1. Menghitung ukuran pelimpah sabo dam

Qd = 100.0 m3/dt (debit aliran debris 50 tahunan berdasarkan analisa hidrologi)

A = 50.0 km2 (luas daerah aliran sungai )

c = koefisien daerah aliran sungai untuk aliran debris


A c
0.1 1.0 3.0
1.0 10.0 4.0
10.0 100.0 5.0
100.0 500.0 6.0
A : Luas daerah alilran sungai km2

B = lebar dasar pelimpah


= c.Qd = 5.0 x 10.0 = 50.0 m

Jika z = 0.5 , maka hw dihitung dengan rumus Q = (1,77.B + 0.71 hw ) hw3/2

trial & error hw = 1.08 m, sampai Q = (1,77.B + 0.71 hw ) hw3/2 = 100.0 m3/dt = Qd

Jika z = 1.0 , maka hw dihitung dengan rumus Q = (1,77.B + 1.42 hw ) hw3/2

trial & error hw = 1.07 m, sampai Q = (1,77.B + 1.42 hw ) hw3/2 = 100.0 m3/dt = Qd
hf = tinggi jagaan (m)

hf berdasarkan is hf berdasarkan Qd
is hf /hw Qd hf Qd = 100.0 m3/dt < 200.0
< 1/10 0.50 < 200 0.6 hf = 0.6 m
1/10 1/30 0.40 200 500 0.8
1/30 1/50 0.35 > 500 1.0
1/50 1/70 0.25 Qd : debit aliran debris (m3/dt)

1/70 1/100 0.20


1/100 1/200 0.10
is : kemiringan dasar sungai rata rata
2. Menghitung Daya Tampung Sabo Dam

h = tinggi efektif sabo dam = 16.0 m

B = lebar rata-rata dasar sungai = 50.0 m


is = kemiringan dasar sungai = 0.050
Vd = daya tampung mati (dead storage)
= 1,5 (0,40. is. h2.B) = 384.0 m3
total daya tampung = 1,027.2 m3
Vc = daya tampung terkendali (control volume)
= 1,5 (0,67. is. h2.B) = 643.2 m3

3. Menghitung kemiringan hilir sabo dam (n)

Berdasarkan pengalaman di daerah G.Merapi, kecepatan lahar dingin 5 s/d 10 km/jam

Ud = kecepatan aliran debris = 2.8 m/dt

g = gaya gravitasi = 9,800.0 m/dt2

H = tinggi sabo dam = 20.0 m

n = kemiringan hilir sabo dam

l 2
=
H
= Ud g
H =

2
= 2.8 9,800.0
20.0 = 0.20

4. Menghitung kemiringan hulu sabo dam (m)

Dalam keadaan banjir Dalam keadaan normal

n = kemiringan hilir sabo dam = 0.20

b = lebar puncak sabo dam = 4.0 m

H = tinggi sabo dam = 20.0 m


he = tinggi endapan sedimen = 9.0 m
Ce = koefisien tekanan tanah/sedimen = 0.40
Cm = koefisien tekanan air dinamis
Hubungan Cm dan (sudut kemiringan hilir Sabo Dam)
30o 35o 40o 50o 60o 70o
Cm 0.54 0.50 0.45 0.38 0.30 0.20

Hubungan Cm dan (sudut kemiringan hilir Sabo Dam)

m 0.60 0.65 0.70 0.75 0.80 0.85 0.90


31 33 o
35 o
37 o
39o 40o 42o
sec 1.16 1.19 1.22 1.25 1.29 1.30 1.34

P = porositas tanah = 0.3

' = berat jenis sedimen kering = 1.8 t/m3


e = berat jenis sedimen dalam air = ' (1 P) w = 1.1 t/m3
w = berat jenis air = 1.0 t/m3
hw = tinggi muka air di pelimpah = 1.1 m

= koefisien gaya angkat air = 0.3

= koefisien gempa = 0.12


c = berat jenis material sabo dam/pasangan batu/beton = 2.4 t/m3
fe = koefisien geser dalam material sabo dam/pasangan batu/beton = 0.8
fr = koefisien geser dalam lapisan tanah pondasi = 0.7
c = tekanan kompresi material sabo dam/pasangan batu/beton yang diijinkan = 400.0 t/m2
c = tensil material sabo dam/pasangan batu/beton yang diijinkan = 10.0 t/m2
Sc = tegangan geser material sabo dam/pasangan batu/beton yang diijinkan = 50.0 t/m2
r = daya dukung tanah pondasi yang diijinkan = 200.0 t/m2
Sr = tegangan geser lapisan tanah pondasi = 50.0 t/m2

