Anda di halaman 1dari 56

TAHUN 2016

PT. PATRA BANGUN NEGARA


COMPANY PROFILE
JL. ARJUNA NO. 7 BLOK B KOMPLEK PEMDA JATIASIH - BEKASI
TELP. +62 21 8273 1102
Email : patra.bn12@Gmail.com

APARTEMEN MARGONDA
DEPOK – JAWA BARAT
KATA PENGANTAR
DI TENGAH BANYAKNYA PESAING DALAM DUNIA USAHA KHUSUSNYA DALAM BIDANG
KONSTRUKSI, KAMI PT. PATRA BANGUN NEGARA YANG BERGERAK DI BIDANG PENGADAAN
JASA KONSTRUKSI MENCOBA TETAP EKSIS DAN BERTAHAN UNTUK BERKARYA DALAM
PELAYANAN.
DENGAN TUJUAN YANG MULIA SERTA IDEALISME YANG TINGGI, KAMI TETAP KONSISTEN
DENGAN KOMITMEN AWAL PADA SAAT MENDIRIKAN PERUSAHAAN, KAMI AKAN MENCOBA
BERKARYA NYATA DAN MEMBERIKAN SERTA MENAMPUNG PARA AHLI DI BERBAGAI BIDANG
DALAM MENGERJAKAN PROYEK- PROYEK DI LINGKUNGAN PEMERINTAH MAUPUN SWASTA
YANG AKAN DISELESAIKAN DENGAN BAIK. KEPUASAN KLIEN ADALAH TUJUAN KAMI MENJADI
MOTTO DALAM PELAKSANAAN PROYEK – PROYEK NANTINYA.
DALAM MEMASUKI ERA BEBAS, DIMANA TUNTUTAN PEMBANGUNAN SEMAKIN MEMERLUKAN
TENAGA TERAMPIL DAN CAKAP DI BIDANGNYA. UNTUK ITU DALAM MENGANTISIPASI HAL INI
PT. PATRA BANGUN NEGARA YANG DIDUKUNG OLEH TENAGA – TENAGA MUDA POTENSIAL
YANG MEMPUNYAI PENGALAMAN DAN KEAHLIAN DI BIDANGNYA MASING – MASING DENGAN
DITUNJANG PERALATAN YANG MEMADAI, BERUSAHA TAMPIL BERSAMA PELAKU
PEMBANGUNAN LAINNYA UNTUK MENGEMBANGKAN KEMAMPUAN DAN POTENSI YANG
DIMILIKINYA DEMI TERCIPTANYA PEMBANGUNAN YANG MAKSIMAL.
BERIKUT KAMI PAPARKAN MENGENAI PERUSAHAAN KAMI DENGAN HARAPAN DAPAT MENJADI
BAHAN PERTIMBANGAN UNTUK MENJALIN KERJASAMA DENGAN KAMI.
PT. PATRA BANGUN NEGARA SAAT INI MEMPUNYAI CUKUP BANYAK TENAGA PENUNJANG DI
LUAR TENAGA AHLI, YANG TERDIRI DARI TENAGA ADMINISTRASI, TEKNISI, DRAFTER, DAN
PENGAWAS PROYEK.
Sekilas Patra
SEIRING PERKEMBANGAN JAMAN, PEMBANGUNAN DI INDONESIA
TELAH MENYEBAR, TIDAK HANYA TERPUSAT DI KOTA-KOTA BESAR
MELAINKAN TELAH MERAMBAH KE DAERAH-DAERAH DI SELURUH
PELOSOK TANAH AIR.

DALAM PEMBANGUNAN TERSEBUT BANYAK BANGUNAN BESAR


SEPERTI GEDUNG, JEMBATAN, DERMAGA, MENARA DAN BANGUNAN
LAIN DIDIRIKAN, UNTUK MENAHAN BEBAN BANGUNAN TERSEBUT
TENTUNYA DIPERLUKAN PONDASI YANG KOKOH.

DENGAN KONDISI TANAH DI PERMUKAAN TIDAK MAMPU MENAHAN


BANGUNAN TERSEBUT, MAKA BEBAN BANGUNAN HARUS DITERUSKAN
KE LAPISAN TANAH KERAS DI BAWAHNYA. UNTUK ITU DIPAKAI JENIS
KONSTRUKSI PONDASI TIANG PANCANG ATAU BORED PILE.
Visi
Menjadi perusahaan yang terbaik dalam memberikan solusi
pekerjaan sipil dan pelaksanaannya.

