Analisis Struktur Baja Kuda-Kuda Atap
Analisis Struktur Baja Kuda-Kuda Atap
BAB II
ANALISA DAN PERHITUNGAN
1
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Tinggi Kuda-kuda
𝑡𝑖𝑛𝑔𝑔𝑖
tan = 1
𝑥𝐿 4,38 m
2
𝑡𝑖𝑛𝑔𝑔𝑖
tan 35 = 1 350
𝑥 12,5 6,25 m
2
0
Tinggi = tan 35 x 6,25
= 4,38 m
Dengan Kemiringan:
7,63 m
Ls = 6,252 4,382 7,63 m
4,38 m
350
6,25 m
2
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
3
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
1
qD = 58,99 kg/m => RD = .q D .L
2
1
= 2 𝑥 58,99 𝑥 4,5 = 132,73 kg
1 4,5
=(2 x 58,99 x ( )) x cos 350
2
= 54,36 kg
1
qD = 58,99 kg/m => MD = .q D .L2
8
1
= 8 𝑥 63,99 𝑥 4,52 = 161,97 kgm’
1 4,5 2
= (8 x 58,99 x ( ) ) x cos 352
2
= 30,58 kgm’
2. Beban Hidup
Berat pekerja = 100 kg (SNI-1727-2013 Tabel 4-1)
1
PL =100 kg => RL = .PL
2
1
= .(100) = 50 kg
2
RLx = (50) sin 350 = 28,68 kg
RLy = (50) cos 350 = 40,96 kg
1
PL =100 kg => ML = .PL .L
4
1
= 8 𝑥 100 𝑥 4,5 = 112,5 kgm’
4
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
x = 0,267
37,5 35
30
5
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
37,5−30 0,9−1,1
=
35−30 𝑥−1.1
X = 0,967
37,5 35
30
6
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
= 25,54 kg
1
Mwx = 8 x q x L2
1
= 8 x (11,35) x 4,52
= 28,73 kg.m
Rwy =0
Mwy =0
= - 92,475 kg
1
Mwx = 8 x q x L2
1
= 8 x (41,1) x 4,52
= - 104,034 kg.m
Rwy =0
Mwy =0
4. Kombinasi Pembebanan
7
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
8
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
9
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
10
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
9
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
11
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Mnx = Mp = Fy x Zx
Mnx = 23,33 cm2 x 4588,72 kg/cm2 = 106917,176 kg.cm = 1069,172 kg.m
Mny = Mp = Fy x Zy
Mny = 11,65 cm2 x 4588,72 kg/cm2 = 53458,589 kg.cm = 534,586 kg.m
𝑀𝑢𝑥 𝑀𝑢𝑦
+ < 1,0
∅𝑀𝑛𝑥 ∅𝑀𝑛𝑦
266,745 184,136
+ < 1,0
0,9 𝑥 1069,172 0,9 x 534,586
12
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
13
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
= 0,0042+ 0,00676
= 0,0112 m = 1,09 cm = 10,96 mm
∆ = ( x ) 2 ( y ) 2
= (8,89) 2 (10,96) 2
l
= 14,11 mm < ∆max = = 18,75 mm OK
240
Jadi gording dengan profil C 150 x 50 x 20, dengan tebal 2,5mm dapat
digunakan karena telah memenuhi persyaratan terhapad pengaruh biaksial dan
lendutan izin yang ditentukan.
