Anda di halaman 1dari 27

PERHITUNGAN KUDA-KUDA BAJA

Data perencanaan :
 : 250
Jarak kuda-kuda :4m
Jarak gording : 1,1 m dan 1,2
Penutup atap : Asbes/Multyroof/Seng BWG

Perhitungan gording :
► Beban mati : 1.2 x 25 = 30,00 kg/m
► Beban : 150 x 50 x 20 x 3,2 = 6,76 kg/m +
q = 36,76 kg/m
Mx = 1/8 x 36,76 x cos 250 x 42
= 1/8 x 33,45 x 42 = 66,90 kgm
2
My = 1/8 x 36,76 x sin 250 x 4
= 1/8 x 15,44 x 42 = 30,88 kgm

_____________________________________________________________ 1
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Beban Hidup P = 100 kg
Mx = 1/4 . 100. cos 250 x 4
= 1/4 . 91 x 4 = 91 kgm
My = 1/4 . 100. sin 250 x 4
= 1/4 . 42 x 4 = 42 kgm

Σ Mx = 66,90 + 91 = 157,90 kgm


Σ My = 30,88 + 42 = 72,88 kgm

Kontrol Tegangan
 Mx  My
 
Wx Wy
15790 7288
 
37,4 8,19

 422,20  889,85 1312,05 kg / cm 2   1600 kg / cm 2


Dimensi gording ini dapat digunakan [ 150 × 50 × 20 × 3,2

Kontrol Stabilitas Terhadap lendutan


5 33,45 10 2  400 4 1 91 400 3
Fx =   
384 2,110 6  280 48 2,1 10 6 280
= 0,190 + 0,206
= 0,396 cm
5 15,44 10 2  400 4 1 42  400 3
Fy =   
384 2,110 6  28,3 48 2,1 10 6 28,3
= 0,866+ 0,942
= 1,808 cm

F= 0,3962  1,8082 = 1,851 cm

 400
F=   2 cm  1,851 cm .......... ok !
200 200
Jadi, Gording [ 150 × 50 × 20 × 3,2 Memenuhi !

_____________________________________________________________ 2
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Perhitungan beban kuda-kuda
P1 = 100 + 4 x 1,1 x 36,76 = 261,74 kg
P2 = 100 + 4 x 0,55 x 36,76 = 180,87 kg
P3 = 1 x 11 x 4 = 44,00 kg
P4 = 0,5 x 11 x 4 = 22,00 kg
Berat sendiri kuda-kuda WF 152 = panjang total kuda-kuda x (2 x 6,91)
= 23 x 23,07 kg/m
= 530,61
530,61
Beban yang diterima tiap titik buhul = = 33,16 kg
16
Beban yang diterima tiap titik buhul
AKIBAT BEBAN MATI P1 = (261,74 + 33,16) - 100 = 376,33 kg
P2 = (180,87 + 33,16) - 100 = 241,4 kg
P3 = 44,00 kg
P4 = 22,00 kg

_____________________________________________________________ 3
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PEMBEBANAN AKIBAT ANGIN

Beban angin :
Angin kiri
- Tekanan angin = 25 kg/m2
- Tekanan dipihak angin = ( : 250) = 0,02  - 0,4 = 0,1
- Beban Angin = 0,1 x 25 x 4 x 1,1 = 11,00 kg
Angin belakang / hisap
- Beban Angin = -0,4 x 25 x 4 x 1,1 = -44,00 kg

P1 Tekan = 11,00 kg
P1 Hisap = - 44,00 kg
► Angin posisi Tekan

fx = 11 x sin 250 = 4,64 kg


1
fy = 11 x cos 250 = 9,97 kg

► Angin posisi Hisap

fx = 44 x sin 250 = 18,60 kg


2
fy = 44 x cos 250 = 39,88 kg

_____________________________________________________________ 4
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PLAT LANTAI

Data Perencanaan :
 Mutu beton fc’ = 20 Mpa
 Mutu baja fy = 240 Mpa
 Tebal plat atap = 12 cm

