4. TAHUN 1994 - 1994 PELAKSANA DI PROYEK DAS IRIGASI TOLINGGULA II, GORONTALO,SULAWESI UTARA.
5. TAHUN 1994 - 1995 PELAKSANA DI PROYEK AL-MARKAZ AL-ISLAMI, ISLAMIC CENTRE UJUNG PANDANG,
SULAWESI SELATAN.
9. TAHUN 2000 – 2001 MANAGER PRODUKSI DI PROYEK APARTEMEN DPA,MA,& BEPEKA PAKET 3 & 4
KEMAYORAN, JAKARTA.
10.TAHUN 2001 – 2004 MANAGER PRODUKSI DI PROYEK KAMPUS UNIVERSITAS GAJAH MADA, PAKET C
FAKULTAS KEDOKTERAN HEWAN & FAKULTAS PETERNAKAN, DI BULAK SUMUR
JOGJAKARTA.
11.TAHUN 2004 – 2005 MANAGER PRODUKSI DI PROYEK SMES'CO PROMOTION CENTRE (GEDUNG DEPKOP)
JAKARTA.
12.TAHUN 2005 - 2005 MANAGER PRODUKSI DI PROYEK RENOVASI KANTOR KEMENTERIAN KOPERASI
14.TAHUN 2007 – 2009 MANAGER PRODUKSI DI PROYEK DEPARTEMEN KELAUTAN DAN PERIKANAN ( DKP )
JAKARTA.
15.TAHUN 2009 – 2011 MANAGER PRODUKSI DI PROYEK PERUMAHAN JABATAN ANGGOTA ( RJA DPR-RI )
KALIBATA-JAKARTA.
16.TAHUN 2011 - 2014 MANAGER KONSTRUKSI DI PROYEK TERMINAL INTERNASIONAL NGURAH RAI
AIRPORT-BALI
17.TAHUN 2014 - 2015 MANAGER KONSTRUKSI DI PROYEK PEMBANGUNAN RESORT & HOTEL PADMA PUHU –
BALI
18.TAHUN 2015 – 2015 MANAGER KONSTRUKSI DI PROYEK PEMBANGUNAN RUSUNAWA POLDA - BALI DI
SANGLAH, DENPASAR, BALI DI DENPASAR
19.TAHUN 2016 – 2016 MANAGER KONSTRUKSI DI PROYEK PEMBANGUNAN RUMAH SAKIT INDERA PEMPROV
BALI
20.TAHUN 2016 – 2018 MANAGER KONSTRUKSI DI PROYEK RENOVASI STADION UTAMA GELORA
BUNG KARNO, SENAYAN, JAKARTA-PUSAT
21.TAHUN 2018 - 2019 MANAGER KONSTRUKSI DI PROYEK RENOVASI STADION MANAHAN, SOLO.
22.TAHUN 2019 – 2020 MANAGER KONSTRUKSI DI PROYEK MENARA MANDIRI WIJAYAKUSUMA, JAKARTA.
23.TAHUN 2020 – 2021 DEPUTY PROJECT MANAGER DI PROYEK PERLUASAN TERMINAL & FASILITAS
PENUNJANGNYA DI BANDARA SAM RATULANGI - MANADO
DESKRIPSI PROYEK
JAKARTA
utara
LOKASI PEKERJAAN
Keterangan:
Lokasi Proyek Pembangunan Gedung Presisi Divtik Polri di
Sanjaya I No. 1 RT.5/RW.2, Selong, Kec. Kebayoran Baru, Kota Jakarta Selatan,
Daerah Khusus Ibu Kota Jakarta
Batas – Batas :
Utara : Jl. Sanjaya, Permukiman penduduk
Selatan : Jl. Trunojoyo
Timur : Jl. Adityawarman, Permukiman penduduk
Barat : Jl. Pattimura
Lokasi Proyek
LOKASI PEKERJAAN
Site Plan Proyek
Gambaran Umum Proyek
DATA UMUM PENJELASAN
NAMA PAKET PEKERJAAN KONSTRUKSI TERINTEGRASI RANCANG DAN BANGUN PEMBANGUNAN GEDUNG PRESISI
DIV TIK POLRI TAHAP 1, T. 8.500, 10 Lt, TEMPAT PARKIR T. 2.700 4 Lt. (LELANG ULANG)
LOKASI PROYEK Jl. Sanjaya I No. 1 RT.5/RW.2, Selong, Kec. Kebaoran Baru, Kota Jakarta Selatan,
Daerah Khusus Ibu Kota Jakarta
PEMILIK PEKERJAAN MARKAS BESAR KEPOLISIAN NEGARA REPUBLIK INDONESIA STAF LOGISTIK
URAIAN PEKERJAAN Design and Build Pembangunan Gedung Presisi Divtik Polri, yang terdiri atas Gedung Utama
dan gedung parkir
LINGKUP [1] PERENCANAAN [2] STRUKTUR [3] ARSITEKTUR [4] MEP [5] LANDSCAPE
[6] INTERIOR
JUMLAH LANTAI Gedung utama 10 lantai Luas Bangunan 11.200 m2
Gedung Parkir 4 lantai
WAKTU PELAKSANAAN 193 (seratus sembilan puluh tiga) hari kalender
Salah satu tantangan dalam Pembangunan Gedung Presisi Div TIK Polri adalah terbatasnya ketersediaan
lahan yang dapat dimanfaatkan untuk pembangunan Gedung, baik dari segi luasan, peruntukan ruang,
maupun intensitas lahan selain itu juga keterbatasan waktu juga menjadi salah satu tantangan utama
dengan pembangunan gedung 13 lantai total luas bangunan 12.311 m2 harus diselesaikan dalam jangka
waktu selama 193 hari kalender.
