LAPORAN PERENCANAAN

STRUKTUR & PONDASI


16 JULI 2022
BILLBOARD
Jl. Yos Sudarso Simpang Bukit Keminting, Palangka Raya

Klien:
CV. ANTA KARYA CONSULTANT
Jl. Lewu Tatau V No. 17, Palangka Raya, Kalimantan Tengah.
1 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

DAFTAR ISI

1. PENDAHULUAN ..................................................................................................................... 2

2. PERATURAN YANG DIGUNAKAN DALAM DESAIN .................................................................. 2

3. MUTU MATERIAL YANG DIGUNAKAN .................................................................................... 2

4. DESKRIPSI SISTEM STRUKTUR BANGUNAN ........................................................................... 2

5. METODE PERENCANAAN STRUKTUR ..................................................................................... 3

6. PEMBEBANAN DASAR DAN PARAMETER REDUKSI ............................................................... 4

7. KARAKTERISTIK DINAMIK STRUKTUR .................................................................................... 4

8. ANALISA BEBAN GAYA GEMPA .............................................................................................. 6

9. ANALISA BEBAN ANGIN ....................................................................................................... 12

10. KOMBINASI BEBAN DESAIN ................................................................................................. 19

11. DESAIN KOMPONEN STRUKTUR .......................................................................................... 23

12. PERENCANAAN PONDASI .................................................................................................... 32

13. PENUTUP ............................................................................................................................. 42

1|Page
2 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

1. PENDAHULUAN
Informasi bangunan yang akan dianalisis pada laporan ini adalah sebagai berukut:
- Fungsi bangunan = Papan Reklame (Billboard)
- Lokasi = Jl. Yos Sudarso Simpang Bukit Keminting
- Ukuran = 4X6
- Tinggi total = 11.5m
- Sistem Struktur = Rangka Baja dengan Bresing Konsentris Biasa

2. PERATURAN YANG DIGUNAKAN DALAM DESAIN


Dasar – dasar peraturan yang digunakan dalam perencanaan ini adalah:
a. PUBI-1982, Peraturan Umum Bahan Bangunan di Indonesia.
b. SNI 1727-2020, Beban Minimum Untuk Perancangan Bangunan Gedung dan
Struktur Lain.
c. SNI 1726:2019, Tata Cara Perencanaan Ketahanan Gempa Untuk Struktur
Bangunan Gedung dan Non Gedung.
d. SNI 2847:2019, Persyaratan Beton Struktural Untuk Bangunan Gedung.
e. SNI 1729:2020, Spesifikasi Untuk Bangunan Gedung Baja Struktural.

3. MUTU MATERIAL YANG DIGUNAKAN


Spesifikasi bahan atau material untuk komponen struktur yang akan digunakan
adalah sebagai berikut:
a. Tiang baja utama = ASTM A36M (Fy = 250 Mpa; Fu = 400 Mpa)
b. Rangka dan bresing baja = ASTM A36M (Fy = 250 Mpa; Fu = 400 Mpa)
c. Beton Pedestal & Pondasi = fc’ 21 Mpa (K-250)
d. Baja tulangan = Tulangan deformasi/ulir dengan Fy 420 Mpa
sesuai SNI 2052-2017 atau SNI 2847-2019.

4. DESKRIPSI SISTEM STRUKTUR BANGUNAN


Bangunan terdiri dari papan reklame 4X6 dengan tinggi total 11.5m. Struktur
dikategorikan sebagai Sistem Rangka Baja dengan Bresing Konsentris Biasa.

2|Page
3 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

5. METODE PERENCANAAN STRUKTUR


Analisis secara umum dilakukan secara 3 dimensi untuk mendapatkan hasil yang
optimal. Analisa struktur beban gempa dilakukan dengan data kegempaan
Indonesia SNI 1726-2019 yang sesuai lokasi bangunan, sehingga dihasilkan gaya-
gaya dalam untuk merancang dinding bangunan dan sambungannya, dan karena
bangunan merupakan bangunan sederhana dan masih dijinkan untuk hanya
dilakukan analisis dengan metode analisis statik ekivalen. Untuk beban angin
dihitung sesuai peraturan SNI 1727-20202 dengan kondisi lingkungan dan struktur
yang didesain. Analisis struktur dilakukan dengan bantuan program ETABS seperti
terlihat pada Gambar 1.

Gambar 1. Pemodelan struktur papan reklame 4X6

3|Page
4 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

6. PEMBEBANAN DASAR GRAVITASI DAN PARAMETER REDUKSI


Berikut adalah pembebanan dasar dan parameter reduksi dalam desain yang
digunakan adalah:
a) Berat jenis baja, 𝛾𝑠 : 78.5 kN/m3
b) Berat jenis beton, 𝛾𝑐 : 24.00 kN/m3
c) Berat jenis aluminium, 𝛾𝐴 : 27.00 kN/m3
d) Berat lampu sorot per unit : 10 kg
e) Beban hidup maintance dan konstruksi : orang+peralatan 100 kg per titik
f) Beban panel aluminium dengan tebal : 0.8 mm
g) Parameter desain (faktor reduksi kuat rencana Ø) yang digunakan dalam
perencanaan struktur (sesuai SNI 2847:2019) adalah:
- Faktor reduksi lentur : 0.90
- Faktor reduksi aksial : 0.65
- Faktor reduksi geser : 0.75
h) Parameter efektifitas momen inertia (penampang retak) kolom pedestal beton
bertulang sesuai SNI 2847:2019 : 0.7 Ig

Input pembebanan selain berat sendiri elemen yang dimodelkan adalah seperti
terlihat pada Gambar 2 berikut.

Gambar 2. Input superimpose dead load dan live load (kN)

4|Page
5 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

7. KARAKTERISTIK DINAMIK STRUKTUR


➢ Berat Bangunan Efektif
Berat bangunan billboard sesuai mass source 1DL+1SDL+0.25LL dari setiap
elevasi, adalah sebagai berikut:
Tabel 1. Berat efektif bangunan billboard per elevasi

TABLE: Mass Summary by Story


Story UX UY UZ
kg kg kg
+11.50 663.81 663.81 0
+5.50 803.1 803.1 0
+0.00 3766.32 3766.32 0
Total 5233.23 5233.23 0

➢ Ragam Getar Struktur


Dari analisis modal dengan metode eigen value, Ragam getar atau mode
shape dari struktur billboard ini adalah seperti terlihat pada Gambar 3,
dimana konfigurasi struktur sudah ideal dimana 2 mode pertama yang
terjadi adalah dominan translasi.

Mode 1 Mode 2 Mode 3


Translasi Y Translasi X Rotasi Z
1.1803 detik 1.1439 detik 0.2430 detik

Gambar 3. Ragam getar struktur pada 3 mode awal

5|Page
6 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

➢ Partisipasi Massa Modal Struktur


Dari analisis modal yang dilakukan dengan menggunanakan software
diperoleh partisipasi modal dari setiap mode struktur adalah seperti terlihat
pada Tabel 2, dimana selain mode 1 dan mode 2 sudah memenuhi untuk
translasi, total partisipasi massa modal juga sudah lebih dari 90%.
Tabel 2. Partisipasi modal masa modal struktur
TABLE: Modal Participating Mass Ratios
Case Mode Period UX UY UZ SumUX SumUY SumUZ RX RY RZ SumRX SumRY SumRZ
sec
Modal 1 1.18 0% 34% 0% 0% 34% 0% 95% 0% 0% 95% 0% 0%
Modal 2 1.144 35% 0% 0% 35% 34% 0% 0% 95% 0% 95% 95% 0%
Modal 3 0.243 0% 0% 0% 35% 34% 0% 0% 0% 91% 95% 95% 91%
Modal 4 0.227 0% 11% 0% 35% 45% 0% 1% 0% 0% 96% 95% 91%
Modal 5 0.169 0% 0% 0% 35% 45% 0% 0% 0% 9% 96% 95% 99%
Modal 6 0.16 14% 0% 0% 48% 45% 0% 0% 0% 0% 96% 96% 99%
Modal 7 0.096 0% 1% 0% 48% 47% 0% 0% 0% 0% 96% 96% 99%
Modal 8 0.084 0% 1% 0% 48% 48% 0% 0% 0% 0% 96% 96% 99%
Modal 9 0.062 0% 0% 0% 48% 48% 0% 0% 0% 0% 96% 96% 99%
Modal 10 0.06 0% 0% 0% 48% 48% 0% 0% 0% 0% 96% 96% 100%
Modal 11 0.06 0% 0% 0% 48% 48% 0% 0% 0% 0% 96% 96% 100%
Modal 12 0.055 0% 0% 0% 48% 48% 0% 0% 0% 0% 96% 96% 100%
Modal 13 0.046 0% 52% 0% 48% 100% 0% 4% 0% 0% 100% 96% 100%
Modal 14 0.046 52% 0% 0% 100% 100% 0% 0% 4% 0% 100% 100% 100%
Modal 15 0.025 0% 0% 0% 100% 100% 0% 0% 0% 0% 100% 100% 100%

8. ANALISA BEBAN GAYA GEMPA


➢ Prosedur Analisis Beban Gempa
Beban gempa pada perencanaan ini akan dilakukan dengan analisis statik
ekivalen dengan program ETABS, dengan menggunakan parameter-parameter
perencanaan beban gempa sesuai SNI 1726-2019. Analisis statik ekivalen
masih dapat dilakukan karena bangunan masih cukup sederhana, terdapat
pada lokasi zona gempa rendah dan dapat diterima sesuai SNI 1726-2019
seperti terlihat pada Tabel 3 berikut.

6|Page
7 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Tabel 3. Prosedur analisis gempa yang diizinkan

➢ Parameter Percepatan Gempa berdasarkan Peta Gempa Indonesia


Sesuai lokasi bangunan yang direncanakan yaitu beradi di Palangka Raya,
sehingga dapat diperoleh nilai percepatan gempa sesuai pada peta Gamba
sesuai SNI 1726-2019 adalah sebagai berikut.