Bentuk plat yang dihitung untuk mewakili perhitungan penulangan plat lantai
sebagai berikut :

ly = 4,5 m

lx = 4 m

Perhitungan plat A
ly 4,5
  1,12 5 < 2 plat 2 arah
lx 4
Pembebanan plat atap
Beban mati
 Berat sendiri plat = 0.12 x 2300 = 276 kg/m²
 Berat sendiri tegel+spesi = 0.05 x 2000 = 100 kg/m²
 Berat sendiri pasir urug = 0.05 x 1600 = 80 kg/m² +
WDL = 456 kg/m²
Beban hidup
 Beban guna WLL = 200 kg/m²

_____________________________________________________________ 5
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
WUL = 1.2 . WDL + 1.6 WLL
= 1.2 . 456 + 1.6 . 200 = 867,2 kg/m²
Sehingga digunakan persamaan momen M = 0.001 . q . lx². X
Mlx = 0.001 (867,2) . 4². 42 = 582,76 kg/m
Mly = 0.001 (867,2) . 4². 37 = 513,38 kg/m
Mtx = 0.001 (867,2) . 4². 42 = - 582,76 kg/m
Mty = 0.001 (867,2) . 4². 37 = - 513,38 kg/m
Direncanakan tulangan utama ø 10 mm selimut beton 20 mm
d = 120 – 20 - ½.10 = 95 mm
Penulangan lapangan arah x
Mu = 582,76 kgm = 5,83 KNm
 min = 0.0058
 max= 0.0323

Mu 5,83 10 3
K =   0,807   min  0.0058
 .b.d 2 0.8 1  (95) 2
As = .b.d
= 0.0058 . 1000 . 95 = 551 mm²
Dipakai ø 10 – 125 mm
Karena momen lapangan arah x lebih besar dari arah y maka, penulangan
arah y disamakan dengan arah x
Penulangan tumpuan x = tumpuan y
Mu = 582,76 kgm = 5,83 KNm
 min = 0.0058
 max = 0.0323
K = 0,807   min  0.0058
As = 551 mm²
Dipakai ø 10 – 125 mm

Tulangan bagi atau susut


= 0.0020 . b . h
= 0.0020 . 1000 . 120 = 240 mm
Dipakai ø 8 – 125 mm = 402,4 > 240 mm²

_____________________________________________________________ 6
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar penulangan Plat A

1/5 L ø 10 – 125 mm

Tul. Bagi ø 8 – 125 mm

ly = 4,5 m ø 10 – 125 mm

Tul. Bagi ø 8 – 125 mm

lx = 4 m

_____________________________________________________________ 7
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Perhitungan plat B

ly = 8,5 m

lx = 4 m

ly 8,5
  2,125 > 2 plat 1 arah
lx 4
Namun di sini didesain menggunakan plat 2 arah
Pembebanan plat atap
Beban mati
 Berat sendiri plat = 0.12 x 2300 = 276 kg/m²
 Berat sendiri tegel+spesi = 0.05 x 2000 = 100 kg/m²
 Berat sendiri pasir urug = 0.05 x 1600 = 80 kg/m² +
WDL = 456 kg/m²

Beban hidup
 Beban guna WLL = 200 kg/m²

WUL = 1.2 . WDL + 1.6 WLL


= 1.2 . 456 + 1.6 . 200 = 867,2 kg/m²
Sehingga digunakan persamaan momen M = 0.001 . q . lx². X
Mlx = 0.001 (867,2) . 4². 62 = 860,26 kg/m
Mly = 0.001 (867,2) . 4². 34 = 471,76 kg/m
Mtx = 0.001 (867,2) . 4². 62 = - 860,26 kg/m
Mty = 0.001 (867,2) . 4². 34 = - 471,76 kg/m
Direncanakan tulangan utama ø 10 mm selimut beton 20 mm
d = 120 – 20 - ½.10 = 95 mm
_____________________________________________________________ 8
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Penulangan lapangan arah x
Mu = 860,26 kgm = 8,60 KNm
 min = 0.0058
 max= 0.0323

