14.

BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI


No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

A. HARGA SATUAN BAHAN / MATERIAL


1 Batu
1 Batu belah / batu kali M01 /m3 476.443
2 Batu pecah /mesin : 0 2/3 cm M02 /m3 521.446
M03 /kg 385
3 Batu pecah /mesin : 0 1/2 cm M04 /m3 518.510
4 Sirtu M05 /m3 352.196
5 Abu Batu M06 /m3 469.595
6 Batu Gunung /Quary M07 /m3 445.137
7 Batu Kapur M08 /m3 322.846
8 Batu Bata : Klas 1 M13 /bh 1.028
9 Bata Ringan : setara Hebel M14 /m3 1.467.484
10 Batu bata : Oven ( Klinker ) M15 /bh 2.837
2 Pasir
1 Pasir Pasang/tras M09 /m3 504.814
2 Pasir Beton M10 /m3 542.970
M11 /kg 388
3 Pasir Urug M12 /m3 293.497
3 Roster
1 Roster beton : 20 x 20 M16 /bh 29.350
2 Roster beton : 30 x 30 M17 /bh 35.708
3 Roster Tanah liat M18 /bh 19.566
4 Roster Kayu kamper M19 /bh 78.266
4 Inter block (paving block) :
1 Paving block ukuran : 6x10x20 M20 /m2 146.747
2 Paving block ukuran : 8 x 10 x 20 M21 /m2 166.315
3 Inter block abu - abu : 4,8 - 44/m2 M22 /m2 173.253
4 Inter block ( merah, hitam ) : 4,6 - 44/m2 M23 /m2 219.787
5 Portland Cement
1 Semen portland : 50 kg M24 /zak 136.966
2 Semen portland M25 /kg 2.739
3 Semen Putih/Warna : 20 kg M26 /zak 117.888
4 Semen putih/warna Pasang lantai/dinding (40 kg) M27 /kg 5.869
5 Semen Mortar MU 380 : 40 kg M28 /zak 281.268
6 Semen Mortar MU 301 : 40 kg M29 /zak 295.943
7 Semen Mortar MU 200 : 40 kg M30 /zak 310.618
6 Kayu
1 Kamper Samarinda : papan (oven) M31 /m3 18.588.124
: balok (oven) M32 /m3 17.609.801
2 Kayu Singkil : papan M33 /m3 13.696.512
: balok M34 /m3 13.500.847
3 Kamper Medan : papan M35 /m3 9.587.559
: balok M36 /m3 9.391.894
4 Kayu Meranti : papan M37 /m3 6.481.385
: balok M38 /m3 6.391.706
5 Kayu Borneo Super : papan M39 /m3 6.261.263
: balok M40 /m3 6.163.430
6 Kayu Terentang : papan M41 /m3 5.282.940

14-1
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

: Balok M42 /m3 5.282.940


7 Kayu Albasia M43 /m3 4.695.947
8 Kayu Perancah M44 /m3 4.695.947
9 Kayu dolken Ø 8-10/400 cm M45 /btg 48.915
7 Besi dan Kawat Beton
1 Harga rata-rata U.24 M46 /kg 19.566
2 Harga rata-rata U.39 M47 /kg 19.176
3 Jenis Kawat 0
Kawat Pengikat/Kawat beton M48 /kg 32.284
Kawat berduri/1gulung : 50 m' M49 /kg 35.220
Kawat kassa M50 /m2 30.817
Kawat burung M51 /m2 30.817
Ram kawat M52 /m2 30.817
Besi Siku rata-rata M53 /kg 22.697
Besi Plat 4' x 8' M54 /kg 22.697
Harga besi plat rata2 M55 /kg 22.697
Harga rata-rata plat lipet chanal M56 /kg 22.697
Harga rata-rata IWF ex DN SII M57 /kg 22.697
Harga rata-rata IWF ex Jepang M58 /kg 22.697
4 Besi beton rata-rata M59 /kg 19.566
Besi stainless dia. 2" M60 /m' 577.210
Besi stainless dia. 1.5" M61 /m' 344.370
5 Pipa besi galvanize 1/2" M62 /m' 40.112
Pipa besi galvanize 3/4" M63 /m' 49.896
Pipa besi galvanize 1" M64 /m' 73.374
Pipa besi galvanize 1.5" M65 /m' 103.701
Pipa besi galvanize 3" M66 /m' 130.116
Pipa besi galvanize 4" M67 /m' 227.949
6 Besi Hollow 40 x 40 x 400mm M70 /m' 42.558
20 x 40 x 400mm M71 /m' 33.262
7 Pipa GIP 1,5" M72 /m' 128.160
8 C75.75 M73 /m' 33.019
9 Reng 33.045 M74 /m' 15.703
10 Skrup Truss M75 /bh 286
11 Skrup Reng M76 /bh 226
8 Bahan Atap
1 Asbes plat datar : Uk. 14mm x 100 x 100 M77 /lbr 58.699
: Uk 100 x 200 x 14 M78 /lbr 115.442
2 Bahan atap Seng Gelombang : BJLS 28 M79 /lbr 88.049
0.2/2.5/6/BDR 9 M80 /lbr 129.138
0.3 BWG 32 M81 /lbr 48.915
3 Seng plat 3' x 6' bjls 28 M82 /lbr 82.433
BJLS 30 I=60 Cm M83 /lbr 76.308
BJLS 30 I=90 Cm M84 /lbr 146.747
4 Asbes Gelombang : ( 105 x 300 x 0,4 ) M85 /lbr 181.968
: ( 105 x 270 x 0,4 ) M86 /lbr 156.859
: ( 105 x 240 x 0,4 ) M87 /lbr 131.747
: ( 105 x 210 x 0,4 ) M88 /lbr 111.528
: ( 105 x 150 x 0,4 ) M89 /lbr 84.135
5 Asbes Gelombang kecil : ( 92 x 180 x 0,5 ) M90 /lbr 90.005