Gambar 4. Peta gempa percepatan batuan dasar pada periode pendek

7|Page
8 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Gambar 5. Peta gempa percepatan batuan dasar pada periode 1 detik

Dari peta gempa diatas, dapat diperoleh nilai Ss dan S1 untuk kota palangka Raya
adalah seperti pada Gambar 6, dimana digunakan kondisi kelas situs tanah adalah
lunak (SE) agar konservatif karena tidak terdapat data penyeledikan tanah berupa
NSPT.

Gambar 6. Nilai percepatan gempa dan spektra desain Palangka Raya (SE)

8|Page
9 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

➢ Kategori Desain Seismik


Dari nilai sebelumnya diperoleh:
𝑆𝑠 = 0.1643 𝑔
𝑆1 = 0.0671 𝑔
Sehingga dengan kondisi kelas situs SE, diperoleh koefisien situs berdasarkan
Tabel 6 dan Tabel 7 SNI 1726-2019 adalah:
Tabel 4. Koefisien situs, Fa dan Fv

2 2
𝑆𝐷𝑆 = × 𝐹𝑎 × 𝑆𝑠 = × 2.4 × 0.1643 = 0.26288
3 3
2 2
𝑆𝐷1 = × 𝐹𝑣 × 𝑆1 = × 4.2 × 0.0671 = 0.18788
3 3
Tabel 5. Penentuan KDS berdasarkan nilai SDS dan SD1

Sehingga bangunan dapat dikategorikan sebagai KDS C.

9|Page
10 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

➢ Parameter Desain Struktur Tahan Gempa


Untuk parameter sistem struktur penahan gempa dimana menggunakan
Rangka Baja dengan Bresing Konsentris Biasa, sehingga diperleh nilai
parameter desain yaitu koefisien modifikasi respons (R)= 3.25; faktor kuat lebih
sistem (Ω0 )= 2; dan faktor pembesaran defleksi (Cd)= 3.25, seperti terdapat
pada Tabel berikut.
Tabel 6. Faktor R, Ω0 dan Cd untuk sistem pemikul gaya seismik

➢ Pendefenisian Beban Gempa Statik Ekivalen


Sehingga dari semua data dan parameter yang telah diperoleh, didefenisikan
gaya gempa statik ekivalen pada ETABS sebagai berikut.

Gambar 7. Pendefenisian beban gempa statik ekivalen arah X

10 | P a g e
11 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Gambar 8. Pendefenisian beban gempa statik ekivalen arah Y

➢ Beban Gempa Desain


Setelah proses running dilakukan, dari berat efektif bangunan dan parameter-
parameter yang telah didefenisikan, diperoleh gaya geser gempa desain seperti
terlihat pada Tabel dan Gambar berikut.
Tabel 7. Gaya geser gempa kumulatif statik ekivalen arah X dan arah Y
TABLE: Story Forces
Story Output Case Location P VX VY T MX MY
kN kN kN kN-m kN-m kN-m
+11.50 Seismic-X Top 0 -0.5018 0 0.1082 0 0
+11.50 Seismic-X Bottom 0 -0.5065 0 0.1082 0 -3.0202
+11.50 Seismic-Y Top 0 0 -0.4879 -0.974 0 0
+11.50 Seismic-Y Bottom 0 0 -0.4925 -0.9887 2.9365 0
+5.50 Seismic-X Top 0 -0.7392 0 0.1615 0 -3.0202
+5.50 Seismic-X Bottom 0 -0.7392 0 0.1615 0 -7.0858
+5.50 Seismic-Y Top 0 0 -0.7157 -1.4337 2.9365 0
+5.50 Seismic-Y Bottom 0 0 -0.7157 -1.4337 6.8727 0
+0.00 Seismic-X Top 0 -0.7392 0 0.1615 0 -7.0858
+0.00 Seismic-X Bottom 0 -0.7392 0 0.1615 0 -9.3035
+0.00 Seismic-Y Top 0 0 -0.7157 -1.4337 6.8727 0
+0.00 Seismic-Y Bottom 0 0 -0.7157 -1.4337 9.0198 0

11 | P a g e
12 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Gambar 9. Gaya geser per elevasi gempa statik ekivalen arah X dan arah Y

9. ANALISA BEBAN ANGIN


Beban angin pada perencanaan ini akan di analisis sesuai dengan SNI 1727-2020
yang saat ini berlaku.

12 | P a g e
13 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

➢ Kecepatan Angin Dasar


Sebagai acuan normatif, pada analisis ini dapat mengambil nilai kecepatan
angin dasar, V (m/s), berdasarkan standar dari Australia, HB 212-2002 – Design
Wind Speeds for the Asia-Pacific Region. Standar ini merupakan publikasi yang
dikeluarkan oleh Australian Standard untuk nilai kecepatan angin pada area
Asia Pasifik. Menurut HB 212-2002, wilayah Indonesia sebagai daerah di sekitar
garis ekuator masuk kedalam level I, yang ditunjukkan pada Gambar berikut.
Dimana dari publikasi ini dapat kita lihat bahwa nilai wind speed adalah 32 m/s
untuk periode 50 tahunan dan 40 m/s untuk periode 500 tahunan.
Berdasarkan standar tersebut, kita dapat mengambil nilai V = 32 m/s untuk
desain beban angin pada kondisi layan (serviceability design) dan V = 40 m/s
pada kondisi batas (strength design), sehingga dalam hal ini digunakan
kecepatan angin dasar 40 m/s atau 90 mph.

Gambar 10. Kecepatan angin dasar sesuai HB 212-2002

13 | P a g e
14 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

➢ Koefisien Arah Angin


Tabel 8. Faktor arah angin, Kd

Dari tabel diatas, diperoleh nilai Kd yang digunakan adalah 0.85.

➢ Kategori Eksposur

Dari keterangan pada Pasal 26.7 pada SNI 1727-2020 tersebut, maka bangunan
dapat termasuk pada kategori C.

14 | P a g e
15 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

➢ Koefisien Faktor Topografi, Kzt


Efek peningkatan kecepatan angin diperhitungkan diperoleh sesuai pasal 26.8
SNI 1727-202, sehingga diperoleh Kzt = 1.0.

➢ Faktor Pengaruh Hembusan Angin, G


Sesuai pasal 26.9 SNI 1727-2022, Untuk bangunan gedung dan struktur lain
yang kaku digunakan nilai G = 0.85.

➢ Koefisien Tekanan Internal, GCpi


Tabel 9. Koefisien tekanan internal, GCpi

Dari tabel diatas, digunakan koefisien tekanan internal untuk nilai positif dan
negatifnya yaitu 0.18.

15 | P a g e
16 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

➢ Koefisien Tekanan, Cp
Tabel 10. Koefisien tekanan angin pada elemen dinding

Dengan lebar papan rekalame (B) adalah 4 m dan tebal (L) 0.5 m, maka rasio
L/B adalah 0.125, maka digunakan Cp = 0.8 pada sisi angin datang; Cp = -0.5
untuk sisi angin pergi; dan Cp = -0.7 pada dinding tepi.

➢ Pendefenisian Beban Angin


Pada arah X, karena tidak terdapat dinding aluminium dan hanya sistem
rangka, maka beban angin dapat diaplikasikan tanpa koefisien tekanan angin
seperti berikut.

Gambar 11. Pendefenisian beban angin arah X

Sedangkan pada arah Y karena terdapat dinding aluminium 1 sisi, maka


diperlukan input koefisien tekanan angin dinding seperti berikut.

16 | P a g e
17 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Gambar 11. Pendefenisian beban angin arah Y

➢ Beban Angin Desain


Setelah proses running, pendefenisian yang telah dilakukan maka diperoleh
gaya geser desain akibaat beban angin seperti terlihat pada Gambar dan Tabel
berikut.

17 | P a g e
18 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Gambar 12. Gaya geser per elevasi beban angin desain arah X dan arah Y

18 | P a g e
19 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Tabel 11. Gaya geser desain akibat beban angin


TABLE: Story Forces
Story Output Case Location P VX VY T MX MY
kN kN kN kN-m kN-m kN-m
+11.50 Wind-X Top 0 -0.1957 0 0.0489 0 0
+11.50 Wind-X Bottom 0 -8.3459 0 1.688 0 -26.0609
+11.50 Wind-Y Top 0 0 -1.1831 -2.3662 0 0
+11.50 Wind-Y Bottom 0 0 -12.2586 -24.5173 40.8814 0
+5.50 Wind-X Top 0 -8.5208 0 1.7317 0 -26.0609
+5.50 Wind-X Bottom 0 -9.3887 0 1.9487 0 -75.3707
+5.50 Wind-Y Top 0 0 -13.2716 -26.5432 40.8814 0
+5.50 Wind-Y Bottom 0 0 -13.2716 -26.5432 113.8751 0
+0.00 Wind-X Top 0 -9.3887 0 1.9487 0 -75.3707
+0.00 Wind-X Bottom 0 -9.3887 0 1.9487 0 -103.5367
+0.00 Wind-Y Top 0 0 -13.2716 -26.5432 113.8751 0
+0.00 Wind-Y Bottom 0 0 -13.2716 -26.5432 153.6898 0

10. KOMBINASI BEBAN DESAIN


Dari yang telah dijabarkan pada analisis diatas, beban terdiri dari gravitasi, angin
dan gempa. Sehingga kombinasi beban desain yang akan digunakan adalah seperti
berikut.
Tabel 12. Kombinasi Beban Desain
TABLE: Load Combination Definitions
Name Type Is Auto Load Name SF Notes
DConS1 Linear Add Yes Dead 1.4
Dead [Strength]
DConS1 SDL 1.4
DConS2 Linear Add Yes Dead 1.2
DConS2 Live 1.6 Dead + Live [Strength]
DConS2 SDL 1.2
DConS3 Linear Add Yes Dead 1.2
DConS3 Live 1 Dead + Live + Wind + Snow
DConS3 SDL 1.2 [Strength]

DConS3 Wind-X 1
DConS4 Linear Add Yes Dead 1.2
DConS4 Live 1 Dead + Live - Wind + Snow
DConS4 SDL 1.2 [Strength]

DConS4 Wind-X -1

19 | P a g e
20 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

DConS5 Linear Add Yes Dead 1.2


DConS5 Live 1 Dead + Live + Wind + Snow
DConS5 SDL 1.2 [Strength]

