SPESIFIKASI MATERIAL
ex. lokal
ex. lokal
ex. lokal
ex. lokal
EX. Tiga Roda, Tonasa, Gresik,
Holcym, Semen Indonesia,
Bosowa
Ex. Jotun Jotaplash
Ex. Jotun Jotashield
Ex. Avian
Ex. lokal
Ex. Jaya Board, Elephant, Knauf ,
Eka Board / Standar
Ex. Sunda Plafond
Ex. Ekaboard, Nusa Board
Ex. SNI
Ex. SNI
Ex. SNI
Ex. SNI
Ex. SNI
ex. Sakura Roof / Azoka Setara
Ex. Bubungan Zincalium Sakura
Roof / Asoka
Ex. Standar
Ex. TACO Maspion
Ex. Asia Tile, Ikad, Mulia
Ex. Indo Grass, Golf, Sejat,
Happy, Standar
Ex. Vintage
Ex. Vintage
Ex. Vintage
Ex. Vintage
Ex. Standar
Ex. Wavin, Maspion, Rucika
ex Externa / Eterna
ex Externa / Eterna
Panasonic
Panasonic
Panasonic
Spesifikasi yang ditawarkan
Clypsal
Standar
MK, Panasonic
Sirim, Snaiderh
Philips
PANASONIC, KDK
Ex. TOTO
Ex. Onda
Ex. Onda
Ex. Onda
Ex. Onda
Ex. Onda
HARGA PERKIRAAN SENDIRI (HPS)
RENCANA ANGGARAN BIAYA
Biaya
Biaya Pengelolaan
Biaya Konstruksi Perencanaan Biaya Manajemen Total Biaya
NO. Kegiatan
Fisik Konstruksi Konstruksi Pembangunan
Konstruksi
1 2 Konstruksi
3 4 5 6
1 3,002,915,000.00 380,280,000.00 283,620,000.00 142,500,000.00 3,809,315,000.00
TERBILANG : …………………………………………………………………………………………….
HARGA SATUAN (
NO. URAIAN PEKERJAAN SATUAN VOLUME
Rp. )
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi M2 1,152.000 18,590.00
2 Pek. Pengupasan lantai Beton dan Pembersihanya M2 1,152.000 27,582.50
3 Pek. Pemasangan Bowplank Dan Pengukuran M' 1,152.000 44,445.50
4 Pek. Pemenuhan SMK3 Konstruksi
a Penyiapan RK3K terdiri atas :
Pembuatan Kartu Identitas ( KIP ) Bh 10.000 150,000.00
b Sosialisasi dan Promosi K3 terdiri atas:
Spanduk / Barner Himbauan Untuk Keselamataan Ls 1.000 730,000.00
c Alat Pelindung Kerja terdiri atas
Topi Pelindung (safety Helmet) BH 10.000 175,000.00
Pelindung Pernapasan dan mulut (Masker) Bh 20.000 175,000.00
Sarung Tangan (safety Gloves) Psg 20.000 145,000.00
Sepatu Keselamatan (Safety Shoes) Psg 10.000 250,000.00
Rompi Keselamatan (Safety Vest) Psg 10.000 130,000.00
d Alat Pelindung Kerja terdiri atas:
Barikade / Pita Pengaman ( Do Not Cross ) Roll 2.000 500,000.00
e Asuransi Dan Perijinan terdiri atas :
BPJS Ketenaga Kerjaan ( Ansuransi Tenaga kerja Selama Berlangsun Ls 1.000 50,000,000.00
f Personil K3 terdiri atas :
Petugas P3K; OB 5.000 3,500,000.00
g Fasilitas sarana kesehatan:
Peralatan P3K ( Obat Luka, Perban, Dll, Serta Kotak P3K ) Ls 1.000 2,500,000.00
h Rambu-rambu terdiri atas :
Rambu Peringatan BH 4.000 150,000.00
JUMLAH ( A )
B PEKERJAAN STRUKTUR DAN PASANGAN
I PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi M3 87.480 73,975.00
2 Pek. Urugan Kembali Galian Tanah Pondasi M3 29.160 33,000.00
3 Pek. Urugan Pasir Bawah Pondasi Dan Lantai M3 66.348 296,725.00
4 Pek. Pondasi Menerus Kali , Spesi 1pc : 4ps M3 489.600 1,238,634.98
