Data perencanaan :
: 250
Jarak kuda-kuda :4m
Jarak gording : 1,1 m dan 1,2
Penutup atap : Asbes/Multyroof/Seng BWG
Perhitungan gording :
► Beban mati : 1.2 x 25 = 30,00 kg/m
► Beban : 150 x 50 x 20 x 3,2 = 6,76 kg/m +
q = 36,76 kg/m
Mx = 1/8 x 36,76 x cos 250 x 42
= 1/8 x 33,45 x 42 = 66,90 kgm
2
My = 1/8 x 36,76 x sin 250 x 4
= 1/8 x 15,44 x 42 = 30,88 kgm
_____________________________________________________________ 1
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Beban Hidup P = 100 kg
Mx = 1/4 . 100. cos 250 x 4
= 1/4 . 91 x 4 = 91 kgm
My = 1/4 . 100. sin 250 x 4
= 1/4 . 42 x 4 = 42 kgm
Kontrol Tegangan
Mx My
Wx Wy
15790 7288
37,4 8,19
400
F= 2 cm 1,851 cm .......... ok !
200 200
Jadi, Gording [ 150 × 50 × 20 × 3,2 Memenuhi !
_____________________________________________________________ 2
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Perhitungan beban kuda-kuda
P1 = 100 + 4 x 1,1 x 36,76 = 261,74 kg
P2 = 100 + 4 x 0,55 x 36,76 = 180,87 kg
P3 = 1 x 11 x 4 = 44,00 kg
P4 = 0,5 x 11 x 4 = 22,00 kg
Berat sendiri kuda-kuda WF 152 = panjang total kuda-kuda x (2 x 6,91)
= 23 x 23,07 kg/m
= 530,61
530,61
Beban yang diterima tiap titik buhul = = 33,16 kg
16
Beban yang diterima tiap titik buhul
AKIBAT BEBAN MATI P1 = (261,74 + 33,16) - 100 = 376,33 kg
P2 = (180,87 + 33,16) - 100 = 241,4 kg
P3 = 44,00 kg
P4 = 22,00 kg
_____________________________________________________________ 3
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PEMBEBANAN AKIBAT ANGIN
Beban angin :
Angin kiri
- Tekanan angin = 25 kg/m2
- Tekanan dipihak angin = ( : 250) = 0,02 - 0,4 = 0,1
- Beban Angin = 0,1 x 25 x 4 x 1,1 = 11,00 kg
Angin belakang / hisap
- Beban Angin = -0,4 x 25 x 4 x 1,1 = -44,00 kg
P1 Tekan = 11,00 kg
P1 Hisap = - 44,00 kg
► Angin posisi Tekan
_____________________________________________________________ 4
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PLAT LANTAI
Data Perencanaan :
Mutu beton fc’ = 20 Mpa
Mutu baja fy = 240 Mpa
Tebal plat atap = 12 cm
Bentuk plat yang dihitung untuk mewakili perhitungan penulangan plat lantai
sebagai berikut :
ly = 4,5 m
lx = 4 m
Perhitungan plat A
ly 4,5
1,12 5 < 2 plat 2 arah
lx 4
Pembebanan plat atap
Beban mati
Berat sendiri plat = 0.12 x 2300 = 276 kg/m²
Berat sendiri tegel+spesi = 0.05 x 2000 = 100 kg/m²
Berat sendiri pasir urug = 0.05 x 1600 = 80 kg/m² +
WDL = 456 kg/m²
Beban hidup
Beban guna WLL = 200 kg/m²
_____________________________________________________________ 5
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
WUL = 1.2 . WDL + 1.6 WLL
= 1.2 . 456 + 1.6 . 200 = 867,2 kg/m²
Sehingga digunakan persamaan momen M = 0.001 . q . lx². X
Mlx = 0.001 (867,2) . 4². 42 = 582,76 kg/m
Mly = 0.001 (867,2) . 4². 37 = 513,38 kg/m
Mtx = 0.001 (867,2) . 4². 42 = - 582,76 kg/m
Mty = 0.001 (867,2) . 4². 37 = - 513,38 kg/m
Direncanakan tulangan utama ø 10 mm selimut beton 20 mm
d = 120 – 20 - ½.10 = 95 mm
Penulangan lapangan arah x
Mu = 582,76 kgm = 5,83 KNm
