@calculation Note FDN - TE-04
@calculation Note FDN - TE-04
PLN (PERSERO)
UNIT INDUK PEMBANGUNAN JAWA-BALI PT. MEDCO ENERG INDONESIA PT. GRAHA USAHA TEKNIK
P(+) P(-)
Fx,y
h1 Mx,y
Fy
Ws Ws Lch Fx
Dt bY BY
h2 D
Wp bX
h3
0 BX
Qall
DAFTAR ISI
DAFTAR ISI................................................................................................................................................................... 1
I. PENDAHULUAN.................................................................................................................................................... 2
II. DASAR PERENCANAAN......................................................................................................................................... 2
2.1. PEDOMAN............................................................................................................................................................. 2
2.2. REFERENSI............................................................................................................................................................. 2
2.2.1. Kriteria Desain (Technical Perpendicular and Guarantee of Foundation)..................................................... 2
2.2.2. Analisa Reaksi Tumpuan Tower (Support Reaction Analisys)........................................................................ 3
2.2.3. Analisa Laporan Penyelidikan Tanah (Soil Test Analisys).............................................................................. 3
V. PERHITUNGAN PEMBESIAN.................................................................................................................................. 8
5.1. Pembesian Chimney.............................................................................................................................................. 8
5.2. Pembesian Pad...................................................................................................................................................... 9
VI. KESIMPULAN........................................................................................................................................................ 10
6.1. Umum.................................................................................................................................................................... 10
6.2. Barbending Skejul.................................................................................................................................................. 10
1/10
PERHITUNGAN STRUKTUR PONDASI TE-04
PEKERJAAN PEMBANGUNAN SUTT 150 KV BALI TIMUR (EAST BALI) Type Tower AA+9
Drawing No. Revision Status Date Kelas Pondasi 1
PT. MEDCO POWER INDONESIA : 0155-MBT-KBU-00-S-TL-027 0 IFC 9 Mar 2024 PAD & CHIMNEY PT. GRAHA USAHA TEKNIK
I. PENDAHULUAN
Dokumen perhitungan pondasi ini dibuat untuk kepentingan desain pada :
Proyek : PEKERJAAN PEMBANGUNAN SUTT 150 KV BALI TIMUR (EAST BALI)
No. Tower : TE-04