5 Pek. Rollag Pasangan Bata 1 Batu Untuk Pondasi KM/WC Dan Teras M2 72.000 286,275.00
HARGA SATUAN (
NO. URAIAN PEKERJAAN SATUAN VOLUME
Rp. )
II PEKERJAAN BETON
1 Pekerjaan Pondasi Plat Setempat
Beton Plat Setempat 1,8 m x 1,8 m x 30 cm M3 26.244 1,303,860.40
Bekisting 2 x Pakai M2 58.320 152,121.75
Besi Penulangan Kg 3,280.500 19,449.65
2 Pekerjaan Sloof 15/25
Beton Kolom 15 x 25 x 300 cm M3 43.200 1,303,860.40
Bekisting 1 x Pakai M2 86.400 59,499.00
Besi Penulangan Kg 5,184.000 19,449.65
3 Pek. Pasangan Kolom 400 cm x 400 cm
Beton Kolom 10 x 15 cm M3 34.560 1,303,860.40
Bekistink 2 x Pakai M2 345.600 29,749.50
Besi Penulangan Kg 4,147.200 19,449.65
4 Pek. Beton Kolom Praktis 10/15
Beton Baalok Latei 10 x 20 cm M3 3.645 1,303,860.40
Bekisting 1 x Pakai M2 97.200 399,503.50
Besi Penulangan Kg 437.400 19,449.65
5 Pek. Beton Ring Balok 15/20
Beton Baalok Latei 12 x 20 cm M3 34.560 1,303,860.40
Bekistink 2 x Pakai M2 20.100 199,751.75
Besi Penulangan Kg 4,147.200 19,449.65
6 Pek. Plat Lantai Dan Kanopy Teras
Beton Plat Tebal 12 cm Dan Kanopy M3 88.200 1,303,860.40
Bekisting 1 x Pakai M2 5.400 277,755.50
Besi Penulangan Kg 7,938.000 19,449.65
HARGA SATUAN (
NO. URAIAN PEKERJAAN SATUAN VOLUME
Rp. )
V PEKERJAAN PENGECATAN
1 Pek. Cat tembok Dinding Luar ( Wall Sealler, Cat Dasar, + Cat tembok M2 1,200.000 29,346.90
2 Pek. Cat tembok Dinding Dalam ( Plamir, Cat Dasar, + Cat tembok ) M2 1,200.000 44,719.40
3 Pek. Cat Plafond M2 576.000 41,097.10
4 Pek. Cat Kayu ( Pintu, Lisplank, Jendela ) M2 124.120 46,739.00
JUMLAH
PPN 10%
JUMLAH + PPN 10 %
JUMLAH DIBULATKAN
A PERKIRAAN SENDIRI (HPS)
NCANA ANGGARAN BIAYA
Halaman 01
21,415,680.00
31,775,040.00
51,201,216.00
1,500,000.00
730,000.00
1,750,000.00
3,500,000.00
2,900,000.00
2,500,000.00
1,300,000.00
1,000,000.00
50,000,000.00
17,500,000.00
2,500,000.00
600,000.00
190,171,936.00
6,471,333.00
962,280.00
19,687,110.30
606,435,686.21
20,611,800.00
654,168,209.51
JUMLAH HARGA ( Rp.
)
34,218,512.42
8,871,740.46
63,804,576.83
56,326,769.42
5,140,713.60
100,826,985.60
45,061,415.54
10,281,427.20
80,661,588.48
4,752,571.17
38,831,740.20
8,507,276.91
45,061,415.54
4,015,010.18
80,661,588.48
115,000,487.57
1,499,879.70
154,391,321.70
857,915,020.99
JUMLAH HARGA ( Rp.
)
85,882,500.00
20,068,422.00
25,000,000.00
8,236,800.00
54,456,600.00
40,887,000.00
234,531,322.00
Halaman 02
115,326,604.80
83,597,184.00
48,739,680.00
4,368,558.24
107,398,368.00
101,689,632.00
461,120,027.04
35,216,280.00
53,663,280.00
23,671,929.60
5,801,244.68
118,352,734.28
12,764,012.25
2,225,629.30
1,880,849.52
1,741,148.75
2,909,252.38
213,642.00
6,932,165.58
1,204,216.19
456,660.09
8,828,497.92
2,146,474.69
135,000.00
1,108,281.34
2,644,232.36
877,373.71
216,137.63
174,261.12
130,838.40
1,425,000.00
48,013,673.23
JUMLAH HARGA ( Rp.