min = 0.0058
max= 0.0323
Mu 5,83 10 3
K = 0,807 min 0.0058
.b.d 2 0.8 1 (95) 2
As = .b.d
= 0.0058 . 1000 . 95 = 551 mm²
Dipakai ø 10 – 125 mm
Karena momen lapangan arah x lebih besar dari arah y maka, penulangan
arah y disamakan dengan arah x
Penulangan tumpuan x = tumpuan y
Mu = 582,76 kgm = 5,83 KNm
min = 0.0058
max = 0.0323
K = 0,807 min 0.0058
As = 551 mm²
Dipakai ø 10 – 125 mm
_____________________________________________________________ 6
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar penulangan Plat A
1/5 L ø 10 – 125 mm
ly = 4,5 m ø 10 – 125 mm
lx = 4 m
_____________________________________________________________ 7
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Perhitungan plat B
ly = 8,5 m
lx = 4 m
ly 8,5
2,125 > 2 plat 1 arah
lx 4
Namun di sini didesain menggunakan plat 2 arah
Pembebanan plat atap
Beban mati
Berat sendiri plat = 0.12 x 2300 = 276 kg/m²
Berat sendiri tegel+spesi = 0.05 x 2000 = 100 kg/m²
Berat sendiri pasir urug = 0.05 x 1600 = 80 kg/m² +
WDL = 456 kg/m²
Beban hidup
Beban guna WLL = 200 kg/m²
Mu 8,60 103
K = 1,19 min 0.0058
.b.d 2 0.8 1 (95) 2
As = .b.d
= 0.0058 . 1000 . 95 = 551 mm²
Dipakai ø 10 – 125 mm
Karena momen lapangan arah x lebih besar dari arah y maka, penulangan
arah y disamakan dengan arah x
Penulangan tumpuan x = tumpuan y
Mu = 860,26 kgm = 8,60 KNm
min = 0.0058
max = 0.0323
K = 1,19 min 0.0058
As = 551 mm²
Dipakai ø 10 – 125 mm
_____________________________________________________________ 9
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar penulangan Plat B
1/5 L ø 10 – 125 mm
ly = 8,5 m ø 10 – 125 mm
lx = 4 m
_____________________________________________________________ 10
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PORTAL I
RA RB
q1 q1 q2
4m
20/30 20/30 20/30 20/30
4m 4m 4,5 m
Gambar Portal 1
_____________________________________________________________ 11
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
DESAIN PENULANGAN BALOK
Penulangan Lapangan
d = 350 – 20 – 10 – (1/2 12 ) = 314 mm
Mu 17,31 103
K = 1,097 mpa min = 0.0058
.b.d 2 0.8 0.2 (0.314)2
As = min. b . d
2 12 5 12
8 - 150 8 - 120
35 cm 35 cm
4 12 2 12
20 cm 20 cm
Lapangan Tumpuan
1/4 L
5 12 2 12 5 12
8 - 150 8 - 120
2 12 4 12 2 12
_____________________________________________________________ 13
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Desain balok untuk Beam 7
Data perencanaan :
Dimensi = 20/40
Bentang = 4,5 m
Mutu fc’ = 20 Mpa
Fy = 240 Mpa
Mu max tumpuan = 38,00 KNm
Mu max lapangan = 24,65 KNm
Pu max = 749 Kg
Vu max = 5179 Kg
Penulangan Tumpuan
d = 400– 20 – 10 – (1/2 12 ) = 364 mm
Mu 38 103
K = 1,793mpa = 0.0080
.b.d 2 0.8 0.2 (0.364)2
As = . b . d
= 0.0080 . 200 . 364 = 582,4 mm²
Dipakai 6 ø 12 = 678,6 mm² > 582,4 mm² ok !
Penulangan Lapangan
d = 400– 20 – 10 – (1/2 12 ) = 364 mm
Mu 24,65 103
K = 1,163 mpa min = 0.0058
.b.d 2 0.8 0.2 (0.364)2
As = . b . d
= 0.0058. 200 . 364 = 422,24 mm²
Dipakai 4 ø 12 = 452,4 mm² > 422,24mm² ok !
