ARY EQUIPMENTS
Ø6
Ø10
OPERATING PLAN
No. Of Part : A4 - 001 Machine : Mesin Frais
Name of Part : Top plate Material : St37
Prepared by : Ahmad asrori Size : 230x120mm
Date : 22 November 2022
No OPERATION DESCRIPTION TOOL & AUXILIARY EQUIPMENTS
10 Pengukuran ~Mistar baja
20 Penandaan ~Mistar baja, Penggores, Penitik
30 Pencekaman benda kerja ~Ragum
40 Pemasangan Endmill ~Arbor, Kunci collect,endmill
50 pengefraisan dengan Ø27.5x25 ~Arbor, Kunci arbor, endmill
rais
mm
ARY EQUIPMENTS
k
MACHINING TIME CALCULATION
Part Name : A4 - 001 Machine : Mesin Gergaji
Part Number : Top Plate Tool : Gergaji
Made by : Ahmad Asrori Material : ST37
Date : 22 November 2022 Size : 230 x 130 mm
Dari tabel machining data handbook Tabel 6.1 diperoleh :
0 mm
MACHINING TIME CALCULATION
Part Name : A4 - 001 Machine : Mesin Milling
Part Number : Top Plate Tool : End mill
Made by : Ahmad Asrori Material : ST37
Date : 22 November 2022 Size : 229 x 120 x 25
Dari tabel machining data handbook Tabel 3.1 diperoleh :
S= z x s tabel
= 4 x 0,52
= 0.52
rpm
min/unit
MACHINING TIME CALCULATION
Part Name : A4 - 001 Machine : Mesin Milling
Part Number : Top Plate Tool : End mill
Made by : Ahmad Asrori Material : ST37
Date : 22 November 2022 Size : 229 x 120 x 25
Dari tabel machining data handbook Tabel 3.1 diperoleh :
S= z x s tabel
= 4 x 0,52
= 0.52
rpm
min/unit
MACHINING TIME CALCULATION
Part Name : A4 - 001 Machine : Mesin Milling
Part Number : Top Plate Tool : End mill
Made by : Ahmad Asrori Material : ST37
Date : 22 November 2022 Size : 229 x 120 x 25
Dari tabel machining data handbook Tabel 3.1 diperoleh :
i= Ps - Pe = 30 - 25 = 5 = 10 kali
a 0.5
S= z x s tabel
= 4 x 0,52
= 0.52
rpm
min/unit
MACHINING TIME CALCULATION
Part Name : A4 - 001 Machine Drilling
Part Number : Top Plate Tool Twist drill
Made by : Ahmad Asrori Material St 37
Date : 22 November 2022 Size Ǿ8 x 25mm
Dari tabel machining data handbook Tabel 3.1 diperoleh :
l = H + (0,3*D) + 1 = 25 + (0,3*8) + 1 = 26
l = H + (0,3*D) + 1 =5 + (0,3*10) + 1 = 6
0.2791 min/unit
0.09812 min/unit
MACHINING TIME CALCULATION
Part Name : A4 - 001 Machine Drilling
Part Number : Top Plate Tool Twist drill
Made by : Ahmad Asrori Material St 37
Date : 22 November 2022 Size Ǿ25x 25mm
Dari tabel machining data handbook Tabel 3.1 diperoleh :
mm
2 min/unit
0.0115 min/unit
MACHINING TIME CALCULATION
Part Name : A4 - 001 Machine Drilling
Part Number : Top Plate Tool Twist drill
Made by : Ahmad Asrori Material St 37
Date : 22 November 2022 Size Ǿ16x 25mm
Dari tabel machining data handbook Tabel 3.1 diperoleh :
mm
0,4597 min/unit
STANDART TIME CALCULATION
Part Name : A4 - 001 Machine : Mesin Gergaji
Part Number Top Plate Material ST 37
Made by Ahmad Asrori
Date : 22 November 2022
Diketahui : 0.89286 min /
MT = unit
DT = 20 min / hari
Demand = 25 unit / hari
ST = 1 x Demand
= 25 min / hari
D = 8 Jam / hari
~ Allowance DT + ST
= x 100%
60 . D
20 + 25
= x 100%
60 x 8
45
= x 100%
480
= 0.09375 x 100%
= 9.375 %
~ STT = MT / Effisiensi
= 0,89286/0,90625
= 0.98522482758621 min / unit
~ OS = 1 / STT
= 1 / 1,050902069
= 1.014997 unit / min
Gergaji
STANDART TIME CALCULATION
Part Name : A4 - 005 Machine : Mesin Milling
Part Number Top Plate Material ST 37
Made by Ahmad Asrori
Date : 22 November 2022
Diketahui : 2,225,572 min /
MT = unit
DT = 20 min / hari
Demand = 25 unit / hari
ST = 5 x Demand
= 125 min / hari
D = 8 Jam / hari
~ Allowance DT + ST
= x 100%
60 . D
20 + 125
= x 100%
60 x 8
145
= x 100%
480
= 0.302083333333333 x 100%
= 30.2 %
~ STT = MT / Effisiensi
= 2,225572/ 0,69792
= 318,886,405 min / unit
~ DS = 1 / STT
= 1 /5,62839403
= 3.14E-09 unit / min
Milling
STANDART TIME CALCULATION
Part Name : A4 - 001 Machine : Mesin Bor
Part Number Top Plate Material ST 37
Made by Ahmad Asrori
Date : 22 November 2022
Diketahui : 28,484 min /
MT = unit
DT = 20 min / hari
Demand = 25 unit / hari
ST = 5 x Demand
= 125 min / hari
D = 8 Jam / hari
~ Allowance DT + ST
= x 100%
60 . D
20 + 125
= x 100%
60 x 8
145
= x 100%
480
= 0.30208333333333 x 100%
= 30.2 %
~ STT = MT / Effisiensi
= 2,8484 / 0,69792
= 40812.8955223881 min / unit
~ DS = 1 / STT
= 1 / 0,373769552
= 2.45E-05 unit / min
Bor