)
11,854,218.75
1,613,431.88
331,155.00
7,705,236.00
5,772,195.00
1,341,862.50
2,628,037.50
5,527,252.50
2,997,802.50
6,662,617.50
6,200,617.50
52,634,426.63
4,737,397.50
286,357.50
144,457.50
309,457.50
185,707.50
210,457.50
316,057.50
441,457.50
4,418,473.68
742,500.00
167,400.00
11,959,723.68
Halaman 03
9,903,437.50
5,942,062.50
4,050,000.00
3,375,000.00
9,322,087.50
4,750,000.00
1,531,612.50
38,874,200.00
JUMLAH HARGA ( Rp.
)
517,825.00
9,253,889.18
3,726,271.82
1,010,979.75
27,082,311.67
1,576,691.88
4,259,702.54
3,139,942.00
1,588,317.50
4,816,350.00
5,209,740.50
62,182,021.82
2,729,923,295.16
272,992,329.52
3,002,915,624.68
3,002,915,000.00
DAFTAR ANALISA HARGA SATUAN
1 1 m1 Memasang Bowplank
A BAHAN
28,330.00
B TENAGA
12,075.00
C PERALATAN
A BAHAN
B TENAGA
67,250.00 67,250.00
C PERALATAN
A BAHAN
B TENAGA
C PERALATAN
- -
A BAHAN
240,000.00 240,000.00
B TENAGA
29,750.00 29,750.00
C PERALATAN
- -
BAHAN
0.000 Hr 10,000.00 -
29,750.00 29,750.00
PERALATAN
- - -
A BAHAN
1 875,156.80 875,156.80
B TENAGA
250,875.00 250,875.00
C PERALATAN
- -
D JUMLAH BAHAN, TENAGA, DAN PERALATAN D = ( A + B + C ) 1,126,031.80
A BAHAN
86,500.00 86,500.00
B TENAGA
43,625.00 43,625.00
C PERALATAN
- -
A BAHAN
89,450.00 89,450.00
B TENAGA
43,625.00 43,625.00
C PERALATAN
- -
A BAHAN
16,780.00 16,780.00
B TENAGA
24,475.00 24,475.00
C PERALATAN
- -
A BAHAN
82,555.00 82,555.00
B TENAGA
48,075.00 - 48,075.00
C PERALATAN
- -
A BAHAN
31,950.00 31,950.00
B TENAGA
48,075.00 - 48,075.00
C PERALATAN
- -
A BAHAN
45,130.00 45,130.00
B TENAGA
27,575.00 - 27,575.00
C PERALATAN
- -
A BAHAN
164,800.00 164,800.00
B TENAGA
C PERALATAN
- -
A BAHAN
345,099.16
B TENAGA
C PERALATAN
A BAHAN
101,442.50 101,442.50
B TENAGA
- -
C PERALATAN
A BAHAN
1.500 m Plesteran 1 : 3
2
80,691.80 121,037.70
338,751.98
B TENAGA
C PERALATAN
A BAHAN
1,413,922.05
B TENAGA
C PERALATAN
BAHAM
64,437 64,437.41
TENAGA
PERALATAN
A BAHAN
124,960 124,960.08
B TENAGA
C PERALATAN
18 1 M3 BETON UNTUK RABAT CAMPURAN 1PC : 3PS : 6BTPC ( Takaran Dari Ember Cat 20 Liter )
A BAHAN
933,614.07 933,614.07
B TENAGA
203,485.00 203,485.00
C PERALATAN
28,000.00 28,000.00
19 1 M3 BETON UNTUK RABAT CAMPURAN 1PC : 2PS : 4BTPC ( Takaran Dari Ember Cat 20 Liter )
A BAHAN
1,010,842.64 1,010,842.64
B TENAGA
146,485.00 146,485.00
C PERALATAN
28,000.00 28,000.00
A BAHAN
1,080,971.21 1,080,971.21
B TENAGA
379,200.00 379,200.00
C PERALATAN
56,000.00 56,000.00
A BAHAN
160,800.00 160,800.00
B TENAGA
