Daftar Isi Daftar isi.................................................................................................................................... i-ii
BAB I. SYARAT TEKNIS UMUM...............................................................................................1
1.LINGKUP PEKERJAAN DAN URAIAN PEKERJAAN..........................................................1 1.1. Lingkup Pekerjaan.....................................................................................................................1 1.2. Uraian Pekerjaan.......................................................................................................................1 2. KETENTUAN-KETENTUAN UMUM......................................................................................1 3. GAMBAR-GAMBAR PELAKSANAAN RKS ..........................................................................2 4. RENCANA KERJA.....................................................................................................................2 5. JAM KERJA.................................................................................................................................3 6. TANGGUNG JAWAB KONTRAKTOR TERHADAP PEKERJAAN....................................3 7. PIMPINAN PELAKSANAAN.....................................................................................................4 8. PENUNJUKAN SUB KONTRAKTOR......................................................................................4 9. KONTROL ATAS PEGAWAI....................................................................................................4 10. KESEJAHTERAAN PEGAWAI................................................................................................5 11. KECELAKAAN DAN PETI PPPK..........................................................................................5 12. ALAT, BAHAN DAN TENAGA PEMBANGUNAN............................................................5 13. CONTOH BAHAN....................................................................................................................6 14. PENGUJIAN BAHAN DAN ALAT........................................................................................6 15. L A P O R A N............................................................................................................................6 16. RAPAT-RAPAT RUTIN............................................................................................................7 17. SHOP DRAWING, AS BUILD DRAWING DAN FOTO-FOTO........................................7 17.1 Shop Drawing............................................................................................................................8 17.2 As Build Drawing......................................................................................................................8 17.3. Foto – Foto...............................................................................................................................8
BAB II. SYARAT-SYARAT TEKNIS KHUSUS PELAKSANAAN DAN PEKERJAAN
BAB III. SYARAT-SYARAT TEKNIS KHUSUS PEKERJAAN STRUKTUR ATAP SISTEM
SPACE TRUSS – HYBRID RANGKA LENGKUNG................................................................52 1. RENCANA KERJA DAN SYARAT PERENCANAAN............................................................52 2. SPESIFIKASI MATERIAL........................................................................................................55 3. METODE PELAKSANAAN KERJA LAPANGAN..................................................................57
BAB IV. SYARAT-SYARAT TEKNIS KHUSUS PEKERJAAN ARSITEKTUR...................60
1. PEKERJAAN LANTAI..............................................................................................................60 1.1. PEKERJAAN SUB LANTAI..................................................................................................61 Rencana Kerja Dan Syarat
1. PEKERJAAN SISTEM ELEKTRIKAL....................................................................................100
1. U M U M......................................................................................................................100 2. TEKNIK INSTALASI..................................................................................................103 3. MOTOR LISTRIK.......................................................................................................107 4. KABEL TEGANGAN RENDAH (NYY, NYFGbY, NYM) 380 V.............................108 5. RAK KABEL...............................................................................................................108 6. PERALATAN LISTRIK..............................................................................................108 7. FIXTURES DAN ARMATURE..................................................................................111 2. SPESIFIKASI TEKNIS PEKERJAAN INSTALASI PENANGKAL PETIR...........................114 3. DAFTAR MATERIAL..............................................................................................................115 4. SPESIFIKASI TEKNIS PEKERJAAN DIESEL GENSET.......................................................116 1. UMUM.........................................................................................................................116 2. SPESIFIKASI TEKNIS KHUSUS...............................................................................118 5. SPESIFIKASI TEKNIS PEKERJAAN TELEPON .................................................................123 1. LINGKUP PEKERJAAN ............................................................................................123 2. SPESIFIKASI TEKNIS KHUSUS...............................................................................123 3. PEMASANGAN..........................................................................................................124 Rencana Kerja Dan Syarat
4. DAFTAR MATERIAL ................................................................................................124
6. SPESIFIKASI TEKNIS PEKERJAAN SISTEM TATA SUARA............................................124 1. LINGKUP PEKERJAAN.............................................................................................124 2. PERALATAN UTAMA TATA SUARA.....................................................................125 3. PEMASANGAN .........................................................................................................126 4. BAHAN/ MATERIAL ................................................................................................127 7. SPESIFIKASI TEKNIS PEKERJAAN SISTEM FIRE ALARM ...........................................127 8. SPESIFIKASI TEKNIS PEKERJAAN PLUMBING (AIR BERSIH, KOTOR DAN BUANGAN) DAN FIRE FIGHTING......................................................................................131 9. SPESIFIKASI TEKNIS PEKERJAAN MEKANIKAL SISTEM TATA UDARA DAN VENTILASI MEKANIK.........................................................................................................141