Dalam rangka memenuhi target kebutuhan tersebut, diperlukan konsekwensi siklus pekerjaan struktur
atas yang benar – benar harus dipenuhi dikarenakan sangat berpengaruh pada prodesesor item
pekerjaan selanjutnya atau sebagai lahan pekerjaan arsitek, interior dan MEP. Pengendalian siklus struktur
atas banyak keterkaitan sehingga perlu disepakati banyak pihak, baik sisi desain, material, tenaga, dan tim
pelaksanaan.
Permasalahan
Pada Proyek Konstruksi Terintegrasi Rancang Dan Bangun Pembangunan Gedung Presisi Div Tik Polri Tahap
1, t. 8.500, 10 lt, Tempat Parkir T. 2.700 4 lt. Dengan jangka waktu pelaksanaan 6 bulan, memliki beberapa
permasalahan yang menjadi potensi resiko keterlambatan antara lain :
Dari perihal tersebut perlu mitigasi resiko mengantisipasi keterlambatan pekerjaan, antara lain yaitu :
Dari beberapa mitigasi tersebut, disini akan membahas terkait point no.4 terkait pekerjaan struktur atas
yang merupakan lahan untuk ruang pekerjaan arsitek dan pekerjaan mep bisa segera masuk.
Gambar Proyek Presisi Dalam 3D
Gambar Proyek Presisi Dalam 3D
Pembahasan
Desain Awal
Terdapat Semi Basement
26 Juni 22 20 Juli 22
START
STRUKTUR
20 Juni 22 02 Juli 22 ATAS
9 Agust 22
Perencanaan
9 titik/hr
7 hari
GROUND FINISH Pek. Struktur Bawah
BREAKING BORE PILE 2 Juli’22 – 9 Agust’22 = 37 hari
Sudah termasuk :
Test Aksial : 2 titik
Test Lateral : 1 titik
Test PDA : 4 titik
Test Pit : 5 titik
Pembahasan
1 2 3 4 5 6 7 8 9 10 11
A A
6 7 8 9 10 11
1 2 3 4 5 6 7 8 9 10 11
D D
TAMPAK DEPAN
C ZONE 3 (As 1–5/A-D) ZONE 2 (As 6–8/A-D) ZONE 1 (As 9–11/A-D) C
Balok & Plat Lt. 2 Balok & Plat Lt. 2 Balok & Plat Lt. 2
Bekisting : 799,07 M2 Bekisting : 699,19 M2 Bekisting : 499,42 M2
B
Pembesian : 15.776,76 Kg Pembesian : 13.804,67 Kg Pembesian : 9.860,48 Kg
B
Volume Per - Lantai (typical) :
Pengecoran : 127,76 M3 Pengecoran : 111,79 M3 Pengecoran : 79,85 M3
➢ Luas Lantai = 1350 m2
➢ Bekisting = 2618 m2
A A
6 7 8 9 10 11
➢ Besi = 58.821 kg
➢ Beton = 440 m3
1 2 3 4 5
TAMPAK ATAS – BALOK & PLAT LT.2
Pembahasan
Squence Realisasi Pengecoran Perlantai
Keterangan :
1. Waktu Penyelesaian Bekisting Kolom 1 Hari
Pek. Struktur Atas
2. Waktu Penyelesaian Bekisting Balok dan Plat Lantai 4 Hari Kerja 10 Agus’22 – 26 Sept’22 = 47 hari
3. Waktu Bongkar Bekisting Plat Lantai 5 hari dan Balok 7 hari setelah pengecoran (tetap shooring)
4. Pengadaan alat dan material 3 lantai 47 hari / 12 lantai = 3,9 hari
5. Pengadaan kolom 1 zone (20 unit)
Schedule Kurva S
JANGKA WAKTU PELAKSANAAN (KURVA S)
KONSTRUKSI TERINTEGRASI RANCANG DAN BANGUN (DESIGN AND BUILD) PEMBANGUNAN GEDUNG PRESISI DIV TIK POLRI TAHAP 1, T. 8.500 10 LANTAI, TEMPAT PARKIR T. 2.700 4 LANTAI APBN T.A 2022
SLOG KEPOLISIAN PT. ADHI KARYA (PERSERO) TBK TANGGAL PELAKSANAAN : 20 JUNI 2022 S/D WAKTU PELAKSANAAN : 194 HARI KALENDER HARI PELAKSANAAN : 104 HARI KALENDER
NEGARA REPUBLIK INDONESIA DEPARTEMEN GEDUNG 31 DESEMBER 2022 WAKTU PEMELIHARAAN : 180 HARI KALENDER SISA HARI KALENDER : 90 HARI KALENDER
JANGKA WAKTU PELAKSANAAN : 194 HARI KALENDER - START (20 JUNI 2022 - 31 DESEMBER 2022)
JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
NO URAIAN PEKERJAAN BOBOT (%) M1 M2 M3 M4 M5 M6 M7 M8 M9 M 10 M 11 M 12 M 13 M 14 M 15 M 16 M 17 M 18 M 19 M 20 M 21 M 22 M 23 M 24 M 25 M 26 M 27 M 28 KET.
