BTN-10-A0-CA-001 - Rev.A - Calculation For Skim Tank (T-280) Foundation
BTN-10-A0-CA-001 - Rev.A - Calculation For Skim Tank (T-280) Foundation
Approval Sheet
Name Title Date Signature
Revision Status
Revisi Revisi
Halaman Halaman
A B 0 1 2 3 A B 0 1 2 3
1 41
2 42
3 43
4 44
5 45
6 46
7 47
8 48
9 49
10 50
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
Lampiran
33
34 A
35 B
36
37
38
39
40
2 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
DAFTAR ISI
1. PENDAHULUAN..........................................................................................................................................................
4
1.1 Tinjauan Umum.....................................................................................................................................................................
4
1.2 Lingkup Pekerjaan................................................................................................................................................................
5
2. ISTILAH, DEFINISI & SINGKATAN................................................................................................................................................
5
2.1 Istilah dan Definisi.................................................................................................................................................................
5
2.2 Daftar Singkatan...................................................................................................................................................................
5
3. DOKUMEN REFERENSI.................................................................................................................................................................
7
3.1 Dokumen Proyek .................................................................................................................................................................
7
3.2 Kode, Standard dan Peraturan.............................................................................................................................................
7
3.3 Urutan Prioritas.....................................................................................................................................................................
7
4. DATA DESAIN.................................................................................................................................................................................
8
4.1 Desain Filosofi......................................................................................................................................................................
8
4.2 Data Bahan...........................................................................................................................................................................
8
4.3 Data Tanah...........................................................................................................................................................................
8
4.4 Data Tiang Pancang.............................................................................................................................................................
8
4.5 Parameter Stabilitas..............................................................................................................................................................
9
5. KONDISI DESAIN............................................................................................................................................................................
9
5.1 Data Equipment....................................................................................................................................................................
9
5.2 Data Pilecap..........................................................................................................................................................................
10
6. DATA PEMBEBANAN DAN PERHITUNGAN................................................................................................................................
11
6.1 Beban Mati (DL)....................................................................................................................................................................
11
6.2 Beban Equipment (ML).........................................................................................................................................................
11
6.3 Beban Hidup (LL)..................................................................................................................................................................
11
6.4 Beban Angin (WL)................................................................................................................................................................
11
6.5 Beban Gempa (EL)...............................................................................................................................................................
12
6.5.1 Beban Gempa dari Kontribusi Equipment.................................................................................................................
13
6.5.2 Beban Gempa dari Kontribusi Pilecap......................................................................................................................
15
6.5.3 Beban Gempa dari Kontribusi Beban Hidup.............................................................................................................
17
6.6 Beban Kombinasi (L-COMB)................................................................................................................................................
17
7. ANALISA DAN DESAIN PONDASI.................................................................................................................................................
20
7.1 Property Tiang Pancang.......................................................................................................................................................
20
7.2 Estimasi Jumlah Tiang Pancang..........................................................................................................................................
21
7.3 Pengaturan Jarak Tiang Pancang........................................................................................................................................
21
7.4 Pengecekan Kapasitas Tiang Pancang...............................................................................................................................
22
7.4.1 Pengecekan Kapasitas Tekan Tiang Pancang.........................................................................................................
23
7.4.2 Pengecekan Kapasitas Tarik Tiang Pancang...........................................................................................................
24
7.4.3 Pengecekan Kapasitas Lateral Tiang Pancang........................................................................................................
25
7.4.4 Pengecekan Gaya Pada Tiang Pancang akibat Beban Terfaktor............................................................................ 25
7.5 Pengecekan Kapasitas Geser (Punching Shear)................................................................................................................
26
7.6 Perhitungan Penurunan Pondasi..........................................................................................................................................
27
8. PERHITUNGAN TULANGAN PONDASI........................................................................................................................................
29
9. KESIMPULAN..................................................................................................................................................................................
31
3 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
1. PENDAHULUAN
SPU Bentayan berada dalam lingkup area kerja Field Ramba. Struktur Bentayan berada di bagian tengah
Cekungan Sumatera Selatan, secara geografis terletak di Kampung Bulian dan Kampung Bentayan, Desa
Bentayan, Kecamatan Tungkal Ilir, Kabupaten Musi Banyuasin, Provinsi Sumatera Selatan.