Type Tower : AA+9
Pemilik Proyek : PT. MEDCO POWER INDONESIA
Kontraktor : PT. GRAHA USAHA TEKNIK
No. Kontrak : -
Tanggal Kontrak : -
Dokumen dibuat dengan perpedoman pada peraturan-peraturan standart yang berlaku, referensi teknis kontrak proyek,
serta literasi-literasi lainnya yang berhubungan dengan perhitungan struktur pondasi.
II. DASAR PERENCANAAN
2.1. Pedoman
1 Standarisasi Perhitungan Pondasi SUTT SPLN T5.008-1:2019
2 Standarisasi Perhitungan Pondasi SUTT SPLN T5.008-2:2021
3 Tata Cara Perhitungan Struktur Beton SNI 03 - 2847 - 2013
4 ACI (American Concrete Institute 1989)
5 PPI. 1983 (Peraturan Pembebanan Indonesia 1983)
2.2. Referensi
2.2.1 Kriteria Desain ( SPLN T5.008-2: 2021 )
2/10
PERHITUNGAN STRUKTUR PONDASI TE-04
PEKERJAAN PEMBANGUNAN SUTT 150 KV BALI TIMUR (EAST BALI) Type Tower AA+9
Drawing No. Revision Status Date Kelas Pondasi 1
PT. MEDCO POWER INDONESIA : 0155-MBT-KBU-00-S-TL-027 0 IFC 9 Mar 2024 PAD & CHIMNEY PT. GRAHA USAHA TEKNIK
2.2.2 Analisa Reaksi Tumpuan Tower AA+9 Jarak antar kaki 6,277 m
COMPRESSION TENSION Beban Tower :
Condition FX FY FZ FX FY FZ Beban Tekan P(+) = 289,842 kN
kN kN kN Kn kN kN Beban Tarik P(-) = 231,543 kN
NORMAL 16,269 20,693 200,172 11,193 15,593 139,033 Beban Geser arah X FX = 21,798 kN
BROKEN 19,566 31,362 289,842 21,798 19,433 231,543 Beban Geser arah Y FY = 31,362 kN
= 246 kN/m
2
Kelas pondasi = 1
= 246,15 kN/m
2
3/10
PERHITUNGAN STRUKTUR PONDASI TE-04
PEKERJAAN PEMBANGUNAN SUTT 150 KV BALI TIMUR (EAST BALI) Type Tower AA+9
Drawing No. Revision Status Date Kelas Pondasi 1
PT. MEDCO POWER INDONESIA : 0155-MBT-KBU-00-S-TL-027 0 IFC 9 Mar 2024 PAD & CHIMNEY PT. GRAHA USAHA TEKNIK
2. Baja Tulangan
2
Mutu baja tulangan utama, BjTD 32 fy = 32 kg/mm = 314 Mpa SNI-2052-2014
2
Mutu baja tulangan geser, BjTP 24 fy = 24 kg/mm = 235 Mpa SNI-2052-2014
Modulus Elastisitas Baja, Es = 210000 Mpa SNI-03-2847-2002
By
Sisi kritis bw = B-a = 0,68 m
bo = B - 2bw = 1,13 m
2
Luas area geser 1 arah A1 = Bx.bw = 1,71 m
Tegangan pada dasar pondasi (SPLN T5.008-2: 2021(3))
a bw
qmax = (P(+)+Wb+Ws2) / (1+ 6.h1/B) 75,43 kN/m2 < qall = 246,15 kN/m2 Bx
qmax < qall = OK P
Beban geser 1 arah
VU1 = qmax x A1 = 128,81 kN
D
Kuat geser beton terfaktor
φVC = 0,75.0,17.√ fc' .B.def = 451,88 kN d' d
VU1 < φVC OK Tebal pad cukup untuk menahan beban geser q
4/10
PERHITUNGAN STRUKTUR PONDASI TE-04
PEKERJAAN PEMBANGUNAN SUTT 150 KV BALI TIMUR (EAST BALI) Type Tower AA+9
Drawing No. Revision Status Date Kelas Pondasi 1
PT. MEDCO POWER INDONESIA : 0155-MBT-KBU-00-S-TL-027 0 IFC 9 Mar 2024 PAD & CHIMNEY PT. GRAHA USAHA TEKNIK
Tinjauan Gaya Geser Pons Dua Arah (SNI 2847:2013 Pasal 11)
2 2 2
Luas area geser 2 arah A2 = Bx - b o = 4,96 m
Area geser dua arah
bw
2
Beban geser 2 arah VU2 = qmax x A2 = 374,46 kN/m
bx
Kuat geser beton:
by
By
bo
VC1 = SNI 2847:2013 Pasal 11.11.2.1.(a)
= 0,17*(1+(2/1)) x 1 x √20,00 x 1,13 x 4 x 0,40
4138,26 kN
bw
=
bw bo bw
VC2 = SNI 2847:2013 Pasal 11.11.2.1.(b) Bx