20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec
26-Jun 3-Jul 10-Jul 17-Jul 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec 31-Dec
B PEKERJAAN PERSIAPAN 3,017 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103
C PEKERJAAN STRUKTUR
- PEKERJAAN TANAH 0,591 - - 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 - - - - - - - - - - - - - -
- PEKERJAAN PERALATAN 2,077 - 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 - - - 90
- PEKERJAAN PONDASI
- PEKERJAAN STRUKTUR LANTAI 1
- PEKERJAAN STRUKTUR LANTAI 2
3,443
4,162
1,974
-
-
-
-
-
-
0,574
-
-
0,574
0,462
-
0,574
0,462
-
0,574
0,462
0,296
0,574
0,462
0,296
0,574
0,462
0,493
-
0,462
0,493
-
0,462
0,395
-
0,462
-
-
0,462
-
-
-
-
-
REALISASI FINISH
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA FINISH
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- PEKERJAAN STRUKTUR LANTAI 3
- PEKERJAAN STRUKTUR LANTAI 4
1,821
1,823
-
-
-
-
-
-
-
-
-
-
-
-
0,364
-
0,364
0,365
0,364
0,365
0,364
0,365
0,364
0,365
-
0,365
-
- STRUKTUR
-
-
-
-
-
-
-
-
-
- STRUKTUR
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- PEKERJAAN STRUKTUR LANTAI 5 1,740 - - - - - - - - 0,348 0,348 0,348 0,348 0,348 - - - - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 6
- PEKERJAAN STRUKTUR LANTAI 7
1,707
1,707
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0,341
-
0,341
0,341
0,341
0,341
0,341
0,341 26 SEPT 2022
0,341
0,341
-
0,341
-
-
-
-
-
- 06 NOV 2022
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
80
- PEKERJAAN STRUKTUR LANTAI 8 1,778 - - - - - - - - - - - 0,356 0,356 0,356 0,356 0,356 - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 9 1,110 - - - - - - - - - - - - 0,222 0,222 0,222 0,222 0,222 - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 10 0,937 - - - - - - - - - - - - - 0,187 0,187 0,187 0,187 0,187 - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI ATAP 0,878 - - - - - - - - - - - - - - 0,176 0,176 0,176 0,176 0,176 - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI DAK ATAP 0,217 - - - - - - - - - - - - - - - 0,043 0,043 0,043 0,043 0,043 - - - - - - - -
- PEKERJAAN ATAP BAJA 0,310 - - - - - - - - - - - - - - - - - - - 0,062 0,062 0,062 0,062 0,062 - - - -
D PEKERJAAN ARSITEKTUR
- PEKERJAAN ARSITEKTUR LANTAI 1 3,440 - - - - - - - - - - 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 -
- PEKERJAAN ARSITEKTUR LANTAI 2 3,000 - - - - - - - - 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 - - - - 70
- PEKERJAAN ARSITEKTUR LANTAI 3 2,427 - - - - - - - - - 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 - - -
- PEKERJAAN ARSITEKTUR LANTAI 4 2,547 - - - - - - - - - - 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 - -
- PEKERJAAN ARSITEKTUR LANTAI 5 3,278 - - - - - - - - - - - 0,126 0,252 0,252 0,252 0,252 0,252 0,252 0,252 0,252 0,252 0,378 0,252 0,252 - - - -
- PEKERJAAN ARSITEKTUR LANTAI 6 3,695 - - - - - - - - - - - - 0,284 0,284 0,284 0,284 0,284 0,284 0,284 0,284 0,284 0,426 0,142 0,284 0,284 - - -
- PEKERJAAN ARSITEKTUR LANTAI 7 3,168 - - - - - - - - - - - - - 0,264 0,264 0,264 0,264 0,264 0,264 0,264 0,264 0,264 0,396 0,132 0,264 - - -
- PEKERJAAN ARSITEKTUR LANTAI 8 2,824 - - - - - - - - - - - - - - 0,235 0,235 0,235 0,235 0,235 0,235 0,235 0,353 0,118 0,235 0,235 0,235 - -
- PEKERJAAN ARSITEKTUR LANTAI 9 1,740 - - - - - - - - - - - - - - - 0,158 0,158 0,158 0,158 0,158 0,158 0,158 0,158 0,158 0,158 0,158 - -
- PEKERJAAN ARSITEKTUR LANTAI 10 1,594 - - - - - - - - - - - - - - - - 0,145 0,145 0,145 0,145 0,145 0,145 0,145 0,145 0,145 0,145 0,145 -
PERCEPATAN
- PEKERJAAN ARSITEKTUR LANTAI ATAP 1,966 - - - - - - - - - - - - - - - - - 0,179 0,179 0,179 0,179 0,179 0,179 0,179 0,179 0,179 0,179 0,179 60
E PEKERJAAN INTERIOR
- PEKERJAAN INTERIOR LANTAI 1 0,221 - - - - - - - - - - - - - - - 0,025 0,025 0,025 0,025 0,025 0,025 0,025 0,025 0,025 - - - -
- PEKERJAAN INTERIOR LANTAI 2 0,145 - - - - - - - - - - - - - - - 0,016 0,016 0,016 0,016 0,016 0,016 0,016 0,016 0,016 - - - -
- PEKERJAAN INTERIOR LANTAI 3 0,252 - - - - - - - - - - - - - - - - 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 - - -
- PEKERJAAN INTERIOR LANTAI 4 0,374 - - - - - - - - - - - - - - - - 0,042 0,042 0,042 0,042 0,042 0,042 0,042 0,042 0,042 - - -
- PEKERJAAN INTERIOR LANTAI 5
- PEKERJAAN INTERIOR LANTAI 6
- PEKERJAAN INTERIOR LANTAI 7
- PEKERJAAN INTERIOR LANTAI 8
0,219
0,857
0,465
0,170
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
39 HARI -