DConS5 Wind-Y 1
DConS6 Linear Add Yes Dead 1.2
DConS6 Live 1 Dead + Live - Wind + Snow
DConS6 SDL 1.2 [Strength]

DConS6 Wind-Y -1
DConS7 Linear Add Yes Dead 0.9
DConS7 SDL 0.9 Dead (min) + Wind [Strength]
DConS7 Wind-X 1
DConS8 Linear Add Yes Dead 0.9
DConS8 SDL 0.9 Dead (min) - Wind [Strength]
DConS8 Wind-X -1
DConS9 Linear Add Yes Dead 0.9
DConS9 SDL 0.9 Dead (min) + Wind [Strength]
DConS9 Wind-Y 1
DConS10 Linear Add Yes Dead 0.9
DConS10 SDL 0.9 Dead (min) - Wind [Strength]
DConS10 Wind-Y -1
DConS11 Linear Add Yes Dead 1.3
DConS11 Live 1 Dead + Live + Static Earthquake
DConS11 SDL 1.3 [Strength]

DConS11 Seismic-X 1
DConS12 Linear Add Yes Dead 1.3
DConS12 Live 1 Dead + Live - Static Earthquake
DConS12 SDL 1.3 [Strength]

DConS12 Seismic-X -1
DConS13 Linear Add Yes Dead 1.3
DConS13 Live 1 Dead + Live + Static Earthquake
DConS13 SDL 1.3 [Strength]

DConS13 Seismic-Y 1
DConS14 Linear Add Yes Dead 1.3
DConS14 Live 1 Dead + Live - Static Earthquake
DConS14 SDL 1.3 [Strength]

DConS14 Seismic-Y -1

20 | P a g e
21 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

DConS15 Linear Add Yes Dead 0.8


Dead (min) + Static Earthquake
DConS15 SDL 0.8
[Strength]
DConS15 Seismic-X 1
DConS16 Linear Add Yes Dead 0.8
Dead (min) - Static Earthquake
DConS16 SDL 0.8
[Strength]
DConS16 Seismic-X -1
DConS17 Linear Add Yes Dead 0.8
Dead (min) + Static Earthquake
DConS17 SDL 0.8
[Strength]
DConS17 Seismic-Y 1
DConS18 Linear Add Yes Dead 0.8
Dead (min) - Static Earthquake
DConS18 SDL 0.8
[Strength]
DConS18 Seismic-Y -1
DStlD1 Linear Add Yes Dead 1
Dead [Deflections]
DStlD1 SDL 1
DStlD2 Linear Add Yes Dead 1
DStlD2 Live 1 Dead + Live [Deflections]
DStlD2 SDL 1
DStlS1 Linear Add Yes Dead 1.4
Dead [Strength]
DStlS1 SDL 1.4
DStlS2 Linear Add Yes Dead 1.2
DStlS2 Live 1.6 Dead + Live [Strength]
DStlS2 SDL 1.2
DStlS3 Linear Add Yes Dead 1.2
DStlS3 Live 1 Dead + Live + Wind + Snow
DStlS3 SDL 1.2 [Strength]

DStlS3 Wind-X 1
DStlS4 Linear Add Yes Dead 1.2
DStlS4 Live 1 Dead + Live - Wind + Snow
DStlS4 SDL 1.2 [Strength]

DStlS4 Wind-X -1
DStlS5 Linear Add Yes Dead 1.2
DStlS5 Live 1 Dead + Live + Wind + Snow
DStlS5 SDL 1.2 [Strength]

DStlS5 Wind-Y 1
DStlS6 Linear Add Yes Dead 1.2 Dead + Live - Wind + Snow
DStlS6 Live 1 [Strength]

21 | P a g e
22 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

DStlS6 SDL 1.2


DStlS6 Wind-Y -1
DStlS7 Linear Add Yes Dead 0.9
DStlS7 SDL 0.9 Dead (min) + Wind [Strength]
DStlS7 Wind-X 1
DStlS8 Linear Add Yes Dead 0.9
DStlS8 SDL 0.9 Dead (min) - Wind [Strength]
DStlS8 Wind-X -1
DStlS9 Linear Add Yes Dead 0.9
DStlS9 SDL 0.9 Dead (min) + Wind [Strength]
DStlS9 Wind-Y 1
DStlS10 Linear Add Yes Dead 0.9
DStlS10 SDL 0.9 Dead (min) - Wind [Strength]
DStlS10 Wind-Y -1
DStlS11 Linear Add Yes Dead 1.25258
DStlS11 Live 1 Dead + Live + Static Earthquake
DStlS11 SDL 1.25258 [Strength]

DStlS11 Seismic-X 1
DStlS12 Linear Add Yes Dead 1.25258
DStlS12 Live 1 Dead + Live - Static Earthquake
DStlS12 SDL 1.25258 [Strength]

DStlS12 Seismic-X -1
DStlS13 Linear Add Yes Dead 1.25258
DStlS13 Live 1 Dead + Live + Static Earthquake
DStlS13 SDL 1.25258 [Strength]

DStlS13 Seismic-Y 1
DStlS14 Linear Add Yes Dead 1.25258
DStlS14 Live 1 Dead + Live - Static Earthquake
DStlS14 SDL 1.25258 [Strength]

DStlS14 Seismic-Y -1
DStlS15 Linear Add Yes Dead 0.84742
Dead (min) + Static Earthquake
DStlS15 SDL 0.84742
[Strength]
DStlS15 Seismic-X 1
DStlS16 Linear Add Yes Dead 0.84742
Dead (min) - Static Earthquake
DStlS16 SDL 0.84742
[Strength]
DStlS16 Seismic-X -1

22 | P a g e
23 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

DStlS17 Linear Add Yes Dead 0.84742


Dead (min) + Static Earthquake
DStlS17 SDL 0.84742
[Strength]
DStlS17 Seismic-Y 1
DStlS18 Linear Add Yes Dead 0.84742
Dead (min) - Static Earthquake
DStlS18 SDL 0.84742
[Strength]
DStlS18 Seismic-Y -1

11. DESAIN KOMPONEN STRUKTUR


➢ Struktur Rangka Baja
Dari kombinasi beban yang disebutkan diatas, maka diperoleh hasil desain
komponen strutkur baja berupa rasio kapasitas elemen seperti terlihat pada
Gambar berikut.

Gambar 13. Rasio kapasitas elemen struktur baja

23 | P a g e
24 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Dari gambar diatas, dpaat diperoleh bahwa semua elemen telah memenuhi
dimana untuk elemen tiang rasio terbesar adalah 0.799 dan untuk elemen
rangka siku adalah 0.784 seperti terlihat pada detail berikut ini.

Story Label Section Moment Interaction Check PMM Combo V22 Ratio V33 Ratio Section Class

