OPERATING PLAN

No. Of Part : A4 - 007 Machine : Mesin Gergaji


Name of Part : Die Material : S45C
Prepared by : Muhammad Iqbal Size : Ø120mm x 6m
Date : 22 November 2022
No OPERATION DESCRIPTION TOOL & AUXILIARY EQUIPMENTS
10 Pengukuran benda kerja dengan ukuran ~Vernier Caliper
Ø120 x 22 mm
20 Penandaan benda kerja ~Penggores
30 Pencekaman benda kerja ~Ragum
40 Pemotongan Ø120 x 22 mm ~Gergaji
OPERATING PLAN
No. Of Part : A4 - 007 Machine : Mesin Bubut
Name of Part : Die Material : S45C
Prepared by : Muhammad Iqbal Size : Ø120 x 22 mm
Date : 22 November 2022
No OPERATION DESCRIPTION TOOL & AUXILIARY EQUIPMENTS
10 Pengukuran benda kerja ~Vernier caliper
20 Pencekaman benda kerja ~Ragum, Kunci ragum
30 Pemasangan pahat facing pada toolpost ~Pahat facing, Toolpost, Kunci toolpost
40 Pembubutan facing pada sisi permukaan muka ~Pahat facing
benda kerja dari ukuran 22 mm menjadi 21 mm
50 Pencekaman ulang benda kerja ~Ragum, Kunci ragum
60 Pembubutan facing pada sisi permukaan muka ~Pahat facing
benda kerja dari ukuran 21 mm menjadi 20 mm
70 Pemasangan center drill untuk proses penandaan ~Kepala lepas, Arbor, Kunci arbor, Center drill
awal lubang pada bagaian tengah poros
80 Center drilling ~Center drill
90 Drilling dengan Ø8 x 20mm ~Kepala lepas, Arbor, Kunci arbor, Mata bor Ø8
100 Drilling dengan Ø12 x 20mm ~Kepala lepas, Arbor, Kunci arbor, Mata bor Ø12
110 Drilling dengan Ø18 x 20mm ~Kepala lepas, Arbor, Kunci arbor, Mata bor Ø18
120 Drilling dengan Ø25 x 20mm ~Kepala lepas, Arbor, Kunci arbor, Mata bor Ø25
130 Pemasangan pahat bubut dalam pada toolpost ~Pahat bubut dalam, Toolpost, Kunci toolpost
140 Pembubutan diameter dalam pada lubang dari ~Pahat bubut dalam
150 Ø25menjadi Ø34.5
160 Pemasangan pahat bubut radius pada toolpost ~Pahat radius, Toolpost, Kunci toolpost
170 Pembubutan radius R6 pada lubang Ø34.5 ~Pahat radius
OPERATING PLAN
No. Of Part : A4 - 007 Machine : Mesin Bor
Name of Part : Die Material : S45C
Prepared by : Muhammad Iqbal Size : Ø120 x 20 mm
Date : 22 November 2022
No OPERATION DESCRIPTION TOOL & AUXILIARY EQUIPMENTS
10 Pengukuran ~Mistar baja
20 Penandaan benda kerja untuk proses pelubangan ~Mistar baja, Penggores, Penitik
30 Pencekaman benda kerja ~Ragum
40 Pemasangan mata bor ~Arbor, Kunci arbor
50 Drilling dengan Ø6 x 20mm ~Arbor, Kunci arbor, Mata bor Ø8
60 Drilling dengan Ø10 x 20mm ~Arbor, Kunci arbor, Mata bor Ø10
MACHINING TIME CALCULATION
Part Name : A4 - 007 Machine : Mesin Gergaji
Part Number : Die Tool : Gergaji
Made by : Muhammad Iqbal Material : S45C
Date : 22 November 2022 Size : Ø120 x 22 mm
Dari tabel machining data handbook Tabel 6.1 diperoleh :

Cutting Speed v= 140 stroke / min


Feed Rate F= 0.23 mm / stroke
Depth H= 120

~ Perhitungan waktu pemesinan (TC) :


TC = H
s.V
= 120
0,23 . 140
= 120
32.2
= 3.726708 min / unit
MACHINING TIME CALCULATION
Part Name : A4 - 007 Machine : Mesin Bubut 1
Part Number : Die Tool : HSS
Made by : Muhammad Iqbal Material : S45C
Date : 22 November 2022 Size : Ø120 x 20 mm
Dari tabel machining data handbook Tabel 1.1 diperoleh :

Cutting Speed v= 45 m / min


Feed Rate f= 0.18 mm / rev
Diameter d= 120 mm

~ Perhitungan putaran spindel :


1000 . v 1000 * 45 45000
n= = = = 119.4268 rpm
π.d 3,14 * 120 376.8

~ Perhitungan jumlah pemotongan dengan :


a =1
dari panjang panjang awal ( Ps = 22mm => Pe = 21mm )
Ps - Pe 22 - 21
i= = = 1 kali
a 1

l = (D/2) + 1 = (120 / 2) + 1 = 61

~ Perhitungan waktu pemotongan untuk :