= hw / H = 0.1

= b/ H = 0.2

= c / w = 2.4

= e / w = 1.1

= he / H = 0.5

Dalam keadaan banjir ( = 0)


{(1 + )(1 ) + (2 2
)}m
3 2 + [ 2 (n + ){1 + 2 (1 + )} + n (4 + ) + 2]m
(1 + 3) (1 + ) (n + )2 Ce 3+ (2n + ) + (3n + 2 + n2 ) = 0

1.05 m2 + 1.26 m -0.78 = 0.00 m = 0.45 ( trial & error m sampai diperoleh = 0.00 )

= 0.50

Dalam keadaan Normal ( hw = 0 )


{(1 ) + (2 2
)} m
3 2 + [ 2 (n + )(1 + 2 ) + (n - )]m
1 + ( n + )2 Ce 3+ (n + 3) (7/5) + (3n + 2 + n2 ) = 0

1.05 m2 + 0.93 m -1.54 = 0.00 m = 0.85 ( trial & error m sampai diperoleh = 0.00 )

= 0.80
3. Menghitung Stabilitas Sabo Dam

Gaya-gaya yang bekerja pada sabo dam

Dalam keadaan banjir : DalamDalam


keadaan
keadaan
normal
normal
: :

Gaya Vertikal

Dalam keadaan banjir


GAYA VERTIKAL JARAK KE PUSAT MOMEN MOMEN
W1 = 1/2.w.n.H2. = 94.0 1/3.H (3m + 3 + n) = 21.3 2,005.3
W2 = w.H2.. = 188.0 1/2.H (2m + ) = 18.0 3,384.0
W3 = 1/2.w.m.H2. = 376.0 2/3.m.H = 10.7 4,010.7
Vw1 = 1/2.w.m.H 2
= 160.0 1/3.m.H {(1 + 3)/(1 + 3)} = 5.3 853.3
Vw2 = w.H2. (m + ) = 21.6 1/2.H (2m + ) = 10.0 215.8
Pev = 1/2.w.m.H2.e.2 = 35.6 1/3.H. = 3.0 106.9
U1 = 1/2.w.H2. (m + n + )(1 + ) = 75.9 1/3.H (n + + m) = 8.0 607.1
V1 = 951.1 My1 11,183.1

Dalam keadaan Normal


GAYA VERTIKAL JARAK KE PUSAT MOMEN MOMEN
W1 = 1/2.w.n.H2. = 94.0 1/3.H (3m + 3 + n) = 21.3 2,005.3
W2 = w.H2.. = 188.0 1/2.H (2m + ) = 18.0 3,384.0
W3 = 1/2.w.m.H2. = 376.0 2/3.m.H = 10.7 4,010.7
Vw1 = 1/2.w.m.H 2
= 160.0 1/3.m.H{(1+ 3)/(1 + 3)} = 5.3 853.3
Pev = 1/2.w.m.H2.e.2 = 35.6 1/3.H. = 3.0 106.9
U2 = 1/2.w.H2. (m + n + ) = 72.0 1/3.H (n + + m) = 8.0
V2 = 925.6 My2 10,360.3

Gaya Horisontal

Dalam keadaan banjir


GAYA HORISONTAL JARAK KE PUSAT MOMEN MOMEN
H1 = 1/2.w.n.H ..
2
= 11.3 1/3.H = 6.67 75.2
H2 = w.H2... = 22.6 1/2.H = 10.00 225.6
H3 = 1/2.w.m.H2.. = 45.1 1/3.H = 6.67 300.8
Hw1 = 1/2.w.m.H2 (1 + ) = 168.6 1/3.H (1 + ) = 7.03 1,184.9
= 1/2.w.m.H .e. .Ce 1/3.H.
2 2
Peh = 14.3 = 3.00 42.8
H1 = 261.8 MX1 1,829.2
Dalam keadaan Normal
GAYA HORISONTAL JARAK KE PUSAT MOMEN MOMEN
H1 = 1/2.w.n.H2.. = 11.3 1/3.H = 6.67 75.2
H2 = w.H2... = 22.6 1/2.H = 10.00 225.6
H3 = 1/2.w.m.H2.. = 45.1 1/3.H = 6.67 300.8
Hw2 = 1/2.w.m.H 2
= 160.0 1/3.H {(1 + )/(1 + )} = 6.67 1,066.7
= 1/2.w.m.H .e. .Ce 1/3.H.
2 2
Peh = 14.3 = 3.00 42.8
Pd = 1/2.w.H2..Cm.n.sec = 2.79 1/3.H {(1 + )/(1 + )} = 6.67 18.6
H2 = 256.0 MX2 1,729.6

