekapitulasi B
DIV. 4
Jumlah Harga Pekerjaan Div. 4 (Dipindahkan ke Rekapitulasi B
DIV. 5
Jumlah Harga Pekerjaan Div. 5 (Dipindahkan ke Rekapitulasi B
DIV. 6
Jumlah Harga Pekerjaan Div. 6 (Dipindahkan ke Rekapitulasi B
DIV. 7
Jumlah Harga Pekerjaan Div. 7 (Dipindahkan ke Rekapitulasi B
DIV. 8
Jumlah Harga Pekerjaan Div. 8 (Dipindahkan ke Rekapitulasi B
DIV. 9
Jumlah Harga Pekerjaan Div. 9 (Dipindahkan ke Rekapitulasi B
DIV. 10
Jumlah Harga Pekerjaan Div. 10 (Dipindahkan ke Rekapitulasi B
DAFTAR HARGA DAN KUANTITAS

ATKER :
AKET :
AHUN ANGGARAN :

Uraian

b
UMUM
Jumlah Harga Pekerjaan Div. 1 (Dipindahkan ke Rekapitulasi Biaya)
DRAINASE
Jumlah Harga Pekerjaan Div. 2 (Dipindahkan ke Rekapitulasi Biaya)
PEKERJAAN TANAH
Jumlah Harga Pekerjaan Div. 3 (Dipindahkan ke Rekapitulasi Biaya)
PELEBARAN PERKERASAN DAN BAHU JALAN
Jumlah Harga Pekerjaan Div. 4 (Dipindahkan ke Rekapitulasi Biaya)
PEKERASAN BERBUTIR DAN PEKERJAAN BETON SEMEN
Jumlah Harga Pekerjaan Div. 5 (Dipindahkan ke Rekapitulasi Biaya)
PERKERASAN ASPAL
Jumlah Harga Pekerjaan Div. 6 (Dipindahkan ke Rekapitulasi Biaya)
STRUKTUR
Jumlah Harga Pekerjaan Div. 7 (Dipindahkan ke Rekapitulasi Biaya)
PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
Jumlah Harga Pekerjaan Div. 8 (Dipindahkan ke Rekapitulasi Biaya)
PEKERJAAN HARIAN
Jumlah Harga Pekerjaan Div. 9 (Dipindahkan ke Rekapitulasi Biaya)
PEKERJAAN PEMELIHARAAN RUTIN
Jumlah Harga Pekerjaan Div. 10 (Dipindahkan ke Rekapitulasi Biaya)
TAS

Satuan KUANTITAS HARGA SATUAN (Rp) HARGA Pekerjaan (Rp)

c d e f=(dxe)

Biaya)

Biaya)

Biaya)

Biaya)

Biaya)

Biaya)

Biaya)

Biaya)

Biaya)

Biaya)
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
(Data Hasil Survei)

KO
No. URAIAN HP KAP.
DE

1 ASPHALT MIXING PLANT E01 294.0 50.0 T/Jam

2 ASPHALT FINISHER E02 72.4 10.0 Ton


3 ASPHALT SPRAYER E03 4.0 850.0 Liter
4 BULLDOZER 100-150 HP E04 155.0 - -

5 COMPRESSOR 4000-6500 E05 60.0 5,000.0 CPM/(L/m)


L\M
6 CONCRETE MIXER 0.3-0.6 E06 20.0 500.0 Liter
M3
7 CRANE 10-15 TON E07 138.0 15.0 Ton
8 DUMP TRUCK 3.5 TON E08 100.0 4.0 Ton
9 DUMP TRUCK 10 TON E09 190.0 10.0 Ton
10 EXCAVATOR 80-140 HP E10 133.0 0.9 M3

11 FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton

12 GENERATOR SET E12 180.0 395.0 KVA


13 MOTOR GRADER >100 HP E13 135.0 10,800.0 -

14 TRACK LOADER 75-100 HP E14 70.0 0.8 M3

15 WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3

16 THREE WHEEL ROLLER 6-8 E16 55.0 8.0 Ton


T
17 TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton

18 TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton


19 VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton

20 CONCRETE VIBRATOR E20 5.5 25.0 -

21 STONE CRUSHER E21 220.0 60.0 T/Jam


22 WATER PUMP 70-100 mm E22 6.0 - -

23 WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter

24 PEDESTRIAN ROLLER E24 8.8 835.00 Ton


25 TAMPER E25 4.7 121.00 Ton
26 JACK HAMMER E26 0.0 1,330.00 -
27 FULVI MIXER E27 345.0 2,005.00 -
28 CONCRETE PUMP E28 100.0 8.00 M3
29 TRAILER 20 TON E29 175.0 20.00 Ton
30 PILE DRIVER + HAMMER E30 25.0 2.50 Ton

31 CRANE ON TRACK 35 TON E31 125.0 35.0 Ton

32 WELDING SET E32 40.0 250.0 Amp


33 BORE PILE MACHINE E33 150.0 2,000.0 Meter
34 ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter

35 TRONTON E35 150.0 15.0 Ton


36 COLD MILLING E36 248.0 1,000.0 m
37 ROCK DRILL BREAKER E37 3.0 - -

38 COLD RECYCLER E38 900.0 2,200.0 M


39 HOT RECYCLER E39 400.0 3.0 M
40 AGGREGAT (CHIP) E40 115.0 3.5 M
SPREADER
41 ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter

42 SLIP FORM PAVER E42 105.0 2.5 M


43 CONCRETE PAN MIXER E43 134.0 600.0 Liter

44 CONCRETE BREAKER E44 290.0 20.0 m3/jam

45 ASPAHLT TANKER E45 190.0 4,000.0 liter


46 CEMENT TANKER E46 190.0 4,000.0 liter
47 CONDRETE MIXER (350) E47 20.0 350.0 liter

48 VIBRATING RAMMER E48 4.2 80.0 KG


49 TRUK MIXER (AGITATOR) E49 220.0 5.0 M3

50 BORE PILE MACHINE E50 125.0 60.0 CM


51 CRANE ON TRACK 75-100 E51 200.0 75.0 Ton
TON
52 BLENDING EQUIPMENT E52 50.0 30.0 Ton

53 ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter

54 BAR BENDER E53 3.0 0.0 0


55 BAR CUTTER E54 3.0 0.0 0
56 BREAKER E55 80.0 3.0 m3/jam
57 GROUTING PUMP E56 100.0 15.0 Ton
58 JACK HIDROLIC E57 3.0 150.0 Ton
59 MESIN LAS E58 3.0 0.2 Ton
60 PILE DRIVER LEADER, 75 kw E59 70.0 75.0 kw

61 PILE HAMMER E60 10.0 0.0 0


62 PILE HAMMER, 2,5 Ton E61 1.0 2.5 Ton
63 STRESSING JACK E62 89.0 15.0 Ton
64 WELDING MACHINE, 300 A E63 5.0 0.0 0

65 PRENATER
66 Grass Cutter
KERJA

BIAYA
SEWA
KET.
ALAT/JAM
(Rp)
6,179,612.00

404,000.00
73,865.00
720,845.00

162,074.00

50,000.00

301,481.00
252,559.00
338,080.00
442,057.00

274,755.00

401,567.00
443,667.00

401,922.00

477,307.00

181,754.00

264,857.00

287,333.00
309,313.00

47,630.00

648,560.00
38,093.00

195,243.00

60,964.00
46,879.00
112,000.00
-
325,501.00
504,244.00
153,098.00

557,169.00

100,421.00
993,451.00
-

365,411.00
1,535,000.00
-

1,596,286.00
746,643.00
291,598.00

295,457.00

251,391.00
389,012.00

547,871.00

374,514.00
-
62,622.00

34,797.00
269,500.00

290,450.00
587,500.00

133,232.00

95,514.00

23,130.00
22,815.00
350,000.00
197,357.00
-
32,030.00
146,114.00

46,864.00
-
1,275,600.00
-

-
70,000.00
1 2 3 4
3 Pengetikan Bahasa Lemb/halaman 4,000
4 Asing
Penulisan Kertas Kerja Lmb/halaman 8,000
5 Terjemahan Naskah Lmb/halaman 75,000
6 Bahasa Asing
Terjemahan Naskah Lmb/halaman 50,000
Catatan : Bahasa Daerah
1. Honor diberikan kepada Non PNS;
2. Biaya terjemahan Naskah Bahasa Daerah tidak termasuk biaya pengetikan.
E. Daftar Satuan Upah Tertinggi
NO URAIAN SATUAN UPAH (Rp) Keterang
1 2 3 4 5
1 Tenaga/Pekerja OH 70,000
2 Mandor OH 85,000
3 Kepala tukang OH 85,000
4 Batu Batu
Tukang OH 80,000
5 Pembantu Tukang OH 70,000
6 Batu
Kepala Tukang OH 90,000
7 Kayu
Tukang Kayu OH 80,000
8 Kasar Kayu
Tukang OH 85,000
9 Halus
Pembantu Tukang OH 70,000
10 Kayu
Tukang Pasang OH 90,000
11 Keramik
Kepala Tukang OH 90,000
12 Besi
Tukang Besi OH 80,000
13 Pembantu Tukang OH 70,000
14 Besi
Kepala tukang OH 85,000
15 Cat/Politur
Tukang Cat/Politur OH 80,000
16 Tukang Listrik OH 85,000
17 Tenaga (Instalasi OH 90,000
18 Listrik)
Tukang Gali OH 100,000
19 Sumur pipa
Tukang OH 85,000
20 Tukang Pipa Air OH 80,000
21 Bersih
Kepala Tukang OH 90,000
22 Aspal
Juru Godog Aspal OH 80,000
23 Juru Semprot OH 80,000
24 Aspal
Mekanik terlatih OH 90,000
25 Pembantu OH 80,000
26 Mekanik
Operator Terlatih OH 85,000
27 Operator Semi OH 80,000
28 Terlatih
Pembantu OH 75,000
29 Operator
Operator alat berat OH 85,000
30 Tukang Bongkar OH 80,000
1 2 3 4 5
31 Pekerja Galian dan OH 80,000
32 Urug
Uang layar Hari 150,000
33 Pengambil/pengiri Hari 85,000
m sampel
34 Juru malaria desa Bulan 730,000
35 Petugas Operasi Hari 70,000
36 SAR
Petugas piket SAR Hari 70,000 > 6 jam
37 Pendataan potensi WP 6,500
38 pajak KBM
Instruktur di laut OH 150,000
39 Responden data OB 50,000
*)Catatan: akses pangan
1) UntukPengetikan Bahasa Asing
renovasi Gedung BCB dapat dinaikkan 10 %.
2) Setiap jenis jasa sudah termasuk pajak dan jasa.
3) Pajak ditambahkan pada perhitungan komulatif dari HPS kegiatan. 75000
F. Honor Tenaga Harian Lepas
NO P PEN SA UPAH (Rp) Ketera
E DIDI TU ngan
1 2 K KAN AN
3 4 5
1 Petugas SD Har 70,000
2 Kandang
Pengolah s.d
SD i
Har 70,000
3 Lahan
Penjaga s.d
SD i
Har 70,000
4 Malam
Pengelola s.d
SD i
Har
70,000
Hijauan s.d i
5 Makan
Pemerah SD. Har 70,000
6 susu
Pemandu s.d
SD i
Har 300,000
7 wisata
Juru masak SD s.d i
Har 70,000
8 Pramu sosial SD s.d i
Har 70,000 1 org: 7-
s.d i 10 klien
9 Tenaga S. Har 85,000
Pendamping M i
10 analis
Analis lab K/ Har 70,000
11 Laboratoriu
Analis S1 i
Har 100,000
12 Laboratoriu
Juru ukur S i
Har 75,000
13 pemetaan
Sopir M
SD i
Har 70,000
14 Transp. s.d
SD i
Ked 110,000
Untuk s.d atan
15 wartawan
Surveyor . gan
Har 110,000
pengumpul i
data paskaDaerah DIY di DKI Jakarta Tarif upah sesuai tarif standar Pemerintah Provinsi D
1. Badan Penghubung
2. *) Pekerjaan yang dapat disetarakan.
3. Tenaga harian lepas adalah tenaga yang digunakan sewaktu-waktu sesuai dengan kebutuhan.
H. HARGA SATUAN BAHAN BANGUNAN
H. HARGA SATUAN BAHAN BANGUNAN
Pengetik
SA
an 
NOMOR TU KOTA BAN KULO
Bahasa  SLEMAN
AN YOGYAKARTA TUL N 
Asing
1 2 3 4 5 75000 PROG
7
K.H. HARGA 
K.H.1. SATUAN 
BAHAN 
K.H.1.001. BAHAN 
BANGUNAN
Air 1 42,000 47,000 39,000 58,000
BANGUNAN teng
ki
K.H.1.002. Alumunium foil Roll 525,000 454,000 438,000 705,000
K.H.1.003. lokal
Alumunium 1,25 x 60 foilm Kg 750,000 802,000 666,000 895,000
K.H.1.004. (single)
luar 1,25 x 60foil
Alumunium m Kg 534,000 537,000 446,000 650,000
(single)
luar 1,25 x 60 m
K.H.1.005. (double)
Aspal curah Kg 17,000 17,000 14,000 17,000
K.H.1.006. Aspal Emulsi Kg 17,000 17,000 14,000 17,000
K.H.1.007. (AspalCRS-1/R-65
Modifikasi ) Kg 17,000 19,000 16,000 17,000
K.H.1.008. (Aspal
BNAModifikasi
) Kg 17,000 19,000 16,000 17,000
K.H.1.009. ( JAP-57
Aspal )
Modifikasi Kg 16,000 17,000 14,000 16,000
K.H.1.010. ( Retona
Aspal )
Modifikasi Lb 20,000 20,000 17,000 20,000
K.H.1.011. (Aspal
starbit )
Modifikasi Lb 17,000 19,000 16,000 17,000
K.H.1.012. (Asbes
STR -semen
55 ) Lb 148,000 147,000 130,000 152,000
K.H.1.013. gelombang
Asbes semen kecil Lb 119,000 132,000 112,000 134,000
K.H.1.014. 3000
Asbes x
gelombang
semen kecil Lb 116,000 117,000 96,000 114,000
1050
2700 xx 4 mm
gelombang kecil
K.H.1.015. Asbes semen Lb 107,000 105,000 89,000 107,000
1050
2400 xx
gelombang4 mm kecil
K.H.1.016. Asbes semen Lb 87,000 79,000 76,000 81,000
1050
2100 x
x
gelombang4 mm kecil
K.H.1.017. Asbes semen Lb 85,000 85,000 71,000 85,000
1050
1800 xx
gelombang4 mm
K.H.1.018. Asbes semen Lb 183,000 185,000 154,000 193,000
1050 x 4 mm
kecil1500
gelombang x besar
K.H.1.019. Asbes semen Lb 150,000 161,000 137,000 172,000
1050
3000 xx
gelombang4 mm besar
K.H.1.020. Asbes semen Lb 117,000 147,000 123,000 164,000
1100
2500 xx
gelombang5 mm besar
K.H.1.021. Asbes semen Lb 129,000 135,000 112,000 141,000
1100
2250 xx
gelombang5 mm besar
K.H.1.022. Asbes semen Lb 119,000 126,000 103,000 129,000
1100
2000 xx5 mm
gelombang besar
K.H.1.023. Asbes semen Lb 96,000 106,000 83,000 105,000
1100
1800 xx
gelombang5 mm besar
K.H.1.024. Asbes semen Lb 28,000 28,000 23,000 29,000
1100
1500 x
x
gelombang5 mm besar
K.H.1.025. Asbes semen Lb 60,000 58,000 48,000 64,000
1100
1000 xx
gelombang5 mm besar
K.H.1.026. Asbes semen Lb 36,000 36,000 30,000 41,000
1000
1000 x
x
gelombang2,8 mm besar
K.H.1.027. Asbes semen Lb 294,000 296,000 24,000 35,000
2000
0,600 xx
gelombang 5 mm besar
K.H.1.028. Asbes semen Lb 24,000 24,000 20,000 28,000
2000
0,500 xx
gelombang 2,8 mm
besar
K.H.1.029. Asbes semen Lb 20,000 20,000 17,000 23,000
1000
0,400 xx2,8 mm
gelombang besar
K.H.1.030. Asbes Gelombang Lb 182,000 137,000 112,000 135,000
1000
0,300
Besar xx2,8 mm
K.H.1.031. Asbes (300
Gelombangx 110 x Lb 154,000 105,000 87,000 105,000
1000
0,5
Besar x
mm) 2,8 mm
K.H.1.032. Asbes (Gelombang
200 x 110 Lb 116,000 97,000 81,000 97,000
K.H.1.033. xx
Besar (penutup
Asbes 180 x 110 x Bj 29,000 29,000 29,000 29,000
0,5
0,5 mm
mm) )
langit-langit
K.H.1.034. Genteng fiber3 mm, Bj 94,000 94,000 78,000 94,000
100 x 100
semen 1150 x 850
K.H.1.035. x 4
Asbes nok kecil m2 58,000 29,000 51,000 63,000