14
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Perencanaan Sag-rod
Karena dipasang sagrod pada tengah bentang, maka besarnya RUy untuk perhitungan
sagrod harus dihitung ulang
Akibat beban mati
1 1
RDy = .q D .L. cos 35 0 = .(58,99).(1,271). cos 35 0 = 30,71kg
2 2
15
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Perhitungan diameter baja pejal bulat untuk sagrod jika dihitung dengan gaya
yang ditahan oleh sagrod :
Pu = 2.Ruy = 2 (102,388) = 204,776 kg
Menghitung dimensi kebutuhan minimal Sagrod
Pu = 204,776 kg
Ø Pn = 0.9 Fy Ag
Ø Pn = 0.9 Fy Ag > Pu
Pu 204,776
Ag = 0,9 𝑓𝑦 = 0,9 𝑥 4588,72 = 0,0496 cm2
1
A = 4 π× d2
4 x Ag 4 x 0,0496
d2 = = = 0,0631 cm
π π
d = 0,0631 = 0, 25 cm = 2,5 mm
Sesuai dengan tabel produk sagrod maka
digunakan ukuran sagrod Ø 18 mm
16
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
lk
=
i min
1 1 I
Ag = × π× d2 I= × π× d4 i min=
4 64 Ag
1 1 0,515
= ×π ×1,82 = × π ×1,84 i min/r=
4 64 2,55
lk 127,1(1)
= = = 282,22 < 300 OK
i min 0,45
Cek Kapasitas Penampang
Ø Pn = 0.9 Ag Fy > Pu
= 0.9 x 2,55 x 4588,72 > Pu
= 10531,11 kg > 204,776 kg (OK)
102,388 kg
Ø 18 mm
102,388 kg
17
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
18
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
19
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
20
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
21
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
22
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
23
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Cek Kelangsingan
𝑙𝑘
λ= < 300
𝑖𝑚𝑖𝑛
589
< 300
1,98
24
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Pn = ∅ ( 𝐹𝑦 . 𝐴𝑔 )
Dimana :
Fy = 4588,72 kg/cm2
Ag = 13,620 cm2
∅t = 0,9
Pn = 0,9 (4588,72 x 13,620 )
= 56248,53 kg
= 56248,53 kg > 𝑷𝒖. (OK)
25
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
2,043
d ≤ √( 0,78 ) = 1,62 cm
26
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
2. PADA DINDING
27
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
28
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
29
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
34
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
35
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
36
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
36
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Cek Kelangsingan
𝑙𝑘
λ= < 300
𝑖𝑚𝑖𝑛
673
< 300
3,6
37
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Pn = ∅ ( 𝐹𝑦 . 𝐴𝑔 )
Dimana :
Fy = 4588,72 kg/cm2
Ag = 38,80 cm2
∅t = 0,9
Pn = 0,9 (4588,72 x 38,80 )
= 160238,1 kg
= 160238,1 kg > 𝑷𝒖. (OK)
38
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
39
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
40
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
1
𝑏 𝑥 150
2
- = = 8,33
𝑡 9
𝐸 200000
- 0,56√(𝐹𝑦) = 0,56√( ) = 11,81
450
𝑏 𝐸
- < 0,56√(𝐹𝑦) = 8,3 < 13,49 (OK)
𝑡
41
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
42
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
43
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Pn = ∅c x Fcr x Ag
Dimana Fcr adalah :
𝐾𝐿 𝐸 1 𝑥 6730 200000
Bila < 4,71√(𝐹𝑦) = < 4,71√( )
𝑟 36 450
Fcr =0,877 Fe
= 0,877 x 56,48
= 49,53 MPa
Pn = ∅c x Fcr x Ag
= 0,9 x 49,53 x 3880
= 172973 N
= 17297,3 kg > 209,575 kg (OK)
44
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
45
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
PERENCANAAN CRANE
Merencanakan crane bangunan industri harus di identifikasi menggunakan
double girder atau single girder yang pemilihannya berdasarkan pada kapasitas atau
peruntukannya. Dalam hal ini perencanaan Tugas struktur baja dengan study kasus
bangunan industri menggunakan single girder karena kapasitas crane hanya sebesar 5
ton.