+11.50 C4 D273 0.28 = 0.007 + 0 + 0.273 DStlS5 0.042 0.026 Seismic HD


+11.50 C9 L 40X40X4 0.141 = 0.002 + 0.059 + 0.08 DStlS2 0.005 0.0001231 Seismic MD
+11.50 C10 L 40X40X4 0.087 = 0.001 + 0.036 + 0.05 DStlS2 0.003 0.0001226 Seismic MD
+11.50 C11 L 40X40X4 0.1 = 0.004 + 0.041 + 0.054 DStlS2 0.003 0 Seismic MD
+11.50 C12 L 40X40X4 0.097 = 0.008 + 0.038 + 0.05 DStlS2 0.003 0 Seismic MD
+11.50 C15 L 40X40X4 0.095 = 0.002 + 0.039 + 0.053 DStlS2 0.003 0 Seismic MD
+11.50 C16 L 40X40X4 0.135 = 0.005 + 0.055 + 0.075 DStlS2 0.004 0 Seismic MD
+11.50 C17 L 40X40X4 0.133 = 0 + 0.042 + 0.091 DStlS5 0.004 0.003 Seismic MD
+11.50 C18 L 40X40X4 0.111 = 0.004 + 0.028 + 0.08 DStlS5 0.002 0.003 Seismic MD
+11.50 C19 L 40X40X4 0.096 = 0.004 + 0.032 + 0.06 DStlS6 0.002 0.002 Seismic MD
+11.50 C20 L 40X40X4 0.091 = 0.003 + 0.031 + 0.056 DStlS6 0.002 0.003 Seismic MD
+11.50 C21 L 40X40X4 0.126 = 1.422E-04 + 0.047 + 0.079 DStlS6 0.002 0.004 Seismic MD
+11.50 C22 L 40X40X4 0.061 = 0.002 + 0.017 + 0.042 DStlS6 0.002 0.001 Seismic MD
+11.50 C23 L 40X40X4 0.379 = 0.035 + 0.018 + 0.326 DStlS5 0.008 0.009 Seismic MD
+11.50 C24 L 40X40X4 0.201 = 0.055 + 0.067 + 0.078 DStlS5 0.005 0.002 Seismic MD
+11.50 C25 L 40X40X4 0.167 = 0.002 + 0.083 + 0.082 DStlS2 0.005 0.002 Seismic MD
+11.50 C26 L 40X40X4 0.168 = 0.019 + 0.026 + 0.123 DStlS6 0.005 0.003 Seismic MD
+11.50 C27 L 40X40X4 0.169 = 0.012 + 0.024 + 0.132 DStlS6 0.005 0.004 Seismic MD
+11.50 C28 L 40X40X4 0.19 = 0.006 + 0.03 + 0.154 DStlS6 0.006 0.004 Seismic MD
+11.50 C29 L 40X40X4 0.323 = 0.015 + 0.138 + 0.171 DStlS6 0.008 0.009 Seismic MD
+11.50 C30 L 40X40X4 0.206 = 0.056 + 0.055 + 0.095 DStlS5 0.005 0.001 Seismic MD
+11.50 C31 L 40X40X4 0.178 = 0.054 + 0.013 + 0.11 DStlS5 0.005 0.002 Seismic MD
+11.50 C32 L 40X40X4 0.173 = 0.002 + 0.061 + 0.111 DStlS2 0.005 0.003 Seismic MD
+11.50 C33 L 40X40X4 0.17 = 3.086E-04 + 0.059 + 0.111 DStlS2 0.005 0.004 Seismic MD
+11.50 C34 L 40X40X4 0.197 = 4.506E-04 + 0.074 + 0.123 DStlS2 0.006 0.004 Seismic MD
+11.50 C35 L 40X40X4 0.125 = 0.002 + 0.068 + 0.055 DStlS5 0.004 0.004 Seismic MD
+11.50 C36 L 40X40X4 0.093 = 0.006 + 0.056 + 0.031 DStlS5 0.002 0.003 Seismic MD
+11.50 C37 L 40X40X4 0.074 = 0.001 + 0.048 + 0.025 DStlS2 0.002 0.002 Seismic MD
+11.50 C38 L 40X40X4 0.116 = 0.002 + 0.055 + 0.059 DStlS6 0.002 0.003 Seismic MD
+11.50 C39 L 40X40X4 0.106 = 0.001 + 0.05 + 0.054 DStlS6 0.002 0.003 Seismic MD
+11.50 C40 L 40X40X4 0.075 = 0.005 + 0.037 + 0.033 DStlS6 0.002 0.002 Seismic MD
+11.50 C41 L 40X40X4 0.143 = 0.002 + 0.06 + 0.08 DStlS2 0.005 0.0001335 Seismic MD
+11.50 C42 L 40X40X4 0.089 = 0.001 + 0.036 + 0.051 DStlS2 0.003 0.0001304 Seismic MD
+11.50 C43 L 40X40X4 0.102 = 0.004 + 0.039 + 0.058 DStlS2 0.003 0.0001087 Seismic MD
+11.50 C44 L 40X40X4 0.099 = 0.008 + 0.037 + 0.054 DStlS2 0.003 0.0001113 Seismic MD
+11.50 C45 L 40X40X4 0.097 = 0.003 + 0.039 + 0.055 DStlS2 0.003 0.0001073 Seismic MD
+11.50 C46 L 40X40X4 0.136 = 0.005 + 0.056 + 0.075 DStlS2 0.004 0 Seismic MD
+11.50 C47 L 40X40X4 0.028 = 0.014 + 0.007 + 0.007 DStlS8 0.001 0.0003828 Seismic MD
+11.50 C48 L 40X40X4 0.064 = 0.051 + 0.005 + 0.008 DStlS4 0.001 0.0003648 Seismic MD
+11.50 C49 L 40X40X4 0.058 = 0.04 + 0.007 + 0.01 DStlS8 0.001 0.0002128 Seismic MD
+11.50 C50 L 40X40X4 0.039 = 0.023 + 0.004 + 0.011 DStlS4 0.001 0.0002001 Seismic MD
+11.50 C51 L 40X40X4 0.022 = 0.007 + 0.007 + 0.008 DStlS8 0.001 0.0002443 Seismic MD
+11.50 C52 L 40X40X4 0.02 = 0.004 + 0.003 + 0.013 DStlS4 0.001 0.0002685 Seismic MD
+11.50 C53 L 40X40X4 0.308 = 0.001 + 0.13 + 0.177 DStlS2 0.001 0.009 Seismic MD
+11.50 C54 L 40X40X4 0.289 = 0.002 + 0.121 + 0.166 DStlS2 0.001 0.008 Seismic MD
+11.50 C55 L 40X40X4 0.277 = 0.006 + 0.114 + 0.157 DStlS2 0.001 0.008 Seismic MD
+11.50 C56 L 40X40X4 0.295 = 0.002 + 0.124 + 0.17 DStlS2 0.001 0.008 Seismic MD
+11.50 C57 L 40X40X4 0.273 = 0.006 + 0.112 + 0.154 DStlS2 0.001 0.008 Seismic MD
+11.50 C58 L 40X40X4 0.294 = 0.005 + 0.122 + 0.167 DStlS2 0.001 0.009 Seismic MD
+11.50 C59 L 40X40X4 0.417 = 0.042 + 0.166 + 0.209 DStlS6 0.002 0.011 Seismic MD

24 | P a g e
25 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Story Label Section Moment Interaction Check PMM Combo V22 Ratio V33 Ratio Section Class

+11.50 C60 L 40X40X4 0.145 = 0.028 + 0.052 + 0.065 DStlS6 0.001 0.003 Seismic MD
+11.50 C61 L 40X40X4 0.137 = 0.007 + 0.058 + 0.072 DStlS5 0.001 0.003 Seismic MD
+11.50 C62 L 40X40X4 0.161 = 0.011 + 0.067 + 0.083 DStlS5 0.001 0.005 Seismic MD
+11.50 C63 L 40X40X4 0.178 = 0.003 + 0.077 + 0.097 DStlS5 0.001 0.005 Seismic MD
+11.50 C64 L 40X40X4 0.199 = 0.008 + 0.085 + 0.106 DStlS5 0.001 0.005 Seismic MD
+11.50 C65 L 40X40X4 0.364 = 0.017 + 0.142 + 0.205 DStlS6 0.002 0.01 Seismic MD
+11.50 C66 L 40X40X4 0.156 = 0.039 + 0.048 + 0.07 DStlS6 0.001 0.003 Seismic MD
+11.50 C67 L 40X40X4 0.142 = 0.012 + 0.054 + 0.077 DStlS5 0.001 0.004 Seismic MD
+11.50 C68 L 40X40X4 0.173 = 0.004 + 0.069 + 0.1 DStlS5 0.001 0.004 Seismic MD
+11.50 C69 L 40X40X4 0.162 = 0.009 + 0.063 + 0.09 DStlS5 0.001 0.005 Seismic MD
+11.50 C70 L 40X40X4 0.2 = 0.002 + 0.082 + 0.117 DStlS5 0.001 0.006 Seismic MD
+11.50 C71 L 40X40X4 0.363 = 0.005 + 0.154 + 0.204 DStlS2 0.001 0.009 Seismic MD
+11.50 C72 L 40X40X4 0.272 = 0.003 + 0.116 + 0.153 DStlS2 0.001 0.008 Seismic MD
+11.50 C73 L 40X40X4 0.297 = 0.001 + 0.128 + 0.168 DStlS2 0.001 0.038 Seismic MD
+11.50 C74 L 40X40X4 0.28 = 0.004 + 0.119 + 0.157 DStlS2 0.001 0.008 Seismic MD
+11.50 C75 L 40X40X4 0.292 = 0.001 + 0.126 + 0.166 DStlS2 0.001 0.008 Seismic MD
+11.50 C76 L 40X40X4 0.349 = 0.014 + 0.144 + 0.191 DStlS2 0.001 0.009 Seismic MD
+11.50 C77 L 40X40X4 0.047 = 0.031 + 0.005 + 0.011 DStlS7 0.001 0.0002347 Seismic MD
+11.50 C78 L 40X40X4 0.061 = 0.046 + 0.004 + 0.011 DStlS7 0.001 0.0001896 Seismic MD
+11.50 C79 L 40X40X4 0.05 = 0.035 + 0.007 + 0.009 DStlS7 0.001 0.0001238 Seismic MD
+11.50 C80 L 40X40X4 0.042 = 0.026 + 0.005 + 0.011 DStlS3 0.001 0.000126 Seismic MD
+11.50 C81 L 40X40X4 0.02 = 0.007 + 0.008 + 0.005 DStlS3 0.001 0.0001643 Seismic MD
+11.50 C82 L 40X40X4 0.019 = 0.003 + 0.005 + 0.01 DStlS3 0.001 0.0001957 Seismic MD
+5.50 C4 D273 0.799 = 0.013 + 0 + 0.786 DStlS6 0.018 0.026 Seismic HD

PMM Section
Story Label Section Moment Interaction Check V22 Ratio V33 Ratio
Combo Class
+11.50 B2 L 40X40X4 0.116 = 0.001 + 0.05 + 0.064 DStlS5 0.001 0.008 Seismic MD
+11.50 B4 L 40X40X4 0.11 = 0.001 + 0.044 + 0.065 DStlS5 0.0004651 0.007 Seismic MD
+11.50 B12 L 40X40X4 0.134 = 0.003 + 0.052 + 0.08 DStlS5 0.001 0.009 Seismic MD
+11.50 B14 L 40X40X4 0.169 = 0.002 + 0.075 + 0.093 DStlS5 0.002 0.01 Seismic MD
+11.50 B20 L 40X40X4 0.192 = 0.002 + 0.075 + 0.115 DStlS5 0.001 0.012 Seismic MD
+11.50 B22 L 40X40X4 0.179 = 0.002 + 0.071 + 0.107 DStlS5 0.0004605 0.011 Seismic MD
+11.50 B27 L 40X40X4 0.185 = 0.001 + 0.075 + 0.109 DStlS6 0.001 0.012 Seismic MD
+11.50 B29 L 40X40X4 0.239 = 0.001 + 0.08 + 0.158 DStlS6 0.002 0.014 Seismic MD
+11.50 B34 L 40X40X4 0.247 = 0.002 + 0.103 + 0.141 DStlS6 0.001 0.016 Seismic MD
+11.50 B36 L 40X40X4 0.227 = 0.003 + 0.091 + 0.134 DStlS6 0.0004593 0.014 Seismic MD
+11.50 B41 L 40X40X4 0.163 = 0.001 + 0.066 + 0.096 DStlS6 0.001 0.011 Seismic MD
+11.50 B43 L 40X40X4 0.204 = 0.001 + 0.082 + 0.121 DStlS6 0.002 0.012 Seismic MD
+11.50 B101 L 40X40X4 0.223 = 0.003 + 0.09 + 0.129 DStlS2 0.007 0.004 Seismic MD
+11.50 B102 L 40X40X4 0.313 = 0.016 + 0.213 + 0.085 DStlS5 0.01 0.012 Seismic MD
+11.50 B104 L 40X40X4 0.311 = 0.016 + 0.212 + 0.083 DStlS5 0.01 0.012 Seismic MD
+11.50 B105 L 40X40X4 0.228 = 0.003 + 0.085 + 0.14 DStlS2 0.007 0.004 Seismic MD
+11.50 B106 L 40X40X4 0.121 = 0.003 + 0.047 + 0.071 DStlS5 0.001 0.004 Seismic MD
+11.50 B107 L 40X40X4 0.319 = 0.011 + 0.13 + 0.178 DStlS5 0.001 0.011 Seismic MD
+11.50 B109 L 40X40X4 0.325 = 0.015 + 0.132 + 0.178 DStlS5 0.001 0.011 Seismic MD
+11.50 B110 L 40X40X4 0.114 = 0.002 + 0.045 + 0.067 DStlS5 0.001 0.003 Seismic MD
+11.50 B111 L 40X40X4 0.397 = 0.002 + 0.158 + 0.237 DStlS2 0.053 0.023 Seismic MD
+11.50 B114 L 40X40X4 0.451 = 0.002 + 0.181 + 0.268 DStlS2 0.049 0.022 Seismic MD
+11.50 B115 L 40X40X4 0.253 = 0.002 + 0.078 + 0.172 DStlS2 0.009 0.005 Seismic MD
+11.50 B116 L 40X40X4 0.368 = 0.019 + 0.252 + 0.097 DStlS5 0.012 0.014 Seismic MD
+11.50 B118 L 40X40X4 0.366 = 0.02 + 0.251 + 0.095 DStlS5 0.012 0.014 Seismic MD
+11.50 B119 L 40X40X4 0.256 = 0.002 + 0.078 + 0.176 DStlS2 0.01 0.005 Seismic MD
+11.50 B120 L 40X40X4 0.143 = 0.002 + 0.057 + 0.084 DStlS5 0.001 0.004 Seismic MD
+11.50 B121 L 40X40X4 0.368 = 0.006 + 0.154 + 0.208 DStlS5 0.001 0.013 Seismic MD