-
-
-
-
-
-
-
0,024
0,095
-
-
0,024
0,095
0,052
0,019
0,024
0,095
0,052
0,019
0,024
0,095
0,052
0,019
0,024
0,095
0,052
0,019
0,024
0,095
0,052
0,019
0,024
0,095
0,052
0,019
0,024
0,095
0,052
0,019
0,024
0,095
0,052
0,019
-
-
0,052
0,019
-
-
-
- 50
- PEKERJAAN INTERIOR LANTAI 9 0,145 - - - - - - - - - - - - - - - - - - - 0,016 0,016 0,016 0,016 0,016 0,016 0,016 0,016 0,016
- PEKERJAAN INTERIOR LANTAI 10 0,170 - - - - - - - - - - - - - - - - - - - 0,019 0,019 0,019 0,019 0,019 0,019 0,019 0,019 0,019
- PEKERJAAN INTERIOR LANTAI ATAP - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
F PEKERJAN MEKANIKAL DAN ELEKTRIKAL -
- PEKERJAAN MEKANIKAL
- PEKERJAAN FIRE FIGHTING 2,185 - - - - - - - - 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 - -
- PEKERJAAN TATA UDARA 7,336 - - - - - - - - - 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386
- PEKERJAAN LIFT 6,428 - - - - - - - - - - 0,179 0,357 0,446 0,357 0,357 0,357 0,446 0,357 0,357 0,357 0,357 0,357 0,357 0,357 0,357 0,357 0,357 0,357
40
- PEKERJAAN GONDOLA 0,564 - - - - - - - - - - - - 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 - -
- PEKERJAAN ELEKTRIKAL -
- PEKERJAAN GENSET 1,621 - - - - - - - - - - - - - - - - - - - - - - 0,270 0,270 0,270 0,270 0,270 0,270
- PEKERJAAN PANEL TM 0,238 - - - - - - - - - - - - - - - - 0,034 0,034 0,034 0,034 0,034 0,034 0,034 - - - - -
- PEKERJAAN TRANSFORMATOR 0,276 - - - - - - - - - - - - - - - - 0,039 0,039 0,039 0,039 0,039 0,039 0,039 - - - - -
- PEKERJAAN PANEL TR 2,145 - - - - - - - - - - 0,195 0,195 0,195 0,195 0,195 0,195 0,195 0,195 0,195 0,195 0,195 - - - - - - -
- PEKERJAAN KABEL TM 0,115 - - - - - - - - - - - - - - 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 - -
- PEKERJAAN KABEL TR 2,656 - - - - - - - - - - 0,241 0,241 0,241 0,241 0,241 0,241 0,241 0,241 0,241 0,241 0,241 - - - - - - -
- PEKERJAAN LAMPU, SAKLAR, STOP KONTAK DAN INSTALASI 1,929 - - - - - - - - 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 - 30
- PEKERJAAN RAK KABEL 0,336 - - - - - - - - - - - - - - - - - - - - 0,056 0,056 0,056 0,056 0,056 0,056 - -
- PEKERJAAN PENYALUR PETIR 0,415 - - - - - - - - - - - - - - - - - - - - - - 0,083 0,083 0,083 0,083 0,083 -
- PEKERJAAN PENTANAHAN 0,179 - - - - - - - - - - - - - - - - - - - - - - - 0,045 0,045 0,045 0,045 -
- PEKERJAAN TEST COMISIONING 0,026 - - - - - - - - - - - - - - - - - - - - - - - - 0,006 0,006 0,006 0,006
- PEKERJAAN FIRE ALARM 0,649 - - - - - - - - - - - - 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 - -
- PEKERJAAN TATA SUARA 0,479 - - - - - - - - - - - - - 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 - -
- PEKERJAAN INSTALASI TELEPON 0,245 - - - - - - - - - - - - - - - 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 -
- PEKERJAAN DATA NETWORK INSTALASI DATA, WIFI 1,837 - - - - - - - - - - 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102
- PEKERJAAN MATV 0,263 - - - - - - - - - - - - - - - - - 0,026 0,026 0,026 0,026 0,026 0,026 0,026 0,026 0,026 0,026 - 20
- PEKERJAAN CCTV 0,243 - - - - - - - - - - - - - - - - - 0,022 0,022 0,022 0,022 0,022 0,022 0,022 0,022 0,022 0,022 0,022
- PEKERJAAN ACCESS CONTROL 0,733 - - - - - - - - - - - - - - - 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 -
- PEKERJAAN TRAY 0,121 - - - - - - - - - - 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 - - - -
- PEKERJAAN PLUMBING 1,853 - - - - - - - 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088
G PEKERJAAN PRASARANA
- PEKERJAAN PERKERASAN JALAN KAWASAN 1,025 - - - - - - - - - - - - - - - - - - 0,114 0,114 0,114 0,114 0,114 0,114 0,114 0,114 0,114 -
- PEKERJAAN PEDESTRIAN KAWASAN 0,070 - - - - - - - - - - - - - - - - - - 0,008 0,008 0,008 0,008 0,008 0,008 0,008 0,008 0,008 -
- PEKERJAAN SALURAN 0,288 - - - - - - - - - - - - - - - - - - 0,029 0,029 0,029 0,029 0,029 0,029 0,029 0,029 0,029 0,029
- PEKERJAAN FINISHING GWT, RWT, R. TRAFO PANEL, R. GENSET 0,198 - - - - - - - - - - - - - - - - - - - - - - - - 0,066 0,066 0,066 - 10
- PEK. TANAMAN & LAMPU TAMAN 0,055 - - - - - - - - - - - - - - - - - - - - - - - - - 0,018 0,018 0,018
- PEK. ENTRANCE 0,233 - - - - - - - - - - - - - - - - - - - - - 0,039 0,039 0,039 0,039 0,039 0,039 -
- PEKERJAAN STP 0,033 - - - - - - - - - - - - - - - - - - - - - - 0,006 0,006 0,006 0,006 0,006 0,006
- PEKERJAAN SUMUR RESAPAN 0,038 - - - - - - - - - - - - - - - - - - - - - - - 0,010 0,010 0,010 0,010 -
