TENAGA
Pekerja org 0.0150 110,000.00 1,650.00
Tukang kayu org 0.1500 120,000.00 18,000.00
Kepala tukang org 0.0150 150,000.00 2,250.00
Mandor org 0.0008 200,000.00 160.00
Jumlah 30,000.00 22,060.00
Keuntungan 10% 3,000.00 2,206.00
Jumlah Total 33,000.00 24,266.00 57,266.00
ABK.041 1 Buah Engsel Jendela Kupu-Kupu
BAHAN
Engsel Jendela Kupu-kupu Bh 1.0000 15,000.00 15,000.00
TENAGA
Pekerja org 0.0100 110,000.00 1,100.00
Tukang kayu org 0.1000 120,000.00 12,000.00
Kepala tukang org 0.0100 150,000.00 1,500.00
Mandor org 0.0005 200,000.00 100.00
Jumlah 15,000.00 14,700.00
Keuntungan 10% 1,500.00 1,470.00
Jumlah Total 16,500.00 16,170.00 32,670.00
ABK.042 1 Buah Hak Angin
BAHAN
Engsel Angin (Hak angin) Bh 1.0000 25,000.00 25,000.00
TENAGA
Pekerja org 0.0200 110,000.00 2,200.00
Tukang kayu org 0.2000 120,000.00 24,000.00
Kepala tukang org 0.0200 150,000.00 3,000.00
Mandor org 0.0100 200,000.00 2,000.00
Jumlah 25,000.00 31,200.00
Keuntungan 10% 2,500.00 3,120.00
Jumlah Total 27,500.00 34,320.00 61,820.00
ABK.043 1 Buah Kunci Slot
Harga Jumlah Harga Jumlah Harga
Kode Uraian Sat. Koeff Satuan Bahan Upah Bahan + Upah
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
BAHAN
Kunci Slot Bh 1.0000 7,500.00 7,500.00
TENAGA
Pekerja org 0.0200 110,000.00 2,200.00
Tukang kayu org 0.2000 120,000.00 24,000.00
Kepala tukang org 0.0200 150,000.00 3,000.00
Mandor org 0.0010 200,000.00 200.00
Jumlah 7,500.00 29,400.00
Keuntungan 10% 750.00 2,940.00
Jumlah Total 8,250.00 32,340.00 40,590.00
ABK.100 1 M1 Pas. Saluran Grevel 1/2 dia 30 cm + Pasangan
Bahan :
Galian Tanah m3 0.4000 75,020.00 30,008.00
Pasir Urug T = 5 cm m3 0.0100 150,000.00 1,500.00
Grevel Beton 1/2 dia 30 cm m' 1.0000 45,000.00 45,000.00
Pasangan Bata 1 Pc : 5 Ps m2 0.1800 184,090.50 33,136.29
Plesteran 1 Pc : 5 Ps m2 0.0180 72,081.90 1,297.47
Jumlah 110,941.76 110,941.76
Keuntungan Maksimal 10% 11,094.18
Jumlah Total 122,035.94
ABK.101 1 Unit Pek. Septictank uk. 2.50 x 2.00 x 1.50 M
Pek. Galian Tanah m3 7.5000 75,020.00 562,650.00
Pasir Urug T = 5 cm m3 0.2300 150,000.00 34,500.00
Pas. Bata 1 Bata 1 : 3 + Plester 1 : 3 m2 21.5100 256,172.40 5,510,268.32
Plat Beton Tutup + Balok m3 0.4600 155,000.00 71,300.00
Socket T PVC 4" bh 2.0000 3,000.00 6,000.00
Pipa Hitam 1 1/2" m' 0.8000 37,500.00 30,000.00
Galian Tanah untuk Rembesan m3 5.0000 75,020.00 375,100.00
Pas. Ijuk kg 75.0000 5,500.00 412,500.00
Urugan Kerikil 3/5 cm m3 1.4000 95,000.00 133,000.00
Pipa PVC 4" Berlubang Jenis (D) m' 4.5000 31,250.00 140,625.00
