a
Dimensi 6
Panjang pondasi (P) : 6.00 m
x L III
Tinggi pondasi (h) : 1.00 m
Kedalaman pondasi (b) : 0.30 m h y
Lebar pondasi atas (a) : 0.30 m
Lebar pondasi bawah ( c ) : 0.50 m LI
Lebar lantai grg2 : 1.20 m
Tinggi X : 0.20 m
Panjang Y : 0.20 m b L II
Tebal lantai grg2 : 0.20 m ( 0.10 s/d 0. 20 m )
Panjang lantai grg2 : m c
6.00
Besi Tulangan Pokok diameter : 10.00 mm
Besi Tulangan Pembagi diameter : 10.00 mm
Harga Bahan
Harga
NO BAHAN
Harga Satuan
1 Batu Belah 110,000 m3
2 Pasir Pasang 250,000 m3
3 Pasir Urug 150,000 m3
4 Semen 40 Kg 45,000 zak
5 Batu Koral 2/3 255,000 m3
6 Besi 10 mm 85,000 Lonjor
7 Besi 10 mm 85,000 Lonjor
8 Papan Begesting 12,000 Lembar
9 Kawat Bendrat 18,000 Kg
10 Air 50 Liter
Alat
Harga
NO ALAT
Harga Satuan
1 Sewa Molen 250,000 hari
2 Ember 8,000 bh
3 Sekop 35,000 bh
4 Cikrak 10,000 bh
5 Benang 3,000 gulung
6 Papan Nama Kegiatan 150,000 bh
7 Prasasti 200,000 bh
Upah
No UPAH Harga Satuan
1 Pekerja Rp 55,000 OH
2 Tukang Batu Rp 64,000 OH
3 Kepala Tukang Rp 77,000 OH
4 Mandor Rp 82,500 OH
Mohon DATA dari survey Lapangan
dimasukkan pada kolom yg berwarna KUNING
YG LAIN SUDAH LINK dan Harga Satuan
Diisi Yaa
ANALISA GORONG GORONG PLAT BETON
a
Panjang pondasi P : 6.00 m
Tinggi pondasi h : 1.00 m
x L III
Kedalaman pondasi b : 0.30 m
Lebar pondasi atas a : 0.30 m h y
Lebar pondasi bawah c : 0.50 m d
Lebar lantai grg2 e : 1.20 m LI
Tinggi X : 0.20 m
Panjang Y : 0.20 m L IV
b L II f
Tebal lantai grg2 f : 0.20 m
Panjang lantai grg2 : 6.00 m e
c
Tinggi lubang Grg2 d : 0.80 m
Vol Pondasi 2 sisi : L I = ((a+c)/2)*h L II = b * c L III = x * y
LI = 0.40 m2
L II = 0.15 m2
L III = 0.04 m2
L Total (L I + L II) - LIII
L Total 0.51 m2
h a b c h P
0.1 s/d 0.2
Vol Lidahan 0.15 0.2 0.2 0.50 0.5
Vol I = b x c x h. = 0.02 m3
II Vol II = tbl x P ldh x h = 0.05 m3
b I
1 LIII = (a+c)/2 xh + (bxc) = 0.1275 m2
c Vol III = 0.128 x 2 = 0.2550
Vol Tot Vol I+Vol II+(Vol III x 2) = 0.58 m3
Volume Galian : P L T
: 6 2.2 1.3 = 17.2 m3
Volume Plat Beton gorong2
P L T
Dimensi Plat 1.60 6 0.20
Volume Plat 1.6 6 0.20 = 1.92 m3
Kebutuhan Papan 1.60 6.00 = 24 lbr
Kebutuhan Usuk 4/6 1.60 6.00 0.50 = 20.8 m'
Volume Plester Guide post ( Buk ) Volume : Lpermukaan
: (1.4*0.5*2)+(0.5*0.3*2)+(1.4*0.3)
: 2.12 x 2 sisi = 4.24 m2
RENCANA ANGGARAN BIAYA
Propinsi : Daerah Istimewa Yogyakarta No Rab : 1
Kabupaten : KABUPATEN GUNUNGKIDUL Program : P3MD
Kecamatan : KEC CONTOH Jenis Kegiatan : Gorong 2 Plat Beton
Desa : DS CONTOH Ukuran / Dimensi : 6
Jumlah : 1
Volume
Harga Satuan Jumlah Swadaya
Uraian Satuan Jumlah Total (Rp)
Total Dari Swadaya Dana Desa (Rp) (Rp)
A Bahan a b c = a -b d e g=bxe h=cxe
1 Batu Belah 1 11.00 - 11.00 m3 110,000 - 1,210,000
2 Pasir Pasang 1 6.00 - 6.00 m3 250,000 - 1,500,000
3 Semen 40 Kg 1 47.00 - 47.00 zak 45,000 - 2,115,000
4 Batu Koral 2/3 1 1.00 - 1.00 m3 255,000 - 255,000
5 Besi 10 mm 1 12.00 - 12.00 ljr 85,000 - 1,020,000