46
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Dalam tugas besar ini, perencaan crane terbagi atas beberapa bagian :
1. Pemilihan jenis hoist
2. Design bridge crane/ balok crane
3. Design run-way crane
47
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
48
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
49
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
A : 552 J :- T : 96
B : 697 K : 350
U :-
C : 425 N : 1145
D : 566 (591) O : 125
E1 : 110 P : 12000
E2 : 110 Q :-
F1 : 135
R : 770
F2 : 135
S : 110
H : 222 (272)
50
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Diketahui :
L = 12,5 m = 12500 mm = 492,13 in
𝐿 492,13
≤ 25 ≤ 25 , ℎ = 19,68 𝑖𝑛 = 499,57 𝑚𝑚
ℎ ℎ
𝐿 492,13
≤ 65 ≤ 65 , 𝑏 = 7,57 𝑖𝑛 = 192,278 𝑚𝑚
𝑏 𝑏
ℎ 1000 21,65 1000
≤ ≤ , 𝑡 = 0,17 𝑖𝑛 = 4,43 mm
𝑡 √𝐹𝑦 𝑡 √65
51
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Di ambil ;
492,13
h = 650 mm = 25,59 in ≤ 25 = 19,23 ≤ 25 OK
25,59
492,13
b = 450 mm = 17,72 in ≤ 65 = 27,77 ≤ 65 OK
17,72
25,59 1000
t = 25 mm = 0,98 in ≤ = 26,11 ≤ 124 OK
0,98 √65
NB :
nilai b disesuaikan dengan produk hoist yang applcable box rail sebesar
450 mm.
flange girder)
Pfactored = 1,6 (1782,82)
= 2852,512 kg
Menghitung Momen Maksimum dan Gaya Geser (Tahap Preliminary)
Penempatan wheel hoist pada bridge crane diambil ¼ λ dan ¾ λ dari titik tengah
bridge crane. Yang berdasar dari “AISC 7th Stee
l Design Guide industrial Buildings Second Edition”
52
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
𝑃 λ
Mmax = 2𝑥𝐿 (𝐿 − 2)2 λ
V = P × (2 − )
L
0,217
2852,512 0,217 2 = 2852,512 × (2 − )
12,5
Mmax = × (12,5 − ) =5655,5 kg
2(12,5) 2
= 5,65 t
= 17520,05 kg.m
= 17,52 t.m
53
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
𝑃
ft = 2
≤ f tarik = fy
7 𝑥 𝑡𝑤
𝑃
2
= tw ≥ 7 𝑥 𝑓𝑦
2852,512
2
= tw ≥ 7 𝑥 4588,72
54
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Cek Stabilitas
NB : Penampang kotak yang memiliki sayap belum diatur pada SNI 1729-2015
namun ANSI- AISC -360-2016 sudah mengatur ketentuan tersebut sehingga
perencanaan bridge crane yang menggunakan box girder mengacu pada AISC
2016
𝐸 200000
λp = 1,12 𝑥 √𝑓𝑦= 1,12 𝑥 √ = 23,61 ( λ ≤ λp ) compact section
450
200000
λp = 2,42 √ = 51,01 ( λ ≤ λp ) compact section
450
55
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
LuasProfil
Luas Penampang
A = F1 + F2 + W1 + W2
= 10000 + 11250 + 12000 + 12000
= 45250 mm2
56
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
= 133333333,3 mm4
1
Iy2 = 12 𝑥 4503 𝑥 25 + 11250(0)2
= 189843750 mm4
1
Iy3 = Iy4 = 12 x 203 x600 +12000 (10+290/2)2
