REV
BLA-FTP-H-PR-00-019 1
TINJAUAN STATUS :
A. DISETUJUI
C. DITINJAU / DIKOMENTAR
Serahkan kembali Dokumen yang telah dikoreksi untuk Persetujuan
TANGGAL : ------------------
TANDA TANGAN : ------------------
STATUS SELANJUTNYA :
KONTRAKTOR PERUSAHAAN
REV TGL TUJUAN DISIAPKAN DIPERIKSA DISETUJUI DISETUJUI
1 10-Mar-16 APPROVED FOR Adhi. S S. Siregar D. Putra
CONSTRUCTION
0 18-FEB-16 ISSUED FOR Adhi. S S. Siregar D. Putra
CONSTRUCTION
C 12-FEB-16 ISSUED FOR Adhi. S S. Siregar D. Putra
APPROVAL
B 07-Dec-15 ISSUED FOR Adhi. S S. Siregar D. Putra
APPROVAL
A 17-Nov-15 ISSUED FOR Adhi. S S. Siregar D. Putra
APPROVAL
0-0709-00-0000 S-000-1654-070
DOKUMEN NO. Dok. No:
BLA-FTP-H-PR-00-
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-H-PR-00- 019
019
Rev. 1 Hlm : 2 dari
PROSEDUR IZIN KERJA (PTW) 47
Kontrak
Tgl : 07-Mar-2017
No.3510005298
RECORD OF REVISION
The revisions listed below have been incorporated in this copy of the document.
PAGE
REV. NO. SECTION NO. DESCRIPTION OF CHANGES
DOKUMEN NO. Dok. No:
BLA-FTP-H-PR-00-
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-H-PR-00- 019
019
Rev. 1 Hlm : 3 dari
PROSEDUR IZIN KERJA (PTW) 47
Kontrak
Tgl : 07-Mar-2017
No.3510005298
DAFTAR ISI
1. PENDAHULUAN........................................................................................................... 6
2. MAKSUD DAN TUJUAN................................................................................................ 6
3. CAKUPAN..................................................................................................................... 6
4. ACUAN......................................................................................................................... 6
5. SINGKATAN DAN DEFINISI........................................................................................... 6
5.1 Definisi........................................................................................................... 6
5.2 Singkatan....................................................................................................... 8
6. PERAN DAN TANGGUNG JAWAB................................................................................. 8
6.1 Manajer Proyek............................................................................................. 8
6.2 Manajer Tapak/Konstruksi............................................................................ 8
6.3 Petugas PTW.................................................................................................. 8
6.4 Otoritas Persetujuan...................................................................................... 9
6.5 Otoritas Pelaksana........................................................................................ 10
6.6 Manajer SHE dan Penyelia Keselamatan...................................................... 11
7. PENUNJUKAN ORANG YANG BERWENANG DAN PELATIHAN..................................... 11
7.1 Persyaratan................................................................................................... 11
7.2 Persyaratan Pelatihan................................................................................... 12
7.3 Isolasi............................................................................................................. 12
7.4 Label Bahaya Pribadi dan Kunci Pribadi......................................................... 13
7.5 Penerbitan Izin Kerja...................................................................................... 14
7.6 Penarikan Izin Kerja......... .............................................................................. 15
7.7 Masa Berlaku Izin Kerja.................................................................................. 15
7.8 Perubahan Penerima atau Orang yang Berwenang....................................... 15
7.9 Penyelesaian Pekerjaan................................................................................. 16
7.10 Catatan PTW................................................................................................ 16
8. KLASIFIKASI IZIN KERJA................................................................................................ 17
8.1 Izin Umum/Pekerjaan Dingin......................................................................... 17
8.2 Izin Pekerjaan Panas...................................................................................... 17
8.3 Sertifikat Izin Kerja......................................................................................... 18
9. CATATAN...................................................................................................................... 18
10. LAMPIRAN.................................................................................................................. 19
Lampiran-1: Proses Izin Kerja............................................................................... 20
Lampiran-2: Penerbit Izin Kerja yang Berwenang................................................ 19
Lampiran-3: Izin Umum/Pekerjaan Dingin........................................................... 23
Lampiran-4: Izin Umum/Pekerjaan Panas............................................................ 23
Lampiran-5: Sertifikat Izin Umum/Dingin............................................................. 26
Lampiran-6: Sertifikat Pekerjaan Panas................................................................ 28
Lampiran-7: Sertifikat Bekerja di Ketinggian......................................................... 30
Lampiran-8: Sertifikat Memasuki Ruang Terbatas................................................ 32
Lampiran-9: Sertifikat Penggalian......................................................................... 35
DOKUMEN NO. Dok. No:
BLA-FTP-H-PR-00-
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-H-PR-00- 019
019
Rev. 1 Hlm : 4 dari
PROSEDUR IZIN KERJA (PTW) 47
Kontrak
Tgl : 07-Mar-2017
No.3510005298
1. PENDAHULUAN
Risiko merupakan bagian inheren dari pekerjaan apa pun. Risiko ada dalam pekerjaan itu
sendiri dan/atau di area yang berdekatan dengan pekerjaan yang akan dilakukan. Sistem izin
kerja ini dibentuk untuk mengendalikan risiko terhadap tingkat yang dapat dikelola.