14-2
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

: ( 92 x 250 x 0,5 ) M91 /lbr 125.225


: ( 92 x 225 x 0,5 ) M92 /lbr 107.616
: ( 92 x 200 x 0,5 ) M93 /lbr 91.963
6 Bubungan paten asbes gelombang : 92 M94 /lbr 101.745
: 105 M95 /lbr 124.247
: 108 M96 /lbr 136.966
7 Plastik/ Fiber 68.088
-warna putih M94 /m2 91.963
-fiber glass M95 /m2 72.396
9 Bahan-bahan penutup atap
1 -Genteng beton Natural 14.5 /m2 /Buah M97 /bh 5.869
2 -Nok genteng beton Natural 14.5 / m2 /Buah M98 /bh 7.827
3 -Genteng keramik Glasur Standard 14.5 /m2 M99 /bh 7.827
4 -Nok genteng keramik M100 /bh 15.653
5 -Atap sirap M101 /m2 352.196
6 -Penutup atap genting metal M102 /m2 247.516
7 -Atap Metal roof : 0.35 mm M103 /m2 236.754
: 0.3 mm M104 /m2 211.317
8 -Onduline uk. 95 x 200 cm M105 /m2 136.966
9 -Nok Metal Roof (panjang 120 cm) M106 /bh 107.851
10 -Genteng Morando Natural 1m2=20Bh /buah M107 /bh 5.478
11 -Genteng Morando Glasur 1m2=20Bh /buah M108 /bh 7.239
12 -Atap Genteng Plentong ex Bakar M109 /bh 2.837
13 -Atap Genteng Plentong Pres Oven M110 /bh 4.375
14 -Genteng plentong press Ex Jatiwangi Berglazur M111 /bh 3.130
15 -Bubungan Ex Jatiwangi M112 /bh 7.338
16 -Bubungan Ex Jatiwangi Berglazur M113 /bh 20.667
17 -Genteng pinggir penutup lisplank morando ex jatiwangi M114 /bh 7.827
18 - Alumunium Foil M115 /m2 12.738
19 -Atap Alumunium USR 26 M116 /m2 176.685
20 -Nok Alumunium M117 /m2 143.813
21 Atap Onduvilla M118 /lbr 88.049
22 Skrup Atap Onduvilla M119 /lbr 156.531
23 Nok Atap Onduvilla M120 /bh 2.446
10 Plat Alumunium
1 Plat alumunium tebal= 2mm M121 /m2 271.519
2 Plat alumunium tebal= 3mm M122 /m2 351.438
3 Kusen pintu/jendela 3" M123 /m' 367.196
4 Karet pelapis M124 /m' 10.762
5 Alumunium lapis pintu KM M125 /lbr 111.528
6 Formika M126 /lbr 129.289
11 Paku
1 Paku Medan : 3 - 5 mm M127 /kg 37.177
2 Paku Gypsum M128 /kg 43.046
3 Paku Triplek/eternit M129 /kg 43.046
4 Paku kaca M130 /kg 43.046
5 Paku sekrup M131 /kg 68.482
6 Ramset/dinabolt M132 /bh 3.912
12 Ijuk
1 Ijuk Per Kg M133 /kg 19.566

14-3
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

2 Ijuk Per Ikat M134 /ikat 19.566


13 Kramik
1 Kramik Warna Putih
Kramik sekualitas (KW1) : 10 x 20 cm Standard M135 /m2 103.176
Kramik sekualitas (KW1) : 20 x20 cm Standard M136 /m2 93.920
Kramik sekualitas (KW1) : 30 x30 cm Standard M137 /m2 85.114
Kramik sekualitas (KW1) : 40 x40 cm Standard M138 /m2 98.485
2 Kramik Berwarna / Anti Slip
Kramik dinding KM KW1 : 20 x 20 cm Standar M139 /m2 107.616
Keramik lantai KM KW1 : 20 x20 cm Standar M140 /m2 97.832
Keramik lantai KW1 warna : 30 x30 cm Standar M141 /m2 103.701
Keramik dinding KM KW1 : 20 x25 cm Standar M142 /m2 107.616
Keramik Step nozing : 10 x30 cm Standar M143 /bh 30.002
Keramik Border Artistik : 10 x20 cm M144 /bh 19.127
Keramik Border Artistik ` : 10 x10 cm M145 /bh 17.567
Keramik Border Artistik : 5 x20 cm M146 /bh 16.025
14 Granit
1 Granit tile Uk. 30x30 Polished M147 /m2 383.221
2 Granit tile Uk. 40x40 Polished M148 /m2 477.357
3 Granit tile Uk. 40x40 Un Polished M149 /m2 275.402
4 Granit tile Uk. 60x60 Polished M150 /m2 587.272
5 Granit tile Uk. 60x60 Un Polished M151 /m2 330.483
6 Plint Granito 10 x 40 M152 /bh 51.198
7 Plint Granito 10 x 30 M153 /bh 44.726
8 Bata Karawang (KW 1) M154 /m2 1.849
9 Batu Candi M155 /m2 215.720
10 Granit tile Uk. 80x80 Polished M156 /m2 723.959
11 Granit tile Uk. 80x80 Un Polished M157 /m2 430.462
15 Bahan Loteng/Plafond
1 Triplek
2 -Uk. 1.2x2.4x3mm M158 /lbr 101.500
3 -Uk. 1.2x2.4x4mm M159 /lbr 124.247
4 -Uk. 1.2x2.4x6mm M160 /lbr 150.907
5 -Uk. 1.2x2.4x9 mm M161 /lbr 230.884
6 Teak wood Uk. 1,2 x 2,4 x 4 mm M162 /lbr 215.230
7 Teakwood untuk pintu Uk. 90 x220 x 4 mm M163 /lbr 151.640
8 Enternit type 1 M164 /lbr 29.350
type 2 M165 /lbr 58.699
9 Multiplek uk. 9 mm 120 x 240 M166 /lbr 241.646
uk. 12 mm 120 x 240 M167 /lbr 310.128
uk. 15 mm 120 x 240 M168 /lbr 406.004
`10 Gypsum
11 Gypsum 120 x 240 t = 9 mm ex DN M169 /lbr 130.116
12 Gypsum 120 x 240 t = 9 mm ex Luar M170 /lbr 144.791
13 Gypsum tape M171 /roll 19.566
14 Compound M172 /zak 119.356
15 List Profil Gypsum M173 /m' 28.862
16 GRC Board
17 GRC Board Uk. 2,4m'x 1.2m'x 4mm M174 /lbr 127.182
18 Lysplank GRC Board Uk. 2,4m'x 0.2m'x 9mm M175 /m' 39.134