Gambar
_____________________________________________________________
2 12 6 12 14
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
8 - 150 8 - 120
40 cm 40 cm
4 12 3 12
20 cm 20 cm
Lapangan Tumpuan
1/5 L
6 12 2 12 6 12
8 - 150 8 - 120
3 12 4 12 3 12
_____________________________________________________________ 15
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
DESAIN PENULANGAN KOLOM
30 cm
20 cm 3 12
3 12
8 - 120
_____________________________________________________________ 16
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Desain Kolom tengah member 2 dan 3 (20/30)
Data perencanaan :
Mutu fc’ = 20 Mpa
Fy = 240 Mpa
Dimensi = 20/30
Mu = 6,30 kNm
Nu = 9179 kg = 91,79 kNm
Dengan menggunakan persamaan diagram interaksi kolom maka :
. Mn 0.65* 6,30 *106
= 0,23
Ag . h (200 * 300) * 300
Dari diagram interaksi didapat rasio tulangan 1 %
. Pn 0.65 *91,79 *103
= 0,99
Ag (200 * 300)
30 cm
20 cm 3 12
3 12
8 - 120
_____________________________________________________________ 17
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PONDASI
P m
Tanah
A w
4968 3800
100 x100 1 (100 1002 )
6
= 0,497 0.023
= 0,52 < F tanah = 1.2 Kg/Cm2 Ok !!!
Perhitungan Penulangan Pondasi
Fc’ = 20 mpa
Fy = 240 mpa
min 0.0058
max 0.0323
Mu = 38 kNm
d = 200 – 30 – ½ Ø12
= 164 mm
Mu 38.103
K = 1,766 0.0078
b . d 2 0.8.1. (0.164) 2
_____________________________________________________________ 18
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar
30
20 cm
15 cm
100 Ø12– 90 mm
Ø12– 90 mm
20/30 100
100
Ø8 – 150 mm
_____________________________________________________________ 19
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Perhitungan PondasiNodal 3 dan 5 (posisi tengah )
Dari hasil perhitungan Staad Pro
Diketahui sebagai berikut :
Pmax = 9179 Kg = 91,79 kN
Mumax = 630 Kg = 6,30 kNm
Direncanakan ukuran plat pondasi 100 X 100 Cm2
P m
Tanah
A w
9179 630
100 x100 1 (100 1002 )
6
= 0,9179 0.0378
= 0,92 < F tanah = 1.2 Kg/Cm2 Ok !!!
Perhitungan Penulangan Pondasi
Fc’ = 20 mpa
Fy = 240 mpa
min 0.0058
max 0.0363
Mu = 6,30 kNm
d = 200 – 30 – ½ Ø12
= 164 mm
Mu 6,30 .103
K = 0,293 min 0.0058
b . d 2 0.8 .1. (0.164) 2
_____________________________________________________________ 20
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar
30
20 cm
15 cm
Ø12– 100 mm
20/30 100
100
Ø8 – 100 mm
_____________________________________________________________ 21
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PORTAL II
RA
q1
30/60
4m
30/50 30/50
8. 5 m
Gambar Portal 2
_____________________________________________________________ 22
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
DESAIN PENULANGAN BALOK
Penulangan Lapangan
d = 600 – 20 – 10 – (1/2 16 ) = 562 mm
Mu 96,14 10 3
K = 1,268 mpa min = 0.0058
.b.d 2 0.8 0.3 (0.562) 2
As = . b . d
_____________________________________________________________ 23
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
= 0.0058 . 300 . 562 = 977,88 mm²
Dipakai 5 ø 16 = 1005,3 mm² > 977,88 mm² ok !
2 16 5 16
10 - 150 10 - 120
60 cm 60 cm
5 16 2 16
30 cm 30 cm
Lapangan Tumpuan
1/5 L
5 16 2 12 5 16
10 - 150 10 - 120
2 16 3 12 2 16
_____________________________________________________________ 24
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
DESAIN PENULANGAN KOLOM
45 cm
1 12
30 cm 3 16
3 16
8 - 120
1 12
_____________________________________________________________ 25
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
PERHITUNGAN PONDASI
P m
Tanah
A w
9447 8278
120 x120 1 (120 120 2 )
6
= 0,656 0.028
= 0,685< F tanah = 1.2 Kg/Cm2 Ok !!!
Perhitungan Penulangan Pondasi
Fc’ = 20 mpa
Fy = 240 mpa
min 0.0058
max 0.0363
Mu = 82,78 kNm
d = 200 – 30 – ½ Ø12
= 164 mm
Mu 82,78 .10 3
K = 3,85 0.0185
b . d 2 0.8.1. (0.164) 2
_____________________________________________________________ 26
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang
Gambar
30
20 cm
15 cm
120 Ø16– 65 mm
Ø16– 65 mm
30/45 120
120
Ø8 – 150 mm
_____________________________________________________________ 27
Syukri Gozali Fakaubun
Teknik Sipil Universitas Widyagama Malang