Anda di halaman 1dari 1

PT GLOBAL SHIPYARD

INDONESIA
Dokumen Studi Kajian
TUKS
Kegiatan Galangan Kapal
dan Perahu
Dermaga Kapasitas Kapal Keterangan :
(dengan Pemadatan Tanah) 10.000 DWT e
Koordinat
1. 05º57'19,98” LS / 106º06'38,90” BT
2. 05º57'18,46” LS / 106º06'36,63” BT
3. 05º57'17,20” LS / 106º06'36,80” BT
d 4. 05º57'16,93” LS / 106º06'39,27” BT
b 5. 05º57'15,08” LS / 106º06'40,11” BT
a 6. 05º57'13,94” LS / 106º06'30,49” BT
c
Keterangan :
Dasar Kolam Dermaga a = Kedalaman Kolam = 5 m' Dermaga
b = Draft = 2.7 m' PT Global Shipyard
Indonesia (GSI)
Muka Air c = Clearance = 2.3 m'
d = LWS = -3 m'
e = Lebar Dermaga = 10-15 m'
Skala :
Tanah Asli (Existing)
Potongan A- Dermaga PT GSI