3. CAKUPAN
Prosedur ini memberikan panduan kepada personil kunci Proyek dalam pelaksanaan Sistem
Izin Kerja yang akan diterapkan selama pelaksanaan kegiatan proyek kecuali di bawah area
SIMOPS, KONTRAKTOR akan mengikuti sistem PTW PERUSAHAAN.
4. ACUAN
BLA-FTP-H-PD-00-001 Rencana SHE
5.2 Singkatan
SHE : Safety, Health and Environmental (Keselamatan, Kesehatan dan Lingkungan)
PPE :Personal Protective Equipment (Alat Perlindungan Diri)
PTW :Permit To Work System/Procedure (Sistem/Prosedur Izin Kerja)
PA :Performing Authority (Otoritas Pelaksana
7.3 Isolasi
Orang yang Berwenang harus memastikan bahwa semua isolasi yang diperlukan ada, telah
ditandai dengan label RUSAK/JANGAN DIJALANKAN dan terkunci bila sesuai. Semua isolasi
listrik harus diperiksa untuk efektivitas mereka, Lampiran-14 menjelaskan prosedur untuk
Sertifikat Pekerjaan Isolasi.
Prosedur isolasi berikut harus dipatuhi:
Isolasi Listrik;
Bekerja pada Prosedur Tegangan Tinggi;
Bekerja pada Peralatan Tegangan Rendah Listrik; dan
Isolasi Pabrik.
Bekerja pada, atau dengan peralatan bertekanan (hidrolik atau pneumatik)
Isolasi harus didokumentasikan menggunakan Lembar Isolasi atau P & ID yang ditandai dan
dilampirkan pada Izin Kerja. Setiap label harus memiliki nomor Izin Kerja yang tertulis di
atasnya untuk referensi.
Catatan: Izin Kerja Kelas—A (MERAH) harus disetujui oleh Otoritas Area paling sedikit 12 jam
sebelum pekerjaan dimulai, kecuali pekerjaan yang mendesak atau darurat.
9. CATATAN
Lembar pencatatan Izin Kerja harus dibuat di Petugas PTW. Salinan izin perorangan harus
disimpan sampai selesai proyek (lihat formulir):
Izin Untuk Kerja Kelas—A
Izin Untuk Kerja Kelas—B
Sertifikat Izin Kerja
Catatan Pelatihan PTW
10. LAMPIRAN
Lampiran-1 Proses Izin Kerja
Lampiran-2 Penerbitan Izin Kerja Terotorisasi
Lampiran-3 Izin Kerja Kelas—A (Warna Merah)
DOKUMEN NO. Dok. No:
BLA-FTP-H-PR-00-
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-H-PR-00- 019
019
Rev. 1 Hlm : 14 dari
PROSEDUR IZIN KERJA (PTW) 47
Kontrak
Tgl : 07-Mar-2017
No.3510005298