25 | P a g e
26 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

PMM Section
Story Label Section Moment Interaction Check V22 Ratio V33 Ratio
Combo Class
+11.50 B123 L 40X40X4 0.376 = 0.006 + 0.157 + 0.213 DStlS5 0.001 0.014 Seismic MD
+11.50 B124 L 40X40X4 0.119 = 0.003 + 0.047 + 0.07 DStlS5 0.001 0.004 Seismic MD
+11.50 B125 L 40X40X4 0.462 = 4.578E-04 + 0.235 + 0.227 DStlS2 0.058 0.026 Seismic MD
+11.50 B128 L 40X40X4 0.641 = 3.514E-04 + 0.2 + 0.441 DStlS2 0.063 0.029 Seismic MD
+11.50 B129 L 40X40X4 0.236 = 0.001 + 0.084 + 0.151 DStlS2 0.008 0.006 Seismic MD
+11.50 B130 L 40X40X4 0.422 = 0.021 + 0.197 + 0.204 DStlS9 0.012 0.016 Seismic MD
+11.50 B132 L 40X40X4 0.43 = 0.02 + 0.2 + 0.209 DStlS9 0.012 0.016 Seismic MD
+11.50 B133 L 40X40X4 0.239 = 0.001 + 0.086 + 0.151 DStlS2 0.009 0.006 Seismic MD
+11.50 B134 L 40X40X4 0.167 = 0 + 0.068 + 0.099 DStlS5 0.001 0.005 Seismic MD
+11.50 B135 L 40X40X4 0.42 = 0.004 + 0.176 + 0.24 DStlS5 0.001 0.015 Seismic MD
+11.50 B137 L 40X40X4 0.407 = 0.003 + 0.172 + 0.233 DStlS5 0.001 0.014 Seismic MD
+11.50 B138 L 40X40X4 0.189 = 0.001 + 0.076 + 0.111 DStlS5 0.001 0.005 Seismic MD
+11.50 B139 L 40X40X4 0.609 = 0 + 0.273 + 0.336 DStlS2 0.064 0.034 Seismic MD
+11.50 B142 L 40X40X4 0.504 = 0.004 + 0.087 + 0.413 DStlS5 0.059 0.03 Seismic MD
+11.50 B143 L 40X40X4 0.252 = 0.008 + 0.04 + 0.203 DStlS5 0.009 0.007 Seismic MD
+11.50 B144 L 40X40X4 0.508 = 0.015 + 0.139 + 0.353 DStlS6 0.012 0.017 Seismic MD
+11.50 B146 L 40X40X4 0.506 = 0.016 + 0.138 + 0.352 DStlS6 0.012 0.017 Seismic MD
+11.50 B147 L 40X40X4 0.257 = 0.007 + 0.042 + 0.207 DStlS5 0.009 0.008 Seismic MD
+11.50 B148 L 40X40X4 0.198 = 0.001 + 0.084 + 0.113 DStlS6 0.001 0.047 Seismic MD
+11.50 B149 L 40X40X4 0.453 = 0.003 + 0.185 + 0.264 DStlS6 0.001 0.016 Seismic MD
+11.50 B151 L 40X40X4 0.455 = 0.004 + 0.186 + 0.265 DStlS6 0.001 0.017 Seismic MD
+11.50 B152 L 40X40X4 0.176 = 0.002 + 0.074 + 0.099 DStlS6 0.001 0.006 Seismic MD
+11.50 B153 L 40X40X4 0.569 = 0.003 + 0.055 + 0.511 DStlS6 0.059 0.033 Seismic MD
+11.50 B156 L 40X40X4 0.647 = 0.003 + 0.1 + 0.545 DStlS5 0.064 0.037 Seismic MD
+11.50 B157 L 40X40X4 0.226 = 0.001 + 0.109 + 0.116 DStlS2 0.008 0.008 Seismic MD
+11.50 B158 L 40X40X4 0.547 = 0.017 + 0.149 + 0.381 DStlS6 0.012 0.018 Seismic MD
+11.50 B160 L 40X40X4 0.554 = 0.017 + 0.151 + 0.386 DStlS6 0.012 0.019 Seismic MD
+11.50 B161 L 40X40X4 0.229 = 0.001 + 0.11 + 0.118 DStlS2 0.009 0.008 Seismic MD
+11.50 B162 L 40X40X4 0.219 = 0.001 + 0.093 + 0.125 DStlS6 0.001 0.007 Seismic MD
+11.50 B163 L 40X40X4 0.494 = 0.004 + 0.202 + 0.288 DStlS6 0.001 0.018 Seismic MD
+11.50 B165 L 40X40X4 0.482 = 0.002 + 0.198 + 0.283 DStlS6 0.001 0.017 Seismic MD
+11.50 B166 L 40X40X4 0.241 = 0.002 + 0.102 + 0.137 DStlS6 0.001 0.007 Seismic MD
+11.50 B167 L 40X40X4 0.713 = 0.003 + 0.105 + 0.605 DStlS6 0.064 0.04 Seismic MD
+11.50 B170 L 40X40X4 0.546 = 0.003 + 0.26 + 0.282 DStlS6 0.059 0.037 Seismic MD
+11.50 B171 L 40X40X4 0.234 = 0.001 + 0.124 + 0.109 DStlS2 0.009 0.006 Seismic MD
+11.50 B172 L 40X40X4 0.496 = 0.014 + 0.113 + 0.368 DStlS6 0.012 0.016 Seismic MD
+11.50 B174 L 40X40X4 0.507 = 0.015 + 0.117 + 0.375 DStlS6 0.012 0.017 Seismic MD
+11.50 B175 L 40X40X4 0.236 = 0.001 + 0.126 + 0.109 DStlS2 0.01 0.006 Seismic MD
+11.50 B176 L 40X40X4 0.177 = 0.004 + 0.074 + 0.099 DStlS6 0.001 0.005 Seismic MD
+11.50 B177 L 40X40X4 0.46 = 0.006 + 0.187 + 0.267 DStlS6 0.001 0.016 Seismic MD
+11.50 B179 L 40X40X4 0.451 = 0.008 + 0.182 + 0.261 DStlS6 0.001 0.016 Seismic MD
+11.50 B180 L 40X40X4 0.156 = 0.004 + 0.065 + 0.086 DStlS6 0.001 0.005 Seismic MD
+11.50 B181 L 40X40X4 0.508 = 0.002 + 0.104 + 0.402 DStlS6 0.057 0.031 Seismic MD
+11.50 B184 L 40X40X4 0.618 = 0.003 + 0.071 + 0.544 DStlS5 0.063 0.034 Seismic MD
+11.50 B1 2L 40X40X4 0.293 = 0.003 + 0.291 + 0 DStlS5 0.068 0.011 Seismic MD
+11.50 B3 2L 40X40X4 0.06 = 0.001 + 0.059 + 1.325E-04 DStlS6 0.013 0.005 Seismic MD
+11.50 B5 2L 40X40X4 0.109 = 1.834E-04 + 0.104 + 0.005 DStlS2 0.01 0.019 Seismic MD
+11.50 B6 2L 40X40X4 0.113 = 0.002 + 0.107 + 0.005 DStlS2 0.011 0.02 Seismic MD
+11.50 B199 2L 40X40X4 0.681 = 0.003 + 0.678 + 0 DStlS5 0.072 0.014 Seismic MD
+11.50 B200 2L 40X40X4 0.163 = 0.002 + 0.161 + 3.058E-04 DStlS6 0.016 0.01 Seismic MD
+11.50 B201 2L 40X40X4 0.195 = 0.016 + 0.132 + 0.048 DStlS5 0.011 0.037 Seismic MD
+11.50 B202 2L 40X40X4 0.172 = 0 + 0.166 + 0.005 DStlS2 0.011 0.032 Seismic MD
+11.50 B203 2L 40X40X4 0.168 = 0 + 0.166 + 0.002 DStlS2 0.011 0.034 Seismic MD
+11.50 B204 2L 40X40X4 0.204 = 0.02 + 0.132 + 0.052 DStlS5 0.011 0.04 Seismic MD
+11.50 B205 2L 40X40X4 0.673 = 0.003 + 0.67 + 1.88E-04 DStlS5 0.071 0.02 Seismic MD
+11.50 B206 2L 40X40X4 0.156 = 0.003 + 0.153 + 3.625E-04 DStlS6 0.016 0.008 Seismic MD