H PEKERJAAN SAMBUNGAN DAYA PLN 0,552 - - - - - - - - - - - - - - - - - 0,050 0,050 0,050 0,050 0,050 0,050 0,050 0,050 0,050 0,050 0,050
I PEKERJAAN SLO TEG MENEGAH & TEG RENDAH 0,132 - - - - - - - - - - - - - - - - - 0,012 0,012 0,012 0,012 0,012 0,012 0,012 0,012 0,012 0,012 0,012
J PEKERJAAN SAMBUNGAN PDAM 0,037 - - - - - - - - - - - - - - - - - 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003
K PEKERJAAN SAMBUNGAN TELKOM 0,018 - - - - - - - - - - - - - - - - - 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0
MINGGUAN (%) 100,000 0,196 0,283 0,934 1,397 1,384 1,680 2,227 2,968 3,134 3,915 4,615 4,911 4,892 4,943 4,973 4,955 4,977 5,079 5,113 5,034 5,047 5,035 4,880 4,857 4,510 3,673 2,690 1,699
RENCANA
KUMULATIF MINGGUAN (%) - 0,196 0,479 1,413 2,810 4,194 5,874 8,101 11,069 14,203 18,118 22,733 27,644 32,536 37,479 42,452 47,407 52,383 57,462 62,575 67,610 72,656 77,691 82,571 87,428 91,939 95,611 98,301 100,000
MINGGUAN (%) - 0,860 0,436 1,754 1,710 1,492 1,940 2,260 3,163 3,214 3,916 3,875 4,436 4,983 5,039 5,071
REALISASI
KUMULATIF MINGGUAN (%) - 0,860 1,296 3,050 4,760 6,252 8,192 10,452 13,615 16,829 20,744 24,619 29,055 34,038 39,077 44,149 100,000
MINGGUAN (%) 0,664 0,153 0,820 0,313 0,108 0,260 0,033 0,195 0,079 0,001 - 0,740 - 0,475 0,091 0,096 0,098
DEVIASI KUMULATIF MINGGUAN (%) - 0,664 0,817 1,637 1,950 2,058 2,318 2,351 2,546 2,626 2,627 1,886 1,411 1,502 1,599 1,697
Schedule Pengecoran Per Lantai Dalam 4 Hari
HARI KE 1
HARI 1
NO URAIAN PEKERJAAN SAT JAM
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7
A HARI 1
1 MARKING KOLOM DAN SEPATU KOLOM UNIT 4 4 4 4
2 TANCAP PEMBESIAN PRECAST KOLOM UNIT 4 4 4 4
3 ERECTION BEKISTING KOLOM UNIT 4 4 4 4
4 SETTING PERKUATAN & VERTIKALITY KOLOM UNIT 2 2 3 3 3 3
5 PENGECORAN KOLOM M3 6,9 6,9 6,9 6,9 6,9 6,9
6 ANGKAT MATERIAL SCHAFOLDING BALOK & PLAT LS 1 1 1 1 1 1 1
Rincian Kegiatan Hari Ke - 1
Dokumentasi Kegiatan Hari KE-1
Flow Chart
Proses Pekerjaan Hari Ke-1 1 2
MULAI
3 4
3 ERECTION BEKISTING KOLOM
5
YA
5 PENGECORAN KOLOM
SELESAI
Schedule Pengecoran Per Lantai Dalam 4 Hari
HARI KE 2
HARI 1 HARI KE 2
NO URAIAN PEKERJAAN SAT JAM JAM
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7
B HARI 2
1 LEPAS BEKISTING KOLOM UNIT 4 4 4 4
2 PASANG SCHAFOLDING BALOK & PLAT M2 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
3 PASANG BODEMAN BEKISTING M2 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23
4 ANGKAT MATERIAL BEKISTING PLAT LANTAI M2 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
5 FABRIKASI PEMBESIAN BALOK KG 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415
Rincian Kegiatan Hari Ke - 2
Dokumentasi Kegiatan Hari KE-2
Flow Chart 1 2
MULAI
5
5 FABRIKASI PEMBESIAN BALOK
SELESAI
Schedule Pengecoran Per Lantai Dalam 4 Hari
HARI KE 3
HARI KE 3
NO URAIAN PEKERJAAN SAT JAM
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7
C HARI 3
1 PASANG BEKISTING PLAT M2 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
2 PASANG BEKISTING KEPALA KOLOM UNIT 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84 0,84
3 PENUTUPAN LUBANG - LUBANG BEKISTING BALOK DAN PLAT M2 33 33 33 33 33 33 33 33 33 33 33
4 PENGANGKATAN MATERIAL BESI BALOK M2 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415
5 PEMASANGAN PEMBESIAN BALOK KG 657 657 657 657 657 657 657 657 657 657 657 657 657 657
Rincian Kegiatan Hari Ke - 3
Dokumentasi Kegiatan Hari KE-3
Flow Chart 1 2
Proses Pekerjaan Hari Ke-3
MULAI
3 4
2 PASANG BEKISTING KEPALA KOLOM
SELESAI
Schedule Pengecoran Per Lantai Dalam 4 Hari
HARI KE 4
HARI KE 4
NO URAIAN PEKERJAAN SAT JAM
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8
D HARI 4
1 ANGKAT MATERIAL BESI PLAT LANTAI KG 876 876 876 876 876 876
2 PASANG BESI PLAT LANTAI KG 405 405 405 405 405 405 405 405 405 405 405 405 405
3 PENGIKATAN BENDRAT PEMBESIAN M2 46 46 46 46 46 46 46 46
4 PEMBERSIHAN AREA DENGAN KOMPRESSOR M2 92 92 92 92
5 PENGECORAN PLAT DAN BALOK M3 10 10 10 10 10 10 10 10 10 10 10
Rincian Kegiatan Hari Ke - 4
Flow Chart Dokumentasi Kegiatan Hari KE-4
Proses Pekerjaan Hari Ke-4 1 2
MULAI
7 PEMBERSIHAN
(DENGAN KOMPRESSOR)
PERBAIKI
INSPEKSI TIDAK
7 8
YA
8 PENGECORAN PLAT & BALOK
SELESAI
Kesimpulan
JANGKA WAKTU PELAKSANAAN : 194 HARI KALENDER - START (20 JUNI 2022 - 31 DESEMBER 2022)
JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
NO URAIAN PEKERJAAN BOBOT (%) M1 M2 M3 M4 M5 M6 M7 M8 M9 M 10 M 11 M 12 M 13 M 14 M 15 M 16 M 17 M 18 M 19 M 20 M 21 M 22 M 23 M 24 M 25 M 26 M 27 M 28 KET.