Urugan Kembali Perataan Tanah m 3
1.0000 32,120.00 32,120.00
Bak Kontrol 25 x 25 (uk. Dalam) bh 2.0000 40,163.00 80,326.00
Tambahan Upah ls 1.0000 25,000.00 25,000.00
Jumlah 7,413,389.32 7,413,389.32
Keuntungan Maksimal 10% 741,338.93
Jumlah Total 8,154,728.26
ABK.102 1 Unit Pek. Septictank uk. 2.00 x 1.00 x 1.50 M
Pek. Galian Tanah m3 6.5600 75,020.00 492,131.20
Pasir Urug T = 5 cm m3 0.1880 150,000.00 28,200.00
Pas. Bata 1 Bata 1 : 3 + Plester 1 : 3 m2 10.3600 256,172.40 2,653,946.06
Plat Beton Tutup + Balok m3 0.2600 155,000.00 40,300.00
Socket T PVC 4" bh 2.0000 3,000.00 6,000.00
Pipa Hitam 1 1/2" m' 0.8000 37,500.00 30,000.00
Galian Tanah untuk Rembesan m3 5.0000 75,020.00 375,100.00
Pas. Ijuk kg 75.0000 5,500.00 412,500.00
Urugan Kerikil 3/5 cm m3 1.4000 95,000.00 133,000.00
Pipa PVC 4" Berlubang Jenis (D) m' 4.5000 31,250.00 140,625.00
Urugan Kembali Perataan Tanah m3 1.0000 32,120.00 32,120.00
Bak Kontrol 25 x 25 (uk. Dalam) bh 2.0000 40,163.00 80,326.00
Tambahan Upah ls 1.0000 25,000.00 25,000.00
Jumlah 4,449,248.26 4,449,248.26
Keuntungan Maksimal 10% 444,924.83
Jumlah Total 4,894,173.09
ABK.B16 1 M3 Pek. Beton B0
Beton readymix m3 1.0000 1,250,000.00 1,250,000.00
Upah pekerja ls 1.0000 50,000.00 50,000.00
Alat dan material bantu ls 1.0000 50,000.00 50,000.00
Jumlah 1,350,000.00
Keuntungan Maksimal 10% 135,000.00
Jumlah 1,485,000.00
Harga Jumlah Harga Jumlah Harga
Kode Uraian Sat. Koeff Satuan Bahan Upah Bahan + Upah
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
ABK.B17 1 M3 Pek. Beton K300
Beton readymix m3 1.0000 1,370,000.00 1,370,000.00
Upah pekerja ls 1.0000 115,000.00 115,000.00
Alat dan material bantu ls 1.0000 100,000.00 100,000.00
Jumlah 1,585,000.00
Keuntungan Maksimal 10% 158,500.00
Jumlah 1,743,500.00
ABK.B19 1 Kg Pek. Baja
Baja m3 1.0000 16,000.00 16,000.00
Upah pekerja ls 1.0000 7,000.00 7,000.00
Alat dan material bantu ls 1.0000 6,000.00 6,000.00
Jumlah 29,000.00
Keuntungan Maksimal 10% 2,900.00
Jumlah 31,900.00
ABK.B20 1 M2 Pasang Paving Block Warna 6 cm
BAHAN
Pavingblock Warna 6 cm 1.0100 m2 175,000.00 176,750.00
Pasir Urug 0.1000 m 3
150,000.00 15,000.00
TENAGA
Pekerja 0.2500 Oh 100,000.00 25,000.00
Tukang batu 0.3500 Oh 110,000.00 38,500.00
Kepala tukang 0.0350 Oh 150,000.00 5,250.00
Mandor 0.0030 Oh 200,000.00 600.00
Jumlah 191,750.00 69,350.00
Keuntungan 10% 19,175.00 6,935.00
Jumlah Total 210,925.00 76,285.00 287,210.00
DAFTAR HARGA STANDARD BAHAN BANGUNAN
#REF!
LOKASI : PANGANDARAN - CIAMIS
#REF!
