Pada hari ini, Rabu tanggal Tiga Puluh Satu bulan Maret tahun Dua Ribu Dua Puluh
Satu, berdasarkan:
1. Kontrak Nomor: PJKP-20004289 Tanggal 10 Febuari 2020 Perihal Pekerjaan Perluasan
Terminal dan Fasilitas Penunjangnya di Bandara Lombok (LOP).
2. Kontrak Addendum Nomor :127-AD/4800001019/PL.02/2021 Tanggal 1 Maret 2021
telah dilaksanakan kegiatan Test Commisioning pekerjaan dimaksud dengan rincian sebagai
berikut :
Lokasi : Proyek Perluasan Terminal dan Fasilitas Penunjangnya di Bandara
Lombok
Tanggal : 31 Maret 2021
Pelaksana : 1. Personil Mechanical Officer Kantor Pusat PT. Angkasa Pura I
(Persero) - Jakarta. --------------------------------------------------------------
2. Personil Mechanical Technician PT. Angkasa Pura I (Persero) Kantor
cabang Bandara Internasional Lombok. -------------------------------------
3. Pelaksana Pekerjaan PT. Nindya Karya.-------------------------------------
4. Konsultan MK PT. Artefak Arkindo.-----------------------------------------
Demikian Berita Acara Pelaksanaan Test Commisioning ini dibuat untuk dipergunakan
sebagaimana mestinya.
___________________ ___________________
SPESIFIKASI TEKNIS
PEKERJAAN BAGGAGE HANDLING SYSTEM (BHS)
PROYEK PERLUASAN TERMINAL DAN FASILITAS PENUNJANGNYA
BANDARA INTERNASIONAL LOMBOK
1
SPESIFIKASI TEKNIS
PEKERJAAN BAGGAGE HANDLING SYSTEM (BHS)
PROYEK PERLUASAN TERMINAL DAN FASILITAS PENUNJANGNYA
BANDARA INTERNASIONAL LOMBOK
2
SPESIFIKASI TEKNIS
PEKERJAAN BAGGAGE HANDLING SYSTEM (BHS)
PROYEK PERLUASAN TERMINAL DAN FASILITAS PENUNJANGNYA
BANDARA INTERNASIONAL LOMBOK
3
HASIL PEMERIKSAAN PENGADAAN DAN PEMASANGAN BHS
( CHECK LIST FUNGSI PERALATAN )
PROYEK PERLUASAN TERMINAL DAN FASILITAS PENUNJANGNYA
BANDARA INTERNATIONAL LOMBOK
A DEPARTURE SYSTEMS :
1 Check In Weigh Scale Conveyor Set 22 21/12/2020 22/12/2020 Terpasang
2 Scale Display (Operator&Passenger) Set 22 21/12/2020 01/12/2021 Terpasang
3 Collecting Conveyor Set 4 16/12/2020 20/12/2020 Terpasang
4 90° Curve Conveyor (Take Away Line) Set 4 28/12/2020 01/02/2021 Terpasang
5 Metering Conveyor (Take Away Line) Set 2 26/12/2020 28/12/2020 Terpasang
6 Make Up Gravity Roller (Make Up) Set 2 26/12/2020 28/12/2020 Terpasang
7 Switchboard / Control Panel Set 2 18/12/2020 19/12/2020 Terpasang
9 Cabling dan Terminasi Panel Lot 1 17/12/2020 18/12/2020 Terpasang
10 Standard PLC dan Pemrograman Lot 1 18/12/2020 01/09/2021 Terpasang
11 Roller Shutter Door + Draught Curtain Set 2 27/12/2020 28/12/2020 Terpasang
12 Integration to Manual x-ray Ls 1 01/08/2021 01/09/2021 Terpasang Fitur Operasi Ready
B ARRIVAL SYSTEMS :
1 Crescent Pallet Conveyor "L" shape Set 2 18/12/2020 01/08/2021 Terpasang
2 Switchboard / Control Panel Set 2 26/12/2020 27/12/2020 Terpasang
3 Cabling Control Panel to Conveyor Lot 1 26/12/2020 27/12/2020 Terpasang
4 Roller Shutter Door + Draught Curtain Set 4 26/12/2020 27/12/2020 Terpasang
5 Infill Floor (Penutup Tengah Conv.) Ls 1 01/02/2021 01/08/2021 Terpasang Fungsi Ready
6 Carpet Finish (Top Infill Floor) Ls 1 25/2/2021 25/2/2021 Terpasang Fungsi Ready
Commissioning No. :
Location of Test : Terminal Building - Ground Floor