16,015.00 16,015.00
C PERALATAN
A BAHAN
160,800.00 160,800.00
B TENAGA
16,015.00 16,015.00
C PERALATAN
E 1 m2 Cetakan Bekesting
A BAHAN
34,100.00 34,100.00
B TENAGA
19,990.00 19,990.00
C PERALATAN
A BAHAN
213,620.00 213,620.00
B TENAGA
38,885.00 38,885.00
C PERALATAN
A BAHAN
191,520.00 191,520.00
B TENAGA
86,970.00 86,970.00
C PERALATAN
A BAHAN
168,720.00 168,720.00
B TENAGA
107,865.00 107,865.00
C PERALATAN
A BAHAN
252,800.00 252,800.00
B TENAGA
110,385.00 110,385.00
C PERALATAN
BAHAN
252,800.00 252,800.00
B TENAGA
0.330 Hr Tukang Kayu 120,000.00 39,600.00
110,385.00 110,385.00
C PERALATAN
A BAHAN
B TENAGA
C PERALATAN
A BAHAN
218,710.00 218,710.00
B TENAGA
80,450.00 80,450.00
C PERALATAN
A BAHAN
55,183.33 55,183.33
B TENAGA
0.070 Hr Tukang Kayu 120,000.00 8,400.00
24,245.00 24,245.00
C PERALATAN
A BAHAN
35,400.00 35,400.00
B TENAGA
19,200.00 19,200.00
C PERALATAN
A BAHAN
53,000.00 53,000.00
B TENAGA
23,925.00 - 23,925.00
A BAHAN
29,445.00 29,445.00
B TENAGA
0.200 Hr Tukang Kayu 120,000.00 24,000.00
36,525.00 36,525.00
C PERALATAN
BAHAN
65,446.00 65,446.00
TENAGA
63,225.00 63,225.00
PERALATAN
BAHAN
4.750 Kg Paku
5,988,000.00 5,988,000.00
TENAGA
3,007,500.00 3,007,500.00
PERALATAN
BAHAN
230,538.00 230,538.00
TENAGA
225,562.50 225,562.50
PERALATAN
31 1 m2 Mengecat Dinding Tembok Luar Dengan Cat Weatershield 2 x Sapu, Untuk tembokLuar Yang Berlumut Lama Dan Di Cuci Dulu Sebeelum Di Cat D
BAHAN
18,100.00 18,100.00
TENAGA
0.042 Hr Tukang Cat 120,000.00 5,040.00
8,579.00 - 8,579.00
PERALATAN
BAHAN
25,200.00 25,200.00
TENAGA
8,579.00 - 8,579.00
PERALATAN
33 1 m2 Mengecat Dinding Tembok Baru Dalam yang Belum pernah di Cat, 1 Lapis Plamur Skim Coat + 1 lapis Cat Dasar + 2 Lapis Cat Peutup ( Cat Dalam
BAHAN
32,075.00 32,075.00
TENAGA
8,579.00 - 8,579.00
PERALATAN
BAHAN
19,950.00 19,950.00
TENAGA
3,391.00 3,391.00
PERALATAN
BAHAN
252,888.89 252,888.89
TENAGA
192,575.00 192,575.00
PERALATAN
BAHAN
48,375.00 48,375.00
TENAGA
138,825.00 138,825.00
PERALATAN
### 1 Bh Membuat Pintu Rangka Kayu Klas II Dan Isi Panil Kayu Klas III
BAHAN
394,250.00 394,250.00
TENAGA
324,187.50 324,187.50
PERALATAN
HARGA SATUAN PEKERJAAN 1 PINTU KAYU ISI PANIL KAYU PAPAN 790,281.25
### 1 M2 Membuat Daun Pintu Rangka Kayu Klas II Dan Isi Panil Kayu
BAHAN
Kayu Bengkirai, Jarum Jaru,
Barsolok Balok Ukuran 5/14
0.060 Btg cm Panjang 400 cm 4,990,000.00 299,400.00
( Termasuk barang
Terbuang )
1.000 Kg Lem Kayu PVAC 15,000.00 15,000.00
TENAGA