K.H.1.036. Asbes nok besar Bh 116,000 54,000 96,000 99,000


K.H.1.037. Genteng Metal Bh 66,000 66,000 55,000 71,000
K.H.1.038. Zinc Alume
Nok atas (U)Type
Type Bh 87,000 87,000 72,000 90,000
K.H.1.039. Prima
proma
Nok atas bulat c x 5
roof (110 Bj 64,000 64,000 53,000 69,000
Roof
x 6 cm)
type prima roof,
K.H.1.040. Nok pinggir (P) P Bj 102,000 102,000 85,000 106,000
K.H.1.041. =
type prima
Batu bata roof Bj 1,000 1,000 1,000 1,000
40
(110cm
K.H.1.042. Batuxbata 5 x 10 x
3,5x10x20 3 1,000 1,000 1,000 1,000
7
22x 10 cm)
m
K.H.1.043. Batako pejal m
3 6,000 6,000 5,000 6,000

K.H.1.044. Batu belah 15/ m


4 264,000 280,000 236,000 283,000
20
K.H.1.045. Batu pecah 10 m
3 291,000 310,000 261,000 300,000
/15
K.H.1.046. Batu pecah 5/ m
3 446,000 475,000 400,000 455,000
7
K.H.1.047. Batu pecah 4/ m
3 459,000 486,000 410,000 467,000
6
K.H.1.048. Batu pecah 3/ m
3 468,000 499,000 420,000 479,000
4

JENIS  KULO
SAT SL
NOMOR BAHAN/B KOTA N 
UAN EM BANTUL
ARANG YOGYAKARTA PROG
AN
O
1 2 3 4 5 6 7
K.H.1.049. Batu pecah m
3 481,000
513,000 431,000 491,000
2/3
K.H.1.050. Batu split m
2 493,000 525,000 442,000 503,000
1/2
K.H.1.051. Batu belah Kg 242,000 243,000 202,000 243,000
putih
3,064,000
K.H.1.052. Batu Alam Kg 3,080,000 2,559,000 3,080,000
Andesit t =
K.H.1.053. 10cm
Baja WF Kg 23,000 23,000 19,000 47,000

17,000
K.H.1.054. Besi cor Kg 20,000 17,000 29,000

19,000
K.H.1.055. Besi beton Kg 17,000 14,000 276,000
bulat
19,000
K.H.1.056. Besi beton D Kg 19,000 16,000 19,000
form C ulir
K.H.1.057. Baut Kg 7,000 7,000 5,000 7,000

K.H.1.058. Besi beton Kg 20,000


19,000 14,000 17,000
bulat
29,000
K.H.1.059. Besi Beton Kg 24,000 19,000 28,000

K.H.1.060. Baja Kg 20,000


20,000 17,000 19,000
Bergelomba
K.H.1.061. ng
Baja Kg 34,000
34,000 28,000 34,000
Prategang
51,000
K.H.1.062. Baja Kg 49,000 41,000 51,000
struktur,titik
leleh 2400-
19,000
K.H.1.063. Baja Kg 19,000 16,000 19,000
Tulangan
K.H.1.064. (Polos)
Baja U24 Kg 19,000
19,000 16,000 19,000
Tulangan
K.H.1.065. (Polos)
Baja U32 Kg 19,000
19,000 16,000 20,000
Tulangan
K.H.1.066. (Ulir)
Baja D32 Kg 19,000
19,000 16,000 19,000
Tulangan
K.H.1.067. (Ulir)
Baja D39 Kg 19,000
19,000 16,000 19,000
Tulangan
K.H.1.068. (Ulir)
KawatD48
Beton Kg 19,000
29,000 23,000 37,000

29,000
K.H.1.069. Kawat Ljr 31,000 26,000 47,000
Bronjong
K.H.1.070. Baut Ljr 7,000 7,000 6,000 7,000

19,000
K.H.1.071. Bambu apus Ljr 19,000 16,000 17,000

19,000
K.H.1.072. Bambu Bj 19,000 16,000 19,000
wulung
94,000
K.H.1.073. Bambu Bj 94,000 78,000 69,000
petung
53,000
K.H.1.074. Buis beton Bj 54,000 45,000 72,000
Diameter 15
K.H.1.075. cm
Buisx beton
1m Bj 58,000
58,000 48,000 63,000
Diameter 20
K.H.1.076. cm x beton
Buis 1m Bj 66,000
66,000 55,000 70,000
Diameter 25
K.H.1.077. cm x beton
Buis 1m Bj 66,000
66,000 55,000 73,000
Diameter 30
K.H.1.078. cm
Buisx beton
1m Bj 81,000
81,000 67,000 97,000
Diameter 40
K.H.1.079. cm
Buisx beton
1m Bj 81,000
79,000 66,000 107,000
Diameter 50
K.H.1.080. cm
Buisx beton
1m Bj 71,000
71,000 59,000 79,000
Diameter 50
K.H.1.081. cm
Buisx beton
0.50m Bj 59,000
59,000 49,000 66,000
Diameter
K.H.1.082. 60cmx 1m
Buis beton Bj 78,000
77,000 64,000 83,000
Diameter 60
K.H.1.083. cm
Buisx beton
0,50 Bj 87,000
94,000 78,000 113,000
Diameter 80
K.H.1.084. cm
Buisx beton
0,5 m BJ 141,000
142,000 118,000 142,000
Diameter 80
K.H.1.085. cm x beton
Buis 1m Bj 207,000
208,000 173,000 208,000
Diameter
K.H.1.086. 100cm x 1m
Buis beton Bj 207,000
170,000 141,000 208,000
Diameter
100cm x
K.H.1.087. Buis beton Kg 64,000 64,000 53,000 64,000
1/2 D 20 cm
K.H.1.088. Buis beton Kg 85,000 85,000 71,000 85,000
1/2 D 25 cm
K.H.1.089. cat Emco Kg 81,000 85,000 67,000 81,000
biasa
K.H.1.090. catEmco Kg 95,000 90,000 75,000 94,000
Segitiga
K.H.1.091. cat Emco Kg 105,000 105,000 85,000 106,000
Bintang
K.H.1.092. Cat dasar Galon 29,000 42,000 35,000 79,000

103,000
K.H.1.093. Cat besi Kg 102,000 87,000 106,000

103,000
K.H.1.094. Cat tembok Kg 102,000 57,000 132,000
Maxilite
31,000
K.H.1.095. Cat tembok Kg 81,000 26,000 31,000
Decholit
36,000
K.H.1.096. Cat tembok Kg 36,000 30,000 36,000
Catylac
K.H.1.097. Biasa
Cat tembok Kg 36,000
36,000 36,000 43,000
Catylac
K.H.1.098. Bintang
Cat tembok Kg 87,000
87,000 72,000 88,000
Mowilek
K.H.1.099. Dalam
Cat tembok Kg 130,000
130,000 108,000 135,000
Mowilek
K.H.1.100. Luar
Cat tembok Kg 97,000
99,000 82,000 107,000
Dulux
K.H.1.101. Dalam
Cat tembok Kg 160,000
161,000 134,000 161,000
Dulux Luar
46,000
K.H.1.102. Cat tembok Kg 47,000 39,000 49,000
flora
K.H.1.103. Cat tembok Kg 146,000
147,000 122,000 147,000
Ex ICI
66,000
K.H.1.104. Oker hitam Kg 66,000 23,000 66,000

61,000
K.H.1.105. cat genteng Kg 63,000 52,000 54,000
air revinol
79,000
K.H.1.106. Cat besi Ex Kg 79,000 72,000 99,000
Emco
K.H.1.107. Bintang
Cat kayu Ex Kg 79,000
79,000 73,000 99,000
Emco
K.H.1.108. Bintang
Cat Marka Kg 129,000
134,000 111,000 129,000
(Non
K.H.1.109. Thermoplas)
Cat Marka Kg 85,000
85,000 75,000 81,000
(Thermoplas
K.H.1.110. tic)
Cat Unit 96,000
29,000 79,000 47,000
46,000
K.H.1.111. Cat anti Unit 71,000 75,000 45,000
karat
2,814,000
K.H.1.112. Daun pintu Unit 2,827,000 2,349,000 2,827,000
baja UK B
=100,
K.H.1.113. H=3,50
Daun pintu Unit 845,000
848,000 705,000 848,000
kayu jati
Ukuran
K.H.1.114. B=80
Daun pintu Unit 900,000
905,000 752,000 905,000
kayu jati Uk,
B=180
K.H.1.115. H=230
Daun pintu Kg 562,000
564,000 469,000 564,000
plat baja UK
B=180,
K.H.1.116. H=0,50
Faberglas biji 132,000
134,000 111,000 134,000
gelombang
K.H.1.117. kecil
Dempul80 x 2 37,000
42,000 36,000 37,000
m
kayu type A
K.H.1.118. putih
Dempul Jago 2 12,000
12,000 10,000 12,000
m
lilin/kayu
26,000
K.H.1.119. Rumput m
2 26,000 22,000 26,000
Gebalan
37,000
K.H.1.120. Rumput m
2 37,000 31,000 37,000
Biasa
46,000
K.H.1.121. Rumput m
2 47,000 39,000 47,000
Manila
K.H.1.122. Rumput Ljr 20,000
20,000 17,000 20,000
Akar Wangi
17,000
K.H.1.123. Rumput Ljr 17,000 14,000 17,000
Serai
141,000
K.H.1.124. Gedek Bj 142,000 118,000 142,000
bambu kulit
85,000
K.H.1.125. Gedek Bj 85,000 71,000 85,000
bambu
K.H.1.126. daging
Genteng Bj 7,000 7,000 6,000 7,000
beton besar
K.H.1.127. Genteng Bj 7,000 7,000 6,000 7,000
beton kecil
K.H.1.128. Genteng Bh 2,000 2,000 2,000 6,000
tanah liat
K.H.1.129. paris
Genteng Bj 2,000 2,000 2,000 6,000
tanah liat
K.H.1.130. kodok
Genteng Bj 17,000
17,000 12,000 14,000
kaca paris
K.H.1.131. Genteng Bj 20,000
20,000 23,000 20,000
kaca kodok
87,000
K.H.1.132. Genteng Bj 87,000 72,000 87,000
kaca beton
16,000
K.H.1.133. Genteng KIA Bj 16,000 13,000 16,000
Warna
14,000
K.H.1.134. Genting Bj 14,000 12,000 16,000
kaca
K.H.1.135. lengkung
Genting BJ 20,000
20,000 17,000 23,000
kaca
K.H.1.136. lengkung
Genting 2 17,000
17,000 12,000 14,000
m
kaca 3m
23,000
K.H.1.137. Genting Ikat 23,000 29,000 35,000
Kaca 5mm
141,000
K.H.1.138. Metal Roof m
2 142,000 118,000 148,000