Bentayan terbagi menjadi dua area, yaitu area barat dan area timur. Fluida produksi dari area barat dialirkan
menuju SP Bentayan melalui sebuah trunkline 8". Sedangkan produksi dari area timur dialirkan melalui trunkline
8", 6" dan 10". Produksi dari kedua area memasuki SP Bentayan dari trunkline bergabung menjadi satu pada
manifold SP Bentayan. Proses produksi minyak di SP Bentayan memisahkan fluida dari sumur menjadi minyak,
gas dan air. Air terproduksi kemudian diinjeksikan kembali ke dalam perut bumi.
Air injeksi dari heater dan separator dialirkan ke T-280 agar dapat dilakukan skimming (diambil film-film
minyaknya). Kemudian dari T-280 dan T-21, air injeksi dialirkan ke T-281 dan T-100 sebagai storage, sebelum
diinjeksikan ke sumur melalui WIP.
Tanki T-280 SP Bentayan adalah skim tank yang dibuat tahun 1988 dengan kapasitas 5000 bbls. Kondisi tanki
air T-280 Bentayan saat ini mengalami kebocoran pada shell course 1 dan 3, serta korosi ringan dan korosi
berat di beberapa bagian. Dengan kondisi tersebut dikhawatirkan kebocoran tanki akan semakin bertambah
hingga tanki tidak dapat digunakan.
Penggantian skim tank T-280 dibutuhkan agar proses skimming film minyak pada air injeksi berjalan normal
tanpa shutdown sumur.
4 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Dokumen ini menyajikan perhitungan untuk pondasi Tanki T-280 di SP Bentayan - Ramba Field.
5 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Kd Directionally factor
Kp Passive soil pressure coefficient
Kz Velocity pressure exposure coefficient
Kzt Topographic factor
Lb Anchor bolt embedded height
LL Live load
Lp Pile length
M Moment
MEL Tank empty load
MOL Tank operational load
MTL Tank test load
Mw Moment wind load at bottom foundation
Mx Moment X-Dir
Mz Moment Z-Dir
n Number of pile
Pall Pile compressive capacity
PCD Pile circle diameter
Pcomp Actual comp load per pile
PGA Peak ground acceleration
Plat Actual lateral load per pile
Pten Actual tens load per pile
Pult Compression
qL Live load
S1 Respon spectral acceleration MCE at 1 s period
Shape Pilecap shape
Ss Respon spectral acceleration MCE at 0.2 s period
Tall Pile tension capacity
tq Equipment shell thickness
tq Thickness of tank shell
Tult Tension
V Wind speed
Va Lateral active soil
Vp Lateral passive soil
Vs Lateral soil
Vt Lateral soil tank
Vu Maximum vertical load
Wc Convective weight
Wi Impulsive weight
Wi Impulsive weight (liquid and all elemets of tanks)
WL Wind load
Wp Tank content load
Wp Weight of content inside tank
Ws Empty tank weight
Xcs Height from bottom of tank to center of lateral force related to convective liquid force
Xis Height from bottom of tank to center of lateral force related to impulsive liquid force
Xs Height of empty tank
αs Outermost pile check
β Ratio between long/short
6 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
3. DOKUMEN REFERENSI
Jika terdapat konflik di antara dokumen-dokumen yang direferensikan, KONTRAKTOR harus memberitahukan
kepada PERUSAHAAN secara tertulis untuk mendapatkan penyelesaian. Secara umum urutan prioritas berikut
harus didahulukan:
7 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
4. DATA DESAIN
Equipment ini memiliki diameter 10.67 m dan tinggi 9.16 m. Pondasi yang digunakan untuk equipment ini akan
ditumpu tiang pancang dengan pilecap beton. Satuan untuk kalkulasi dalam metrik, dan software yang digunakan
untuk kalkulasi adalah Microsoft Excel.