26 | P a g e
27 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

PMM Section
Story Label Section Moment Interaction Check V22 Ratio V33 Ratio
Combo Class
+11.50 B207 2L 40X40X4 0.209 = 0.022 + 0.131 + 0.055 DStlS5 0.011 0.043 Seismic MD
+11.50 B208 2L 40X40X4 0.171 = 3.929E-04 + 0.122 + 0.048 DStlS5 0.011 0.037 Seismic MD
+11.50 B209 2L 40X40X4 0.625 = 2.932E-04 + 0.625 + 0 DStlS2 0.066 0.011 Seismic MD
+11.50 B210 2L 40X40X4 0.133 = 0.003 + 0.13 + 0.001 DStlS6 0.013 0.01 Seismic MD
+11.50 B211 2L 40X40X4 0.784 = 0.046 + 0.737 + 0.001 DStlS6 0.078 0.335 Seismic MD
+11.50 B212 2L 40X40X4 0.226 = 0.033 + 0.192 + 3.942E-04 DStlS5 0.02 0.025 Seismic MD
+11.50 B213 2L 40X40X4 0.199 = 0.058 + 0.13 + 0.01 DStlS3 0.012 0.049 Seismic MD
+11.50 B214 2L 40X40X4 0.188 = 0.053 + 0.126 + 0.01 DStlS4 0.012 0.043 Seismic MD
+11.50 B253 2L 40X40X4 0.174 = 0 + 0.172 + 0.002 DStlS2 0.011 0.04 Seismic MD
+11.50 B254 2L 40X40X4 0.207 = 0.021 + 0.128 + 0.057 DStlS5 0.012 0.047 Seismic MD
+11.50 B255 2L 40X40X4 0.638 = 0.004 + 0.634 + 1.058E-04 DStlS2 0.067 0.093 Seismic MD
+11.50 B256 2L 40X40X4 0.113 = 0.046 + 0.068 + 2.41E-04 DStlS5 0.01 0.012 Seismic MD
+11.50 B7 L 40X40X4 0.18 = 0.007 + 0.074 + 0.1 DStlS5 0.0003243 0.01 Seismic MD
+11.50 B8 L 40X40X4 0.18 = 0.023 + 0.067 + 0.09 DStlS5 0.0004104 0.009 Seismic MD
+11.50 B9 L 40X40X4 0.21 = 0.006 + 0.086 + 0.118 DStlS5 0.0003471 0.012 Seismic MD
+11.50 B10 L 40X40X4 0.227 = 0.008 + 0.091 + 0.127 DStlS10 0.0003542 0.012 Seismic MD
+11.50 B11 L 40X40X4 0.244 = 0.007 + 0.098 + 0.139 DStlS6 0.0003504 0.013 Seismic MD
+11.50 B13 L 40X40X4 0.192 = 0.005 + 0.077 + 0.11 DStlS6 0.0003463 0.01 Seismic MD
+11.50 B15 L 40X40X4 0.278 = 0.012 + 0.132 + 0.134 DStlS6 0.016 0.008 Seismic MD
+11.50 B16 L 40X40X4 0.263 = 0.006 + 0.113 + 0.144 DStlS6 0.013 0.007 Seismic MD
+11.50 B17 L 40X40X4 0.272 = 0.018 + 0.137 + 0.117 DStlS6 0.015 0.009 Seismic MD
+11.50 B18 L 40X40X4 0.239 = 0.024 + 0.128 + 0.087 DStlS6 0.013 0.01 Seismic MD
+11.50 B19 L 40X40X4 0.216 = 0.039 + 0.07 + 0.108 DStlS9 0.01 0.011 Seismic MD
+11.50 B21 L 40X40X4 0.356 = 0.025 + 0.113 + 0.219 DStlS5 0.019 0.009 Seismic MD
+11.50 B23 L 40X40X4 0.287 = 0.012 + 0.13 + 0.145 DStlS6 0.017 0.028 Seismic MD
+11.50 B24 L 40X40X4 0.417 = 0.019 + 0.027 + 0.37 DStlS5 0.027 0.028 Seismic MD
+11.50 B25 L 40X40X4 0.21 = 0.005 + 0.021 + 0.185 DStlS5 0.017 0.018 Seismic MD
+11.50 B26 L 40X40X4 0.308 = 0.016 + 0.005 + 0.286 DStlS5 0.023 0.024 Seismic MD
+11.50 B28 L 40X40X4 0.42 = 0.022 + 0.031 + 0.367 DStlS5 0.023 0.036 Seismic MD
+11.50 B30 L 40X40X4 0.387 = 0.021 + 0.298 + 0.068 DStlS6 0.033 0.032 Seismic MD
+11.50 B31 L 40X40X4 0.423 = 0.02 + 0.102 + 0.301 DStlS6 0.019 0.039 Seismic MD
+11.50 B32 L 40X40X4 0.245 = 0.016 + 0.193 + 0.036 DStlS5 0.024 0.021 Seismic MD
+11.50 B33 L 40X40X4 0.194 = 0.009 + 0.164 + 0.02 DStlS5 0.018 0.022 Seismic MD
+11.50 B35 L 40X40X4 0.29 = 0.016 + 0.151 + 0.123 DStlS6 0.026 0.033 Seismic MD
+11.50 B37 L 40X40X4 0.269 = 0.015 + 0.11 + 0.144 DStlS6 0.02 0.026 Seismic MD
+11.50 B38 L 40X40X4 0.407 = 0.016 + 0.031 + 0.36 DStlS6 0.029 0.027 Seismic MD
+5.50 B2 L 40X40X4 0.085 = 0.001 + 0.034 + 0.05 DStlS4 0.001 0.005 Seismic MD
+5.50 B4 L 40X40X4 0.074 = 0.001 + 0.03 + 0.043 DStlS3 0.001 0.005 Seismic MD
+5.50 B101 L 40X40X4 0.229 = 0.002 + 0.096 + 0.131 DStlS2 0.007 0.002 Seismic MD
+5.50 B102 L 40X40X4 0.311 = 0.005 + 0.043 + 0.264 DStlS2 0.01 0.007 Seismic MD
+5.50 B104 L 40X40X4 0.312 = 0.005 + 0.05 + 0.257 DStlS2 0.01 0.007 Seismic MD
+5.50 B105 L 40X40X4 0.229 = 0.002 + 0.104 + 0.123 DStlS2 0.007 0.002 Seismic MD
+5.50 B106 L 40X40X4 0.082 = 0.008 + 0.035 + 0.04 DStlS4 0.001 0.002 Seismic MD
+5.50 B107 L 40X40X4 0.199 = 0.021 + 0.075 + 0.103 DStlS4 0.001 0.006 Seismic MD
+5.50 B109 L 40X40X4 0.223 = 0.031 + 0.08 + 0.112 DStlS3 0.001 0.007 Seismic MD
+5.50 B110 L 40X40X4 0.071 = 0.004 + 0.031 + 0.035 DStlS3 0.001 0.002 Seismic MD
+5.50 B111 L 40X40X4 0.5 = 0.002 + 0.115 + 0.383 DStlS2 0.053 0.013 Seismic MD
+5.50 B114 L 40X40X4 0.452 = 0.001 + 0.183 + 0.268 DStlS2 0.049 0.012 Seismic MD
+5.50 B1 2L 40X40X4 0.557 = 0.022 + 0.535 + 1.019E-04 DStlS6 0.124 0.279 Seismic MD
+5.50 B3 2L 40X40X4 0.15 = 3.193E-04 + 0.15 + 1.25E-04 DStlS5 0.033 0.009 Seismic MD
+5.50 B5 2L 40X40X4 0.208 = 0.043 + 0.159 + 0.006 DStlS4 0.016 0.009 Seismic MD
+5.50 B6 2L 40X40X4 0.214 = 0.045 + 0.163 + 0.006 DStlS3 0.016 0.008 Seismic MD
+5.50 B8 L 40X40X4 0.239 = 0.108 + 0.055 + 0.075 DStlS3 0.001 0.008 Seismic MD
+5.50 B16 L 40X40X4 0.601 = 4.76E-04 + 0.254 + 0.346 DStlS5 0.033 0.004 Seismic MD
+5.50 B25 L 40X40X4 0.315 = 0.002 + 0.169 + 0.143 DStlS6 0.027 0.025 Seismic MD
+5.50 B33 L 40X40X4 0.464 = 0.002 + 0.103 + 0.358 DStlS6 0.031 0.027 Seismic MD

