JCC-P3-IK-00 INSTRUKSI KERJA Penyambungan Steel Pada Mesin Cabling
JCC-P3-IK-00 INSTRUKSI KERJA Penyambungan Steel Pada Mesin Cabling
INSTRUKSI KERJA
PENYAMBUNGAN STEEL PADA MESIN CABLING
WORK INSTRUCTION
REWIND MARKING CABLES GYAXTCBY 12/1 IN EX 90 H MACHINES
P3-Manager
Diperiksa oleh (Checked by) :
Bambang PP 10-Mei-19
General Manager
Manufacturing
Disetujui oleh (Approved by) :
Mahmud Jonsen
Management 10-Mei-19
Representatif/
OHS Expert (Ahli K3)
No. Dok
SISTEM MANAJEMEN MUTU, JCC-P3-IK-0
Doc. No
K3 DAN LINGKUNGAN
QUALITY MANAGEMENT SYSTEM, OHS Tgl. Terbit
Est. Date
10-Mei-2019
AND ENVIRONMENT
INSTRUKSI KERJA Revisi
PENYAMBUNGAN STEEL PADA 1
Revision
MESIN CABLING
WORK INSTRUCTION
REWIND MARKING CABLE GYAXTCBY Hal
IN EX 90 H MACHINES
2 dari 9
Page
MAINTENANCE
4 WIJAYA SATRIA YES
MANAGER
5 MEIDY DWI H. PRODUKSI 1 MANAGER YES
CATATAN (NOTES):
No. Dok
SISTEM MANAJEMEN MUTU, JCC-P3-IK-0
Doc. No
K3 DAN LINGKUNGAN
QUALITY MANAGEMENT SYSTEM, OHS Tgl. Terbit
Est. Date
10-Mei-2019
AND ENVIRONMENT
INSTRUKSI KERJA Revisi
PENYAMBUNGAN STEEL PADA 1
Revision
MESIN CABLING
WORK INSTRUCTION
REWIND MARKING CABLE GYAXTCBY Hal
IN EX 90 H MACHINES
3 dari 9
Page
Prosedur Sistem ini harus dikendalikan dalam suatu pengendalian dokumen dan
diberikan kepada yang namanya tertulis dalam daftar diatas dengan cap biru
(controlled copy).
Controlled Copy
The system procedure must be controlled within a given document control and to whose name is
written in the above list with blue cap (controlled copy).
Controlled Copy
Dalam hal khusus prosedur sistem ini dapat diterbitkan sebagai salinan yang tidak
dikendalikan (tidak terdapat Cap Biru “control copy”), maka salinan tersebut tidak
dapat digunakan di tempat dimana bukan sumber pembuat dokumen.
In the special case, this procedures system can be published as uncontrolled copies (there is no Blue
Cap "control copy"), then the copy can not be used in places where no source document maker.
No. Dok
SISTEM MANAJEMEN MUTU, JCC-P3-IK-0
Doc. No
K3 DAN LINGKUNGAN
QUALITY MANAGEMENT SYSTEM, OHS Tgl. Terbit
Est. Date
10-Mei-2019
AND ENVIRONMENT
INSTRUKSI KERJA Revisi
PENYAMBUNGAN STEEL PADA 1
Revision
MESIN CABLING
WORK INSTRUCTION
REWIND MARKING CABLE GYAXTCBY Hal
IN EX 90 H MACHINES
4 dari 9
Page
Halaman/Page
1. TUJUAN (PURPOSE)................................................................................5
2. RUANG LINGKUP (SCOPE).......................................................................5
3. TANGGUNG JAWAB (RESPONSIBILITY)........................................................5
4. URAIAN INSTRUKSI KERJA (WORK INSTRUCTION DESCRIPTION)........................6
5. DOKUMEN TERKAIT (RELATED DOCUMENT)...........................................8
No. Dok
SISTEM MANAJEMEN MUTU, JCC-P3-IK-0
Doc. No
K3 DAN LINGKUNGAN
QUALITY MANAGEMENT SYSTEM, OHS Tgl. Terbit
Est. Date
10-Mei-2019
AND ENVIRONMENT
INSTRUKSI KERJA Revisi
PENYAMBUNGAN STEEL PADA 1
Revision
MESIN CABLING
WORK INSTRUCTION
REWIND MARKING CABLE GYAXTCBY Hal
IN EX 90 H MACHINES
5 dari 9
Page
1. TUJUAN(PURPOSE)
Instruksi kerja ini bertujuan untuk memberikan pemahaman dan panduan
kepada Foreman dan Operator dalam proses penyambungan steel pada
mesin cabling.
This work instruction aims to provide understanding and guidance to Foreman and the
Operator in the process of rewind cable marking GYAXTCBY 12/1 on ex 90 machines.
2. RUANG LINGKUP(SCOPE)
Instruksi kerja ini menjelaskan tentang tata cara penyambungan steel pada
mesin cabling.
This work instruction explains the procedure for the rewind marking of the GYAXTCBY cable
12/1 form the start of preparation until the rewind process takes place.
3. TANGGUNG JAWAB(RESPONSIBILITY)
Manajer Produksi dan Supervisor bertanggung jawab dalam pembuatan
instruksi kerja ini. Sedangkan Foreman dan Operator harus melaksanakan
instruksi kerja ini sehingga proses berjalan lancar dan sesuai dengan target
produksi yang telah ditetapkan.
Production Manager and Supervisor are responsible for making this work instruction. While
Foreman and Operator must implement this work instructions so that the process runs and in
accordance with the production target set.
No. Dok
SISTEM MANAJEMEN MUTU, JCC-P3-IK-0
Doc. No
K3 DAN LINGKUNGAN
QUALITY MANAGEMENT SYSTEM, OHS Tgl. Terbit
Est. Date
10-Mei-2019
AND ENVIRONMENT
INSTRUKSI KERJA Revisi
PENYAMBUNGAN STEEL PADA 1
Revision
MESIN CABLING
WORK INSTRUCTION
REWIND MARKING CABLE GYAXTCBY Hal
IN EX 90 H MACHINES
6 dari 9
Page
No Uraian(Explanation) Foto(Image)
1 Apabila steel habis, maka steel
dipotong.
Prepare Sock bobbins, bobbin doors and
bobbins containing 12 / 1t cables in the pay off
area of the machine. Put the bobbin in the pay
off.