Bahan Struktur
Dimensi
h= 400 mm
Diameter TulanganPolos Φ= 12 mm
Selimut beton ts = 40 mm
Output SAP
Wx terfaktor Wx = 34,254 kN
Wy terfaktor Wy = 34,958 kN
Wx Wx = 34,44 kN
Wy Wy = 34,967 kN
Potongan A
My = 55,93 kNm
ex = 0,1649
ey = 0,1682
σ =
P
A (
1+
6 ex 6 ey
B
+
B )
=
332,456
1,5× 1,5 (
1+
6 × 0,1649 6 × 0,1682
1,5
+
1,5 )
= 344,628 kN/m2 ≤ σnetto (= 1018,45 kN/m2) (OK)
σu netto =
P
A (
1±
6 ex 6 ey
B
±
B )
σu nett max =
P
A ( 1+
6 ex 6 ey
B
+
B )
=
410,199
1,5× 1,5 ( 1+
6 × 0,1343 6 × 0,1364
1,5
+
1,5 )
= 1050,62 kN/m2
σu nett min =
P
A (
1−
6 ex 6 ey
B
−
B )
=
410,199
1,5× 1,5 (
1−
6 ×0,1343 6 ×0,1364
1,5
−
1,5 )
= 180,812 kN/m2
Perencanaan Struktur Gedung Rumah Susun Pangkalan TNI – AL
Semarang 158
Laporan Kerja Proyek
Program Studi D3- Konstruksi Gedung
σ u max −σ u max
σu nett rata-rata =
2
1050,62−180,812
=
2
= 280,273 kN/m2
5. Kontrol Kekuatan Pondasi Beton Bertulang
d = h – (ts + ½ diameter tulangan sengkang)
= 400 – (40 + ½ . 12)
= 349 mm
Cek Terhadap Geser :
Geser 1 Arah
Vu = ( B2 − a2 ) x L
σu nett rata-rata x
280,27 x (
2 )
1,5 0,4
= − x 1,5
2
= 231,2255 kN
1
x fc x L x d
6 √
ϕVc = ϕx
1
x 25 x 1500 x 349
6 √
= 0,75 x
= 327187,5 N
= 327,1875 kN
Karena :
Vu > ϕVc
231,2255 kN > 327,1875 kN (Perlu Tulangan Geser)
Geser 2 Arah
Vu = σu nett rata-rata x (B x L – (a + d) (b + d))
= 280,27 x (1,5 x 1,5 – (0,4 + 0, 349) (0,4 + 0,349))
= 473,38 kN
bo = 2 (a + d) + 2 (b +d)
1
x fc x bo x d
3 √
ϕVc = ϕx
1
= 0,75 x x 25 x 2996 x 349
3 √
= 1307,005 N
= 1307,005 kN
Karena :
Vu > ϕVc
473,381 kN > 1307,005 kN (Tidak Perlu Tulangan Geser)
( )
2
B a
MUA = ½ σu nett rata-rata −
2 2
½ x 280,27 x (
2 )
2
1,5 0,4
= −
2
= 42,391 kNm
Mu
Rn = 2
∅.b.d
42,391× 106
= 2
0,8 ×1000 ×349
= 0,435 MPa
fy
m =
0,85× fc '
400
=
0,85× 25
= 18,824
ρmin = 0,0018
1
ρperlu = ¿
m
1
= ¿
18,824
= 0,0011
0,85× 25 600
= β1 +
400 600+ 400
= 0,0271
ρmax = 0,75.ρb
= 0,75 x 0,0271
= 0,0203
Karena,
As = ρperlu x b x d
= 628,2 mm2
2
0,25× π × D × 1000
Sada =
As
Spakai = 150 mm
0,25× π × D2 × 1000
Asada =
As