Type of Work : Departure Conveyor - Check In Area
Activity : Test & Commissioning
No. of RFC :
Assesment Date :
Test Result :
Installation : YES NO
Power
- Ampere : A
- Voltage : Volt
1
PROYEK PERLUASAN TERMINAL DAN FASILTAS PENUNJANGNYA DI BANDARA LOMBOK
Approved - Mutlimeter
Re - Tested
2
PROYEK PERLUASAN TERMINAL DAN FASILTAS PENUNJANGNYA DI BANDARA LOMBOK
Commissioning No. :
Location of Test : Terminal Building - Ground Floor
Type of Work : Arrival Conveyor - Baggage Claim Area
Activity : Test & Commissioning
No. of RFC :
Assesment Date :
Test Result :
Installation : YES NO
Power
- Ampere : A
- Voltage : Volt
Approved - Mutlimeter
Re - Tested
Commissioning No. :
Location of Test : Terminal Building - Ground Floor
Type of Work : Departure Conveyor - Check In Area
Activity : Test & Commissioning
No. of RFC :
Assesment Date :
1
PROYEK PERLUASAN TERMINAL DAN FASILTAS PENUNJANGNYA DI BANDARA LOMBOK
2
LOMBOK INTERNATIONAL AIRPORT
BAGGAGE HANDLING SYSTEMS
DEPARTURE AND ARRIVAL SYSTEM
LAYOUT AS-BUILT DRAWINGS
PEMBERI TUGAS :
9500
3000
REVISI
NO TANGGAL KETERANGAN
4525
PEKERJAAN
PEKERJAAN PERLUASAN TERMINAL DAN
FASILITAS PENUNJANGNYA DI BANDARA
LOMBOK
AS - BUILT DRAWING
PEMBERI TUGAS :
DIKETAHUI OLEH
PEMBERI TUGAS
AIRPORT TECHNICAL SENIOR MANAGER
8100
Nugroho S B
Direksi Pekerjaan
706,36 M2
Pongky Ramadhan .ST , IAI
Team Leader
KONTRAKTOR PELAKSANA :
DIBUAT OLEH
KONTRAKTOR PELAKSANA
SKALA : Tgl.
DIGAMBAR :
REFRENSI GAMBAR :
0 1 2 3 4 5 6 7 8 9 10 11
REVISI
REVISI
NO TANGGAL KETERANGAN
PEKERJAAN
PEKERJAAN PERLUASAN TERMINAL DAN
FASILITAS PENUNJANGNYA DI BANDARA
LOMBOK
AS - BUILT DRAWING
PEMBERI TUGAS :
DIKETAHUI OLEH
PEMBERI TUGAS
AIRPORT TECHNICAL SENIOR MANAGER
Nugroho S B
Direksi Pekerjaan
KONTRAKTOR PELAKSANA :
DIBUAT OLEH
KONTRAKTOR PELAKSANA
SKALA : Tgl.
DIGAMBAR :
REFRENSI GAMBAR :
0 1 2 3 4 5 6 7 8 9 10 11
REVISI
4600
XRAY
REVISI
NO TANGGAL KETERANGAN
PEKERJAAN
PEKERJAAN PERLUASAN TERMINAL DAN
FASILITAS PENUNJANGNYA DI BANDARA
LOMBOK
AS - BUILT DRAWING
PEMBERI TUGAS :
DIKETAHUI OLEH
PEMBERI TUGAS
AIRPORT TECHNICAL SENIOR MANAGER
Nugroho S B
Direksi Pekerjaan
828,9 M2
PT. NINDYA KARYA (Persero)
DIBUAT OLEH
KONTRAKTOR PELAKSANA
SKALA : Tgl.
DIGAMBAR :
REFRENSI GAMBAR :
0 1 2 3 4 5 6 7 8 9 10 11
REVISI
REVISI
NO TANGGAL KETERANGAN
PEKERJAAN
PEKERJAAN PERLUASAN TERMINAL DAN
FASILITAS PENUNJANGNYA DI BANDARA
LOMBOK
AS - BUILT DRAWING
PEMBERI TUGAS :
DIKETAHUI OLEH
PEMBERI TUGAS
AIRPORT TECHNICAL SENIOR MANAGER
Nugroho S B
Direksi Pekerjaan
KONTRAKTOR PELAKSANA :
DIBUAT OLEH
KONTRAKTOR PELAKSANA
SKALA : Tgl.
DIGAMBAR :
REFRENSI GAMBAR :
0 1 2 3 4 5 6 7 8 9 10 11
REVISI
10
11
12
1
DAFTAR HADIR
PROYEK PERLUASAN TERMINAL DAN FASILITAS PENUNJANGNYA
DI BANDARA INTERNATIONAL LOMBOK
13
14
15
16
17
18
19
20
21
22
23
24
25
2
TESTING & COMMISSIONING
PEKERJAAN BAGGAGE HANDLING SYSTEM (BHS)
PROYEK PERLUASAN TERMINAL DAN FASILITAS PENUNJANGNYA
BANDARA INTERNATIONAL LOMBOK
COMMENT :
TESTING & COMMISSIONING
PEKERJAAN BAGGAGE HANDLING SYSTEM (BHS)
PROYEK PERLUASAN TERMINAL DAN FASILITAS PENUNJANGNYA
BANDARA INTERNATIONAL LOMBOK
DOKUMENTASI :