Data tanah diambil dari dokumen Soil Investigation Report Sludge Pond SP Bentayan :
Berat jenis tanah rata-rata γs = 1865.00 kg/m3 = 18.43 kN/m3
Berat jenis air γw = 1000.00 kg/m3 = 10.00 kN/m3
Sudut geser f = 11.90
Koef. Tekanan tanah aktif Ka = tan² (45 - f/2) = 0.66
Tekanan tanah lateral aktif Va = 1/2 Ka * γs * Hf3^2 = 0.44 kN = 0.04 ton per m
Koef. Tekanan tanah pasif Kp = 1 / Ka = 1.52
Tekanan tanah lateral pasif Vp = 1/2 Kp * γs * Hf3^2 = 1.02 kN = 0.10 ton per m
Tekanan tanah lateral Vs = Vp - Va = 0.58 kN = 0.06 ton per m
Tekanan tanah lateral tank Vt = Vs * p * Df/2 = 10.43 kN = 1.04 ton
Kapasitas tiang pancang berdasarkan hasil soil investigation report. Data tiang pancang yang digunakan
sebagai berikut :
Jenis tiang pancang : Prestressed Concrete (PC) Spun Pile fc' = 52 MPa
Diameter tiang pancang Dp = 300 mm
Panjang tiang pancang Lp = 6000 mm
Kapasitas tiang pancang (mengacu pada LAMPIRAN B : ANALISIS DATA TANAH)
Kapasitas tekan tiang pancang, Qall with SF=3 Pall = 32.00 ton
Kapasitas tarik tiang pancang, Qall with SF=3 Tall = 11.15 ton
Kapasitas lateral tiang pancang, Qall with deflection 30mm Hall = 1.53 ton
8 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Semua jenis pondasi harus di desain memenuhi faktor keamanan, tidak boleh kurang dari nilai yang diberikan
dalam kondisi apapun :
9 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
5. KONDISI DESAIN
Data equipment harus mengacu ke dokumen no. BTN-10-T0-DS-XXX Data Sheet For Skimming Tank T-280:
10 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
11 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Parameter Gempa
Kategori risiko 3
Faktor keutamaan (importance factor) I = 1.25
Tipe tanah Medium Soil
Percepatan tanah puncak (Peak Ground Acceleration) PGA = 0.12
Koefisien situs untuk periode pendek (pada periode 0.2 detik) Fa = 1.60 g
Parameter percepatan respon spektra MCE pada periode 0.2 detik Ss = 0.234 g
Koefisien situs untuk periode panjang (pada periode 1 detik) Fv = 2.108 g
Parameter percepatan respon spektra MCE pada periode 1 detik S1 = 0.173 g
Fa x Ss Sms = 0.374
Fv x S1 Sm1 = 0.365
12 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
D
Tc = 1.8 x 0.578
√ tanh (3.68 H/D)
= 3.40 s
TL = = 4.00 s
Response modification coef for impulsive condition (Table E.4 API 650) Ri = 4.00
Response modification coef for convective condition (Table E.4 API 650) Rc = 2.00
Spectral acceleration of the sloshing liquid (convective component) based on Tc and 0.5% damping
For Tc ≤ TL Sac = 1.5 Sd1 / Tc ≤ 1.5 Sds = 0.107
2
For Tc > TL Sac = 1.5 Sd1 TL / Tc = 0.126 Used Sac = 0.11 s
Seismic coefficient
Seismic respons coefficient for tank = Sai x I / Ri Csai = 0.078
Seismic respons coefficient for sloshing liquid = Sac x I / Rc Csac = 0.067
Impulsive Weight
tanh (0.866 D/H) API 650 Annex E
Wi1 = Wp If D/H ≥ 1.333
0.866 D/H
Wi2 = (1 - 0.218 (D/H)) xWp If D/H < 1.333 API 650 Annex E
Used impulsive weight = D/H < 1.333, Use Wi2 Wi = 611.1 ton
Convective Weight
Wc = 0.23 x (D/H) x tanh(3.67H/D) x Wp API 650 Annex E
= 0.23 x 1.164 x tanh(3.67 x 0.86) x 819.02ton = 218.5 ton
where :
Wi = Impulsive weight
Wc = Convective weight
D = Tank diameter
H = Tank total height
Wp = Weight of content inside tank
13 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
where :
Csai = Seismic respons coefficient for tank
Csac = Seismic respons coefficient for sloshing liquid
Wi = Impulsive weight (liquid and all elemets of tanks)
Ws = Empty tank weight
Wc = Convective weight / sloshing weight