325,750.00 325,750.00
PERALATAN
HARGA SATUAN PEKERJAAN 1 PINTU KAYU ISI PANIL KAYU PAPAN 713,790.00
### 1 M2 Membuat Daun Pintu Rangka Kayu Klas II Dan Isi Panil Kayu
BAHAN
Kayu Bengkirai, Jarum Jaru,
Barsolok Balok Ukuran 5/14
0.050 Btg cm Panjang 400 cm 4,990,000.00 249,500.00
( Termasuk barang
Terbuang )
0.500 Kg Lem Kayu PVAC 15,000.00 7,500.00
262,000.00 262,000.00
TENAGA
431,250.00 431,250.00
PERALATAN
HARGA SATUAN PEKERJAAN 1 PINTU KAYU ISI PANIL KAYU PAPAN 762,575.00
### 1 Bh Membuat Pintu Rangka Kayu Klas II Dan Isi Panil Kayu Klas III Sisi Dalam Di lapis Aluminiumm Kulit Jeruk
A BAHAN
728,750.00 728,750.00
B TENAGA
922,500.00 922,500.00
PERALATAN
HARGA SATUAN PEKERJAAN 1 PINTU KAYU ISI PANIL KAYU PAPAN 1,816,375.00
1 Bh Membuat Daun Jendela Rangka Kayu Panil Kaca Ryben 5 mm Ukuran ( 1.15 x 0.70 ) m - ( 1.40 x 0.65 ) m
BAHAN
TENAGA
196,500.00 196,500.00
PERALATAN
BAHAN
28,950.00 28,950.00
TENAGA
8,411.00 8,411.00
PERALATA
BAHAN
33,650.00 33,650.00
TENAGA
PERALATAN
BAHAN
302,500.00 302,500.00
TENAGA
21,325.00 21,325.00
PERALATAN
BAHAN
60,000.00 60,000.00
TENAGA
21,325.00 21,325.00
BAHAN
151,700.00 151,700.00
TENAGA
PERALATAN
BAHAN
115,000.00 115,000.00
TENAGA
BAHAN
145,000.00 145,000.00
TENAGA
14,275.00 14,275.00
PERALATAN
BAHAN
130,000.00 130,000.00
TENAGA
14,212.50 14,212.50
PERALATAN
BAHAN
120,000.00 120,000.00
TENAGA
14,212.50 - 14,212.50
PERALATAN
BAHAN
225,000.00 225,000.00
TENAGA
14,275.00 14,275.00
PERALATAN
BAHAN
477,200.00 477,200.00
TENAGA
113,375.00 113,375.00
PERALATAN
BAHAN
72,000.00 72,000.00
TENAGA
14,775.00 14,775.00
PERALATAN
BAHAN
32,625.00 32,625.00
TENAGA
26,027.50 26,027.50
PERALATAN
BAHAN
39,875.00 39,875.00
TENAGA
19,282.50 19,282.50
PERALATAN
- -
BAHAN
522,000.00 522,000.00
TENAGA
401,500.00 401,500.00
PERALATAN
BAHAN
16,965.00 16,965.00
TENAGA
26,015.00 26,015.00
BAHAN
50,287.50 50,287.50
TENAGA
10,415.00 10,415.00
PERALATAN
BAHAN
4,387.50 4,387.50
TENAGA
PERALATAN
BAHAN
857,000.00 857,000.00
TENAGA
246,885.00 246,885.00
PERALATAN
BAHAN
114,370.00 114,370.00
TENAGA
0.125 oh Pekerja 95,000.00 11,875.00
46,125.00 46,125.00
PERALATAN
BAHAN
15,580.00 15,580.00
TENAGA
14,405.00 14,405.00
PERALATAN
61 1 m Acian Tembok dengan semen Mortar Acian Putih ( Mortar Siap Pakai / MSP )
2
BAHAN
2,625.00 2,625.00
TENAGA
1 m Acian Tembok
2
28,350.00 28,350.00
PEARALATAN
BAHAN
82,805.00 82,805.00
TENAGA
99,450.00 99,450.00
PERALATA
BAHAN
51,900.00 51,900.00
TENAGA
99,450.00 99,450.00