20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec
26-Jun 3-Jul 10-Jul 17-Jul 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec 31-Dec
B PEKERJAAN PERSIAPAN 2,878 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103 0,103
C PEKERJAAN STRUKTUR
- PEKERJAAN TANAH 0,539 - - 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 0,049 - - - - - - - - - - - - - -
- PEKERJAAN PERALATAN 1,678 - 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 0,087 - - - 90
- PEKERJAAN PONDASI 3,446 - - 0,574 0,574 0,574 0,574 0,574 0,574 - - - - - - - - - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 1 4,382 - - - 0,462 0,462 0,462 0,462 0,462 0,462 0,462 0,462 0,462 - - - - - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 2 2,253 - - - - - 0,296 0,296 0,493 0,493 0,395 - - - - - - - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 3 2,127 - - - - - - 0,364 0,364 0,364 0,364 0,364 - - - - - - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 4 2,125 - - - - - - - 0,365 0,365 0,365 0,365 0,365 - - - - - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 5 1,965 - - - - - - - - 0,348 0,348 0,348 0,348 0,348 - - - - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 6 1,821 - - - - - - - - - 0,341 0,341 0,341 0,341 0,341 - - - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 7 1,806 - - - - - - - - - - 0,341 0,341 0,341 0,341 0,341 - - - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 8 1,847 - - - - - - - - - - - 0,356 0,356 0,356 0,356 0,356 - - - - - - - - - - - - 80
- PEKERJAAN STRUKTUR LANTAI 9 1,353 - - - - - - - - - - - - 0,222 0,222 0,222 0,222 0,222 - - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI 10 0,817 - - - - - - - - - - - - - 0,187 0,187 0,187 0,187 0,187 - - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI ATAP 0,902 - - - - - - - - - - - - - - 0,176 0,176 0,176 0,176 0,176 - - - - - - - - -
- PEKERJAAN STRUKTUR LANTAI DAK ATAP 0,348 - - - - - - - - - - - - - - - 0,043 0,043 0,043 0,043 0,043 - - - - - - - -
- PEKERJAAN ATAP BAJA 0,195 - - - - - - - - - - - - - - - - - - - 0,062 0,062 0,062 0,062 0,062 - - - -
D PEKERJAAN ARSITEKTUR
- PEKERJAAN ARSITEKTUR LANTAI 1 3,028 - - - - - - - - - - 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 0,202 -
- PEKERJAAN ARSITEKTUR LANTAI 2 2,680 - - - - - - - - 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 0,187 - - - - 70
- PEKERJAAN ARSITEKTUR LANTAI 3 1,918 - - - - - - - - - 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 0,152 - - -
- PEKERJAAN ARSITEKTUR LANTAI 4 2,376 - - - - - - - - - - 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 0,159 - -
- PEKERJAAN ARSITEKTUR LANTAI 5 3,422 - - - - - - - - - - - 0,126 0,252 0,252 0,252 0,252 0,252 0,252 0,252 0,252 0,252 0,378 0,252 0,252 - - - -
- PEKERJAAN ARSITEKTUR LANTAI 6 3,822 - - - - - - - - - - - - 0,284 0,284 0,284 0,284 0,284 0,284 0,284 0,284 0,284 0,426 0,142 0,284 0,284 - - -
- PEKERJAAN ARSITEKTUR LANTAI 7 3,176 - - - - - - - - - - - - - 0,264 0,264 0,264 0,264 0,264 0,264 0,264 0,264 0,264 0,396 0,132 0,264 - - -
- PEKERJAAN ARSITEKTUR LANTAI 8 2,533 - - - - - - - - - - - - - - 0,235 0,235 0,235 0,235 0,235 0,235 0,235 0,353 0,118 0,235 0,235 0,235 - -
- PEKERJAAN ARSITEKTUR LANTAI 9 1,967 - - - - - - - - - - - - - - - 0,158 0,158 0,158 0,158 0,158 0,158 0,158 0,158 0,158 0,158 0,158 - -
- PEKERJAAN ARSITEKTUR LANTAI 10 1,643 - - - - - - - - - - - - - - - - 0,145 0,145 0,145 0,145 0,145 0,145 0,145 0,145 0,145 0,145 0,145 -
- PEKERJAAN ARSITEKTUR LANTAI ATAP 2,144 - - - - - - - - - - - - - - - - - 0,179 0,179 0,179 0,179 0,179 0,179 0,179 0,179 0,179 0,179 0,179 60
E PEKERJAAN INTERIOR
- PEKERJAAN INTERIOR LANTAI 1 0,421 - - - - - - - - - - - - - - - 0,025 0,025 0,025 0,025 0,025 0,025 0,025 0,025 0,025 - - - -
- PEKERJAAN INTERIOR LANTAI 2 0,112 - - - - - - - - - - - - - - - 0,016 0,016 0,016 0,016 0,016 0,016 0,016 0,016 0,016 - - - -
- PEKERJAAN INTERIOR LANTAI 3 0,220 - - - - - - - - - - - - - - - - 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 - - -