K.H.1.139. Ijuk 2 8,000 10,000 7,000 10,000


m

150,000
K.H.1.140. Kaca bening 2
m
102,000 85,000 94,000
3 mm
167,000
K.H.1.141. Kaca bening 2
m
137,000 114,000 113,000
5 mm
160,000
K.H.1.142. Kaca buram 2
m
161,000 134,000 159,000
3 mm
181,000
K.H.1.143. Kaca buram 2
m
181,000 150,000 181,000
5 mm
189,000
K.H.1.144. Kaca Cermin 2
m
185,000 154,000 181,000
3mm
246,000
K.H.1.145. Kaca Cermin 2
m
247,000 205,000 237,000
5mm
1,655,000
K.H.1.146. Kaca Patri 2
m
1,663,000 1,382,000 1,660,000

117,000
K.H.1.147. Kaca 3
m
117,000 100,000 114,000
reyband 3
K.H.1.148. mm
Kaca 3 123,000
123,000 130,000 141,000
m
reyband 5
K.H.1.149. mm
Kayu bakar 3 304,000
288,000 254,000 306,000
m

4,401,000
K.H.1.150. Kayu 3
m
2,992,000 3,675,000 4,804,000
bekisteng
17,000
K.H.1.151. Kayu dolken 3
m
17,000 14,000 16,000

54,103,000
K.H.1.152. Kayu jati 3
m
58,138,000 47,759,000 57,476,000
klas I Papan
K.H.1.153. Kayu jati 3 57,476,000 46,977,000 56,535,000
46,603,000

m
klas I Balok
K.H.1.154. 3 46,170,000 37,582,000 45,228,000
42,850,000
Kayu jati m
klas II
K.H.1.155. Papanjati
Kayu 3
39,100,000
45,228,000 36,799,000 44,286,000
m
klas II Balok
22,579,000
K.H.1.156. Kayu jati 3
m
28,268,000 23,489,000 28,268,000
klas III
Papan
K.H.1.157. Kayu jati m1 27,326,000 22,706,000 27,326,000
20,703,000

klas III
K.H.1.158. Balok
Kayu jati m1
8,439,000
8,480,000 7,046,000 8,480,000
klas III Reng
58,000
K.H.1.159. Lis dan m1 70,000 58,000 70,000
Dam Jalusi
kelas I
K.H.1.160. ukuran
Lis dan Dam m1 37,000
47,000 37,000 45,000
Jalusi
K.H.1.161. ukuran
Lis dan 2/4
Dam m1 24,000
29,000 23,000 28,000
Jalusi kelas I
ukuran
K.H.1.162. 1/5
Bingkai m1 165,000
201,000 166,000 219,000
Kayu Klas I
K.H.1.163. Ukuran
Bingkai 5/7 m1 112,000
140,000 112,000 183,000
Kayu Klas I
K.H.1.164. Ukuran
Bingkai 4/6 m3 58,000
70,000 58,000 70,000
Kayu Klas I
K.H.1.165. Ukuran
Bingkai m3 28,000
35,000 29,000 20,000
Kayu Klas I
K.H.1.166. Ukuran
Kayu 2/3 m1
22,504,000
21,673,000 18,791,000 18,845,000
Bengkirai
K.H.1.167. Papan
Kayu m1
18,754,000
19,787,000 17,225,000 18,373,000
Bengkirai
K.H.1.168. Balok
Bingkai m1 51,000
55,000 46,000 55,000
kayu kelas I
K.H.1.169. ukuran kayu
Bingkai 5/7 m1 29,000
41,000 34,000 41,000
kels I
K.H.1.170. ukuran
Bingkai 4/6
kayu m1 8,000 8,000 7,000 8,000
kelas I
K.H.1.171. ukuran
Bingkai 3/4
kayu m1 7,000 7,000 6,000 7,000
kelas I
K.H.1.172. ukuran
Lis dan 2/3
Dam m1 17,000
17,000 14,000 17,000
Jalusi kelas I
ukuran
K.H.1.173. 2/4
Lis dan dam 3 10,000
10,000 8,000 10,000
m
Jalusi kelas I
K.H.1.174. ukuran
Lis dan 1/5
Dam m3 7,000 7,000 6,000 7,000
Jalusi kelas
I ukuran
K.H.1.175. 1/3
Kayu m1
16,879,000
16,962,000 14,094,000 16,962,000
Kamper
K.H.1.176. Papan
Kayu m1
16,879,000
16,962,000 14,094,000 16,962,000
Kamper
K.H.1.177. Balok
Bingkai reng m1 45,000
47,000 37,000 47,000
dan kaso
kayu kelas I
ukuran 5/7
31,000
K.H.1.178. Bingkai reng m1 35,000 29,000 35,000
dan kaso
kayu kelas I
K.H.1.179. ukuran
Bingkai 4/6
reng m1 14,000
8,000 7,000 8,000
dan kaso
kayu kelas I
K.H.1.180. ukuran
Bingkai 3/4
reng m1 12,000
7,000 6,000 7,000
dan kaso
kayu kelas I
K.H.1.181. ukuran
Lis dan 2/3
Dam m1 14,000
8,000 12,000 14,000
Jalusi kelas I
ukuran
K.H.1.182. 2/4
Lis dan dam 3 10,000
8,000 8,000 10,000
m
jalusi kelas I
K.H.1.183. ukuran
Lis dan 1/5
dam 3 6,000 6,000 5,000 6,000
m
Jalusi kelas I
K.H.1.184. ukuran 1/3
Kayu kruing m1
14,065,000
14,135,000 11,745,000 14,135,000
Papan
12,189,000
K.H.1.185. Kayu kruing m1 13,192,000 10,962,000 13,192,000
Balok
42,000
K.H.1.186. Bingkai m1 42,000 35,000 42,000
Reng dan
kaso kelas I
K.H.1.187. ukuran
Bingkai m1 28,000
28,000 23,000 28,000
Reng dan
kaso kelas I
K.H.1.188. Ukuran
Bingkai reng m1 8,000 8,000 7,000 8,000
dan kaso
kelas I
K.H.1.189. kuran3/4
Bingkai reng m1 7,000 7,000 6,000 7,000
dan Kaso
kelas I
K.H.1.190. ukuran
Lis Dan m1 10,000
10,000 8,000 10,000
jalusi kelas I
K.H.1.191. ukuran
Lis Dan2/4 3 7,000 7,000 6,000 7,000
m
jalusi kelas I
K.H.1.192. ukuran
Lis Dan1/5 3 6,000 6,000 5,000 6,000
m
jalusi Klas I
K.H.1.193. Ukuran
Kayu 1/3 3
10,315,000
10,365,000 8,613,000 10,365,000
m
meranti
K.H.1.194. Papan
Kayu Kg
10,315,000
10,365,000 8,613,000 10,365,000
meranti
K.H.1.195. Balok
Kapur Kg 12,000
10,000 12,000 14,000
pasang
K.H.1.196. Tepung Lb 8,000 8,000 7,000 8,000
gypsum
31,000
K.H.1.197. Alkasit Ro 29,000 24,000 31,000
l
K.H.1.198. gypsum m3 108,000 99,000 82,000 99,000
board
K.H.1.199. Kasa m3 24,000 20,000 96,000 20,000
Gypsum
K.H.1.200. list profil m3 14,000 14,000 12,000 14,000
gypsum
K.H.1.201. lebar 5 Cm
Lis profil Lb 19,000
19,000 16,000 19,000
gypsum
K.H.1.202. lebar 6-10
List profil m 26,000
26,000 22,000 26,000
gypsum > 10
K.H.1.203. Cm
Kalsi board Kg 112,000
97,000 81,000 97,000
(122x244x0,
K.H.1.204. 35)
KawatCm m 29,000
28,000 39,000 28,000
ayakan
K.H.1.205. Kawat beton Kg 28,000
28,000 20,000 29,000
/ bendrat
K.H.1.206. Kawat Kg 28,000
34,000 39,000 34,000
nyamuk
37,000
K.H.1.207. Bronjong Kg 37,000 31,000 37,000
Kawat
K.H.1.208. Galvanized
Kawat las rol 45,000
41,000 36,000 55,000

37,000
K.H.1.209. Kawat Kg 37,000 31,000 37,000
galvanis
K.H.1.210. Kawat duri m2 123,000
123,000 102,000 123,000

K.H.1.211. Besi jaring m2 35,000 34,000 29,000 36,000


kawat baja
K.H.1.212. Kawat kasa m2 19,000 19,000 16,000 20,000

29,000
K.H.1.213. Kawat Bh 29,000 24,000 34,000
burung
35,000
K.H.1.214. Kawat Bh 47,000 39,000 52,000
harmonika
46,000
K.H.1.215. Kuas rool Bh 26,000 22,000 23,000

K.H.1.216. Kuas Bh 20,000


14,000 12,000 8,000
ukuran 3,5"
K.H.1.217. Kuas ukuran uni 17,000 10,000 8,000 7,000
2,5" t
K.H.1.218. Kuas kecil uni 10,000 6,000 5,000 2,000
1" t
K.H.1.219. Bronjong uni 622,000 626,000 520,000 626,000
Kawat t
galvanis,
Ukuran Ø
2,70 mm
K.H.1.220. Bronjong uni 954,000 959,000 797,000 959,000
Kawat t
galvanis,
Ukuran Ø
2,70 mm 1,256,000
K.H.1.221. Bronjong uni 1,262,000 1,049,000 1,262,000
Kawat t
galvanis,
Ukuran Ø
2,70 mm
K.H.1.222. Un 1,246,000 1,035,000 1,246,000
1,240,000
Bronjong
Kawat it
galvanis,
Ukuran Ø
2,70 mm
K.H.1.223. Bronjong uni 724,000 728,000 605,000 728,000
Kawat t
galvanis,
Ukuran Ø
2,70 mm
K.H.1.224. Bronjong uni 954,000 777,000 797,000 959,000
Kawat t
galvanis,
Ukuran Ø
2,70 mm 1,403,000
K.H.1.225. Bronjong uni 1,410,000 1,172,000 1,410,000
Kawat t
galvanis,
Ukuran Ø
2,70 mm
K.H.1.226. uni 1,845,000 1,533,000 1,845,000
1,836,000
Bronjong
Kawat t
galvanis,
Ukuran Ø
2,70 mm
K.H.1.227. Bronjong uni 672,000 675,000 561,000 675,000
Kawat t
galvanis,
Ukuran Ø
3,00 mm
K.H.1.228. Bronjong uni 968,000 972,000 808,000 972,000
Kawat t
galvanis,
Ukuran Ø
3,00 mm 1,427,000
K.H.1.229. Bronjong uni 1,433,000 1,191,000 1,433,000
Kawat t
galvanis,
Ukuran Ø
3,00 mm 1,392,000
K.H.1.230. Bronjong uni 1,400,000 1,163,000 1,400,000
Kawat t
galvanis,
Ukuran Ø
3,00 mm
K.H.1.231. Bronjong uni 808,000 811,000 674,000 811,000
Kawat t
galvanis,
Ukuran Ø
3,00 mm
1,005,000
K.H.1.232. Bronjong uni 1,010,000 839,000 1,010,000
Kawat t
galvanis,
Ukuran Ø
3,00 mm 1,546,000
K.H.1.233. Bronjong uni 1,554,000 1,291,000 1,554,000
Kawat t
galvanis,
Ukuran Ø
3,00 mm 2,056,000
K.H.1.234. Bronjong uni 2,065,000 1,716,000 2,065,000

