Anda di halaman 1dari 6

JASA PELAKSANAAN UPGRADING BS II, BS V

DAN BS VI FIELD TANJUNG –TANJUNG


WATERFLOOD PROJECT
No. Dok : BSTJG-10-T2-TE-004
TECHNICAL BID EVALUATION - FOR
Rev. : 0
CRUDE OIL TANK (02-T-105)
Halaman : 1 dari 6

NAMA PEMILIK PROYEK : PERTAMINA EP

NAMA PROYEK : JASA PELAKSANAAN UPGRADING BS II, BS V


DAN BS VI FIELD TANJUNG –TANJUNG
WATERFLOOD PROJECT

LOKASI : TANJUNG EOR PROJECT

NO. KONTRAK :

0 26-Nov-2019 Aprroval for Contruction AWS DWH ANS DKN NP


B 21-Nov-2019 Issued for Approval AWS DWH ANS
A 19-Nov-2019 Issued for Review AWS DWH ANS
DIPERIKSA DISETUJUI DIPERIKSA DISETUJUI
REV. TANGGAL DESKRIPSI DISIAPKAN
PT. GLOBALINDO BUANA PERTAMINA EP
TECHINCAL BID EVALUATION FOR CRUDE OIL TANK (02-T-105) BSTJG-10-T2-TE-004
JASA PELAKSANAAN UPGRADING BS II, BS V DAN BS VI FIELD TANJUNG -
TANJUNG WATERFLOOD PROJECT Hal 2 dari 6

TABEL REVISI

Rev. Tanggal Deskripsi


A 19-Nov-2019 Issued for Review
B 21-Nov-2019 Issued for Approval
0 26-Nov-2019 Aprroval for Contruction
TECHINCAL BID EVALUATION FOR CRUDE OIL TANK (02-T-105) BSTJG-10-T2-TE-004
JASA PELAKSANAAN UPGRADING BS II, BS V DAN BS VI FIELD TANJUNG -
TANJUNG WATERFLOOD PROJECT Hal 3 dari 6

DAFTAR ISI

1.  TECHNICAL BID EVALUATION FOR CRUDE OIL TANK (02-T-105) ............................................... 4 
TECHINCAL BID EVALUATION FOR CRUDE OIL TANK (02-T-105) BSTJG-10-T2-TE-004
JASA PELAKSANAAN UPGRADING BS II, BS V DAN BS VI FIELD TANJUNG -
TANJUNG WATERFLOOD PROJECT Hal 4 dari 6

1. TECHNICAL EVALUATION FOR STORAGE TANK

RESUME

Dokumen ini dipersiapkan sebagai dasar rangkuman perhitungan internal PT Globalindo Buana atas
pekerjaan Crude Oil Tank (02 – T – 105) di kontrak pekerjaan “Pekerjaan Jasa Pelaksanaan Upgrading
BS II, BS V dan BS VI Field Tanjung – Tanjung Waterflood Project”.

Pelaksanaan kontruksi rencana tangki crude oil (02-T-105) ini akan di kerjakan swa-kelola oleh PT.
Globalindo Buana dengan dasar referensi PT. Globalindo Buana mempunyai SKUP (Surat Kemampuan
Usaha Penunjang) MIGAS dan mempunyai WPS (Welding Specification Specification) dan PQR
(Procedure Qualification Record) dan berpengalaman.
PEKERJAAN JASA PELAKSANAAN UPGRADING BS II, BS V, BS VI FIELD TANJUNG – TANJUNG WATERFLOOD PROJECT

TECHNICAL BID EVALUATION - CRUDE OIL TANK (02-T-105)