Xis = Height from bottom of tank to center of lateral force related to impulsive liquid force
Xs = Height of empty tank
Xcs = Height from bottom of tank to center of lateral force related to convective liquid force
From calculation above the resume of seismic load for foundation design :
Lateral Force Hvc = 65.58 ton
Moment Force Mvc = 276.99 ton.m
14 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Beban Gempa
Beban gempa harus sesuai dengan peraturan UBC 1997
Lokasi Proyek : Bentayan
Zona : 3
Tipe Profil Tanah : Medium Soil (SD)
Tinggi Pondasi : 0.60 m
Hcog : 0.30 m
= 0.7
dimana :
Ca =koefisien gempa, sesuai UBC 1997 Tabel 16-Q
I = Faktor keutamaan (importance factor)
R = Faktor daktilitas (global ductility factor)
T = periode struktur = Ct (hn)3/4
Ct =0.035 (0.0853) untuk sistem rangka baja pemikul momen
Ct =0.030 (0.0731) untuk sistem rangka beton pemikul momen dan rangka berpengaku eksentris
Ct =0.020 (0.0488) untuk semua bangunan lainnya
hn =, tinggi struktur
W = Beban seismik efektif struktur dan equipment
15 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Ca = 0.36
I = 1.25
R = 2.20
3/4
T = (0.0488) (hn) = 0.0488 * (0.6) ^ 0.75 = 0.033
V = 0.7 = 0.315 *W
16 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Mx Mz
No Simbol Deskripsi Fx (ton) Fy (ton) Fz (ton)
(ton.m) (ton.m)
1 DL Beban mati 0.00 148.74 0.00 0.00 0.00
2 MEL Mech. Empty Load 0.00 41.12 0.00 0.00 0.00
3 MOL Mech. Operation Load 0.00 860.13 0.00 0.00 0.00
4 MTL Mech.Test Load 0.00 860.13 0.00 0.00 0.00
5 LL Beban hidup 0.00 12.91 0.00 0.00 0.00
6 WLx Beban Angin (X) 9.16 0.00 0.00 0.00 47.46
7 WLz Beban Angin (Z) 0.00 0.00 9.16 47.46 0.00
8 ELx Beban Gempa (X) 47.16 0.00 0.00 0.00 16.83
9 ELz Beban Gempa (Z) 0.00 0.00 47.16 16.83 0.00
17 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
18 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
19 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Ringkasan dari laporan investigasi tanah, kapasitas tiang pancang izin disajikan sebagai berikut :
Kapasitas tekan tiang pancang Pall = 32.00 ton
Kapasitas tarik tiang pancang Tall = 11.15 ton
Kapasitas lateral tiang pancang Hall = 1.53 ton
20 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
PCD max = Df - 2 x (1.2 * Dp) Cek PCD < PCD max ...OK!
= 10748 mm
21 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
dimana :
Fy = Gaya aksial PCD = Diameter lingkar tiang pancang (Pile Circle Diameter)
M = Momen n = Jumlah tiang pancang
Ip = Inersia tiang pancang (m2) di = Jarak tiang pancang ke titik tengah pondasi
Max di = 5.34 m
Total Ip = 385.53 m2
22 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
1 2 3 4 5
201 1DL+1MEL 190.54 0.00 0.00 4.23 27.20 0.16
202 1DL+1MEL+1WLx 190.54 0.00 47.46 4.89 36.18 0.14
203 1DL+1MEL+1WLz 190.54 47.46 0.00 4.89 36.18 0.14
204 1DL+1MEL+1ELx 190.54 0.00 16.83 4.47 36.18 0.12
205 1DL+1MEL+1ELz 190.54 16.83 0.00 4.47 36.18 0.12
206 1DL+1MOL+1LL 1022.47 0.00 0.00 22.72 27.20 0.84
207 1DL+1MOL+1WLx+1LL 1022.47 0.00 47.46 23.38 36.18 0.65
208 1DL+1MOL+1WLz+1LL 1022.47 47.46 0.00 23.38 36.18 0.65
209 1DL+1MOL+1ELx+1LL 1022.47 0.00 16.83 22.95 36.18 0.63
210 1DL+1MOL+1ELz+1LL 1022.47 16.83 0.00 22.95 36.18 0.63
211 1DL+1MTL+1LL 1022.47 0.00 0.00 22.72 27.20 0.84
212 1DL+1MTL+1LL+0.25WLx 1022.47 0.00 11.86 22.89 36.18 0.63
213 1DL+1MTL+1LL+0.25WLz 1022.47 11.86 0.00 22.89 36.18 0.63
Rasio maksimum (kondisi kombinasi permanen) 0.84
Rasio maksimum (kondisi kombinasi sementara) 0.65
Status ...OK!