Mu 8,60 103
K =   1,19   min  0.0058
 .b.d 2 0.8 1  (95) 2
As = .b.d
= 0.0058 . 1000 . 95 = 551 mm²
Dipakai ø 10 – 125 mm
Karena momen lapangan arah x lebih besar dari arah y maka, penulangan
arah y disamakan dengan arah x
Penulangan tumpuan x = tumpuan y
Mu = 860,26 kgm = 8,60 KNm
 min = 0.0058
 max = 0.0323
K = 1,19   min  0.0058
As = 551 mm²
Dipakai ø 10 – 125 mm

Tulangan bagi atau susut


= 0.0020 . b . h
= 0.0020 . 1000 . 120 = 240 mm
Dipakai ø 8 – 125 mm = 402,4 > 240 mm²

_____________________________________________________________ 9
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar penulangan Plat B

1/5 L ø 10 – 125 mm

Tul. Bagi ø 8 – 125 mm

ly = 8,5 m ø 10 – 125 mm

Tul. Bagi ø 8 – 125 mm

lx = 4 m

_____________________________________________________________ 10
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PORTAL I

RA RB
q1 q1 q2

20/35 20/35 20/40

4m
20/30 20/30 20/30 20/30

4m 4m 4,5 m
Gambar Portal 1

Beban Mati (q1)


o Berat sendiri balok 20/35 = 0.20 x 0.35 x 2300 = 161 kg/m1
o Berat perataan plat = 2 x 456 = 912 kg/m1 +
= 1073 kg/m1

Beban Hidup (q1’)


o Berat perataan plat = 2 x 200 = 400 kg/m1

Beban Mati (q2)


o Berat sendiri balok 20/40 = 0.20 x 0.40 x 2300 = 184 kg/m1
o Berat perataan plat = 2,2 x 456 = 1003,2 kg/m1 +
= 1187,2 kg/m1
Beban Hidup (q2’)
o Berat perataan plat = 2,2 x 200 = 440 kg/m1

RA = RB = reaksi Kuda-kuda + kolom atas = 879 + 552 = 1431 kg

_____________________________________________________________ 11
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
DESAIN PENULANGAN BALOK

DESAIN BALOK PORTAL 1


Dengan memperhatikan hasil output gaya-gaya dari Staad Pro 2004 yang
terjadi maka desain penulangan balok adalah sebagai berikut :
 Desain balok untuk Beam 5 dan Beam 6
Data perencanaan :
Dimensi = 20/35
Bentang =4m
Mutu fc’ = 20 Mpa
Fy = 240 Mpa
 min = 0.0058
 max = 0.0323
Mu max tumpuan = 27,86 KNm
Mu max lapangan = 17,31 KNm
Pu max = 5963 Kg
Vu max = 4185 Kg
Penulangan Tumpuan
d = 350 – 20 – 10 – (1/2 12 ) = 314 mm
Mu 27,86  103
K =   1,766 mpa  = 0.0078
.b.d 2 0.8  0.2  (0.314) 2
As =  . b . d
= 0.0078 . 200 . 314 = 490mm²
Dipakai 5 ø 12 = 565,5mm² > 490 mm² ok !

As’ = 0.4 x As = 0.4x 490 = 196 mm²


Dipakai 2 ø 12 = 226.2 mm² > 196 mm² ok !

Penulangan Lapangan
d = 350 – 20 – 10 – (1/2 12 ) = 314 mm
Mu 17,31  103
K =   1,097 mpa  min = 0.0058
 .b.d 2 0.8  0.2  (0.314)2
As =  min. b . d

= 0.0058 . 200 . 314 = 364,24 mm²


_____________________________________________________________ 12
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Dipakai 4 ø 12 = 452,4 mm² > 364,24 mm² ok !