Status
NO. DESCRIPTION REQUIREMENT PT. GLOBALINDO BUANA

1 I - GENERAL
2 Tag No. 02-T-105 02-T-105 
3 Quantity 1 (Satu) 1 (Satu) 
4 Service Crude Oil Tank Crude Oil Tank 
5 Tank Type Silinder Silinder 
6 Roof Type Self Supported Cone Roof Self Supported Cone Roof 
7 Bottom Type Flat Bottom Flat Bottom 
8 II - CONFORMITY (as listed in Requisition)
9 Applicable Code and Standard listed in specification Required Confirmed 
10 Compliance with Project Specification Required Confirmed 
11 III - SCOPE OF SUPPLY / SERVICES
12 III.1 - Scope of Supply
Detail Design, Material Supply, Fabrication, Painting, Shop Test/Hydrotest, Expediting and Testing, Internal
13 Confirmed 
Assembly & Installation, External Attachments, and Documentation of Crude Oil Tank (02-T-105)
One unit
14 Scope of supply as minimum consists of the followings:
15 • One (1) unit of Crude Oil Tank c/w internal pipe, external attachment, nozzle,and gaskets Required Confirmed 
16 • Internally Epoxy Lining Required Confirmed 
17 • Coating and painting as per project specification PEP-00-N1-SP-0001 Required Confirmed 
18 • Pipe Support Clips Required Confirmed 
19 • Anchor Bolts Required Confirmed 
20 • Anchor Chair Required Confirmed 
21 • Vortex Breaker Required Confirmed 
22 • Measurement Table Required Confirmed 
23 • Deflector Required Confirmed 
24 • Foam Chamber Required Confirmed 
25 • Earthing Boss Required Confirmed 
26 • Lifting Lugs Required Confirmed 
27 • Davit Required Confirmed 
28 • Name plate & it's bracket Required Confirmed 
29 Guarantee for selected material is suitable for process service Required
Confirmed 
30 Recommended 2 years operation spare parts lists with itemized price One set Confirmed 
Spare parts for precommissioning / commissioning and start-up including bolst&nuts, washer, gaskets,
31 Confirmed 
packing, etc. One set
32 Special tools for maintenance and installation (if any) One set Confirmed 
33 III.2 - Scope of Services
34 Packing and Shipping Preparation as per Project Specification Required Confirmed 
Detail engineering for the Crude Oil Tank including tank datasheet, calculation report (tank & skid support),
35 Confirmed 
GA drawing, detail fabrication drawing & other required documentations. Required
36 Warranty and mechanical guarantee Required Confirmed 
37 III.2.a - QA Inspection and Test
38 ITP (Inspection Test Plan), Inspection Report, QA/QC Procedure Required Confirmed 
39 Material Certification ISO 10474 Confirmed 
40 Material Traceability Required Confirmed 
41 Non Destructive Testing As Per Code Confirmed 
42 Hydrotesting (Full of Water) Required Confirmed 
43 Radiography Test Required Confirmed 
44 Vacuum Test Required Confirmed 
45 Painting + Linning Inspection Procedure PEP-TJG-M-JP-010 Confirmed 
46 WPS Required Confirmed 
47 PQR PEP-TJG-M-JP-010 Confirmed 
48 Welder Test Required Confirmed 
49 Dimensions Required Confirmed 
50 Inspection and Testing Schedule Required Confirmed 
TECHNICAL BID EVALUATION - CRUDE OIL TANK (02-T-105)

Status
NO. DESCRIPTION REQUIREMENT PT. GLOBALINDO BUANA

51 III.2.b - Others
52 All Documents (MDR) required for SI/PLO Required Confirmed 
53 IV. OPERATING CONDITION
54 IV.1 - SITE AND INSTALLATION DATA
55 Basic Wind Speed 108 mph 108 mph 
56 Seismic Factor Ss=0,283; S1=0,085 Ss=0,283; S1=0,085 
57 IV.2 - MECHANICAL DESIGN DATA
58 Liquid Service Crude Oil Crude Oil 
59 Design Code API 650 API 650 
60 Size: ID x Tinggi ID 8230 x 5490 H ID 8230 x 5490 H 
61 Design Pressure: Internal/External Full of Water + 1 psig / - Full of Water + 1 psig / - 
62 Design Temperature 160 oF 160 oF 
63 Operating Pressure Atm Atm 
64 Operating Temperature 110 oF o
110 F 
65 Corrosion Allowance 3 mm 3 mm 
66 Thickness: Course 1 (mm) 8 mm 8 mm 
67 Thickness: Course 2 (mm) 8 mm 8 mm 
68 Thickness: Course 3 (mm) 8 mm 8 mm 
69 Thickness: Roof (mm) 10 mm 10 mm 
70 Thickness: Bottom (mm) 10 mm 10 mm 
71 Pumping Rate in / out (bpd) 4500 / 3680 4500 / 3680 
72 Material: As Per Datasheet / GA Drawings Confirmed 
73 Nozzle Connection (Size/Rating/Type): As Per Datasheet / GA Drawings Confirmed 
74 V. WEIGHT and DIMENSIONS
75 Empty (lb) VTA 46786 lbs 
76 Operating (lb) VTA 578360 lbs 
77 Test Full of Water (lb) VTA 689880 lbs 
78 VI. MISCELANEOUS
79 Delivery time Best possible 3 Months 
80 Location of Fabrication VTA Site Tanjung Field 
81 Design Life 20 years Confirmed 
A

FINAL RESULT Bidder's Offer is Technically Acceptable.

REMARKS: (VTA): Vendor To Advise (NAV): No Data Available Yet (C): Compliant (CR): Clarification Required (A): Acceptable (NC): Not Compliant (NA): Not Applicable