14-4
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

19 Lysplank GRC Board Uk. 2,4m'x 0.1m'x 9mm M176 /m' 24.458
20 Paku Sekrup khusus (1box = 1000 bh) M177 /box 169.250
21 Asbes
22 Asbes 1 m' x 1 m' 6 mm M178 /lbr 43.246
23 Asbes 1 m' x 1 m' 5 mm M179 /lbr 43.246
24 Asbes 1 m' x 1 m' 4 mm M180 /lbr 43.046
25 Asbes 1 m' x 1 m' 3.5 mm M181 /lbr 27.304
26 Furniture Laminate (HPL) uk. 1,2 x 2,4 m M182 /m2 78.266
27 Acoustic 30 x 30 M183 /lbr 111.291
28 Acoustic 30 x 60 M184 /lbr 121.195
29 Acoustic 60 x 120 M185 /lbr 148.395
30 Shunda Plafond M186 /lbr 148.395
31 List profil kayu M187 /m' 37.339
32 profil kayu M188 /m' 30.817
16 Kran
1 Kran lokal Kuningan : 0 1/2 inc M189 /bh 58.699
2 Kran lokal Kuningan : 0 3/4 inc M190 /bh 75.820
3 Kran Ex luar : 0 1/2 inc M191 /bh 78.266
4 Kran Ex luar : 0 3/4 inc M192 /bh 78.266
5 Jet washer M193 /bh 708.541
17 Pipa Paralon
1 Pipa PVC (AW) : 0 1/2" - 4 m M194 /btg 36.362
2 Pipa PVC (AW) : 0 3/4" - 4 m M195 /btg 46.569
3 Pipa PVC (AW) : 0 1" - 4 m M196 /btg 66.036
4 Pipa PVC (AW) : 0 1,5" - 4 m M197 /btg 113.975
5 Pipa PVC (AW) : 0 2" - 4 m M198 /btg 126.008
6 Pipa PVC (AW) : 0 2,5" - 4 m M199 /btg 223.058
7 Pipa PVC (AW) : 0 3" - 4 m M200 /btg 273.734
8 Pipa PVC (AW) : 0 4" - 4 m M201 /btg 368.339
9 Pipa PVC (AW) : 0 5" - 4 m M202 /btg 741.568
10 Pipa PVC (AW) : 0 6" - 4 m M203 /btg 1.043.870
11 Penyambung pipa PVC
- Soket 0 1/2" s/d 3/4" M204 /bh 4.891
- Soket 0 1" s/d 2" M205 /bh 7.893
- Soket 0 3" s/d 5" M206 /bh 34.241
- Soket 0 6" M207 /bh 112.507
- Knie 0 1/2" s/d 3/4" M208 /bh 4.403
- Knie 0 1" s/d 2" M209 /bh 9.196
- Knie 0 3" s/d 5" M210 /bh 39.622
- Knie 0 6" M211 /bh 140.878
- Pralon Listrik 0 5/8" - 4 m M212 /bh 24.458
18 Buis Beton Bulat
1 Buis Beton Bulat Dia. 20 cm - 1 m M213 /bh 43.046
2 Buis Beton Bulat Dia. 30 cm - 1 m M214 /bh 58.699
3 Buis Beton Bulat Dia. 40 cm - 1 m M215 /bh 143.813
4 Buis Beton Bulat Dia. 50 cm - 1 m M216 /bh 205.448
5 Buis Beton Bulat Dia. 60 cm - 1 m M217 /bh 469.595
6 Buis Beton Bulat Dia. 80 cm - 1 m M218 /bh 586.994
7 Buis Beton Bulat Dia. 100 cm - 1m M219 /bh 626.126
19 Beton Jadi (Ready Mix)