23 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
24 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
6 7 8
201 1DL+1MEL -1.04 -1.04 0.03 1.30 0.03
202 1DL+1MEL+1WLx 8.12 -1.04 0.18 1.73 0.11
203 1DL+1MEL+1WLz -1.04 8.12 0.18 1.73 0.11
204 1DL+1MEL+1ELx 46.12 -1.04 1.03 1.73 0.59
205 1DL+1MEL+1ELz -1.04 46.12 1.03 1.73 0.59
206 1DL+1MOL+1LL -1.04 -1.04 0.03 1.30 0.03
207 1DL+1MOL+1WLx+1LL 8.12 -1.04 0.18 1.73 0.11
208 1DL+1MOL+1WLz+1LL -1.04 8.12 0.18 1.73 0.11
209 1DL+1MOL+1ELx+1LL 46.12 -1.04 1.03 1.73 0.59
210 1DL+1MOL+1ELz+1LL -1.04 46.12 1.03 1.73 0.59
211 1DL+1MTL+1LL -1.04 -1.04 0.03 1.30 0.03
212 1DL+1MTL+1LL+0.25WLx 1.25 -1.04 0.04 1.73 0.02
213 1DL+1MTL+1LL+0.25WLz -1.04 1.25 0.04 1.73 0.02
Rasio maksimum (kondisi kombinasi permanen) 0.03
Rasio maksimum (kondisi kombinasi sementara) 0.59
Status ...OK!
1 2 3 4
301 1.4DL+1.4MEL 266.48 0.00 0.00 5.92
302 1.4DL+1.4MEL+1.7WLx 200.03 0.00 60.51 5.28
303 1.4DL+1.4MEL+1.7WLz 200.03 60.51 0.00 5.28
304 1.4DL+1.4MEL+1.7ELx 200.03 0.00 1.03 4.46
305 1.4DL+1.4MEL+1.7ELz 200.03 1.03 0.00 4.46
306 1.4DL+1.4MOL+1.7LL 1435.05 0.00 0.00 31.89
307 1.4DL+1.4MOL+1.7WLx+1.7LL 1076.46 0.00 60.51 24.76
308 1.4DL+1.4MOL+1.7WLz+1.7LL 1076.46 60.51 0.00 24.76
309 1.4DL+1.4MOL+1.7ELx+1.7LL 1076.46 0.00 21.46 24.22
310 1.4DL+1.4MOL+1.7ELz+1.7LL 1076.46 21.46 0.00 24.22
311 1.4DL+1.4MTL+1.7LL+0.425WLx 1076.46 0.00 15.13 24.13
312 1.4DL+1.4MTL+1.7LL+0.425WLz 1076.46 15.13 0.00 24.13
313 1.4DL+1.4MTL+1.7LL 1148.17 0.00 0.00 25.51
Reaksi Maksimum Tiang Pancang 31.89
25 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
26 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
0.84
0.52
0,22
0,10
H2/B = 0.35
H1/B = 0,17
27 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Penurunan (settlement)
µ0 = 0.84
µs1 = 0.10
µs2 = 0.22
Lapisan 1
S1 = µ0 x µs2 x ( q x B ) / Es = 0.84 x 0.1 x ( 98.92 x 11.468 ) / 42500 = 0.00224 m = 2.24 mm
Lapisan 2
S2 = µ0 x µs2 x ( q x B ) / Es = 0.84 x 0.22 x ( 98.92 x 11.468 ) / 50000 = 0.00419 m = 4.19 mm
Sall = S1 + S2
= 6.44 mm
28 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
L L L L
29 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
Perhitungan Penulangan
Mmax 11302.49
Rn = = = 51258.48 kg/m2 = 5.13 MPa
0.8 x b x d^2 0.8 x 1000 x 525^2
Penulangan Aktual
2
Diameter tulangan, D = 19 mm Asused = i x 0.25 x π x d
Spasi tulangan, S = 150 mm = 7 x 0.25 x π x 19^2
2
b 1000 = 1984.70 mm
Jumlah tulangan, i = = = 7
S 150
Cek desain penulangan Tulangan Pondasi : D19@150mm
OK..!! As used > As req 2 Lapis Tulangan
30 of 31
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : CALCULATION FOR SKIM TANK FOUNDATION Rev.Date : 20-Jun-2022
Engineering Team (T-280) Revision : A
9. KESIMPULAN
Berdasarkan hasil perhitungan diatas, dapat disimpulkan bahwa pondasi tangki untuk Injection Water sudah
memenuhi persyaratan desain. Adapun detail pondasi tangki ditunjukkan seperti gambar dibawah ini :
= 11468 mm
Pondasi
10830 mm
Diameter angkur ke angkur (BCD)
330 mm
Pondasi
270 mm
11468 mm
Diameter Pondasi
31 of 31
LAMPIRAN A
MECHANICAL DATA SHEET
API 650 Job Title :