= 288700000 mm4
Iy total = Iy1 + Iy2 + Iy3 + Iy4
= 133333333,3 + 189843750 + 288700000+ 288700000
= 900577083,3 mm4
57
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
7131,25
= 7×2 < 4588,72
= 509,375 kg/cm < 𝜎𝑦 = 4588,72𝑘𝑔/𝑐𝑚2
2
0,75 ∙(7131,25)
= < 𝜎𝑦 = 0,6 x 4588,72
2,52
= 855,75 kg/cm2 < 𝜎𝑦 = 2753,232 kg/cm2
58
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
1
𝑀𝑚𝑎𝑥 = 8 𝑞 𝑥 𝑙 2 + (𝑀𝑝 max 𝑐𝑟𝑎𝑛𝑒)
1
` = 8 0,457 𝑥 12,52 + (17,52)
= 26,45 tm
1
V = (2 × q × 𝑙) + V
1
= (2 × 0,457 × 12,5) + 5,65
= 8,51 ton
Zx = 6914860 + 6914977,5
= 13829837,5 mm3
59
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
60
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
A B
Vn1 = 0,6 x fy x Aw x Cv
Aw = 2 ht
= 2 x ( 65-50) x 2
= 240 cm2
ℎ 𝐾𝑣 𝐸
Cv2 Jika ≤ 1,1 √ Kv = 5
𝑡𝑤 𝐹𝑦
61
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
60 5 𝑥 20000000
≤ 1,1 √
2 4588,72
30 ≤ 51,35
Cv2 =1
Vn1 = 0,6 x fy x Aw x Cv
= 0,6 x 4588,72x 240 x 1
= 660775,68 kg
= 660,8 t
Vu ≤ ø Vn1
5,65 ton ≤ 0,9 x 660,8 ton
5,65 ton ≤ 594,72 ton OK
Vn2 = 0,6 x fy x Aw x Cv
Aw = 2 ht
= 2 x ( 45-5) x 2
= 180 cm2
ℎ 𝐾𝑣 𝐸
Cv2 Jika ≤ 1,1 √ Kv = 5
𝑡𝑤 𝐹𝑦
40 5 𝑥 20000000
≤ 1,1 √
2 4588,72
20 ≤ 51,35
Cv2 =1
Vn2 = 0,6 x fy x Aw x Cv
= 0,6 x 4588,72x 180 x 1
= 495581,76 kg
= 495,581 t
Vu ≤ ø Vn2
5,65 ton ≤ 0,9 x 495,581 ton
5,65 ton ≤ 446,02 ton OK
62
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Preliminary design
Perhitungan beban
o Beban mati
Bridge Weight = 4110 kg
Runway Bridge = 66 kg/m ( IWF 400x200x8x13)
o Beban hidup
Crane capacity = 5000 kg
P berat crane ( weight hoist) = 555 kg
P hook block weight = 50 kg
P foot walk = 100 kg
P crane sadle / trolley = 100 kg +
= 5805 kg
5805 + (25 % x 5805) = 7256, 25 kg
Beban vertical
o P vertical = 1,2 x 1027,5 + 1,6 x 3628,125
= 7038 kg
63
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
= 12712,5 kg.m
λ
Vultimate = P × (2 − L)
1000
= 7038 × (2 − 4500)
= 12512 kg
64
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
𝑏 𝐸 𝐸
≤ 0,38 √𝐹𝑦 ≤ 1,00 √𝐹𝑦
𝑡
100 200000 200000
≤ 0,38 √ ≤ 1,00 √
13 450 450
ℎ 𝐸 𝐸
≤ 3,76 √𝐹𝑦 ≤ 5,70 √𝐹𝑦
𝑡
342 200000 200000
≤ 3,76√ ≤ 5,70 √
8 450 450
Property penampang
1
J = 3 ( 2𝑡 3 𝑏 + 𝑡𝑤 3 ℎ)
1
= 3 ( 2𝑥 133 𝑥 200 + 83 (400 − 13)
= 1076944 mm4
𝐼𝑥 23700 x 104
Sx = 𝑦0 = = 1185000 mm3
200
65
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Zx = bt (d-t) + 0,25wh2
= 200 x 13 ( 400- 13) + 0,25 x 8 x 3422
= 1240128 mm3
ℎ2 𝑏 3 t (400−13)2 𝑥 2003 x 13
Cw = =
24 24
= 6,489 x 1011
400−13
ho = = 193,5 mm
2
1 1
𝐼𝑦 2 1740 𝑥 104 2
ry = (𝐴) = ( 84,1 𝑥 102 )
