Dimensi (m) Volume
No Luas (m2) 1
Lebar Tinggi Panjang (m3)
1 1.5 0.13 10.2 0.195 1.989
2 6 0.13 7.2 0.780 5.616
3 3 0.13 7.2 0.390 2.808
4
4 3 0.13 9 0.390 3.510
5 6 0.13 7.2 0.780 5.616
6 3 0.13 3.6 0.390 1.404
6
7 1.5 0.13 1.2 0.195 0.234
Total Volume Cor Plat Lantai (m3) 21.177
5
VOLUME PELAKSANAAN
Truck Mixer Volume Cor (m3)
Mobil 1 6
Mobil 2 6
Mobil 3 6
Mobil 4 6
Mobil 5 6
Mobil 6 6
Mobil 7 6
Mobil 8 6
Mobil 9 4
TOTAL TRUCK MIXER
52
(m3)
REKAPITULASI VOLUME PENGECORAN SELASA, 6 OKTOBER 2021
47.402
3
4
REKAPITULASI VOLUME PENGECORAN SELASA, 6 OKTOBER 2021
REKAPITULASI VOLUME COR KOLOM LT.2 (ZONA 1), BALOK & PLAT LANTAI LT.2 (ZONA 2)
VOLUME PELAKSANAAN
Truck Mixer Volume Cor (m3) Volume Cor (m3)
Mobil 1 7 7
Mobil 2 7 7
Mobil 3 7 6
Mobil 4 7 6
Mobil 5 7 6
Mobil 6 7 6
Mobil 7 7 6
Mobil 8 7 6
Mobil 9 6
TOTAL TRUCK MIXER
56 56
(m3)
OPSI 1 OPSI 2
REKAPITULASI VOLUME PENGECORAN SELASA, 12 OKTOBER 2021
2 3
4
REKAPITULASI VOLUME PENGECORAN SELASA, 12 OKTOBER 2021
VOLUME PELAKSANAAN
Truck Mixer Volume Cor (m3) Volume Cor (m3)
Mobil 1 7 6
Mobil 2 7 6
Mobil 3 7 6
Mobil 4 6 6
Mobil 5 6 6
Mobil 6 6 6
Mobil 7 6 6
Mobil 8 6 6
Mobil 9 3
TOTAL TRUCK MIXER
51 51
(m3)
OPSI 1 OPSI 2
REKAPITULASI VOLUME PENGECORAN SELASA, 19 OKTOBER 2021
3
4
5
4
Dimensi Tangga
Antrede = 0.3 m Keterangan : Untuk mengetahui optrede
Optrede = 0.18 m Tinggi Lantai 1 - 2 = 3.96 m
Lebar Tangga = 1.35 m
Jumlah Anak Tangga = 21 buah
Dimensi Bordes
Panjang = 1.132 m
Lebar = 2.95 m
Tebal = 0.12 m
Panjang Plat Sisi Miring Bagian 1 = 3.396 m 6.624
Panjang Plat Sisi Miring Bagian 2 = 3.228 m 1.073088
Balok = 0.1715 m
Volume Pengecoran Beton
Volume Cor Anak Tangga = 0.765 m3
Volume Cor Bordes = 0.401 m3
Tebal Plat = 0.12 m
Volume Plat Bawah Bagian 1 = 0.550 m3
Volume Plat Bawah Bagian 2 = 0.523 m3
Total Volume Cor = 2.531 m3
REKAPITULASI VOLUME PENGECORAN SELASA, 19 OKTOBER 2021
REKAPITULASI VOLUME COR KOLOM LT.2 (ZONA 1), BALOK & PLAT LANTAI LT.2
(ZONA 2)
VOLUME PELAKSANAAN
Truck Mixer Volume Cor (m3) Volume Cor (m3)
Mobil 1 7 7
Mobil 2 7 7
0.31 Mobil 3 7 7
Mobil 4 7 7
Mobil 5 6 7
Mobil 6 6 5
Mobil 7 6 5
TOTAL TRUCK MIXER
46 45
(m3)
OPSI 1 OPSI 2
12.590
1.156
1.156
1.328
15.075
REKAPITULASI VOLUME PENGECORAN SELASA, 28 OKTOBER 2021
2
4
3
REKAPITULASI VOLUME PENGECORAN SELASA, 28 OKTOBER 2021
1
REKAPITULASI VOLUME PENGECORAN JUMAT, 6 NOVEMBER 2021
REKAPITULASI VOLUME COR KOLOM LT.DAK ATAP (ZONA 1), BALOK & PLAT
LANTAI LT.DAK ATAP (ZONA 2) & TOP TANGGA
TAI DAK ATAP (ZONA 1) REKAPITULASI VOLUME COR KOLOM LT.DAK ATAP (ZONA 1
BALOK & PLAT LANTAI LT.DAK ATAP (ZONA 2) & TOP TANGG
Luas Volume
(m2) (m3) No. Pekerjaan Vol. Excel
0.25 1.6 1 Perhitungan Kolom 1.600
Total Vol. Kolom 1.6 2 Perhitungan Balok 0.000
3 Perhitungan Plat Lantai 9.007
4 Perhitungan Tangga 5.130
T 3-Dak Atap
5 Perhitungan Top tangga 0.000
JUMLAH 15.737
an : Untuk mengetahui optrede VOLUME COR + LOST 16.737
3.91 m
Truck Mixer Volume Cor (m3) Volume Cor (m3)
Mobil 1 7 7
Mobil 2 7 6
Mobil 3 7 6
Mobil 4 6 6
Mobil 5 4.5 6.5
TOTAL TRUCK
31.5 31.5
MIXER (m3)
OPSI 1 OPSI 2
AN SELASA, 28 OKTOBER 2021
Vol. ArchiCAD
1.650
9.600
9.010
5.200
5.000
30.460
31.460
Luas Batu Andesit (Plaza Taman)