14-5
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

1 Readymix Beton K.450, tanpa pompa ( selang ) M220 /m3 1.971.515


2 Readymix Beton K.350, tanpa pompa ( selang ) M221 /m3 1.773.502
3 Readymix Beton K.300, tanpa pompa ( selang ) M222 /m3 1.700.323
4 Readymix Beton K.250, tanpa pompa ( selang ) M223 /m3 1.605.623
5 Readymix Beton K.225, tanpa pompa ( selang ) M224 /m3 1.584.745
6 Readymix Beton K.175, tanpa pompa ( selang ) M225 /m3 1.522.758
7 Readymix Beton K.125, tanpa pompa ( selang ) M226 /m3 1.438.818
8 Sewa pompa beton M227 m3 78.266
20 Kaca
1 Kaca polos tebal 3 mm M228 /m2 176.098
2 Kaca polos tebal 5 mm M229 /m2 205.448
3 Kaca polos tebal 8 mm M230 /m2 313.062
4 Kaca Rayband 5 mm M231 /m2 122.290
5 Kaca Rayband 8 mm M232 /m2 256.810
6 Kaca Rayband 12 mm M233 /m2 451.985
7 Kaca Es t=3mm M234 /m2 166.315
8 Kaca Es t=5mm M235 /m2 489.162
9 Kaca cermin 5 mm M236 /m2 163.381
10 Kaca cermin 6 mm M237 /m2 449.725
11 Kaca cermin 8 mm M238 /m2 569.638
12 Glass block 20 x 20 mm M239 /bh 45.493
21 Penggantung dan Kunci
1 Kunci pintu tanam Double slaag M240 /Unit 313.062
2 Kunci jangkar standar Double Slaag M241 /Unit 392.529
3 Kunci Silinder KL I M242 /Unit 215.230
4 Kunci Silinder KL II M243 /Unit 176.098
5 Kunci KM/WC Bulat Kwalitas II M244 /Unit 157.619
6 Kunci KM/WC Bulat Kwalitas I M245 /Unit 151.640
7 Kunci Selot pintu M246 /bh 23.010
8 Engsel Nylon untuk pintu M247 /bh 50.950
9 Engsel Nylon untuk Jendela M248 /bh 51.851
10 Spring knip M249 /bh 29.350
11 Door closer M250 /bh 411.972
12 Door holder M251 /bh 230.696
13 Door stop M252 /bh 142.499
14 Espagnolet M253 /bh 1.730.301
15 Rel Handerson Lengkap M254 /bh 391.329
16 Grendel jendela M255 /bh 78.266
17 Grendel tanam pintu M256 /bh 97.832
18 Handel jendela M257 /bh 45.003
19 Hak kait angin kuningan M258 /bh 58.699
- Engsel 4" M259 /bh 73.374
- Angsel 3" M260 psg 53.808
- Casement Handle (untuk jendela aluminium) M261 bh 58.699
22 Bahan Pelapis / Cat
1 Cat minyak
- Warna khusus interior M262 /kg 122.290
- Warna khusus eksterior M263 /kg 141.857
- Warna standar eksterior M264 /kg 127.182
- Warna standar interior M265 /kg 107.616

14-6
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

2 Cat Dasar
- Cat dasar kayu M266 /kg 107.616
- Meni kayu M267 /kg 78.266
- Meni besi M268 /kg 97.832
- Residu M269 /ltr 9.293
3 Cat Tembok
- Cat dasar tembok M270 /kg 37.762
- Cat tembok Interior M271 /kg 42.393
- Cat tembok Eksterior M272 /kg 65.874
4 Cat besi M273 /kg 108.920
5 Amplas M274 /lbr 15.653
- Amplas Besi M275 /lbr 17.284
- Amplas Kayu M276 /lbr 16.143
6 Dempul M277 /kg 65.874
7 Spirtus M278 /btl 20.544
8 Amplas Asbes/GRC/Beton M279 /lbr 18.588
9 Rol cat M280 /bh 65.220
10 Plamur tembok M281 /kg 44.219
11 Plamur kayu M282 /kg 68.482
12 Politur M283 /kg 90.005
13 Politur jadi M284 /ltr 100.766
14 Vernis M285 /ltr 99.789
15 Oker M286 /kg 45.003
16 Batu apung M287 /kg 83.158
17 Lem kayu M288 /kg 50.873
18 Lem Putih M289 /kg 50.873
19 Sirlak plitur M290 /kg 48.915
20 Kwas 3 " M291 /bh 26.089
21 Minyak cat M292 ./ltr 33.753
22 Kapur sirih M293 /kg 4.273
23 Cat Tahan Asam M294 /kg 8.588
24 Cat anti lumut M295 /kg 117.398
25 Water proofing emulsion Ex poxtar M296 /kg 90.005
26 Water proofing Membrane M297 /kg 90.005
27 Soda api M298 /kg 18.588
28 Sabun cuci M299 /kg 50.581
29 Pasir silica M300 /kg 17.197
23 Pembatas
1 Kansteen / Kerb M300 /bh 172.453
Ukuran 15:25:40 cm 0
24 Beton Gravel
1 Beton Gravel 1/2 0 20 cm M301 /bh 73.694
2 Beton Gravel 1/2 0 30 cm M302 /bh 72.762
3 Beton Gravel U 20 cm M303 /m 56.107
4 Beton Gravel U 30 cm M304 /m 73.694
25 Bahan Bakar dan Pelumas
1 Minyak Solar M305 /ltr 14.480
2 Bensin/Premium M306 /ltr 14.674
3 Oli pelumas M307 /ltr 68.482
4 Elpiji M308 /15.1 K 13.696

14-7
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

5 Kawat las M309 /dus 293.497


6 Residu M310 /lt 88.049
26 Kloset dan bahan porselin lainnya
1 Kloset Jongkok Impor M311 /bh 476.117
2 Kloset Jongkok lokal Putih M312 /bh 418.232
3 Kloset duduk lokal std. Toto M313 /bh 4.891.611
4 Bak Mandi Fibre glass M314 /bh 525.033
5 Urinoir std. Toto M315 /bh 436.011
6 Wastafel Lengkap Standard Klas I M316 /bh 1.614.231
7 Wastafel Lengkap Standard Klas II M317 /bh 1.027.238
8 Meja Wastafel M318 /bh 782.658
9 Kran air std. Onda M319 /bh 342.412
10 Kran Air Besi std. Onda M320 /bh 70.542
11 Kran Air Angsa std. Onda M321 /bh 616.343
12 Jet Washer std. Onda M322 /bh 264.147
13 Tempat Tissue M323 /bh 97.832
14 Tempat Sabun M324 /bh 68.482
15 Kitchen Zink M325 /bh 366.870
16 Floor Drain M326 /bh 60.004
17 Cermin M327 /bh 293.497
18 Water drain + Asesories M328 /Set 1.076.154
19 Seal tape M329 /bh 8.478
20 Lem pipa PVC M330 /bh 71.743
27 Elektrikal
1 Grounding M331 /unit 5.839.809
2 Titik Penangkal petir M332 /Ttk 1.038.188
3 Kabel BC M333 /Ttk 201.852
4 Titik lampu M334 /Ttk 403.725
5 Titik saklar M335 /Ttk 444.712
6 Titik saklar hotel M336 /Ttk 444.712
7 Titik stop kontak M337 /Ttk 444.712
8 Titik listrik AC M338 /Ttk 1.167.950
9 Lampu TL 2 x 40 M339 /Ttk 564.200
10 Lampu TL 2 x 36 M340 /Ttk 394.521
11 Lampu baret M341 /Ttk 1.167.950
12 Lampu SL M342 /Ttk 227.923
13 Down light M343 /Ttk 720.958
14 Pipa listrik EGA 1/2" M344 /m' 5.815
15 Conector M345 bh 24.530
16 Fitting lampu M346 /bh 23.010
17 Lampu PL 13 watt M347 /bh 74.352
18 Lampu TL 40 watt M348 /set 129.760
19 Lampu TL 2 x 40 watt M349 /set 252.967
20 Lampu Baret 40 Watt M350 /bh 461.662
21 Stop kontak M351 /bh 39.134
22 Saklar lampu M352 /bh 39.134
23 Saklar Tunggal M353 /bh 29.350
24 Saklar Seri M354 /bh 39.134
25 Box sekering M355 /bh 53.808
26 Box Panel MCB 20 x 20 M356 /bh 78.266

