Analisa Struktur, Konstruksi Open Channel

Perhitungan Open Channel


ISI DATA HANYA PADA HURUF WARNA MERAH SAJA

beban merata, q INPUT DATA TANAH : Density (BJ. Tanah) : g= 1.9 t/m3
T1 Sudut Geser : f= 25 o

h= 0 Cohesion : c= 0.5 t/m2


sho B sho T1= 0.4 m
T2= 0.6 m
g , f, c
D B= 14 m
Z p2
P1 P1 D= 4.5 m
h2 p1 q= 2.5 t/m2
H
h1 W= 14.8 m
h= Z
shz O C shz T2
Z= 5.1 m

shz1 P2 Menurut Rankine, Koefisien Tanah Aktif, Ka= tan2(45-f/2) =


0.406
W
Koefisien Tanah Pasif, Kp=tan2(45+f/2) =
p1 = (s hz-sho)xZ/2 = 10.029 t 2.464
p2 = shoxZ = 1.926 t sh = g.h.Ka + q.Ka - 2.c.√Ka
h1 = Z/3 = 1.700 m h=0 -> sho = 0.378 t/m2
h2 = Z/2 = 2.550 m h=Z -> shz = 4.310 t/m2
M.tumpuan di ttk. O : Mo = p1xh1+p2xh2 = 21.959 t.m/m' shz1 = {(2xT1xD+WxT2)x2.5}/W
M.lapangan di ttk. C : Mc = Mo-1/8xshz1xW2 = -35.761 t.m/m' = 2.108 t/m2

File Name : 562761482.xls


Date : 12/08/2021n Time : 03:21:48
Analisa Struktur, Konstruksi Open Channel

File Name : 562761482.xls


Date : 12/08/2021n Time : 03:21:48
Perhitungan Open Channel
PEMBESIAN MOMEN TUMPUAN ISI HANYA PADA HURUF WARNA MERAH SAJA

Beban ( v ) M= 21,959 kgm begel D 0


v Permanen b= 100 cm selimut = 3 cm A'
Temporer ht = 40 cm d= 8.5 cm
h= 31.5 cm
h
Beton Mutu : K 300 sb = 99.0 kg/cm 2
h ht
tulangan bagi
Baja Mutu : U 24 sa = 1392.0 kg/cm2 Ca = = 1.82 jarak space
n= 19.1 n.M 2 baris

b.sa 1 baris
A selimut d
sa
fo = = 0.738 d = 1.00 b
n sb'

x = 0.4210 Jml baris


z = 0.882 3 baris
nw = 0.343
f = 1.375 (ok) 5 pcs per baris
f' = 1.804

Tulangan Utama A = w.b.h = 56.78 cm2 --> 15 D22 Atot(cm2) jarak space
Tulangan Utama A' = dA = 56.78 cm2 --> 15 D22 114.04 20.75 cm
ok….
Tul. Bagi A = 20%. A= 11.36 cm2 --> 11 D12 jrk space 7.890909 cm
Tul. Bagi A' = 20%. A'= 11.36 cm -->
2
11 D12

Perhitungan Pembesian Balok Beton Bertulang


Dihitung dengan Metoda "Lentur N (Ir. Wiratman)"
Perhitungan Open Channel
PEMBESIAN MOMEN LAPANGAN ISI HANYA PADA HURUF WARNA MERAH SAJA

Beban ( v ) M= 35,761 kgm begel D 0


v Permanen b= 100 cm selimut = 3 cm A'
Temporer ht = 60 cm d= 6.3 cm
h= 53.7 cm
h
Beton Mutu : K 300 sb = 99.0 kg/cm 2
h ht
tulangan bagi
Baja Mutu : U 24 sa = 1392.0 kg/cm2 Ca = = 2.43 jarak space
n= 19.1 n.M 2 baris
b.sa 1 baris
A selimut d
sa
fo = = 0.738 d = 1.00 b
n sb'

x = 0.3706 Jml baris


z = 0.887 2 baris
nw = 0.191
f = 1.698 (ok) 8 pcs per baris
f' = 2.326

Tulangan Utama A = w.b.h = 53.96 cm2 --> 15 D22 Atot(cm2) jarak space
Tulangan Utama A' = dA = 53.96 cm2 --> 15 D22 114.04 10.91 cm
ok….
Tul. Bagi A = 20%. A= 10.79 cm2 --> 10 D12 jrk space 8.8 cm
Tul. Bagi A' = 20%. A'= 10.79 cm -->
2
10 D12

Perhitungan Pembesian Balok Beton Bertulang


Dihitung dengan Metoda "Lentur N (Ir. Wiratman)"
Perhitungan Open Channel
GAMBAR PEMBESIAN
40 1400 40

3 D 22 - 31.13 3 D 22 - 31.13
450

3 D 22 - 20.75 3 D 22 - 20.75

60

3 D 22 - 20.75 3 D 22 - 20.75
2 D 22 - 10.91
Gambar ini tidak berskala