~ facing (22mm => 21mm)
l.i 61 * 1 61
TC = = = = 2.83763 min
s.n 0,18 * 119,427 21.49682

~ Perhitungan waktu pemotongan untuk :


~ facing (21mm => 20mm)
l.i 61 * 1 61
TC = = = = 2.83763 min
s.n 0,18 * 119,427 21.49682
MACHINING TIME CALCULATION
Part Name : A4 - 007 Machine : Mesin Bubut 2
Part Number : Die Tool : Center Drill, Mata Bor
Made by : Muhammad Iqbal Material : S45C
Date : 22 November 2022 Size : Ø120 x 20 mm
Dari tabel machining data handbook Tabel 1.1 diperoleh :

Cutting Speed v= 45 m / min


Feed Rate f= 0.18 mm / rev
Diameter d= 120 mm

~ Perhitungan putaran spindel :


1000 . v 1000 * 45 45000
n= = = = 119.4268 rpm
π.d 3,14 * 120 376.8

~ Perhitungan waktu pemotongan untuk :


~ Center Drilling
dari tabel pada buku All about machine T55.1 diperoleh :
l= 7

l.i 7*1 7
TC = = = = 0.32563 min
s.n 0,18 * 119,427 21.4968153

~ Drilling untuk Ø8 x 20mm


dari tabel machining handbook tabel 3.1 diperoleh :
v= 34 m / min Diameter benda (d) = 120 mm
s = Ø8 = 0.18 mm / rev Depth (H) = 20 mm

1000 . v 1000 * 34 34000 =


n= = = 90.23355 rpm
π.d 3,14 * 120 376.8

l= H + (0,3 * d) + 1 = 20 + (0,3*8) + 1 = 23.4

TC = 2 [ l / (s . n)] = 2 [ 23,4 / (0,18*90,2335)] = 2.881412 min

~ Drilling untuk Ø12 x 20mm


dari tabel machining handbook tabel 3.1 diperoleh :
v= 34 m / min Diameter benda (d) = 120 mm
s = Ø12 = 0.3 mm / rev Depth (H) = 20 mm

1000 . v 1000 * 34 34000 =


n= = = 90.23355 rpm
π.d 3,14 * 120 376.8

l= H + (0,3 * d) + 1 = 20 + (0,3*12) + 1 = 24.6

TC = 2 [ l / (s . n)] = 2 [ 24,6 / (0,30*90,2335)] = 1.817506 min

~ Drilling untuk Ø18 x 20mm


dari tabel machining handbook tabel 3.1 diperoleh :
v= 34 m / min Diameter benda (d) = 120 mm
s = Ø18 = 0.45 mm / rev Depth (H) = 20 mm

1000 . v 1000 * 34 34000 =


n= = = 90.23355 rpm
π.d 3,14 * 120 376.8

l= H + (0,3 * d) + 1 = 20 + (0,3*18) + 1 = 26.4

TC = 2 [ l / (s . n)] = 2 [ 26,4 / (0,45*90,2335)] = 1.300329 min

~ Drilling untuk Ø25 x 20mm


dari tabel machining handbook tabel 3.1 diperoleh :
v= 34 m / min Diameter benda (d) = 120 mm
s = Ø25 = 0.55 mm / rev Depth (H) = 20 mm

1000 . v 1000 * 34 34000 =


n= = = 90.23355 rpm
π.d 3,14 * 120 376.8

l= H + (0,3 * d) + 1 = 20 + (0,3*25) + 1 = 28.5

TC = 2 [ l / (s . n)] = 2 [ 28,5 / (0,55*90,2335)] = 1.148535 min


MACHINING TIME CALCULATION
Part Name : A4 - 007 Machine : Mesin Bubut 3
Part Number : Die Tool : Mata Bor
Made by : Muhammad Iqbal Material : S45C
Date : 22 November 2022 Size : Ø120 x 20 mm
Dari tabel machining data handbook Tabel 1.1 diperoleh :

Cutting Speed v= 45 m / min


Feed Rate F1= 0.40 mm / rev F2= 0.18 mm / rev
Diameter d= 120 mm

~ Perhitungan putaran spindel :


1000 . v 1000 * 45 45000
n= = = = 119.4268 rpm
π.d 3,14 * 120 376.8

~ Perhitungan jumlah pemotongan dengan F1 :


a =4
dari diameter awal ( Øds = 25mm => Øde = 33mm )
ds - de 33 - 25
i= = = 1 kali
2.a 2*4

l = L gambar + 1 = 21 mm

~ Perhitungan waktu pemotongan untuk :


~ Pembubutan diameter dalam untuk Ø25 x 20 => Ø33 x 20
l.i 21 * 1 21
TC = = = = 0.4396 min
s.n 0,4 * 119,427 47.7707

~ Perhitungan jumlah pemotongan dengan F2 :


a = 0.75
dari diameter awal ( Øds = 33mm => Øde = 34,5mm )
ds - de 34,5 - 33
i= = = 1 kali
2.a 2 * 0,75

l = L gambar + 1 = 21 mm

~ Perhitungan waktu pemotongan untuk :