- PEKERJAAN INTERIOR LANTAI 4 0,317 - - - - - - - - - - - - - - - - 0,042 0,042 0,042 0,042 0,042 0,042 0,042 0,042 0,042 - - -
- PEKERJAAN INTERIOR LANTAI 5 0,171 - - - - - - - - - - - - - - - - - 0,024 0,024 0,024 0,024 0,024 0,024 0,024 0,024 0,024 - -
- PEKERJAAN INTERIOR LANTAI 6 0,956 - - - - - - - - - - - - - - - - - 0,095 0,095 0,095 0,095 0,095 0,095 0,095 0,095 0,095 - -
- PEKERJAAN INTERIOR LANTAI 7 0,279 - - - - - - - - - - - - - - - - - - 0,052 0,052 0,052 0,052 0,052 0,052 0,052 0,052 0,052 -
- PEKERJAAN INTERIOR LANTAI 8 0,121 - - - - - - - - - - - - - - - - - - 0,019 0,019 0,019 0,019 0,019 0,019 0,019 0,019 0,019 - 50
- PEKERJAAN INTERIOR LANTAI 9 0,086 - - - - - - - - - - - - - - - - - - - 0,016 0,016 0,016 0,016 0,016 0,016 0,016 0,016 0,016
- PEKERJAAN INTERIOR LANTAI 10 0,110 - - - - - - - - - - - - - - - - - - - 0,019 0,019 0,019 0,019 0,019 0,019 0,019 0,019 0,019
- PEKERJAAN INTERIOR LANTAI ATAP - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
F PEKERJAN MEKANIKAL DAN ELEKTRIKAL -
- PEKERJAAN MEKANIKAL
- PEKERJAAN FIRE FIGHTING 2,172 - - - - - - - - 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 0,121 - -
- PEKERJAAN TATA UDARA 7,282 - - - - - - - - - 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386 0,386
- PEKERJAAN LIFT 6,434 - - - - - - - - - - 0,179 0,357 0,446 0,357 0,357 0,357 0,446 0,357 0,357 0,357 0,357 0,357 0,357 0,357 0,357 0,357 0,357 0,357
40
- PEKERJAAN GONDOLA 0,565 - - - - - - - - - - - - 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 0,040 - -
- PEKERJAAN ELEKTRIKAL -
- PEKERJAAN GENSET 1,622 - - - - - - - - - - - - - - - - - - - - - - 0,270 0,270 0,270 0,270 0,270 0,270
- PEKERJAAN PANEL TM 0,238 - - - - - - - - - - - - - - - - 0,034 0,034 0,034 0,034 0,034 0,034 0,034 - - - - -
- PEKERJAAN TRANSFORMATOR 0,276 - - - - - - - - - - - - - - - - 0,039 0,039 0,039 0,039 0,039 0,039 0,039 - - - - -
- PEKERJAAN PANEL TR 2,129 - - - - - - - - - - 0,195 0,195 0,195 0,195 0,195 0,195 0,195 0,195 0,195 0,195 0,195 - - - - - - -
- PEKERJAAN KABEL TM 0,068 - - - - - - - - - - - - - - 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 0,010 - -
- PEKERJAAN KABEL TR 2,385 - - - - - - - - - - 0,241 0,241 0,241 0,241 0,241 0,241 0,241 0,241 0,241 0,241 0,241 - - - - - - -
- PEKERJAAN LAMPU, SAKLAR, STOP KONTAK DAN INSTALASI 1,932 - - - - - - - - 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 - 30
- PEKERJAAN RAK KABEL 0,353 - - - - - - - - - - - - - - - - - - - - 0,056 0,056 0,056 0,056 0,056 0,056 - -
- PEKERJAAN PENYALUR PETIR 0,416 - - - - - - - - - - - - - - - - - - - - - - 0,083 0,083 0,083 0,083 0,083 -
- PEKERJAAN PENTANAHAN 0,180 - - - - - - - - - - - - - - - - - - - - - - - 0,045 0,045 0,045 0,045 -
- PEKERJAAN TEST COMISIONING 0,026 - - - - - - - - - - - - - - - - - - - - - - - - 0,006 0,006 0,006 0,006
- PEKERJAAN FIRE ALARM 0,662 - - - - - - - - - - - - 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 0,046 - -
- PEKERJAAN TATA SUARA 0,441 - - - - - - - - - - - - - 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 0,037 - -
- PEKERJAAN INSTALASI TELEPON 0,441 - - - - - - - - - - - - - - - 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 0,020 -
- PEKERJAAN DATA NETWORK INSTALASI DATA, WIFI 2,377 - - - - - - - - - - 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102 0,102
- PEKERJAAN MATV 0,339 - - - - - - - - - - - - - - - - - 0,026 0,026 0,026 0,026 0,026 0,026 0,026 0,026 0,026 0,026 - 20
- PEKERJAAN CCTV 0,337 - - - - - - - - - - - - - - - - - 0,022 0,022 0,022 0,022 0,022 0,022 0,022 0,022 0,022 0,022 0,022
- PEKERJAAN ACCESS CONTROL 0,404 - - - - - - - - - - - - - - - 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 0,061 -
- PEKERJAAN TRAY 0,121 - - - - - - - - - - 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 0,009 - - - -
- PEKERJAAN PLUMBING 1,821 - - - - - - - 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088 0,088
G PEKERJAAN PRASARANA
