Frekwensi Jumlah Unit Persediaan Carrying Cost Ordering Cost Total Cost
Pemesanan Per Order Rata rata
( X) (N/X) ( N/2 ) (N/2*Tarif) ( X*Tarif) (CC + OC) Misal: 1 Tahun = 360 Hari
1 4,800 2,400 Rp 192,000 Rp 3,000 Rp 195,000 100 Safety Stock
2 2,400 1,200 Rp 96,000 Rp 6,000 Rp 102,000 13.33 Rata rata penggunaan per hari
3 1,600 800 Rp 64,000 Rp 9,000 Rp 73,000 30 Lama Waktu Pengiriman 1 Bln. = 30 hari
4 1,200 600 Rp 48,000 Rp 12,000 Rp 60,000 + 400 = Lead Time
5 960 480 Rp 38,400 Rp 15,000 Rp 53,400 500 = ROP
6 800 400 Rp 32,000 Rp 18,000 Rp 50,000 + 600 = EOQ (Q)
7 686 343 Rp 27,429 Rp 21,000 Rp 48,429 1,100 = Total Bahan Baku Digudang (F1)
8 600 300 Rp 24,000 Rp 24,000 Rp 48,000
9 533 267 Rp 21,333 Rp 27,000 Rp 48,333
10 480 240 Rp 19,200 Rp 30,000 Rp 49,200 EOQ = 600 Kg.
11 436 218 Rp 17,455 Rp 33,000 Rp 50,455
12 400 200 Rp 16,000 Rp 36,000 Rp 52,000
13 369 185 Rp 14,769 Rp 39,000 Rp 53,769
14 343 171 Rp 13,714 Rp 42,000 Rp 55,714
15 320 160 Rp 12,800 Rp 45,000 Rp 57,800
EOQ=√2xRxS/IxP
EOQ=√2x180000x6000/60
Bapak Hide
Silakan Unhide
= EOQ