~ Pembubutan diameter dalam untuk Ø33x 20 => Ø34,5 x 20
l.i 21 * 1 21
TC = = = = 0.976889 min
s.n 0,18 * 119,427 21.49682

Note : ~ MT = semua hasil TC dijumlahkan


~ MT = 14.56516 min / unit
MACHINING TIME CALCULATION
Part Name : A4 - 007 Machine : Mesin Bor
Part Number : Die Tool : Mata Bor
Made by : Muhammad Iqbal Material : S45C
Date : 22 November 2022 Size : Ø120 x 20 mm
Dari tabel machining data handbook Tabel 1.1 diperoleh :

Cutting Speed v= 45 m / min


Feed Rate f= 0.18 mm / rev
Diameter d= 120 mm

~ Perhitungan putaran spindel :


1000 . v 1000 * 45 45000
n= = = = 119.4268 rpm
π.d 3,14 * 120 376.8

~ Perhitungan waktu pemotongan untuk :


~ Center Drilling
dari tabel pada buku All about machine T55.1 diperoleh :
l= 7

l.i 7*1 7
TC = = = = 0.32563 min
s.n 0,18 * 119,427 21.4968153

~ Drilling untuk Ø8 x 20mm


dari tabel machining handbook tabel 3.1 diperoleh :
v= 34 m / min Diameter benda (d) = 120 mm
s = Ø8 = 0.18 mm / rev Depth (H) = 20 mm

1000 . v 1000 * 34 34000 =


n= = = 90.23355 rpm
π.d 3,14 * 120 376.8

l= H + (0,3 * d) + 1 = 20 + (0,3*8) + 1 = 23.4

TC = 2 [ l / (s . n)] = 2 [ 23,4 / (0,18*90,2335)] = 2.881412 min

~ Drilling untuk Ø10 x 20mm


dari tabel machining handbook tabel 3.1 diperoleh :
v= 34 m / min Diameter benda (d) = 120 mm
s = Ø10 = 0.3 mm / rev Depth (H) = 20 mm

1000 . v 1000 * 34 34000 =


n= = = 90.23355 rpm
π.d 3,14 * 120 376.8

l= H + (0,3 * d) + 1 = 20 + (0,3*10) + 1 = 24

TC = 2 [ l / (s . n)] = 2 [ 24 / (0,30*90,2335)] = 1.773176 min

Note : ~ MT = semua TC dijumlahkan


~ MT = 4.980218 min / unit
STANDART TIME CALCULATION
Part Name : A4 - 007 Machine : Mesin Gergaji
Part Number : Die Material : S45C
Made by : Muhammad Iqbal
Date : 22 November 2022
Diketahui : MT = 3.72671 min / unit
DT = 20 min / hari
Demand = 25 unit / hari
ST = 1 x Demand
= 25 min / hari
D = 8 Jam / hari

~ Allowance DT + ST
= x 100%
60 . D
20 + 25
= x 100%
60 x 8
45
= x 100%
480
= 0.09375 x 100%
= 9.375 %

~ Effisiensi = 100% - %Allowance


= 1 - 0,09375
= 0.90625

~ STT = MT / Effisiensi
= 3,72671/0,90625
= 4.11223172413793 min / unit

~ DS = 1 / STT
= 1 / 4,112231724
= 0.243177 unit / min
STANDART TIME CALCULATION
Part Name : A4 - 007 Machine : Mesin Bubut
Part Number : Die Material : S45C
Made by : Muhammad Iqbal
Date : 22 November 2022
Diketahui : MT = 14.5652 min / unit
DT = 20 min / hari
Demand = 25 unit / hari
ST = 5 x Demand
= 125 min / hari
D = 8 Jam / hari

~ Allowance DT + ST
= x 100%
60 . D
20 + 125
= x 100%
60 x 8
145
= x 100%
480
= 0.302083333333333 x 100%
= 30.2 %

~ Effisiensi = 100% - %Allowance


= 1 - 0,302083333
= 0.697917

~ STT = MT / Effisiensi
= 14,5652 / 0,69792
= 20.8695402985075 min / unit

~ DS = 1 / STT
= 1 / 20,8695403
= 0.047917 unit / min
STANDART TIME CALCULATION
Part Name : A4 - 007 Machine : Mesin Bor
Part Number : Die Material : S45C
Made by : Muhammad Iqbal
Date : 22 November 2022
Diketahui : MT = 4.98022 min / unit
DT = 20 min / hari
Demand = 25 unit / hari
ST = 5 x Demand
= 125 min / hari
D = 8 Jam / hari

~ Allowance DT + ST
= x 100%
60 . D
20 + 125
= x 100%
60 x 8
145
= x 100%
480
= 0.302083333333333 x 100%
= 30.2 %

~ Effisiensi = 100% - %Allowance


= 1 - 0,302083333
= 0.697917

~ STT = MT / Effisiensi
= 4,98022 / 0,69792
= 7.1358376119403 min / unit

~ DS = 1 / STT
= 1 / 7,135837612
= 0.140138 unit / min