Kawat t
galvanis,
Ukuran Ø
3,00 mm
K.H.1.235. Bronjong uni 933,000 937,000 779,000 937,000
Kawat t
galvanis +
Lapis PVC
2,70 mm 1,422,000
K.H.1.236. Bronjong uni 1,430,000 1,188,000 1,430,000
Kawat t
galvanis +
Lapis PVC
2,70 mm 1,959,000
K.H.1.237. Bronjong uni 1,969,000 1,636,000 1,969,000
Kawat t
galvanis +
Lapis PVC
2,70 mm
K.H.1.238. Un 1,845,000 1,533,000 1,845,000
1,836,000
Bronjong
Kawat it
galvanis +
Lapis PVC
2,70 mm 1,125,000
K.H.1.239. Bronjong uni 1,131,000 940,000 1,131,000
Kawat t
galvanis +
Lapis PVC
2,70 mm 1,474,000
K.H.1.240. Bronjong uni 1,481,000 1,231,000 1,481,000
Kawat t
galvanis +
Lapis PVC
2,70 mm 2,080,000
K.H.1.241. Bronjong uni 2,090,000 1,737,000 2,090,000
Kawat t
galvanis +
Lapis PVC
2,70 mm
K.H.1.242. Kg 2,776,000 2,307,000 2,776,000
2,763,000
Bronjong
Kawat
galvanis +
Lapis PVC
2,70 mm
K.H.1.243. Kawat m3 556,000 560,000 465,000 615,000
anyam
Galvanized
Ukuran 270
43,000
K.H.1.244. Kawat Bj 43,000 36,000 43,000
bronjong
K.H.1.245. Kerikil beton Bj 357,000
359,000 298,000 359,000

58,000
K.H.1.246. Kunci tanam Bj 58,000 48,000 142,000
besar
K.H.1.247. Kunci tanam Bj 46,000
47,000 39,000 113,000
kecil
1,867,000
K.H.1.248. Kloset Bj 1,886,000 1,567,000 1,886,000
duduk
K.H.1.249. lengkap
Kloset Bj
1,546,000
1,554,000 1,291,000 1,573,000
duduk
standar/por
K.H.1.250. selin
Kloset BJ
2,149,000
2,169,000 1,802,000 2,355,000
duduk
porselin lux
K.H.1.251. (dengan
Kloset Bj
2,908,000
2,921,000 2,897,000 2,921,000
duduk
putih
K.H.1.252. dengan
Kloset Bj
3,657,000
3,675,000 3,054,000 3,675,000
duduk
warna
K.H.1.253. dengan
Kloset Bj 141,000
142,000 118,000 170,000
Jongkok
PorselinTyp
K.H.1.254. eKloset
CE7 Bj 211,000
212,000 176,000 218,000
Jongkok
Porselin
K.H.1.255. Type
KlosetCE8 Bj 235,000
150,000 125,000 264,000
Jongkok
K.H.1.256. Putih
Kloset Bj 207,000
142,000 160,000 283,000
Jongkok
K.H.1.257. Warna
Kloset Set 141,000
142,000 148,000 170,000
Jongkok
K.H.1.258. standar/ker
Wastafel Set 508,000
510,000 392,000 585,000
Standar INA
497,000
K.H.1.259. Wastafel Set 499,000 415,000 499,000
Lux INA
K.H.1.260. Bak cuci bh 272,000
273,000 29,000 28,000
stainless
K.H.1.261. steel
Water drain bh 46,000
47,000 39,000 55,000
dan
K.H.1.262. assesoris
Meja cuci bh 656,000
425,000 353,000 425,000
dapur 125 x
K.H.1.263. 50 cm
Tempat bh 45,000
47,000 45,000 37,000
sabun
tunggal
58,000
K.H.1.264. Kran air bh 58,000 48,000 58,000
diameter
3/4 atau 1/2
K.H.1.265. Ex
Seal Tape bh 6,000 6,000 5,000 6,000

K.H.1.266. Floodrain Kg 28,000


16,000 13,000 16,000

189,000
K.H.1.267. Floor drain Kg 190,000 158,000 218,000
(TX1AN) 4"
K.H.1.268. EX
LemTOTO
Aica Lt 79,000
85,000 102,000 85,000
Aibon
100,000
K.H.1.269. Melamin bh 100,000 83,000 123,000

K.H.1.270. Minyak Galon 19,000 19,000 16,000 19,000


tanah
19,000
K.H.1.271. Mayteran Lt 10,000 19,000 23,000

K.H.1.272. Olie Lt
Proppeler
K.H.1.273. Olie Lt 76,000
77,000 61,000 77,000
Persneling
81,000
K.H.1.274. Olie Gardan Kg 81,000 67,000 81,000

81,000
K.H.1.275. Oli mesin Kg 81,000 67,000 81,000

26,000
K.H.1.276. Paku Besar, Kg 24,000 20,000 24,000
sedang
K.H.1.277. Paku Kecil Kg 28,000
29,000 28,000 37,000
Triplek atau
K.H.1.278. eternit
Paku Payung Kg 45,000
41,000 31,000 43,000

24,000
K.H.1.279. Paku Kg 24,000 19,000 2,000
Gording 125
K.H.1.280. x 1 mm
Paku Kg 23,000
23,000 19,000 34,000
Gording 100
K.H.1.281. x 4,2 mm
Paku Usuk Kg 24,000
24,000 19,000 24,000
80 x 3,8
24,000
K.H.1.282. Paku reng Kg 24,000 19,000 24,000
55 x 3,1
42,000
K.H.1.283. Paku plepet Bh 29,000 24,000 26,000
40 x 2,1
37,000
K.H.1.284. Paku eternit Bh 35,000 29,000 28,000
20 x 1,5
K.H.1.285. Paku Beton Bh 1,000 1,000 1,000 1,000
5 cm
36,000
K.H.1.286. Paku Bh 36,000 31,000 41,000
pancing
K.H.1.287. Paku asbes Bh 1,000 1,000 12,000 2,000

K.H.1.288. Paku Kg 1,000 1,000 1,000 1,000


sumbat
K.H.1.289. Paku sekrup Kg 1,000 2,000 1,000 1,000

K.H.1.290. Paku Akrup Kg 37,000


37,000 31,000 41,000

K.H.1.291. Paku Kg 45,000


43,000 35,000 150,000
gypsum
37,000
K.H.1.292. Paku hak Kg 37,000 31,000 41,000
panjang 15
K.H.1.293. Cm
paku reng Kg 24,000
23,000 19,000 23,000

24,000
K.H.1.294. Paku Usuk Bh 23,000 19,000 23,000

K.H.1.295. Paku anti Bh 28,000


28,000 22,000 34,000
karat
K.H.1.296. Paku skrop 3
m
1,000 1,000 1,000 1,000
atap
K.H.1.297. policarbonat
Paku Beton 3 1,000 1,000 1,000 1,000
m
5 cm
371,000
K.H.1.298. Pasir pasang 3
m
389,000 326,000 389,000
progo
K.H.1.299. Pasir urug 3
m
268,000
270,000 231,000 278,000
lokal
K.H.1.300. (campur
Pasir beton 3 320,000
321,000 274,000 330,000
m
(kasar)
K.H.1.301. Sirtu piihan 3
m
185,000
187,000 155,000 187,000

K.H.1.302. Tanah uru M' 129,000


129,000 107,000 129,000
biasa
184,000
K.H.1.303. Tanah urug M' 185,000 154,000 185,000
pilihan
41,000
K.H.1.304. Galvanis M' 41,000 34,000 41,000
diameter 0,5
K.H.1.305. "Galvanis
Medium M' 52,000
52,000 43,000 52,000
diameter
K.H.1.306. 0,75
Galvanis M' 78,000
78,000 65,000 78,000
diameter 1 "
K.H.1.307. Medium
Galvanis SNI M' 103,000
105,000 87,000 105,000
diameter
K.H.1.308. 1,25"
Galvanis M' 119,000
120,000 100,000 120,000
diameter 1,5
K.H.1.309. Medium
Galvanis M' 160,000
161,000 134,000 161,000
diameter 2
K.H.1.310. "Medium
Galvanis M' 206,000
207,000 172,000 207,000
diameter 2,5
"Medium
265,000
K.H.1.311. Galvanis M' 266,000 221,000 266,000
diameter 3
K.H.1.312. "Medium
Galvanis m' 385,000
386,000 321,000 386,000
diameter 4
K.H.1.313. "Medium
Galvanis m' 706,000
710,000 590,000 710,000
diameter 5 "
K.H.1.314. Medium
Galvanis SNI
Ø m' 108,000
108,000 90,000 108,000
0,5"
K.H.1.315. Galvanis Ø m' 123,000
123,000 102,000 123,000
0,75"
150,000
K.H.1.316. Galvanis Ø m' 150,000 125,000 150,000
1,0"
17,000
K.H.1.317. Galvanis Ø btg 17,000 14,000 17,000
1,25"
K.H.1.318. Galvanis Ø btg 217,000
218,000 181,000 218,000
1,5"
K.H.1.319. Galvanis 6 btg 193,000
194,000 161,000 194,000
m' Ø 1/2"
248,000
K.H.1.320. Galvanis 6 btg 249,000 207,000 249,000
m' Ø 3/4"
386,000
K.H.1.321. Galvanis 6 btg 389,000 323,000 389,000
m' Ø 1"
K.H.1.322. Galvanis 6 btg 497,000 499,000 415,000 499,000
m' Ø 1 1/4"
570,000
K.H.1.323. Galvanis 6 btg 574,000 477,000 574,000
m' Ø 1 1/2"
K.H.1.324. Galvanis 6 btg 776,000
781,000 649,000 781,000
m' Ø 2"
K.H.1.325. Galvanis 6 btg 987,000 992,000 824,000 992,000
m' Ø 2 1/2"
1,294,000
K.H.1.326. Galvanis 6 btg 1,301,000 1,081,000 1,301,000
m' Ø 3"
1,852,000
K.H.1.327. Galvanis 6 btg 1,861,000 1,546,000 1,861,000
m' Ø 4"
2,490,000
K.H.1.328. Galvanis 6 btg 2,503,000 2,080,000 2,503,000
m' Ø 5"
2,963,000
K.H.1.329. Galvanis 6 btg 2,977,000 2,474,000 2,977,000
m' Ø 6"
4,221,000
K.H.1.330. Galvanis 6 btg 4,241,000 3,524,000 4,241,000
m' Ø 8"
K.H.1.331. Galvanis Ø btg 147,000 148,000 123,000 148,000
1/2"
K.H.1.332. Galvanis Ø btg 190,000 191,000 159,000 191,000
3/4"
K.H.1.333. Galvanis Ø btg 242,000 243,000 202,000 243,000
1"
K.H.1.334. Galvanis Ø 1 btg 308,000 310,000 258,000 310,000
1/4"
3,565,000
K.H.1.335. Galvanis Ø 1 btg 3,575,000 2,971,000 3,575,000
1/2"
445,000
K.H.1.336. Galvanis Ø btg 448,000 372,000 448,000
2"
K.H.1.337. Galvanis Ø 2 btg 574,000 576,000 479,000 576,000
1/2"
K.H.1.338. Galvanis Ø btg 670,000 674,000 560,000 674,000
3"
863,000
K.H.1.339. Galvanis Ø btg 868,000 721,000 868,000
4"
1,373,000
K.H.1.340. Galvanis Ø btg 1,380,000 1,147,000 1,380,000
5"
K.H.1.341. Galvanis Ø btg 55,000 55,000 46,000 55,000
1/2"
K.H.1.342. Galvanis Ø btg 72,000 72,000 60,000 72,000
3/4"
K.H.1.343. Galvanis Ø btg 89,000 90,000 75,000 90,000
1"
119,000
K.H.1.344. Galvanis Ø 1 btg 120,000 100,000 120,000
1/4"
K.H.1.345. Galvanis Ø 1 btg 137,000 137,000 114,000 137,000
1/2"
K.H.1.346. Galvanis Ø btg 168,000 170,000 141,000 170,000
2"
K.H.1.347. Galvanis Ø 2 btg 246,000 244,000 203,000 244,000
1/2"
K.H.1.348. Galvanis Ø M451,000 454,000 377,000 454,000
3" '
K.H.1.349. Galvanis Ø M610,000 613,000 509,000 613,000
4" '
K.H.1.350. Pipa baja M45,000 45,000 37,000 45,000
hitam '
K.H.1.351. diameter
pipa baja M59,000 59,000 49,000 59,000
hitam 3/4" '
K.H.1.352. pipa baja M87,000 87,000 72,000 87,000
hitam 1" '
K.H.1.353. pipa baja M117,000 117,000 97,000 117,000
hitam 1.1/4" '
K.H.1.354. pipa baja M141,000 142,000 118,000 142,000
hitam 1.1/2" '
K.H.1.355. pipa baja M189,000 190,000 158,000 190,000
hitam 2" '
K.H.1.356. pipa baja M298,000 300,000 249,000 300,000
hitam 2,50" '
K.H.1.357. pipa baja M391,000 392,000 326,000 392,000
hitam 3" '
K.H.1.358. pipa baja M556,000 560,000 465,000 560,000
hitam 4" '
K.H.1.359. pipa baja M753,000 757,000 629,000 757,000
hitam 5" '
K.H.1.360. pipa baja M976,000 981,000 815,000 981,000
hitam 6" '
K.H.1.361. pipa baja M1,151,000 1,155,000 960,000 1,155,000
hitam 8" '
K.H.1.362. pipa baja M 1,451,000 1,206,000 1,451,000
1,444,000

hitam 10" '