= 0,083.(((40*0,4)/(4*1,134))+2) x 1 √20,00 x4 x 1,13 x 0,40 P
= 3722,56 kN
5/10
PERHITUNGAN STRUKTUR PONDASI TE-04
PEKERJAAN PEMBANGUNAN SUTT 150 KV BALI TIMUR (EAST BALI) Type Tower AA+9
Drawing No. Revision Status Date Kelas Pondasi 1
PT. MEDCO POWER INDONESIA : 0155-MBT-KBU-00-S-TL-027 0 IFC 9 Mar 2024 PAD & CHIMNEY PT. GRAHA USAHA TEKNIK
qall 246,15
CHECK STABILITAS TEKAN (Bearing Capacity) = = 1,36 > SF = 1,00 OK
qmax 180,62
V. PERHITUNGAN PEMBESIAN
5.1. PERHITUNGAN PEMBESIAN CHIMNEY
Tulangan Utama
Panjang chimney L = 3600 mm Beban vertikal chimney P(+) = 289,84 kN
Lebar chimney h=b = 500 mm Beban vertikal ultimate PU = 1,2.P(+) = 347,81 kN
Jarak tulangan ke sisi luar d' = 83 mm Beban horisontal arah X FX = 21,80 kN
Lebar efektif h' =b - 2.d' = 334 mm Beban horisontal arah Y FY = 31,36 kN
Beban horisontal maksimal max (FX;FY) = 31,36 kN
Momen akibat beban horisontal M = FH.Lc = 112,90 kN.m
Parameter grafis : Momen ultimate MU = 1,2.M 135,48 kN.m
PU 347810
K1 = 2 =
φ.0,85 fc.b 2762500
= 0,13
MU 135483,05
e = =
PU 347810,18
= 0,390 m = 390 mm
e' = 1/6.B = 417 mm
e < e' = OK
e 390
= = 0,97383
ht 400
Tulangan Geser
Diameter Øg = 10 mm
2
Luas penampang Ag = 78,54 mm
Faktor reduksi φg = 0,75 (SNI 2847:2013 Pasal 9.3.2.3)
Beban Geser VC = FH = 31,36 kN
Beban geser ultimate VU = 1,2 .VC = 37,63 kN
Kuat geser beton
φVc = 0,17√fc.bw.h' = 0,75. 0,17 .√20,0 .500 .334 = 95223 N = 95,22 kN (SNI 2847:2013 Pasal 11.2.1.1)
φVc > VU (Gunakan tulangan geser minimum)
Jarak sengkang perlu s
s'1 = b/4 = 500/4 = 125 mm (SNI 2847:2013 Pasal 21.6.4.3)
s'2 = Jarak maksimum = 150 mm (SNI 2847:2013 Pasal 21.6.4.3)
Digunakan tulangan, s = Ø10 - 100 s <= smax OK
7/10
PERHITUNGAN STRUKTUR PONDASI TE-04
PEKERJAAN PEMBANGUNAN SUTT 150 KV BALI TIMUR (EAST BALI) Type Tower AA+9
Drawing No. Revision Status Date Kelas Pondasi 1
PT. MEDCO POWER INDONESIA : 0155-MBT-KBU-00-S-TL-027 0 IFC 9 Mar 2024 PAD & CHIMNEY PT. GRAHA USAHA TEKNIK
2 2
Momen dasar pondasi, MU =1/2.τU.B.be = 1/2. 0,1781 x 2500 x 1000 = 222683735 N.mm
2
Rn = ((Mu/(Bxd²)) = 222.683.735 /( 2500 x 400 )= 0,557 Mpa
m = fy/(0,85*fc) = 314 /( 0,85 x 20,00 )= 18,46
Rasio tul (ρ) =
2x 0,557 x 18,46 0,5
0,85. 𝑓′𝑐 2. 𝑅𝑛. 𝑚 = 0,054 x (( 1 -( 1 -( ))
𝜌= 1− 1− 314
𝑓𝑦 𝑓𝑦
ρ = 0,00180
ρmin = 0,04 (fc/fy) = 0,04 x (20 /313,8128 ) = 0,00255
ρb = β1.(0,85fc/fy).(600/(600+fy)) =
= 0,85 x ( 0,85 x 20,00 / 314 ) x ( 600 / ( 600 + 313,8 ))
= 0,85 x 0,05 x 0,66 = 0,0302
ρmax = 0,75 ρb = 0,75 x 0,03 = 0,02268
8/10
PERHITUNGAN STRUKTUR PONDASI TE-04
PEKERJAAN PEMBANGUNAN SUTT 150 KV BALI TIMUR (EAST BALI) Type Tower AA+9
Drawing No. Revision Status Date Kelas Pondasi 1
PT. MEDCO POWER INDONESIA : 0155-MBT-KBU-00-S-TL-027 0 IFC 9 Mar 2024 PAD & CHIMNEY PT. GRAHA USAHA TEKNIK
VI. KESIMPULAN
6.1. UMUM
Setelah dilakukan proses perhitungan, baik perhitungan
500
kapasitas daya dukung, perhitungan struktur, maupun
perhitungan pembesian, maka untuk pondasi pada titik 1000
2. Pembesian
500