PENGGANTIAN T-280 SP Bentayan
1 Bottom Design
1.1 Plates : ASTM A 283M/A 283, Grade C, for plates to a maximum thickness of 25 mm (1 in.)
1.2 Min. plates corroded thickness : 6 mm (ref. to clause 5.4.1)
1.3 Corrosion allowance (CA) : 3.00 mm
2 Shell Design
2.1 Plates : ASTM A 283M/A 283, Grade C, for plates to a maximum thickness of 25 mm (1 in.)
2.2 Min. nominal plates thickness : 5 mm (ref. to clause 5.6.1.1)
2.3 Nominal tank diameter (D) : 10.67 m
2.4 Design liquid level (H) : 9.15 m
2.5 Design specific gravity of the liquid (G) : 1.02
2.6 Corrosion allowance (CA) : 3.00 mm
2.7 Allowable stress for the design : 137 Mpa (ref. to table 5-2a)
2.8 condition
Allowable (S d)
stress for the hydrostatic : 154 Mpa (ref. to table 5-2a)
test condition (St)
Calculation of Thickness by the 1-Foot Method
td = 6.44 mm
ts = 3.00 mm
3 Roof Design
3.1 Plates : ASTM A 283M/A 283, Grade C, for plates to a maximum thickness of 25 mm (1 in.)
3.2 Min. plates thickness : 5 mm (ref. to clause 5.10.2.2)
Data investigasi tanah untuk pondasi tanki T-280 diambil dari pengujian sondir (S.02) terdekat dari lokasi
pembangunan tanki baru.
S.01 S.02
Gambar B.1 Lokasi Investigasi Tanah (S.02) untuk Desain Pondasi Tanki T-280
0.80 15.00 20.00 10.01 150.00 0.33 6.67 18.68 3.75 0.15 0.99
1.00 17.00 27.00 10.01 150.00 0.67 13.35 32.03 4.25 0.18 1.12
1.20 13.00 33.00 10.01 150.00 1.33 26.69 58.72 3.25 0.22 0.85
1.40 12.00 32.00 10.01 150.00 1.33 26.69 85.42 3.00 0.25 0.78
1.60 15.00 35.00 10.01 150.00 1.33 26.69 112.11 3.75 0.29 0.98
1.80 19.00 39.00 10.01 150.00 1.33 26.69 138.80 4.75 0.33 1.24
2.00 29.00 49.00 10.01 150.00 1.33 26.69 165.50 7.25 0.36 1.91
2.20 35.00 55.00 10.01 150.00 1.33 26.69 192.19 8.75 0.41 2.31
2.40 45.00 65.00 10.01 150.00 1.33 26.69 218.88 11.25 0.44 2.97
2.60 60.00 85.00 10.01 150.00 1.67 33.37 252.25 15.00 0.48 3.97
2.80 65.00 85.00 10.01 150.00 1.33 26.69 278.94 16.25 0.52 4.30
3.00 70.00 90.00 10.01 150.00 1.33 26.69 305.63 17.50 0.55 4.63
3.20 75.00 95.00 10.01 150.00 1.33 26.69 332.33 18.75 0.59 4.96
3.40 80.00 101.00 10.01 150.00 1.40 28.03 360.35 20.00 0.67 5.29
3.60 85.00 105.00 10.01 150.00 1.33 26.69 387.05 21.25 0.71 5.62
3.80 90.00 110.00 10.01 150.00 1.33 26.69 413.74 22.50 0.75 5.95
4.00 90.00 115.00 10.01 150.00 1.67 33.37 447.11 22.50 0.79 5.95
4.20 97.00 125.00 10.01 150.00 1.87 37.37 484.48 24.25 0.83 6.41
4.40 110.00 145.00 10.01 150.00 2.34 46.71 531.19 27.50 0.87 7.28
4.60 125.00 150.00 10.01 150.00 1.67 33.37 564.55 31.25 0.91 8.27
4.80 150.00 170.00 10.01 150.00 1.33 26.69 591.25 37.50 0.95 9.94
5.00 155.00 175.00 10.01 150.00 1.33 26.69 617.94 38.75 0.99 10.27
