Disusun oleh :
1. Nabila Azzakhroh (180523630101)
2. Nabila Mahartika N. (180523630121)
3. Welly Sembiring (180523630134)
9. Harga Lc
Lc = 0,0175 x R x Δ’
= 0,0175 x 300 x 22,361
= 117,057
10. Harga K, P, L, Ts, dan Es
- K = K* x Ls
= 0,49992 x 40
= 19,997
- P = P* x Ls
= 0,00553 x 40
= 0,2212
- L = 2 x Ls + Lc
= 2 x 40 + 117,057
= 197,057
- Ts = (R + P) tg 1/2 Δ + K
= (300 + 0,2212) tg 1/2. 30 + 19,997
= 100,440 m
(R+ P)
- Es = 1 -R
cos ∆
2
(300+0,2212)
= 1 – 300
cos .30
2
= 10,812 m
11. Harga b’
b’ = b + R – √ R 2 – P2
= 3,5 + 300 – √ 3002 – 0,22122
= 3,549 m
Tabel Hasil Perhitungan
S – C - S d1 = 150 m
d2 = 250 m
V = 5 0 Km/jam
Δ = 30°
R = 300 m
Ts = 100,440 m
Es = 10,812 m
Lc = 117,057 m
Ls = 40 m
L = 197,057 m
e = 4,4 %
b’ = 3,549 m
BENTUK LENGKUNG
FULL CIRCLE (FC)
FC d2 = 250 M
d3 = 150 M
V = 50 Km/jam
Δ = 24°
R = 400 M
Tc = 85,023 M
Ec = 8,936 M
Ls = 26,67 M
E = 3,00 %
b’ = 3,547 M
KONTROL OVERLAPING