6 Besi 10 mm 1 12.00 - 12.00 ljr 85,000 - 1,020,000
7 Papan Begesting 1 24.00 - 24.00 lbr 12,000 - 288,000
8 Kawat Bendrat 1 4.00 - 4.00 kg 18,000 - 72,000
10 Air 413.00 - 413.00 Liter 50 - 20,650
Sub Total A - 7,500,650
B Alat
1 Sewa Molen 1.00 - 1.00 hari 250,000 - 250,000
2 Ember 2.00 - 2.00 bh 8,000 - 16,000
3 Sekop 2.00 - 2.00 bh 35,000 - 70,000
4 Cikrak 1.00 - 1.00 bh 10,000 - 10,000
5 Benang 5.00 - 5.00 gulung 3,000 - 15,000
6 Papan Nama Kegiatan 1.00 - 1.00 bh 150,000 - 150,000
7 Prasasti 1.00 - 1.00 bh 200,000 - 200,000
Sub Total B - 711,000
C Upah
1 Pekerja 1 31.00 0.00 31.00 OH 55,000 - 1,705,000
2 Tukang Batu 8.00 0.00 8.00 OH 64,000 - 512,000
3 Kepala Tukang 1.00 0.00 1.00 OH 77,000 - 77,000
4 Mandor 1.00 0.00 1.00 OH 82,500 - 82,500
41.00 0.00 41.00
Sub Total C - 2,376,500
Total Biaya (Dana Desa + Swadaya ) 10,588,150
Sumber Dana Total Biaya Dana Desa 10,588,150
Total Biaya Swadaya -
Data ini sudah link jadi jangan diisi
RENCANA ANGGARAN BIAYA SUMBER DANA DARI SWADAYA MASYA
Propinsi : Daerah Istimewa Yogyakarta
Kabupaten : KABUPATEN GUNUNGKIDUL
Kecamatan : KEC CONTOH
Desa : DS CONTOH
VOLUME
URAIAN Total Volume Volume Swadaya Swadaya Satuan
Volume Swadaya Selain Uang Uang
a b=a-c c=d+e d e f
BAHAN
Batu Belah 11 11 - m3
Pasir Pasang 6 6 - m3
Semen 40 Kg 47 47 - zak
Batu Koral 2/3 1 1 - m3
Besi 10 mm 12 12 - ljr
Besi 10 mm 12 12 - ljr
Papan Begesting 24 24 - lbr
Kawat Bendrat 4 4 - kg
Sub Total A
Alat
Sewa Molen 1 1 - hari
Ember 2 2 - bh
Sekop 2 2 - bh
Cikrak 1 1 - bh
Benang 5 5 - gulung
Papan Nama Kegiatan 1 1 - bh
Prasasti 1 1 - bh
-
Sub Total B
UPAH
Pekerja 31.00 31 - OH
Tukang Batu 8.00 8 - OH
Kepala Tukang 1.00 1 - OH
Mandor 1.00 1 - OH
Sub Total C
TOTAL BIAYA SWADAYA
Swadaya Selain Uang
Sumber Dana
Swadaya Uang
ARI SWADAYA MASYARAKAT
No. RAB : 02
Pogram : P3MD
Jenis Kegiatan : Gorong 2 Plat Beton
Ukuran/Dimensi : DATA PERLU
6
DIISI pada
KOLOM d
Harga Nilai Swadaya Nilai Swadaya Jumlah
Satuan Selain Uang Uang Total
( Rp. ) ( Rp. ) ( Rp. )
g h=dxg i=exg j(=Rp.
h +) i
110,000 - - -
250,000 - - -
45,000 - - -
255,000 - - -
85,000 - - -
85,000 - - -
12,000 - - -
18,000 - - -
- - -
250,000 - - -
8,000 - - -
35,000 - - -
10,000 - - -
3,000
150,000
200,000
- - -
- - -
55,000 - - -
64,000 - - -
77,000 - - -
82,500 - - -
- - -
AL BIAYA SWADAYA - - -
Swadaya Selain Uang - -
Swadaya Uang - -
REKAPITULASI RENCANA ANGGARAN BIAYA
- 711,000 - 6.7
2,376,500 - 22.4
- - - 10,588,150 - 100.0
KEC CONTOH
Pas. Batu Kali camp = 1 : 5 DESA
0,4
0,5 DS CONTOH
GAMBAR RENCANA
0,5
0,20
0,30
0,20 Diketahui Oleh :
POTONGAN
Tanpa Skala
0,20
Daerah Istimewa Yogyakarta
KEC CONTOH
Pas. Batu Kali 1 : 5 DESA
0,5 0,20 1,20 0,20 DS CONTOH
GAMBAR RENCANA
Gorong 2 Plat
0,20
LOKASI
2.0
0,80 DSN CONTOH
Pas. Batu Kali 1 : 5 GAMBAR DETAIL
Dibuat Oleh :
0,20
0,20
Drainase gorong2
POTONGAN A
Diketahui Oleh :
0.3 0.3
1
1 3 0.15 0.8
0.3 DETAIL
0.4 PENULANG
0.5 AN
DETAIL
PENULANG
0.5 AN