14-8
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

27 Box Panel MCB 20 x 30 M357 /bh 92.942


28 MCB 6 Ampere /220 V M358 /bh 78.266
29 Kawat BC / Kg ( Tembaga) M359 /kg 68.538
30 Kabel listrik NYY tunggal M360 /roll 782.658
28 Sumur Pompa / Artetis
1 Jet Pump Kualitas 1 M361 /unit 12.135.712
2 Pompa Air 125 Watt Kualitas 1 M362 /unit 5.311.090
3 Tangki Air Fiber Glas 0.5 m3 M363 /unit 1.304.305
4 Tangki Air Fiber Glas 1 m3 M364 /unit 2.968.083
5 Tangki Air Fiber Glas 2 m3 M365 /unit 7.810.442
6 Bak Fiber 60x60 M366 /unit 413.074
29 Bahan Alat Gantung dan Kaca
1 Engsel Jendela Arch Buah 38.946
2 Engsel Pintu Kuningan Arch Buah 102.793
3 Engsel Pintu Buah 37.225
4 Engsel Lokal Buah 46.742
5 Engsel Import Buah 98.774
6 Engsel Jendela Cashment 12" Buah 131.768
7 Hak Angin Antik Buah 28.553
8 Hak Angin Lokal Buah 16.499
9 Kaca Naco Polos Tebal 5 mm Buah 47.589
10 Kaca Polos Tebal 3 mm M2 252.395
11 Kaca Polos Tebal 5 mm M2 291.225
12 Kaca Ryben Polos Tebal 5 mm Buah 174.736
13 Kaca Ryben Tebal 5 mm M2 348.353
14 Kaca Ryben Tebal 3 mm M2 298.013
15 Kaca Warna Tebal 5 mm M2 396.997
16 Kaca Buram Tebal 3 mm M2 359.985
17 Kaca Buram Tebal 5 mm M2 271.153
18 Kaca Cermin Tebal 5 mm M2 301.187
19 Kaca Patri M2 640.665
20 Kaca Etsa. Grafir M2 542.092
21 Motif Kaca Film M2 98.774
22 Glass Block 20/20 Buah 75.507
23 Nako (Kerangka dan Daun) Buah 36.972
24 Rooster Buah 12.690
25 Kunci Pintu Silinder Buah 300.933
26 Kunci Pintu Tanam 2 Slaag Besar Buah 410.746
27 Kunci Pintu Tanam 2 Slaag Kecil Buah 206.642
28 Kunci Pintu Tanam Buah 231.812
29 Kunci Gembok Lengkap Uk. Sedang Buah 115.904
30 Grendel Tanam Buah 145.613
31 Grendel Kecil Buah 21.150
32 Grendel Besar Buah 37.225
33 Grendel Lokal Buah 56.259
34 Grendel Import Buah 61.973
35 Door Closer Buah 409.268
36 Menara Air dari Besi Siku Unit 3.157.583
37 Paku Triplek Rata-rata Kg 49.492
38 Paku Uk. 1-3 cm Kg 52.420

14-9
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

39 Paku Uk. 3-5 cm Kg 37.225


40 Paku Uk. 5-10 cm Kg 36.803
41 Paku Asbes Buah 2.329
42 Paku Eternit Kg 64.069
43 Paku Payung Kg 74.662
44 Paku Seng Kg 61.973
45 Paku Kait Buah 2.329
46 Paku Sekrup Buah 2.750
47 Hanslot Pintu 2 x Putar Buah 399.959
48 Slot Jendela Kupu-kupu Buah 21.363
49 Slot Pintu Kupu-kupu Buah 21.150
50 Slot Pintu Tanam Buah 124.155
30 Bahan Besi, Baja dan Beton
1 Besi Beton Polos Kg 44.629
2 Besi Beton Ulir Kg 49.282
3 Baja Ringan Profil U (Zincalume) T min 0,83 mm M' 177.664
4 Baja Ringan Profil Reng (Zincalume) T min 0,48 mm M' 146.998
5 Baja Ringan Profil U (Galvanise) T min 0,83 mm M' 163.495
6 Baja Ringan Profil Reng (Galvanise) T min 0,48 mm M' 128.595
7 Besi Rangka Hollow Uk. 2 x 4 M' 29.124
8 Besi Rangka Hollow Uk. 4 x 4 M' 27.075
9 Besi Baja WF + H Beam Kg 70.644
10 Besi Baja Channel Kg 70.644
11 Besi Baugel (Baut) Kuda-kuda Kg 60.278
12 Expantion Joint Buah 679.995
13 Baja Tralis Kg 60.068
14 Baut Baja Buah 57.110
15 Paku Jembatan Kg 32.359
16 Baja Tulangan Beton Kg 21.363
17 Besi Plat Kg 72.757
18 Besi Pipa 133.038
19 Besi Pipa Batang 35.808
20 Besi Pipa 41.498
21 Besi Pipa 541.034
22 Pipa Galvanis 1/2" Batang 271.153
23 Pipa Galvanis 3/4" Batang 427.879
24 Pipa Galvanis 1" 595.815
25 Pipa Galvanis 1 1/2" Batang 906.305
26 Pipa Galvanis 2" Batang 1.327.416
27 Pipa Galvanis 2 1/2" Batang 1.436.767
28 Pipa Galvanis 3" 1.984.144
29 Pipa Galvanis 4" 2.068.535
30 Besi Siku Batang 314.512
31 Besi Siku Batang 396.787
32 Besi Siku Batang 460.661
33 Besi Siku Batang 534.901
34 Besi Siku Batang 555.840
35 Besi Siku Batang 707.280
36 Besi Strip Kg 73.602
37 Kawat Beton Kg 57.529