Misi

Menyediakan produk dan jasa


unggulan dalam bidang
pekerjaan sipil dan
pelaksanaannya demi
meningkatkan kualitas hidup
manusia dan lingkungan.
DATA PERUSAHAAN
Nama Perusahaan : PT. PATRA BANGUN NEGARA
Alamat : Jl. Arjuna Blok B no 07 Jatiasih – Bekasi 17423
Telpon : +62 21 8273 1102
Email : Patra.bn12@gmail.com
Akte Pendirian Notaris : Parimpunan Harahap, SH.M.Kn
Surat Ijin Usaha Perdagangan : 510/202-BPPT/PM/III/2014
Nomor Pokok Wajib Pajak : 02.727.553.6-432.000
IUJK Nasional : 1.008539.3275.2.00826
SBU Jasa Konstruksi : 0.3275.07.002.1.10.008539
Tanda Daftar Perusahaan : 102614611651
Surat Keterangan Domisili : 503/168-Ekbang/XII/2013
Perusahaan
SK Menhuk & Ham : AHU-6789.AH.01.Tahun 2013
Bank Mandiri : 1670001040715
STRUKTUR ORGANISASI
PT. PATRA BANGUN NEGARA
SPESIALISASI BIDANG :

 Tanah :
 Jalan dan Jembatan :
Soil Investigasi
Rigid Pavement
Pemetaan Tanah
Instalasi Girder
Cut & Fill
 Bangunan Gedung Apartement, Ruko,
 Pondasi :
Dermaga, Galangan kapal dll,..
Bored Pile
 Pengadaan material
Pemancangan Hidraulic Hammer
Tiang pancang (Spun Pile, Square Pile,
Pemancangan Diessel Hammer
Mini Pile)
Pemancangan Jack in Hammer
 Sheet Pile (CCSP, CSSP, Flat)
Pemancangan Drop Hammer
Girder
Preboring
 Ready mix concrete
Sistem Dewatering pembangunan
 Besi dan Baja
basement gedung.
1. Geotechnical/foundation works
1.1 Pilling
1.1.1 Driven Pile
Driven Pile come in many types: Steel Pile,
Precast Concrete Pile and timber pile etc. We
have all the techniques, machineries and years of
experience in these type . PT. PATRA BANGUN
NEGARA has more than 30 years of Driven Pile
experience.

1.1.2 Loading Test.


Pile loading test are usually carried out that one or
some of the following reasons are fulfilled:
1. To obtain back-figured soil data that will enable
other piles to be designed.
2. To confirm pile lengths and hence contract costs
before the client is committed to overall job
costs.
3. To counter-check results from geotechnical and
pile driving formula.
1.1.3 Bored Pile
Bored Pile belongs to the nondisplacement
pile group. This method involves drilling by a
mechanical spiral plate or bucket auger. This
method is suitable for hard stratum or complex
soil conditions. Bored Pile also causes less
noise pollution compared to Drive
Pile works. PT. PATRA BANGUN NEGARA has
formulated and improvised reverse and double
casing method that increase efficiency and
reduce cost.
1.2 Ground Improvement
1.2.1 Compaction Stone Column

Soils with appreciable silt or clay content do


not respond to deep vibratory compaction. To
improve these cohesive soil types to allow
building and other heavy construction, it is
necessary to create stiff reinforcing elements
in the soil mass.
The stone column technique, also known as vibro-replacement or
vibrodisplacement, is a ground improvement process where vertical columns
of compacted aggregate are formed through the soils to be improved.
These columns result in considerable vertical load carrying capacity and
improved shear resistance in the soil mass.
Stone columns are installed with specialized vibratory probes, generally having a
horizontal mode of vibration. Column diameters of 2 to 5 feet can be achieved,
depending upon soil conditions and design requirements.
The vibrator first penetrates to the required depth by vibration and air or water
jetting or by vibration alone. Gravel is then added at the tip of the vibrator and
progressive raising and re penetration of the vibrator results in the gravel being
pushed into the surrounding soil. The soil-column matrix results in an overall mass
having a high shear strength and a low compressibility.
We are currently the leading Stone Column Installation Contractor in Indonesia
1.2.2 Vertical Drain: Sand Pile/Sand Drain

In the 1930s the first reasonable application


of vertical sand drains was made in
California. In Sweden, during the same
decade, Kjellman introduced the first
prototype of a prefabricated vertical drain
made entirely of cardboard (Jamiolkowski et
al., 1983).
Subsequently, several types of prefabricated
vertical drains were developed which are
basically consisting of a plastic core with a
longitudinal channel wick functioning as a
drain, and a sleeve of paper of fibrous
material as a filter protecting the core.
1.3 Retaining wall
1.3.1 Diaphragm Wall
Diaphragm Wall is a cast in place with a
reinforced or plain concrete retaining
wall constructed by special designed
trench equipment with multiple drill
head or clamshell bucket. Diaphragm
walls are underground structural
elements commonly used for retention
systems and permanent foundation
walls. They can also be used as deep
groundwater barriers the specialty in this
method is to apply stabilizing fluid
(bentonite slurry or polymer slurry) for
preventing collapse of excavated trench.