= 45,49 mm
66
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
67
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
ℎ⁄
= 𝐿𝑏 𝑡𝑤 ≤ 2,3
⁄𝑏𝑓
342⁄
8
= 4500⁄ ≤ 2,3
200
= 1,9 ≤ 2,3
3
𝐶𝑟 𝑡𝑤 3 𝑡𝑓 ℎ⁄
𝑡𝑤
Rn = [1 + 0,4 (𝐿𝑏 ) ] , Cr = 6,62 x 106 MPa
ℎ2 ⁄𝑏𝑓
342⁄ 3
6,62 𝑥 106 𝑥 83 𝑥 13 8
= [1 + 0,4 (4500⁄ ) ]
3422 200
= 388916,68 N = 38891,7 Kg
68
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Vn = 0,6 x fy x Aw x Cv
Aw = 2 ht
= 2 x (342) x 8
= 5472 mm2
ℎ 𝐾𝑣 𝐸
Cv2 Jika ≤ 1,1 √ Kv = 5
𝑡𝑤 𝐹𝑦
342 5 𝑥 200000
≤ 1,1 √
8 450
42,75 ≤ 51,85
Cv2 =1
Vn1 = 0,6 x fy x Aw x Cv
= 0,6 x 450 x 5472 x 1
= 1477440 N
= 14774 kg
Vu ≤ Ø Vn1
12512 kg ≤ 0,9 x 14774 kg
12512 kg ≤ 13296,6 kg OK
Menghitung Reaksi
R = ½ x q x L2 + V
= ½ x 66 x 4,52 + 12512
= 13848,5 kg
= 13,85 ton
69
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
𝐿 5
< 65 < 65 ; b = 7,7 cm
𝑏 𝑏
Di ambil ;
𝐿 5
h = 25 cm = 0,25 = 20 < 25 OK
ℎ
𝐿 5
b = 25 cm = 0,25 = 20 < 65 OK
𝑏
λ = 1,5 m
5.00
λ < 0,586 L
λ < 0,586 . 5
λ <2,93 m’
Reaksi Perletakan
R = ½ x q x L2 + V
= ½ x 0,946 x 5 + 10,75
= 13,115 ton
70
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
t2
t1 H
r
t2
Cek Stabilitas
𝐸 200000
λp = 0,38√𝑓𝑦 = 0,38√ 446,88 = 8,04 ( λ ≤ λp )
71
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
𝐻 400
λ = = = 50
𝑡 8
𝐸 200000
λp = 3,76√𝑓𝑦 = 3,76√ 446,88 = 79,54 ( λ ≤ λp )
𝑞𝑡𝑜𝑡𝑎𝑙𝑥𝐿2 𝑃𝑥𝐿
Mmax = +
8 4
= 19,22 tm
= 22,10 tm
Vmax = ½ x q x L + P
= ½ x (0,946+0,66) x 5 + 11,36
= 15,37 ton
λc < 0. 25 ω=1
𝜆 𝑓𝑦 110,13 448
λc = 𝜋√𝐸 = √ = 1,66 1,43
3,14 200000 0.25 <λc < 1,2
1,6 0,67c
1,25c 2 λc>1,2 1,25c 2
0 15797,8
= 3,44 x 0,85𝑥 84,1 + 0,9𝑥 1190
Penampang balok WF cukup aman menerima gaya kombinasi dan tidak terjadi tekuk
lentur.
72
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Mn = Mp
Zx = bf x tf x (d-tf) + ¼ x tw x (d-2tf)2
= 20 x 1,3 x (40-1,3) + ¼ x 0,8 x (40 – 2 x 1,3)2
= 1285,95 cm3
Mp = Zx x fy
= 1285,95 x 446,88
= 574665,34 kg/cm = 57,47 tm
Mu ≤ Ø Mn
22,10 tm ≤ 0,9 x 57,41 tm
22,10 tm ≤ 51,67 tm
73
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
74
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
E 2x105
λp = 0,38 √fy = 0,38 √446,88 = 8,04
𝜆 ≤ 𝜆𝑝 Penampang Compact
E 2x105
𝜆𝑝 = 3,76 √fy = 3,76√446,88 = 79,54
𝜆 ≤ 𝜆𝑝 Penampang Compact
= 2096,36 cm3
1
Mn = Zx . Fy = 2096,36 x 4468,8 x 105 = 93,68 tm
Mu < ∅ Mn
75
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
𝑀 𝑁 ( 11300×100) 0
𝜎 = 𝜙𝑥𝑧 ± 𝜙𝑥𝐴 = ± 0,90 𝑥 114,2
𝑥 0,9 𝑥 1910
𝑘𝑔 𝑘𝑔⁄
= 657,36 ⁄𝑐𝑚2 ≤ 𝑓𝑦 = 4468,8 𝑐𝑚2
Profil WF 400 x 200 x 8, aman menerima gaya-gaya kombinasi.