As’ = 0.4 x As = 0.4x 306,24 = 145,7 mm²


Dipakai 2 ø 12 = 226.2 mm² > 145,7 mm² ok !
Gambar

2  12 5 12

 8 - 150  8 - 120
35 cm 35 cm
4  12 2  12

20 cm 20 cm
Lapangan Tumpuan

Gambar Potongan Memanjang

1/4 L
5  12 2  12 5  12

 8 - 150  8 - 120

2  12 4  12 2  12

_____________________________________________________________ 13
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
 Desain balok untuk Beam 7
Data perencanaan :
Dimensi = 20/40
Bentang = 4,5 m
Mutu fc’ = 20 Mpa
Fy = 240 Mpa
Mu max tumpuan = 38,00 KNm
Mu max lapangan = 24,65 KNm
Pu max = 749 Kg
Vu max = 5179 Kg
Penulangan Tumpuan
d = 400– 20 – 10 – (1/2 12 ) = 364 mm
Mu 38  103
K =   1,793mpa  = 0.0080
.b.d 2 0.8  0.2  (0.364)2
As =  . b . d
= 0.0080 . 200 . 364 = 582,4 mm²
Dipakai 6 ø 12 = 678,6 mm² > 582,4 mm² ok !

As’ = 0.4 x As = 0.4x 582,4 = 232,96 mm²


Dipakai 3 ø 12 = 398,2 mm² > 232,96 mm² ok !

Penulangan Lapangan
d = 400– 20 – 10 – (1/2 12 ) = 364 mm
Mu 24,65  103
K =   1,163 mpa  min = 0.0058
.b.d 2 0.8  0.2  (0.364)2
As =  . b . d
= 0.0058. 200 . 364 = 422,24 mm²
Dipakai 4 ø 12 = 452,4 mm² > 422,24mm² ok !

As’ = 0.4 x As = 0.4x 422,24= 168,9 mm²


Dipakai 2 ø 12 = 226,2mm² > 168,9 mm² ok !

Gambar

_____________________________________________________________
2  12 6  12 14
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
 8 - 150  8 - 120
40 cm 40 cm
4  12 3  12

20 cm 20 cm
Lapangan Tumpuan

Gambar Potongan Memanjang

1/5 L
6  12 2  12 6  12

 8 - 150  8 - 120

3 12 4  12 3  12

_____________________________________________________________ 15
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
DESAIN PENULANGAN KOLOM

 Desain Kolom ujung member 1 dan 4 (20/30)


Data perencanaan :
Mutu fc’ = 20 Mpa
Fy = 240 Mpa
Dimensi = 20/30
Mu = 20,46 kNm
Nu = 5963 kg = 59,63 kN
Dengan menggunakan persamaan diagram interaksi kolom maka :
 . Mn 0.65* 20,46 *106
 = 0,738
Ag . h (200 * 300) * 300
Dari diagram interaksi didapat rasio tulangan 1 %
 . Pn 0.65 *59,63*103
 = 0,65
Ag (200 * 300)

As = 1 % * 200 * 300 = 600 mm²


Dipakai 6 ø 12 = 678,6 > 600 mm² ………… ok!

30 cm

20 cm 3  12
3  12

 8 - 120

_____________________________________________________________ 16
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
 Desain Kolom tengah member 2 dan 3 (20/30)
Data perencanaan :
Mutu fc’ = 20 Mpa
Fy = 240 Mpa
Dimensi = 20/30
Mu = 6,30 kNm
Nu = 9179 kg = 91,79 kNm
Dengan menggunakan persamaan diagram interaksi kolom maka :
 . Mn 0.65* 6,30 *106
 = 0,23
Ag . h (200 * 300) * 300
Dari diagram interaksi didapat rasio tulangan 1 %
 . Pn 0.65 *91,79 *103
 = 0,99
Ag (200 * 300)

As = 1 % * 200 * 300 = 600 mm²


Dipakai 6 ø 12 = 678,6 > 600 mm² ………… ok!