HARGA SATUAN
NO. JENIS BAHAN BANGUNAN SAT
(Rp)
1 2 3 4
H BAHAN FINISHING
1 Cat Dasar Tembok, Indo 9000 Saeler Water Base kg 30,000.00
2 Cat Dasar Kayu ltr 22,500.00
3 Cat Tembok Dullux kg 90,000.00
4 Cat Tembok Sanlex Wonder kg 27,500.00
5 Cat Tembok Vinilex kg 27,500.00
6 Cat Tembok Wiratex kg 12,000.00
7 Cat Kayu / Besi Seiv kg 45,000.00
8 Cat Kayu / Besi Avian kg 55,000.00
9 Meni Kayu / Besi Bola Mas kg 30,000.00
10 Soda Coustic kg 12,000.00
11 Cat Sinchromate Bola Mas kg 30,000.00
12 Plint Coat ltr 30,000.00
13 Dempul Tembok (Plamir) Dullux kg 12,000.00
14 Dempul Kayu Cap Kucing kg 22,000.00
15 Dempul Halus Impra kg 30,000.00
16 Dempul Lilin kg 9,000.00
17 Dempul Plastik kg 30,000.00
18 Terpentine (Minyak Cat) ltr 9,000.00
19 Solignem ( 1 blek = 10 ltr ) ltr 4,500.00
20 Thiner A ltr 17,500.00
21 Thiner B ltr 22,000.00
22 Oker kg 7,500.00
23 Oten (Pewarna Plituran) bks 12,000.00
24 Sirlax ex. India kg 135,000.00
HARGA SATUAN
NO. JENIS BAHAN BANGUNAN SAT
(Rp)
1 2 3 4
K BAHAN ELEKTRIKAL
1 Pas. Box Sikring bh 150,000.00
2 Pas. Pipa PVC 5/8" m1 15,000.00
3 Pas. Elbow (Terminal) bh 5,000.00
4 Pas. Inbow bh 5,000.00
5 Pas. Fitting Lampu bh 15,000.00
6 Pas. Saklar Inbow Tunggal Broco bh 120,000.00
7 Pas. Saklar Inbow Seri Broco bh 120,000.00
8 Pas. Stop Kontak Broco bh 120,000.00
9 Pas. Kabel NYM 3 x 2.5 rol 750,000.00
10 Pas. Kabel NYM 2 x 2.5 rol 600,000.00
11 Pas. Klem pack 6,000.00
75,000.00
140,000.00
100,000.00
120,000.00
150,000.00
150,000.00
125,000.00
150,000.00
150,000.00
150,000.00
150,000.00
90,000.00
110,000.00
120,000.00
1,050.00
1,400.00
4,125.00
5,500.00
7,500.00
150,000.00
20,000.00
7,500.00
20,000.00
450.00
1,200.00
1,500.00
3,500.00
3,000.00
3,500.00
4,000.00
4,500.00
30,000.00
4,000.00
10,000.00
25,000.00
15,000.00
15,000.00
15,000.00
18,000.00
18,000.00
18,000.00
20,000.00
24,000.00
50,000.00
50,000.00
62,500.00
88,000.00
15,000.00
40,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
1,200.00
25,000.00
10,000.00
750.00
8,000.00
25,000.00
250.00
12,500.00
10,000.00
8,000.00
22,500.00
7,500.00
2,500.00
5,000.00
25,000.00
12,500.00
2,500.00
40,000.00
75,000.00
65,000.00
45,000.00
40,000.00
85,000.00
130,000.00
275,000.00
45,000.00
7,500.00
125,000.00
58,000.00
50,000.00
150,000.00
65,000.00
85,000.00
60,000.00
750,000.00
300,000.00
250,000.00
1,500.00
20,000.00
2,000,000.00
2,000,000.00
3,000,000.00
3,000,000.00
4,000,000.00
4,000,000.00
4,000,000.00
4,250,000.00
4,500,000.00
4,500,000.00
4,500,000.00
6,000,000.00
6,000,000.00
12,000,000.00
12,000,000.00
3,000,000.00
25,000.00
50,000.00
10,000.00
15,000.00
35,000.00
58,200.00
70,500.00
103,400.00
137,000.00
178,900.00
180,000.00
234,500.00
127,000.00
122,100.00
184,400.00
200,000.00
3,500.00
7,425.00