K.H.1.363. pipa baja M1,752,000 1,761,000 1,463,000 1,761,000
hitam 12" '
1,923,000
K.H.1.364. pipa baja M 1,932,000 1,605,000 1,932,000
hitam 14" '
2,195,000
K.H.1.365. pipa baja M 2,206,000 1,833,000 2,206,000

hitam 16" '


2,482,000
K.H.1.366. pipa baja M 2,494,000 2,072,000 2,494,000
hitam 18" '
2,770,000
K.H.1.367. pipa baja btg 2,784,000 2,313,000 2,784,000
hitam 20"
3,335,000
K.H.1.368. pipa baja btg 3,352,000 2,785,000 3,352,000
hitam 24"
K.H.1.369. pipa baja btg 217,000 218,000 181,000 218,000
hitam Ø 1/2"
K.H.1.370. pipa baja btg 272,000 273,000 227,000 273,000
hitam Ø
K.H.1.371. 3/4"
pipa baja btg 395,000
397,000 330,000 397,000
hitam Ø 1"
508,000
K.H.1.372. pipa baja btg 510,000 424,000 510,000
hitam Ø 1
K.H.1.373. 1/4"
pipa baja btg 601,000 604,000 502,000 604,000
hitam Ø 1
K.H.1.374. 1/2"
pipa baja btg 743,000 746,000 620,000 746,000
hitam Ø 2"
1,240,000
K.H.1.375. pipa baja btg 1,246,000 1,035,000 1,246,000
hitam Ø 2
K.H.1.376. 1/2"
pipa baja btg 1,501,000 1,508,000 1,253,000 1,508,000
hitam Ø 3"
2,158,000
K.H.1.377. pipa baja btg 2,169,000 1,802,000 2,169,000
hitam Ø 4"
4,124,000
K.H.1.378. pipa baja btg 4,145,000 3,444,000 4,145,000
hitam Ø 6"
K.H.1.379. Pipa Hitam btg 71,000 71,000 59,000 71,000
Ø 1/2" (1,2)
K.H.1.380. Pipa Hitam btg 87,000 87,000 72,000 87,000
Ø 1/2" (2)
K.H.1.381. Pipa Hitam btg 97,000 99,000 82,000 99,000
Ø 1/2"(2A)
K.H.1.382. Pipa Hitam btg 49,000 49,000 41,000 49,000
Ø 3/4"(1,2)
K.H.1.383. Pipa Hitam btg 87,000 87,000 72,000 87,000
Ø 3/4" 1,6
116,000
K.H.1.384. Pipa Hitam btg 116,000 96,000 116,000
Ø 3/4" 2
K.H.1.385. Pipa Hitam btg 129,000
129,000 107,000 129,000
Ø 3/4" 2a
K.H.1.386. Pipa Hitam btg 60,000 61,000 51,000 61,000
Ø 1" 1,2
117,000
K.H.1.387. Pipa Hitam btg 117,000 97,000 117,000
Ø 1" 1,6
K.H.1.388. Pipa Hitam btg 137,000 137,000 114,000 137,000
Ø 1" 2
K.H.1.389. Pipa Hitam btg 189,000 190,000 158,000 190,000
Ø 1" 2,3
K.H.1.390. Pipa Hitam btg 73,000 73,000 61,000 73,000
Ø 1 1/4" 1,2
K.H.1.391. Pipa Hitam btg 134,000
135,000 112,000 135,000
Ø 1 1/4"1,6
K.H.1.392. Pipa Hitam btg 181,000 181,000 150,000 181,000
Ø 1 1/4" 2
K.H.1.393. Pipa Hitam btg 193,000
194,000 161,000 194,000
Ø 1 1/4" 2a
254,000
K.H.1.394. Pipa Hitam btg 255,000 212,000 255,000
Ø 1 1/4"2,3
K.H.1.395. Pipa Hitam btg 94,000 94,000 78,000 94,000
Ø 1 1/2"1,2
K.H.1.396. Pipa Hitam btg 160,000 161,000 134,000 161,000
Ø 1 1/2" 1,6
202,000
K.H.1.397. Pipa Hitam btg 202,000 168,000 202,000
Ø 1 1/2" 2
K.H.1.398. Pipa Hitam btg 229,000 230,000 191,000 230,000
Ø 1 1/2" 2a
254,000
K.H.1.399. Pipa Hitam btg 255,000 212,000 255,000
Ø 1 1/2" 2,3
K.H.1.400. Pipa Hitam btg 338,000 341,000 283,000 341,000
Ø 1 1/2" 2,8
K.H.1.401. Pipa Hitam btg 123,000
123,000 102,000 123,000
Ø 2" 1,2
K.H.1.402. Pipa Hitam btg 226,000 227,000 189,000 227,000
Ø 2" 1,6
K.H.1.403. Pipa Hitam btg 262,000 264,000 219,000 264,000
Ø 2" 2
K.H.1.404. Pipa Hitam btg 366,000 368,000 306,000 368,000
Ø 2" 2,3
K.H.1.405. Pipa Hitam btg 291,000
292,000 243,000 292,000
Ø 2 1/2" 1,6
K.H.1.406. Pipa Hitam btg 338,000 341,000 283,000 341,000
Ø 2 1/2" 2
K.H.1.407. Pipa Hitam btg 515,000 517,000 430,000 517,000
Ø 2 1/2" 2,5
K.H.1.408. Pipa Hitam btg 610,000 613,000 509,000 613,000
Ø 2 1/2" 3
K.H.1.409. Pipa Hitam btg 329,000 330,000 274,000 330,000
Ø 3" 1,6
K.H.1.410. Pipa Hitam btg 422,000 425,000 353,000 425,000
Ø 3" 2
K.H.1.411. Pipa Hitam btg 525,000 527,000 438,000 527,000
Ø 3" 2,5
K.H.1.412. Pipa Hitam btg 451,000 454,000 377,000 454,000
Ø 4" 1,6
K.H.1.413. Pipa Hitam btg 516,000 519,000 431,000 519,000
Ø 4"2
K.H.1.414. Pipa Hitam btg 656,000
659,000 548,000 659,000
Ø 4" 2,5
1,022,000
K.H.1.415. Pipa Hitam btg 1,027,000 853,000 1,027,000
Ø 5" 2,5
K.H.1.416. Pipa Hitam btg 1,313,000 1,319,000 1,096,000 1,319,000
Ø 5" 3,3
K.H.1.417. Pipa Hitam btg 1,781,000 1,790,000 1,487,000 1,790,000
Ø 5" 3,8
K.H.1.418. Pipa Hitam btg 1,182,000 1,188,000 987,000 1,188,000
Ø 6"2,5
1,276,000
K.H.1.419. Pipa Hitam btg 1,282,000 1,065,000 1,282,000
Ø 6" 2,8
2,999,000
K.H.1.420. Pipa Hitam btg 3,013,000 2,504,000 3,013,000
Ø 8" 4,5
3,562,000
K.H.1.421. Pipa Hitam btg 3,580,000 2,975,000 3,580,000
Ø 8" 5,3
4,875,000
K.H.1.422. Pipa Hitam btg 4,899,000 4,071,000 4,899,000

Ø 10" 5,3
6,002,000
K.H.1.423. Pipa Hitam btg 6,031,000 5,011,000 6,031,000
Ø 10" 6,3
7,783,000
K.H.1.424. Pipa Hitam btg 7,821,000 6,499,000 7,821,000
Ø 12" 6,3
9,190,000
K.H.1.425. Pipa Hitam btg 9,234,000 7,673,000 9,234,000
Ø 14" 6,3
11,533,000
K.H.1.426. Pipa Hitam btg 11,589,000 9,630,000 11,589,000
Ø 16" 6,3
K.H.1.427. Pipa Hitam btg 13,003,000 10,805,000 13,003,000
12,940,000

Ø 18" 6,3
K.H.1.428. PVC 4m' btg 26,000 26,000 22,000 26,000
diameter
K.H.1.429. 0.5"
PVC 4m' btg 35,000 35,000 29,000 35,000
diameter
K.H.1.430. 0.75"
PVC 4m' btg 45,000 45,000 37,000 45,000
diameter 1"
K.H.1.431. PVC 4m' btg 45,000 45,000 37,000 45,000
diameter
K.H.1.432. 1.25"
PVC 4m' btg 51,000 51,000 42,000 51,000
diameter
K.H.1.433. 1.5"
PVC 4m' btg 64,000 64,000 53,000 64,000
diameter 2"
K.H.1.434. PVC 4m' btg 102,000 102,000 85,000 102,000
diameter 3"
K.H.1.435. PVC 4m' btg 159,000 159,000 132,000 159,000
diameter 4"
K.H.1.436. PVC 4 m' Ø btg 28,000 26,000 23,000 28,000
1/2"
K.H.1.437. PVC 4 m' Ø btg 36,000 37,000 28,000 37,000
3/4"
K.H.1.438. PVC 4 m' Ø btg 46,000 49,000 39,000 58,000
1"
K.H.1.439. PVC 4 m' Ø 1 btg 72,000 71,000 59,000 72,000
1/4"
K.H.1.440. PVC 4 m' Ø 1 btg 82,000 77,000 67,000 83,000
1/2"
K.H.1.441. PVC 4 m' Ø btg 103,000 99,000 83,000 105,000
2"
K.H.1.442. PVC 4 m' Ø btg 147,000 143,000 117,000 165,000
2 1/2"
K.H.1.443. PVC 4 m' Ø btg 193,000
199,000 155,000 194,000
3"
K.H.1.444. PVC 4 m' Ø btg 308,000 327,000 255,000 325,000
4"
K.H.1.445. PVC 4 m' Ø btg 610,000 598,000 509,000 613,000
5"
K.H.1.446. PVC 4 m' Ø btg 751,000 755,000 627,000 755,000
6"
1,427,000
K.H.1.447. PVC 4 m' Ø btg 1,433,000 1,191,000 1,433,000
8"
2,206,000
K.H.1.448. PVC 4 m' Ø btg 2,217,000 1,842,000 2,217,000
10"
3,109,000
K.H.1.449. PVC 4 m' Ø btg 3,125,000 2,597,000 3,125,000
12"
K.H.1.450. PVC 4 m' Ø 1 btg 52,000 47,000 39,000 52,000
1/4"
K.H.1.451. PVC 4 m' Ø 1 btg 60,000 51,000 49,000 59,000
1/2"
K.H.1.452. PVC 4 m' Ø btg 72,000 64,000 59,000 72,000
2"
K.H.1.453. PVC 4 m' Ø btg 87,000 94,000 71,000 94,000
2 1/2"
K.H.1.454. PVC 4 m' Ø btg 111,000 126,000 88,000 114,000
3"
K.H.1.455. PVC 4 m' Ø btg 165,000 166,000 134,000 187,000
4"
K.H.1.456. PVC 4 m' Ø btg 337,000 339,000 282,000 339,000
5"
508,000
K.H.1.457. PVC 4 m' Ø btg 510,000 424,000 510,000
6"
K.H.1.458. PVC 4 m' Ø btg 672,000 675,000 561,000 675,000
6"
K.H.1.459. PVC 4 m' Ø M1,136,000 1,141,000 948,000 1,141,000
6" '
1,596,000
K.H.1.460. PVC 4 m' Ø M 1,603,000 1,332,000 1,603,000
6" '
K.H.1.461. pipa PVC s- M6,000 6,000 5,000 6,000
12,5 panjang '
6 m (MOF)
K.H.1.462. diameter
pipa PVC s- M7,000 7,000 6,000 7,000
12,5 panjang '
6 m (MOF)
K.H.1.463. diameter
pipa PVC s- M10,000 10,000 8,000 10,000
12,5 panjang '
6 m (MOF)
K.H.1.464. diameter
pipa PVC 1"
s- M16,000 16,000 13,000 16,000
12,5 panjang '
6 m (MOF)
K.H.1.465. diameter
pipa PVC s- M23,000 23,000 19,000 23,000
12,5 panjang '
6 m (MOF)
K.H.1.466. diameter
pipa PVC s- M35,000 35,000 29,000 35,000
12,5 panjang '
6 m (MOF)
K.H.1.467. diameter
pipa PVC 2"
s- M49,000 49,000 41,000 49,000
12,5 panjang '
6 m (MOF)
K.H.1.468. diameter
pipa PVC s- M71,000 71,000 59,000 71,000
12,5 panjang '
6 m (MOF)
K.H.1.469. diameter
pipa PVC 3"
s- M102,000 102,000 85,000 102,000
12,5 panjang '
6 m (MOF)
K.H.1.470. diameter
pipa PVC 4"
s- M218,000 219,000 182,000 219,000
12,5 panjang '
6 m (MOF)
K.H.1.471. diameter
pipa PVC 6"
s- M351,000 354,000 294,000 354,000
12,5 panjang '
6 m (MOF)
K.H.1.472. diameter
pipa PVC 8"
s- M552,000 555,000 461,000 555,000
12,5 panjang '
6 m (MOF)
diameter 10"
K.H.1.473. pipa PVC s- M881,000 885,000 735,000 885,000
12,5 panjang '
6 m (MOF)
K.H.1.474. diameter
pipa PVC 12"
s- M37,000 37,000 31,000 37,000
12,5 panjang '
6 m rubber
K.H.1.475. ring
pipa PVC s- M53,000 54,000 45,000 54,000
12,5 panjang '
6 m rubber
K.H.1.476. ring
pipa PVC s- M73,000 73,000 61,000 73,000
12,5 panjang '
6 m rubber
K.H.1.477. ring
pipa PVC s- M108,000 108,000 90,000 108,000
12,5 panjang '
6 m rubber
K.H.1.478. ring
pipa PVC s- M226,000 227,000 189,000 227,000
12,5 panjang '
6 m rubber
K.H.1.479. ring
pipa PVC s- M365,000 366,000 304,000 366,000
12,5 panjang '
6 m rubber
K.H.1.480. ring
pipa PVC s- M569,000 572,000 475,000 572,000
12,5 panjang '
6 m rubber
K.H.1.481. ring
pipa PVC s- M999,000 1,004,000 834,000 1,004,000
12,5 panjang '
6 m rubber
K.H.1.482. ring
pipa PVC s- M1,170,000 1,176,000 977,000 1,176,000
12,5 panjang '
6 m rubber
K.H.1.483. ring
pipa PVC s- M
1,483,000
1,490,000 1,238,000 1,490,000