42,8 200000
< 2,24 x √
1,0 446,8
= 1,25 mm
Iki ceng
PL3 14995 x 7503
Δijin = =
3EI 3 x 200000 x 2140
=
Δmax = 2,04 mm < 7,5 mm
76
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Profil WF 500 x 200 x 10 x 16, aman terhadap lendutan dan aman untuk digunakan.
E 2x105
λp = 0,38 √fy = 0,38 √446,88 = 8,04
77
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Kondisi Leleh
Ø Py = 0,9 × Ag × Fy
= 0,9 × 173,9 × 4468,8
= 699411,89 kg
Pu 1740
=
ØPy 0,9× 173,9×4468,8
350−(2×19)−(2×20) 200000
< 3,76 × √
12 446,8
= 111415,23 kgm
Mu < ∅ Mn
78
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
27,2 200000
< 2,24 x √
1,2 446,8
h 272 200000
= = 22,6 < 1,49 x √ 446,8 = 31,5 ( tak langsing )
tw 12
Maka penampang tersebut tak langsing.
lk 𝐸
≤ 4,71 √𝐹𝑦
i min
Mencari nilai k, pada nomogram :
79
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
∑ 𝐼/𝐻
Ga = ∑ 𝐼/𝐿
13600/500
Ga = 13600/532
Ga = 1,064
𝜋2 𝐸 𝜋 2 200000
Fe = = = 443,156 Mpa
λ2 66,742
Fy
H 500
Fcr = [0,658QFe ] Fy Δ= = =1
500 500
446,8
= [0,658443,156 ] × 446,88
= 293,01 Mpa
80
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
ØPn = Ø × Ag × Fcr
= 0,9 × 173,9 × 293,01
= 45858,99 kg
Pu 1740
= = 0,038 ≤ 0,2
∅ Pn 45858,99
Pu Mu 1740 6270
+ (∅ Mn) ≤ 1,0 → 2 x 127289,58 + (100270) ≤ 1,0
2 ∅Pn
81
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
b 175
𝜆 =t = = 9,21
f 19
E 2x105
λp = 0,38 √fy = 0,38 √446,88 = 8,04
Kondisi Leleh
Ø Py = 0,9 × Ag × Fy
= 0,9 × 173,9 × 4468,8
= 699411,89 kg
Pu 2820
=
ØPy 0,9× 173,9×4468,8
350−(2×19)−(2×20) 200000
< 3,76 × √
12 446,8
82
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Mn = Zx × Fy
1
= 2493,18 cm3 × 4468,8 kg/cm2 × (102 )
= 111415,23 kgm
Mu < ∅ Mn
27,2 200000
< 2,24 x √
1,2 446,8
h 272 200000
= = 22,6 < 1,49 x √ 446,8 = 31,5 ( tak langsing )
tw 12
Maka penampang tersebut tak langsing.