Tulangan Utama Chimney = 16 D 19
Tulangan Geser Chimney = Ø10 - 100
2500
500
16-150
16-150
Tulangan Atas Pad = D-16 - 150
Tulangan Bawah Pad = D-16 - 150 16D19
10-100
3. Mutu Material 16-150
Beton = Fc =20 16-150
Tulangan Utama = BjTD 32
Tulangan Geser = BjTP 24 Sketsa Desain
4. Rasio Faktor Keamanan 5. Volume 1 Set Pondasi
Daya Dukung (Bearing) = 1,36 > 1,00 Beton = 13,60 m3 Galian tanah = 75,00 m
3
3
Gaya Tarik (Up-lift) = 2,59 > 2,00 Besi U-32 = 1814,04 kg Lantai kerja = 2,50 m
3
Gaya Guling (Over Turning) = 22,60 > 2,00 Besi U-24 = 159,43 kg Pasir urug = 2,50 m
3
Gaya Geser (Slidding) = 3,24 > 1,50 Total Besi = 1973,47 kg Urugan kembali = 32,60 m
Chimney A B
2 50 400 400 1700 36 10 0,617 37,76 d10 -100
Sengkang C
Pad Tulangan B
3a
A A 250 2350 2850 33,333 16 1,578 149,91 D16 -150
atas
Pad Tulangan A A
3b 50 2350 250 2950 33,333 16 1,578 155,17 D16 -150
Bawah C B C
A
4 Spacer B B 100 150 250 850 4 10 0,617 2,10 d10 -750
C C
9/10
PERHITUNGAN STRUKTUR PONDASI TE-04
PEKERJAAN PEMBANGUNAN SUTT 150 KV BALI TIMUR (EAST BALI) Type Tower AA+9
Drawing No. Revision Status Date Kelas Pondasi 1
PT. MEDCO POWER INDONESIA : 0155-MBT-KBU-00-S-TL-027 0 IFC 9 Mar 2024 PAD & CHIMNEY PT. GRAHA USAHA TEKNIK
10/10
Support Reaction
All Forces in kN
OLF 1.5 for Normal and
1.1 for Broken
4-1
ENGINEERING SERVICES DESIGN CONSULTANTS
DUTCH CONE PENETRTION TEST Hole No. : TE-04
Project : Eastern Bali Solar PV Plant 25 MW Depth of GWL : None X :334778.347 Ac : 10.01 cm2
Location : Kubu, Karangasem, Bali Tested by : Aan Y :9092181.234 ds : 3.57 cm
Max. Depth : 3.4 m Date : 1-Oct-22 GWL: None Ls : 13.3 cm
Max. Cone resist : 250 Kg/cm2 Cone type : Bageman Cone As : 149.17 cm2
Depth qc qt fs Lsf Ft Fr Cone Resistance (Qc, Kg/cm2) Local Side Friction (Lsf, Kg/cm 2)
m kg/cm² kg/cm² kg/cm² kg/cm² kg/cm² % 0 50 100 150 200 250 0 20 40 60 80 100
0.0 0.0 0.00 0.00 0.00 0.00
0
0.0
0.2 18.00 20.00 0.13 2.68 2.68 0.75
0.4 25.00 28.00 0.20 4.03 6.71 0.81
0.6 40.00 45.00 0.34 6.71 13.42 0.84
0.8 38.00 42.00 0.27 5.37 18.79 0.71
35.00 40.00 0.34 6.71 25.50 0.96
1
1.0
1.2 43.00 48.00 0.34 6.71 32.21 0.78
1.4 45.00 50.00 0.34 6.71 38.92 0.75
1.6 48.00 54.00 0.40 8.05 46.97 0.84
1.8 60.00 65.00 0.34 6.71 53.68 0.56
2
2.0 68.00 75.00 0.47 9.39 63.07 0.69
2.2 74.00 78.00 0.27 5.37 68.44 0.36
2.4 90.00 95.00 0.34 6.71 75.15 0.37
2.6 100.00 110.00 0.67 13.42 88.57 0.67
2.8 170.00 190.00 1.34 26.84 115.41 0.79
3
3.0 190.00 220.00 2.01 40.26 155.67 1.06
3.2 210.00 250.00 2.68 53.68 209.35 1.28
3.4 250.00 280.00 2.01 40.26 249.61 0.81
3.6
3.8
4
4.0
4.2
4.4
4.6
4.8
5
5.0
5.2
5.4
5.6
5.8
6
6.0
6.2
6.4
6.6
6.8
7
7.0
7.2
7.4
7.6
7.8
8
8.0
8.2
8.4
8.6
8.8
9
9.0
9.2
9.4
9.6
Depth (m)
9.8
10
10.0
10.2
10.4
10.6
11
10.8
11.0
11.2
11.4
11.6
12
11.8
12.0
12.2
12.4
12.6
13
12.8
13.0
13.2
13.4
13.6
14
13.8
14.0
14.2
14.4
14.6
15
14.8
15.0
15.2
15.4
15.6
16
15.8
16.0
16.2
16.4
16.6
17
16.8
17.0
17.2
17.4
17.6
18
17.8
18.0
18.2
18.4
18.6
19
18.8
19.0
19.2
19.4
19.6
20