12,5 panjang '


6 m rubber
K.H.1.484. ring
pipa PVC s- M6,000 6,000 5,000 6,000
10 panjang 6 '
m( MOF)
K.H.1.485. diameter
pipa PVC s- M7,000 7,000 6,000 7,000
10 panjang 6 '
m( MOF)
K.H.1.486. diameter
pipa PVC s- M12,000 12,000 10,000 12,000
10 panjang 6 '
m( MOF)
K.H.1.487. diameter
pipa PVC 1"
s- M17,000 17,000 14,000 17,000
10 panjang 6 '
m( MOF)
K.H.1.488. diameter
pipa PVC s- M28,000 28,000 23,000 28,000
10 panjang 6 '
m( MOF)
diameter
K.H.1.489. pipa PVC s- M42,000 42,000 35,000 42,000
10 panjang 6 '
m( MOF)
K.H.1.490. diameter
pipa PVC 2"
s- M59,000 59,000 49,000 59,000
10 panjang 6 '
m( MOF)
K.H.1.491. diameter
pipa PVC s- M82,000 83,000 69,000 83,000
10 panjang 6 '
m( MOF)
K.H.1.492. diameter
pipa PVC 3"
s- M125,000 126,000 105,000 126,000
10 panjang 6 '
m( MOF)
K.H.1.493. diameter
pipa PVC 4"
s- M265,000 266,000 221,000 266,000
10 panjang 6 '
m( MOF)
K.H.1.494. diameter
pipa PVC 6"
s- M45,000 45,000 37,000 45,000
10 panjang 6 '
m( MOF)
K.H.1.495. diameter
pipa PVC 8"
s- M679,000 682,000 567,000 682,000
10 panjang 6 '
m( MOF)
K.H.1.496. diameter
pipa PVC 10"
s- M
1,078,000
1,083,000 900,000 1,083,000
10 panjang 6 '
m( MOF)
K.H.1.497. diameter
pipa PVC 12"
s- M45,000 45,000 37,000 45,000
10 panjang 6 '
m rubber
K.H.1.498. ring
pipa PVC s- M64,000 64,000 53,000 64,000
10 panjang 6 '
m rubber
K.H.1.499. ring
pipa PVC s- M89,000 90,000 75,000 90,000
10 panjang 6 '
m rubber
K.H.1.500. ring
pipa PVC s- M175,000 176,000 146,000 176,000
10 panjang 6 '
m rubber
K.H.1.501. ring
pipa PVC s- M274,000 276,000 229,000 276,000
10 panjang 6 '
m rubber
K.H.1.502. ring
pipa PVC s- M446,000 449,000 373,000 449,000
10 panjang 6 '
m rubber
K.H.1.503. ring
pipa PVC s- M693,000 697,000 579,000 697,000
10 panjang 6 '
m rubber
K.H.1.504. ring
pipa PVC s- M1,101,000 1,106,000 919,000 1,106,000
10 panjang 6 '
m rubber
ring
K.H.1.505. pipa PVC s- M1,416,000 1,424,000 1,183,000 1,424,000
10 panjang 6 '
m rubber
K.H.1.506. ring
pipa PVC s- M
1,758,000
1,767,000 1,468,000 1,767,000
10 panjang 6 '
m rubber
K.H.1.507. ring
pipa PVC s- M7,000 7,000 6,000 7,000
8 panjang6 '
m (MOF)
K.H.1.508. diameter
pipa PVC s- M10,000 10,000 8,000 10,000
8 panjang6 '
m (MOF)
K.H.1.509. diameter
pipa PVC s- M16,000 16,000 13,000 16,000
8 panjang6 '
m (MOF)
K.H.1.510. diameter
pipa PVC 1"
s- M23,000 23,000 19,000 23,000
8 panjang6 '
m (MOF)
K.H.1.511. diameter
pipa PVC s- M59,000 59,000 49,000 59,000
8 panjang 6 '
m rubber
K.H.1.512. ring
pipa PVC s- M117,000 117,000 97,000 117,000
8 panjang 6 '
m rubber
K.H.1.513. ring
pipa PVC s- M175,000 176,000 146,000 176,000
8 panjang 6 '
m rubber
K.H.1.514. ring
pipa PVC s- M
8 panjang 6 '
m rubber
K.H.1.515. ring
pipa PVC s- M365,000 366,000 304,000 366,000
8 panjang 6 '
m rubber
K.H.1.516. ring
pipa PVC s- M570,000 574,000 477,000 574,000
8 panjang 6 '
m rubber
K.H.1.517. ring
pipa PVC s- btg 881,000 885,000 735,000 885,000
8 panjang 6
m rubber
K.H.1.518. ring
pipa PVC s- btg
1,408,000
1,415,000 1,176,000 1,415,000
8 panjang 6
m rubber
K.H.1.519. ring
Pipa btg 79,000
79,000 66,000 79,000
stainless
K.H.1.520. steel
Pipa Ø 1/2" btg 100,000
100,000 83,000 100,000
stainless
K.H.1.521. steel
Pipa Ø 5/8" btg 122,000
122,000 101,000 122,000
stainless
steel Ø 3/4"
155,000
K.H.1.522. Pipa btg 156,000 130,000 156,000
stainless
K.H.1.523. steel
Pipa Ø 1" btg 197,000
199,000 165,000 199,000
stainless
K.H.1.524. steel
Pipa Ø 1 btg 236,000
237,000 197,000 237,000
stainless
K.H.1.525. steel
Pipa Ø 1 btg 317,000
319,000 265,000 319,000
stainless
K.H.1.526. steel
Pipa Ø 2" btg 96,000
97,000 81,000 97,000
stainless
K.H.1.527. steel Ø 1/2"
Pipa btg 123,000
123,000 102,000 123,000
stainless
K.H.1.528. steel
Pipa Ø 5/8" btg 148,000
149,000 124,000 149,000
stainless
K.H.1.529. steel
Pipa Ø 3/4" btg 195,000
195,000 162,000 195,000
stainless
K.H.1.530. steel
Pipa Ø 1" btg 246,000
247,000 205,000 247,000
stainless
K.H.1.531. steel
Pipa Ø 1 btg 296,000
297,000 247,000 297,000
stainless
K.H.1.532. steel
Pipa Ø 1 btg 395,000
397,000 330,000 397,000
stainless
K.H.1.533. steel Ø 2"
Paving/con btg 94,000
94,000 78,000 94,000
block abu-
abu Tebal 6
K.H.1.534. mm
Paving/con btg 94,000
94,000 78,000 94,000
block abu-
abu Tebal 8
K.H.1.535. mm
Paving/con btg 132,000
134,000 111,000 134,000
block Type
segi 4 unit 6
K.H.1.536. tebal 8 Cm K btg
Paving/con 124,000
124,000 103,000 124,000
block type
uni dan segi
K.H.1.537. 4
Paving/con btg 81,000
81,000 67,000 81,000
block Type
segi 4 tebal
K.H.1.538. 6
Paving/con btg 117,000
117,000 97,000 117,000
block Type
segi 4 tebal
K.H.1.539. 8
Paving/con btg 81,000
81,000 67,000 81,000
block Type
segi 6 tebal
K.H.1.540. 6
Paving/con btg 117,000
117,000 97,000 117,000
block Type
segi 6 tebal
8
K.H.1.541. Paving/con btg 146,000
147,000 122,000 147,000
block warna
merah/hita
m Type segi
4 uni segi 8
tebal 8 cm 137,000
K.H.1.542. Paving/con btg 137,000 114,000 137,000
block warna
merah/hita
m Type uni
segi 4 tebal 103,000
K.H.1.543. Paving/con btg 105,000 87,000 105,000
block warna
merah/hita
m Type segi
4 Tebal 6 137,000
K.H.1.544. Paving/con btg 137,000 114,000 137,000
block warna
merah/hita
m Type segi
4 tebal 8 cm
K.H.1.545. Paving/con btg 129,000
129,000 107,000 129,000
block warna
merah/hita
m Type segi
6 tebal 6 cm 137,000
K.H.1.546. Paving/con btg 137,000 114,000 137,000
block warna
merah/hita
m Type segi
6 tebal 8 cm 103,000
K.H.1.547. Grass blok Lbr 105,000 87,000 105,000
bulat tebal
K.H.1.548. 10 cm blok
Grass btg 103,000
105,000 87,000 105,000
tebal 10 cm
43,000
K.H.1.549. Plastik btg 43,000 36,000 43,000
gelombang
41,000
K.H.1.550. Plamur kayu btg 41,000 31,000 37,000
jago
K.H.1.551. Plamur btg 28,000
28,000 23,000 31,000
tembok
K.H.1.552. Acrilye
Plamur jenis btg 10,000
10,000 8,000 10,000
sirsak
K.H.1.553. kuning
Sirlak Putih Lt 51,000
51,000 42,000 52,000
Batangan
66,000
K.H.1.554. Sirlak Lt 37,000 31,000 37,000
kuning
K.H.1.555. serbuk
Politur jadi Lt 112,000
52,000 76,000 85,000

45,000
K.H.1.556. Tek oil fuji Lt 45,000 85,000 51,000

73,000
K.H.1.557. Pernis Lt 47,000 36,000 47,000
42,000
K.H.1.558. Glass bit Lt 42,000 35,000 42,000

K.H.1.559. Ter petin Lt 28,000


29,000 30,000 41,000

37,000
K.H.1.560. Minyak cat Lt 29,000 28,000 35,000

K.H.1.561. Tiner Lb 29,000


28,000 22,000 29,000

17,000
K.H.1.562. spritus Kg 16,000 14,000 19,000

K.H.1.563. Amplas Lt 7,000 6,000 6,000 7,000

19,000
K.H.1.564. Batu Apung Lb 19,000 16,000 19,000

K.H.1.565. Teer Lb 28,000


31,000 24,000 29,000

155,000
K.H.1.566. Plywood Kg 156,000 130,000 156,000
900x2100x4
K.H.1.567. cm
Plywood Kg 264,000
265,000 220,000 265,000
1200x2400x
K.H.1.568. 4 cm
Portland m3 1,000 1,000 2,000 2,000
Cemen (PC)
Nusantara,
K.H.1.569. Tiga
Portland Kg 2,000 6,000 5,000 2,000
Cemen (PC)
K.H.1.570. Putih
Portland Bh 16,000
16,000 13,000 16,000
Cemen (PC)
K.H.1.571. Semen
Portland Bh 19,000
19,000 16,000 19,000
Cemen (PC)
K.H.1.572. Warna
Sekop pasir ml 66,000
47,000 58,000 66,000