5.20 160.00 185.00 10.01 150.00 1.67 33.37 651.31 40.00 1.03 10.60
5.40 180.00 205.00 10.01 150.00 1.67 33.37 684.67 45.00 1.07 11.93
5.60 185.00 215.00 10.01 150.00 2.00 40.04 724.71 46.25 1.11 12.26
5.80 195.00 220.00 10.01 150.00 1.67 33.37 758.08 48.75 1.15 12.92
6.00 205.00 235.00 10.01 150.00 2.00 40.04 798.12 51.25 1.19 13.59
S.02
0 100 200 300 400 500 600 700 800
0.00
1.00
2.00
Depth (m)
3.00 qc (kg/cm2)
Jhl (kg/cm)
4.00
5.00
6.00
7.00
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : Rev.Date : 20-Jun-2022
CALCULATION FOR SKIM TANK FOUNDATION
Engineering Team Revision :A
Pile Properties:
Type = PC Spun Pipe Ø300mm qc = Qonus (CPT capacity) = 250 kg/cm2
Class = - Dp = Dia.of Pile = 30.00 cm
Pile Diameter (Dp) = 30.00 cm Ap = Area of end pile = 452.39 cm2
Ab = 452.39 cm2 SF = Safety Factor = 3.00 (compresion)
Allow. axial load on pile = 72.60 ton SF = Safety Factor = 3.00 (tension)
Unit weight of pile = 113.00 kg/m
Length of pile = 6.00 m
= .ω. + . . −
Qs = A s * fs
= 32.76 ton
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : Rev.Date : 20-Jun-2022
CALCULATION FOR SKIM TANK FOUNDATION
Engineering Team Revision :A
0,45
29,34 128.73
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : Rev.Date : 20-Jun-2022
CALCULATION FOR SKIM TANK FOUNDATION
Engineering Team Revision :A
Analysis
1. Calculate lateral force based on maximum deflection on pile head
b = (Kh * d / (4 * Ep * Ip))^0.25
= 0.619
bL = 3.72 > 2.50 ---> pile category is long pile
e/d = 0.00
3
My / (cu * d ) = 1.77
From chart can be found :
Hu / (cu * d2) = 1 ---> and Hu = 46.08 kN
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : Rev.Date : 20-Jun-2022
CALCULATION FOR SKIM TANK FOUNDATION
Engineering Team Revision :A
Maximum moment which must be in resist by pile, when soil is pressed into horizontal direction by pile
until failure condition on soil.
Mmax = Hu (e + 1.5d + 0.5f)
= 4211.93 kN.m > My = 24.52 kN.m
because of Mmax > My, pile category is long pile (failure on pile), use calculation below
Doc.No. : BTN-10-A0-CA-001
PENGGANTIAN SKIM TANK (T-280) SP
Discipline : Civil
BENTAYAN - FIELD RAMBA
Doc.type : Calculation
Author's Organization : Rev.Date : 20-Jun-2022
CALCULATION FOR SKIM TANK FOUNDATION
Engineering Team Revision :A
My = Hu (e + 1.5*d + 0.5*f)
My = Hu (e + 1.5*d + 0.5*Hu / (9 * cu * d))
My = Hu*e + Hu*1.5*d + 0.5*Hu2 / (9 * cu * d)
24.52 = 0.00 Hu + 0.45 Hu + 0.0004 Hu2
2
0.00 = 0.00036 Hu + 0.45 Hu + -24.52
0.00 = 1.00 Hu2 + 1244.26 Hu + -67789.23
Hu1 = 52.28 kN (Hu from chart was found ---> 46.08 kN)
Hu2 = -1296.55 kN (not for use)
Ha = 15.36 kN