DIVISI PEC. PT. INDO HUSADA UTAMA (RADJAK GROUP)
PROGRAM PENGEMBANGAN PROPERTY (FASILITAS GEDUNG DLL)
PERIODE : 2022 - 2023
URAIAN
I. RH SALEMBA
I.1. TAHAP 1 : Gedung Anex & Gdg Penunjang lainnya :
Renov Lt. 1 ( R. MRI, R Dapur Gizi, dll)
Renov Lt.2 (R. CSSD., R.Chiler, R Adm & R Tunggu Pasien RJ BPJS.)
Renov Tangga Darurat Lt 1,2,3,4.
Renov Lt. 1 Bgn Penunjang (K. Jenazah, R.Genset, Gudang, Toilet, Bak Sampah, Ipal, Landscape)
Renov Lt.2 Bgn Penunjang (R.Teknik, Workshop, Gudang, R. T.Solar, R. Div. Umum)
I.2. TAHAP 2 : Gedung Utama :
Renov. R.UGD, ESWL, Panoramik, Fluoroscopy, Komersial Area Lt.1 & Bf), Medrec, Restoran)
Renov. Landscape Pertamanan Lt.1.
Renov Lt.2 ( R. Poliklinik Spesialis, R. MCU, Akses ke Gdg Annex)
Renov Lt.3 (R. ICU & ICCU, HCU, & R. OK)
Renov Lt.4 (R.R.Inap : Anak, NICU, PICU, PERINA, VK, R. Bayi)
Renov Lt.5 (R.Inap Kls 2&3 : Plafon, dinding, lantai, lampu2, Toilet Umum)
Renov Lt.7 (R. Inap & R.Jalan, & Apotek, Pav. HIP)
Renov. R. PS, & R.809 Untuk akses Emergency Exit dari Lt.8 Heliport)
Renov. Lt.11 (Lt.Atap : Konstruksi BillBoard, & Panel Surya / Efisiensi Listrik PLN)
Renov. Penggantian semua Pipa Distribusi Air Bersih Lt.1 sd 10
1.3. TAHAP 3 : Pembangunan Tower 02 di Area Parkir SLB 24 &
Rencana Pemb. Lenac di area Pembebasan Tanah Baru di Belakang Gdg Utama
III.3. TAHAP 3 : (Pembangunan TOWER 02 8 lt & bangunan Mes :karyawan, Dokter, Mhswa Praktek)
Tower 02 : Lt.1-3 Parkir Mobil, Lt.4-8 Rawat inap & Unit2 Unggulan
Pembuatan Jembatan Baja antar Penghubung Tower (Sky Bridge)
NO
I TIM PROPERTY & KONSTR 1 ANWAR Saeful ST
(MANAGER)
2 Bobby AM
3 B. Rama AA
4 N Andre B
5 Aksan IR
6 Rangga AN
7 A Fahmi
8 M Farhan D
9 Antok Sriyanta
10 Rezky NF
11 Hanif SA
12 Ika Nureliza
13 Muhkyar
JAK GROUP)
ASILITAS GEDUNG DLL)
ARET 2022
URAIAN KET
ipal salemba desain upground ipal
ipal RH cileungsi final desain
desain fasade RH cilegon
redesain area dapur RH salemba
desain RH TANGERANG
Up Date 3D Semua Master site plan pwkt
monitoring pek. Pondok gede
revisi desain rh purwakarta masterplan alt 2
4/15/2022
3/23/2022
3/9/2022
4/25/2022
4/15/2022
3/21/2022
3/25/2022
3/25/2022
4/15/2022
3/23/2022
4/15/2022
3/23/2022
4/15/2022
3/23/2022
4/15/2022
3/9/2022
3/25/2022
3/25/2022
3/25/2022
3/25/2022
3/25/2022
3/25/2022
3/25/2022
3/25/2022
3/25/2022
3/25/2022
4/20/2022
NO CABANG SBU TYPE / LUAS BANGUNAN KAP BED RI KAP IN
KLS SBU M2 PLN TRAFO
KVA KVA
1 RH SALEMBA B
2 RH CILEUNGSI C
3 RH PURWAKARTA B
4 RH CIBITUNG
5 RH CENGKARENG
6 RH TAMBUN
7 RH CILEGON
8 RH TANGERANG
9 dst
10
KAP INST TERPASANG
GENSET AIR PAM DEEP WEEL ROOF GROUND TELKOM MATRIX PABX
PIPA SUP TANK TANK
KVA DIA …." DALAM …M" M3 M3 LINE LINE EXT