2 Project Management
PT. PATRA BANGUN NEGARA provide a project management services for helping
organizations apply project management and practices to improve business
performance.
3 Procurement
Procurement Management is a goal for ensuring that procurement processes run
smoothly so that the needed products and services can be obtained at the right
time, in the right quantity, the right quality and the right price.

4 Contraction and construction Management


PROJET EXPERIENCES
PROJECT NAME LOCATION CLIENT DURATION SCOPE OF WORK
Indonesia Integreted Steel Mill Area Plate Cilegon, Banten PT Krakatau Engineering November 2011 Pile Driving, PDA Test
Mill Krakatau-POSCO
Pembangunan Perkantoran &Apartement Jati Waringin, Jakarta PT Nosuno April s/d Juni Mini Pile ø25/25,
Estonia Timur 2012 BorePile ø400
Pembangunan JalanToliLingkarLuar Jakarta Barat PT Wijaya Karya Persero, Oktober 2012 Preboring, Pile Driving
Jakarta Ruas W2 Utara (Kebon Jeruk- TBK
Ulujami)
Proyek Minaret 99 m Masjid Islamic Mataram, Nusa PT Wijaya Karya Persero, Oktober s/d Bore Pile ø600
Centre Provinsi Nusa Tenggara Barat Tenggara Barat TBK November 2012
Renovasi Rumah Saki tHusen, Palembang Palembang, Sumatra PT Nindya Karya Wilayah IV Agustus s/d Bore Pile ø600
Selatan Oktober 2012
HPPM New Factory (Honda) DawuanKerawang, PT Shimizu BangunCipta Oktober s/d Pile Driving
Jawa Barat Contractor Desember 2012
Proyek Perkuatan LerengKanan / Kiri Kaki JatiGede, Jawa Barat PT FajarParahiyangan Oktober s/d Bore Pile ø600 & ø800
Bendungan JatiGede, Jawa Barat Desember 2012
Sekolah Tinggi Kepemerintahan dan Sentul, Bogor - Jawa PT Kencana Graha Pertiwi Desember 2012 Bore Pile ø600 & ø800
Kebijakan Public (STKKP) Barat s/d Maret 2013
HPPMQC Building (Honda) Sentul, Bogor - Jawa PT Shimizu Bangun Cipta Februari 2013 s/d mini Pile ø25/25
Barat Contractor Maret 2013
Pembangunan Rusunawa di Pakri, Palembang, Sumatra PT Asaki Maret s/d April mini Pile ø25/25
Palembang Selatan 2013
Steel Sheet Pile pada Project RFCC at ISBL Cilacap, Jawa Tengah PT KoinPratama April s/d Juli Driving Steel Sheet
AREA Engineering 2013 PileIIIW350
Pembangunan Rusunawa di Jaka Baring, Palembang, Sumatra PT Asaki Maret s/d April mini Pile ø25/25
Palembang Selatan 2013
Pembangunan Infrastruktur M2100 Cibitung, PT Tirta Alam Segar Februari 2014 Bore Pile 300 @12M68
Jawa Barat Nos
Poject Infrastruktur Win Properties Bogor - Jawa Barat PT Jaya Properti Indonesia Juni 2013 Cut & Fill &
(Win delRio) Yasmin - Bogor Infrastruktur
PROJET EXPERIENCES
PROJECT NAME LOCATION CLIENT DURATION SCOPE OF WORK
Cikarang Listrindo Phase VIII di MM210 Cibitung, Bekasi PT SilkarNasional Agustus – Spun Pile 450, 105 Nos
September 2013
Proyek Pemb. Jalan Tol Cikampek – Merak - Banten PT Girder Indonesia Agustus – Spun Pile 450
Palimanan Seksi 1a, 2b dan 3c September 2013

Proyek Shipon Bekasi Bekasi - Jawa Barat PT WaskitaKarya Agustus – Pancang & Cabut SSP
September 2013
Pagar Gd. Diklat BPK Kali Bata Jakarta Timur Dinas Pekerjaan Umum Agustus – Bore Pile
September 2013
Pelebaran Ruas Toll Jagorawi Jakarta PT Sarana Marga Utama September – Spun Pile Dia500, 40
STA. 28.800 & STA. 33.200 Oktober 2013 Nos
Proyek Infra struktur Kawasan Industri LippoCikarang PT Lampiri Djaya Abadi Oktober 2013 Pancang square
Lippo Cikarang Pile350
Pemancangan Sheet Pile Hankook Cikarang PT Trilogi Surya Wisesa Oktober – Sheet Pile350
November 2013
Infrastruktur Lippo Cikarang Cikarang PT Bangkit Usaha Oktober – Sheet Pile W600 -
Contractor November 2013 A1000
Proyek Pembangunan JalanTolCikampek Palimanan PT Pembangunan Oktober – Pancang Square Pile
– Palimanan ( Cipal ) section 6B Perumahan Desember 2013 400
ProyekNormalisasi Kali Pesanggrahan Jakarta Selatan PT Pembangunan Oktober 2013 Pancang dia35/35,
Perumahan
Supply & Install 20.000 m3 Bolted Steel Jakarta PT Aetra Air Jakarta November –
Tank (Refer to AWWA D103 Or ISO Desember 2013
28765)
Bolted Steel Tank For Reservoir Cilincing TanjungPriok PT Amarta Jaya November 2013 Boring 600@14M',
Distribution Centre ( Cdc )
PROJET EXPERIENCES
PROJECT NAME LOCATION CLIENT DURATION SCOPE OF WORK

