Anda di halaman 1dari 10

METODE

PEKERJAAN
SIDE DITCH

January, 2021

PT WIKA
HSR PROJECT
PREPARED BY
SECTION 3
Ardefian P.Suharno
Page 01

PENGECORAN TAHAP PERTAMA DILAKUKAN PADA


1 STAGE 1 ATAU FOOTING SIDE DITCH TERLEBIH DAHULU

2 EGATS

STAGE 1
Page 02
MEMASANG STEK BESI UNTUK MENGUNCI POSISI
2 FORMWORK BODY DITCH

MENGHALUSKAN AREA PERMUKAAN FOOTING YANG AKAN


3 DIGUNAKAN UNTUK DUDUKAN FORMWORK BODY AGAR
NANTINYA SAAT PEMASANGAN RATA
Page 01
FORMWORK YANG DIGUNAKAN WAJIB MENGGUNAKAN
4 PHENOLIC YANG DI BERI PERKUATAN BERUPA BESI
HOLLOW
Page 01
MELUMASI PERMUKAAN PHENOLIC MENGGUNAKAN SIKA
5 SAPAROL DENGAN CARA :
1. MELUMASI PERMUKAAN BEKESTING DENGAN SIKA
SAPAROL MENGGUNAKAN ROL UKURAN KECIL SECARA
TIPIS
2. MENGELAP BEKAS SIKA SAPAROL PADA PERMUKAAN
BEKESTING MENGGUNAKAN ROL UKURAN BESAR

MEMBUAT LUBANG PADA BAGIAN ATAS BEKESTING UNTUK


6 MENCEGAH ADANYA HONEY COMB PADA BAGIAN ATAS
Page 01
SAAT PEMASANGAN FORMWORK BODY, BUSA
7 WAJIB DI PASANG PADA BAGIAN BAWAH GUNA
MENCEGAH TERJADINYA KEBOCORAN

8 MEMASANG PIPA DENGAN KEMIRINGAN 5%


Page 01
TIE ROT WAJIB DIPASANG UNTUK PERKUATAN DAN
9 PENGUNCI FORMWORK DENGAN JARAK ANTAR TIE ROT
MAKSIMAL 80 CM

60 CM
Page 01

MEMASANG LIST MENGGUNAKAN BESI SIKU "L" (L FLANGE)


10 UNTUK MENGASILKAN BENTUK CHAMPER PADA SISI TEPI
DITCH SERTA MEMASANG BETON DECKING UNTUK MENJAGA
SELIMUT BETON

MEMASANG PERKUATAN BERUPA BRACING PADA SISI


11 TENGAH DITCH
Page 01
MENGGUNAKAN PERKUATAN PENGAKU PADA SISI ATAS
12 GUNA MENCEGAH BEKESTING BERGESER SAAT PROSES
PENGECORAN

MENGGUNAKAN STEROFOAM PADA AREA DILATASI


13 /SAMBUNGAN
Page 01

14 HASIL PENGECORAN