14-10
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

38 Kawat Bronjong Kg 49.282


39 Kawat Nyamuk M2 66.414
40 Kawat Kasa M2 81.640
41 Kawat Bronjong Pabrikasi 2x1x05 m - diameter kawat : 2,70 mm Unit 833.334
42 Kawat Bend rat Kg 44.628
43 Plat Bordes (Cheekeer) 3 mm Lembar 1.610.413
44 Plat Bordes (Cheekeer) 4 mm Lembar 2.100.896
45 Plat Bordes (Cheekeer) 6 mm Lembar 3.323.827
46 Plat Bordes (Cheekeer) 8 mm Lembar 4.778.572
47 Rolling Door M2 1.007.831
31 Beton
1 Beton Batching Plan B.0 M3 1.775.649
2 Beton Batching Plan (Non Fly Ash) K. 125 M3 1.869.297
3 Beton Batching Plan (Non Fly Ash) K. 175 M3 1.985.627
4 Beton Batching Plan (Non Fly Ash) K. 225 M3 2.074.457
5 Beton Batching Plan (Non Fly Ash) K. 250 M3 2.191.433
6 Beton Batching Plan (Non Fly Ash) K. 300 M3 2.243.451
7 Beton Batching Plan (Non Fly Ash) K. 350 M3 2.337.995
8 Beton Batching Plan (Non Fly Ash) K. 400 M3 2.501.067
9 Beton Batching Plan (Non Fly Ash) K. 450 M3 2.568.324
10 Beton Batching Plan (Non Fly Ash) K. 500 M3 2.829.113
11 Gorong-gorong Beton Tak Bertulang (Witera) Dia. 0.60 cm - 1.25 1.25 m' 2.212.149
12 Gorong-gorong Beton Tak Bertulang Dia. 0.80 cm - 2.5 2.5 m' 3.874.167
13 Gorong-gorong Beton Tak Bertulang Dia. 100 cm - 2.5 2.5 m' 6.046.764
14 Gorong-gorong Beton Tak Bertulang (Witera) Dia. 0.60 cm - 2.25 2.25 m' 2.589.899
15 Gorong-gorong Beton Tak Bertulang (Witera) Dia. 0.80 cm - 2.5 2.5 m' 4.798.029
16 Gorong-gorong Beton Tak Bertulang (Witera) Dia. 100 cm - 2.5 2.5 m' 7.332.936
17 Tiang Pancang Diameter 35 cm (Single) M' 1.455.589
18 Tiang Pancang Diameter 35 cm (Midle) M' 1.751.273
19 Tiang Pancang Diameter 40 cm (Single) M' 1.858.724
20 Tiang Pancang Diameter 40 cm (Midle) M' 2.200.940
21 Tiang Pancang Diameter 45 cm (Single) M' 1.946.919
22 Tiang Pancang Diameter 45 cm (Midle) M' 2.221.455
23 Tiang Pancang Diameter 50 cm (Single) M' 2.356.607
24 Tiang Pancang Diameter 50 cm (Midle) M' 2.693.326
25 Tiang Pancang Diameter 60 cm (Single) M' 3.136.220
26 Tiang Pancang Diameter 60 cm (Midle) M' 2.573.403
27 Elastomeric Bearing Pad 500x400x50 Buah 3.195.442
32 Bahan / Material Lain-lain
1 Tanah Merah M367 /m3 184.368
2 Tanah Urug M368 /m3 184.368
3 Pagar BRC M369 /m2 186.691
4 Tralis Besi M370 /m2 771.394
5 Pipa tiang BRC dia. 2" + tutup dan baut M371 /bh 173.767
6 Pintu roll door M372 /m2 374.901
7 Pintu PVC 70 x 195 cm M373 /m2 480.624
8 Aluminium kusen 3" natural M374 /m' 165.446
9 Aluminium kusen 4" natural M375 /m' 206.804
10 Aluminium kusen 3" coklat/hitam M376 /m' 179.602
11 Aluminium kusen 4" coklat/hitam M377 /m' 219.972

14-11
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.