Project of Landslide area, AWI 14 G. Salak - Sukabumi PT GadingMaju Sejahtera Desember 2013 Boriing 600@14M',
Area Chevron Geothermal

Proyek Cikampek Palimanan Package I Palimanan PT PACIFIC PRESTRESS Desember 2013 Preboring u/ TP Spun
Cikopo - Kalijati INDONESIA – Januari 2014 Pile

Perancangan Pembangunan Pipa Gas Jakarta - Bogor PT Estu Artha Lancar Oktober – Survey ( GPR ) - GPS
Kota 2014 November 2014 Benchmark and Soil
Resistivinity Survey

Perluasan Gedung Terminal 3 Ultimate Tagerang Kawahapejaya Indonesia Oktober 2014 Bore Pile
Bandara Soekarno Hatta KSO

Pembangunan Trestle KBS KBS Cilegon PT Alhas Jaya Group September 2014 Pancang Spun Pile

Rumah Sakit Siloam Ambon, Mauku PT Handaru Adhiputra Oktober – Bore Pile
Ambon Desember 2014

Rumah pompa Tubagus Angke Jelambar Jakarta PT Suburo Jayana Indah November 2014 Pengadaan CCSP
Corp

Jembatan Timbang Indah Kiat MerakSerng PT Boner November 2014 Pancang Square Pile

Pembangunan Apartemen Adhi Griya Depok PT GrahaLokaPangestu Desember 2014 Soil Investigasi &
Pangestu Margonda Perencanaan Struktur

Horisontal drilling dan pemasangan pipa Tanjung Priok TPK Koja Jakarta. Juni - Juli 2015 Drilling & Pipe line
Pertamina - Vopak
Soil Investigasi

Sondir

Bore Hole

Down Hole Seismic


Pemetaan Geo Radar
BORED PILE

WASH BORING DI RS AINUN HABIBIE -


GORONTALO
BORED PILE
Bore Pile Bore Pile

Bore Pile Bore Pile

Pegeboran Pengecoran
Bore Pile
Jacking Pile
DRIVEN PILE
PREBORING

Mechanical Flower

Proyek PLTU Tanjung Awar Awar Tuban


Pekerjaan Preboring
STEEL SHEET
PILE
INSTALATION Of PRECAST
CONCRETE GIRDER By LAUNCHER
Photo Corners
PILE LOADING
TEST
CRANE TADANO
Kapasitas 45 Ton

CRANE SERVICE CLORER 35 T


DAN JACKING 240 T
CRANE SERVICE DG TRIPOD 60 T
JACKING 320 Ton
DAN DIESEL HAMMER DWD 55
BOR AUGER

SOIL MEC 2200 PC


BORE PILE WORKS
PLTU 2 Jateng 1x660 MW Adipala - Cilacap
EPC BUT China National Technical Import
and Export Corporation

SOIL MEC 2200 PC


REKING PILE WORK

HYDRAULIC HAMMER
PILING WORK
APARTEMEN MARGONDA
DEPOK – JAWA BARAT
KEMANG PENTHOUSE
JAKARTA SELATAN
TMII DISTRIC BISNIS
JAKARTA TIMUR
LEGALITAS
PT. PATRA BANGUN NEGARA
SURAT KETERANGAN DOMISILI
USAHA
PKP
PT. PATRA BANGUN NEGARA
PKP
PT. PATRA BANGUN NEGARA
TDP
PT. PATRA BANGUN NEGARA
SK MENTERI HUKUM DAN HAM
PT. PATRA BANGUN NEGARA
SIUP
PT. PATRA BANGUN NEGARA
SUJK
PT. PATRA BANGUN NEGARA
SUJK
PT. PATRA BANGUN NEGARA
SBU
PT. PATRA BANGUN NEGARA
SBU
PT. PATRA BANGUN NEGARA
SBU
PT. PATRA BANGUN NEGARA
SBU
PT. PATRA BANGUN NEGARA
KTP dan NPWP
PT. PATRA BANGUN NEGARA

NPWP badan usaha


PT. PATRA BANGUN NEGARA
TERIMA KASIH

Anda mungkin juga menyukai