85,000.00
55,000.00
63,600.00
200,000.00
250,000.00
9,000.00
7,000.00
48,500.00
68,500.00
8,000.00
10,000.00
9,500.00
10,000.00
4,000.00
8,000.00
9,500.00
5,000.00
6,000.00
7,000.00
10,000.00
12,000.00
18,000.00
1,000.00
1,500.00
1,750.00
2,250.00
4,000.00
6,500.00
2,000.00
2,250.00
68,500.00
52,100.00
100,000.00
45,300.00
51,200.00
10,000.00
37,500.00
40,000.00
3,000.00
3,750.00
16,500.00
13,500.00
20,000.00
15,000.00
10,000.00
10,000.00
17,500.00
7,500.00
30,000.00
35,000.00
17,500.00
7,500.00
20,000.00
20,000.00
7,500.00
15,000.00
20,000.00
5,000.00
20,000.00
5,000.00
2,000.00
10,000.00
15,000.00
4,500.00
750.00
75,000.00
7,500.00
20,000.00
30,000.00
20,000.00
30,000.00
5,000.00
7,500.00
2,000.00
20,000.00
13,000.00
16,000.00
20,000.00
30,000.00
35,000.00
50,000.00
65,000.00
90,000.00
150,000.00
250,000.00
20,000.00
25,000.00
40,000.00
50,000.00
70,000.00
130,000.00
100,000.00
6,000.00
8,000.00
30,000.00
45,000.00
15,000.00
25,000.00
17,500.00
30,000.00
10,000.00
300,000.00
250,000.00
1,500,000.00
750,000.00
900,000.00
100,000.00
500,000.00
240,000.00
250,000.00
80,000.00
55,000.00
24,500.00
70,000.00
25,000.00
385,000.00
170,000.00
25,000.00
200,000.00
120,000.00
10,000.00
3,000.00
3,000.00
10,000.00
90,000.00
90,000.00
90,000.00
275,000.00
200,000.00
4,500.00
DAFTAR HARGA STANDAR UPAH PEKERJA BANGUNAN
###
LOKASI : PANGANDARAN - CIAMIS
###
UPAH
NO JENIS PEKERJA 1 HARI
8 JAM
Rp
1 2 3
1 PEKERJA 100,000.00
2 PEKERJA SETENGAH TERAMPIL 110,000.00
3 PEKERJA TERAMPIL 120,000.00
4 TUKANG GALI 110,000.00
5 TUKANG BATU SETENGAH TERAMPIL 110,000.00
6 TUKANG BATU TERAMPIL 110,000.00
7 KEPALA TUKANG BATU 150,000.00
8 TUKANG KAYU SETENGAH TERAMPIL 150,000.00
9 TUKANG KAYU TERAMPIL 120,000.00
10 KEPALA TUKANG KAYU 150,000.00
11 TUKANG CAT / PLITUR SETENGAH TERAMPIL 100,000.00
12 TUKANG CAT / PLITUR TERAMPIL 110,000.00
13 KEPALA TUKANG CAT / PLITUR 120,000.00
14 TUKANG BESI BETON SETENGAH TERAMPIL 110,000.00
15 TUKANG BESI BETON TRAMPIL 120,000.00
16 KEPALA TUKANG BESI BETON 150,000.00
17 TUKANG BESI PROPIL SETENGAH TERAMPIL 110,000.00
18 TUKANG BESI PROPIL TERAMPIL 120,000.00
19 KEPALA TUKANG BESI PROPIL 150,000.00
20 TUKANG LAS PROFIL SETENGAH TERAMPIL 110,000.00
21 TUKANG LAS PROFIL TERAMPIL 120,000.00
22 KEPALA TUKANG LAS 150,000.00
23 MANDOR 200,000.00
24 OPRATOR ALAT BESAR 150,000.00
25 PEMBANTU OPRATOR / MEKANIK 200,000.00
26 SUPIR TRUK 130,000.00
27 KENEK TRUK 110,000.00
28 PENJAGA MALAM 120,000.00
30,000.00
32,000.00
35,000.00
35,000.00
35,000.00
39,000.00
42,000.00
39,000.00
42,000.00
46,000.00
39,000.00
42,000.00
46,000.00
32,000.00
36,000.00
46,000.00
42,000.00
46,000.00
50,000.00
55,000.00
60,000.00
65,000.00
46,000.00
34,000.00
30,000.00
60,000.00
39,000.00
35,000.00