12 Fisher M378 /bh 1.766


13 Sealant M379 /bh 58.407
14 Paku keling M380 /bh 1.254
15 Bambu M381 /btg 46.780
16 Panel beton pracetak M382 /lbr 899.799
17 Tiang beton pracetak M383 /btg 409.807
18 Hollow Block (HB 20) M384 /bh 11.935
19 Hollow Block (HB 15) M385 /bh 10.369
20 Hollow Block (HB 10) M386 /bh 6.652
21 Bilik bambu M387 /m2 73.591
22 Batacote (waterproof) M388 /kg 78.152
23 Formica M389 /lbr 118.564
24 Vernis M390 /ltr 101.183
25 PVC Waterstop L=150 mm M391 /m' 143.895
26 PVC Waterstop L=200 mm M392 /m' 224.864
27 PVC Waterstop L=230 mm M393 /m' 273.431
28 PVC Waterstop L=250 mm M394 /m' 305.809
29 PVC Waterstop L=300 mm M395 /m' 386.755
30 PVC Waterstop L=320 mm M396 /m' 419.133
31 Kabel presstresed M397 /kg 28.105
32 Nok genteng plentong M398 /bh 11.855
33 Nok genteng plentong besar M399 /bh 11.855
34 Nok genteng kodok M400 /bh 8.649
35 Nok genteng kodok glazur M401 /bh 9.881
36 Alumunium T (rangka plafond) M402 /btg 160.763
37 Heubel 20 x 60 cm tb. 10 cm M403 /m3 1.467.484
38 Floor hardener ferrovax M404 /kg 12.634
39 Wire Mesh M.10 (8,51 kg/m2) M405 /kg 20.934
40 Plat Bondex M406 /m2 282.101
41 Banner Digital Printing M407 /m2 67.449
42 Kapek M408 /m2 22.476
43 Karpet Talang M409 /m2 35.220
44 Air M410 /ltr 391
45 Sewa pompa beton M411 /jam 766.548
46 Bahan Kusen Pintu dan jendela Alumunium /m' 131.461
47 Aluminium kusen 3" M412 /m' 165.446
48 Aluminium kusen 4" M413 /m' 206.804
49 Aluminium kusen 3" coklat/hitam M414 /m' 179.602
50 Aluminium kusen 4" coklat/hitam M415 /m' 219.972
51 Fisher M416 /bh 1.766
52 Sealant M417 /bh 58.407
53 Paku keling M418 /bh 1.254
54 Alumunium Frame Jendela 2" M419 /m' 97.832
55 Alumunium Frame Pintu 3" M420 /m' 122.642
56 Alumunium Frame Jendela 2" coklat/hitam M421 /m' 107.616
57 Alumunium Frame Pintu 3" coklat/hitam M422 /m' 126.536
58 List Karet Jendela M423 /m' 5.831
59 Grassblock 30x45 6 cm M424 bh 48.915
2
60 Batu andesit bakar macam ukuran M425 m 322.846
61 Batu sikat M426 kg 11.740

14-12
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
No. URAIAN SPESIFIKASI KODE SATUAN HARGA Rp.
2
62 Batu paras M427 m 254.363
2
63 Batu candi M428 m 254.363
64 Kanstein 15x30x60 M429 bh 76.231
65 Kanstein 15x30x40 M430 bh 42.049
2
66 Floor hadenner M431 m 58.876
67 Kunci pintu tanam antik umum dobel slaght setara mutu menengah M432 set 283.713
68 Kunci pintu tanam biasa umum dobel slaght setara mutu menengah M433 set 225.015
69 Jendela Naco M434 bh 273.931
70 Panel beton pracetak M435 bh 342.412
71 Kolom beton pracetak M436 bh 547.860
3
72 Tanah Liat M436 m 156.531
B. HARGA SATUAN UPAH KERJA
1 Pekerja /orang/hari/8 jam L.01 OH 194.150
2 Pekerja Setengah Trampil /orang/hari/8 jam L.02 OH 213.565
3 Pekerja Trampil /orang/hari/8 jam L.03 OH 232.980
4 Tukang Kayu /orang/hari/8 jam L.04 OH 291.225
5 Tukang kayu setengah trampil /orang/hari/8 jam L.05 OH 252.395
6 Tukang kayu trampil /orang/hari/8 jam L.06 OH 291.225
7 Kepala tukang kayu /orang/hari/8 jam L.07 OH 339.764
8 Tukang Besi /orang/hari/8 jam L.08 OH 291.225
9 Tukang besi beton setengah trampil /orang/hari/8 jam L.09 OH 252.395
10 Tukang besi beton trampil /orang/hari/8 jam L.10 OH 291.225
11 Tukang besi IWF/Profil setengah trampil /orang/hari/8 jam L.11 OH 339.764
12 Tukang besi IWF/Profil trampil /orang/hari/8 jam L.12 OH 291.225
13 Kepala tukang besi beton /orang/hari/8 jam L.13 OH 291.225
14 Kepala tukang besi konstruksi/profil /orang/hari/8 jam L.14 OH 339.764
15 Tukang batu /orang/hari/8 jam L.15 OH 291.225
16 Tukang batu setengah trampil /orang/hari/8 jam L.16 OH 242.688
17 Tukang batu trampil /orang/hari/8 jam L.17 OH 291.225
18 Kepala tukang batu /orang/hari/8 jam L.18 OH 310.640
19 Tukang cat / Pelitur setengah trampil /orang/hari/8 jam L.19 OH 242.688
20 Tukang cat /orang/hari/8 jam L.20 OH 252.395
21 Tukang pelitur /orang/hari/8 jam L.21 OH 281.519
22 Kepala tukang cat / Pelitur /orang/hari/8 jam L.22 OH 291.225
23 Tukang Pipa /orang/hari/8 jam L.23 OH 242.688
24 Kepala Tukang Pipa /orang/hari/8 jam L.24 OH 291.225
25 Tukang listrik /orang/hari/8 jam L.25 OH 300.933
26 Mandor /orang/hari/8 jam L.26 OH 388.300
27 Operator alat besar /orang/hari/8 jam L.27 OH 388.300
28 Pembantu operator /orang/hari/8 jam L.28 OH 291.225
29 Supir truck /orang/hari/8 jam L.29 OH 291.225
30 Kernet truck /orang/hari/8 jam L.30 OH 242.688
31 Penjaga malam /orang/hari/8 jam L.31 OH 242.688
32 Buruh lapangan tak terlatih /orang/hari/8 jam L.32 OH 242.688
33 Buruh lapangan kurang terlatih /orang/hari/8 jam L.33 OH 242.688
34 Buruh lapangan terlatih /orang/hari/8 jam L.34 OH 291.225
35 Mekanik /orang/hari/8 jam L.35 OH 388.300
36 Pembantu Mekanik /orang/hari/8 jam L.36 OH 339.764
36 Staf Pelaksana Proyek /orang/hari/8 jam L.37 OH 291.225
37 Tukang Vibrator /orang/hari/8 jam L.38 OH 291.225