lk 𝐸
≤ 4,71 √𝐹𝑦
i min
Mencari nilai k, pada nomogram :
83
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
∑ 𝐼/𝑙
Ga = 0
1870/532
Ga = 1870/532
Ga = 1
𝜋2 𝐸 𝜋 2 200000
Fe = = = 312,79 Mpa
λ2 79,442
Fy
L 1000
Fcr = [0,658Fe ] Fy Δ= = =5
200 200
446,8
= [0,658312,79 ] × 446,8
= 245,75 Mpa
84
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
ØPn = Ø × Ag × Fcr
= 0,9 × 173,9 × 245,75
= 38462,33 kg
Pu 2760
= = 0,07 ≤ 0,2
∅ Pn 38462,33
Pu Mu 2760 2120
+ (∅ Mn) ≤ 1,0 → 2 x 38462,33 + (100270 ) ≤ 1,0
2 ∅Pn
Perencanaan Sambungan
Gaya – gaya Yang Bekerja Pada Perencanaan Sambungan :
Gaya-Gaya yang bekerja
Perencanaan
M max Nmax Vmax
Sambungan
(kgm’ ) (kg) (kg)
85
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
86
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
350X350X12X19
Jarak Baut
3d < S < 15tp atau 200 mm
3 x 20 < S < 15 x 25
60 mm < S < 375 mm
digunakan S = 200 mm = 20 cm
Jarak Tepi Baut
1,75d < S1 < 12tpatau 150 mm
1,75 x 20 < S1 < 12 x 25
35 mm < S1 < 300 mm
digunakan S = 100 mm = 10 cm
Alob.y = n.d.tp
= 2.2.(2,5)
= 10 cm2
87
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Cek
Alob. 15%.(Fbruto)
10 15%.(601,5)
10 cm2 90,22 cm2
F < Td
9904,5 kg < 29216,81 kg
9904
Mn = Td.z ,6
=(29216,81).(0,2)
=5843,36 kgm > Mmax =1980,9kgm
Kapasitas geser baut
Vd = 0,75 x fnv x Ab
= 0,75 x 4570 x (¼ x π x 22)
= 10767 kg
Vn = Vd.n
= (10767).2
= 21534 kg > Vmax = 897,2 kg
88
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Fnt
F’nt = 1,3 Fnt – (ØFnv) Frv > Fnt
6200
= 1,3 x 6200 – (0,75 x 4570) x 71,40 >6200 kg/cm2
89
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
350X350X12X19
350X350X12X19
Jarak Baut
3d <S < 15tp atau 200 mm
3 x 20 <S < 15 x 25
60 mm <S < 375 mm
digunakan S = 100 mm = 10 cm
90
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
= 87606 kg
T1 = 87606kgx 2
= 175212 kg
T1 x z2
T2 = z1
175212 𝑘𝑔 𝑥 20 𝑐𝑚
= 30 𝑐𝑚
= 116808 kg
𝑧3
T3 = 𝑧1x T1
10 𝑐𝑚
= x 175212 kg
30 𝑐𝑚
=58404 kg
91
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Mn = T1 . z1 + T2 . z2 + T3 . z3
= (175212 kg x 30 cm) + (116808 kg x 20 cm) + (58404 kg x 10 cm)
= 8176560 kg.cm
= 81765,60 kgm > Mu = 4277,6 kgm
Kuat geser baut
Vd = 0,75 x fnv x Ab
= 0,75 x 4570 x (¼ x π x 22)
= 10767 kg
Vn = Vd.n
= (10767).6
= 64602 kg > Vmax = 2499,58 kg
Fnt
F’nt = 1,3 Fnt – (ØFnv) Frv > Fnt
6200
= 1,3 x 6200 – (0,75 x 4570) x 66,30 > 6200 kg/cm2
= 7940,07 kg/cm2 > 6200 kg/cm2
92
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
350X350X12X19
500X200X10X16
400X200X8X13
25 mm
Jarak Baut
3d <S < 15tp atau 200 mm
3 x 20 <S < 15 x 25
60 mm <S < 375 mm
digunakan S = 100 mm = 10 cm
Jarak Tepi Baut
1,75d < S1 < 12tp atau 150 mm
1,75 x 20 < S1 < 12 x 25
35 mm < S1 <300 mm
digunakan S = 75 mm = 7,5 cm
93
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Alob.y = n.d.t
= 5.2.(2,5)
= 25 cm2
Cek
Alob. 15%.(Fbruto.)
25 cm2 15%.(601,5)
25 cm2 90,22 cm2
Kapasitas tarik baut
Td = 0,75 x fnt x Ab
1
= (0,75).(6200).(4. .2 2 .5)
= 73042,03 kg
M =Fxz
M
F = z
6146,4 kgm x 100
= = 7680 kg
20 cm
F < Td
30732 kg < 73042,03 kg
94
Harrys Purnama ( 201510340311020 )
Dede Rizki Alimudin ( 201401340311049 )
Tugas Besar Struktur Baja 2017
Fnt
F’nt = 1,3 Fnt – (ØFnv) Frv > Fnt
6200
= 1,3 x 6200 – (0,75 x 4570) x 84,99 > 6200 kg/cm2
95