27 | P a g e
28 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

PMM Section
Story Label Section Moment Interaction Check V22 Ratio V33 Ratio
Combo Class
+11.50 D7 L 40X40X4 0.253 = 0.006 + 0.105 + 0.142 DStlS5 0.002 0.004 Seismic MD
+11.50 D8 L 40X40X4 0.142 = 0.041 + 0.04 + 0.06 DStlS6 0.001 0.001 Seismic MD
+11.50 D22 L 40X40X4 0.502 = 0.27 + 0.109 + 0.123 DStlS6 0.009 0.04 Seismic MD
+11.50 D23 L 40X40X4 0.114 = 0.024 + 0.043 + 0.047 DStlS6 0.001 0.002 Seismic MD
+11.50 D24 L 40X40X4 0.091 = 0.005 + 0.035 + 0.051 DStlS2 0.002 0.002 Seismic MD
+11.50 D25 L 40X40X4 0.108 = 0.016 + 0.046 + 0.047 DStlS5 0.002 0.002 Seismic MD
+11.50 D32 L 40X40X4 0.271 = 0.041 + 0.105 + 0.126 DStlS6 0.002 0.005 Seismic MD
+11.50 D33 L 40X40X4 0.296 = 0.084 + 0.096 + 0.116 DStlS6 0.001 0.004 Seismic MD
+11.50 D34 L 40X40X4 0.132 = 0.03 + 0.041 + 0.061 DStlS6 0.002 0.002 Seismic MD
+11.50 D35 L 40X40X4 0.09 = 0.007 + 0.04 + 0.043 DStlS5 0.002 0.002 Seismic MD
+11.50 D36 L 40X40X4 0.148 = 0.018 + 0.052 + 0.077 DStlS5 0.002 0.003 Seismic MD
+11.50 D37 L 40X40X4 0.126 = 0.007 + 0.057 + 0.062 DStlS5 0.002 0.002 Seismic MD
+11.50 D41 L 40X40X4 0.157 = 0.078 + 0.044 + 0.035 DStlS4 0.001 0.002 Seismic MD
+11.50 D42 L 40X40X4 0.092 = 0.004 + 0.035 + 0.053 DStlS5 0.001 0.002 Seismic MD
+11.50 D43 L 40X40X4 0.195 = 0.015 + 0.077 + 0.104 DStlS10 0.002 0.004 Seismic MD
+11.50 D44 L 40X40X4 0.115 = 0.006 + 0.052 + 0.056 DStlS5 0.002 0.002 Seismic MD
+11.50 D45 L 40X40X4 0.238 = 0.038 + 0.092 + 0.108 DStlS6 0.002 0.004 Seismic MD
+11.50 D46 L 40X40X4 0.055 = 0.007 + 0.018 + 0.031 DStlS2 0.002 0.001 Seismic MD
+11.50 D1 L 40X40X4 0.05 = 0.008 + 0.014 + 0.028 DStlS3 0.0004615 0.002 Seismic MD
+11.50 D2 L 40X40X4 0.064 = 0.003 + 0.021 + 0.039 DStlS4 0.0004629 0.002 Seismic MD
+11.50 D5 L 40X40X4 0.055 = 0.014 + 0.014 + 0.027 DStlS2 0.0004317 0.002 Seismic MD
+11.50 D6 L 40X40X4 0.033 = 0.001 + 0.011 + 0.021 DStlS6 0.0004256 0.002 Seismic MD
+11.50 D9 L 40X40X4 0.047 = 0.008 + 0.021 + 0.018 DStlS4 0.0004761 0.002 Seismic MD
+11.50 D10 L 40X40X4 0.065 = 0.003 + 0.029 + 0.034 DStlS3 0.001 0.002 Seismic MD
+11.50 D14 L 40X40X4 0.077 = 0.012 + 0.028 + 0.037 DStlS5 0.001 0.002 Seismic MD
+11.50 D15 L 40X40X4 0.074 = 0.007 + 0.028 + 0.038 DStlS6 0.001 0.002 Seismic MD
+11.50 D17 L 40X40X4 0.057 = 0.013 + 0.018 + 0.025 DStlS2 0.001 0.002 Seismic MD
+11.50 D18 L 40X40X4 0.038 = 0.001 + 0.016 + 0.02 DStlS6 0.0004337 0.002 Seismic MD
+11.50 D19 L 40X40X4 0.068 = 0.013 + 0.02 + 0.034 DStlS5 0.0004727 0.002 Seismic MD
+11.50 D20 L 40X40X4 0.064 = 0.008 + 0.02 + 0.036 DStlS6 0.0004572 0.002 Seismic MD
+11.50 D4 L 40X40X4 0.206 = 0.186 + 0.01 + 0.01 DStlS8 0.001 0.001 Seismic MD
+11.50 D21 L 40X40X4 0.244 = 0.007 + 0.118 + 0.119 DStlS6 0.025 0.011 Seismic MD
+11.50 D52 L 40X40X4 0.105 = 0.007 + 0.039 + 0.059 DStlS5 0.002 0.001 Seismic MD
+11.50 D53 L 40X40X4 0.265 = 0.05 + 0.09 + 0.125 DStlS6 0.002 0.005 Seismic MD
+11.50 D54 L 40X40X4 0.081 = 0.014 + 0.026 + 0.042 DStlS6 0.002 0.001 Seismic MD
+11.50 D66 L 40X40X4 0.221 = 0.182 + 0.03 + 0.008 DStlS3 0.004 0.005 Seismic MD
+11.50 D67 L 40X40X4 0.152 = 0.032 + 0.05 + 0.07 DStlS6 0.001 0.002 Seismic MD
+11.50 D68 L 40X40X4 0.128 = 0.006 + 0.053 + 0.068 DStlS5 0.003 0.022 Seismic MD
+11.50 D69 L 40X40X4 0.167 = 0.018 + 0.063 + 0.086 DStlS5 0.002 0.003 Seismic MD
+11.50 D70 L 40X40X4 0.117 = 0.007 + 0.044 + 0.066 DStlS5 0.002 0.002 Seismic MD
+11.50 D71 L 40X40X4 0.204 = 0.028 + 0.074 + 0.103 DStlS6 0.002 0.003 Seismic MD
+11.50 D72 L 40X40X4 0.132 = 2.882E-04 + 0.061 + 0.071 DStlS2 0.002 0.002 Seismic MD

28 | P a g e
29 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

➢ Struktur Pedestal Beton Bertulang


Untuk elemen kolom pedestal beton bertulang, dapat diperoleh bahwa
tulangan yang diperlukan masih merupakan tulangan minimum (1%) seperti
terlihat pada Gambar berikut.

Gambar 14. Rasio tulangan perlu dan gaya ultimate untuk komponen pedestal

29 | P a g e
30 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

P ( kN)
8000

(Pmax) (Pmax)

fs=0 fs=0

fs=0.5fy fs=0.5fy

1
-1200 1200

Mx ( kNm)

(Pmin) (Pmin)
-3000

Gambar 15. Plot beban ultimate tarhadap kapasitas kolom pedestal

30 | P a g e
31 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

➢ Sambungan Pedestal dengan Pipa Baja


Perhitungan sambungan pedestal beton bertulang dengan tiang pipa baja
dilakukan dengan menggunakan gaya dalam maksimum akibat analisis,
sehingga diperleh hasil seperti berikut.

Gambar 16. Pemodelan sistem sambungan pedestal dan tiang pipa baja

Dari pemodelan dan beban yang diperhitungkan diatas, maka diperoleh hasil
analisis bahwa desain sambungan telah memenuhi baik analisis secara
keseluruhan yang sudah konvergen maupun batasan tegangan yang terjadi
masih dibawah tegangan leleh baja yang digunakan seperti berikut.

31 | P a g e
32 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Gambar 17. Hasil analisis perhitungan sambungan

12. PERENCANAAN PONDASI


Metodologi perencanaan pondasi adalah analisis eigenvalue untuk menentukan
mode dan perioda getaran yang dominan. Jika mode getaran dominan berupa
getaran translasi (bukan torsi) maka model struktur dapat diterima dan perioda
getar dijadikan masukan untuk menentukan gaya gempa statik berdasarkan respon
spektra yang sesuai.

Dari hasil soil test yang telah dilakukan yakni test sondir, diperoleh bahwa tanah
keras diperoleh pada kedalaman 2.6m dengan nilai konus 200 kg/cm2 dan JHP 340
kg/cm seperti pada gambar berikut.

32 | P a g e
33 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Gambar 18. Data hasil sondir

Gambar 19. Dokumentasi pengujian sondir

33 | P a g e
34 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Gambar 20. Grafik hasil sondir di Jl. Yos Sudarso Simpang Bukit Keminting

Dari grafik diatas, karena pondasi diletakan pada kedalaman 3m, maka digunakan
nilai CR (tahanan ujung konus) sebesar 20 kg/cm2 untuk perhitungan daya dukung
pondasi tapak supaya lebih konservatif.

34 | P a g e
35 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Dimana dari analisis yang diperoleh reaksi tumpuan yang akan dijadikan beban pada
perencanaan pondasi adalah:
Tabel 13. Joint reactions yang digunakan sebagai beban untuk desain pondasi
TABLE: Joint Reactions
Story Label Output Case FX FY FZ MX MY MZ
kN kN kN kN-m kN-m kN-m
-3.00 2 DStlS1 0.0 0.0 116.4 -0.6 0.0 0.0
-3.00 2 DStlS2 0.0 0.0 122.1 -0.5 0.0 0.0
-3.00 2 DStlS3 -9.4 0.0 113.7 -0.5 -103.5 -0.4
-3.00 2 DStlS4 9.4 0.0 113.7 -0.5 103.5 0.4
-3.00 2 DStlS5 0.0 -13.3 113.7 153.2 0.0 0.0
-3.00 2 DStlS6 0.0 13.3 113.7 -154.2 0.0 0.0
-3.00 2 DStlS7 -9.4 0.0 74.8 -0.4 -103.5 -0.4
-3.00 2 DStlS8 9.4 0.0 74.8 -0.4 103.5 0.4
-3.00 2 DStlS9 0.0 -13.3 74.8 153.3 0.0 0.0
-3.00 2 DStlS10 0.0 13.3 74.8 -154.1 0.0 0.0
-3.00 2 DStlS11 -0.7 0.0 118.1 -0.5 -9.3 0.0
-3.00 2 DStlS12 0.7 0.0 118.1 -0.5 9.3 0.0
-3.00 2 DStlS13 0.0 -0.7 118.1 8.5 0.0 0.0
-3.00 2 DStlS14 0.0 0.7 118.1 -9.5 0.0 0.0
-3.00 2 DStlS15 -0.7 0.0 70.4 -0.3 -9.3 0.0
-3.00 2 DStlS16 0.7 0.0 70.4 -0.3 9.3 0.0
-3.00 2 DStlS17 0.0 -0.7 70.4 8.7 0.0 0.0
-3.00 2 DStlS18 0.0 0.7 70.4 -9.4 0.0 0.0
-3.00 2 DStlD1 0.0 0.0 83.1 -0.4 0.0 0.0
-3.00 2 DStlD2 0.0 0.0 97.1 -0.4 0.0 0.0
-3.00 2 DConS1 0.0 0.0 116.4 -0.6 0.0 0.0
-3.00 2 DConS2 0.0 0.0 122.1 -0.5 0.0 0.0
-3.00 2 DConS3 -9.4 0.0 113.7 -0.5 -103.5 -0.4
-3.00 2 DConS4 9.4 0.0 113.7 -0.5 103.5 0.4
-3.00 2 DConS5 0.0 -13.3 113.7 153.2 0.0 0.0
-3.00 2 DConS6 0.0 13.3 113.7 -154.2 0.0 0.0
-3.00 2 DConS7 -9.4 0.0 74.8 -0.4 -103.5 -0.4
-3.00 2 DConS12 0.7 0.0 122.1 -0.5 9.3 0.0
-3.00 2 DConS13 0.0 -0.7 122.1 8.5 0.0 0.0
-3.00 2 DConS14 0.0 0.7 122.1 -9.5 0.0 0.0
-3.00 2 DConS15 -0.7 0.0 66.5 -0.3 -9.3 0.0
-3.00 2 DConS16 0.7 0.0 66.5 -0.3 9.3 0.0
-3.00 2 DConS17 0.0 -0.7 66.5 8.7 0.0 0.0
-3.00 2 DConS18 0.0 0.7 66.5 -9.3 0.0 0.0

Dari tabel diatas, diperoleh bahwa beban ultimate yang diperoleh adalah Pu = 122.1 kN
dan Mu = 154.2 kN.m.