14-13
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
C. BILLING RATE TENAGA AHLI KONSULTAN

Biaya Langsung Personil (Remuneration / Billing Rate)


untuk Tenaga Ahli Nasional berpendidikan S1/S2/S3
dalam rangka Undangan Pelelangan Internasional (ICB)
Berdasarkan Pengalaman Profesi yang setara (comparable experiences ) *)

TENAGA AHLI RUPIAH PER BULAN


DAN TAHUN PENGALAMAN S1 / Setara S2 / Setara S3 / Setara
1 **) 43.461.000 46.095.000
2 **) 48.290.000 51.363.000
3 32.266.500 53.119.000 56.631.000
4 37.095.500 57.948.000 61.899.000
5 41.924.500 62.996.500 67.167.000
6 46.753.500 68.045.000 72.215.500
7 51.802.000 72.654.500 77.483.500
8 56.631.000 77.703.000 82.751.500
9 61.460.000 82.751.500 87.800.000
10 66.508.500 87.361.000 93.068.000
11 71.337.500 92.409.500 98.116.500
12 76.166.500 97.458.000 103.384.500
13 80.995.500 102.067.500 108.652.500
14 86.044.000 107.116.000 113.701.000
15 90.873.000 112.164.500 118.969.000
16 95.702.000 116.993.500 124.237.000
17 100.750.500 121.822.500 129.285.500
18 105.579.500 126.651.500 134.553.500
19 110.408.500 131.700.000 139.602.000
20 115.237.500 136.529.000 144.870.000
21 120.286.000 141.358.000 150.138.000
22 125.115.000 146.406.500 155.186.500
23 130.163.500 151.235.500 160.674.000
24 134.773.000 156.064.500 165.942.000
25 139.821.500 161.113.000 171.210.000

14-15
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
Biaya Langsung Personil (Remuneration / Billing Rate)
dalam rangka Undangan Pelelangan Nasional (NCB)
Berdasarkan Pengalaman Profesi yang setara (comparable experiences ) *)

KUALIFIKASI TENAGA AHLI DAN RUPIAH PER BULAN


TAHUN PENGALAMAN S1 / Setara S2 / Setara S3 / Setara
1 **) 19.755.000 25.462.000
TENAGA AHLI (TIDAK PUNYA SKA / SKK) ►
2 **) 21.511.000 27.218.000
1 3 15.804.000 23.047.500 28.974.000
AHLI MUDA ►
2 4 17.121.000 24.584.000 30.730.000
1 3 5 18.438.000 26.340.000 32.486.000
AHLI MADYA ► 2 4 6 19.755.000 27.876.500 34.242.000
3 5 7 21.072.000 29.413.000 35.998.000
1 4 6 8 22.389.000 31.169.000 37.754.000
2 5 7 9 23.706.000 32.705.500 39.510.000
3 6 8 10 25.023.000 34.242.000 41.266.000
4 7 9 11 26.340.000 35.998.000 43.022.000
5 8 10 12 27.657.000 37.534.500 44.778.000
6 9 11 13 28.974.000 39.071.000 46.534.000
7 10 12 14 30.291.000 40.827.000 48.290.000
8 11 13 15 31.608.000 42.363.500 50.046.000
9 12 14 16 32.925.000 43.900.000 51.802.000
AHLI UTAMA ►
10 13 15 17 34.242.000 45.656.000 53.558.000
11 14 16 18 35.559.000 47.192.500 55.314.000
12 15 17 19 36.876.000 48.729.000 57.070.000
13 16 18 20 38.193.000 50.485.000 58.826.000
14 17 19 21 39.510.000 52.021.500 60.582.000
15 18 20 22 40.827.000 53.558.000 62.338.000
16 19 21 23 42.144.000 55.314.000 64.094.000
17 20 22 24 43.461.000 56.850.500 65.850.000
18 21 23 25 44.778.000 58.387.000 67.606.000

14-16
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020
BAHAN/MATERIAL, UPAH TENAGA KERJA DAN BILLING RATE TENAGA AHLI
Biaya Langsung Personil (Remuneration / Billing Rate)
Untuk Tenaga Sub Profesional

RUPIAH PER
NO PERSONIL
BULAN (Rp.)
1 CAD / CAM OPERATOR 9.087.300
2 SOFTWARE PROGRAMMER / IMPLEMENTER 10.667.700
3 HARDWARE TECHNICIAN 9.087.300
4 FACILITATOR 9.087.300
5 SENIOR ASSISTANT PROFESSIONAL STAFF 11.589.600
6 ASSISTANT PROFESSIONAL STAFF 10.931.100
7 SPECIAL TECHNICIAN / INSPECTOR 10.667.700
8 TECHNICIAN 9.087.300
9 INSPECTOR 9.087.300
10 SURVEYOR 8.165.400

Biaya Langsung Personil (Remuneration / Billing Rate)


Untuk Tenaga Pendukung (Supporting Staff)

RUPIAH PER
NO PERSONIL
BULAN (Rp.)
1 OFFICE MANAGER 9.526.300
2 SITE OFFICE MANAGER / ADMINISTRATOR 8.648.300
3 BILINGUAL SECRETARY 9.438.500
4 SECRETARY 5.838.700
5 COMPUTER OPERATOR / TYPIST 5.180.200
6 DRAFTER (MANUAL) 4.829.000
7 MESSENGER 3.643.700
8 OFFICE BOY 3.380.300
9 DRIVER 3.907.100
10 OFFICE GUARD / SECURITY OFFICER 3.599.800

14-17
STANDAR HARGA SATUAN TERTINGGI BARANG / JASA TAHUN 2020