- PEKERJAAN PERKERASAN JALAN KAWASAN 0,978 - - - - - - - - - - - - - - - - - - 0,114 0,114 0,114 0,114 0,114 0,114 0,114 0,114 0,114 -
- PEKERJAAN PEDESTRIAN KAWASAN 0,084 - - - - - - - - - - - - - - - - - - 0,008 0,008 0,008 0,008 0,008 0,008 0,008 0,008 0,008 -
- PEKERJAAN SALURAN 0,367 - - - - - - - - - - - - - - - - - - 0,029 0,029 0,029 0,029 0,029 0,029 0,029 0,029 0,029 0,029
- PEKERJAAN FINISHING GWT, RWT, R. TRAFO PANEL, R. GENSET 0,120 - - - - - - - - - - - - - - - - - - - - - - - - 0,066 0,066 0,066 - 10
- PEK. TANAMAN & LAMPU TAMAN 0,052 - - - - - - - - - - - - - - - - - - - - - - - - - 0,018 0,018 0,018
- PEK. ENTRANCE 0,152 - - - - - - - - - - - - - - - - - - - - - 0,039 0,039 0,039 0,039 0,039 0,039 -
- PEKERJAAN STP 0,042 - - - - - - - - - - - - - - - - - - - - - - 0,006 0,006 0,006 0,006 0,006 0,006
- PEKERJAAN SUMUR RESAPAN 0,038 - - - - - - - - - - - - - - - - - - - - - - - 0,010 0,010 0,010 0,010 -
H PEKERJAAN SAMBUNGAN DAYA PLN 0,552 - - - - - - - - - - - - - - - - - 0,050 0,050 0,050 0,050 0,050 0,050 0,050 0,050 0,050 0,050 0,050
I PEKERJAAN SLO TEG MENEGAH & TEG RENDAH 0,132 - - - - - - - - - - - - - - - - - 0,012 0,012 0,012 0,012 0,012 0,012 0,012 0,012 0,012 0,012 0,012
J PEKERJAAN SAMBUNGAN PDAM - - - - - - - - - - - - - - - - - - 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003
K PEKERJAAN SAMBUNGAN TELKOM 0,018 - - - - - - - - - - - - - - - - - 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0,002 0
MINGGUAN (%) 100,000 0,196 0,283 0,934 1,397 1,384 1,680 2,227 2,968 3,134 3,915 4,615 4,911 4,892 4,943 4,973 4,955 4,977 5,079 5,113 5,034 5,047 5,035 4,880 4,857 4,510 3,673 2,690 1,699
RENCANA
KUMULATIF MINGGUAN (%) - 0,196 0,479 1,413 2,810 4,194 5,874 8,101 11,069 14,203 18,118 22,733 27,644 32,536 37,479 42,452 47,407 52,383 57,462 62,575 67,610 72,656 77,691 82,571 87,428 91,939 95,611 98,301 100,000
MINGGUAN (%) - 0,860 0,436 1,754 1,710 1,492 1,940 2,260 3,163 3,214 3,916 3,875 4,436 4,983 5,039 5,071 5,031 5,042 5,350 5,743 4,539 5,546 5,246 4,930 4,497 4,364 5,562
REALISASI
KUMULATIF MINGGUAN (%) - 0,860 1,296 3,050 4,760 6,252 8,192 10,452 13,615 16,829 20,744 24,619 29,055 34,038 39,077 44,149 49,180 54,222 59,572 65,316 69,855 75,401 80,646 85,577 90,074 94,438 100,000 100,000
MINGGUAN (%) 0,664 0,153 0,820 0,313 0,108 0,260 0,033 0,195 0,079 0,001 - 0,740 - 0,475 0,091 0,096 0,098 0,076 0,066 0,271 0,631 - 0,495 0,499 0,211 0,050 - 0,360 - 0,146 1,890
DEVIASI KUMULATIF MINGGUAN (%) - 0,664 0,817 1,637 1,950 2,058 2,318 2,351 2,546 2,626 2,627 1,886 1,411 1,502 1,599 1,697 1,773 1,839 2,110 2,740 2,246 2,744 2,955 3,005 2,646 2,499 4,389
DOKUMENTASI PROYEK
Tampak Isometri Gedung PRESISI DIV TIK POLRI Tahap 1 (Malam Hari) Tampak Isometri Gedung PRESISI DIV TIK POLRI Tahap 1 (Malam Hari)
Lobby Entrance Lantai 1 Landscape Landscape
Pump Room Lantai 1 Ruang Lobby Lift VVIP Lantai 1 Toilet Lantai 1
Area Parkir Lantai 2 Ruang Radiologi Lantai 2 Ruang Lobby Lift Passengers Lantai 2
Ruang Lobby Lift VVIP Lantai 2 Toilet Pria Lantai 2 Toilet Wanita Lantai 2
Ruang Rapat Lantai 3 Ruang Lobby Lift Passengers Lantai 3 Ruang Lobby Lift VVIP Lantai 3
Ruang Wudhu & Musholla Lantai 3 Toilet Pria Lantai 3 Toilet Wanita Lantai 3
Ruang Tunggu Kapus Pusdokkes Lantai 4 Ruang Kerja Kapus Pusdokkes Lantai 4 Ruang Istirahat Kapus Pusdokkes Lantai 4
Ruang SOC Lantai 5 Ruang Staff Banum Div Tik Lantai 5 Ruang Lobby Lift VVIP Lantai 5
Ruang Tunggu Pengembang Div Tik Lantai 6 Ruang Kerja Pengembang Div Tik Lantai 6 Ruang Istirahat Pengembang Div Tik Lantai 6
Ruang Lobby Lift Passengers Lantai 7 Ruang Lobby Lift VVIP Lantai 7
Ruang Cafetaria Lantai 8 Ruang Bagjiansiskom Lantai 8
Ruang Lobby Lift Passengers Lantai 8 Ruang Lobby Lift VVIP Lantai 8
Ruang Staff Div Tik Lantai 9 Ruang Storage Lantai 9
Ruang Maintenance Lantai Atap OutDoor dan Ruang Gudang Lantai Atap
KONSTRUKSI TERINTEGRASI RANCANG DAN BANGUN PEMBANGUNAN GEDUNG PRESISI DIV TIK POLRI TAHAP 1,
T. 8.500, 10 Lt, TEMPAT PARKIR T. 2.700 4 Lt.