PERALATAN
BAHAN
31,483.75 31,483.75
TENAGA
66,300.00 66,300.00
PERALATAN
38,800.00 38,800.00
TENAGA
61,550.00 61,550.00
PERALATAN
### 1 m Pasangan Papan untuk Dinding Ukuran Papan 1.5 x 18 cm Dengan Ketam Manual
2
BAHAN
89,280.00 89,280.00
TENAGA
298,350.00 298,350.00
PERALATAN
BAHAN
152,468.00 152,468.00
TENAGA
29,550.00 29,550.00
PERALATAN
BAHAN
148,270.00 148,270.00
TENAGA
21,235.00 21,235.00
PERALATAN
BAHAN
45,770.00 45,770.00
TENAGA
16,725.00 16,725.00
PERALATAN
BAHAN
57,226.00 57,226.00
TENAGA
16,725.00 16,725.00
PERALATAN
BAHAN
47,850.00 47,850.00
TENAGA
PERALATAN
BAHAN
404,325.00 404,325.00
TENAGA
77,735.00 77,735.00
PERALATAN
### 1 M' Pekerjaan Galian Dan Perbaikan Saluran Di Jalal Gang Depan Rumah Dinas
BAHAN
- - 204,601
TENAGA
PERALATAN
BAHAN
1,650.00 1,650.00
TENAGA
1 m Acian Tembok
2
32,725.00 32,725.00
PERALATAN
BAHAN
8,022,741 8,022,741
TENAGA
316,625.00 316,625.00
PERALATAN
BAHAN
6,383,301 6,383,301
TENAGA
564,750.00 564,750.00
PERALATAN
BAHAN
TENAGA
8,775.00 8,775.00
PERALATAN
BAHAN
TENAGA
8,775.00 8,775.00
PERALATAN
BAHAN
TENAGA
8,775.00 8,775.00
PERALATAN
BAHAN
TENAGA
8,775.00 8,775.00
PERALATAN
BAHAN
87,000.00 87,000.00
TENAGA
8,775.00 8,775.00
PERALATAN
BAHAN
TENAGA
8,775.00 8,775.00
PERALATAN
BAHAN
TENAGA
85,575.00 85,575.00
PERALATAN
### 1 M2 PEKERJAAN PEMBONGKARAN ATAP, PLAFOND, DAN RANGKA KUDA KUDA ( DI KUMPUL & DI BERSIHKAN ) ( Di Hitung Rata Sesuai Luasan Ba
A BAHAN
Jumlah - -
B TENAGA
16,900.00 16,900.00
C PERALATAN
A BAHAN
Jumlah - -
B TENAGA
25,075.00 25,075.00
C PERALATAN
### 1 M2 PEKERJAAN MENGUPAS DAN MEMBERSIHKAN LUMUT DAN KERAK PADA DINDING PAGAR DAN DI CUCI
A BAHAN
Jumlah - -
B TENAGA
9,875.00 9,875.00
C PERALATAN
A BAHAN
Jumlah - -
B TENAGA
44,250.00 44,250.00
C PERALATAN
### 1 M' PEKERJAAN MENGGALI DAN MEMBONGKAR PONDASI BATU GUNUNG DAN PASANG KEMBALI
A BAHAN
Jumlah - -
B TENAGA
32,250.00 32,250.00
C PERALATAN
BAHAN
10,925.00 10,925.00
TENAGA
PERALATAN
BAHAN
347,195.00 347,195.00
TENAGA
116,275.00 116,275.00
PERALATAN
60,000.00 60,000.00
BAHAN
560,091.67 560,091.67
TENAGA
45,575.00 45,575.00
PERALATAN
50,000.00 50,000.00
BAHAN
326,000.00 326,000.00
TENAGA
34,125.00 34,125.00
PERALATAN
BAHAN
736,500.00 736,500.00
TENAGA
34,125.00 34,125.00
PERALATAN
- -
BAHAN
2,744,250.00 2,744,250.00
TENAGA
80,625.00 80,625.00
PERALATAN
- -
BAHAN
293,500.00 293,500.00
TENAGA
43,625.00 43,625.00
PERALATAN
- -
BAHAN
420,500.00 420,500.00
TENAGA
43,625.00 43,625.00
PERALATAN
- -