19,000
K.H.1.573. Senggrong ml 20,000 22,000 28,000

36,000
K.H.1.574. Seng plat Bj ml 36,000 36,000 45,000
Ls 30 L 60
24,000
K.H.1.575. Seng plat Bj ml 24,000 29,000 35,000
Ls 20 L 60
55,000
K.H.1.576. Seng plat Bj Lb 55,000 43,000 59,000
Ls 30 L 90
45,000
K.H.1.577. Seng plat Bj Lb 36,000 36,000 47,000
Ls 20 L 90
K.H.1.578. Seng Lb 90,000
71,000 64,000 77,000
gelombang
K.H.1.579. Bj Ls 20 90
Seng Lb 107,000
77,000 72,000 87,000
gelombang
K.H.1.580. Bj Ls 20 90
Seng 2 122,000
83,000 81,000 99,000
m
gelombangB
j Ls 20 90 x
67,000
K.H.1.581. Seng lb 69,000 101,000 123,000
gelombang
K.H.1.582. Bj Ls BJLS
Seng 20 90 3 23,000
23,000 19,000 24,000
m
Alumunium
K.H.1.583. foil
Seng BJLS 3 129,000
0 0 0
m
Tek wood 90
K.H.1.584. x 120 Urug
Tanah m3 114,000
69,000 95,000 114,000
Biasa
167,000
K.H.1.585. Tanah urug m
2 95,000 140,000 168,000
pilihan
167,000
K.H.1.586. tanah urug m
2 135,000 140,000 173,000
Sirtu
85,000
K.H.1.587. keramikpolo m
2 85,000 71,000 87,000
s 10 x 20 cm
85,000
K.H.1.588. keramikpolo m
2 85,000 67,000 85,000
s 20 x 20 cm
81,000
K.H.1.589. keramikpolo m
2 85,000 66,000 90,000
s 30 x 30 cm
85,000
K.H.1.590. keramikpolo m
2 79,000 66,000 79,000
s 20 x 25 cm
K.H.1.591. keramikpolo dos 82,000
83,000 73,000 90,000
s 40 x 40 cm
81,000
K.H.1.592. keramikpolo dos 79,000 65,000 79,000
s putih 30 x
K.H.1.593. 30 cm
keramik bj 85,000
85,000 71,000 87,000
motif (25 x
K.H.1.594. 25)
keramik dos 85,000
85,000 71,000 85,000
motif (20 x
K.H.1.595. 20)
keramik dos 7,000 7,000 6,000 7,000
motif (8 x
K.H.1.596. 20)
keramik bj 85,000
85,000 71,000 88,000
motif (20
K.H.1.597. x25)
keramik 2 85,000
85,000 71,000 88,000
m
motif (20 x
K.H.1.598. 25)
keramik 2 7,000 7,000 6,000 7,000
m
motif (8 x
K.H.1.599. 20)
Keramik 2 85,000
85,000 71,000 87,000
m
10/20
K.H.1.600. berglasir
Keramik 2 85,000
85,000 71,000 85,000
m
20/20
K.H.1.601. berglasir
Keramik 2 81,000
81,000 67,000 81,000
m
30/30
K.H.1.602. berglasir
Keramik std 2 89,000
90,000 75,000 91,000
m
40/40
K.H.1.603. berglasir
Keramik Lb 73,000
73,000 61,000 77,000
20/20 dan
K.H.1.604. 30/30
Keramik putih Lb 103,000
105,000 87,000 108,000
mosaik
81,000
K.H.1.605. Triplek 3 Lb 78,000 66,000 85,000
mm
94,000
K.H.1.606. Multiplek 4 Lb 99,000 87,000 123,000
mm
K.H.1.607. Multiplek 6 Lb 124,000
120,000 102,000 142,000
mm
K.H.1.608. Multiplek 9 m 189,000
177,000 172,000 227,000
mm
254,000
K.H.1.609. Multiplek 12 m 256,000 213,000 270,000
mm
10,000
K.H.1.610. Kabel NYM bh 10,000 8,000 10,000
2 x 2.5 mm2
10,000
K.H.1.611. Kabel NYM Kg 10,000 8,000 10,000
2 x 4 mm2
226,000
K.H.1.612. Condensator bh 227,000 189,000 249,000

26,000
K.H.1.613. Mortar bh 26,000 22,000 31,000
Semen/Grou
K.H.1.614. tBegel bh 37,000
37,000 31,000 42,000
Kalung
42,000
K.H.1.615. Baut 12 mm kg 42,000 35,000 45,000

K.H.1.616. Drum Aspal liter 797,000


802,000 666,000 762,000

K.H.1.617. Abu batu kg

95,000
K.H.1.618. Additive kg 95,000 79,000 95,000
Slurry Seal
19,000
K.H.1.619. Aspal kg 19,000 16,000 19,000
Panas/Drum
17,000
K.H.1.620. Aspal kg 17,000 14,000 17,000
Emulsi Type
K.H.1.621. CRS-2
Aspal ton 17,000
17,000 14,000 17,000
Emulsi Type
K.H.1.622. CSS-1
Aspal buah 17,000
17,000 14,000 17,000
Emulsi Type
K.H.1.623. CSS-1
AC-WCL. m3
1,761,000
1,770,000 1,471,000 1,770,000
(bahan)
K.H.1.624. Batu Bata (5 kg 1,000 1,000 1,000 1,000
x 10 x 22)
229,000
K.H.1.625. Batu Belah kg 230,000 191,000 230,000
Hitam
K.H.1.626. Cat dasar/ m2 45,000
45,000 37,000 45,000
meni
78,000
K.H.1.627. Cat kg 78,000 65,000 78,000
Thermoplast
K.H.1.628. ic powdersegi
Conblok m1 79,000
79,000 66,000 79,000
6t=6
cm.K.200
96,000
K.H.1.629. Elastobond kg 97,000 81,000 97,000

16,000
K.H.1.630. Filler rami m3 16,000 13,000 16,000

45,000
K.H.1.631. Glass bead bh 45,000 37,000 45,000

233,000
K.H.1.632. Kapur bh 235,000 195,000 235,000
pasang
K.H.1.633. Kerb K3. unit 79,000
79,000 66,000 79,000

141,000
K.H.1.634. Kerb K4 m3 142,000 118,000 142,000
(devider)
K.H.1.635. Kawat liter 457,000
459,000 381,000 459,000
bronjong (2
K.H.1.636. x 1 x 0,5)
Pasir urug m1 150,000
150,000 132,000 159,000

34,000
K.H.1.637. Primer kg 34,000 28,000 34,000

1,938,000
K.H.1.638. Rubber joint kg 1,946,000 1,617,000 1,946,000

16,000
K.H.1.639. Sika Grout m2 16,000 13,000 16,000
215 M
K.H.1.640. Sikadur m2 255,000
256,000 213,000 256,000
732/731
96,000
K.H.1.641. Tegel liter 97,000 81,000 97,000
kembang
heksagonal
K.H.1.642. abu-abu
Tegel m3 116,000
116,000 96,000 116,000
kembang
heksagonal
K.H.1.643. merah
Air m3

385,000
K.H.1.644. Agregat Ton 410,000 338,000 390,000
Halus
359,000
K.H.1.645. Agregat m3 410,000 315,000 410,000
Kasar
3,668,000
K.H.1.646. Asbuton m3 3,514,000 2,910,000 3,665,000
Halus
236,000
K.H.1.647. Agregat m3 314,000 229,000 270,000
Pecah Mesin
K.H.1.648. 0-5 mm
Agregat m3 271,000
335,000 247,000 290,000
Pecah Mesin
K.H.1.649. 20-30
Agregatmm m3 271,000
280,000 247,000 290,000
Pecah Mesin
K.H.1.650. 5-10&10-0
Bahan Agr. m3 466,000
492,000 410,000 472,000
Base Kelas A
462,000
K.H.1.651. Bahan Agr. m3 489,000 407,000 468,000
Base Kelas B
497,000
K.H.1.652. Bahan Agr. m3 525,000 437,000 501,000
Base Kelas C
497,000
K.H.1.653. Bahan Agr. Liter 525,000 437,000 501,000
Base Kelas
K.H.1.654. C2
Bahan Agr. Buah 312,000
342,000 254,000 301,000
Base Kelas S
108,000
K.H.1.655. Additive Liter 114,000 95,000 108,000

K.H.1.656. Anchorage Kg 2,676,000 2,224,000 2,676,000


2,663,000

116,000
K.H.1.657. Anti Botol 112,000 93,000 116,000
stripping
K.H.1.658. agent
Arbocell Liter 58,000
58,000 48,000 58,000

483,000
K.H.1.659. Assetiline m3 463,000 385,000 484,000

K.H.1.660. Bahan m3 8,000 8,000 7,000 8,000


pengawet :
K.H.1.661. kreoset
Beton K-125 m3
1,406,000
1,543,000 1,344,000 1,522,000

1,607,000
K.H.1.662. Beton K-175 m3 1,749,000 1,520,000 1,732,000

2,049,000
K.H.1.663. Beton K-250 m3 2,308,000 2,019,000 2,306,000

2,164,000
K.H.1.664. Beton K-300 m3 2,429,000 2,133,000 2,426,000

2,562,000
K.H.1.665. Beton K-350 m3 2,932,000 2,551,000 2,932,000

2,668,000
K.H.1.666. Beton K-400 m2 3,038,000 2,646,000 3,039,000

2,858,000
K.H.1.667. Beton K-500 m3 3,259,000 2,859,000 3,266,000

43,000
K.H.1.668. Casing Kg 47,000 39,000 45,000

296,000
K.H.1.669. Chipping m' 296,000 247,000 297,000

K.H.1.670. Chipping Liter


(kg)
45,000
K.H.1.671. Cerucuk m' 45,000 37,000 45,000
diameter 10-
K.H.1.672. 15 cm
Curing m' 69,000
70,000 58,000 70,000
Compound
265,000
K.H.1.673. Ducting Buah 266,000 221,000 266,000
(Kabel
K.H.1.674. prestress)
Ducting Buah 89,000
90,000 75,000 90,000
(Strand
K.H.1.675. prestress)
Elastomer Buah 705,000
676,000 560,000 704,000
jenis 1
(35x30x3,6c
862,000
K.H.1.676. Elastomer m2 826,000 684,000 862,000
jenis 2
K.H.1.677. (45x35x3,9c
Elastomer m' 1,136,000
1,089,000 900,000 1,134,000
jenis 3
K.H.1.678. (45x40x4,5c
Expansion m' 14,000
12,000 10,000 14,000
Cap
K.H.1.679. m' 1,991,000
Expansion 1,906,000 1,578,000 1,030,000
Join Baja
K.H.1.680. Siku
Expansion m'
2,516,000
2,413,000 1,998,000 2,514,000
Join Tipe
K.H.1.681. Rubber
Expansion Kg
2,544,000
2,437,000 2,019,000 2,543,000
Join Tipe
K.H.1.682. Torma
Expansion Kg
3,427,000
3,284,000 2,721,000 3,425,000
Tipe Joint
K.H.1.683. Asphaltic
Glass Bead Set 95,000
94,000 79,000 95,000

69,000
K.H.1.684. Joint Set 66,000 53,000 69,000
Sealent
114,000
K.H.1.685. Joint Socket Buah 114,000 96,000 114,000
Pile
K.H.1.686. 16x16x16
Joint Socket Buah
1,031,000
1,030,000 862,000 1,037,000
Pile 35x35
119,000
K.H.1.687. Kerb Type A Buah 114,000 95,000 120,000

715,000
K.H.1.688. Marmer m2 712,000 597,000 717,000
Nama
K.H.1.689. Jembatan
Mata Kucing m' 193,000
166,000 137,000 173,000

184,000
K.H.1.690. Matras Buah 177,000 147,000 185,000
Concrete
K.H.1.691. (Tebal=10)
Mini Pile Lbr 315,000
314,000 264,000 315,000
16x16x16
49,000
K.H.1.692. Mini Timber Botol 49,000 41,000 49,000
Pile
248,000
K.H.1.693. Multipleks Kg 261,000 202,000 243,000
12 mm
315,000
K.H.1.694. Oxygen (isi Kg 304,000 250,000 315,000
6 M3)
K.H.1.695. Nusantara, m3 2,000 2,000 2,000 2,000
Tiga Roda
K.H.1.696. Portland
Putih Kg 2,000 6,000 5,000 6,000

K.H.1.697. Semen Bh 16,000


16,000 13,000 16,000
merah
K.H.1.698. Warna Bh 1,000 19,000 16,000 19,000

67,000
K.H.1.699. Sekop pasir Zak 49,000 59,000 69,000
K.H.1.700. Senggrong Kg 20,000
20,000 23,000 29,000

K.H.1.701. Semen/ PC Kg 124,000


114,000 97,000 114,000
(50kg)
K.H.1.702. Semen/ PC 2000 1000 2,000 2000
(kg)
K.H.1.703. Filler 1000 1000 2000 1000
Cement
Catatan:
1) Setiap jenis jasa sudah termasuk pajak dan jasa.
2) Dalam membuat perhitungan HPS pada setiap kegiatan maka dari harga barang dikurangi 10%.
3) Pajak ditambahkan pada perhitungan komulatif dari HPS kegiatan.

I.HARGA BETON CURAH
NOMOR Pengeti SL HARGA PER M3 *)
1 2 kan  UM3 4
K.I. BETON CURAH
K.I.1. MORTAR
K.I.1.001. BO 10 + 824,000
K.I.1.002. K 100 102 + 1,066,000
K.I.1.003. K 125 102 + 1,104,000
K.I.1.004. K 150 2
10 + 1,140,000
K.I.1.005. K 175 2
10 + 1,178,000
K.I.1.006. K 200 102 + 1,215,000
K.I.1.007. K 225 2
10 + 1,256,000
K.I.1.008. K 250 2
10 + 1,297,000
K.I.1.009. K 275 2
10 + 1,334,000
K.I.1.010. K 300 102 + 1,380,000
K.I.1.011. K 325 102 + 1,421,000
K.I.1.012. K 350 2
10 + 1,468,000
K.I.1.013. K 375 2
10 + 1,517,000
K.I.1.014. K 400 102 + 1,567,000
K.I.1.015. K 425 102 + 1,641,000
K.I.1.016. K 450 2
10 + 1,692,000
K.I.1.017. K 475 2
10 + 1,753,000
K.I.1.018. K 500 102 + 1,817,000
K.I.1.019. Fs 45 2
10 + 1,857,000
2
Harga beton curah sampai di tempat dengan radius/ jarak dari pabrik ke lokasi/proyek 20 km
Jika ke lokasi/proyek lebih dari 20 km harga, ditambah Rp. 30.000,- per km per M3.
Alat kelengkapan lain seperti Pompa dan Feberator belum termasuk dalam harga tersebut diatas
Harga tersebut diatas perhitungan dengan jarak maksimal 25 km dari plant ADP.
Minimal pengiriman 3 m3 kecuali pengecoran besar volume terakhir minimal.