35 | P a g e
36 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Billboard Jl. Yos Sudarso Simpang Bukit Keminting


Analisis Daya Dukung Tanah Metode Schmertmann
(1978)
- Tanah kohesif (Lempung)
Untuk Pondasi Lajur
Qu = 2 + 0.28 qc
Untuk Pondasi Persegi
Qu = 5 + 0.28 qc

qc = 20 kg/cm²
Qu = 5 + 0.28 qc
= 10.6 kg/cm²
= 106 ton/m²

Qi = Qu
FK
= 35.33 ton/m²
= 353.33 kN/m²

- Tanah Non kohesif (Pasir)


Untuk Pondasi Lajur
Qu = 28 - 0.009 (300-qc)1.5
Untuk Pondasi Persegi
Qu = 48 - 0.009 (300-qc)1.5

Qu = 48 - 0.009 (300-qc)1.5
= 5.83 kg/cm²
= 58.32 ton/m²

Qi = Qu
FK
= 19.44 ton/m²
= 194.411 kN/m²

36 | P a g e
37 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Data Struktur :

1 Dimensi Kolom b = 700 mm


h = 700 mm
Type Kolom αs = 40
2 Dimensi Pondasi B = 2.10 m
L = 2.10 m B=L
ht = 0.30 m
3 Mutu Beton fc' = 21 Mpa
4 Mutu Baja fy' = 420 Mpa
5 Besi tulangan D = 13
(dipakai)
6 BJ Beton γc = 24 KN/m3

Data Tanah :

6 Daya dukung tanah σt = 194.41 Kpa


7 Berat tanah γt = 18.00 KN/m3
8 Tebal tanah diatas ha = 3.00 m
pondasi

Data Beban :

9 Beban P ultimate Pult = 122.06 KN


10 Beban M ultimate Mult = 154.17 KNm

37 | P a g e
38 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Analisa

q = Berat Fondasi + Berat Tanah


= ht x γc + ha x γt
= 0.30 x 24 + 3.00 x 18.00
= 61.2 KN/m2

Cek Fondasi Terhadap Tegangan Izin Tanah

Tegangan yang terjadi pada tanah

Pult Mult
σmaks = + + q ≤ σt
B x L 1/6 B x L2

122.0617 154.1728
= + + 61.2 ≤ 194.41116
2
2.10 x 2.10 1/6 2.10 x 2.10

= 27.67839 + 99.885 + 61.2

= 188.764 ≤ 194.41 Save!

Pult Mult
σmin = - + q ≤ σt
B x L 1/6 B x L2

122.0617 154.1728
= - + 61.2 ≤ 194.41116
2
2.10 x 2.10 1/6 2.10 x 2.10

= 27.67839 - 99.885 + 61.2

= -11.007 ≤ 194.41 Save!

Kontrol Tegangan Geser 1 Arah

0.70
ds = 75 + D/2
= 75 + 6.50
= 82.00 mm

d = ht - ds
= 300 - 82.00
0.30 = 218.00

L = 2.10 a = B/2 - b/2 - d


= 1050 - 350 - 218.00
2.10 = 482.00 mm
= 0.482 m

σa = σmin + B - a x σmaks - σmin b

= -11.007 + 2.10 - 0.482 x 188.764 - -11.007 2.10


2.10
0.7 = 142.912 KN/m2

Gaya tekan ke atas dari tanah (Vu)

Vu = a x B x σmaks + σa 2
0.7
= 0.482 x 2.10 x 188.764 + 142.912 2

= 167.861 KN

38 | P a g e
39 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

0.70 0.218 0.482 Gaya geser yang dapat ditahan oleh beton (Ø.Vc)

fc'
Ø.Vc = Ø x x B x d
6
21
= 0.75 x x 2.10 x 218.00
6
0.218
= 262.238 KN
2.10
Ø.Vc = 262.238 > Vu = 167.861 ......... Save!

σmin σa σmaks
-11.007 142.912 188.764

Kontrol Tegangan Geser 2 Arah (Geser Pons)

Dimensi Kolom, b = 700


h = 700

b + d = 700.00 + 218.00 = 918.00 mm = 0.918 m


h + d = 700 + 218.00 = 918.00 mm = 0.918 m

Gaya Tekan Ke Atas (Geser Pons)

σmaks + σmin
2
Vu = B - b + d x h + d x
2

188.764 + -11.007
= 2.10 2 - 0.918 x 0.918 x
2
= 317.0537

hk 700
βc = = = 1.000
Bk 700

bo = 2 x bk + d + hk + d

bo = 2 x 700 + 218.00 + 700 + 218.00

= 3672 mm

Gaya geser yang ditahan oleh beton

2 fc' bo d
Vc1 = 1 + x
βc 6
0.109

2 21 3672 218.00
0.70
Vc1 = 1 + x
1.000 6
0.109

Vc1 = 1834166.757 N
= 1834.167 KN

0.591 0.109 0.70 0.109 0.591


αs d fc' bo d
Vc2 = 2 + x
bo 12

40 218.00 21 3672 218.00


Vc2 = 2 + x
0.218 3672 12

0.082 Vc2 = 1031635.551 N


2.10 = 1031.636 KN

39 | P a g e
40 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

1
Vc3 = x fc' bo d
3
1
σmin Vc3 = x 21 3672 218.00
-11.007 σmaks 3
188.764
= 1222777.838 N
= 1222.778 KN

Jadi

Vc1 = 1834.167
Vc2 = 1031.636 Diambil yang terkecil
Vc3 = 1222.778

Vc = 1031.636 KN
Ø.Vc = 0.75 x 1031.636
= 773.727 KN

Ø.Vc = 773.727 > Vu = 317.054 ......... Save!

Hitungan Penulangan Fondasi

0.70 ds = 75 + 13 + 6.5
= 94.500 mm
≈ 0.096 m
0.70
1.05 d = ht - ds
= 0.30 - 0.096
= 0.204 m
0.30 0.204 = 204 mm
0.096
B h
2.10 x = -
2 2

2100 700
x = -
2 2
σmin σx σmaks x = 700 mm
-11.007 122.173 188.764 = 0.7 m

σx = σmin + B - x x σmaks - σmin B

σx = -11.007 + 2.10 - 0.7 x 188.764 - -11.007 2.10


`
= 122.173 KN/m3

σmaks - σx
2 2
Mu = 0.5 σx x + x
3
188.764 - 122.173
2 2
= 0.5 122.173 1 + 0.7
3
= 40.809 KNm

Mu
K =
2
Ø x b x d

40808884.568
=
2
0.8 x 1000 x 204

= 1.226 Mpa

40 | P a g e
41 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

382.5 x 0.85 x 600 + fy - 225 x β1 fc'


Kmaks =
2
600 + fy

382.5 x 0.85 x 600 + 420 - 225 x 0.85 21


Kmaks =
2
600 + 420

= 5.439 Mpa

K < Kmaks
K = 1.226 < Kmaks = 5.439 ......... OK!

2 x K
a' = 1 - 1 - d
0.85 x fc'

2 x 1.226
= 1 - 1 - 204
0.85 x 21

= 14.526 mm

0.85 x fc' x a' x b


As(1) =
fy

0.85 x 21 x 14.526 x 1000


=
420
= 617.347 mm2

Jika
fc' ≤ 31.36 Mpa
maka
1.4 x b x d
As ≥ ........... (R.1)
fy ....... SNI 03-2847-2002 (Pasal 12.5.1)

Jika
fc' > 31.36 Mpa
maka
fc' x b x d
As = ........... (R.2)
4 fy ....... SNI 03-2847-2002 (Pasal 12.5.1)

fc' = 21 < 31.36


maka yang dipakai adalah pers ..................... (R.1)

1.4 x b x d fc' x b x d
As(2) = ....... (R.1) As(2') = ....... (R.2)
fy 4 fy

1.4 x 1000 x 204 0 x 0 x 0


= =
420 4 0

= 680.000 mm2 ........... As dipakai = #DIV/0! mm2 ........... As tidak Dipakai!

Dipilih yang terbesar dari As(1) dan As(2)......... Sehingga,

As(1) = 617.347 mm2


As = 680.000 mm2
As(2) = 680.000 mm2

41 | P a g e
42 LAPORAN PERENCANAAN STRUKTUR & PONDASI BILLBOARD

Jarak tulangan,

2
0.25 x phi x D x S
s =
As

2
0.25 x 3.14 x 13 x 1000
=
680.000

= 195.096 mm

s ≤ 2 x ht
≤ 2 x 300
≤ 600

s ≤ 450 mm

Dipilih (s) yang terkecil = 195.096 mm

Jadi dipakai tulangan = D 13 - 195

Result
Cek Status Pondasi :

Tegangan yang terjadi pada tanah σmaks = 188.7636 < 194.41116 OK!
σmin = -11.0068 < 194.41116 OK!

Kontrol gaya geser 1 arah Ø.Vc = 262.238


Vu = 167.861 < 262.238 OK!

Kontrol gaya geser 2 arah Ø.Vc = 773.727


Vu = 317.054 < 773.727 OK!

Penulangan Pondasi
Arah X = Y D 13 - 195

13. PENUTUP
Demikian laporan ini disajikan agar dapat digunakan dengan semestinya oleh
pihak-pihak terkait dalam mendukung pembangunan proyek ini.

Jakarta, 16 Juli 2022

Martinus Nifotuho Fau, ST.


No. SKA: 1.2.201.3.049.09.1179487

42 | P a g e