30 cm

20 cm 3  12
3  12

 8 - 120

_____________________________________________________________ 17
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PONDASI

Nodal 1 dan 7 (posisi ujung )


Dari hasil perhitungan Staad Pro
Diketahui sebagai berikut :
Pmax = 4968 Kg = 49,68 kN
Mumax = 3800 Kgm = 38 kNm
Direncanakan ukuran plat pondasi 100 X 100 Cm2

P m
 Tanah  
A w
4968 3800
 
100 x100 1 (100  1002 )
6
= 0,497  0.023
= 0,52 < F tanah = 1.2 Kg/Cm2 Ok !!!
Perhitungan Penulangan Pondasi
Fc’ = 20 mpa
Fy = 240 mpa
 min  0.0058
 max  0.0323
Mu = 38 kNm
d = 200 – 30 – ½ Ø12
= 164 mm
Mu 38.103
K =  1,766    0.0078
b . d 2 0.8.1. (0.164) 2

As =  . b . d  0.0078 .1000 .164 = 1279,2mm2


Dipakai tulangan  12 Jarak 85 mm
Penutup digunakan As’ = 0.0020 b . h =0.0020 X 1000 X 200 = 400 mm2
Dipakai tulangan  8 Jarak 125 mm

_____________________________________________________________ 18
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar

30

2 Ø12 2 Ø12 Ø8 – 150 mm

20 cm
15 cm

100 Ø12– 90 mm

Ø12– 90 mm

20/30 100

100
Ø8 – 150 mm

_____________________________________________________________ 19
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Perhitungan PondasiNodal 3 dan 5 (posisi tengah )
Dari hasil perhitungan Staad Pro
Diketahui sebagai berikut :
Pmax = 9179 Kg = 91,79 kN
Mumax = 630 Kg = 6,30 kNm
Direncanakan ukuran plat pondasi 100 X 100 Cm2

P m
 Tanah  
A w
9179 630
 
100 x100 1 (100  1002 )
6
= 0,9179  0.0378
= 0,92 < F tanah = 1.2 Kg/Cm2 Ok !!!
Perhitungan Penulangan Pondasi
Fc’ = 20 mpa
Fy = 240 mpa
 min  0.0058
 max  0.0363
Mu = 6,30 kNm
d = 200 – 30 – ½ Ø12
= 164 mm
Mu 6,30 .103
K =   0,293   min  0.0058
b . d 2 0.8 .1. (0.164) 2

As =  . b . d  0.0058 .1000 .164 = 951,2mm2


Dipakai tulangan  12 Jarak 100 mm

Penutup digunakan As’ = 0.0020 b . h =0.0020 X 1000 X 200 = 400 mm2


Dipakai tulangan  8 Jarak 150 mm

_____________________________________________________________ 20
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar

30

2 Ø12 2 Ø12 Ø8 – 150 mm

20 cm
15 cm

120 Ø12– 100 mm

Ø12– 100 mm

20/30 100

100
Ø8 – 100 mm

_____________________________________________________________ 21
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PORTAL II

RA
q1

30/60

4m
30/50 30/50

8. 5 m

Gambar Portal 2

Beban Mati (q1)


o Berat sendiri balok 30/60 = 0.3 x 0.6 x 2300 = 414 kg/m1
o Berat perataan plat = 1,6 x 456 = 729 kg/m1 +
= 1143 kg/m1

Beban Hidup (q1’)


o Berat perataan plat = 1,6 x 200 = 320 kg/m1

RA = RB = reaksi Kuda-kuda + kolom atas = 879 + 552 = 1431 kg

_____________________________________________________________ 22
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
DESAIN PENULANGAN BALOK

DESAIN BALOK PORTAL 2


Dengan memperhatikan hasil output gaya-gaya dari Staad Pro 2004 yang
terjadi maka desain penulangan balok adalah sebagai berikut :
 Desain balok untuk Beam 3
Data perencanaan :
Dimensi = 30/60
Bentang = 8,5 m
Mutu fc’ = 20 Mpa
Fy = 240 Mpa
 min = 0.0058
 max = 0.0363
Mu max tumpuan = 82,78 KNm
Mu max lapangan = 96,14 KNm
Pu max = 2925 Kg
Vu max = 8006 Kg
Penulangan Tumpuan
d = 600 – 20 – 10 – (1/2 16 ) = 562 mm
Mu 82,78  10 3
K =   1,092 mpa  min = 0.0058
 .b.d 2 0.8  0.3  (0.562)2
As =  . b . d
= 0.0058 . 300 . 562 = 977,88 mm²
Dipakai 5 ø 16 = 1005,3 mm² > 977,88 mm² ok !