Stabilitas terhadap guling


1/3. L < X < 2/3. L
L = n.H + b + m.H
Mx + My
X =
V
L = 24.0
1/3. L = 8.0
2/3. L = 16.0

Dalam keadaan banjir


1829.2 + 11183.1
X = = 13.7 m
951.1

Dalam keadaan normal


1729.6 + 10360.3
X = = 13.1 m
925.6

Stabilitas terhadap geser


fr.V + Sr.L
N <
H
N = 4.0 untuk H > 15 m
N = 2.0 untuk H < 15 m
Dalam keadaan banjir
665.8 + 1200.0
N = = 7.1 > 4.0
261.8

Dalam keadaan normal


647.9 + 1,200.0
N = = 7.2 > 4.0
256.00

Stabilitas terhadap kompresi dan daya dukung tanah pondasi


- Aman terhadap kompresi hilir
< c

- Aman terhadap daya kukung hilir


< r

V 6.e
hilir
=
L
x (1 + L
)
V 6.e
hulu
=
L
x (1 L
)
e = X 1/2.L
Dalam keadaan banjir
e = 1.7 m
951.10 6 x 1.7
hilir
=
24.0
x (1 +
24.0
) = 56.3 t/m2 < 200.0 t/m2 < 400.0 t/m2

951.10 6 x 1.7
hulu
=
24.0
x (1
24.0
) = 23.0 t/m2

Dalam keadaan normal


e = 1.7 m
925.64 6 x 1.7
hilir
=
24.0
x (1 +
24.0
) = 54.8 t/m2 < 200.0 t/m2 < 400.0 t/m2

925.64 6 x 1.7
hulu
=
24.0
x (1
24.0
) = 22.4 t/m2

Menghitung tinggi dan tebal sayap sabo dam

Ud = kecepatan aliran debris = 277.8 cm/dt


mb = masa batu batu aliran debris = 2,650.0 kg.cm/dt 2
nb = koefisien masa batu batu aliran debris = 1/mb = 0.0004
a = hollow length sabo dam
5.Ud2
{ } { }
0.4 5.0 x 77,160.5 0
= 0,4 = = 98.6
4.nb.mb 4 x 0.00038 x 2,650.0
Pe = daya benturan efektif
= a2/3.nb = 1.22
b = tebal sayap = 4.00 m
h = tinggi sayap dihitung dari dasar pelimpah (h > 5 m)
= hw + hf = 1.08 + 0.60 = 1.68 m
Re = daya tahan terhadap benturan efektif
= 0,5.b.h = 0.50 x 4.00 x 1.68 = 3.36
Fe = faktor keamanan terhadap benturan (Fs > 1.25)
Re 3.36
= = = 2.75
Pe 1.22
Menghitung panjang dan tebal apron sabo dam

hw = tinggi muka air di pelimpah = 1.1 m


h' = tinggi muka air di pelimpah = 16.0 m

n = kemiringan hilir sabo dam = 0.20


L = panjang apron
L = 1,5 (h' + hw) - n.h' , untuk sabo dam tinggi H 15 m.
= 22.4 m
L = 2,0 (h' + hw) n.h' , untuk sabo dam tinggi H < 15 m.
d = tebal apron
d = 0.2 {0,6 (h' + hw) + 3 hw 1,0 }
= 2.5 m

Menghitung tinggi overlaping subdam

hw = tinggi muka air di pelimpah = 1.1 m


h' = tinggi muka air di pelimpah = 16.0 m
Ds = tinggi overlaping subdam
1/6 (h' + hw) + hw = 4.0 m

Mengestimasi kedalaman subdam

D = kedalaman gerusan (scouring) = 2 - 3 m (menurut DR.KAKI)


= kedalaman gerusan (scouring) = 6 - 8 m (di beberapa sabo dam setelah letusan G. Merapi 2010I)