ARGA SATUAN DASAR (JSD) ALAT
NOMOR Pengetikan Bahasa Asing DAYA (JP) KAP. ALAT
1 2 3 4
K.J. JARGA SATUAN DASAR 75000
K.J.1. JARGA SATUAN DASAR ALAT
K.J.1.001. ASPJALT MIXING PLANT 294 50.00 T/Jam

K.J.1.002. ASPJALT FINISJER 72.4 10 Ton

K.J.1.003. ASPJALT SPRAYER 4 0 Liter

K.J.1.004. BULLDOZER 100-150 JP 155 - -

K.J.1.005. COMPRESSOR 4000-6500 L\M 60 0 L/m

K.J.1.006. CONCRETE MIXER 0.3-0.6 M3 20 500 Liter

K.J.1.007. CRANE 10-15 TON 138 15 Ton

K.J.1.008. DUMP TRUCK 3-4 M3 100 4 Ton

K.J.1.009. DUMP TRUCK 190 12 Ton

K.J.1.010. EXCAVATOR 80-140 JP 133 0.93 M3

K.J.1.011. FLAT BED TRUCK 3-4 M3 190 10 ton

K.J.1.012. GENERATOR SET 180 395 KVA

K.J.1.013. MOTOR GRADER >100 JP 135 800

K.J.1.014. TRACK LOADER 75-100 JP 70 0.8 M3

K.J.1.015. WJEEL LOADER 1.0-1.6 M3 96 1.5 M3

K.J.1.016. TJREE WJEEL ROLLER 6-8 T 55 8 Ton

K.J.1.017. TANDEM ROLLER 6-8 T. 82 8.1 Ton

K.J.1.018. TIRE ROLLER 8-10 T. 100.5 9 Ton

K.J.1.019. VIBRATORY ROLLER 5-8 T. 82 7.05 Ton

K.J.1.020. CONCRETE VIBRATOR 5.5 25

K.J.1.021. STONE CRUSJER 220 50 T/Jam

K.J.1.022. WATER PUMP 70-100 MM 6 3000 Liter


K.J.1.023. WATER TANKER 3000-4500 L. 100 5000 Liter

K.J.1.024. PEDESTRIAN ROLLER 8.8 835 Ton

K.J.1.025. TAMPER 4.7 121 Ton

K.J.1.026. JACK JAMMER 0 1330

K.J.1.027. FULVI MIXER 345 2005

K.J.1.028. CONCRETE PUMP 100 8 M3

K.J.1.029. TRAILER 20 TON 175 20 Ton

K.J.1.030. PILE DRIVER + JAMMER 25 2.5 Ton

K.J.1.031. CRANE ON TRACK 35 TON 125 35 Ton

K.J.1.032. WELDING SET 40 250 Amp

K.J.1.033. BORE PILE MACJINE 150 2000 Meter

K.J.1.034. ASPJALT LIQUID MIXER 40 20000 Liter

K.J.1.035. TRAILLER 15 TON 150 15 Ton

K.J.1.036. ROCK DRILL BREAKER 3 6 KG

K.J.1.037. COLD MILLING 248 1000 m

K.J.1.038. COLD RECYCLER 900 2200 M

K.J.1.039. JOT RECYCLER 400 3 M

K.J.1.040. AGGREGAT (CJIP) SPREADER 115 3.5 M

K.J.1.041. ASPJALT DISTRIBUTION 115 4000 Liter

K.J.1.042. SPLIT FORM PAVER 105 2.5 M

K.J.1.043. CONCRETE PAN MIXER 134 600 Liter

m3/ja
K.J.1.044. CONCRETE BREAKER 290 20
m

K.J.1.045. ASPJALT TANKER 190 4000 liter

K.J.1.046. CEMENT TANKER 190 4000 liter


K.J.1.047. CONCRETE MIXER (350) 20 350 liter

K.J.1.048. VIBRATING RAMMER 4.2 80 KG

K.J.1.049. TRUK MIXER ( AGITATOR ) 220 5 M3

K.J.1.050. BORE PILE MACJINE DIA 60 125 60 CM

K.J.1.051. CRANE ON TRACK 75 - 100TON 200 75 Ton

K.J.1.052. BLENDING EQUIPMENT 50 30 Ton

K.J.1.053. ASPJALT LIQUID MIXER (KAP 20000) 40 20000 Liter


5

Keterangan
5

5
> 6 jam

ar Pemerintah Provinsi DKI.

GUNUNG
KIDUL
8

156,000
835,000
925,000
760,000

16,000
16,000
16,000
16,000
15,000
20,000
16,000
135,000
123,000
107,000
93,000
82,000
66,000
256,000
168,000
145,000
135,000
119,000
98,000
37,000
63,000
43,000
35,000
32,000
25,000
128,000
99,000
92,000
28,000
89,000

55,000

95,000
70,000
90,000
66,000
103,000
1,000
1,000
2,000

261,000

312,000

445,000

460,000

469,000

GUNUNG
KIDUL

8
483,000

498,000

194,000

2,559,000

49,000

32,000

28,000

18,000

7,000

30,000

27,000

22,000

32,000

48,000
18,000

15,000

18,000

16,000

16,000

26,000

30,000

7,000

15,000

19,000

58,000

52,000

64,000

68,000

84,000

109,000

130,000

90,000

78,000

94,000

119,000

128,000

168,000

216,000
36,000

46,000

91,000

93,000

103,000

38,000

103,000

128,000

48,000

34,000

73,000

89,000

132,000

141,000

156,000

49,000

139,000

89,000

45,000

105,000

102,000

127,000

100,000

87,000
74,000

2,690,000

823,000

870,000

536,000

127,000

41,000

14,000

25,000

35,000

45,000

20,000

16,000

135,000

81,000

7,000

7,000

2,000

5,000

11,000

22,000

86,000
16,000

16,000

22,000

14,000

31,000

143,000

11,000

83,000

110,000

153,000

163,000

181,000

242,000

1,379,000

320,000

161,000

274,000

5,463,000

15,000

49,328,000

47,759,000

43,376,000

42,753,000

28,592,000
26,805,000

9,382,000

67,000

47,000

28,000

197,000

136,000

67,000

34,000

17,422,000

15,725,000

51,000

35,000

8,000

7,000

16,000

9,000

7,000

15,290,000

14,773,000

42,000
33,000

8,000

7,000

14,000

9,000

6,000

10,721,000

10,186,000

39,000

25,000

7,000

6,000

9,000

7,000

6,000

10,855,000

10,498,000

13,000

6,000

32,000
95,000

23,000

14,000

18,000

25,000

99,000

41,000

32,000

26,000

40,000

77,000

35,000

116,000

35,000

23,000

34,000

55,000

26,000

18,000

9,000

6,000

593,000
909,000

1,197,000

1,181,000

690,000

909,000

1,337,000

1,775,000

640,000

922,000

1,359,000

1,327,000

769,000
957,000

1,473,000

1,958,000

889,000

1,356,000

1,867,000

1,750,000

1,073,000

1,405,000

1,982,000

2,633,000

610,000
48,000

340,000

268,000

107,000

3,240,000

1,520,000

2,412,000

3,127,000

3,753,000

206,000

223,000

223,000

206,000

153,000

671,000

474,000

331,000

60,000

331,000

63,000
45,000

6,000

26,000

247,000

67,000

107,000

19,000

26,000

70,000

77,000

77,000

23,000

38,000

41,000

26,000

34,000

23,000

26,000

35,000

35,000

2,000

40,000
6,000

1,000

2,000

40,000

45,000

40,000

25,000

23,000

34,000

1,000

2,000

394,000

333,000

401,000

225,000

127,000

138,000

39,000

49,000

74,000

99,000

114,000

153,000

196,000
252,000

366,000

673,000

103,000

116,000

143,000

35,000

206,000

184,000

236,000

369,000

474,000

544,000

741,000

940,000

1,234,000

1,764,000

2,374,000

2,823,000

4,021,000

140,000

181,000

231,000

294,000
3,390,000

424,000

546,000

639,000

823,000

1,309,000

52,000

68,000

86,000

114,000

130,000

161,000

232,000

430,000

581,000

42,000

56,000

82,000

111,000

135,000

180,000

284,000

372,000

530,000
718,000

930,000

1,095,000

1,376,000

1,670,000

1,832,000

2,092,000

2,365,000

2,640,000

3,178,000

206,000

259,000

377,000

484,000

573,000

707,000

1,181,000

1,430,000

2,056,000

3,930,000

67,000

82,000

94,000

47,000
82,000

110,000

122,000

58,000

111,000

130,000

180,000

70,000

128,000

171,000

184,000

242,000

89,000

153,000

192,000

218,000

242,000

323,000

116,000

216,000

250,000

349,000

277,000

323,000
491,000

581,000

313,000

403,000

500,000

430,000

492,000

625,000

973,000

1,251,000

1,697,000

1,126,000

1,215,000

2,858,000

3,395,000

4,646,000

5,718,000

7,416,000

8,756,000

10,990,000

12,329,000

25,000

33,000

42,000
42,000

48,000

61,000

97,000

151,000

26,000

35,000

55,000

68,000

79,000

99,000

140,000

189,000

308,000

590,000

734,000

1,366,000

2,102,000

2,964,000

51,000

59,000

76,000

92,000

110,000
177,000

322,000

484,000

640,000

1,082,000

1,520,000

6,000

7,000

9,000

15,000

22,000

33,000

47,000

67,000

97,000

208,000

336,000

526,000
839,000

35,000

51,000

70,000

103,000

216,000

347,000

542,000

952,000

1,115,000

1,413,000

6,000

7,000

11,000

16,000

26,000
40,000

56,000

79,000

120,000

252,000

42,000

647,000

1,027,000

42,000

61,000

86,000

167,000

261,000

426,000

661,000

1,049,000
1,350,000

1,675,000

7,000

9,000

15,000

22,000

56,000

111,000

167,000

347,000

544,000

839,000

1,342,000

75,000

95,000

115,000
148,000

188,000

225,000

302,000

92,000

117,000

142,000

185,000

234,000

282,000

377,000

126,000

89,000

169,000

161,000

89,000

99,000

135,000

99,000
139,000

130,000

99,000

130,000

122,000

130,000

99,000

89,000

41,000

39,000

32,000

10,000

49,000

35,000

75,000

49,000

35,000
45,000

41,000

28,000

26,000

18,000

7,000

22,000

23,000

156,000

259,000

1,000

2,000

15,000

15,000

45,000

33,000

42,000

33,000

62,000

47,000

71,000

84,000

95,000
110,000

23,000

67,000

147,000

294,000

127,000

85,000

82,000

82,000

87,000

90,000

74,000

86,000

81,000

8,000

87,000

87,000

8,000

86,000

81,000

81,000

89,000

74,000

107,000
85,000

99,000

127,000

210,000

274,000

11,000

11,000

249,000

35,000

42,000

45,000

804,000

90,000

18,000

16,000

16,000

16,000

1,679,000

1,000

290,000

42,000

74,000

75,000
92,000

15,000

42,000

222,000

75,000

135,000

435,000

201,000

32,000

1,845,000

15,000

243,000

92,000

110,000

546,000

511,000

3,083,000

263,000

284,000

284,000

467,000

464,000
499,000

499,000

460,000

94,000

2,538,000

99,000

56,000

406,000

8,000

1,480,000

1,707,000

2,297,000

2,412,000

2,999,000

3,103,000

3,313,000

44,000

292,000

42,000

67,000

252,000

85,000

680,000
816,000

1,067,000

11,000

1,673,000

2,117,000

2,140,000

2,883,000

67,000

58,000

114,000

1,021,000

100,000

706,000

147,000

156,000

313,000

47,000

241,000

268,000

2,000

2,000

16,000

16,000

47,000
33,000

104,000

1500

1000

JARGA ALAT 
(Rp)
5

4,516,076,000

4,921,250,000

376,333,000

3,015,435,000

174,511,000

70,574,000

438,844,000

371,939,000

1,183,403,000

1,753,937,000

464,507,000

507,173,000

2,630,906,000

1,628,656,000

2,004,500,000

607,581,000

2,004,500,000

1,753,937,000

2,004,500,000

6,446,000

1,794,192,000

36,046,000
174,511,000

192,476,000

32,079,000

125,444,000

930,298,000

384,951,000

957,630,000

627,222,000

893,086,000

188,166,000

6,315,714,000

224,548,000

1,384,951,000

529,344,000

3,161,197,000

15,160,654,000

4,390,552,000

513,268,000

627,222,000

1,732,280,000

962,378,000

574,945,000

439,055,000

439,055,000
52,687,000

32,079,000

834,061,000

6,288,798,000

7,263,384,000

861,803,000

224,555,000