As’ = 0.4 x As = 0.4x 977,88 = 391,2 mm²


Dipakai 2 ø 16 = 402.2 mm² > 391,2 mm² ok !

Penulangan Lapangan
d = 600 – 20 – 10 – (1/2 16 ) = 562 mm
Mu 96,14  10 3
K =   1,268 mpa  min = 0.0058
 .b.d 2 0.8  0.3  (0.562) 2
As =  . b . d

_____________________________________________________________ 23
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
= 0.0058 . 300 . 562 = 977,88 mm²
Dipakai 5 ø 16 = 1005,3 mm² > 977,88 mm² ok !

As’ = 0.4 x As = 0.4x 977,88 = 391,2 mm²


Dipakai 2 ø 16 = 402.2 mm² > 391,2 mm² ok !
Gambar

2  16 5  16

 10 - 150  10 - 120
60 cm 60 cm
5  16 2  16

30 cm 30 cm
Lapangan Tumpuan

Gambar Potongan Memanjang

1/5 L
5  16 2  12 5  16

 10 - 150  10 - 120

2  16 3  12 2  16

_____________________________________________________________ 24
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
DESAIN PENULANGAN KOLOM

 Desain Kolom ujung member 1 dan 2 (30/45)


Data perencanaan :
Mutu fc’ = 20 Mpa
Fy = 240 Mpa
Dimensi = 30/45
Mu = 82,78 kNm
Nu = 9447 kg = 94,47 kNm
Dengan menggunakan persamaan diagram interaksi kolom maka :
 . Mn 0.65*82,78*106
 = 0,89
Ag . h (300 * 450) * 450
Dari diagram interaksi didapat rasio tulangan 1 %
 . Pn 0.65 *94,47 *103
 = 0,45
Ag (300 * 450)

As = 1 % * 300 * 450 = 1350 mm²


Dipakai 6 ø 16 + 1 ø 12 = 1407,4 > 1350 mm² ………… ok!

45 cm
1 12

30 cm 3  16
3  16

 8 - 120
1  12

_____________________________________________________________ 25
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PONDASI

Nodal 1 dan 3 (posisi ujung )


Dari hasil perhitungan Staad Pro
Diketahui sebagai berikut :
Pmax = 9447 Kg = 94,47 kN
Mumax = 8278 Kg = 82,78 kNm
Direncanakan ukuran plat pondasi 120 X 120 Cm2

P m
 Tanah  
A w
9447 8278
 
120 x120 1 (120 120 2 )
6
= 0,656  0.028
= 0,685< F tanah = 1.2 Kg/Cm2 Ok !!!
Perhitungan Penulangan Pondasi
Fc’ = 20 mpa
Fy = 240 mpa
 min  0.0058
 max  0.0363
Mu = 82,78 kNm
d = 200 – 30 – ½ Ø12
= 164 mm
Mu 82,78 .10 3
K =   3,85    0.0185
b . d 2 0.8.1. (0.164) 2

As =  . b . d  0.0185 .1000 .164 = 3034 mm2


Dipakai tulangan  16 Jarak 65 mm

Penutup digunakan As’ = 0.0020 b . h =0.0020 X 1000 X 200 = 400 mm2


Dipakai tulangan  8 Jarak 150 mm

_____________________________________________________________ 26
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar

30

2 Ø16 2 Ø16 Ø8 – 150 mm

20 cm
15 cm

120 Ø16– 65 mm

Ø16– 65 mm

30/45 120

120
Ø8 – 150 mm

_____________________________________________________________ 27
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang

Anda mungkin juga menyukai